2254•. r �e,n
NOTE:•
With proper validationf,
this form constitutes an CITY OF LA QUINTA
encroachment permit']
' APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
r
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
i
DATE
10-25-94
Subdivision Improvement Permit — Class II I
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Century Homes Tract 26188
1330' W/O Dune Palms ,Road
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Rough Grade Tract Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION Build Residential homes
N, See Attached Conditions
DIMENSION OF INSTALLATION OR REMOVAL
J
SIZE OF EXCAVATION, IF NEEDED
13 acres Per The Approved Rough Grading Plans
\'.
APPROXIMATE TIME WHEN WORK WILL BEGIN 10-25-94 EZ:Z__� APPROXIMATE TIME OF COMPLETION11-25-94 ESTIMATED CONSTRUCTION COST$ 85.000 81994
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
4
Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the.C' "of
La Quinta and to pay for any additional replacement necessary as the result of this w rk.
Signature of Applicant or Agent
Century Homes 1535 S. "D" Street Ste 200 San Bernardino, CA (909) 381-6007
Name of Applicant (please print) Business Address Telephone No.
Allen Wood Construction P.O. Box 556 Nuevo, CA 92567 (909) 928-9560
Name of Contractor and Job Foreman Business Address Telephone No.
584639
3289
Contractor's License No. City Business License No.
Golden Eagle Ins. CCP -213241-01
Applicant's Insurance Company I Policy Number
FEES: Subdivision Improvement Permit — Class 111
l
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $ 2550 II
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
. 10
$ 2560
Received by Date
2254
PERMIT VALIDATION
PERMIT NO. 2254
DATE APPROVED 11-7-94
EXPIRATION DATE 3-25-95
DATE iqqiivn 1 8-94
By
Administrative Authority
Recorded by TELEPHONE: (619) 564-2246
CITY OF LA QUINTA
NOTE: OCT 1 01994
With proper validation PUBLIC
this form constitutes an WORKS
encroachment permit CITY OF LA QUINTA
APPLICATION FOR PERMIT
-PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks,
parking
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE:1cl)
Za
LOCATION OF CONSTRUCTION
vU A.(-)
(Street addrets or Oaertptton of Location) Vo K67
PURPOSA OF CONSTRUCTION
V 1 '
RIPTION OF COWRUCTION
DIMENSION OF INSTALLATION OR REMOVAL
M
SIZE OF EXCAVATION, IF NEEDED I
APPROXIMATE TIME WHEN WORK WILL BEGIN
Subdivision Improvement permit — Class III
k Minor Improvement Permit Class IV
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST S
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
Sketch (attach construction plans if appropriate)
In consideration of the granting of this permit, the applicant hereby agrees to:
Ind
Penalties.
l defend e and save ma City. Its authorized agents, office". representatives and employees. harmiese from and
perlatties, lubilitia or loss resulting from eta�nq or court salon and arising out of any stxrd•nt, lots or ��� any and all
hapWning or occurring as • Proximate result of any work undertaken under the permit granted pursuant to tlt s 800licet�, or prppeity
r ottry the Administrative Authonty ai ie, st twangy -lour 1124) hours in advancrt of the tirrz ..srt vvoe..: will be started.
Comply with all applicable City Ordinances, the terms and conditions of the
It end
La Quintall a tica0le rules and regutatbro of the Gly Of
a and t0 pay for any additiOnet replaeertlntt necessary as the t Of this
5-l"tur Sof
Ali — gent
Name of Applicant (please print)-1Business Address
Telephone No.
CY
a. go
696
Name of Contractor and Job Foreman ' "�'��� �� 9oG �1Z�-45(,D
Business Address Telephone No.
Contractor's License No. 3288
City Business License No.
Applicant's Insurance Company
Policy Number
FEES: Subdivision Improvement Permit — Class ill
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Oeposit•Surety Bond
if required
TOTAL:
Receipt No.
a
deceived by Date
Recorded by
YT
PERMIT VALIDATION
PERMIT NO. '005-Y
DATE APPROVED
EXPIRATION DATE
DATE ISSUED
By
Administrative Authority
TELEPHONE: (619) 564.2246
xe. � a ��,i%�.�r9�`
.� � 1�
• P �
t
i
Z0 d Sd W OH GG: 8 anJL b6 -SZ -100
�- �.oeN`�i' �p
�'�..:t
;ti;�.�:�
:;.� �::.
