Loading...
1352• i \ 'NOTE-" 2 With proper +validation R o this form constitutes an , CITY/bF LA QUINTA encroachment permit U APPLICATION FOR PERMIT g PUBLIC WORKS, CONSTRUCTION (ENCROACHMENT) 16; 1-t : r -OF TFt��w r For the construction of 'public or private curbs, driveways, pavements, sidewalks, ;parking lots, sewers, -water mains and other like public works, improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS ► Subdivision Improvement Permit- Class III DATE: 1-31-92 ' _ Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION _apn,617-020-003 Corner of Washington & Ave 50 (Street address or Description of Location) . , ,. *► PURPOSE OF CONSTRUCTIONstock pile dirt Sketch (attach construction plans if appropriate) .. Q 4 DESCRIPTION OF CONSTRUCTION` O�14 0 CA� 7 i1 TOTAL i-9� 424.00 ' see attached conditions 1%, DIMENSION..OF INSTALLATION OR REMOVAL r r Approx .', 6001* 105!x 3' r � SIZE OF EXCAVATION, IF NEEDED -92 s0 APPROXIMATE TIME WHEN WORK WILL BEGIN 2-03-92 i ' ^• GAH ;(9#�1,� } .7000.00 K- N APPROXIMATE TIME OF COMPLETION10-29-92 ESTIMATED CONSTRUCTION COST $" (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In, consideration of'the granting of this permit; the applicant hereby agrees to:. Indemnify,. defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from .claims or+court action and arising out of any accident, loss or damage to persons,or property happening Pr,occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. 7 . Notify the Administrative Authority at least twenty-four (24) hours in adv A of the time when work will be started. . Comply with all applicable City Ordinances, the terms and conditions of e permit an all applicabl rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the a ult of th`s o k. ~ Signatt re of App icant or Agent v Winchester'Aaset Mngnt Inc./Amcor Realty III 41-865 Boardwalk Ste 101 Paln.Di'itort,_CA 92260 Name'of Applicant (please print) ` Business Address Telephone No. xarutac ,� 77-$64 Country klub Dr. � `�" r .36 0 Name of Contractor and Job Foreman Business Address - Teleph ne No. , 27169 : Contractor's'Licerise 'No. City Business 'License No. Applicant's Insurance Company Policy Number ' FEES: Subdivision Improvement Permit - Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated "construction costs 1352, Minor Improvement Permit - Class IV: See attached schedule ■ Inspection Fee $ ( PERMIT VALIDATION Permit Fee4Z0 PERMIT NO. 1352 , Penalty 1/31/92 Cash Deposit -Surety Bond DATE APPROVED if required FOOD EXPIRATION DATE 10/29/92 . TOTAL: $���_0 DATE SSUED 1/31/91 Receipt No. By �- Received by Date Administrative Authority ty Recorded by TELEPHONE: (619) 564-2246 ST.'NE's•-+'+T�,pT�{�#iYti+r(CC�iM �'l' ,� a w y y.4`�jx+ I •r � 1 J F DEMAND-% CHECK REQUESt OF Return check to requestor Mail check Name /Title of person requesting check " Marcus Fuller, Assistant Engineer I Department individual is associated with: 3 Public Works/Engineering F t ' Check payable to: AmcorM Rye-Ity LII .- Amount: $ 7,000. (Name) (Vendor No.) 52300 Fnterpr4se Way Account Ner� 1 00-343�3±7 Y (Address Coachella, SCA $2236 Project Number: Permit - No. 1352 Check description and invoice number: RefundAP developer of security/deposit of $7,000 for ainstallation of so8i erosion 8 measures associated with stockpile permit ii1352,.issued 1/31/92. Signature: (Department ea (Date) APPROVED FOR PAYMENT (Finance Department Use Only) BY:' BY: ACCOUNT ISO.- r/7JE�1"ra tea- c M .`k'4, L� ,�� , .��:'-.