Loading...
1527NOTE:.; With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: August 31, 1992 Subdivision Improvement Permit — Class II I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION HWY 111 acid Washington N/E corner 1 treet address or Description of Location) PURPOSE OF CONSTRUCTION Shopping center improvement Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Street improvement SEE XASHINGTON ST. IMPROVEMENT PLANS. r DIMENSION OF INSTALLATION OR REMOVAL Sae plan SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 9/14/92 APPROXIMATE TIME OF COMPLETION 60 days ESTIMATED CONSTRUCTION COST $ 150.000 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) I In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. ` a1 Signature , App scant or Agent Near Cal Crop. 600 Central Ave. Bldg A, Lake Elsinor, CA (714)245-5400 Name of Applicant (please print) Business Address Telephone No. Same Name of Contractor and Job Foreman Business Address Telephone No. A/B 23077 752 Contractor's License No. City Business License No. On file On file Applicant's Insurance Company Pol�icy,(Vt�r ,e�nag:l,.t�n� ,0 10 .--FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. tReceived by Recorded by $ 1,500.00 $ 1,500.00 Date 17 PERMIT VALIDATION PERMIT NO. — DATE APPROVED 1527 8/31/92 EXPIRATION DATE DATE IS UE 8/31/92 By Administrative Authority TELEPHONE: (619) 564-2246 OCT -22-'92 13:38 ID:DIST 11%TRAFFIC_ DES r TEL NO:6192383162**86313162 #134 P81 Bei WARNIA MOPARTMPMT f» YPANSPORTATION IC T R A N S. DATE: SEND TO: NAME: DEPARTMENT: PHONE #: FAX #: FROM: CALTRANS DISTRICT 11 CITY: SAN DIEGO NAME: L 0� � �`� Q� S' C'� Y11 PHONE # FAX #: (619) 6$6-3162 TOTAL PAGES TO FOLLOW: � CL ER NUMER LO w Ca V LL u - Q uO Q ( ITEM NUMBER "UNIT ISSUE ITEM NAME QUANTITY IL 744001.706 EA 170 CONTROLLER N 2 744061710 EA DUAL ACIA 174 CONTROLLED ---- 13 744001797 744001316 EA EA 332 CABINET C2P HARNESS �9J� 51 744001304. EA 408 RODER ®N� 6 744002902 I EA SIlCUPW 200 'fi Et_�lE 7 744003300 EA DETEC-1' MODEL 222 744003702 EA DETEC-4 MODEL 224 9 744004755 EA ISOLATR2 MODEL 242 Two k0 744001951 EA ISOLATR MODEL 252 11 744005505 ER 420 allX LOAD FILE ' 12 ?,!o Z lsc-gov. 13 14 m r� N Q1 �I f - V O ' WASHINGTON/ADAMS PARTNERSHIP 0002226 DATE 08/25/92 INVOICE NO. DESCRIPTION 082592 WASHINGTON ST. PERMIT INVOICE AMOUNT 1,500.00 DEDUCTION BALANCE 1,500.00 c- 7 CHECK PATE CHECK 08/27/92 NUMBER 22G6 TOTALS 1,500.00 1,500.00 PLEASE SPECIAL CONDITIONS --PERMIT NO. 1527 --- Washington Street --- In addition to the standard permit conditions, the following shall apply: 1. All work shall be performed in accordance with the Washington Street Improvement plans prepared by Hall & Foreman Inc. and approved by the city on 9-09-92 2. Permittee shall be responsible for providing continuous dust and erosion control. Permittee shall submit an erosion control plan for city approval prior to issuance of the permit. The plan shall address temporary control measures as well as permanent stabilization after construction is complete. The plan shall .become part of the permit. Permittee shall furnish the name(s) and phone number(s) of the individuals) responsible for maintaining dust control after hours, weekends, holidays, etc. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4., Contractor shall comply with the local noise ordinance. Operation and maintenance of equipment within one half mile of human occupancy shall be performed only during the following time periods:' October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 P.M. Work shall be prohibited on legal holidays including Sundays. 