Loading...
1770NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 6/18/93 LOCATION OF CONSTRUCTION West End Keller Pit Rd (Street address or Description of Location) PURPOSE OF CONSTRUCTION Move Equipment DE4C%IPTION OF CONSTRUCTION D-9 Dozer 14 6 High, 12 Wide, 85 Long, 190,000 Abs DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN Subdivision Improvement Permit — Class III Minor Improvement Permit Class IV Sketch (attach construction plans if appropriate) East City Limits over 58th & Keller Pit Rd to West End Keller Pit Rd & Return Unladen APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant Hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applica t or Agent Cattrac Construction 15030 Slover Fontana 92335 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. a+ On File On File Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee._ Permit Fee Penalty Cash Deposit -Surety Bond if requir4ed TOTAL: Receipt No. 10.00 $ 10.00 Received by Date PERMIT -'VALIDATION PERMIT NO. 1170 DATE APPROVED 6/18/93 EXPIRATION DATE 6/21/93 DATE ISSUWED 6/.l#/93 By Administrative Authority Recorded by 11 TELEPHONE: (619) 564-2246 , ♦ �' }�IJUN ,18„a93 �6 49 CH I I KHF (UNY D I KUG 11UN? ,TOy Fmrn Pt.A . hone MA Fax K f V P” INC. encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) P.1 For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: Subdivialon.lmprovament Permit —Class III "—'--~---� Minor Imp;9vement Permit Class IV LOCATION OF CONSTRUCTION __ 1A t'^� (Street eddress or Description of location) PURPOSE OF CONSTRUCTION _Wlovr- Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION �.�� >ozKV-1 DIMENSION OF INSTALLqqJ ION OR REMOVAL S12E OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN _- - FrOqi QW: 4*f 7a � - APPROXIMATE TIMEOF COMPLETION � LRV ESTIMATED CONSTRUCTION COST (Including removal of all obatructlon, materials, and debris, backfilling, cont. priCtlOn and placing permanent resilefgcing and/or replacing Improvements) .�. r ,hr-coriiilderativn of the grantltig of obis: perilSit, this 0001i cant hereby 80reeS tici '" Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless, from and against any and eu penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undartoken under the permit granted purauent to this application, Notify the Administrative Authority at least twenty-four (24) hours In advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and ell applicable rules and regulations of the City of Le Quints and to pay for any additional replacement necessary at the result of this work, Name of Applicant (please print) Signature Business Address `�cic 3 S Telephone No. ' Name of Contractor and Job Foreman Business Address Telephone No, Contractor's license No. City Business License. No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class III P, thiln imnmvamPnts: R% trot, p�4i ,itRrl rYlnafri�rrinn rare 0 Minor Improvement Permit ... Clsr,-. IV: See attached Inspection Fee Permit Fee Penalty Cash deposit -Surety Bond If required TOTAL: Receipt No, Received .6V ia'... - Recorded by Extended Page 1.1 Nb P644MIT VALIDATION PEF4,101T NO, DATE APPRMVED FXPIRATION DATE DATE ISSUED By kuthorfty 0 11