2028NOTE:-
With
OTE _With proper validation
this form constitutes an
CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
JANtT)V[Y 3 1994 Subdivision Improvement Permit — Class III
DATE: , Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION WERT SIDE OF JEVFERSON STREET. BETWIIEN AVENUE 50 and HIGHWAY 111
ALL WORK WILL BE DONE IN DIRT OFF JEPFERSON.(WORK WILL BE 8" TO 10" TEST HOLES)
(Street address or Description of Location)
TEST HOLES TO CONFIRM LOCATION
PURPaS. OFCSUC
Sketch uf riate)
nDEPHH0LMIG UT LIS E . PUIt EI IOFINALTZi�DESIGNOP SANITARY SEWER
DESCRIPTION OF CONSTRUCTION ALIGNMENT
ASABOVE. USING AIR AND VACUUM SOIL
extraction as a non-destructive method
DIMENSION OF INSTALLATION OR REMOVAL 8"TO10" HOLES SEE ATTACKED CONDITIONS
TO A DEPTH OF i TO 5 FEET
SIZE OF EXCAVATION, IF NEEDED A3 ABOVE
D Q
APPROXIMATE TIME WHEN WORK WILL BEGIN AS SOON AS
POSSIBLE FOR COACHELLA VALLEY WATER DISTRICT DESIGN
APPROXIMATE TIME OF COMPLETION TWO TO THREE DAYS JAN 0 3 1994
ESTIMATED CONSTRUCTION COST $ 61000.
(Including removal of all obstruction, materials, and debris, backfilling, com- Ry
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, +harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
Signature of Applicant or Agent
JOHN P. MARCINEK P.O. BOX 1578 PALM DESERT* CA 92261 (619) 360-3343
Name of Applicant (please print) Business Address Telephone No.
JOHN MARCINEKILEON FARLOW P.O. BOX 1578 PALM DESERT, CA 92261 (619) 360-3343
Name of Contractor and Job Foreman
Contractor's License No.
LIBERTY MUTUAL INSURANCE COMPANY
Business Address
Telephone No.
3032
City Business License No.
569840808
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class II I
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
Received by
Recorded by
$ 150
10
$ 160
Date
i
2030
PERMIT VALIDATION
PERMIT NO. 2028
DATE APPROVED 1-3-98
EXPIRATION DATE 1-7-94
1-3-94
DATE ISSUED
By .w
Administrative Authority,
4tt_fi'�TELEPHONE: (619) 564-2246
The tallowina General ano Special Provisions aro attached to and merle a part of Permit No.
GENERAL PROVISIONS
The following snail always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit autnerizes work to be accomplished within City of La Quints right of wav
ONLY. Whenever construction extenas within private procenv, it shall be the resoonsiDdity of the permittee for his COntractorsl to
Secure permission tram abutting property Owners. Such authOrizatlon must be secured by the Perrnittes prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaving construction SOUIPment shall not be oarmrttedto operate an env
Paved surface unless fitted wnh smooth -faced street pans. All meenanical outriggers snail be fitted witn rubber street shoes to protect
the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areae. If the existing
pavement is scarred. scallop. Or broken during the term of this contract, or it the pavement is marred. City of La Qujnte shall request
that these portions of road be resurfaeso over their Smite width. Resurfacing shall consist of one coat of two
surtaging plus appropnate seal coat as Specified above.orches 12'1 of A.C.
PROTECTION OF TRAFFIC: All excavations and work areas shall be -properly lighted and barricaded asdee ned
neceryby the City
Engineer or LaQuintaCity Public Works Inspectors. Suitabledetours and detour signs shallbePlaced and maintanedffoortheedura on
of the project. The City shall be notified 24 Hrs. in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe. concrete pipe. stesi Culvert a
concrete structures encountered during excavation which necessitate remove) shag be replaced in kind. In the ova -it nd
t.0 becomes
-- necessary to remove or cut existing drainage structures. City of La Quints shall be notified prior to commeneemem of this work.