5. Permittee shall assume responsibility for repair of any pavement breakdown at the haul road access to any public orprivate street and for any damage to other City, streets or facilities. 6. Any on-site haul or construction access roads shall be effectively destroyed at the conclusion of the work to prevent continuing use by vehicles unrelated to the work authorized by the permit. 7. Advance warning signs and traffic control shall'be installed and maintained in accordance with Cal Trans Standards. Permittee shall submit a traffic control/circulation plan for approval by the City Engineer prior to the start of any work. 8. Permittee shall notify the City Engineering Dept. at 564-2246 at least 24 hours in advance of starting construction. 9. Prior to the start of the clearing and grubbing operation, permittee shall pre - water the area to be graded to prevent airborne dust. 10. In advance of excavation, Contractor/permittee shall submit to the city for acceptance a detailed plan, in accordance with Labor Code Section 6705, showing the design or .shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard'of caving ground during the.excavation of -any trench or trenches five feet or more in depth. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. As a part of the plan, a note shall be included stating that the registered civil or structural engineer certified that the plan complies with the Cal OSHA Construction Safety Orders or that the plan is not less effective than the shoring, bracing, sloping, or other provision of the Construction Safety Orders. Special Conditions - Permit No. 1527 t Page 1 of 2 11. Storm drain systems in the CVWD right of way are not included in this permit. 12. The contractor shall pay prevailing wages and provide certified payrolls to the city. 13. Contractor/ permittee shall provide the city with a construction schedule that includes each item of work with a duration of 2 days or'greater. The schedule shall be submitted to the city for approval prior to any work. 14. Contractor shall schedule a pre -construction meeting and shall notify all parties involved a minimum of 3 working days in advance. 15. * No work on Washington St. will be permitted on Friday March 19, 1993, work on other fridays will only be permitted between the hours of 9am & 3pm. This permit is for all the work, and only the work, shown on plans labeled "City of La Quinta Washington Street Improvements, approved by the city on 9-09-92. The permit fee, based on a construction cost of $150,000, is $1,500. * Condition added to permit extension V Special Conditions - Permit No. 1527 Page 2 of 2 T4&t 4 C Qamm 78-105 CALLE ESTADO - LA QUINTA, CALIFORNIA 92253 - (619).564-2246 March 18, 1993 Near Cal .Corp. 600 Central Ave. Bldg A Lake Elsinore, CA 92530 Attn: Marty Clark Re: Encroachment Permit No. 1527 Dear Mr. Clark: The City of La Quinta hereby grants Near Cal Corporation a time extension on Encroachment Permit No. 1527, for the Washington Street Improvements, with all conditions remaining in effect and the additional condition below: Work on Washington Street to be performed on fridays shall only be performed during - 9am and 3pm. No work will be permitted on Friday March 18, 1993 The new expiration date will be April 16, 1993. Please notify the City Engineering Department 24 hours in advance of the time when work will begin. If you have any questions regarding this matter, please contact me at (619) 564-2246 (ext.226). Very truly yours, Hector Guzman Engineering Technician HG/hg cc: John Freeland Mike Hudson Anthony Moreno Encroachment Permit File No. 1527 MAILING ADDRESS ; P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253 e— — — — — — r. — — — — — — — — — — — — --- — — - — — — — — — — — — — — y - — — — — — — — — — SFr t:w' •+. '``� �1 � Y '1' '.. a. _ r atraz+rsa�IBl41 is"{OI�J!