Loading...
2092NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks,`parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS t 1 3/4/94 Subdivision Improvement Permit — Class I II DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Laguna De La Paz - Tract 20052-4 j Eidenhoaer and Vista Laguna (Street address or Description of Location) PURPOSE OF CONSTRUCTION Grading DESCRIPTION OF CONSTRUCTION $ee Approved Plans DIMENSION OF INSTALLATION OR REMOVAL Sketch (attach construction plans if appropriate) See attached Conditions On File.[ ZZ p SIZE OF EXCAVATION, IF NEEDED 0 APPROXIMATE TIME WHEN WORK WILL BEGIN 3/7/94 By APPROXIMATE TIME OF COMPLETION 4/94 ESTIMATED CONSTRUCTION COST $ 51.650.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: `. FD" 0 041994 4P Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent Roger Snellenberger & Assoc. Inc.. 55-695 Pebble Beach La Quinta 777-7766 Name of Applicant (please print) Business Address Telephone No. James E. Simon Co. Jeff Herrington 35-905 Dillon Rd. Indio 347-5399 Name of Contractor and Job Foreman Business Address Telephone No. A521795 1217 Contractor's License No. City Business -License No. Sfingi & Hannon Insurance Matt Costello 360-3700 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ Permit Fee Penalty' Cash Deposit -Surety Bond if required TOTAL: Receipt No. 516.50` 10.00 $ 526.50 Received by Date Recorded by 2092 PERMIT VALIDATION PERMIT NO. 2092 DATE APPROVED 3/4/94 EXPIRATION DATE 5/13/94 DATE ISSU D 4 By— 2 Administrative Authority TELEPHONE: (619)5ff4'-7 77— 7079 r y a I -he followino General and Special Provisions arsettarnaa to aro meas •Dart of Perron No. 09 a 'i GENERAL PROVISIONS the following snail always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property. it snail be the resoonsibillty of the Dermntes tot has Contractors, t0 secure permission from abutting property owners. Such authorization must De secured by the permittee Prior to starting work. TRACKLAYINGCONSTRUCTIONEQUIPMENT: Cleatedtracklevangconstructionedutpmentshallnotbepermmedt0opersteonam paved surtace unless f itted wnh smocin-faced street pacts. All mechanical outriggers snail be fitted with rubber street than to protea Me paving during excavations. Rubber-tirea e0ulamem only shall be used in baddill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this COMraa, or if the pavement is marred. City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of One cost Of two inches 12') of A.C. surfacing plus aocropnate deal coat as spentified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be propeny lighted and barricaded es deemed neeesti Mby the City Engineer or La Quints City Public Works Inspectors. Suitable detours a rid detour signs shall be placed and maintained for the duration of the prole". The City shall be notified 24 Mrs. in advance of any traffic detours or defineatrara CARE OF DRAINAGE STRUCTURES: Any drainage structure including cprrugated metal pipe, concrete Pape, steel Culvert and concrete structures encountered during excavation which necessitate removal shell be replaced in kind. In the ova Lit becomes neeessary to remove or cut existing drainage structures. City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed frontline right of way. All Paved surfaces shall be broomed dean of earth and other Objectionable materials immedaatelyafter backfill an o compaction Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shay be removed prior to paving. Water tanker shall be used, as required. to sprinkle the lob site to keep down dust conditions and shay be used immediately after backfill. DE -WATER OPERATIONS: If dewatering operations are required and pumps are forcing wateran City of La Quints roatls it shall be the resoonsioility of the Permittee 1ContractOr11 to Control this water and to provide off-street bamcades when nagssry. CLOSING STREETS: No street shall be closed. A minimum of one fere of traffic shall be maintained at all times to provide limned access for the adjoining property owners and emsrgenev vehicles. In the event at is fah by the permittee that he must Close a street for any length of time. permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The follwing shall apply ONLY when indicated: NOTIFICATION: Permittee shall nobly the Ci —77 % 7075- City s1t-5f3d-"ZZIIB It least 48 hours in advance of starting pptltprtaxi0n. •y R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not leas than s roads and survey monuments. This bond shall be continuous until cancelled by the City Engineer. shall be furnished in the name of City of La Quints to Cover ell work