Loading...
2240NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT ( PUBLIC WORKS° CONSTRUCTION (ENCROACHMENT) r i For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works -improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I II DATE: 10-5-94 . Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION — S/W corner of Dune Palms Rd. and Miles Ave. Tract 23935-5 Topaz (Street address or Description of Location) S for or F PURPOSE OF CONSTRUCTION Grading.D Pads .,`Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Clear, Grub, & Grade See attached conditions Per the approved plans DIMENSION OF INSTALLATION OR REMOVAL Fugitive Dust Mitigation Plan on file SIZE OF EXCAVATION, IF NEEDED 8 acres APPROXIMATE TIME WHEN WORK WILL BEGIN 10-6-94 APPROXIMATE- TIME OF COMPLETION 11-15-94 ESTIMATED CONSTRUCTION COST $ 88.885 ;, (Including removal of all obstruction, materials, and debris, backfilling, som- � , paction and placing perwmanent resurfacing and/or replacing im provemeot s) In consideration of the granting of this permit, the applicant,*,Ireby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities,orlioss resulting from claimsFor,coyuMrrt action and arising tout of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours,in advance offtthe^timeme w� rk will be started. Comply with all applicable City Ordinances, the terms and c nditions o�off`th6 permit andall-applicablerules and regulations of the City of,. La Quinta and to pay for any additional replacement necessary as _th'!;"result°.of this Work. Applicant or Century Homes 1535 S Wr Street San Bernardle66; CA (909) 381-6007_, Name of Applicant (please print) Business Address / Telephone No. —.'' Aleen Wood Contracting "\. P.O. Box 556 Nuevo, CA 92567 (909) 928-9560 Name of Contractor and Job Foreman Business Address Telephone No. 314473-B� 2120 Contractor's License No. United National Ins. Applicant's Insurance Company FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 889 Permit Fee 10 Penalty Cash Deposit -Surety Bond if required TOTAL: ` $ 899 Receipt No. Received by Date Recorded by City Business License No. SMP42985 !r PERMIT NO. Policy Number - ILI OCT 0 5 1994` Fy 2240 PERMIT VALIDATION 2240 DATE APPROVED 10-5-94 i EXPIRATION DATE 12-31-94 , DATE ISSUED 1A-5-94 00, By T Administrative Authority TELEPHONE: (619) 564-2246 0 -he tollowand tieneraa ano SOOCu11 Provisions are artacr so to aro mace a Cart of permit No. 2410 GENERAL PROVISIONS The following snail always accov: ENCROACHMENT ON PRIVATE PROPERTY- This oermn autnorizes work to be accomailsned wamin City of la Quin ONLY. Whenever construction extends within Private eroeeriv. it snail be the resbonsaouaty or the Dammam waw for has ts to right ght of at a to secure permission rrorn abutting property owners. Such authorization must De secured by the permittee Prior to Starnng work. TRACKLAYING CONSTRUCTION EQUIPMENT: CleateO lrsclitwving construction eduapmemt shall not be bernitstedtooperate on env 08VOC surface uniess tied Wam smoctn•tacea street oaas. All nleenanical outriggers snail be fined wnn rubber street an.. LO crateG :no coving curing excavations. Rubber -tires eauadment only small be used in oacktall dcerstions in Davao areas. If the existinc Pavement is scarred. sOalleo. or broken during the term at this contract. Or it the Pavement is marreda. City of La eai that these portions at rasa be resurtaceo over their emirs width. Resurfacing smell Camara at One am Of two InchesInchesQuints small ail Ieduof A.C. surfacing plus a00i00riats 2081 coat a$ specified above. PROTECTION OF TRAFFIC: All excavations ana work areas smell baoropeny lighted and bamcaaad as assented necessary try the City Engineer or La Quanta City Public Works Inspectors. Suitable oetoursanodetour signs snail beclaceQand maintnecesormrythe int, of the proles. The City Shall be notified 24 Hrs. in advance of any traffic detours or delinaatforta CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe. concrete Ripe. $I I culvert amp cORCrate structures encounterea curing excavation which necessitate removal Shap be reduced in kid. In the evellt•it hecomie2 necessary to remove or stir auSting drainage structures. City of La Quanta snail be natdieo erior to commencement of this work Drainage Structures and open o mins small be kept free of deans at all tames tar proper Drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backtill operations snap be remo way. All pavea surfaces snail be arc omea clean of earth and other dblectionable materials ammeeuuly aherbaracwtilal Brom rite right m Existing gutter lane and drainage catches snail be re Placea to their original standard or potter. All testy as material 2hno Compaction. Prior di paving. Water tanker shall be used. as required, to sprinkle the lob site to keep Down dust cdndations and ahsu be usea immediatety cher badEfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints mods• it shall be the reseonslcallty or Ina permittee Icantractor) to control Inas water and to proms off•street barricades When necessary. CLOSING STREETS: No street shall be closed. A minimum access for me aalOaning at one Ione of traffic shall be maintained at all tames to prays@ limited property owners and emergency vemicies. in the event It Isfalt bvtne pearnttrue that he muRdose a chest for any length of time. Denntttee snail Contact this office to obtain the necessary Permission, SPECIAL PROVISIONS The tOiWng snail agoty ONLY when indicated: Rt NOTIFICATION: Permittee shell notify the City at gfik=8 at lean 48 hours in advance of starting cohatructaon. R2 . CASH DEPOSITS OR BONDS: A cash bona Oran approved surety bona in an amount of not less than s Stull be furnished in the name of City of La Quima to cover ell work involved in Ina restoration of the venous V Quanta roads and survey monuments. This bona Snell be continuous until cancelled Posted prior to commencement of any work on this protect. by ilio City Engineer. This beta must Oe R3 UTIL.ITYCLEARANCE:ISubstructuresiPriortomakinganyexeavauonwithnthiCityotLaOwntanghtotyveYeurhorizQO by permits, the permmee snail contact all concerned utility companies relative til tM Io�aOLU t-Onasigh tat e Damage to existing