�l�y � A>y PRp,�N ' * !q!Jot{1rd tnp `/ l$ t► %4-*, b /� I. ..r..�. tw,rr Aa pRAlaoat r a 141"Og k .eot, late js :-1vJ.ot W�1 pv, WT02 pun molrg•illamc u"3 f LAS I 1 r �� ta). owoui Islipstmij )MI puasq .01490d �, � •iep.uaT prlpaia af3 !/1i +rs9 — ilu+utl iuruwnaJ W 1 iw•itW r J n MOO 4J6jWuUutl% p.itiU!ttf !a tit rnw*u,*AdUJWI 61tr1+4 c' w • tstbe '.l*jMmj%rjOc P.uwisn;t %q :nwtU3"jAwi cilge4 ' til N��p, sstw�e� fu.ur....lsewi W"lr;�I►1"d '7ia�0 lop �� 1� �p agyr.� Ae+1od ��� 7`y�Auidw N rJvuatul t,vJ1:1'ady .-- roM MuiGt! ! nRusn� Aslp 'aN t14IIall I,J93Dinw� LQ0 CZ roy tuaude a{. eta:p0y n►alirl0 ulwuaai Oar Pua Jamfj;Uep to ",q ' sN "m4�i°1. nomy imilMq (w1Ad a.ao1±1 svpiycldy la rwsN 06A5S'h2h/L. t.- _ toady Ja tuaeiltltl•/!;b a�Jr„fe�uQ�B� � . r I/� '� i"!!�1 140 j0 SiRrtJ r J1 fr AJli1CJtY SLtWIM AtJ JIUCIlleM 4L1 Kj Ato at cue nu,n 41W, $0 anq.tq tirf p..gn 04n1!tt� ii• Poe i u.tc rtp 1m wgilpvm Pur r uJ1i t t1 wlvruiWO ^41ZIMM'IdeW ;It 4i!.. AJOW7:1 •pWtV* " iV^ 110- w,V- -wit .w ;• •rout. 6, .:nay.h i C ,"wj.A.w..m as .! i,ir gi,iayynp rrljahs�u)titp'y a':i Nt10N t• rfi,•w i,.1..e . ,�. t.r,..�•r .!,t,.w r,• . .. Ap�...w...•. ��".. u,. (w fi.r q..1�. .. rr.. ,.m •� n...ftrfry eupdo'c .a %vubd 01 R1TWt9 10 tfO 114ANAM 4:7 M tt'* fu:ttla OUR VOWS 14rWM JO f,:itteR kudl t{flt^t.'J Mf r♦ .it`Illrtr:l 4y1/wrerl ' �.. � • Itt /'JT ,W1iNt}^If RV/iLNY71.ltJ�M!•4701}1�lYI.M� Nry(1RV4M'•�Ti �T,�l�.l:s�f.it•.tagos ane yW.4+a +wl v+s Y+..a.}..'N!Ywewf rt S 1011%1#61 1gV114 414%'1[u,JRd 14q% ;a UJIMA ail ;o U01t Joo!tuos ul I;r �'� „ InuouJteafew(:JSulaadeJ Jnfpul 9U1OtJ4”. 4 1MUru:,fad bul0tld put uonsed •wey •�Lil(ljlFtq'tr1S0II C::f •titJ.ltltisAl •uCtlnnntge. ilfr to lwiaar.J B,opr�f{} o'er%;fir--� a,too T+a�onwasl toe an.tiwlaea 40 Ol+{tta•Lt+wJJOJiJJ�d <<' ; .• 'a' � • 2b,bt �I�i_-t�a�C✓� :�IE1:6 Z�1lA �;s�4.v M3H,w 3P�i1L �.t'dYr�X�addv� a,; d -�75� as9nex d!'Nnl mmix@ dG $Y!5 WOMB WO N0UV*"V4VNj 90 N010014M cam._-on,-�+ses�-�'tau��'n���'2�f�S' Nolc�nw�auo�aona!�trtwa i . ! tnT!Jae,cet J; .utld uolsen:itJa� 1,atuitirl:exgn� �r' / �►v't ed is e,' NCI�O!"FJ18N7J d4 �SOdEfs id ' � '+'� � w � �w+Jn1= Je vend!,+ma Ja rrrJq,r .t.�1 l�_ • („ off. � t� � 1f s,:�,,•; �..(� _ _ 1, • � � ��f � � �-� Vit; ��►u',;� f l�,y l// "' tip1��n��u�� �Q ��t��- t Al'RIC tluutlwt.arCJdtijmja W G,: °-r---� IH tta iIW�� wauianadi:Ji ugtu{pgn� - ,: . '>;S'I?i`I!'lr;fh��3N^'i�t'!?�+ttlhifirVil�t?YdWI 1t^ldlWl�IMueltelt:u4o nl e4sr,...exl:lq .wr,uf �,��r e.�i ,..fin ,.,��. ' ! f .,ltwl .tuvN t3lAMM :"!!i ttY,ttR :v!�rHtap M111410AY4 •RntnuAltp 'tgJro #11AIJe J. tInAn gn.:J7pGtt.Lud7 oq>, Jos ,•�� _ � i�r1�WW0�o►r0o��1 IuolsOn�azcNo0.4�u0!u �iti8na �x�' X ® a� LIWU2d 61?d NOUV01144r y V t Nlno vn t[Q Allt� J!mJ1a Ivat'ytploAavt ' ^ �, u* ilirt3!SNoD 4Jitl{ iJJ!S • . � toleF111AAROOJ'}'�l�A .. R.i �.,.. .,r,.,.",.. ..,.. .' , tru+.n+• t IIiVJi.!ti t ItJ...l )..f1 + Ifl11t Jatllll!!til'tl:t YIS.16lV�'!'.!` t11.11j�.`+6•' 't � �t.._t•,— —.__� �.�.e�! _.. , � —"— -�— — —'—�— — — —�Ql— = — —— — — — — �• , ..,�r►-�•+.s.�cCt,sl7r#"r#'k:iati.'r�•�+t��.+�s•i uta'....s�•.'red"',�y;,�,"-,'.•t;.,+a5t�+.n�.:..a.-::.+1: .,i, _ _„�,.-.