Loading...
1694NOTE': With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 3/16/A3 Subdivision Improvement Permit — Class I I I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Within the paved and earth rtection of various LA Quints roads within the boundaries of CM operating area. (Street address or Description of Location) PURPOSE OF CONSTRUCTION Blanket Permit Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Maintenance & repairs of existing underground equip. & installation. DIMENSION OF INSTALLATION OR REMOVALNOT MORE THAN 80 LINEAR FT EXCAVATED UNDER BLANKET PERMIT. SIZE OF EXCAVATION, IF NEEDED 3 % 4 bell holes and installation of new services. APPROXIMATE TIME WHEN WORK WILL BEGIN will, notify City 24 hours in advance of anV work. APPROXIMATE TIME OF COMPLETION''Permit en 12/31/93 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: THIS AUTHORIZATION DOES NOT INCLUDE EXCAVATION OF FAS (MAJOR ROADS). PERMITTEE SHALL NOTIFY CITY HAIL A MINIMUM OF 24 HOURS PRIOR TO THE START OF CONSTRUCTION. A SEPARATE PERMIT I8 REQUIRED FOR FAS ROADS. Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. 111 �j Signature oY Applicant or Agent COACHELLA VALLEY WATER DISTRICT P.0 BOX 1058 COACHELL., CA 92236 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address a Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by t. Recorded by $ 0 $ 0 Date PERMIT VALIDATION PERMIT NO. 1694 DATE APPROVED 3/16/93 EXPIRATION DATE 12/31/93 DATE I"SUE ,3/17/93 By Administrative Authority TELEPHONE: (619) 564-2246 NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS '� - 11193 Subdivision Improvement Permit —Class I I I DATE: March � , XgWec Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Within the paved and earth section of various La Quinta roads within the boundaries of CVWD operating area. (Street address or Description of Location) PURPOSE OF CONSTRUCTION Blanket permit Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION maintenance and repairs THIS AUTHORIZATION DOES NOT INCLUDE of existing underground equipment and installation. EXCAVATION OF FAS (major roads). DIMENSION OF INSTALLATION OR REMOVAL not more than 80 linear feet excavated under blanket permit. SIZE OF EXCAVATION, IF NEEDED 3 X 4 bell holes and installation of new services. APPROXIMATE TIME WHEN WORK WILL BEGIN will notify City 24 hours in advance of any work. 3 APPROXIMATE TIME OF COMPLETION Permit expires 12/31/. ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: PERMITTEE SHALL NOTIFY CITY HALL A MINIMUM OF 24 HOURS PRIOR TO THE START OF CONSTRUCTION. A SEPARATE,PERMIT IS REQUIRED FOR FAS ROADS. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be -started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent Coachella Valley Water District P.O. Box 1058 Coachella, CA 92236 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class Ili Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule L`pq Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by $ —0— $ —0— Date PERMIT VALIDATION PERMIT NO. I& LH DATE APPROVED 3/25/92 3_11.P.g7-> EXPIRATION DATE 12/31/92 k7_-31- a 3 DATE ISSUED " 1?—f3 By Administrative Authority TELEPHONE: (619) 564-2246 I The following General and Special Provisions aro attached to and made a part of Permit No. l� I GENERAL PROVISIONS The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property, it shall be the responsibility of the Permatee (or his contractors) to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: ClOstedtrack . laying construction equipment shall not be Ps"hittlidtO operate on any Paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas- If the existing pavement is scarred, spoiled, or broken during the term of this contract, or if the pavement is maned, City of La Quints shell request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of ons coat of two inches 12") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be -properly lighted and barricaded as deemed nscn"ry by the City Engineer or La Quints City Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified 24 Mrs. in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe. areal culvert and Concrete structures encoumered during excavation which necessitate removal shop be replaced in kind, In the svent.it bort and necessary to remove or cut existing drainage structures, City of La Quints shall be notffied prior to Commencementd.Inteveof this work. 'Drainage structures and open drains shall be kept free of debris at ate times for proper drainage RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed dean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess ved meal shop be remo prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep.davvn dust conditions and shall be used teri immediately after backfill. DE -WATER OPERATIONS: If de -watering operations aro required and pumps are forcing wateron City of La Quints roods, it shall be the responsibility of the permittee (contractor) to control this water and to provide Ott -street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time. permittee shall contact this office to obtain the necessary permission SPECIAL PROVISIONS The follwing shall apply ONLY when indicated: NOTIFICATION: Permittee shall notify the City at 564-2248 at leashhours in advance of starting conozion. R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not teas than t shall be furnished in the name of City of La Quints to cover all work involved in the restoration of the various La Quin roads and survey monuments. This bond shall be continuous until cancelled