substructures resulting from operations conducted Una to ne' ' Shaul fe thetng �ructures. of the Committee. re4ombility UTILITY CLEARANCE: !Surface structures) No vidrs shelf be done under this perms until all utilities are deer of the Proposed work site. The permmee snail notify all concerned utility companies of the proposed wore, R5 PAVEMENT WIDENING: Area between tits propose surface" with inches of A.C. paving Placedno ochic-e gamer line and the existing road pavemam shall be having an"R'value ofnot lass imam _inehesatelass aggregates and in contormancswitmCitvotLaQuintaRoadl �baaeeewsa and Specific ations. Ordinance #461. mPrdvementStanaarda R6 PARKWAY GRADING: Area between the property line and tODOt thearoposed concrete curb snail begradadtoaalopeo} 1/4 inch to one foot 111. � RADES & STAKES: City of La Quinta shall establish graces and stakes for the proposed concrete curb and construction. putter RB GRADE CHECKING: City of La Quanta snail ehedagradesuvonreeeaptotalanandbeofileand/orgradesasesubfiaheaby a lirensea engineer. R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter 1 tOWIthau be removed. Curb ana/or curb and gutter shell be saw cut prior to removal. Depressed curb, mateming concrete gutter ana Concrete driveway approach snail be constructed in conformance with City of La Quinta Standard 0207. RIO DRIVEWAYS. A.C.: Driveways shall be constructed as not to alter existing Drainage pattern. Surfacing between the Property line and tore ersting road paving shall be 2-1/2 inches of A.C. paving placed an I aggregate base. Driveway construction snail conform to anacnea drawing. I of elasa._� R 11 CULVERTS. A :ncn Diameter i inches oeiow and in eine with the existing tlow lane. Culvertivnstauation s aUiconroarmert small be instled wthtto thee t erneDaaratMnng. 1/2 SIGHT CLEARANCE. Sight clearance of 600 feet In either direction snail be assured and maintamea. R1 SOIL STERILIZER: The area to oe surfaced shall be treatedvvith sou sterilizer. Rate of admication shall eamptywam the manufacturers specifications, 14 COORDINATE WORK: The propaseb work shall be sucoraanated to any operation which the State of California or City of La Quanta may conduct in this area during the ponoo of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or Interference with State or City of La Quanta crolecm. R15 SURVEY MONUMENTS: Prior to excavation or be re0utaa by • lielfgaa ciN) ength0el Or sum beginning of construction. all survey monuments which end on the cemenine at all scree" or property hews when involved shall be Doolatety tied out so they may be raaylyarm r m�rGCIV rvevmr at the examanse at the owimmealA cam stem Seat of mates atiovaana me ties to mese monumsn" snob be turman ad to the City Emmsesr orarto the rertlmyer ae am ffmmmem". This arrKe snail da ndtmea udmn cwnoswoon of roouannom at all survey Rgssurnemle for aeeee►are.ect ewwAmrw .0_-.X .- �... w.���•.r •.�•.•. _... . . � . i.... • ter.. y... 'i.T :. .. . �. . �. _ �. Y'e �. ?:i .. a . , t 6 _»VEY MONUMENTS P••or fo excavation or ceoimmno or construction. ant survev monuments snalr be tied :t La Quinta and soman oavmem or guarantee or oavmem snail be made as reimoursemem t outpv t.n, R 17 °AVEMENT CUTTING: Pavement will be macnanwuv cut to a or all Ni01 involved. cutting snail be aborovea tnrcuon the office of the City Engineer. winner ado a orf o r to exit s seen . oe used to excavate prior to cuttino or oavementf. Excavation material snarl be placed to such a position df Davamem raciletate the oeneraf flow of traffic. Prior to final paving operations, anv camaae to pavement excavating equfomem hted as ro pest corrected. straf R1 PAVEMENT CUTTING. Pavement snall be saw cut prior to removal. Prior to final pawn gilt nods sage be Pavement straight edge snail be corrected. q operations, R19 LIMIT OF EXCAVATIONS: Excavations snail be umitec to 1.000lines, feet of open trench before oacktill d any damage to begin. All excavations snail be property barricaaeo witn lidh[s Overiiignt, on yyeQ1iends and nolldays for to the traveun perotions must gpulre.Thnopen Workstnspectorsnaea'vermtn.,nesu.......TV-excavationbarridaaen i °eonactionm t excavation shall remain open for a period exceeding rive i5l days. No excavation shall De mate unie material is actually on the work site. 9 neeeneructase. No BACKFI ss rile construction LL MATERIAL Backtill shall be free or brush. roots or other organic substance detrimenta.. _ .:s of Produefng an adegwrohr consoudateo baedill. Any material wnteh the City of replaced by an approved sano or gravel. La pointe deems insultablelspongyor saturated ni ater1n11 which is encountered during excavation shall. not be used for backfill, but shall uaefe Ouftec or \ R21 BACKFILL SAND: Backfill °hall be aporeved transa.mn sa_ nd or be suppiamenea or throe feet 131 and vibrated usingvibrotaatent equivalent and shall lin olaceo in lifts Of not case a relative compacDon of 95 percent shall be artaineO equivalent �te Rateal etndda may be substituted. greater than BACKFILL PLACEMENT: Backfill snail be appiud in lavers [rf not more than 50 section of the roaovi y. but to any before fiddmngoramaumumatfive•foot1511ihswnaretreratnotches r Percent of the totala Of baeydill.matenal is not subhecten to extreme tiviell °nf a:eessrve demlts. Care is to be se� the venhe resulting compaction shall be not less than 90"611 y flrooding operations. Backfill material shall be placed that the ecurvatemito the compaction. Where conning or flooding is used for a malumum sememem. aaeouaee dikes will be con so the the 9 ground. whichever lithe greeter the water. Where letting is used. the lets shall be of sufficient length to ream the bottom w cane :a s[rppty Shall -be continuous, Brand the retain �2 COMPACTION TESTS: If so requiredor, ver and the water DaCuOn Tests feet and a minimum of one 111 test on eachroaQ One I I I copy or each lest, nabe il beeforwarded to the Cl at 'marvels of not more than t,ODO aDOroval anofiled prior to making permanent repairs. Compaction tests shall ba made aSOutiined In Serndh Standard ScaCIf=atIOnL Division of Hi h Engineer for R24 COMPACTION TE Highways. State of California, dated January 1973, e 3 01 of the STS: K so