1862t
NOTE:
,With proper validation
'k this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
r -
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DATE: 9/1/93 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Jefferson Street W/S forth of Fiesta Drive
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Place buried tel0hone cable
DESCRIPTION OF CONSTRUCTION Trench from pole to polo
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED 120% 30" Deep 241t W
APPROXIMATE TIME WHEN WORK WILL BEGIN 9/1193
Sketch (attach construction plans if appropriate)
W.O. li 340.3Y0011V
SEE ATTACHED DRAWING
SEE ATTACHED CONDITIONS
APPROXIMATE TIME OF COMPLETION 11/30/93
ESTIMATED CONSTRUCTION COST $ 1000.00
(Including removal of all obstruction, materials, and debris,'backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
Signature of Applicant or Agent is" u>F.. !'t *3 1 Q"P. .
General. Telephone Company 45.590 Jackson Stro*t Indio 92201 (619) 342-0621
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor's License No.
City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class I I I
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
0
$ 0
Received by Date
1862
PERMIT VALIDATION
PERMIT NO. 1862
DATE APPROVED 9/1/93
EXPIRATION DATE 11/30/93
DATE IS UE 9/1/93
ALY
Administrative Authority
Recorded by 11 TELEPHONE: (619) 564-2246
CITY OF LA U0 A
NOTE: AUG 2 51993
With proper validation
this form constitutes an PUBLIC WORKS
encroachment permit CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalksi parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit - Class III
DATE: 1993 Minor Improvement Permit Class IV
LOCATION OF CONSTPUCT!ON JEFFERSON STREET W/S NORTH OF FIESTA DRIVE
IStreet address or Description of Location)
PURPOSE OF CONSTRUCTION PLACE BURIED TELEPHONE CABLE Sk ch
DESCRIPTION OF CONSTRUCTION TRENCH FROM
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED 20
APPROXIMATE TIME WHEN WORK WILL BEGIN 09/01/93
et (attach construcslon plans if appropriate)
W.O. # 540-3P00jFV
SEE ATTACHED DRAWING
APPROXIMATE TIME OF COMPLETION 11/30/93
ESTIMATED CONSTRUCTION COSTS 1000.00
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnity, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and'all
Penalties. liabilities or loss rea@Iti.gg !"0'" e!ei!-ts Or ccur: =Uan and :nzi :y ou: a. any accidaa:, :os; od damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notity the Administrative Authority at least twenty-four 1241 hours in advance of the time when work will be started.
' Comply with all applicable City Ordinances, the terms and conditions of the permit and all epplieable rules and regulations of the City of
La Ouinto and to pay for any additional replacement necessary as the result of this work.
i
Signature of Applicant or Agent
GENERAL TELEPHONE COMPANY 45-590 JACKSON STREET INDIO, CA 92201 619/342-0621
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
:ontractor's License No. City Business License No.
4pplicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III -'—
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
nspection Fee $
iermit Fee
'enalty
:ash Deposit -Surety Bond
f required
TOTAL: S b
leceipt No.
leceived by Date
lecorded by
1• i
PERMIT VALIDATION
PERMIT NO.
DATE APPROVED 9— l ✓ 93
EXPIRATION DATE
DATE ISSUED % l
a
ti
By
Administrative Authority
TELEPHONE: 181915"2246
V1. ) m!"
" - -Li I , - W 10 Is
V,Q,%,0
The following Generei anti Spectal'Provisions are attached to and made a part of Permit No. _/ULA
GENERAL PROVISIONS
4 The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way
ONLY. Whenever construction extenas within private property. it shall be the responsibility of the Permrnee tar his contractorslto
secure permission from abutting property owners. Such allthorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated trackleving construction equipment shall not be permitted to operate an any
paved surface unless fined with smooth -faces street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect
the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing
pavement is scarred. spelled. or broken during the term of this contract, or if the pavement is maned. City of La Quints shall request
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2») of A.C.
surfacing plus appropriate seal coat as spectfied above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessarybythe City
Engineer or La Quinta City Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration
of the project. The City shall be notified 24 Hra. in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe. steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event.it becomes
necessary to remove or cut existing drainage structures. City of La Quints shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of
way. All paved surfaces shall be broomed dean of earth and other objectionable materials immediately after backfill and Compaction.