• he following uanenl are Soeefal Provisions aro attached t0 and rngeo a art of Perm" No.
GENERAL PROVISIONS
The following snail always apply:
ENCROACHMENT ON PRIVATE PROPERTY This oermrt autnorizes wan to be accomotfsneo within City of La Ouirtq right of way
ONLY. Whenever construction extends whrtln private orocenv. n snail be ins resoonsloulty or the permittee for Quints
is right
to
secure permission from abutting property owners. Sucn autnorizatlon must be secwea try [rte permfnee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Claatw traauawng con must on eau red ov shad not ins prior oto
Caves aurtace unless trtte0wnn smoetn-feces street peas. All mernenlcat Outrtbe
:no paying curing excavations. Rubber -fired eowoment only small be uSao 9n oacictigers allloperelloNbe rtnrcaved set aoeratsanetty
pavement IS scafreo. spafles. Of brOKen OUfing tnW term a imis controR Ord the payemem a marred Ciry a} Li toroth IO xisteR
Past these porhone at r d the existing
sip be resurfaced aver Merl smile width. Resurtactng shell coMtst Of ane coat Of Qui snail request
surfacing plus accropmete wa1 can a specified above, two Ing1
_ w 12'1 of A.C.
PROTECTION OFQ TRAFFIC: All sxavPublic
Works ns and w0hi areas shall urs a my lighted and barricaded w deemes neea�yoytne City
Engineer or La Quanta City Public Works Inspectors Suitable cetOuro and dames signs Small be paced and mental
Of the proletz. The City shad be rtotdlad 24 Hrs. in advance at any tnlfie demurs or Smalldaiibe ciac
^estolthedwation
CARE OF DRAINAGE STRUCTURES: Any drainage structure Including corrugated
concrete structures encountered during excavation wnlcn nacestumte concrete cps. steel culvert and
mets) pirerrlaval shad be rooapead in. kap. In the
necessary to remove or cut existing drainage structures. City of La Quints snail be notified arfor to commencsm
Drainage structures and event.1, becomes
open drams shall be ken free at debts at SU times for em of this wort.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and bac kfp Ispat arnage.
ons anal Oe remo
way. All Caved surfaces snail bebroomeoclean oteartnand atnerOblecrfdnsblemateraalmme0atn ilberbacw"tra tmerlghlot
Existing gutter line and drainage altenes snail be reolacea to their original standard Of boner. All excess materiel
Prior to paving. Water tanner shall be used, as tpacoon.
ifhfneslateN after bacldig_ Fred• [O ttPrinka Ice fob site to keep down oust conditions nu D1 ren us"
Gnu shad be urea
OE -WATER OPERATIONS: If de -watering aperctf0rla are required and pumps are forcing water on City o} La Quints r
in* ►esponslblllry of the POtmlttee Ieontractorl to control this water and to Wovee aft -greet oamceoes wren Reo�ry•
asps. It shall be
CLOSING STREETS; No street shall be eased. A minimum of one one of traffic shall be mamtatnes a all times to
aOPassfortheadtofningproperryownerand emergency venfeas.Intheeventfifetchlbem intatnecatathem
any (engin df time. pmgs hmrtes
Dermtttee shad eontaa tots office t0 obtain Ire necessary permission. unaoweatroettor
SPECIAL PROVISIONS
The folMnng shad apply ONLYwhen Indicated:
® NOT1FlCgT10N:PWrtnmee shall nofdy the City at g7S
at Ian 48 hours
R2 CASH DEPOSITS OR BONDS: A coon pony a an aopraved sure In advance of starting ccnswu tton.
Shall be turnlsned n ramount of not
the name of City o} La Quints to cover all wok involved in the restoration of time muni be
v
roads and survey bV fns City Engtneet. Thisbane
y monuments_ This bore shall be continuous uml) cancelled er1bo V Qwme
Coated prior to eommeneemproleR ain of any work on this •
ria) UTILITYCLFARANCE:(SubstructuralPriortomakingnNezcavatlonvmthlntheCitvofLsQuintsnghtofvm a mar no
by permit, the psrmntse shall eomaei all eoneemad utility Cornpanlp reative to the 1001113011 of Wasting SoijbillopuCUS,62.
