2069NOTE: '
With proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class I I I
DATE: 2/17/94 Minor Improvement Permit Class IV
LOCATION OF C(ONCROACT�IONT) Storm drain catch basin on south side of Avenue 50
approx. 800' West of Park Avenue.
(Street address orDescriptionoff Location)PURPOSEEOF C�� fiNMCT )Discharge up to 3500 gpm for Sketch (attach construction plans if appropriate)
40 hours -of well -site -development water
DESCRIPTION OF
"�""ONSTRUCTIO"""""N`I Temporary installation
of water discharge hose into catch basin.
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED None - offsite
APPROXIMATE TIME WHEN WORK WILL BEGIN ftba=rW
APPROXIMATE TIME OF COMPLETION 30 — 98 Days
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) _
In consideration of the granting of this permit, the applicant hereby agrees to:
SEE ATTACHED CONDITIONS
Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four 124) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
&.a,=�..,0
g Ag -J,1
Signature of Applicant or Agent
Bakersfield Well & Pump Co. 1600 E. California Ave. Bakersfield 93307
Name of Applicant (please print) Business Address (805) 324-6026 Telephone No.
David Allacher Same AS Above
Name of Contractor and Job Foreman Business Address Telephone No.
440537
Contractor's License No.
City Business License No.
DIBUDID & DEFENDIS INS. WP9350036504
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class II I
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $
/9
0D•A-"'
�tS:..
Permit Fee
•
Penalty
Cash Deposit -Surety Bond
if required
TOTAL: $
90
Receipt No.
Received by
Date
Recorded by
PERMIT NO.
2469
PERMIT VALIDATION
2069
DATE APPROVED 2/18/94
EXPIRATION DATE �—� ( `9q
DATE ISS ED
By
Administrative Authority
TELEPHONE: (619) 564-2246
(I t,
----------------------------- ter=------ --- ----
--
NOTE:
With proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
7
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
�'►� �t`f
Subdivision Improvement Permit — Class ,II I
DATE: I Minor Improvement Permit Class IV' ^
LOCATION OF CC
$OOH u
(Street addrels or Dest
P RPOSE OF #f%O
40
DES T NOF
of 06tion)
L ' .0+Z 35 0
L L
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
APPROXIMA
. cc Lq
Sketch (attach construhi&&Irs� appproo )
` ptow 1994
CC) ti
ME WHEN WORK WILL BEGIN 'N ''_ 7 p�,&�
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST $ —O
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City,. its authorized agents, officers, representatives:and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quints and to pay for any additional replacement necessary as the result of this work.
Co .
Signature of Applicant or Agent I
" q 3 3o 7
isA
(P I- - COA_. 9:0aW(A �&1 r- 5A,�4,rASf'Zw C.am ?-
V -<
-y t C),e —� L,.j, _. % 1 C - q''i ( BdS)
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
,// 91.0 s -:P7
Contractor's License No. City Business License No.
8
LA, Jl1� fK F I, is --F t.�s wP1
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $
Permit Fee
Penalty
Cash Deposit -Surety Bond.
if required
TOTAL: $
Receipt No.
Received by Date
PERMIT NO. 2�69
DATE APPROVED 2 IS—IN
EXPIRATION DATE
DATE ISSUED
By
Recorded by 11 TELEPHONE: (619) 564.2246
Administrative Authority
r
s
,•
M �
i
r", �•` �
:,.. � .
<. � .
,, ,.
SPECIAL CONDITIONS --PERMIT NO. 2069
--- Bakersfield Well & Pump Co. ---
In addition to the standard permit conditions, the following shall apply:
1. All work shall be performed in accordance with the latest edition of the Standard
Specifications For Public Works Construction.
2. Permittee shall be responsible for providing continuous dust and erosion control.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each
working day and more frequently if required.
4. Contractor shall comply with the local noise ordinance. Operation and
maintenance 'of equipment within one half mile of human occupancy shall be
performed only during the following time periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30p.m.
Saturday 8:00 a.m. to 5:00p.m.
May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00p.m.
Saturday 8:00 a.m. to 5:00p.m.
Work shall be prohibited on legal holidays including Sundays.
5. Permittee/contractor shall assume responsibility for repair of any pavement
damage to any public or private street and for any damage to other City streets
or facilities as a result of work performed under this permit.