� f b The following General and Special Provisions are attached to and made a pan of Permit No. �S Z 7 GENERAL PROVISIONS The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it shall be the responsibility of the permittee (or his contractors) to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred. City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing- shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Work ENnspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified 24 Hrs. in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event -it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to•their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt bythe permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The follwing shall apply ONLY when indicated: NOTIFICATION: Permittee shall notify the City at 564-2246 at least 48 hours in advance of starting construction. R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than 6 shall be furnished in the name of City of La Quinta to cover all work involved in the restoration of the various La Quinta roads and survey monuments. This bond shall be continuous until cancelled by the City Engineer. This bond must be posted prior to commencement of any work on this project . UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of wayauthorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R4 UTILITY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R5 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R6 PARKWAY GRADING: -Area between the property line and top of the proposed concrete curb shall be graded to a slope of 1/4 inch to one foot (1 �. R7 GRADES & STAKES: City of La Quinta shall establish grades and stakes for the proposed concrete curb and gutter construction. R8 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. R10 DRIVEWAYS, A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2-1/2 inches of A.C. paving placed on (_;') of class aggregate base. Driveway construction shall conform to attached drawing. R11 CULVERTS: A inch diameter( )culvert shall be installed with the invert approximately 1- 1 /2 inches below and in line with the existing flow line. Culvert installation shall conform to the attached drawing. 12 IGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained. R13 SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall comply with th manufacturer's specifications. R1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may be readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion of replacement of all survey monuments for proper project clearance. RD -31 n R16 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments shall be tied out by City of La Quinta and suitable payment or guarantee of payment shall be made as reimbursement for all work+involved. R17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be corrected. R1 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to pavement straight edge shall be corrected. LIMIT OF EXCAVATIONS: Excavations shall be limited to 1,000 linealfeetof open trench before backfill operations must begin. All excavations shall be properly barricadedwith lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R20 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongyor saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in lifts of notgreaterthan three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods maybe substituted, but in any case a relative compaction of 95 percent shall be attained within the structural section of the roadway. R2 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (51 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greatO compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. COMPACTION