Damage to existing flubapuRurea resuffing n'Om Operations conducted undfaith
of the permmee.4 OertnR shall be aha wMlewdrtoblllty
LJ UTILITY CLEARANCE. (Surface structures# No work shwa be pons under Ina pennrt until all utilities an of the
OrODOses wort sne. The committee snail natdy all concerned ulllity companies of the proposes worlL
es
R5 PAVEMENT WIpENING: Area between ins Procdsed co
surfaces with inches of A.C. paving placed on trenh inches
line and the existing road Paweeare shad be
having an"R-vstueatnot less than intoeCitvofclass aggragsu
and SCecdicatfons.Ordinance "6 anOfneonformarleewlthCiryofLaQuintsRadl suMStan course
mprdemetl} SundarOs
_ R6 PARKWAY GRADING: Area between the Property line and too ofThe proposed con&etoCurd snail begrsdedtpaaftem
1/4 intro to one foot (1 �.
R7 GRADES & STAKES: City of La Quints snail establish grades and stakes for the proposed concrete corp sop goner
construction.
GRADE CHECKING: City of La Quante snail check graces uoon recefpt of olan arof ilk end/or grades as Kttbtishes by
a licensed engmser. nd p
R9 CURB REMOVALFOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter I fOWShall be
removed. Curb and/or curb and gutter shay be asw cut prior to removal. Decreased curb. matching concrete gutter and
concrete driveway approaen shall be constructed in conformance with City of La Quints Standard #207.
RIO DRIVEWAYS. A.C.: Driveways small be constructed as not to alter existing drainage pattern. Surfacing between the
Property line and the extsting road paving snail be 2-1/2 inches of A.C. paving placed on I __� Of Cfs..
aggregate base. Orivewev construction snail contorm to attached drawing.
R11 CULVERTS. A-;ncn dlameterl � sail be
invert approx1matem,
acnes below and In fine wftn tris existing flow-ions.vert)vert installation ail confled ormtthe o the attarnea drawkn1.1 /2
415)'SIGHT CLEARANCE. Signs clearance of 600 feel In either alreeuan small be assured and mafntafneo
R13 SOIL STERIUZER: The area to no surfaced small be treated wnn sou sterlllzw.
manufacturer's sonclRate of application shall kxmpkyMntn the
ficaborts.
® COORDINATE WORK: The Proposes work shod be sucordlnated to any operation which the State of California or
City of La Quanta may conduct in this area during the perloe of this Dann". Work snail be coordinated with the State or
City of La Quints faces to preclude delay or interference vonth State or City of La Quints protects.
15
SURVEY -MONUMENTS: Prior to excavation ar beginning at construction, all survey monuments wnlcrl
• _ cemenlne of all straen or property fines when Invgred snail "Completely ties out a they may ere nam side[ on ins
. .. bili reo sco'c ov's ucwmm crytl engmeer or sufyewp at the ramsm se OtMOOennnma A ccnmme actor nodass� col►eQly
::a_:t•, ;.�.y� ."r _ ce n +srkosnauberurooksosenakeaau ktvEntnrw►ortstotrkerenwwror arleesnne
upon cOM0,a°m' a survey ma+mrmrto ,. wwmenummitL Thaeekowrngall
me
',•' ; rt•� yy"_ rrlfi. .. a �.-c�rvrr o:�,:•. �; �.:; -;+,.> :.. .