Drainage structures and open drains shall be kept free of debris at all times tar proper drainage.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations Shall be removed fromthe right of
way. All paved surfaces shall be broomed dean of earth and other objectionable materials immediately eherbackfill and compaction
Existing gutter line and drainage ditches snail be replaced to their original standard or better. All excess ma[anal &hall be removed
prior to paving. Water tanker shall be used, as required, to sprinkle the lob site to keep down dust conditions and stray be used
immsdiatOlY after backfill.
DE -WATER OPERATIONS: If de -watering operations aro required arta PUMPS aro forcing wateron City of La Quints roads. it shall be
the responsibility of the permittee Icontractorl to control this water and to provide off-street barricades when napaaaani
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all timet to prowdS limned
access for the adjoining property owners and emergency vehicles. In the event K is tettbythe permmee that he must Clow a street for
any length of time. permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The follwing shall apply ONLY when indicated:
R/ NOTIFICATION: Permittee shell nattily the Ci -777-7D75
ty atfdM32246 at least 48 hours in advance of starting Construction.
R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amountot notless than a
stud be furnished in the name of City of La
roads and survey
Quints to cover all work involved in the restoration of the varlpua V Quint:
ey monuments. This bond shall be continuous until cancelled by the City Engineer, This bond must be
Posted prlcr to commencement of any work on this protea .
UTILITY CLEARANCE: (Substructures$ Prfor to making any excavation within tha City of La Quints right otwayauthcrized
by permit, the permmee shall contact all concsmad utility Companies relative to the latatron of existing Substructures.
Damage to existing substructures resulting from operebons conducted
of the permitted.under this permit ola
shallbathasresponsibility
UTILITY CLEARANCE: (Surface structuresl No work shall be done under this permit until all utilities ars dear of the
proposed work site. The permmee shall notify all concerned utility companies of the proposed work.
R5 PAVEMENT WIDENING. Area between the proposed concrete gutter line and the existing road pavement shall be
surfaced with inches of A.C. paving placed on_inches of class havaggregate subbase course
and S an "cation . Ordineof notance
law nce # n and in conformance With Cltyof La Quints Road Improvement Standards
and Specifications. Ordinenes #481.
R8 PARKWAY GRADING: Area between the property line and top of the Proposed concrete curbshallbegradedtosstopeof
1/4 inch to one foot (19.
R7 GRADES & STAKES: City of La Quints shall establish grades and stakes for the proposed concrete curb and gutter
construction.
R8 GRADE CHECKING: City of LaQuinteshall check gradesupon race= atplanandprofileand/or gra deeasasta011sIt
a licensed engineer.ad by
R9 CURB REMOVAL FOR DRIVEWAYS. A portion of the existing concrete curb and/or curb and gutter ( feet$shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quints Standard #207.
RIO DRIVEWAYS. A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the
property line and the existing road paving shall be 2-1/2 inches of A.C. paving placed an 1 "1 of clams
aggregate base. Driveway construction shall conform to attached drawing.
R11 CULVERTS: A :nch diameter 1 ) culvert shall be installed with the invert approxlmetelv 1-1 /2
inches below and in line with the existing flow line. Culvert installation shall conform to the attached drawing.
R1 SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained
R13 SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shallcomptywith the
manufacturer's Specifications.
R1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or
City of La Quints mei conduct in this area during the period of this permit. Work shall be coordinated with the State ar
City of La Quints forces to preclude delay or interference with State or City of La Quints projects.
(29> SURVEY MONUMENTS: Prior -to excavation or beginning of construction, all survey monuments which exist on the
camertine of all $trees or property lines when involved shad be eomplawly tied out so they may be readilyandcorrealy
tisnplaCadbyaIfcaMadcivilSngrnaiworsurvsysrattheStstetssotthepertttitrosAcotnplaasstotttotasstt Mn9th9
ties to tnom monuments WtaU bo furnshed m the City Engirwer prrortotnarsrrretrslof anynierwmarrta: Thbeffiea aMtl
be rlotdied upon eampNtien of replapanl M at all survey nin.............r ---
=.16=-RVEYMONUMENTS.P-,ortoexcavation oroeoinninoofconstruction. ail survey monuments small betied cut ovc1tv
u La Uuinta and suiaois oavment or guarantee Of oavment
snail be mane as reimoursemem for all work invarved.