TESTS: If so required by the inspector• compaction tests shall be made at intervalsof not more than 1.008 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications. Division of Highways, State of California, dated January 1973. (_R2,p COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications. Division of Highways, State of California, dated January 1973. R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations• a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch consisting of two inches (2') of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill and compaction, a temporary patch consisting of two inches (2'1 of cold mix paving (SC -800) shall be placed immediately. A permanent patch of three inches (3') of A.C. surfacing shall be placed on six inches (6") concrete base as directed, but not later than fifteen (15) days after completion of temporary paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section 37, Standard Specifications, State of California, Division of Highways, dated January 1973. Work of pavement repair to be accomplished by a licensed contractor engaged in the business of pavement repair. 30 STREET RESTRIPING: Where streetstriping is still visibleon streelstobe excavated. such striping shall be replacedupon completion of permanent repairs. R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safelywithout interference or hazardto the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be removed in sections which can be handled safelywithout interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and/or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California. dated January 1973. R32 TREE TRIMMING: a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year. All broken or weak sections within the trimming shall be removed. b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500feet at any one time. Adequate signs, flagmen, and/or barricades shall be provided to protect the traveling public at all times. c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided by this permit. d. All tree trimming on EVERGREEN TREES, PALM TREES, and other ORNAMENTAL TREES shall be accomplished to the satisfaction of the City Public Works Inspector. e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees. I. Pruning shall, in all instances, be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches (2") and above in s,ze. Sealant shall be applied to all cut sections as directed by the City Public Works Inspector. SPECIAL CONDITIONS --PERMIT NO. 1527 --- Washington Street --- In addition to the standard permit conditions, the following shall apply: 1. All work shall be performed in accordance with the Washington Street Improvement plans prepared by Hall & Foreman Inc. and approved by the city on 9-09-92 2.• Permittee shall be responsible for providing continuous dust and erosion control. Permittee shall submit an erosion control plan for city approval prior to issuance of the permit. The plan shall address temporary control measures as well as permanent.stabilization after construction is complete. The plan shall become part of the permit. Permittee shall: -furnish the name(s) and phone number(s) of the individual(s) responsible for maintaining dust control after hours, weekends, holidays, etc. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Contractor shall comply with the local noise ordinance. Operation and maintenance -of equipment within one half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays including Sundays. 