:l La Uuints anis sultaole payment orr guaran i ion or ee at OaVMOntej snail be Maas es errrlelledouttrvt.ity
R17 °AVEMENT CUTTING; Pavement will be maenanauv cut to a atralgrtt sags put,em nt fist n
Prior towort Imo�O'
eunrnq shell W approved tnrougn the otfree or me City Engineer. lUnaer no circumstances excavation. ne Method of
oe used to excavate °nor to cutnno or oavememi. Excavation rnatenal small be placed In Oswment
lacnnate tree cava^ngedwoment
general flow or traffic. Prior to renal oavinq operations. anv damage to pavement straight e
corrected. position as to nest
PAVEMENT CUTTING. Pavement snail be saw cut orror to removal. Prior to renal pawn age snail be
pavement stralgm edge snail be corrected. g operations,
Rt LIMITOFEXCAVATIONS: Excavations snail belimnedto1,000linealfeetofopentrencn before backflllooeranons must
anvnonageto
begin. All excavations snail be DfOpe►H barrtcadea wren lights OVernl mt• on
Ihetravenn 9 weakenvationas and otmaysr°rinseencase. or
9 pill remain ocen or a ria toc exceeding
fiv erminetne sultabllitydt excavation parrieaatn I
excavation snail remain open for a Reread exceeding rive t:il day• No excavation snail be mane tines
militarist Is actually on the Work site. g in seen case. No
BACKFI ss the construction
LL MATERIAL telirBacc ll shallbetree i ll, roots or Other organicsuomance detriments. , • .;s
Of producing an adequa[aly consolidated baetflll. Any material which the City of I a Quints seems unsutcrour Is
saturated material whlen is encountered during excavation snail not be use fist baektill. but snarl be ttabl* Supplemented or
reolaceo °V an acuroveo sand or gravel. table mented or
R21 BACK fast
SANG: vibrated
shall be approvedamve trarun-mix sand or equivalent and shall be placed In lifts of
no
throefeet (3'1onombna lousing Vtb►Ofamp,r brecurvatent egulpment. Alternate methods may, be sub
Cafe •relative compaction Ot han
95 percent shall be attained within the a:rLctural seC[ton pt the roadway greaten any
stlmle0, but In any
BACKFILL PLACEMENT: Baaddl shall be elopusa In ever, of not more tnan 50 percent at the total d
becks tl ctlinguteri or maximum of fivefoot 151 "its wnare trenches arewt excessive deptms. Cars is to be e
batJltill material Is not subjected to extents swap by fl000mions. �^ of the trencn
resulting COmoactlon snail be not lead than 90oercom or ecu oepnTT to the SUAOUBackfndlrmjatercet shall be xa►craedrlatthe
compaction. Where oondeng or flooding is used for a maximum 0egp so [nn the
the water. o Where dikes will be c never is tins greater
lening Is used. the lets shall be of sufficient ength to.reaeh here dikes will c constructed to retain
supply shall -ba edtmnuous. bottom of seen :aver dna the water
COMPACTION TESTS: I}sore cored
q by the enspewr,compaction tests shell be made at 'marvels of not m
feet and a minimum of one (1) test on each road One 11 I copy of each test Shall be forwarded t0 the C!
approval anOflled OflOr to maklre °n ^ 1'�0
Standard S eat 9 permanent repast,. Compaction [est, shall be macs asoutllned in Section City Engineer for
p leaupns, Division of Mi9t+wava. State of California. deed January 1973. 8.3.Ot ohne
COMPACTION TESTS; If so required by the Inspector, companion tests shall be made for each trossin
One (11Copy ofeecntest small beforwardedtotheCityEngineertonles"Smlandffledefore cncr
Comoaaton tear snail be 10
Mace asou[llned In Sswon 6.3.01 of the Sertaard g or a m re line•
Of California. dated January 1973 SpeCttications. Division of N' ansm repaus.
R25 TEMPORARY PA Igftyysye, State
PAVEMENT REPAIRS: After rornptttion b} backfill and compaaron operations, a to
consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary
atter a maximum of 3.000 lineal feet of trench has been excavated and backfill operations completeO. Out In nocaseeases al
the placement of the temporary _ ° ry Paving chap be placed
R26 PERMANENT PAVEMENT REPAIR: After Oaektill demo compaction )IIMI[•
consisting of two (nenes'(2-) of SC -800 shall be placed Immediately.rations have A Psrmanentteen path ofDleted. a to
surfacin mptrary paten
9 placed on a inch elan base shall be please no later then inches A. C.
