Loading...
2177NOTE: With proper validation this f4m constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class II I DATE: 5-18-94 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION City of La Quints, Washington & Calle Tampico (Street address or Description of Location) PURPOSE OF CONSTRUCTION Clear & grub site Sketch (attach constructionlans if appropriate) ppropriate) DESCRIPTION OF CONSTRUCTION Commercial shopping ctr. SHE ATTACHED CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL AMrOk- 8 acres Approx 5001x 700' SIZE OF EXCAVATION, IF NEEDED Approx. 8 acres APPROXIMATE TIME WHEN WORK WILL BEGIN Thursday 5-19-94 n� J I , APPROXIMATE TIME OF COMPLETION 5-23-94 � MAe17 �4 ESTIMATED CONSTRUCTION COST=$ 12,500.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the grariting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting' from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted� pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. w * f Signature of Applicant or Agent MOOREFIELD CONSTRUCTION, INC. 1950 SA3iTELLE 81vd.#295,L.A.,CA 90025 (310)478-8295 Name of Applicant (please print) 1 Business Address Telephone No' Name of Contractor and Job Foreman Business Address Telephone No. 397892 Contractor's License No. SCOTTSDALE INS. CO. City Business License No. GLS498836 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ Permit Fee 150.00 Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No $ 150.00 Received by Date Recorded by 2171. PERMIT VALIDATION PERMIT NO. 2177 DATE APPROVED 5-18-94 EXPIRATION DATE 5-27-94 DATE IS UE 5—A8-94 By Administrative Authority TELEPHONE: (619) 564-2246 1 7 MAY 18 '94 10:10AM MOOREFIELD'CONSTRUCTION INC. P.2/2 Aa aa++O99a PAla.d �.. _ VN Illit+»a --77'—s '.IVIL041 -.—�.A-- a•,hr., ji PU00 p.Ang.11+o"a 410* MINI, 00d 411Wt+d IuolidallVA LIWVd2 � OS � ood Wo11p101111 91�p9{R/ pt�9lfs e>1� �s11 s*p + {IWH j iWtiWfMA W 1 �w+tyli 111M uo!tonrs U" pROW$1m9 P W ISUI<W"WdWI IVARd flan v"manm p9mpu #0 %c IWAweA01dwi bllgnd 111 ala — �Iw+/d w9msAs W 1 Ybl/IMtigT1� 1t>t9td "WAN b31'►d A.L 1.111011 -rxto AYtldwe9 sowmtul purmld v s£8 6bS"10 MOT 3ONn.nSNI IIVO 1.LOOS x 'ON @WWII Imling A410 'ON RM01011 Vu1 MW1 ;4 Z68L6£ x maw PW. n;WTnvoa 0 WWVN X 5628-8Lb vmpub4dplil " 91&MPVtl91+P+18 L/v(midaaA)su.bltddwioswoN SZOOS dO sa v1 uy 501 `9W •pA LS a L la4MpS .0961 `ONI `NOI1571.SNW 0�3IAHOOW x wtcy ja 4upolwov ►d lum"m 9990 110 d0 /" N Aamem WkummOm ppm A" mi Amb Rus %ulna *4 :e 4m 941 to vo""- w pu/>•!N smi, bo IP Po 11uu/d ow to vmi pAo Ru/ jum iul't+9Mmul9u0 A11.1 sMie,Wg to NAVA Arolwop W" 9n Ina NAM laum W" rug A NNW40 u1 Imm (re) +ue►•+auWAS poll is Armin irly 64ML VIUMV s41 Alt1oN 'uapoHOW INA ba sumurW MOA /IWnsd 90 MUM W/gq%W M WWA Aug A 1trYU VMVWWd r M 6*JJA b A 4utOWN4 w.OWO m eulu/e mo 4"W10 M W l IWOWN 1s WR SUMIS pus mops IMW dg jWt•A wpq multlnM a91 as nitimm1 lisow d 14 MR Awe it'Witd)/ pus unw,mumno •rrAtydw/ Ms ...pmmw"WJ '/+M1B#s 'INUAN 01114J0*114 to 'A.lo ma vim Wr �1/P 'AIWwlput 1% WJt4 Agtta4 aLmllod9 aip 14wod 011 40 PuPuth 941 P u011RnP)/u05 ul " (ausWttAWd" AUYM*S J0/PYR AWRT#JhW UlMWnd BUmsid PV1 WAARRJ •1WWp9'etlBlti11199A'+lNg9P P"'111TRU A 'W9R*n nWM 111 10 I&ROIA a B+IPnISUI) s Woo NotsanvgNga osavw= VVIEZIS NOILI' Idwoo do WILL Li VAIXoW"y bm7G6E2a�riur. Mase MINI NaoM NI A4 3I1L RIVIRIXOtdidd �.w�rr.r�wnwwir.i, 0203IN d1'N*IJ.VAHPXj d0 2219 -WACV WW V0 N0U ` -TyAN1r0N - la ry ' 1a91�lo+dtl0 ft /uA10 VAI19(M3�RAp W91itf1 IR a1 N0110naamo io WWand toe"Van W uepowma +s MIN* W11bg) C7zd,% amv I m-pw ' gI AIi31i1nIdJ.>iNb;i d0 NISta,V'OC!'1 At 2" uurd UMUVAOWWI JOuIyW. 18iV0 """—'�"'— IBB a9tp—i1WWsd}wwsfaOkfwi Wvl>EIA1Pq"S ���8T�5 9901 IIAIKf81 S Q3AQWddV PUT 1)w.iNjVQA0Vdm KOMi1M LPA Wmwuev ul uulw&Awdwj muom *IWO 91111 iris pulp *1901 &V"M '114 'x101 tupwtfd '8W1A%PPl1 '11UNW SO 'MWF0119 'tWrD 191AIJU w *tohd JO U00rUnU00 a41 Iad (3N;�Y1t�t F�011l L N0110nLd.Ll N00 timmom oriond' 11WV3d ww Nol.l.V01'140 VJLNIMO V1 d® Ali* itW{l�tt suw+lp9on�B up mmpwco'Wai 910 ue1s�1I19A J404 4W IiilpM L #!Za9v ehl M +-606LLLLBti6b : WdSZ;e : v8—Ll-9 : OZOL joldooa,lai Xo,aeX:AS AAS j k ' r ) ' OOREFIELD ONSTRUCTION, INC. 1950 SAWTELLE BLVD. SUITE 295 LOS ANGELES, CA 90025 (310) 478-8295 CALIF. CORP. LIC. 397892 May 17, 1994 CITY OF LA QUINTA P.O.