5. Permittee shall assume responsibility for repair of any pavement breakdown at the haul road access to any public or private street and for any damage to other City streets or facilities. 6. Any on-site haul or construction access roads shall be effectively destroyed at the conclusion of. the work to prevent continuing use by vehicles unrelated to the work authorized by the permit. 7. Advance.;.warning signs and traffic control shall be installed and maintained in accordance' with Cal Trans Standards. Permittee shall submit a traffic control/circulation plan for approval by the City. Engineer prior to the start of any 'work. 8. Permittee.shall.notify the City Engineering Dept. at 564-2246 at least 24 hours in advance of starting construction. 9. Prior to .the start of the clearing and grubbing operation, permittee shall pre - water the:'area.to be graded to prevent airborne dust. 10. In. .advance, :of excavation, Contractor/ permittee shall submit to the city for acceptance a detailed plan, in accordance with Labor Code Section 6705, showing .the design .or. shoring, bracing, sloping, or other provisions to be made for worker,..protect•ion from the hazard of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural- engineer. As a part of the plan, a note shall be !.included stating that the registered civil or structural engineer certified that the plan complies with the Cal OSHA Construction Safety Orders or that -the plan is not less effective than the shoring, bracing, sloping, or other provision of the Construction Safety Orders. Special Conditions - Permit No. 1527 Page 1 of 2 11. Storm drain systems in the CVWD right of way are -not included in this permit. 12. The contractor shall pay prevailing wages and provide certified payrolls to the city. 13. Contractor/permittee shall provide the city with a construction schedule that includes each item,of work with a duration of 2 days or greater. The schedule shall be submitted to the city for approval prior to any..work. 14. Contractor shall schedule a pre -construction meeting and shall notify all parties involved a minimum of 3 working days in advance. This permit is for all the work,, and only the work, shown on plans labeled "City of La Quinta Washington Street Improvements, approved by the city on 9-09-92. The permit fee, based on a construction cost of $150,000, is $1,500. Special Conditions - Permit No. 1527 Page 2 of 2 NEAR-CALCORP GENERAL CONTRACTORS September 9, 1992 City of La Quinta Engineering Department 78-105 Calle Estado La Quinta, CA 92253 ATTN: Hector Guzman 600 Central Avenue, Building A, Lake Elsinore, California 92530 714 245-5400 Fax: 714 245-5408 RE: City of La Quinta Business License Dear Mr. Guzman, In regards to the permit for the Washington Street Improvements, here is the erosion control schedule: dust control will be done during the hours of 7:00 a.m. to 3:30 p.m. as necessary, in conjunction with the site erosion control. There will also be dust control on Saturday or Sunday or as deemed necessary by the City of La Quinta. The following is a list of people that you may contact during non -working hours: Marty Clark Bob Resewehr Otto Roehl If you.have any questions, Sinc rely, Dw h ohnson Executive Vice President DHJ/kst ACCO CALIFORNIA (714) 278-8747 (714) 678-1921 (619) 322-7634 please do not hesitate to contact me. License No. A/B 230077 .