by the City Enginests ; This bond must is Posted prior to commencement of any work on this projectbe R3 UTILITY CLEARANCE: (Substructures)Priorto making any excavation within the City of La Quints righto}wayouthorized by permit. the permittee shall Contact all concerned utility companies relative to the beation of existmq substructures. Damageexisting substrutxuroaresuningfrom ape rationsconductedunderthispermit of the perr mittee. shallbethe soleresponsibility R4 L1TY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilitiq aro door of the Proposed work ane. The permittee shall notify all concerned utility Companies of the proposed work. R5 PAVEMENT WIDENING: Area between the proposed concrete utter line and the existing road surfaced with inches of A.C. paving placed on g g awmant shell be having an "R"valueof not less than inMhCitclass aggtprovesubbssacourae -wand in conformance with City of Le Quints Road Improvement Standards • and Specifications. Ordinance #481. RB PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of 1/4 inch to one foot 117. R7 GRADES &. STAKES: City of La Quints shall establish grades and stakes for the proposed concrete curb and gutter construction. Re GRADE CHECKING:CityofLaQuintsshallcheckgradesuponreceiptofplanandprofileand/or grades as established by' a licensed engineer. Re CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( feetlshall be removed. Curb and/or Curb and gutter shall u saw cut prior to removal. Depressed Curb, matching conerote gutter and concrete driveway approach shall be constructed in conformance with City of La Quints Standard #207.. RIO DRIVEWAYS, A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2-1/2 inches of A.C. paving plaCed on ( ) of dam aggregate base. Driveway construction shall conform to attached drawing. R 11 CULVERTS: A inch diameter ( ) culvert shall be installed with the invert approximately 1.1 /2 inches below and in line with the existing flow line. Culvert installation shall conform to the attached drawing, R.1 SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained R 13 SOIL STERILIZER: The area to be surfaced shall be created with soil sterilizer. Rate of application shall comply with the manufacturer's specifications. R14 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quints may conduct in this area during the period of thii permit. Work shall be Coordinated with the State or City of La Quints forces to preclude delay or interference with State or City of La Quints projects. 15 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the cemerline of all streets or property lines when involved shall be completely tied out so they maybe readily and correctly be replaced by a licensed Civil engineer or surveyor at the expense of the pemtittes A complete set of notes showing the ties to these monumvn s shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be-rtodfiad upon Completion of replacement of 811 survey monuments for properpojea cbaronee. 1 'r R16 SURVEY MONUMENTS: Prior to excavation or oeommnq of construction. ad survey monuments slfall be tied out by City of La Quints and suitable payment or guarantee of payment shall be made as reimbursement for all w&k involve(i. R17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer, (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best facilitate the general flow of traffic. Prior to final paving operations. any damage to pavement straight edge shall be corrected. 18 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to pavement straight edge shall be corrected. R19 UMITOFEXCAVATIONS: Excavations shall be limitedto 1 .000 lineal feetot opentrench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidaysforthe protection of the traveling public. The Public Works inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. RZO BACKFILL MATERIAL Backfill shall be free of brush. roots or other organic substance detriments,;..;stitinforpurposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuuebforle spongyes saturated materiall which is encountered during excavation shalt not be used for backfill, but shall bs supplemented or • ar replaced by an approved sand or gravel. R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in lifts of notgreaterthan three feet 131 and vibrated using vibrotamperorequivalent equipment. Alternate methods may besubstituted. but in any (29 case a relative compaction of 95 percent shall be attained within the -R:ructural section of the roadway, BACKFILL PLACEMENT: Backfill shall be applied in layers of not more tnan 50 percent of the total depth of the trench before flooding or a maximum of five-foot 151 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme Swell by flooding operations. 88ckhll material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikeswill be constructed to retain the water. Where jetting is used. the jets shall be of sufficient length to reach the bottom of each ;aver and the water supply shall be continuous. COMPACTION TESTS: If so required bythe inspector, compaction tans shall be made at i ntervals of not more than 1.000 feet and a minimum of one 11) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and f fled prior to making permanent repairs. Compaction tests shall be made as outlined in Section 8.3.01 of the Standard Specifications, Division of Highways. State of California, dated January 1973. 