temporary road repair. daysahercO
R27 PA mptetlonof
VEMENTREPAIR:F.A.S.:Uponcompletionofbaadillandcompaaron.atemporarypatchconsistin of
Of cold mix Paving (SC -800) shall be placed Immediately. A permanent patch of three inches (3') of A.C. two surfaan
be Placed on sit Inflate l6") concrete base as directed, but not later tnan fifteen } 15) day, after completion �InChe312'j
Paving. Concrete base snail beat five -sock mtx and shall conform to the City of La Quina Rosa improvem g shall
and SpeatiMOM Ordinance 0461, te"Worary
FOG SEAL: A t GMStaneares
d9 seal coat consisting of an application at aspnallic emulsion shall be applled over all
dwermmeo by the City Engineer,
Oaten areas as
R29 SEAL ARMOR COAT; A Wal coat consisting of an application binder and screenings shall be applied on all
where suer sen coon tions. S Prior to Issuance at this permit. Seal or armor coats shall be applied as sdaediad rn Section
37. $IirWarn Specifications. State Of California, Division of Miated tNteh areas
be accomplished by a licensed contractor engaged in me business of PavementJan arepa973. Work at pavement r
30 STREET RESTRIPIN repair to
G. Where sires[ striping is still vesicle on streets to be excavated. such striping shall be replaced Completion Of permanent rep81r5.
ep can upon
R31 TREE RELOCATION OR REMOVAL. Tree relocation ventnin tree City of La Qulnta road right of way shall be accomplished
by a licensed. bonded and insured Tree service. and handled sately wllnout interference or hazard to the trawling public.
It ,hall be the responsibility of the permmee to maintain the tree In a vigorous growing eondnion at Its new location.
Trees to be removed shall be removed in sectionsvyhteh can be handled safelvwitneut interference or hatarato hl
traffic. The entire width of the tree stumo small be removed and disposed of so inat no debris remains in view of the
highway. The sTumDhole snail bebackfilled and tharougnlycdmpactedasspeCiftedlnthe}olbwrn grewev
becomes necessary to resmct traffic. the work shall be restncted to s asrdmunt of 500 }ant of any one ntns. Ait
Jigtq, flagmen end/or barricades shall be roved graph. Where e
Provided to protea the traveling public at all times, Adequate
Large holes resulting from tree removal shall be backtilled and compacted to not less than 90 percent or
surrounding ground. whichever is the greater compaction as determined
tests shall comply with Section 6.3.01 of the Standard equivalenttotne
OV the Impact or. Std a Of California.
January 1973. Speertieations. Division of Highways. State of Calidates
R32 TREE TRIMMING:
a. Only then week ry trimming snarl be aeeomolisnea to
or weproved, clearance of the facility for one calendar year.
All broken or sections witnm the trimming snail be removed.
b. Where It becomes necessary to.restnatraffic. theworkshallberestnaedtoamaximum at500feetatarryonetame.
Adequate signs. flagmen and/or barricades snail be provided to protea the traveling public at all rimae
C. If res tramrunks are partialfy Outside of the City of La palma road right of way. permittee small reek, his own
by this
vinm adjoining progeny owners far cantle to the rimming in addition to the authorization provided
by this permn.
CL All tree trimming on EVERGREEN TREES, PALM TREES. and other ORNAMENTAL TREES shall be aotbmpfished to
the satlsfeaton of the City Public Works inspector.
is. Abutting property owners Shall be
Pruning email in an l^ au fnatanaaa, prior to ramming or topping wee
r.—_Mcas• to n thshoulder
_ 12'1 arra M the cr'OtCn
!="�/.:iC•w:t�.x'i.��1•:�:-�\;L!V:�n/:••(:.jV�:e.'�l�`l:`}.�.��.3`�:i+-Y.�:Yi:+:f'�:iJ:�•rt;C'.I':lt`.i:11j':W ��✓:1•.T,Ti :�{'i�C'..��. .�V�?_.�.�'l:i 'S �''. �a:t.isai:, �:� i4.�'.i,: Ya•: ^,=
SPECIAL CONDITIONS --PERMIT NO. 2254
--- CENTURY HOMES TRACT 26188 ---
In addition to the standard permit conditions, the following shall apply:
1. All work shall be performed in accordance with the latest edition of the "Standard Specifications
For Public Works Construction".