✓r Member of 04$4 International Council of Shopping Centers ;Hall & Foreman - Ontario TEL: 1-714-941-7510 Oct 29 , 92 15:41 No 004 P.01 CC ,' PCP'Yh) r, c,, --ttr /sZ HALL & FOREMAN, INC, 3602 Inland Empire Blvd., Suitc C-320 Ontario, CA 91764 (714) 941-3570 FAX TRANSMITTAL Date: 1 b ,z71 R L- I_FAXNUMBER: 9 • S G 4- • To: GfT-�5 o �A Qu tµTA Attention: STr=v 3 pea—lZ. From: Message: It C Cu J b V-*-` U v v de ore d �.1- PIC -Ca R 4-�L �ury a v Cwt-irlr�o� 'f`ratumittieg s total of.:::: ` pages inc!udang thi's page. Place coeitaa"Moneen 8etern at (714).9.4,1-35 N 'iCyou`luve ditYiNlty i. .th this treruritiss on: !+ I H. . . . . . . . . . . cd _)TC ii I 1:! .. ........ 0! 4-i" w w o i .1, 4 44 1.. - !--im 4-4 -4 -4444 1 14 r.. 4 It i: �ii1i iiii iii; 6! OL: III lit ;i.: ii 1 1: lilt 1 1`11 too .... ....... ;++ iij! �iii 71;1 iif'ill'! ii;; rjl)!� • H !itilii ii T'. ti. o I ... it too iiii 111 iii; FT? it ..,..;..{..i. -H, liti !It '1111M "ll I,!: i!i 1, 1!1: !!!1 ll:i . ..... .. ..... I _�4 . .... .... .. m A.; 1 447 14 I :)T Jii-i P FFT i 74 ...ijii too T!! it .1 7 M fi: I L. lot :11: T mi 4-1 4� 7 CF • '1771 !177 lit .4 H i. I'M i i .;Ill fill CF, .4. 4 T)I 4 :tf T LH4 H.4--r- iiij it I Hi It 11:1-l!ii ij ilii iM MIL: I :: i; Pili:4 :;;1. ::: iiii J.: 4 i: H i444- 4.; BCR .... .... ... i CXCF lot, T 111" ... ... . . .... W. i i! t i I M T jlli I I I. Ittv I lj� f-. :1(•11'1 :iii .111'1111 iiii.4 74 E. T." c it t ETT* 'T" Itil T; i i it i!: i i •i i i! 7TT ......... .... .. 7.7 14JUT; HHH... 14 4. a ' ' 4 T. ':.47.-+f AAA!] t ?l.? I , . ` 1 ! S ! : ; 1 I : , ! i .�. ST ��.d.a.i ' °.l.i_c�{. I 1 i :: I : i : (j I , . I ; i 1.(.(,1.1.1 -►r, ' It T. 13 ;;;:i:i;: ... !1!. 1 t T. ::tlf 1it Ir It • ;1!; ri 1 �L 9 44 it 44. i-i.L ..F ilt! I i;ji .. ..... . !..i lit . , 1 rrT -:11t H: _r: , " — 4. it f • T 4: �.Ir. 1- 44 W i L 0 61 1 1 is T FI W I il.l. m:1.1; J;:;: r ;it 70 d VOO ON TV:ST k7,616Z 130 0TSL1—TV6—VTZ—T :�Dj O1J1P;U0 UPWGgod ' H- w... .�. _ ,• : __ _._.__._...._;.._.._ ..........._... �._.__.,._.�, ._....._.. - -- :::: _:---------- . PROFILE �, _..__ _ v ...._..:.-....-...._ _ _ .�..._............. __..._.� ..... -- . --- �...._._...... - - - - - -- - - - _ ._-�6..!... a ..�M... _..... .................... _._..:.... �._.___ ._. _..a... ....... _.._... _ --- _._. .-tic �z.. _...._..._........ •�-----•_-- ---- — -- �___.._..�-.__._.---•_._..__..b.-- ._..... ... _ _ _ ....._. _._C..... ' _aA VERJ �- - _ - _- _ ___cei.__•_._.....:-_ _ -.......... T....... �._..._...---. ...._._,--._.._..- -..........:.. _...r.... ..._._......................1'T.....8�...... .._..._ . Cs ...... r........t..�__._. .__--..__._..t._..._.y._.......-._._.... - -- o ----------- -----__._..._.- .r - ro ._._. . ._.. ._L._.....:.........._._.._� _._ - _.._..__.---.:.._...-i—._... ......_.. _...._.. _._....s.._.... - -- --- -- - - - - _ Cu *1$+00 *17+00 * 18+00 PAIANG LEGEM I .. n S STATIONING _..�._...�..,......_...._. -: -,- .. E EXISTING C.L. U raj �i / nl or m � V V + �j m Z m W W f0 'X! m �' � I FUTURE + .2co R MAIN + PUT, • D g�1 ^ n w 7 -Cl L0, FUT. s. _ �P FUT. CURB 1 ?2 Ft CURB -- EX.2-12' D.J. SEWER FORCE MAID ~' RfTURN RETURN & EX 3- GAS RETUJi N LINE l STT EX. . Fit's' r _c,> ".._•�_,, ��— oel 4P,48+00 t -20W* _......_.._...._.. .......a[3 1)r_.3 i ito,' Z AL . `*. r 1 ...: ._.._.. ..�.: _._..... ........ ......._._....._..__ �..:..:...:-__.: c -'.__.:.-.:.....tom - _, � � . o . ...�; :rte.,._._.: '� - - •. t:-• - t `. 'b =7 4 t > .. nd �.. =--:— — _ �,..:. - - -=- =:F <v� jr CURB A Tr-. . . . .. . . . . - - -•- - - - - �. � � .. .Q'�-�.-'>.<Gre�� C F41i BRtDGE• ()ESI _. . ,_.:. . r+ -,--r . �1^ �-^-_�-�-•� -- -• d ` r VAULT _ a � �� �.'�•�: �� �-! 1 4� I~ r { Ile EX- j EX_ TEL UNE A 8F r y� s FRE v VEX- R/W �` Y;u $UTUCURB EX. 18 WATER ECR CD EXISTING