involved in the restoration of the vartdua V Quints Posted prior to -Commencement of any work on this prole". This bond must be R3 TILITY CLEARANCE: (Substructures) priartO Making any Oxcavationiainthin theCitV of La Quints arightatwipyguthOrized by permit, the pertnmee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations condu"sd under this permit shall be the $ole responsibility %;) of the permmse. g' UTILITY CLEARANCE: (Surface structures, NO work shall be done under this permit until all utilities Ire door of the Proposed work site. The permittee small notify all Concerned utility companies of the proposed work. RS PAVEMENT WIDENING: Area between the proposed Concrete utter line end the existing road ave surfaced with inches of A.C. paving placed on g g a rrierit shall be having an"R'velueof not less than inMesofelass aggregatssubbaseeourse and in conformance with CIry of la Quints Road Improvemam Standards and Specifications. Ordinance 0481. Re PARKWAY GRADING: Area between the property line and topoftheoroposedconcrete curbshellbegre.dedtosslopeof 1 /4 inch tc one foot I11. R7 GRADES & STAKES: City of La Quima shell establish grades and stakes for the proposed concrete curb and gutter construction. R8 RADE CHECKING: CItyofLaQuints snail check grades upon receipt ofPlan and profileand/or grades as established by a licensed engineer. R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter I feet$Small be removed. Curb and/orcurb and gutter shall be sewcut prior to removal. OeOressed curb. matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quints Stanoard 0207. RIO DRIVEWAYS. A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2-1/2 inches of A.C. paving placed on f —:'i of clssa aggregate bass. Driveway, construction shall conform to attached drawing. Rll CULVERTS: A :ncndiametert mcnes below and in line wain the existing flow line.vert) installation s alvert snail belceon oarmthe to the attachrdinvertidrsawing-l /2 R12 SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained. R13 SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall cOmptywith the manufacturer's Specifications. R14 COORDINATE -WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quints may Conduct in this area during the period of this permn. Work shall be Coordinated with the State r City of La Quints forces to preclude delay or interference with State or City of La Quints projects. o R1 SURVEY MONUMENTS: Prior to exavation or beginning of construction all survey monuments which exist on the centerline of all streets or property lines when involved shall be Complanly tied out to they may be lis"ty and Correaly tis tothes bVa umentsnsoo adhaflanginas►tor•uMYorattheeldense atUtepstmirtee.Acdrrtplan"tat notesfwwwrrgthe cies tomegmonumentslimastis ohsfirralamed to the City Engineer chim11ethsremovalofany mottum ina.Thlsotfiessmall be harmed upOm COmlpleppr Of roolalsmerit of sit surveb nortumenrs for Proper oroaser efalinkme. =.16 -RVEY MONUMENTS. Prior to excavation or oeammno or construction. au survev monuments snail betiej,=out ovCnv )e La Uuints ane suttacie oavmem or guarantee of payment snail ce maaa as reimoursemem for all work fnyory00, R17 PAVEMENT CUTTING: Pavement will be mecnaneesuv cut to a Straight cuBags prior to excavation. Method of pavemertt mno anal) be epprovea through office or the City Engineer. (Under no circumstances small excavating equipmem be uses to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best facilitate the general flow or trarfic. Prior to final caving operations. anv damage to pavement straight edge Shap be corrected, R18 PAVEMENT CUTTING: Pavement Small be saw cut prior to removal. Prior to final paving operations, any damage to pavement stralgnt edge snail be corrected, R1 LIMIT OF EXCAVATIONS: Excavations Shall be limited to 1.000 lineal feet at open trench before packfilloperations must begin. All excavations snail be properly barticaaed with lights overnight. on weekends and nolldays tar the grataetlon of the traveling putt ic. The Public Works inspector snail determine the suitability Of excavation barrecacing In each case_ No excavation shall remain open for a aerloa exceeding five 15) days. No excavation snail be mace unless the Construction material is actually on the work site. R2 BACKFILL MATERIAL Backfill shall be free of brush.rcotsorotherorganfcsubstancedetrimenta,::.:suseforpurposes Of producing an adequately consolidated backfill. Any matenel which the City of La Quinta deems unsuitable (Spongy or saturated material) which is encountered during excavation shallnot be used for backfill. but shall