No fill shall be placed which will cover or obscure asphalt concrete, petroleum product spillage,
or other non-native materials.
2. Permittee shall furnish the name(s) and phone number(s) of the individual(s) responsible for
maintaining dust control after hours, weekends, holidays, etc.
3. All -streets shall be kept clean of all trackage or spillage from vehicles using this site. The roads
shall be completely cleaned at the end of each work day, if necessary, and more frequently if
required.
4. Operation and maintenance of equipment within one half mile of human occupancy shall be
performed only during the following time periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday .8:00. a.m. to 5:00 P.M.
May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m..to 5:00 p.m.
Equipment may not be operated or maintained on legal holidays including Sundays.
5. Permittee is responsible for repair of any pavement damage or other damage to access roads and
other public facilities.
7. Should additional work or modifications be required in order to meet established City Standards
or in order to fit -field conditions, the work shall be performed by the permittee as directed by
and to the satisfaction of the City Engineer at no cost to the City of La Quinta.
8. It is the permit tee's responsibility to comply with the California Regional Water Quality Control
Board's National Pollutant Discharge Elimination System '(NPDES).
9. Any on-site haul road shall be effectively destroyed at the conclusion of the work to prevent use
by unauthorized vehicles.
10. Per shall install stop signs to stop construction traffic prior to entering any street
from the construction site.
Special Conditions - Permit No. 2254
Page 1 of 2
SPECIAL CONDITIONS - PERMIT NO. 2254 continued
CENTURY HOMES TRACT 26188
11. If buried remains are encountered during development, a qualified archaeologist shall be
contacted immediately and appropriate measures shall be taken.
12. All grading shall be performed per the soils report.
13. It is the permittee/contractor's responsibility to provide continuous dust control while the grading
is being performed, or at any other time as deemed necessary by the City Engineer. Permittee
shall provide soil stabilization on the entire site per the approved dust control plan immediately
after completing the operation.
14. - Street closures shall not be permitted at any time. A minimum of one lane on paved surface
shall be maintained at all times with flagmen at all .times per CALTRANS standards or the
WATCH (work area traffic control handbook).
15. All excavations at or near the travel way shall be backfilled at the end of each work day for the
protection of the traveling public. No trenches shall be allowed to remain open overnight.
16. All grading shall be performed per the approved grading plan for Tract 26188 and* the plan
labeled "Interim Grading Plan Tract 25363".
Special Conditions - Permit No. 2254 Page 2 of 2
MEMORANDUM
TO: Saundra Juhola, Admin. Services Director
FROM: Hector Guzman, Engineering Technician
DATE: November 9, 1994
SUBJECT: Century Homes Tract 26188
The developer of the subject project has provided the City with a Performance Bond (#156898S)
in the amount of $16,000. The bond is a security for the Fugitive Dust Mitigation Plan. Please
keep this Performance Bond -in your Development file.
cc: File, Permit 2254
hg
Medium -Large Scale Construction/Demolition Projects
Fugitive Greater
Du t(PM 10) M t Mitigation Plan
Z-lvl 65
Date: JurisdictionA� Project File #:A0V
Part 1 - Project Information
Please provide the information below as completely as possible even if it has already been
provided on other forms related to this project. Failure to provide complete information or
provision of inaccurate information may delay the processing of your Fugitive Dust (PM10)
Mitigation Plan (Plan). It,is recommended that you submit your Plan concurrent with your
grading or demolition permit application.
Project proponent:
Address:.S
� r�7
Day phone number: CIC�_�. Emergency phone number:4S7
Grading contractor (Contact Person):
Address:��
Day phone number: Emergency phone number:
Construction site street address:
,;66
Construction site location: .�
(Please include an 8.5 x 11 location map)
Construction site assessor's parcel number (Tract
Parcel (Tract) size: I Acres or _ Square feet
Anticipated date of physical project initiation: p Z�
Anticipated date of project completion:
Anticipated costs for dust suppression: $�
(Attachment B - Must also be completed and mailed tot the appropriate address when
construction activities have been completed)
1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and
403.1.