Existing gutter line and drainage ditches snail be replaced to their original standard or better. All excess material shall be removed
prior to paving. Water tanker shall be used. as required. to sprinkle the job site to keep down dust conditions and shall be used
immediately after backfill.
OE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads. it shall be
the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limned
access for the adjoining property owners and emergency vehicles. In the event it is felt bythe permmeethat he mustdoao a street for
any length of time. permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The follwing shall apply ONLY when indicated:
R1 NOTIFICATION: Permmee shall notify the City at 5642246 at least 48 hours in advance of starting eonearmion.
R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than s
shall be furnished in the name of City of La Quinta to cover 811 work involved in the restoration of the various La Quinta
roads and survey monuments. This bond shall be continuous until cancelled by the City Engineer. This bond must be
posted prior to commencement of any work an this project .
UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of vmyauthorized
by permit, the permittee shall contact all concerned utility Companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted underthis permit ahallbeth8 oobresponsibility
of the permmee.
UTILITY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilities are doer of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R5 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be
surfaced with inches of A.C. paving placed on inches of class
course
having an "R'valueof not less than and in conformance with Cityof La Quints Road Imrpate rgoveIn St�jnderds
and Specifications. Ordinance #461.
R6 PARKWAY GRADING: Area between the property fine and top Of the proposed concrete curb shall be graded to a slope of
1 /4 inch to one foot (1 �.
R7 GRADES & STAKES: City of La Quinta shall establish grades and stakes for the proposed concrete curb and gutter
construction.
R8 GRADE CHECKING: City of La Quinta shall chedtgradesupon receipt ofplan and pr)fileand/or grades asasnblishedby
a lirensed engineer.
R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter I fsotlshall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
RIO DRIVEWAYS. A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the
Property line and the existing road paving shall be 2-1/2 inches of A.C. paving placed on I ") of clams
aggregate base. Driveway construction shall conform to attached drawing.
R11 CULVERTS: A inch diameter ( ) culvert shall be installed with the invert approximately 1-1 /2
nches below and in line with the existing flow line. Culvert installation shall conform to the attached drawing.
SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained.
R13 SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall comply with the
manufacturer's specifications.
R 44 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or
City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or
City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects.
R15 SURVEY MONUMENTS: Prior to excavation or beginning of construction. all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they maybe readily and correctly
be replaced by a licensed ofvil engineer or surveyor at the expense of theperMM88. A complete set of notes ohovving the
ties to these monuments shall be furnished to the City Engineer prior to the removal of any monumentsall
. This office Ch
ams
be notified upon completion of r8018nt of all survey monuments for Proper wgea cbarenee.
R16 SURVEY MONUMENTS: Prior to excavation or oeainnino or construction.all survey monuments snail be tied out by City
at La Quints and suftaois oavment or guarantee or Pavment snail be mace as relmoursement tar all work Involved.
R17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances snail excavating equipment
be used to excavate prior to cutting of oavementl. Excavation material shall be Placed in such a position as to best
facilitate the general flow of traffic. Prior to final paving operations. arev damage to Pavement straight edge shall be
corrected.
R18 PAVEMENT CUTTING: Pavement snail be saw cut error to removal. Prior to final paving operations. any damage to
pavement straignt edge snail be corrected.
19 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1.000 lineal feet at open trench before oackfill operations must
begin. All excavations snail be prooerfv barricaded with lights overnight, on weekends and holidays for the protection of
the traveling puolic. The Public Works Inspector snail determine tne'suitability of excavation barrlcaaing in each case. No
excavation snail remain open for a period exceeding five f51 days. No excavation snail be mage unless tree construction
material is actually on the work site.
R20 BACKFILL MATERIAL: Backfill shall be free of brush. roots or other organic substancedetrimenta.::.:suse for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill. but shall be supplemented or
replaced by an approved sand or gravel.