be supplemented or • replaced by an approved sand Or gravel. R21 BACKFILL SAND: Bacidill shall be approved traftsrt•mix sand or equivalent and shall be placed in lifts of nho igrsatarthan three feet (31 ane vibrated using vibratamper or equivalent equipment_ Alternate methods may be substlttfted, but in any case a relative compaction of 95 percent shall be attained within the c:ructural section of the roadwey. R22 CKFILL PLACEMENT: Backfill shell tis appliad in lavers of not more than 50 percent of the total depth Of the trench beton flooding ora maximum of five-foot 461 lifts where trenches aro of excessive depths. Care is to be sxsfetsed to nthe backfill material is not subjected to extreme swell bV flooding operations. Backfill matenel shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the Surrounding ground. whichever Is the greater compaction. Where ponafng or flooding is used for a maximum settlement. adequate dikes will be constructed to retain the water. Where letting is used. the jets shall be of sufficient length to reach the bottom of each :aver and the water supply shall be continuous. COMPACTION TESTS: If so required by the inspector. compaction tests shall be made at i marvals Of not more man 1,000 feet and a minimum of one 11) test on each road. One 11) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repair$. Compaction tests shall be mace as outlined in Sa Standard SpsCdieations, Division of Highways. State of California. dated January 1973. etion &301 of the RI COMPACTION TESTS: If so required by the inspector, compaafon tests shall be mace for each sassing or spvtw fine One (1) copy of each test shall be forwarded to the City Engineer fa approval and filed prior to making permanent repairs. Compaction tests shall be made asoutlineo in Section 6.3.01 of the Standard Specdieaalcns. Division of Higlmseye. State of Califomia, dated January 1973. R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary at) be piepaten consisting of 2 inches of SC-800 shall be placed on a prepared aubgrade. The SC-800 temporary paving sh after a maximum of 3.000 lineal feet of trench has been excavated and backfill operations completed. but Icod n noeaae shall the placement of the temporary pavement exceed a five 15) day limit. R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed. a tel 4mmry paten consisting of two inches (2) Of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed an a inch class base shall be placed no later than -d an road repair. alas ahaemnptetlon of R27 PAVEMENTREPAIR:F.A.S.:Uponcompletionofbackfillandcompaction,atemporarypatchconsistingoftwoinches(27 Of cold mix paving (SC-800) Shall be placed Immediately. A permanent paten of three enemas (31 of A.C. surfacing shall be placed on six inches (6') Concrete base as directed, but not later man fifteen (15) days after completion of temporary Plying. Concrete bass shall be of five-sack mix and shall conform to the City of La Quinta Road Improvemen[Standards and Specifications. Ordinance #461. R28 FOG SEAL A tog Seal coat consisting of an appliestion of asphaltic emulsion shall be applied over all patch peas as determinea try the City Engineer. R29 SEAL ARMOR COAT: A Seel coat consisting of an application binder and screenings shall be applied on all paten areas where such seal coats existed price to Issuance of this permn. Seal or armor coats shall be applied as scecdied in Section 37. Standard Specilieations. State of California. Division of Highway, dated January 1973. Work of pavement repair to be accomplished by a licensed contractor engaged in the business of pavement repair. R30 STREET RESTRIPING: Where street striping is still visible on streets 10 be excavated. such striping shall be replaced upon completion of permanent repairs. R31 TREE RELOCATION OR REMOVAL. Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed. bonded and ensured tree service. and handled satelywttnout interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to heghwev traffic. The entire width of the tree slump shall be removed and disposed of so that no debris remains in view of the highway. The Stump hole shall be backfilled and thoroughly compacted as Specified in the following paragraph. Where it becomes necessary to restrict traffic. the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and/or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivatem to the Surrounding ground. whichever is the greater compaction as determined by the impact or field method. Compaction testa shall Comply with Section 6.3.01 of the Standard Specifications. Division of Highways. State of California, dated