24 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making Permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways. State of California, dated January 1973. R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed. a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of surfacing pieced ona inch class base shall be placed nolaterthan A.C. temporary road repair. days of R27 PAVEMENT REPAIR: F.A.S.: Upon completion of baCktili and compaction, a temporarypatch consistingof twoinches; (2-) of cold mix paving ISC-800) shall be placed immediately. A permanent patch of three inches 43"► of A.C. surfacing shall be placed on six inches (6") concrete base as directed, but not later than fifteen 115) days after completion of temporary paving. Concrete base shall be of five•sadk mix and shall conform to the City of La Quints Road Improvement Standards and Specifications, Ordinance #461. R28 FOG SEAL A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all Patch areas as determined by the City Engineer. R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas where such seal coats existed prior to issuance of this permit. Seal or armorcoats shall be epplisdasspecdied in Section 37, Standard Specifications. State of California, Division of Highways, dated January 1973. Work of pavement repair to be accomplished by a licensed contractor engaged in the business of pavement repair. R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated. such striping shall be replaced upon completion of permanent repairs. R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be removed in sectionswitich can be handled safelywithout interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic. the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and/or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method Compaction tests shall comply with Section 6.3.01 of the Standard Specifications. Division of Highways, State of California, dated January 1973. R32 TREE TRIMMING: a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year. All broken or weak sections within the trimming shall be removed. b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs. flagmen. V ndior barricades shall be provided to protect the traveling public at all times. c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided by this permit. d. All tree trimming on EVERGREEN TREES. PALM TREES. and other ORNAMENTAL TREES shall be accomplished to the satisfaction of the City Public Works Inspector. e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees. f. Pruning shall, in all instances, be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches (21 and some in size- Sealant shell be applied to all cut sections as directed by the City Public Works lnwr.....,.. ADDITIONAL CONDITIONS Coachella Valley Water District PERMIT NO. 1694 BLANKET PERMIT January 1, 1993 - December 31, 1993 R33 Survey monuments shall be protected in place or re-established pursuant to City standards and the State of California Land Surveyor's Act. R34 Contractor shall comply with the local noise ordinance and construction operations and maintenance of equipment within one half mile of human occupancy shall be performed only during the time periods as follows: October 1st to April 30: Monday -Friday 7:OOam - 5:30 pm Saturday 8:OOam - 5:00 pm May 1st to Sept. 30: Monday -Friday 6:OOam - 7:00 pm Saturday 8:OOam - 5:00 pm Work shall be prohibited anytime on Sunday and Federal holidays. R35 Traffic control shall be as per Cal Trans Traffic Manual. Field adjustments in detouring shall be accomplished as directed in order to adjust to actual field conditions. It shall be the contractor's responsiblity to adequately barricade and detour this site. R36 All excavations at or near the travel way shall be backfilled at the end of, the work day, for the protection of the traveling public. R37 This permit is only for work within public street right-of-way. R3.8 Ingress and egress for local properties shall be maintained at all time. R39 Prior to work starting, Underground Service Alert shall be contracted at 1-800-422-3155 and an "inquiry number" shall be provided to the City Public Works Inspector. R40 Replacement pavement shall be existing asphalt thickness plus one inch, but. not less than 3 inches of AC pavement shall be placed. Class 2 aggregate base shall be as per existing or 4" minimum (whichever is greater). R41 If work is to be performed .by forces other than the utility company, the contracting company will be required to apply for an additional encroachment permit and pay the appropriate fee. Y, GEORGE H. CHANEY CO. Inspection Services TO: Zk 4wAJ T7* THE FOLLOWING WAS NOTED: � cj i3Gi DATE I/ JOB NO. PROJECT DESCRIPTION lees E 674i¢l� •G LOCATION 10F(J��6KNGP�z� �JTil�¢i✓G� CONTRACTOR J WEATHER FROM TO HRS 'BO ID.DO , O 11:.30 /o /0 31130 : 30 d. TOTAL 2 `ydo�' eAl S� piesr�✓��� �-�, Cu/p AC-F� V/- cey. Tfl T A0'4>'0_ /Z �- 1e&-'#vaS,a,2> 6o S1,gzr5 �� !`� " 3-�,eolk-� e -,G- .sem uFUT DFV " 5ANs OR 6-0-- tIP 5-e- % B,✓ M"14 -x I Z 5 A) C m_� oPFzcg- /2 14 442 ��c �-� T�� �� B�uy��rs l, -LPA �•J� ,�-�-,-�e. �% Cep��� ���✓�/c��.���^•�-- ,�s� � L.�-l� r���9�/�.,�/� f�� COPIES TO:. SIGNED WHITE -CLIENT, YELLOW -FIELD FILE, PINK - OFFICE FILE c GEORGE H. CHANEY CO. Inspection Services • THE FOLLOWING WAS NOTED: U Imo- L/��i•-/ Io � �l • 7712 DATE (,,� 1 PROJEC DESCRIPTION 12 Q-AAIA LOCATION W � � CONTRACTOR.WEATHER FROM TO HRS TOTAL 0 IFF -S A-- ) M )Z- U e Ll� d IN Mli �r- Alm COPIES TO: LI.r�I1T.R'q 01 4Ut�! ;'EPR WHITE-CLIENT, YELLOW -FIELD FILE. PINK - OFFICE FILE -.,o � � _. ! � ��%2,�i.T��.���:�'�.,k.. +N'�F9 fX .alt � �� `,+^ �q.� � ♦ �;c Y '1�+'Y 4i. ,- _. _.�. ..`�Mw.. f;K�J.�;'. �.?�¢,(��?, +��.,� r ... ,