R21 BACKFILL SAND: Backfill shall be approved transit-mix sand or equivalent and shall be placed in lifts of notgreaterthan
three feet 13') and vibrated using vibrotamper or equivalent equipment. Alternate methods maybe substituted, but In any
case a relative compaction of 95 percent shall be attained within the ;:rt:cturai section of the roadway,
R2 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of f ive-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall be not less than 90oercent or equivalent to the surrounding ground, whichever is the greater
compaction. Where ponding or flooding is used for a maximum settlement. adequate dikes will be constructed to retain
the water. Where jetting is used. the jets shall be of sufficient length to reach the bottom of each :aver and the water
Supply shall be continuous.
R23 COMPACTION TESTS: If so required bythe inspector. compaction tests shall be made at intervals of not more than 1.000
feet and a minimum of one (1) test on each road. One 11) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways. State of California, dated January 1973.
R24 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One 11) copy of each test Shall be forwarded to the City Engineer far approval and filed prior to making permanent repairs.
Compaction tests shall be made asoutlinea in Section 6.3.01 of the Standard Specifications. Division of Highways. State
at California, dated January 1973.
R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed
after a maximum of 3.000 lineal feet of trencn has been excavated and backfill operations completed. but In no case shall
the placement of the temporary pavement exceed a five (5) day limit.
R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed. a temporary patch
consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of
surfacing placed on a inch class inches A.C.
baseshallbeplacednolaterthandaysaftercompletionat
temporary road repair.
R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill and compaction, a temporary patch consisting at two inches (2'1
of cold mix paving (SC-8001 shall be placed immediately. A permanent patch of three inches (3") of A.C. surfacing shall
be placed on six inches I6") concrete base as directed, but not later than fifteen 115) days after completion of temoorary
paving. Concrete base shall be of five-sack mix and shall conform to the City of La Quinta Road Improvement Standards
and Specifications. Ordinance #461.
R28 FOG SEAL: A fog seal coat consisting of an application o` asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas
where such seal coats existed prior to Issuanceof this permit. Seal or armor coats shall be applied as specified in Section
37, Standard Specifications. State of California, Division of Highways, dated January 1973. Work of pavement repair to
be accomplished by a licensed contractor engaged in the business of pavement repair.
R30 STREET RESTRIPING: Where street striping Is still visible on streets to be excavated. such striping shall be replaced upon
completion of permanent repairs.
R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished
by a licensed. bonded and insured tree service. and handled safely without interference or hazard to the traveling public.
It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to highway
traffic. The entire width of the tree stump snall be removed and disposed of so that no debris remains in view of the
highway. The stump hole shall be backfilled and thoroughly compacted asspecified in thefollowing paragraph. Where it
becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at anyone time. Adequate
signs, flagmen and/or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction
tests shall comply with Section 6.3.01 of the Standard Specifications. Division of Highways. State of California, dated
January 1973.
R32 TREE TRIMMING.-
a.
RIMMING:a. Only the necessary trimming snail be accomplished to provide clearance of the facility for one calendar year.
All broken or weak sections within the trimming shall be removed.
b. Where it becomes necessary to restrict traffic. the work shall be restricted to a maximum of 500 feet at any one time.
Adequate signs. flagmen. and/or barricades shall be provided to protect the traveling public at all times.
c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own
arrangements with adjoining property owners for, consent to the trimming in addition to the authorization provided
by this permit.
d. All tree trimming on EVERGREEN TREES. PALM TREES. and other ORNAMENTAL TREES shall be accomplished to
the satisfaction of the City Public Works Inspector.
e. Abutting property owners shall be contacted, in all instances. prior to trimming or topping trees.