January 1973. R32 TREE TRIMMING: a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year. All broken or weak sections within the trimming shall be removed. b. Where ttbecomes necessary torestrict traffic. the work shallbarestrictedtoamaximumof500feetatanyonetime. Adequate signs. flagmen. and/or barricades shall be provided to protect the traveling public at all time. C. If tree trunks are partially outside of the City of La Quima road right of way, permittee shall maks his own arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided by this permit. d. All tree trimming on EVERGREEN TREES, PALM TREES. and outer ORNAMENTAL TREES shall be aeeomplishad to the satisfaction of the City Public Works Inspecwr• e. Abutting property owners shall be ContatxalL fn sit instances, prior to trimming or rapping tress. I. Pruning shalt. in all insrattCea, be at the shoulder of the crotch to insure Sven. tau nestling m all citta of I" Inch" '79 ant) shown -M an— C..i.w..��..._ -_.._ . Iixanf lrreAl�ne � � ... .. .. .., .. _ _ y,�._v,_;•_��_ .k ?. .._:r�. <+., ... :.. 'i^ - _.:. - SPECIAL CONDITIONS --PERMIT NO. 2092 --- SNELLENBERGER 20052-4 --- In addition to the standard permit conditions, the following shall apply: 1. All work shall be performed in accordance with the latest edition of the "Standard Specifications For Public Works Construction'. No fill shall be placed which will cover or obscure asphalt concrete, petroleum product spillage, or other non-native materials. 2. Permittee shall furnish the name(s) and .phone number(s) of the individual(s) responsible for maintaining dust control after hours, weekends, holidays, etc. 3. All streets shall be kept clean of all trackage or spillage from vehicles using this site. The roads shall be completely cleaned at the end of each work day, if necessary, and more frequently if required. 4. Operation and. maintenance of equipment within one half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a. m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a. m. to 7:00 p. m. Saturday 8:00 a. m. to 5:00 p. m. Equipment may not be operated or maintained on legal holidays including Sundays. 5. Permittee is responsible for repair of any pavement damage or other damage to access roads and other public facilities. 7. Should additional work or modifications be required in order to meet established City Standards or in order to fit field conditions, the work shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 8. It is the permittee's responsibility to comply with the California Regional Water Quality Control Board's National Pollutant Discharge Elimination System (NPDES). 9. Any on-site haul road shall be effectively destroyed at the conclusion of the work to prevent use by unauthorized vehicles. 10. Permittee/contractor shall install stop signs to stop construction traffic prior to entering any street from the construction site. Special Conditions - Permit No. 2092 Page 1 of 2 k SPECIAL CONDITIONS - PERMIT NO. 2092 continued SNELLENBERGER 20052-4 11. If buried remains are encountered during development, a qualified archaeologist shall be contacted immediately and appropriate measures shall be taken. 12. All grading, shall be performed per the soils report. 13. It is the permittee/contractor's responsibility to provide continuous dust control while the grading is being performed, or at any other time as deemed necessary by the City Engineer. Permittee shall provide soil stabilization on the entire site per the approved dust control plan immediately after completing the operation. 14. Street closures shall not be permitted at any time. A minimum of one lane on paved surface shall be maintained at all times with flagmen at all times per CALTRANS standards or the WATCH (work area traffic control handbook). 15. All excavations at or near the travel way shall be backfilled at the end of each work day for the protection of the traveling public. No trenches shall be allowed to remain open overnight. 16. All grading shall be performed per the approved grading plan for Tract 20052-4. Special Conditions - Permit No. 2092 Page 2 of 2 NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT . PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 3�y / Subdivision Improvement Permit — Class I II DATE: / 1 / 94' Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Laguna De La Paz — Tract 20052-4 Eisenhower and Vista Laguna (Street address or Description of Location) PURPOSE OF CONSTRUCTION Grading DESCRIPTION OF CONSTRUCTION see approved plans DIMENSION OF INSTALLATION OR REMOVAL see approved plans SIZE OF EXCAVATION, IF NEEDED 0 APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION 4/94 ESTIMATED CONSTRUCTION COST $ 51j65-0.00 Sketch (attach construction plans if appropriate) -FD P (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,defend and save the City, its authorized agents, officers, representatives.and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this k. Signature of Applicant or Agent Rogpr SnP11PnbergPr & Assoc. Inc. r 5-695 Pebble Beach La 0uinta:777-7766 Name of Applicant (please print) Business Address Telephone No. ,Tames F.