817 'AVEMENT CUTTING: Pavement will be mecnanicanv cut to a straignt adds odor to excavation. Method of pavement
cunino shall be 000rovea throuan the office or the Citv Engineer. tUnder no circumstances snail excavating equipment
ce used to excavate onor to cutting or pavement). Excavation material snail be olacea in sucn a position as to best
facilitate the aeneral flow or traffic. Prior to final paving operations. anv aamaae to pavement stratgnt edge small be
correctea.
R18 'AVEMENT CUTTING: Pavement snail be saw cut prior to removal. Prior to final paving operations. any damage to
pavement stratgnt edge snail be corrected.
R19 LIMIT OF EXCAVATIONS: Excavations snail be limited to 1.000lineal feet of ooentrencn before backfillaoerstfons must
begin. All excavations snail be crooerly barricaded win Itahts overntdnt, on weekenas and hohdays tar tne protection of
the traveling pumic. The Public Works inspector snail determine the suitablllty of excavation barricaainq in each case. No
excavation snail remain open for a period exceeding live 151 days. No excavation snail be made unless the construction
material is actually on the worx size.
BACKFILL MATERIAL Backfill shall be free of brusn. roots or other organic substance oetrimenta. ; ; .;s usn for purposes
Of producing an adequately consolidated backfill. Any material which the City of La Quinta deems Unsuitable lspongyor
saturated material) which Is encountered during excavation shallnot be used for backfill, but shall be supplemented or
replaced by an approved. sand or gravel.
R21 BACKFILL SAND: Baektifl shall be approved transit -mix sand or equivalent and shall be placed in lifts of notgreaterthan
throe feet 131 ana vibrated using vibrotamoar or equivalent equipment. Alternate methods maybe substituted, but in any
®case a relative compaction of 95 percent shall be attained within the s:ruclurai section of the roadway.
BACKFILL PLACEMENT: Batddill shall be applied in lavers of not more inan 50 percent of the total depth of the trench
before flooding are maximum of five-foot 1511 ifts where trenches argot excessive depths. Care is to be exarctsad that the
backfill material is not subjected to extreme awed by flooding operations. Backfill material shall be placed ao that the
resulting compaction shall be not less than 90carcent or equivalent to the surrounding ground. whtcnevaristhe greater
compaction. Where ponatng or flooding Is used for a maximum senlemem, adequate dikes will be constructed to retain
the water. Where letting is used, the jets shall be of sufficient length to reach the bottom of eacn :aver and the water
supply shall• be continuous.
R23 COMPACTION TESTS: If so required bVthe inspector. compaction tests shall be made at intervalsof not Marathon I.DOO
feet and a minimum of one 11) test on each road. One 11) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Stannara Spelxfieattdns. Division of Highways. State of California, dated January 1973.
R2 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made far eacn crossing or sainnee line.
One I1) copy of each test shall be forwarded to the City Engineer tar approve) and filed prior to making permanent repairs.
Compaction teas shall be made asouutnso in Section 6.3.01 of the Standard Specdicatlans. Division of Highwe". State
of California, dated January 1973.
R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches at SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shad be placed
after a maximum of 3.000lineai feet of trench has been excavated and backfill operations completeo. but in no case shall
the placement of the temporary pavement exceed a five (5) day limit.
R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed. a temporary patch
consisting of two inches 12'1 of SC -800 shall be placed immediately. A permanent patch of
surfacing placed on a inch class base shall binches A.C.
beplaced no later [hon days after completion of
temporary road repair.