Earthwork Information:( creaggf Cubic Yards):
Project Area: ��' •``�✓� ,Total Disturbed Surface Area: A;</ 3
Cut: `-7jkcx� AV;;> 'Fill: :F jVoa-c=>
Import:— xport: —�
Phasing of Earthwork:. Date Date
Phase I Grading (Acreage): From: \%�A To:
Phase 1I Grading(Acreage): From: To:
Phase III Grading(Acreage): From: To:
Phase IV Grading(Acreage): From: To:
(Attach additional information if necessary)
Part 2_- Fugitive Dust Control Actions
From the inventory of fugitive dust control measures provided in Attachment A, please indicate
which measures are to be implemented during the project by placing the corresponding letter
beneath the following sources. In addition, please indicate at which phase the measure will be
implemented, either at Rough Grading (RG), Finish Grading (FG), or /Final Construction
(FC). Demolition projects should only indicate measures in the Rough Grading (RG) column.
After indicating what measures are to be implemented, complete the Details section by
describing how and when the measures are to be implemented.
Sou Details (e.g., freauencv of application number and tune of dust control implements.
No RG FG FC etc Please beas specific as possible)
�A _ — Ttezi\� _V5
WA
(Use copies of this page if additional space is needed)
Source petalls (e.e 'rreauena of application number and hme or dust control implements.
No. Rte' .N etc Please be_aS:4pecific as Ross e
�� u?b tIp L
Part 3 - Aergement
I certify that the information contained in this Fugitive'Dust (PM10) Mitigation Plan is true
and accurate and;that.all-measures specified in Part 2 will be implemented during project
construction. I authorize the City of La Quinta to enter the above mentioned property
for inspection and/or. abatement purposes, and I agree to hold harmless the City and its
representatives from .liability for any actions related to this project. I also agree to
complete the record-keeping requirements included herein as Attachment B. once the
project
completed.
resentative
I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has
authorized the implementation of all its provisions throughout project buildout.
i nature o Grading Contractor or Authorized Representative ate
(If not the same as above)
For City Use Only
Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan
the Plan is:
Approved
,G x Conditionally approved (Conditions specified below)
Denied (Explanation attached)
Guff �/ lo- 2C-- 9y
Signature of City Representative (Date)
The following conditions of approval have been added to the Plan by staff in order to ensure
an adequate level of fugitive dust control
(Attach additional information if necessary)
I have read the ahoye conditions of the Fugitive Dust (PM10) Mitigation Plan and I agree
to impleme provisions at the concentrations and frequencies identified.
eDresentative te,
_ ��
` ,� � � ,
X'
;,�.
CONDITIONS FOR FDCP APPLICATION
CENTURY/CROWELL COMMUNITIES
+ 10 ACRES WITHIN TRACT 26188 AND
A +3 ACRE PORTION OF TRACT 2:533,
1. Applicant shall comply with all control measure provisions as set forth in the approved
FDCP application, which shall include the following conditional measures and
requirements.
2. The full amount of security furnished with the approved dust control plan shall be
available to the City for measure(s) deemed necessary by the City to achieve adequate
dust control even though such measures may be other than those listed by the applicant
on this application.
3. Applicant shall submit copies of all records/invoices related to cost accounting for the
dust control measures assumed during grading construction. Said records shall be
submitted within 30 -days after completion of all dust control measures outlined in the
plan, including any measures made part of the plan as a condition to its approval.
Security may be withheld pending submittal of this information. All such invoices shall
be provided along with the required completion of the PM10 Program Report Form,
which can be obtained from the Public Works or Community Development Departments.
4. Paved roadways in areas to be graded shall be kept free of track -out and flushed with
water and/or wet -swept in sufficient frequencies and amounts so as to prevent blowing
dust due to traffic on pavement. Track -out or other accumulation of soil material(s) shall
be prevented onto any paved public streets outside of the areas proposed for grading.
Any track -out or other accumulation of soil material(s) onto paved areas, either public
or private, shall be wet -swept or water -flushed by the end of the work day, and shall be
kept damp during hours of operation until removed.