- Simon Co. Teff Herrington 35-905 Dillon Rd. Indio, CA 347-5399 Name of Contractor and Job Foreman Business Address Telephone No. A521795 Contractor's License No. 1217 City Business License No. f i ngi & Hannon Insurance Matt Costello 34 O — H76a N=W ✓'o> z cy/ Applicant's Insurance Company Policy Number _ L FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 5-16.6-0 Permit Fee Penalty Cash Deposit -Surety • Bond. if required TOTAL: Receipt No. $ 5.26. 50 Received by Date i PERMIT NO. o2oRa . DATE APPROVED EXPIRATION DATE S� �— DATE ISSUED By Administrative Authority Recorded by 11 TELEPHONE: (619) 564-2246 Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres)' Fugitive Dust (PM10) Mitigation Plan Date: 12/28/93 Jurisdiction: JA Project File #: Part 1 Project Information Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information. or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: Roger Snellenberger & Assoc. Inc. Address: 55-695 Pebble Beach La Quinta, CA 92253 Day phone number: 777-7767 Emergency phone number: Same Grading contractor (Contact Person): xenco Address: 51-510 Herrera La Quinta; CA 92253 Day phone number: 564-3562 Emergency phone number: same Construction site street address: Laguna De La Paz Construction site location: (Please include an &5x 11 location map) Laguna De La Paz Construction site assessor's parcel number (Tract #): 20052-4 Parcel (Tract) size: a Acres or Square feet Anticipated date of physical project initiation: March 94 Anticipated date of project completion: December 94 Anticipated costs for dust suppression: $ 2, 000.00 (Attachment B - Must also be completed mai a to t ze appropriate address when construction activities have been completed) 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. Earthwork Information (Acreage/Cubic Yards): Project Area: 8 AQP-" Cut: Import: J0,000 Phasic of Earthwork: Phase I Grading (Acreage): Phase II Grading(Acreage): Phase III Grading(Acreage): Total Disturbed Surface Area: J3 nC,eKs Fill: Export: Date Date From: 12/28/93 To: 3/1/94 From: From: Phase IV Grading(Acreage): From: (Attach additional information if necessary) Part 2 - Fugitive Dust Control Actions To: To: To: From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the corresponding letter beneath the following sources. In addition, please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating what measures are to be implemented, complete the "Details" section by describing how and when the measures are to be implemented. Source Details (e.a., frequency of application number and type of dust control implements. No. RG FG FC etc. Please be as specific as possible) 1 & C_ _ During the importing and grading stages the dirt will be kept wet with our water truck. In addition the project is surrounded with a six foot wall. 4 _ _ The street will be kept wet and washed down at the end of every day-.-_ Part 3 - Agreement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of La Quinta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this project. I also agree to complete the record-keeping requirements included herein as Attachment B' once the project has been completed. 1Z - tative at I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorized the implementation of all its provisions throughout project buildout. nature of Uraaing contractor or Au not the same as above) (P -A% -11 sentative ate For City Use Only Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved _X Conditionally approved (Conditions specified below) Denied (Explanation attached) (Attach additional information if necessary) I have read the above conditions of the Fugitive t (PM10) Mitigation Plan and I agree to implement of all provisions at the concentrations and frequencies identified. or Authorized Representative CONDITIONS FOR FRCP APPLICATION TRACT 20052-4 1. The full amount of security furnished with the approved dust control plan shall be available to the City for measures) deemed necessary by the City to achieve adequate dust control even though such measures may be other than those listed by the applicant on this application. 