redutred lila the inspector, compaction tens snail be mace for each atlssm One 11) copy at each teat shall be forwardea to the City Engineer tar approve 1 and f ited brtor to makin Compact" tests shall be made as outlined in SPermanent g Or service line. Of California. Section 6.3 01 ottheStardaro Speerfieatlons.0ivisionu H •hemroo tate oared January 1973, phweya. State R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a t , patch consisting of 2 inches of SC -800 shall be placed on a orecared $upgrade. The SC -800 temporary ns mpteteavingnd. but n �shaced rV paving chap i>. pleee0 the placement of the temporary pavement exceed a five 151 day limit. R26 PERMANENT PAVEMENT REPAIR: Atter oacktill and Compaction operations nave been completed, a Le consisting of two inenes 121 of SC shall be placed immewateiv. A permanear oaten of surfacing �Orary patch 9 ptecea on a inch class base shall be pieced no later than ina+ea A. C. temporary road repair. days cher ' cdmptetian of R27 PAVEMENT REPAIR: F.A.S,: Upon completion of backfill and eoniprrtaion, a temporary patch consistingof twdinches 127 Of cold mix Paving ISC-8001 shall be placed immediately. A permanent paten of three inches 13'1 of A.C. D* placed on six intros 16'1 concrete base as directed.. but not later than fifteen I15) day$ after completion of to Pmng' Concrete base shall be of fiv"act mix and shall conform surfacing shall and SDebrticenons. Ordmance 0461. to the City of La Diorite Road lmprpyer^ moorary R28 FOG SEAL: A fog seal coal consisting of an application Of a OMIStandaras determined by the City Engineer. aDhahit emulsion snail be eppnea over all Patch arena as R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings snail be applied on all where such seat coats amazed prior to issuance of thts oermn. Seal or armor coats snail be spoiled as specified In Season 37, Standard Spadlfications. State of California, Division of H' Wtat areas ran be accomplished by a licensed contractor engaged in the beat^ 003,60 January 1973. Work of awm 30 TREETmalar RESTon of P rma: aWhere ep ire. oing Is still viskote On streets toas xcaweed. Such striving shall be rep acen upon nt repair. airto dntnpla[tdn of pefmanem repairs. R31 TREE RELOCATION OR REMOVAL. Tree relocation within the City of La puinta road right of wav shall be accomplished by a licensed. bonded and insured tree service, and handled safely without mt6rferenee or hazard to the tea ccom pushed ehng It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location Trees to be removed shall be removed in sections which can be handled safeivwrthout interference or ria o highwav traffic. The entire width at the tree stump snail be removed and cusoosea of so trial no debris highway. The stump hate shall bebackftlledand thOrougntyCompacted asSpecified inthsfollowin pam3graph. v erect becomes necessary to restrict traffic, the work shall be restnaep to a maximum of 500 feet a, any one time. paragraph. it 319113• flagmen and/or barricades shall be provided to protea the traveling public at all rimes. Adequate Large holes resulting from tree removal shall be bac tilled and compacted to not less than 90 percent or surrounding ground. whichever is the greater Compernon as deterimned by the impact or field me,hod TOM nail comply with Seaton 6.3.01 of the Standard S equiCompaothe January 1973. Specifications. Division of Highways. State of California.orCompaction dated R32 TREE TRIMMING: a. Only the necessary trimming snail be accomplished to Woviae elearenee of the feeding for one calendar r. All broken or weak sections within the trimming shall be removed, D. Where it becomelneeessarytorest ricttraffic. the work ahallberestricted toamaximumOf500feetatangonetme. Adequate signs, flagmen, and/or barricades snail be provided to protea me traveling coolie at all times. G It tree trunks are partially outside of the City of La dolma roan right of way. parmmeePubl shall make his dMr^ by this mentspermit with aalotning property owner for consent to the trimming in addition to the authorization provided by this oermn. III. All tree trimming on EVERGREEN TREES. PALM TREES. arta other ORNAMENTAL TREES shall t» aaomOtiahed to the sattsfaalon of the City Public Works Inspaapr. e. Abutang Property owaas shall be contacted In ad inst§fwmc onor to tn Pruning anall, in all mmanmming or topping thea tla a e the shoulder of the a'elcn .. i SPECIAL CONDITIONS --PERMIT NO. 2240 --- CENTURY HOMES TRACT 23935-5 ---- In addition to the standard permit conditions, the following shall apply: 1. All work shall be performed in accordance with the latest edition of the "Standard Specifications For Public Works Construction". No fill shall be placed which will cover or obscure asphalt concrete, petroleum product spillage, or other non-native materials. 2. Permittee shall furnish the name(s) and phone number(s) of the individual(s)' responsible for . maintaining dust control after hours, weekends, holidays, etc. 3. All streets shall be kept clean of all trackage or spillage from vehicles using this site. The roads shall be completely cleaned at the end of each work day, if necessary, and more frequently if required. 4. Operation and maintenance of equipment within one half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to.5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a. m. to 7:00 p. m. Saturday 8:00 a. M. to 5:00 P. M. Equipment may not be operated or maintained on legal holidays including Sundays. 5. Permittee is responsible for repair of any pavement damage or other damage to access roads and other public facilities. 7. Should additional work or modifications be required in order to'meet established City Standards or in order to fit field conditions, the work shall be performed by the permittee as directed by and to the satisfaction. of the City Engineer at no cost to the City of La Quinta. 8. It is the permittee's responsibility to comply with the California Regional Water Quality Control Board's National Pollutant Discharge Elimination System (NPDES). 9. Any on-site haul road shall be effectively destroyed at the conclusion of the work to prevent use by unauthorized vehicles. 