-Box 1504 La Quinta, California 92253 RE: LA QUINTA SHOPPING CENTER WASHINGTON & CALLE TAMPICO LA QUINTA, CALIFORNIA Dear Sirs: This shall serve as your authorization to allow Richard' Bianchi to pull any permits on Moorefield Construction, Inc.'s behalf for the above referenced project. Should you have any questions, please feel free to call. Sincerely, MOOREFIELD CONSTRUCT , INC. Mike Mooref d President M. M:atc SPECIAL CONDITIONS --PERMIT NO. 2177 --- MOOREFIELD CONSTUCTION --- In addition to the standard permit conditions, the following shall apply: 1. All work shall be performed in accordance with the latest edition of the "Standard Specifications For Public Works Construction". No fill shall be placed which will cover or obscure asphalt concrete, petroleum product spillage, or other non-native materials. 2. Permittee shall furnish the name,(s) and phone number(s) of the individual(s) responsible for maintaining dust control after hours, weekends, holidays, etc. 3. All streets shall be kept clean of all trackage or spillage from vehicles using this site. The roads shall be completely cleaned at the end of each work day, if•necessary, and more frequently if required. 4. Operation and maintenance of equipment within one half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m-. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Equipment may not be operated or maintained on legal holidays including Sundays. 5. Permittee is responsible for repair of any pavement damage or other damage to access roads and other public facilities. 7. Should additional work or modifications be required in order to meet established City Standards or in order to fit field conditions, the work shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 8. It is the permittee's responsibility to comply with the California Regional Water Quality Control Board's National Pollutant Discharge Elimination System (NPDES). 9. Any on-site haul road shall be effectively destroyed at the conclusion of the work to prevent use by unauthorized vehicles. 10. Permittee/contractor shall install stop signs to stop construction traffic prior to entering any street from the construction site. 11. Washington St. shall not be used as an access/egress point for construction equipment traffic unless otherwise approved by the City Engineer. 12. If buried remains are encountered during development, a qualified archaeologist shall be contacted immediately and appropriate measures shall be taken. 13. This permit authorizes the clearing and grubbing operation only. No Grading shall be performed until a grading permit is issued. 14. The project site shall be watered prior to and during the clearing and grubbing operation as directed by and to the satisfaction of the City Engineer. Special Conditions - Permit No. 2177 Page 1 of 2 IL .. , r f 1 4 Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres), Fugitive Dust (PM10) Mitigation Plan Date: 5/17/94 Jurisdiction: ,,a (,,rota Project File #: POD- 91f516 Part 1 - Project Information Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PMIO) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: ],a Quinta village Partnership Address: 796 W. 9th St., San Pedro, CA 90731 Day phone number. (310)547-3326 Emergency phone number. Grading contractor (Contact Person): Moorefield Constriction Mr. Fred Stephenson Address: 1950 Sawtelle Blvd., Ste. 295 Los Angeles, CA 90025 Day phone number: Emergency phone number: Construction site street address: N.W. Cor. of Calle Tampico and Washington St. Construction site location: See attached marked up Grading_ Plan (Please include an 8.5 x 11 location map) Construction site assessor's parcel number ("Bract #): R9-03084039, 769-030-044 Parcel (Tract) size: 9.33 AC. Acres or Square feet Anticipated date of physical project initiation: 5/23/94 Anticipated date of project completion: 6/17/94 Anticipated costs for dust suppression: $l01000.00 (Attachment B - Must also be completed and mailed tot the appropriate address when construction activities have been completed) MAY 1 7 1994 0 DEPARTMENT 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. t Earthwork Information (AcreagefCubic Yards): Project Area: 9.33 Ac. Total Disturbed Surface Area: 9.33 _ AC. Cut: 33,320 Import: 11, 280 Fill: 33,320 Export: 0 Phasing of Earthwork: Date Date Phase I Grading (Acreage): 9.33 From: 5/23/94 To: 6/17/94 Phase II Grading(Acreage): From: To: Phase III Grading(Acreage): From: To: Phase IV Grading(Acreage): From: To: (Attach additional information if necessary) Part Z - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the corresponding