2. Applicant shall submit copies of all records/invoices related to cost accounting for the dust control measures assumed during grading construction. Said records shall be submitted within 30 days after completion of all dust control measures outlined in the plan, including any measures made part of the plan as a condition to its approval. 3. Paved roadways in areas to be graded shall be kept free of track -out and flushed with water and/or swept in sufficient frequencies and amounts so as to prevent blowing dust due to traffic on pavement.. No track -out of material shall be allowed onto streets outside of the areas proposed for grading. Any track -out into paved streets shall be swept or water -flushed by the end of the work day, and shall be kept damp during hours of operation until such time as it is removed. 4. Any imported/ exported materials shall be covered and/or wet down prior to transport. If material is. not covered, it shall be sufficiently stabilized (watered down) so as not to spill or create dust during transport. Minimum freeboard shall be as established by the Public Works Department. 5. Enforcement of these conditions shall be at the discretion of the assigned field inspector, who shall verify in the field that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities, and other aspects of this FDCP may be made by the inspector, at his/her discretion, to insure such compliance. 6. Upon submittal of the final grading plan, the City may require supplemental measures beyond those contained in this FDCP. At that time the applicant shall submit proposed measures for dust control to supplement the plan. DOCWN.007 ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Source Control Measures Comments (1) Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement will increase the moisture content thereby moving increasing stability of material o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Z) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist o 'Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available Source Control Measures (2) . Unpaved (I) Reduce speed limits Roads (Cont'd) (1) Reduce vehicle trips (3) Storage Piles ------------- (4) Paved Road Track -out (K) Wind sheltering (L) Wet suppression Comments o 15 mile per hour maximum o Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent ------------------------------------------------------------------------------------ o Choices include silos or enclosures o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings ------------------------------------------------------------------------------------------------------------------- (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles - o Entire surface area should be covered once vehicle is full ---------------------------------------------------------------------------------------------------------------------- (5) Disturbed (S) Chemical stabilization o Vendors can supply information on methods for application and Areas/ required concentrations Inactive Construction Sites (T) Watering o Would require frequent applications unless a crust can be developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant, native vegetation is encouraged ATTACHMENT B - COST INFORMATION Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres)' Fugitive Dust (PM10) Mitigation Plan Date: 12/28/93 Jurisdiction: Project File #: Project proponent: Roger . Snellenberger & Assoc., Inc. Address: 55-695 Pebble Beach La Quinta, CA 92253 Day phone number: 777-7767 Emergency phone number: In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: 1,000.00 Chemical stabilization: Wind fencing: Covering haul vehicles: Wheel washers: Street sweeping: 1,000.00 Paving: Wind sheltering: Coverings: Vegetation reestablishment: Alter project completion tnese recoras snau oe transmutea to the miry where ine grading/demolition permit was attained and to the Coachella Valley Association of Governments (CVA G) at the address provided below. PM10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. TO: Saundra Juhola, Admin. Services Director FROM: Marcus Fuller, Assistant Engineer I VIA: David M. Cosper, City Engineer DATE: July 15, 1996 SUBJECT: Tract 20052-4 - Laguna de La Paz The developer of the referenced project has requested the release of bond #156404S in the amount of $6,000.00 for dust control measures, as was agreed to with their PM -10 Fugitive Dust Mitigation Plan. As all site improvements have been completed, the security is no longer needed. Please release the associated bond. c: File, Permit 2092 mf