10. Permittee/contractor shall install stop signs to stop construction traffic prior to entering any street from the construction site. Special Conditions - Permit No. 2226 Page 1 of 2 SPECIAL CONDITIONS - PERMIT NO. 2240 continued CENTURY HOMES TRACT 23935-5 11. If buried remains are encountered during development, a qualified archaeologist shall be contacted immediately and appropriate measures shall be taken. 12. All grading shall be performed per the soils report. 13. It is the permittee/contractor's responsibility to provide continuous dust control while the grading is being performed, or at any other time as deemed necessary by the City Engineer. Permittee shall provide soil stabilization on the entire site per the approved dust control plan immediately after completing the operation. 14. Street closures shall not be permitted at any time. A minimum of one lane on paved surface shall be maintained at all times. with flagmen at all times per CALTRANS standards or the WATCH (work area traffic control handbook). 15. All excavations at or near the travel way shall be backfilled at the end of each work day for the protection of the traveling public. No trenches shall be allowed to remain open overnight. 16. All grading shall be performed per the approved grading plan for Tract 23935-5. Special Conditions - Permit No. 2226. Page 2 of 2 Tjht 4 4 Qu&& MEMORANDUM J TO: Saundra Juhola, Admin. Services Director FROM: Hector Guzman, Engineering Technician DATE: October 7, 1994 SUBJECT: Century Homes Tract 23935-5 The developer of the subject project has provided the City with a Performance Bond (#156837S) ,in the amount of $13,200. The bond is a security for the Fugitive Dust Mitigation Plan. Please keep this Performance Bond in your Development file. cc: File, Permit 2240 hg Ins5 BOND NO: 1568375 ffl�c--D- INITIALPREMIUM:� _$185.00 SUBJECT TO RENEWAL. SUBDIVISION IMPROVEMENTS PERFORMANCE BOND "DUST CONTROL" i KNOW ALL MEN BY THESE PRESENTS: That we, TOPAZ ASSOCIATES, L.P. , A CALIFORNIA LIMITED PARTNERSHIP as Principal, and DEVELOPERS INSURANCE COMPANY, a corporation organized and doing business under and by virtue of the laws of the State of California and duly licensed to conduct a general surety business in the State of California as Surety, are held and firmly bound unto CITY OF LA QUINTA as Obligee. in the sum of THIRTEEN THOUSAND TWO HUNDRED AND NO/100-------------------------=------ ($ 13.200.00 ***** ) Dollars, for which payment. well and truly to be made, we bind ourselves, our heirs, executors and successors, jointly and severally firmly by these presents. THE CO.NDITION OF THE OBLIGATION IS SUCH THAT: WHEREAS, the above named Principal, as a condition of the filing of the final subdivision map of (Tract/Parcel) Map No. 23935-5 entered into an agreement or agreements with said Obligee to complete the improvements specified in said agreement or agreements. NOW THEREFORE, the condition of this obligation is such, that if the above Principal shall well and truly perform said agreement or agreements during the original term thereof or of any extension of said term that may be granted by the Obligee with or without notice to the Surety, this obligation shall be void, otherwise it shall remain in full force and effect. IN WITNESS WHEREOF, the seal and signature of said Principal is hereto affixed and the corporate seal and the name of the said Surety is hereto affixed and attested by its duly authorized Attorney -in -Fact at 1425 W. Foothill Blvd., #120- Upland California, this 3rd day of October 19 94 "PRINCIPAL" TOPAZ ASSOCIATES, L.P.,A CALIFORNIA LIMITED PARTNERSHIP by: CENTURY HUMES. COMMUNITIES, A CAL!FuRN1A CURPURATIUN, AS GENERAL PARTNER NEINTRAUB, ASSISTANT SECRETARY DI 113 Rev. 2/91 "SURETY" DEVELOPERS INSURANCE COMPANY BY: MIPAEL J. ENSEL, Attorney -in -Fact 17780 Fitch Irvine, California 92714 (714)263-3300 STATE OF California COUNTY OF San Bernardino On October 3, 1994 PERSONALLY APPEARED , before me, Michael J. Hensel personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowl- edged to me that he/she/they executed the same in his/ her/their authorized capacity(ies), and that by his/her/ their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Signature SS. Marci Schaefer OPTIONAL - 2", `111ARC1 SCHAEFER NOTARY FUBL;C CALir"ORNIA PRINCIPAL OFFICE 1N \; >AN $RRNARDIN01 COUNTY This area for Official Notarial Seal Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER r ME(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) DEVELOPERS INSURANCE COMPANY DESCRIPTION OF ATTACHED DOCUMENT Performance Bond (Dust Control) TITLE OR TYPE OF DOCUMENT One NUMBER OF PAGES October 3, 1994 DATE OF DOCUMENT None SIGNER(S) OTHER THAN NAMED ABOVE ID -081 Pev.6/94 ALL-PURPOSE ACKNOWLEDGEMENT • • POWER OF ATTORNEY OF i' INDEMNITY COMPANY OF CALIFORNIA AND DEVELOPERS INSURANCE COMPANY N2 269158 P.O. BOX 19725, IRVINE, CA 92713 • (714) 263-3300 NOTICE 1. AN power and autfiortty herein granted shall In any event terminate on the 31st day of March, 199& 2. This Power of Attorney Is void It attend or it any portion Is erased. 3. This Power of Attorney Isvokt unless the seal Is readable, the text is In brown Into, the signatures aro in blue Ink and this notice Is In red ink. 4. This Power of Attorney should not be returned to the Attorney(s)-In-Fact, but should remain a permanent part of the obligee's records. KNOW ALL MEN BY THESE PRESENTS, that except as expressly limited, INDEMNITY COMPANY OF CALIFORNIA and DEVELOPERS INSURANCE COMPANY, do each severalty, but not jointly, hereby make, constitute and appoint ***SUSAN C. MONTEON, ALICE RODRIGUEZ, MICHELLE HAASE, E. URENO, MICHAEL J. HENSEL, JOINTLY OR SEVERALLY*** the true and lawful Attorney(s)-In-Fact, to make, execute, deliver and acknowledge, for and on behalf of each of said corporations as sureties, bonds, undertakings and contracts of suretyship in an amount not exceeding Two Million Five Hundred Thousand Dollars ($2,500,000) In any single undertaking; giving and granting unto said Attorneys) -In -Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation; and all of the acts of said Attorney(s)-In-Fact, pursuant to these presents, are hereby ratified and confirmed. The authority