letter beneath the following sources. In addition, please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) colu»in. After indicating what measures are to be implemented, complete the "Details" section by describing how and when the measures are to be implemented Source Details (e frequence of application number and type or dust control iniolements. No. RG FG FC etc. Please be as specific as possible) 1 -.L _ — (A) Watering by means of triick, hoses and sprinklers 55 -2L _ (V) Establish as quickly.as possible when active operations have ceased the izse of rye grass and temporary irrigation as shown on attached marked up Grading Plan. 1 (Use copies of this page if additional space is needed) Source . Details (e.g., frequency of application. number and tree of dust control implements. No. RG FG FC etc. Please be as sMiric as possible) 4 Part.3 - Agreement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of La Quinta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this project. I also agree to complete the record-keeping requirements included herein as Attachment B. once the project has been completed. Signature of Owner or Authorized Representative ate I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorized the implementation of all its provisions throughout project buildout. nAture of Grading Contractor or Autnornze not the same as above) For City Use Only Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved xx Conditionally approved (Conditions specified below) Denied (Explanation attached) Signature of City Representative (Date) The following conditions of approval have been added to the Plan by staff in order to ensure. an adequate level of fugitive dust control Q�F�L T� %N7frcdf� GoNOJr7oNS /-�i�L(C1W-� S/G-�-Bd� /1£a?o4E0 �i✓co�u (Attach additional information if necessary) I have read the above conditions of the Fugitive Dust (PM10) Mitigation rtan to implement of all provisions at the concentrations and frequencies identified. ure of owner or ut 5 ze epresentat�ve ate agree CONDITIONS FOIA. FDCP APPLICATION LA QUINTA VILLAGE PARTNERSHIP 9.33 ACRES NORTHWEST -CORNER OF WASHINGTON STREET AND CALLE TAMPICO 1. Applicant shall comply with all control measure provisions as set forth in the approved FDCP, which shall include the following conditional measures and requirements. 2. The full amount of security furnished with the approved dust control .plan shall be available to the City for measure (s) deemed necessary by the City to achieve adequate dust control even though such measures may be other than those listed by the applicant on this application. 3. Applicant shall submit copies of all records/ invoices related to cost accounting for the dust control measures assumed during grading construction. Said records shall be submitted within 30 days after completion of all dust control measures outlined in the plan, including any measures made part of the plan as a condition to its approval. Security may be withheld pending submittal of this information. All such invoices shall be provided along with the required completion of the PM10 program report form, which can be obtained from the Public Works or Planning Departments. 4. Paved roadways in areas to be graded shall be kept free of track -out and flushed with water and/or swept in sufficient frequencies and amounts so as to prevent blowing dust due to traffic on pavement. Track -out of material shall be prevented onto streets outside of the areas proposed for grading. Any track -out into paved streets, either public or private, shall be swept or water -flushed by the end of- the work day, and shall "be kept damp during hours of operation until such time as it is removed. 5. Any imported/exported materials shall be covered and/or wet down prior to transport. If material is not covered, it shall be sufficiently stabilized (watered down) so as not to spill or otherwise create dust during transport. Minimum freeboard shall be as established by the Public Works Department. 6. Enforcement of these conditions shall be at the discretion of the assigned field inspector, who shall verify in the field that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities, and other aspects of this FDCP may be made by the inspector, at his/her discretion, to insure such compliance. 