*;C1t�?t4' e"3. '•'t ;. ir. s-v.Y'�:». .xi .... Return.check to requestor R -Mail check , Name /Title of person requesting check Marcus Fuller, Assistant Engineer I 3 Department individual is associated with:: , Public Works/Engineering J Check payable to: Amcor Realty III Amount: $ 7,000.00- (Name) (V ,000:00ame en or o. 52.300 Enterprise Way, ' Account Number: 101-000-443-317 Tress Coachella, CA 92236 Project Number: Permit No. 1352 Check description and invoice number: Refund to developer of security/deposit of ,$7,000 for .installation'of soil erosion measures associated with stockpile-permit #1352,,issued 1/31/92.:., DUNS No. 08-177-7104 SOLD AND INVOICE TO LOCATION NO. 21694 001 001 BARRETT CONSTRUCTION 51-870 AVENUE VILLA LAQUINTA, CA 92253 SHIP TO LOCATION NO. 21694 001 001 BARRETT CONSTRUCTION 51-870 AVENUE VILLA LAGUINTA, CA 92253 MAIL REMITTANCE TO: MIDWEST INDUSTRIAL SUPPLY, INC. P.O. BOX 8431 CANTON, OHIO 44711 PHONE: 330/456-3121 FAX: 330/456-3247 INVOICE DATE 05/01/97 NO. OF UNITS INVOICE NO. 26675 PURCHASE ORDER NO. NET QUANTITY SHIPPED VERBAL AMOUNT SALESMAN FRANK ELSWICV WORK ORDER NO. - 00012248 CARRIER MIDWEST INDUSTRIAL SUPPLY, INC. FREIGHT TERMS OTHER 6370.000/ PRO NO. 6/L N0. 12248 Delivered e-. Applied: 04/29/97 agent THRU 04/30/97 =M NO. NO. OF UNITS NET CONTENTS PER UNIT _ DESCRIPTION NET QUANTITY SHIPPED PRICE / UNIT AMOUNT 1 LT SOIL-SEMENT® dust and erosion control 1 LOT 6370.000/ 6,370.00 agent LOT } 13 ACRES.@ $490.00/ACRE SUB -TOTAL TERMS: 1% 10, NET 30 DAYS. SALES TAX A periodic rate of 11h% monthly as a FINANCE CHARGE will be added on FREIGHT $6,370.00 balance over 30 days, which is an ANNUAL PERCENTAGE RATE OF 18%. INVOICE TOTAL T4ht 4 lwa�rw MEMORANDU TO: Tom Hartung, Building & Safety Dir FROM: Steve Speer, Senior Enginee DATE: January 2, 1997 RE: Vacant Land: NEC Washington/Avenue 50 In January 1992, Public Works issued a dirt stock pile 'permit (#1352) to Amcor Realty III authorizing Tarmac to stock pile dirt on the subject property. The City received a$7,000 check as security for installation of soil erosion measures. The soil erosion measures were never implemented and according to Geniene in Finance, the City has not refunded the $7,000. I spoke to Fred Behrens (398-9520) with Amcor today regarding the unfulfilled soil erosion control requirement and the related $7,000 in cash security that we currently are holding. I mentioned we have two options: 1) they install the erosion control measures at there expense and obtain a full refund from the City, or 2) have the City administer implementation of the erosion control measures and draw down on the $7,000 that we have on hand. Mr. Behrens expressed an interest in having Amcor administer implementation of the control measures instead of the City. He indicated he will have his partner, Bob Wright, call. you tomorrow or early. next week to discuss what is needed. cc: Chris Vogt :Marcus Fuller Wally Nesbit. F:1P W DEPT%STAFM P EER WIEMOS19701028 ENCROACHMENT PERMIT CONDITIONS Permit No. 35 Z In addition to the other, conditions for the subject grading permit, the following requirements shall apply: 1. Permit is issued for the sole purpose of placing import fill material in a stockpile. 2. The location and configuration of the stockpile shall be as approved by the City Engineer. The stockpile shall be located so it will not interfere with any natural or existing drainage course. 3. Prior to beginning construction, permittee shall submit a permanent erosion control plan for approval by the City Engineer. Erosion.control shall be provided for all areas disturbed and may include, but not be limited to, seeding, irrigating and plant establishment. Plant establishment and growth shall be adequate to provide permanent protection against wind and water erosion. 4. Prior to placing material, the area to receive the stockpile shall be cleared and grubbed, removing vegetation and other material unsuitable for fill. 5. Permittee shall provide continuous dust control including, but not necessarily limited to, enclosure of disturbed areas and the stockpile with drift fencing and provision of a water truck or irrigation system to effect thorough watering of all areas disturbed and of the stockpile itself. The water source is subject to approval of CVWD. 6. Haul traffic shall be restricted to the street sections, access and egress points as follows: A GC.E SS ; WAsHi N CTo 0 ao a -1-1f e vw oj'�, ec- s �Q � kyr- ���STTi�aytP1D 7. Permittee shall furnish, install and maintain stop signs to control construction traffic entering 50th Ave at the egress point(s). 