I. Pruning snail, in all instances. be at the shoulder of the crotch to insure even, fast healing in all cuts of two Inches
(2"1 and aDave In size. Sealant Shall be aneuwe — .0 _... -- _. - _ - .. . _
29ST "oN 41wjod .-suaTjTpuaj jETDad,,-:,
0 4 U T n
ej a. r, AITO a' -i:.} af4san au je jaauTbu3 AfID aqq ja uaTjmejsj4es..-.,
aq4 o4 pue Aq palmajTp se aaqjTwjad aq4 Aq pawiagiad aq lTa- qB
Miam aqj 6suajqTpuo3 plaTj jen4ne'qTj a ja 6s4uawajTnbaw abeubts
6sq1_!.awaAi1'1baA A4ajes ispiepue4s QTn laaw ol japia uT paiTnbaA aq
Miam aq4 ja sual4enTlIpow _Lo 6sjeTjaqww "liom jeuoT4jppu pinoqS "O,r
"EETN-225 (OOB)T 4e 4AaIV anTAjaS
punciBiapun Inequan lleqs haqqjwjad aqj 6bUT4eAenxa aq jaTid
-aa, a4elidaAdde aqq Aed pue 4Twiad quawqneajmuajeuaTqjppe
ue jal Qdde lleqs AuedWom bLJ. TInwiquan 'aq4 Auedwan AITIT41 )
aW ja 4eq4 ueq4 Aaq4a sanAaj Aq pawialiad a al s; Ijam aQq 11 .8
"Sawl'.1
. I
Ife 4e uawbell qqTm pauje4uTew aq lleqs aDejAnS PaAed ua auel.
JaAeAj allO 10 wnLLS TuTw V -paj;Twjad a q a u lleqs sainsaln Jap Aqs
sTq4 apenTAAeq pue ina4ap al AjTjTqTsuadsaA s,aajjTwAad aq,.I.
aq Ile4s 41 -spiepueqs sueAl-leD qjjm aluepmone ul paujequTetv
pue palle4sul aq lleqs lao4um mlygeAl pue subTs'BuTuiem aMUeAPV C?
"SOT111Tmej ja s4aajls A113 jaqla al aBewep Aue jal pue
jaaj4S aleATid so nTlqnd A u e aq ssame peaj Ineq aq4 j umapyeami
4UaWaAed Me 10 jTedaj jej AjTlTqjsLJ. adsaj-awQse lleqs aaliTmaj -g
-sAepunS buTpnTmul sAep!TOq Mal ua pajjqjqoid aq Tleqs YARI
-w-doo:q aq We 00,B. AepAnq)=-S
-w-doouL a4 -w-e 00cq AepTwA.AepuaW WE jaqwWac_ 04 qST Awj
Qdoo:g t)':} OONB Aepjnqe,3
-w-dqW9 01 -w-e OWL AepjAA.AepuaW WE ITAdV 04 ISI jaqO4m(:)
:spaTiad
awl'.) buTmalfal aq; BuTinp Aluo pawjoljad*aq lleqs Amuedwma 1_1.e1snt.1
jo alTw y1eq a u o uTqqlm quawdlnba j anueualuTeLJ) pue uaTjeAadc:)
-aDueulpia asTau Tonal a44 qjTm AldLS) on Ilems JaIneAqUO3 .47
-pajTnbaj 11 Alluanpaij ajaw pue A Bull -tam qnea Aa pua aq--I.
4e pauealm Aja4aldwon aq lleqs Aaqj -Waln 4day aq lleqs sjaajjS -E
-10j4U00 Ualsaja
pue 4snp snonulquaD bujpTAoid jpj alqTsuadsaA aq lleqs aa4jTwjad .72
.u6Tqmnj4sua3-sjjaM nTlqnd Ij sualymyllnedS piepuejS 7 4 p-)
uoj4Tpa 4sa4eT aq4 qjTm,anuam` pAanme u; pawAajjpd aq lleqs liom IIV T
: A I d A.-.?
lleqs BuTmallal aq4 isualITpuas ITwiad pAepuels aqq 61 u0suppy ul
--- 310 ---. .
298T "ON IIWH3d--SNOI!IGNOD
..s9 .;T -ON Pwild - SU014TPUOD lwl"S
-0ajjTwiad aq ITeqs buylIgn 4uawaAOd ON -gT
-A;Tsuap Aip aATqelaj %96 04 pa;nedwan aq lleqs leTialew aseq 11?