and powers conferred by this Power of Attorney do not extend to any of the following bonds, undertakings or contracts of suretyship: Bank depository bonds, mortgage deficiency bonds, mortgage guarantee bonds, guarantees of installment paper, note guarantee bonds, bonds on financial institutions, lease bonds, Insurance company qualifying bonds, self -insurer's bonds, fidelity bonds or ball bonds. This Power of Attorney is granted and Is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of INDEMNITY COMPANY OF CALIFORNIA and DEVELOPERS INSURANCE COMPANY, effective as of September 24,1986: RESOLVED, that the Chairman of the Board, the President and any Vice President of the corporation be, and that each of them hereby Is, authorized to execute Powers of Attorney, qualifying the attorney(s) named in the Powers of Attorney to execute, on behalf of the corporation, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assis- tant Secretary of the corporation be, and each of them hereby is, authorized to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporation when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which It is attached. IN WITNESS WHEREOF, INDEMNITY COMPANY OF CALIFORNIA and DEVELOPERS INSURANCE COMPANY have severally caused Mese presents to be signed by their respec- tive Presidents and attested by their respective Secretaries this 1st day of April, 1993. INDEMNITY COMPANY OF CALIFORNIA I ' t F. Viroerti. jr: President i • = acy. IL ATTEST IMF o 011 Wafter Crowell Secretary STATE OF CALIFORNIA) DEVELOPERS INSURANCE COMPANY By r Dan F. Vtncertl, Jr, President `ATTEST Netlp4 c ' O�F014A MAR. u» ; 0 s' ) SS. COUNTY OF ORANGE ) On App 1, 1993, before me, Tinsa Tsatua, personally appeared Dante F. Vlnosnti, Jr. and Wafter Crowel, periorally known to me (or provided to me on the basis of satislWory evktence) to be the persons) whose name(s) •is/are subscribed to the within Instrument and acknowledged to me Mat he/she/they executed tie same in his/her/their authortxed capadtyfss), and that by his/her/their sigr"re(s) on the instrument the peraon(s), or the entity upon behalf of which the persons) acted, executed the Instrument. WITNESS my hand and official sed. ' ereeeeeeNN - OFFICK SEAM TIRESA TAAFUA Signature T NOTARY P6FtriIC•GILIFOfitNA �p PRINCIRALOFFICEN ORANW COUNTY My Cwm &;m Exp Aug. 4.1995 r CERTIFICATE The undersigned, as Senior Vice President of INDEMNITY COMPANY OF CALIFORNIA, and Senior Vice President of DEVELOPERS INSURANCE COMPANY, does hereby certify that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore, that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney, aro in force as of the daft of tithe Certificate. This Certificate is executed In the City of Irvine, California, this 3rd day of October 199 4 INDEMNITY COMPANY OF CALIFORNIA rpAMy i OM.4 0 By ra Senior Vice President 1 ID -310 REV. 4/93 DEVELOPERS INSURANCE COMPANY P� mail pat0o By LC. Fletilger Senior Vice President CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of CALIFURNIA County of SAN BERNARDINU On Uctober 4, 1994 before me, Doris A. Benoit, Notary Public , DATE NAME. TITLE OF OFFICER - E.G.. *JANE DOE. NOTARY PUBLIC" personally appeared **Gary Weintraub** NAME(S) OF SIGNER(S) 19 personally known to me - OR - e 15asis OT satisT5 to be the person(&) whose name(s-) is/afe subscribed to the within instrument and ac- knowledged to me that he/sem executed the same in his/herr/tom authorized capacity(L&4 and that by his/I srlthair .. D0RIS A. BENOIT signature(sj on the instrument the person(&), rn Comm. No. 991106 NOTARY FUBLIC- CALIFORNIA CAP or the entity upon behalf of which the SAN BERNAROINOCOUNn person(&} acted, executed the instrument. I My Comm. Exp, lune 13, 1997 ~ WITNESS my hand and official seal. SIGNATUREOF TTARY OPTIONAL No. 5907 Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑( INDIVIDUAL ISI CORPORATE OFFICER Assistant Secretar TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) Century Homes Communities DESCRIPTION OF ATTACHED DOCUMENT Subdivision Improvement Bono TITLE OR TYPE OF DOCUMENT Une NUMBER OF PAGES Uctober 3, 1994 DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE ©1993 NATIONAL NOTARY ASSOCIATION - 8236 Remmet Ave., P.O. Box 7184 - Canoga Park, CA 91309-7184 r NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit k APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For. the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS (:�ASubdivision Improvement Permit — Class I I I DATE: Minor Im overQent Permit Class IV LOCATION F COSNRUCTION (Street address or Description of Location) PURPOSE OF CONST_qUCTION Sketch (attach construction plans if appropriate) -9S,1502. C DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATION OR REMOVAL gMddif 4 SIZE OF EXCAVATION, IF NEEDED 0.4d 4d5E=& APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, baccfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the per �nd applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of his. Name of Applicant (please print) gnature of Applican Business Address nt Telephone No. Za Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. ul!Al � � �N� g,- P-1T-4� Ie��— Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule �O Inspection Fee $ s 1 Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. 