R27 PAVEMENTREPAIR:F.A.S.:Uponcamolettanofbackfillandcompactfon,atemoorarypatchconsistingoftwoinchesl2'1
of cold mix paving ISC-8001 shall be placed Immediately. A permanent patch of three inches 13'1 of A.C. surfacing shall
be placed On six Inches 16"1 concrete base as directed, but not later than fifteen 115) days after completion at temporary
Paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvem' smStandards
and Specifications. Ordinance #461.
R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all paten areas as
determined by the City Engineer.
R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas
where such Seal cents existed prior to issuance of this parmrt. Seal or armor coats shall be applied as specified in Section
37. Standard Specifications. State of California. Division of Highways, dated January 1973. Work of pavement repair to
be accomplished by a licensed contractor engaged in the business of pavement repair.
R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated. such striping shall be replaced upon
completion of permanent repairs.
R31 TREE RELOCATION OR REMOVAL. Tree relocation within the City of La Quinta road right of way shall beaoeompllshed
by a licensed. bonded and insured tree service, and handled safely without mterference or hazard to the vewling public.
It shall be the resconstbility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to highway
traffic. The entire width of the tree stump snail be removed and disposed of so that no debris remains in view of th
It
highway. The stumthe
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where e
becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at anyone time. Adequate
signs, flagmen and/or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever Is the greater compaction as determined by the Impact or field method. Compaction
tests shall comply with Section 6.3.01 of the Standard Specifications. Division of Highways. State of California, dated
January 1973.
R32 TREE TRIMMING:
a. Only the necessary trimming snail be acpomDllshed to provide clearance of the facility for one calendar year.
All broken or weak sections within the trimming snail be removed.
b. Where it becomes necessary to restrict traffic. the work shall be restricted to a maximum of 500 feet at anyone time.
. Adequate signs. flagmen. and/or barricades shall be provided to protea the traveling public at all times.
c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own
arrangements with adjoining property owners for consent to the trimming In addition to the authorization provided
by this oermrt.
d. All tree trimming on EVERGREEN TREES. PALM TREES. and other ORNAMENTAL TREES shall be accomplished to
the satstaakon of the City Public Works Inspector,
e: Abutting property owttere shall be txiitsctmm in all Insanes. prior to trimming or topping trona.
I. Pruning shag- in all inuancaa- be at the shoulder of the w - • i n
SPECIAL CONDITIONS --PERMIT NO. 2028
--- SOFT DIG UNDERGROUND SERVICES ---
In addition to the standard permit conditions, the following shall apply:
1. All work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works
Construction.
Permittee ,shall be responsible for providing continuous dust and erosion control.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently
if required.
4. Contractor shall comply with the local noise ordinance.. Operation and maintenance of equipment within one half
mile of human occupancy shall be performed only during the following time periods:
October - 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p. m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a. in. to 7:00 p.m.
Saturday 8:00 a. in. to 5:00 p.m.
Work shall be prohibited on legal holidays including Sundays.
-5. Permittee shall assume responsibility for repair of any pavement breakdown at the haul road access' to any public
or private street and for any damage to other City streets or facilities.
6. Advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards.
It shall be the permittee's responsibility to detour and barricade this site.
7. Street closures shall not be permitted. A minimum of one travel lane on paved surface shall be maintained with
flagmen at all times.
8. Should additional work, materials, or modifications of the work be required in order to meet city standards, safety
requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the permittee
as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta.
9. All landscaping, irrigation, decorative rock etc. shall be replaced to its original condition.
10. All work shall be coordinated with the City's contractor and others working within the area as directed by and to
the satisfaction of the City Engineer.
11. All backfill and subgrade soil shall be compacted to 90% relative dry density, all backfill soil within the top 2' of
finish pavement surface shall be compacted to 95 % relative dry density, all base material shall be compacted to 95 %
relative dry density.
12. Permanent pavement replacement section shall be one inch greater than existing. Permanent pavement shall be
installed within 72 hours of the temporary patch.
Special Conditions - Permit No. 2028
Page 1 of 1