7. All construction access and approved travelways within the site shall be kept compacted and watered down so as to retain moisture content during construction traffic/activity. The road length shall be watered, each day, prior to any traffic activity and at the end of the day after all activity has ceased. Track out shall be removed as per Condition #3. Post two construction speed limit signs at 15 mph, one for entry traffic off Washington Street access and one for exit traffic at Calle Tampico access. DOCWN.007 8. All pads and other disturbed surface areas upon which construction activities will cease for more than 30 days shall be stabilized in the manner as approved in the FDCP. In any event, all disturbed surface areas during grading construction and rough grade stages shall maintain dust suppression methods until physical construction begins or interim stabilization is initiated pending such construction. 9. Import site at 50th Avenue and Washington Street shall also be regulated under the applicable provisions of these conditions; i.e., track -out, dust suppression, etc. Import material from this site may not exceed use of the spread material exported from Phase V of the Cove Improvement Program; i.e., no alteration of the original site relief beyond removal of the previously imported fill from Phase V. 10. Prior to grading permit issuance, applicant or developer shall comply with all condition requirements of Plot Plan 91-456 relative to grading requirements, archaeological reporting and site mitigation due to land disturbance associated with grading activities. DOCWN.007 ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Source Control Measures Commcnt (1) Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement will increase the moisture content thereby moving increasing stability of material o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles eat unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul,vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available Sou Control Measu Comments (2) Unpaved (1) Reduce -speed limits o 15 mile per hour maximum Roads (Cont'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent ------------------------------------------------------------------------------------------------------------------------------------------ (3) Storage (K) Wind sheltering o Choices include silos or enclosures Piles o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity (L) Wet suppression o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings ------------------------------------------------------------------------------------------------------------------------------------------- (4) Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved Road areas Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full ------------------------------------------------------------------------------------------------------------------------------------------ (5) Disturbed (S) Chemical stabilisation o Vendors can supply information on methods for application and Areas/ required concentrations Inactive Construction Sites (T) Watering o Would require frequent applications unless a crust can be developed over the site (U) Wind fencing o Three to rive foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant, native vegetation is encouraged ATTACHMENT B - COST INFORMATION Medium -Large Scale Construction/Demolition, Projects (Greater than 5 acres)' Fugitive Dust (PM10) Mitigation Plan Date: Jurisdiction: project File #: Project proponent: Address: I Day phone number. Emergency phone number: In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: Chemical stabilization: Wind fencing: Covering haul vehicles: Wheel Hashers: Street sweeping: Paving: Wind sheltering: Coverings: Vegetation reestablishment: After project completion these records shall be transmitted to the Oty where the grading demolition permit was attained and to the Coachella Valley Association of Governments (CVAG) at the address provided below. PM10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. COO �Ll BOND NO: 30598033 INITIAI. PREMIUM:188.00 , SUBJECT TO RENEWAL. SUBDIVISION IMPROVEMENTS PERFORMANCE BOND DUST CONTROL BOND KNOW ALL MEN BY THESE PRESENTS: Moorefield Construction, Inc. That µc. , as Principal. and Fidelity ane. Dgmit Omp—�ty of Maryla-k3urporation organized and doing business under and by virtue of the law; of the Statc of Marylandrnd drily lirc.n.ar.rl to rnntln,:r % ornrrrl .amrrty hmsinc.a+ in the State of California as Surety. are held and firmly bound unto City of La Quinta as Obligcc. in the sum of Ten Thousand