6. Advance warning signs and traffic control, shall be installed and maintained in
accordance with Cal Trans Standards. It shall be the permittee's responsibility
to detour and barricade this site:
7. Prior to excavating, the permittee shall contact Underground Service Alert at
1(800) 422-4133.
8. Should additional work, materials, or modifications of the work be required in
order to meet city standards, safety requirements, signage requirements, or to
fit actual field conditions, the work shall be performed by the permittee as
directed by and to the satisfaction of the City Engineer at no cost to the City
of La Quinta.
9. All work shall be coordinated with the City's contractor and others working
within the area as directed by and to the satisfaction of the City Engineer.
10. When the work i.s within 500' of a signalized intersection, the permittee shall
notify Riverside County Signal Dept. at (714) 275-6894 or Caltrans Signal Dept.
at (619) 688-6845 as appropriate a minimum of 48 hrs prior to starting work.
11. All backfill and subgrade soil shall be compacted to 90% relative dry density,
all backfill soil within the top 2' of finish pavement surface shall be compacted
to 95% relative dry density, all base material shall be compacted to 95% relative
dry density.
12. Permittee shall provide ramping over the discharge hose at the sidewalk.
13. Permittee shall take the necessary steps to ensure that the water being
discharged into the evacuation channel does flow into Ave 50.
14. Permittee shall be responsible for any flooding etc., and for restoring the area
to its original condition (landscaping, irrigation etc.)
Special Conditions - Permit No. 2069
Page I of 1
T4hf 4 1'wa"
78-095 CALLE TAMPICO - LA QUINTA, CALIFORNIA 92253 - (619) 777-7000
FAX (619) 777-7101
February 22, 1994
David R. Allacher
Bakersfield Well & Pump Co.
1600 East California Avenue
Bakersfield, CA 93307
Re: Extended Work Hours
Dear Mr. Allacher:
The City of La Quinta hereby grants Bakersfield Well & Pump Co. permission to work extended
hours for well drilling purposes, pursuant to section 6.08.050 (B)(2) of the Municipal Code with
the following conditions.
1.. Contractor shall meet with the Desert Fairways Home Owners Association and make a
reasonable effort to address and resolve all complaints regarding construction noise
resulting from extended work hours during well development operations.
2. A letter approved by the City shall be sent to all residents in the vicinity stating the
purpose of construction, work hours, anticipated start and completion dates of all
construction, as well as the. start ,and completion dates of the 24 hour operation. The
letter shall be in the. residents' possession 48 hours prior to starting the 24 hour
operation.
3. This authorization of extended work hours shall. expire on March 18, 1994. However,
the City reserves the right to terminate the extended hours authorization for any reason
without cause.
If you have any questions regarding this matter, please call David M. Cosper, Public Works
Director at (619) 777-7075.
Sincerely',
b�x,t-L. ttazl—,
Robert L. Hunt
City Manager
RLH: HG: hg
cc: David M. Cosper, Public Works Director J
MAILING ADDRESS - P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253
i
V. BAKERSFIELD WELL & PUMP CO.
• 1600 E California Avenue • Bakersfield. CA 93307 • 805/324.6026
TO: All Residents Near The Construction Site Of
Coachella Valley Water District
WELL 6703
February 22, 1994
Zim Industries, Inc. (Bakersfield Well & Pump) has been awarded a contract to construct water
well 6703 for the Coachella Valley Water District. The well site is located in the Desert
Fairways subdivision adjacent to Avenue 50.
We started construction during the week of February 7, 1994 and anticipate two months of
drilling activities to complete the well. Most of the well drilling operations will occur between
7:00 a.m. and 5:30 p.m.
However, depending on drilling conditions, and/or drilling problems it may be necessary to
operate the rig later than 5:30 p.m. We will try to avoid the later hours to the best of our
ability and if they cannot be avoided completely we will try to minimize them as best we can.
During certain phases of our operation it will be necessary to run continuous operations 24 hours
a day for approximately 2 weeks. The continuous operation is expected to begin on February
28, 1994.
Thanking you in advance for your cooperation, patience and understanding for our necessary
but, short stay in your neighborhood.