8 Received by Date Recorded by PERMIT NO. _ PERMIT VALIDATION ZZ Y1) DATE APPROVED EXPIRATION DATE DATE ISSUED By TELEPHONE: (619) 564-2246 Administrative Authority .9k-1 . PAGE 2 ACCT DESCRIPTION UNIT PRICE UNIT QTY—TRI TR1 TOTAL QTY—TR2 TR2 TOTAL QTY—TR3 TR3 TOTAL QTY—TR4 TR4 TOTAL QTY—TR5 - TR5 TOTAL QTY—TR6 TR6 TOTAL ONTY TOTAL GRAND TOTAL I GRADING & CLEARING ( ` 150630 EXPORT 0.75 CY 53000 39,750 0 0 0 0 0 0 0 0 0 0 53000 39750 150620 REMEDAL GRAIJING 100.00 LS 1 0 0 0 0 0 0 0 0 0 0 0 0 0 150640 MOBILIZATION 4380.00 LS 1 4,380 0 0 0 0 0 0 0 0 0 0 1 4380 150610 STREET STRIPING 6290.00 1 6,290 0 0 0 0 0 0 0 0 0 0 1 6290 150620 EXCAVATION CUT & FILL 0.70 CY 20400 14,280 0 0 0 0 0 0 0 0 0 0 20400 14280 150620 20 4810.00 1 4,810 0 0 0 0 0 0 0 0 0 0 1 4810 150620 SITE PREP/OVER EX 0 0 0 0 0 0 0 0 0 0 0 0 0 150620 FINISH ADS 300.00 31 9,300 0 0 0 0 0 0 0 0 0 0 31 9300 150640 BLASTING 0 0 0 0 0 0 0 0 0 0 0 0 0 150620 GUNITE BNCHS & DOWNDRAINS 0 0 0 0 0 0 0 0 0 0 0 0 0 150620 SLIDE REMOVAL 46127 0 0 0 0 0 0 0 0 0 0 0 0 0 150620 ADJUST MANHOLES 10GRAD EE SEWER 0 0 0 0 0 0 0 0 0 0 0 0 0 150620 ADDITIONAL MOVE— IN 0 0 0 0 0 0 0 0 0 0 0 0 0 150610 PAVEMENT REMOVAL 20.00 LOT 31 0 0 0 0 0 0 0 0 0 0 0 0 0 152400 CONST. WATER OFF—SITE 325.00 LOT 31 10075 0 0 0 0 0 0 0 0 0 0 31 10075 150820 GRADING & CLEARING TOTAL COST PER UNIT CUMMULATNE TOTAL 30.00 LOT 31 88,885 0 0 0 0 0 0 0 0 0 0 31 88885 2867 88885 ACCT DESCRIPTION UNIT PRICE UNIT QTY—TRI TR1 TOTAL QTY—TR2 TR2 TOTAL QTY—TR3 TR3 TOTAL QTY—TR4 TR4 TOTAL QTY—TRS TR5 TOTAL QTY—TR6 TR6 TOTAL QNTY TOTAL GRAND TOTAL II STREETS 150920 1 STREET SIGNS 300.00 LS 1 300 0 0 0 0 01 0 0 0 0 0 1 300 150920 STOP SIGN/NAME SIGN 100.00 LS 1 100 0 0 0 0 0 0 0 0 0 0 1 100 150710 TAC OVER 4' 0.80 46127 36,902 0 0 0 0 0 0 0 0 0 0 46127 36902 150710 STREET STRIPING 1000.00 LS 1 1,000 0 0 0 0 0 0 0 0 0 0 1 1000 150710 STREETSTRIPING 0 0 0 0 0 0 0 0 0 0 0 0 0 150710 8" CL 11 BASE' 0 0 0 0 0 0 0 0 0 0 0 0 0 150710 0 0 0 0 0 0 0 0 0 0 0 0 0 150710 AC OVER BASE EXTERIO 0 0 ol 0 0 0 0 0 0 0 0 0 0 150710 0 0 ol 0 0 0 0 0 0 ol 0 0 0 150710 AQ CHER NATIVE 0 0 ol 0 0 0 0 0 0 0 0 0 0 150720 VAR. THICKNESS AC. CAP79F 46127 11,532 0 0 0 0 0 0 0 0 0 0 46127 11532 150900 ADJUST MANHOLES 10GRAD EE SEWER 0 0 0 0 0 0 0 0 0 0 0 0 0 150810 SIDEWALX IMP 0 0 0 0 0 0 0 0 0 0 0 0 0 150820 PAVEMENT REMOVAL 20.00 LOT 31 620 0 0 0 0 0 0 0 0 0 0 31 620 150820 100.00 31 3,100 0 0 0 0 0 0 0 0 0 0 31 3100 150820 SIDEWALK REMOVAL 30.00 LOT 31 930 0 0 0 ol 0 0 0 0 0 ol 31 930 150910 BARRICADE RIDMOVAL OR CONST 0 ol 0 0 0 0 0 0 0 ol ol 0 0 150810 REDWOOD HEADER 201 ol 0 0 0 0 0 0 0 0 0 0 150920 RELOCATE WARNING SIGNS I 1 0 ol ol 0 0 0 0 0 0 0 0 0 0 150920 REFLECTORS I I 1 0 01 01 0 0 0 0 0 0 0 ol 0 0 STREETS TOTAL COST PER UNIT CUMMULATIVE TOTAL 54,483 0 0 0 0 0 54483 1758 143368 4s , CENTURY HOMES Century -Crowell Communities 4,-0, Vii ® September 16, 1996 Hector Guzman Assistant Engineer I Engineering Department CITY OF LA QUINTA 78-495 Calle Tampico La Quinta, CA 92253 Ref: Bond Exoneration Tract 23935-5 PM 10 Dust Control Bond Bond #1568372, $13,200.00 Dear Mr. Guzman: CITY OF LA gLgNT'A S EP 18 1996 PURUC WORKS Topaz Associates, L. P, a California limited partnership, By: Century Crowell Communities, a California limited partnership, G. P. By: Century Homes Communities, a California corporation, G.P., hereby requests release of the above referenced bond. All grading has been completed, and I have.enclosed a copy of the PM 10 Program Report, and the bond for you use. If the City requires additional information in order to release this bond, or if you have any questions, please call me at (909) 381-6007 ext.51. Thank you. Sincerely, CENTURY HOMES COMMUNITIES Doris A. Benoit Secretary of Operations u\p\d\bonddc2.wk3 1535 South "D" Street, Suite 200 • San Bernardino, CA 92408 (909) 381-6007 • FAX (909) 381-0041 PM 10 Dust Report Form I. GENERAL INFORMATION CENTURY HOMES COMMUNITIES Project Developer Name: Address: 1535 SOUTH D SCR=, SAN BERNARDINO, CA 924M Phone: 909 381-6007 Project Site MILES AVENUE/DUNE Project Title TOPAZ AT LA QUINTA NORTE PALMS 500' WEST OF DUNE PALMS Address: Tract No.: 23935-5 Acreage: Grading Subcontractor (if defferent) Name: ALAN WOOD CONSTRUCTION Address: P.O. BOX 558, NUEVO, CA 92567 Phone: 909 978-9560 PHASES? YES NO_X If so how many? Type of Development/Project: Commercial Single Family_X_ Multi Family Demolition Other Date of Project/Phase Start -Up: 7/94 Date of Project/Phase Completion: 2/95 II. COST INFORMATION If actual costs are not available, please estimate to the best of your ability. 1. WATER: Amount: Total Cost $5800 2. EQUIPMENT COSTS: A. Water Truck: Number on Site: 2 Total Cost: -$16,500 Hourly Rate: _$55 Hours -300_ B. Street Sweeper: Number on Site: _1 Total Cost:—$900 Hourly Rate: _$75 Hours -1 2 C. Temporary Irrigation: Total Cost: _$2500 D. Wind Fencing: Linear Ft: Total Cost: Cost/Ft. E. Chemical/Material Stabilization: Total Cost: -$3000 Sq.Ft:_100,000 Cost per Sq.Ft._.03 F. Vegetation Cost: Material: Total Cost: Maintenance: G. Other: Type: Total Cost: Hourly Rate: Hours 3. LABOR COST: Hourly Rate Total Cost: Hours: 4. ADMINISTRATION COSTS: Total Cost: $2000 III. TOTAL COSTS: Add items 1-4 for total cost. TOTAL COST: $30,700 PLEASE RETURN FORM AT COMPLETION OF PROJECT OR PHASE OR ANNUALLY FROM THE DATE OF PROJECT/PHASE START UP. Small Scale Construction/Demolition Projects JS Acres or Uss)1 Fugitive Dust (PM10) Mitigation lan Date: 2, Jurisdiction: File #: iA Part 1 - PrQject Information Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: Address:VIT S '� Day phone number:F,(,,,-�5(eA Emergency phone number: (qbc Grading contractor (Contact Person): Address: Day phone number: Emergency phone number: Construction site street address. Construction site location: vl ''`' Uk. (Please include an 8.5 x 11 location map) Construction site assessor's parcel number (Tract Parcel (Tract) size: 6 Acres or Square feet Anticipated date of physical project initiation: Anticipated date of project completion: Anticipated costs for dust suppression: OLO (Attachment B - Must also be completed and mailed tlo��ropriate address when construction activities have been completed) . a 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. E b I , ., 11 --?,7 *;> - -, Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the letter beneath the fugitive dust sources listed below. Please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating what measures are to be implemented complete the 'Details" section by describing how and when the measures are to be implemented. RG G FC Details (e.g., frequency of application number and type of dust control implements, etc. Please be as specific as possible) Storage Piles i -- — w I, I A, - •' i 4 _ � A _ __ �� ! o ` � � � ` f - t � � r � .. �. r � l � r • t { f y • R � l . ' � Y rt � .