8. If the City Engineer determines that permittee's operations are obstructing or endangering traffic or pedestrians, Permittee may be required to submit a traffic control plan for review and approval and to abide by the conditions of the approved plan. 7. Permittee shall take any necessary steps to avoid depositing material on streets along the haul route. Spilled and tracked material shall be cleaned, at a minimum, at the end of each work day. If necessary to control airborne dust or avert traffic hazards, spillage and trackage shall be cleaned immediately and/or continuously. Encroachment Permit Conditions Page 1 of 2 8. Permittee shall be responsible for repair of any damage or deterioration of pavement, shoulders or other improvements to city streets or other city, facilities which, in the opinion of the City Engineer, is caused -by permittee's operations. 9. Upon completion of the permitted work, permittee shall obliterate and render unpassable any on-site haul roads established to facilitate the permitted work. 10. The stockpile shall be completed within nine months from the date of the permit. Plant establishment (erosion control) shall be completed not more than 90 days thereafter. 11. The permit/inspection fee shall be $420. 12. The developer shall provide security in the amount of $7,000 to assure full compliance with erosion control and street cleaning requirements. Acceptable forms of security are performance bond, letter of credit, and certificate of deposit in favor of the city. Encroachment Permit Conditions H.I. 1 ...f Page 2 of 2 DEPOSIT AGREEMENT Amcor Realty Fund III hereby submits to the City of La Quinta Check No. _/.3 7- in the amount 'of $7,000.00 to provide security in accordance with requirement No. 10 of the attached Encroachment Permit Conditions regarding Washington Street and Avenue 50, APN 617-020-.003. It is agreed that proceeds from said check shall be held by the City until January 28, 1993 and shall only be used by the City in the event that Amcor Realty Fund III has not completed erosion control by January 28, 1993. It is further agreed that in any event said proceeds shall not be used by the City without 30 days advance notice to Amcor Realty Fund III in order that Amcor has the opportunity to remedy, if any, uncompleted erosion control. Lastly, it is agreed that if by January 28, 1993 said erosion control is complete, the, entire proceeds shall be returned to Amcor. Further, if the erosion control is not complete by January 28, 1993 and the City has to use but a portion of the proceeds that any unused proceeds remaining shall be returned to Amcor. . Behrens General Partner Amcor Realty III 39% -9s2 -Q ��9- Date: 3 Z 9971 -C -KD City of La QuIrVa by !TMY6 5PECP Date • 3� G 0, I-Pl� 'm 0-1l U 6 1N Ion N �J` NOTE: With Proper validation this torm conatitutas an encroachment permit CITY OF LA GUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the constnscdon of public or private Curbs, driveways, RawmeMt, sidewalk@; parking Tots, rawer, vveter mels and other like public works Improvements in aonnecdon with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 1-27-92 Subdivision Immo mlint Permit — Clan III Minor APN 617-020-003 Corner of Washingtontbran Claw w LOCATION OF CONSTRUCTION Street and Avenue 50. seises adapts or Deamptton at Laoetion) PURPOSE OF CONSTRUCTION Stock Pile Dirt Sketch Construction piano if appropriate) DESCRIPTION OF CONSTRUCTION—Stock P 1 e jr—t See attached plan DIMENSION OF STALLATION OR REMOVAL roxlmae 600' x 1(��jx 31 SIZE OF EXCAVATION, IF NEEDED APPROXIMATC Time WHEN WORK WILL BEGIN 1 -29 -9'Z --- APPROXIMATE TIME OF COMPLETION - 10-22-92 ESTIMATED — — ESTIMATED CONSTRUCTION COSTS (Indudielg removal of all obsdrtsatlon, materiels, and debris, backfilling, corn• paodon and placing permanent resurfacing and/or replacing Improvermitu) In consideration of the granting of this permit, ft applicant hereby agrees tol Indemnity,•detend and eve the Chy, Its authorlsod oaams, offtaro, reprenmmlyrot and emNaym, h mi se from and asalmt eery and SII pans"In' lkibllhin ser Inst muldnp from pial" ter court