Regards,
Dave Allacher
Drilling coordinator
WATER SUPPLY SERVICES
FEB -16-94 WED 15:39
�Vfarq�is
MANAGEMENT GROUP
February 16, 1994
Public Works
City of La Oulnta
PO Box 1504
La Quinta CA 92253
Atten: Steve Speer
Dear Mr. Speer:
P . 0 1
68•$95 PEREZ ROAD SUITS 23
CATHEDRAL CITY CA 92234
(619)' 324-5811
PAX (619) 324-1701
The Board of Directors of Desert Fairways Homeowners Association has
approved the request from Mr. Allacher of Bakersfield Well & Pump Co. to
maintain twenty-four hour drilling seven days a week as necessary until the well
Is completed. The Board of Directors surveyed the owners directly affected by
the drilling and found that the owners are willing to allow the 24 hour schedule if
this means the project will be completed quickly.
The Board made a formal motion to approve the request with a reservation to
withdrawal the approval should the noise become unbearable. The contractor
was informed that the City would be notified immediately if the decision were
reversed.
Please feel.free to call if you have any questions.
Sincerely,
Nancyane
Account Executive
cc: Board of Directors Desert Fairways HOA
(David Allacher, Bakersfield Well & Pump Co.
BAKERSFIELD WELL & PUMP CO.
LIM
1600 E. California Avenue • Bakersfield. CA 93307 • 805/324-6026
February 15,1994
CITY OF LA QUINTA
Mr. David M. Cosper FEB 1 81994
Public Works Director
78-495 Calle Tampico PUBLIC WORKS
La Quinta, CA 92253
RE: Permit for extended work hours
Dear Mr. Cosper;
We have been contracted by Coachella Valley Water District to
construct a potable water well in the Desert Fairway Housing
Complex, near the intersection of Avenue 50 and Park Avenue.
It is to be approximately 1000 feet in depth and capable of
pumping approximately 3500 gallons per minute.
During certain phases of our operations it is vital to per-
form continous 24 hour a day, seven days a week operations.
I will break down these phases of our operation and give the
reason as to why continous operations are necessary.
PILOT HOLE
This is to determine what water bearing formations are avail-
able to design a well. it is vital information to determine
what kind of well can be made and if a well can be constructed
at all. Without continous operations the pilot hole can cave
off,cutting settle in hole, making it confusing at best to
determine the true formations encountered.
REAMING OF PILOT HOLE
This is a process of enlarging the pilot to a larger diameter.
The diameter and depth.of which is determined from information
gained from the pilot hole. The well normally takes water
during this phase of operation. If not a continous operation
the water in the bore can become clean, thereby taking huge
amounts of water to maintain the integrity of the hole.
INSTALLING CASING AND GRAVEL PACKING
The phase is done after completion of the reaming and is ac-
complished by welding joints of casing together as they go
into the reamed hole. After the casing is set, gravel is pumped
around the outside of the casing to fill the remaining part
of the hole. The gravel is what keeps the well from producing
unwanted sand. 24 hour a day operations are required by the
specifications.
TEST PUMPING
This is a procedure used to determine the capacity of the well
and is -used to design the permanent pump.
WATER SUPPLY SERVICES
BAKERSFIELD WELL & PUMP CO.
® • 1600 E. California Avenue • Bakersfield. CA 93307 • 805/324-6026
The time frame of events is that the pilot hole is drilled
first, and upon its completion there could be up to a two
day cease in operation, which allow for analysis of the data
and design of the well: The reason for continous operations
for the pilot hole was explained earlier.
When the reaming starts the only thing that keeps the bore
hole open is the fact that the hole is full of water. Loss
of water in the well would create caving thereby ruining the
bore hole. Depending on the amount of caving it can become
a very dangerous situation. The reason it is vital to main-
tain continous operations is that if the drilling has been
stopped and the hole is taking water,it tends to clean the
water thereby taking still more water and when you reach the
point that the well is taking more water than you can provide,
the walls of the bore hole will cave in.
Once the reaming has been completed and the installing of the
casing and gravel pack begin, there is no way to clean out the
bore hole, because of settling of the muds or caving of the
bore hole walls. The casing would have to be removed and
started over.
The test pumping 24 hour test is vital information for the
design of the final pumping plant and there is no way to
get this information in any other manner.
We would anticipate that with the extended continous hours
that we could complete all the above in 14 days.
For all the above reasons we respectfully request a permit to
have entended working hours. We will do our best to make the
operation as mild and short as possible.
Sincerely,
`a,U-L GY �,,&aeAu
David R. Allacher
Drilling Construction Manager
DRA/bsk
WATER SUPPLY SERVICES