� • � � J 1 � • ' • ' � , ♦ .t • ' s + w s� � 1 w , ,, ` > �' �'_� � ' � r •' i 4 _ � A _ __ �� ! o ` � � � ` f - t � � r � .. �. r � l � r • t { f y R(; FG f�; Details (e.g., freauencv of ,%Rnlication number and= of dust control implements. etc. Please be as specific as possible) Land Clearing or Earth -Moving Disturbed Surface Areas Part 3 - Agreement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of La Qu i nta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representative liability for any actions related to this project. I also agree to complete a rec d -keeping requirements included herein as Attachment B once the project be completed. � �� or I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorized the implementation of all its provisions throughout project buildout. nature of Grading Contractor (mate not the same as above) For City Use Only Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved Conditionally approved (Conditions specified below) Denied (Explanation attached) Signature of City Representative (Date) The following conditions of approval have been added to the Plan by staff in order to ensure an adequate level of fugitive dust control (Attach additional information if necessary I have read 4a -Above nditions of the Fugitive Dust (PM10) Mitigation Plan and I agree to implem t al rovisions at the concentj3iefls and frequencies identified. or ... L ;A- .,;,yl t�;,; c ;C� �;� _ ".: . . '� � ��., CONDITIONS FOR FDCP APPLICATION CENTURY/CROWELL COMMUNITIES +8 ACRES WITHIN TRACT 23935-5 AND A +2 ACRE PORTION OF TRACT 25363 1. Applicant shall comply with all control measure provisions as set forth in the approved FDCP application, which shall include the following conditional measures and requirements. 2. The full amount of security furnished with the approved dust control plan shall be available to the City for measure(s) deemed necessary by the City to achieve adequate dust control even though such measures may be other than those listed by the applicant on this application. 3. Applicant shall submit copies of all records/invoices related to cost accounting for the dust control measures assumed during grading construction. Said records shall be submitted within 30 -days after completion of all dust control measures outlined in the plan, including any measures made part of the plan as a condition to its approval. Security may be withheld pending submittal of this information. All such invoices shall be provided along with the required completion of the PM10 Program Report Form, which can be obtained from the Public Works or Community Development Departments. 4. Paved roadways in areas to be graded shall be kept free of track -out and flushed with water and/or wet -swept in sufficient frequencies and amounts so as to prevent blowing dust due to traffic on pavement. Track -out or other accumulation of soil material(s) shall be prevented onto any paved public streets outside of the areas proposed for grading. Any track -out or other accumulation of soil material(s) onto paved areas, . either public or private, shall be wet -swept or water -flushed by the end of the work day, and shall be kept damp during hours of operation until removed. 5. All soils associated with borrow activities on-site shall be sufficiently stabilized (watered down) so as not to create dust during loading, transport and spreading. Minimum freeboard shall be as established by the Public Works Department. Storage piles. shall be watered at sufficient intervals so as to maintain adequate moisture at all times. 6. Enforcement of these conditions shall be at the discretion of the assigned field inspector, who shall verify in the field that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities, and other aspects of this FDCP may be made by the inspector, at his/her discretion, to insure such compliance. 7. All unpaved construction accessways and approved travelways within the site shall be kept compacted and watered down so as to retain moisture content during construction traffic/activity. The road length shall be watered, each day, prior to any traffic activity and at the end of the day after all activity has ceased. Track out shall be removed as per Condition #4. 8. If any employee parking occurs on-site, a suitably stabilized parking area and access shall be provided for those vehicles. Review and approval of this requirement shall be accomplished by the Community Development Department and Public Works Department. If roadways are paved prior to construction activities commencing, then this requirement may be waived upon review by the Planning and Development Director. DOCWN.024 ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan (Source No) Reasonably Available Source Control Measures Comments (I) Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement will increase the moisture content thereby moving increasing stability of material o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads 1 accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available ource Control Measures (2) Unpaved (1) Reduce speed limits Roads (Cont'd) (J) Reduce vehicle trips ------------------------------------------------- (3) Storage (K) Wind sheltering Piles (L) Wet suppression Comments o 15 mile per hour maximum o Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent ----------------------------------------------------------------------=--------------- o Choices include silos or enclosures o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings ------------------------------------------------------------------------------------------------------------------------------------------- (4) Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved Road areas Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full ------------------------------------------------------------------------------------------------------------------------------------------- (5) Disturbed (S) Chemical stabilization o Vendors can supply information on methods for application and Areas/ required concentrations Inactive Construction Sites (T) Watering o Would require frequent applications unless a crust can be developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant, native vegetation is encouraged ATTACHMENT B - COST INFORMATION Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres), Fugitive Dust (PM10) Mitigation Plan Date: Z. Jurisdiction: Project