cation and Indra out of env neltlent, "of damps to psrtOM or ortaorty hap ming a amrrh a at a pesu:lmoto essuh of env work undsruMn under- the permit eramad puentent to this onlleatlsa. ffotltV the Adminbvethra Authoettvy at Icor r^jmy faur (141 heart In adgnee at tM time when work w111 be at~. Comply VAth oil appllnW OIN Ordinansw, the teems turd saMltfene of the le"It and ail appllssWs ru e I and ropof the Ohy of 4 Quints and to pay for any Additionalreolaaement no"MV at the suit of this �"L 116�11 /"�� Winchester Asset Management, Inc. g r wre of ARPil t or L on behalf of Amcor Realty III QGp� . y, Z ri Name of Applicant (please prIM) Bwlnae Address f Telephone, No. Tarmac * 77-564 Country Club Dr., Palm Desert 360-4500 Nam of Contractor and ,bob Pommcn Burrow Address Taiepporhe No. 271769 Contractor's Limns No. City Business License No. ARRlloont's Inwrsnoe Company Polley Number FEES: Subdivlslon Improvement Permit —Class III Public Improvamentst 3% of estimated construction casts Private Improvenantss 3% Of at1111sud construction corp Minor Ifnorovement Permit — Claa IVs See attached schedule Impeetion,Fee 8 Permit Fee Pafsalty , Cash Deposit -Surety Bond It required TOTAL: $ Rewipt No. Received by One,.�� Recorded by 1200) PERMIT VALIDATION PERMIT NO. DATE APPROVED EXPIRATION DATE DATE ISSUED BV Administrative Authority TELEPHONE: (010) $044248 ENCROAcHmENT PERMrr CONDITIONS In addition to the other conditions for the subject grading permit, the followi.-ig requirements shall apply: 1, Permit is issued for the sole purpose of placing import fill material in a stockpile. 2. The stockpile shall be located so it will not interfere with any natural or existing drainage course for storm water. 3. Prior to beginning construction, permittee shall submit an erosion control plan for approval by the City Engineer. Erosion control shall be provided for all area involved and may include, but not be limited to, seeding, irrigating and plant establishment. Plant establishment and growth shall be adequate to provide satisfactory permanent protection against wind and water erosion. 4. Prior to placing material, the area to receive the stockpile shall be cleared and grubbed, removing . vegetation and other material unsuitable for fill. S. Haul traffic shall be restricted to -the street sections, access and egress points as follows: Washington Street and Avenue 50 (see attached plan) 6. Permittee shall take any necessary steps to avoid depositing material on streets along the haul route. Spilled and tracked material shall be cleaned, at a minimum, at the end of each work day. If necessary to control airborne dust or avert traffic hazards, spillage and trackage shall be cleaned immediately and/or continuously. I Permittee shall provide temporary dust control during operations including thorough watering of all areas disturbed and of the stockpile itself. The water source is subject to approval of CVWD. S. The stockpile shall be completed within nine months from the date of the permit, Plant establishment (=sion control) shall be completed not more than 90 days thereafter. 9. The permit/inspection fee shall be $ 420 10. The developer shall provide security in the amount of $ 7, 000 to assure full compliance with erosion control and street cleaning requirements, Acceptable forms of security are performance bond, letter of credit, and certificate of deposit in favor of the city. r. LN NUEVO ENGINEERING , INC. 79-811 COUNTRY CLUB DRIVE • BERMUDA DUNES, CA 92201 9 619/345-1778 GENERAL ENGINEERING CONTRACTOR - LICENSE #438834 PROPOSAL S CONTRACT Page No. of Pages TO City of La Quinta PHONE 564-2246 DATE ' 1_10/16/91 JOB P.O. Box 1504 Temporary Waterlin Installation La-Quinta, CA 92253 N. of Tampico at Channel Attn: Hector Guzman We hereby submit specifications and estimates for: INSTALL TEMPORARY WATERLINE L.S. $ 7,000.00 PROPOSAL NOTES 1. Bid includes listed items only. 2. Bid excludes: a) Engineering, inspections, and permit fees, and b) Construction water costs. 