and no/100 *** (g 10,968i.00 ** ) Dollars, for which payment, well and truly to be made, we bind ourselves, our heirs, executors and successors. jointly and severally firmly by these presents. THE CONDITION OF THE OBLIGATION IS SUCH THAT: %VHEREAS. the above named Principal, as a condition of the filing of the final subdivision map of ('tract; Parcel) Map No. 19730 L3 Qtllrtka Village 3)Tpulg Canenrtered into an agreement or agreements with said Obligcc to complete the improvements specified in said agreement or agreements. NOW TNERF,Ff-1RI-'. th? enndit;,.:n of th;v nblie v114 -h, Ih'It if tha ahnvo Prinriral shall urrII and tniIv rrr(r%rm caitl aorPPmPnt A agreements during the original term thereof or of any extension of said term that may be granted by the ()hligee with or without notice to the Surety, this obligation shall be void, otherwise it shall remain in full force and effect. , IN WITNESS WHEREOF. the stat and signature of said Principal is hereto affixed and the corporate seal and the name of the said Surctv is hereto affixed and attested by its duly authorized Attorney -in -Fact at Mission Viejo California, this 18th "PRINCIPAL - day of May .19 94 Moorefield Construction, Inc. 01 113 Rev. 2/81 "SURETY" Fidelity and Deposit Company of Maryland BY: / Stanley Attorney -in -Fact Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND HOME OFFICE, BALTIMORE, MD. KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by C. M. PECOT, JR. , Vice -President, and C..W. ROBBINS Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By -Laws of said Company, which reads as follows: "The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant.Vice-Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertakings, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages, ... and to affix the seal of the Company thereto." does hereby nominate constitute and appoint Stanley C. Lynn of Costa Mesa, Californi ITS and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings ............................... _ execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Company, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the Company at its office in Baltimore, Md., in their own proper persons. The said Assistant Secretary does hereby certify that the aforegoing is a true copy of Article VI, Section 2, of the By -Laws of said Company, and is now in force. IN WITNESS WHEREOF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this ........... 1.1.1:1}. .............. day of.......---------JumP.-------------------------------- - A.D. 19...&5... FIDELITY AND DEPOSIT COMPANY OF MARY N ATTEST: D . Assistant Secretary Vice. idau STATE OF MARYLAND 1 CITY OF BALTIMORE 55: On this 11th day of June A.D. 19 85 , before the subscriber, a Notary Public of the State of Maryland, in and for the City of Baltimore, duly commissioned and qualified, came the above-named Vice -President and Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my d affixed by Official Seal, at the City of Baltimore, the day and year first above written. NOTA lic ,o t.... ................... oil C Not ry Public m ' sion Facpires...July .1...... 1986 CERTIFICATE 1, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the original Power of Attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to appoint any Attorney -in -Fact as provided in Article Vl, Section 2 of the By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND. This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 16th day of July, 1969. RESOLVED: "That the facsimile or mechanically reproduced signature of any Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon is certified copy of any Power of attorney issued by the. Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. ' IN TESTIMO Y WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this....!.i1..�'.!1.1., day A..........! 4 . .......................... 19. ... L1429.—Cff. 012-6163 . ......... A.ui.vnnt .iirr.rn.v ca ks 2 --� MEMORANDUM TO: Saundra Juhola, Admin. Services Director 1 FROM: Hector Guzman, Engineering Technician) DATE: May 19, 1994 SUBJECT: La Quinta Village Shopping Center (PP 91-456) The developer of the subject project has provided the City with a Performance Bond (#30598033) in the amount of $10,000. The bond is a security for the Fugitive Dust Mitigation Plan. Please keep this Performance Bond in your Development file. cc: File, Permit 2177 hg w 2 � a m � U N Ftw! d1CY m .., f / t�iS'