File #: Project proponent: �OW Address: 1sZ'­S Day pne number: _ Emergency phone numN& In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering:'4�`'� Chemical stabilization: 8'a�'�s--c �� Z� . Wind fencing: Covering haul vehicles: Wheel washers: Street sweeping: Paving: Wind sheltering: Coverings: Vegetation reestablishment: After project completion these records shall be transmitted to the city where the grading demolition permit was attained and to the Coachella Valley Association of Governments (CVA G) at the address provided below. PM10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. } � J a ti 7 ^y. .f � + S ' a ti 7 ` \ 5 .May 10, 1994 78-495 CALLE TAMPICO — LA QUINTA, CALIFORNIA 92253 - (619) 777-7000 FAX (619) 777-7101 TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS IN THE CITY OF LA QUINTA RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL PLANS Dear Developer/Builder: The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992. Among the required control measures was the enactment by Valley cities of dust control ordinances which require builders to implement dust control actions during construction, demolition and paving activities. In conjunction with City staff members, we ask your help with the reporting requirements. A significant aspect of the PM 10 Program is the need to report statistical information to the Federal Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources Board. In response to this requirement, a Dust Control Reporting Form has been created, a copy of which is attached. It is requested that if any project developers have amounts to report for any PM 10 mitigation, these forms must be filled out. This form is intended to supplement Attachment "B" of the Fugitive Dust Control Plan by providing specific cost figures related only to dust control measures. The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for reporting purposes. This means that each jurisdiction is requested to review projects since that date where PM 10 control measure expenses have been incurred by developers, whether or not they have been incorporated as part of a Dust Control Plan, and forward this data to CVAG as soon as practical. Your cooperation in completing these forms as part of the grading permit procedure will help assure that the Coachella Valley and the development community as a whole receive deserved credit for the effort to attain Clean Air Act standards for PM 10. Very truly yours, dRRY HERMAN Planning & Development Director JH:WHN:bjs Attachment C,,MAILING ADDRESS - P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253 CODE # P.. U.S. DEPARTMENT OF LABOR Occupational Sal'oty and Health Administration MATERIAL SAFETY OATH SHEET nomuirej unjut VIOL Saloty enJHysiti, noguivi.som lot Ship Alpsirings ShipUuWlAg, ON WoWiskIng (20 CPK 1016, 1910, 1917) SECTION I 'Li;LAQ9I4C'4TLLtt�MONL N0. -A-MERICAN FIBERS I'MV (9 st�CA. 90601 V-0-1-CA6 tqDplf ANQ 5'T'Nol'sykii Tit "A, 4: A F190 V j)#I AIJI 0' SECTION 11 HAZARDOUS INGREDIENTS PAINTS, jORtStI1VATIVE2. b IOLVEhys % TLV A 4QYS AND MGTALLIC CQ^TiNG8 1< ITLv UASS #A1ETA6 A L V b f w u 1 A660vt %,LmA m9TA661C COATINGS of ff ._..., _^ "Xmvrf41% M fI�LER METAL In it PLVS OAYIIjr U11 ;r rr %.w x OTI ft AS 0 It H1 A s HAZARDOIJI MIXTURES Of OTHER 1.10VI0S, SOLIDS. #J11 QA691i IVP., 1: THIS !$RODUCT DOES 140T COMTAI-1 REGULATED LEVELS OF HAZARDOUS 11-1GREDIENTS AS DEFINED IN OSIJA STANDARD 29 CPR 1010.1000 SECTION Ill PHYSICAL DATA H.A. 111. A AP4111 0M 'S',&,JXL IMMI 141 1 Pc r. C j*tV T. V()L' AT' I L E NY vUj.VIAt. j I V.A. EVAPQAATi(jh nATJ IN ,ATEA MISCIBLE APISLAAANCLANU 000ft 139.4Y WITH 1OWN0 ODOR SECTION IV '7iiii AND E.XFLOSI6W14AZARD DATA rLASrt FOXT'FM.111.WI;ij if.As- _�A.MIAAM-C LIMITS L41 --- U41 �J_ fUT1ftGWJ1v41F4Q AA901A MAN SP[CIAI. FIAE FIGHTIP40 P110CE04RCS "out www51/okL VAC AND 9x0t.0V0m MAJAlk0i A (Continued on revery Form OSIIA- Ft#v, Moir It P.4 AMERICAN F KERS 10820 Beverly Blvd,, Suite 322 Whittier, Carifornia 90641 (213) 693-4072 SPEC SHEET A/P 2 00 is a, fi bAr base dust pall:&*.lve des�.grrr� for hydraulle 411p11cation through conventional hydro - mulching equipment. A/ F 2000 icy a pulp prcduct- ing of million" u: fibers suspended In , semi -^oast erte. These fibers, when applied., form a durable barriu'r too - wind and water r. ro sjon . A/C 200-- is made /` of 100 ,,.1 pulp fl,tei'. These.. are ail orlsanic , non-toxic, and bond nat orally -tout eliminating need fo,, ::outly binder:%. - Application rates may vary depQndinb on rainfa11, wind, slopes, 1.411(tin, etc:, Aa d So:nera? rule, 1, 500- 2,000 k18 per acre is sufficient, to deliver a l,iar,i.ng barrier to the elempnr.;. Under normal Circumstances, you can reasonably exposit 9-12 months of protectiot-1. A/F 20G%) fiasre are anial'i enough to Anter-uetwe with the finest of purticlaE and yet long dnou.n. to form 8 dontinuoun mat. cn.the surface. 'ihis blend of fibers allows the applicator to create a subterranean base to which the surface tnat• may be anchored. Once dried (l;ormally same day),. the AIF 2000 ,ria;, reacts well to the .many expansions and contractions caused by temperatures and elements. The A/F 2000 mat allows Moisture to pass through, all the while ;maintaining it's otrenath and integrity. A/F 2000 i-�-not designed for trarric areas and care should be taken to avoid breaches in the mat. Should the barrier be breached, it iG eaaily mended by over-eprayin& t"e lmr. ediate Brea rrlth A/F 2000. T-itit 4 4 Qum& MEMORAN-DUM TO: Saundra Juhola, Admin. Services Director FROM: Hector Guzman, Assistant Engineer I VIA: Chris Vogt, Public Works Director/City Engineer DATE: November 25, 1996 SUBJECT: Century Crowell Communities - Topaz @ La Quinta Norte -Tract 23935-5 The developer of the subject project has requested the release of Dust Control Bond (No. 156837S) in the amount of $13,200. All soil stabilization measures have been satisfactorily completed therefore, the bond is no longer required. Please mail the bond to the following address: Doris Benoit, Secretary of Operations Century. Crowell Commmunities 1535 South "D" Street, Suite 200 San Bernardino, CA 9240.8 cc: File, Permit 224A f.\pwdept\sa61go>man\memoa96\961125 u