3. Nuevo Engineering, -Inc. will set up and remove the pipe. 4. The City will be responsible for maintenance, damage or loss of pipe during use. 5. The above price is good for one month's rent. Rent for additional months is $ 4,000/mo. MP f roposP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:' dollars ($ ) Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike Authorized manner according to standard practices. Any alteration or deviation from above specifica• Signature tions irivolving extra casts will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or Note: This proposal may be withdrawn delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our by us if not.accepted within days. workers arefully covered by Workmen's Compensation Insurance.. Arreptaurr of fThe above specifications -r—nVDB81- prices, and conditions are satisfactory and are hereby accepted. You are authorized to Signature do the work as specified. Payment will be made as outlilned above. Date of Acceptance: Signature � 7 • '� .�tir�}Kfa�"r� ��� � i � o7,"y'"°',""'i'•"" �yc-'—_:,,..•s\`'•,.� �'T �ly��''Fcrw `��S t•' ,��r`.• _,-. � 1•, NUEVO ENGINEERING ,INC. 79-81 1COUNTRY CLUB DRIVE •. BERMUDA DUNES, CA 92201 • 619/345-1778 r GENERAL ENGINEERING CONTRACTOR - LICENSE #438834 PROPOSAL & CONTRACT Page No. of Pages � TO , ! City of La Quinta �� PHONE 564-2246 DATE 10/16/91 JOB P.O. Box 1504 Temporary Waterlin Installation La Quinta, CA 92253 N. of Tampico at Channel Attn: Hector Guzman We hereby submit specifications and estimates for: r INSTALL(TEMPORARY WATERLINE L.S. $ 7,000-.00 PROPOSAL NO ES , 1. Bidt lnclddes li-sted -items only. y 2.. Bid excludes:C•a),Engineering, inspections, and permit fees, and . }. '' b ), Construction'' -water costs. .,3.• Nuevo Engineering, Inc. will set up and remove the pipe.. .'The Ci�tyswiTl .be responsible for maintenance, damage or loss of use., g ,5. • The 'above' price• is good for one month's rent. Rent for -additional' months is $ 4,000/mo. r } ' i �'v��I•a �' ' .. w �'t - • 4 1 1 -_ ....y�.� ,,,,.., t_• ,"�}._„».#'.,-;.�r_._.=t.-:-iL�Y.,....�,,,.,._. ...:r.:.d.1_._ £•;.,r.a.�, e,3_ ry.t....-e�,,..>::�:._..�..__.e.+*1s�..,•",, . 18P 11ra'p"P. hereby to furnish material and labor — complete.in accordance with above specifications, for the sumo , f: '-� L dollars ($ r• 1 , .Payment to be made as follows: ref` t{ ' All material is guaranteed to be as specified. All work to be completed in a workmanlike Authorized manner according -to standard practices. Any alteration or deviation from above specitica-. Signature tions involving extra costs will be executed only upon written orders, and will become an extra , charge over and above the -estimate. All agreements contingent upon strikes, accidents or -Note: This proposal may be withdrawn delays beyond our control. Owner to carry fire, tornado and other necessary insurarice. Our by u5 if no1.2CCepted within days. ' workers are fully covered by Workmen's Compensation Insurance. Arre++.�. ptanre of f ropos�l- The above specifications ^^ •. prices, and conditions are satisfactory and are hereby accepted. You are authorized to Signature do the work as specified. Payment will be made as outlilned above.- l Date of Acceptance: Signature r FDCP APPLICATION: SMALL SCALE PROJECTS (5 ACRES OR LESS). V to (1370 01 fol Small Scale Construction/Demolition Projects�5 Acres or Less)' Fugitive Dust (PM10) Mitigation Ian Date: Jurisdiction: File #: Part 1 • Project Information Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: Address: , J� _�W Day phone number: Emergency phone number: Grading contractor (Contact Person): Address: 5� : L! Day phone number: 11 _zd_ 3S � Emergency phone number: 7/4/ -%9 7"&l 3 Construction site street address: �' e o� `�K Ct Construction site location: N E Corker a cts i"-04- -a SAV(, (Please include an 8.5 x 11 location map) 70 Construction site assessor's parcel number (Tract #): yr Parcel (Tract) size: Acres or Square feet Anticipated date of physical project initiation: Wry Anticipated date of project completion: %5: A a'7 Anticipated costs for dust suppression: 00 (Attachment B - Must also be completed and mailed to the appropriate address when construction activities have been completed) 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403:1. Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the letter beneath the fugitive dust sources listed below. Please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating what measures are to be implemented, complete the 'Details" section by describing how and when the. measures are to be implemented. RG FG FC Details (e.g., frequency of application number and type of dust control imalements. etc. Please be as specific as possible) Unpaved Roads Storage Piles A- —V Cflrrlr�.� nr WN 5aDVJa a 14104- _fi7Zk to Ore, IYI&tAV-1-- Ka�ed.Road.'&�Ic�t ,AQ � �1 e ,5- k\ be, . +o- aavv�-- RG FG FC Details (e.g.. frequency of application number and tme of dust control implements. etc. Please be as specific as possible) Land Clearing or Earth -Moving Disturbed Surface Areas Part 3 - Agreement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that. all measures specified in Part 2 will be implemented during. project construction. I authorize the City of La Qu i nta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this project.. I also agree to complete the record-keeping requirements included herein as Attachment B once the project has been completed. or I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorizodlthe implementation of all its provisions thloughopt project buildout. same aVbove) For City Use Only Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved Conditionally.approved`(Conditions specified below) Denied (Explanation attached):::. Signature of City Representative (Date)' The following conditions of approval: have been: added to the. Plan by staff in order to ensure: an: adequate level of fugitive dust. control (Attach additional m ormation if necessary I have read the above conditions of the Fugitive Dust (PM10) Mitigation Plan and I agree to implement all provisions at the concentrations and frequencies identified. Signature of Owner or Authorized Representative ate ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Source Control Measures (1) Land (A) Watering Clearing/ Earth- moving Comments o Application of water by means of truck, hoses,and/ or sprinklers prior to any land clearing or earth movement will increase the moisture content thereby increasing stability of material o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas.which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o .Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation . (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist. o Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available Source Control Measures (2) Unpaved (1) Reduce speed limits Roads (Cont'd) (J) Reduce vehicle trips ----------------------------------------- (3) Storage (K) Wind sheltering Piles (L) Wet suppression Comments o 15 mile per hour maximum o Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent ------------------------------------------------------------------------------------ o Choices include silos or enclosures o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings (4) Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved Road areas Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full -------------------------=--------------------------------------------------------------------=-=------------------------------------------ (5) Disturbed (S) Chemical stabilization o Vendors can supply information on methods for application and Areas/ required concentrations Inactive Construction Sites (T) Watering o Would require frequent applications unless a crust can be developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant, native vegetation is encouraged ATTACHMENT B - COST INFORMATION Small Scale Construction/Demolition Projects�5 acres or Less) Fugitive Dust (PM10) Mitigation Pan Date: Jurisdiction: Project File #: Project proponent: Address: Ki Day phone number: ��� , ���� Emergency phone number: In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. o® �1�y0.1 