4AqTsu6p Aip aATIelaA %96 04 palDedwom aq lleqs aselins 4171aAed
mull, A a dal a q 4 uTq4Tm jTbS 11TAImeq Ily QTsuap Ajp
OAT4ujaj % 04 paqnedwan aq jjeqs ImE apejbqns pue IITyynyq liv - ,I:
-M-tom bulqjeqs al jaTid siq 8, I wnwluTw e aleTidaidde-
so 9,89-889 (6T9) IE -jdaa leubis suejqTeD AO' 96B9 -9W
(,IL) 45 "qdaa leubTS A;uno3 apTsjaATY AIT401.% lleqs aaj4jwjad
aqj 6uoj4masAa4uj pazTleubis e go oog uTqqym sT liom aq4 uaqM "ET
"ja6ulbu3 A113 aqa ja uoT;mejsTjes
aq4 a pue Aq pa4mailp se ea j a q q uTq4lm bulliom sAaq4l*"j
pue jolmijuaD S,AITD aqq qjjm paqeulpiam aq 11eq, liam liv "2'I.
-U014Tpum leuTbTjo SIT a! PaDelda...'.
6q llpqS -34a JDOJ aAT4WjOnap KbuTdwnspuej liv "TT
1 2 3 4 5 6 FORM WOW ("'/) 7
1
2
3
4
5
6 7
1 2 3 4 5 6 FORM WOW ("'/) 7
Vi
9rB5522D �
a
3
V
19
LAJ
• o
'i
C
N F i E5TA DR.
L
(a 5319 cull)
NOTES
J � = 50�
GTE To B ufL�3 CABLE FRDM
POLE At 5055 ZZD Ta PoLC #
THOMAS Caw DE
PAGE 2156kiDZA
3b92n. Lw T' P"D KEKWC &ERtaL
Califor�la
CFE CRm_%SJnl6 FI sTA DR, AMD
_uA,ov E POLE 4V L _x619 Curr' To
LOCATION EFF Lsoa sr. Ar F(E.sTA DR,
c_LL hR_ C V Ulf D CN R,+LJ 0 F.L \ii Ls,
EXCHANGE T uD t p
C.O. Dt a
ISSUE DATE APPROVALS
DWG SIZE
A • - AREA GENERAL --MANAGER
DWG. NO. RELATED DWGS.
PERM rr' �-I.-WORKORDER
5 3P firV
1 2 3 4 5 6 FORM WOW ("'/) 7
VIN8O.::[IlV� ]lS :]AIlV1N]S]8 ]]1lIWH]J
]AI8O VlS]I.::I H18ON S/M 1]]8l3 lV
26/3T/6O NO NOS]8 1SO� SVH 398T ^ON lIW�]� NO A8OM
OIONI :�O JIHSNMOl ]Hl NI
l8VlS 8]O8O AHOM AO ]3IlON
26/�O/OT
A�TOOJ2-O�� :8]O80 W8OM
^ON lIW8]J
2�JJ6 V3 ^p�u�»0 pl
~---'m�
____ p�U"
-_opp�s] aIIp3 �OT-8�
� � K���
�~ �'
O�� A\3q���� pl �o
,
m
City of La Quinta
78-105 Calle Estado
La Quinta, CA 92253
12/31/93
/ 1
CITY OF LA QUIN A (El
JAN 0 51994
PUBLIC WORKS
General Telephone Company
of California
1500 Crafton Avenue, Box 1-18
Mentone, California 92359.
In Reply Refer To
PERMIT NO. 1862
WORK ORDE 40-3P001FV
100 % COMPLETION NOTICE
IN THE TOWNSHIP OF: INDIO
WORK ON PERMIT NO. 1862 WAS COMPLETED ON 12/31/93
AT LOCATION: JEFFERSON STREET W/S NORTH OF FIESTA DRIVE
PERMITTEE REPRESENTATIVE: GTE CALIFORNIA
A part of GTE Corporation