R n"': A , Watering: Chemical stabilization: Wind fencing: Covering haul vehicles: Wheel washers: Street sweeping: Paving: Wind sheltering: Coverings: Vegetation reestablishment: U Y After project completion these records shall be transmitted to the Jurisdiction where the grading/demolition permit, was attained and to the Coachella Valley Association of Governments (CVAG) at the address provided below. PM 10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 CEN,t h CONTRACTORS CORPORATE OFFICE - 1694 91 st Avenue N.E. - Blaine, Minnesota 55449 - (612) 786-6510 - Fax (612) 786-6602 SOUTHWESTERN DIVISION - 16415 Addison Road, Suite 308 - Dallas, Texas 75248 - (214) 931-9494 - Fax (214) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 -.(909) 795-2568 - Fax (909) 795-1840 AMCORE • 6193989532 • P.01 - P AMCOR CAPITAL CDRPOR.�1T[ON 33300 Enterprise Way • Coachella • CA • 92236 Telephone (619) 398-9520 FAX (619) 398.9530 TO: COMPANY: FAX: FACSIMILE TRANSMITTAL TE: S -, f- yK TOTAL PAGES: �. FROM: ' FREDBEHRENS 13 ROBERT WRIGHT P"-"'GRACEN JOHNSEN 17. ED MADIGAN ❑ PATTI GOMEZ D BARRY JONES 0 HILLY JONES b PARK ROMNEY O d CHECK ONE I& MESSAGE: P --"-NORMAL PROCESSING C1 CONFIDENTIAL--ATTORNEY/CLIENT PRIVILEGE t7 CALL TO CONFIRM 0 ORIGINAL TO FOLLOW BY MAIL/OVER NIGHT 'M Pl aME CAM 61*39&9s2p SHOULD .TEM BE My PR0Uj3j s a r' AMCOR+ 6193989532 P.02 na � AMCOR CAPITAL c0Rp0jjATi()N 52.900Entepri a WaV Coachella • CA • 922.36 Telephone (619).19' .9520 • PAX (619) 398-9530 I March 3, 1994 VIA FACSIMILE TO: FROM: RE: c DAVID COSPER, DIRECTOR OF PUBLIC WORKS CITY OF LA QUINTA ROBERT A. WRIGHT, PRESIDENT PROPERTY LOCATED AT THE NORTH EAST CORNER, WASHINGTON & AVE. 50 This is to advise you that Mr. Joe Swain of JASCORP has authorization to move clean fill -dirt on to the above referenced property, This property is owned by AMCOR Realty Fund III, a California limited partnership of which I am General Partner and AMCOR is Managing Agent. Please feel welcome to contact me at the above number should you have any questions. Sincerely, obert A. Wright President RAW/gj cc: Joe .Swain, JASCORP LVZ—C) ,00 COTE: v With proper validation rt Q O this form constitutes an CITY OF LA QUINTA encroachment permit � 5 APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) OF For the construction of public or .private curbs, driveways,. pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit -Class III + DATE: 1-31-92 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION apn 617-020-003 Corner of Washington & Ave 50 (Street address or Description of Location) PURPOSE OF CONSTRUCTION stock pile dirt Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION . " + '-•- = see attached conditions DIMENSION OF INSTALLATION OR REMOVAL Approx. 600'x 1051x 3' SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 2-03-92 - APPROXIMATE TIME OF COMPLETION 10-29-92 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of,the granting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims- or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in adva of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions ofM permit a%i all applicable ules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the p4jGjt ofth' Signa re of App}Scant or Agent/rdw /, / f✓ Winchester Asset Mngnt Inc./Amcor Realty III 41-86/5 Board/walk Ste 10 Palm esert, A 92260 Name of Applicant (please print) Business Address Telephone No. . Tarmac 77-564 Country Club Dr. 360-4500 Name of Contractor and Job Foreman Business Address Telephone No. 27169 Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class II I Public improvements: 3% of estimated construction costs '7 Private improvements: 3% of estimated construction costs;. - Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ PERMIT VALIDATION Permit Fee �i Z 1352 PERMIT NO. Penalty Cash Deposit -Surety Bond DATE APPROVED 1/31/92 if required -700D EXPIRATION DATE 10/29/92 TOTAL: $ -7 4 ZO 1/31/91 Receipt No. Received by Date Recorded by DATE SUED By Administrative Authority TELEPHONE: (619) 564-2246