5. All soils associated with borrow activities on-site shall be sufficiently stabilized (watered
down) so as not to create dust during loading, transport and spreading. Minimum
freeboard shall be as established by the Public Works Department. Storage piles shall
be watered at sufficient intervals so as to maintain adequate moisture at all times.
6. Enforcement of these conditions shall be at the discretion of the assigned field inspector,
who shall verify in the field that the spirit and intent of the FDCP and its attached
conditions are being complied with. Adjustments to application frequencies, quantities,
and other aspects of this FDCP may be made by the inspector, at his/her discretion, to
insure such compliance.
DOCWN.024
7. All unpaved construction 'accessways and approved travelways within the site shall be
kept compacted and watered down so as to retain moisture content during construction
traffic/activity. The road length. shall be watered, each day, prior to any traffic activity
and at the end of the day after all activity has ceased. Track out shall be removed as per
Condition #4. Any construction access from a paved roadway shall be paved into the site
a minimum distance of 100 -feet from the access roadway's pavement edge.
8. If any employee parking occurs on-site, a suitably stabilized parking area and access shall
be provided for those vehicles. Review and approval of this requirement shall be .
accomplished by the Community Development Department and Public Works
Department. If roadways are paved prior to construction activities commencing, then
this requirement may be waived upon review by the Planning and Development Director.
DOCWN.024
ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES
The left column contains the sources of fugitive dust which are intended for emission control
under the City's dust control ordinance. The two right columns contain an inventory and
description of reasonably available fugitive dust control measures for each of the sources.
Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan.
(Source No) Reasonably Available .
Sourc Control Measures Comment
(1)
Land (A) Watering
o Application of water by means of truck, hoses and/
Clearing/
or sprinklers prior to any land clearing or earth
Earth.
movement will increase the moisture content thereby
moving
increasing stability of material
o Once the initial land clearing/earth movement activities are
complete, a second round of watering can generate a thin
crust which stabilizes the disturbed surface areas provided
that it is not disturbed
o Security fencing can be used to prevent unwanted future
disturbances of sitcs where a surface crust has been created
(B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances
o Vendors can supply information on product application and
required concentrations
(C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(D) Cover haul vehicles o Entire surface area should be covered once vehicle is full
(E) Wheel washers o Should be placed where vehicles eat unpaved areas onto paved
areas
o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(2)
Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material
Roads accumulation
(G) Chemical Stabilization o Vendors can supply information as to application methods and
concentrations
o Not recommended for roads with high volumes or those used for
heavy equipment
(H) Watering o In sufficient quantities to keep surface moist
o Required application frequency will vary according to soil type,
weather conditions, and vehicular use
(Source No) Reasonably Available _Cqmm n
ourcg Q9ntr easures
(2) Unpaved (1) Reduce speed limits o 15 mile per hour ma>amum
Unpa g paved roads in order to
Roads o Access restriction or redirecting
minimum of 60 percent
J Reduce vehicle trips vehicle trips by .------
reduce ----------------
_ __ -_..
rs
(3) K Wind sheltering o Choices include silos or enclosures
() o Enclosures should consist. of three
i ebcentPorosity
Storage r equal to height o
Piles material with no more than pe
lication methods include: spray bars, hoses
s elfin watercondititrucks
suppression ° p+PF plication will vary ons pe
(L) Wet supe o Frequency of ap
sion o Best for use on storage piles subject to infrequent disturbances
(M) Chemical Suppres (downwind) side
(N) Altering toadin/loadout o Confine loadin/loadout procedures to leeward
of the material
procedures o Most effective when used in conjunction with wind sheltering
o Tarps, plastic, or other material can be used as temporary
(p) Coverings coveringsrevent wind from
o When used, these should be anchored to p
coverings ----_-
removmg---..._.----
-------------------
.._.------
- -----
---------- paved
-------- _"' h re vehicles exit unpaved areas onto
(4)
paved
Road
Track -out
o Should be placed w e
(p) Wheel washers areas
o System can be adjusted to spray entire vehicle, including store
bulk material in haul vehicles
(Q) Sweep/clean roadways
(R) Cover haul vehicles
(5)
Disturbed (S) Chemical stabilization
Areas/
Inactive
Construction
Sites
(T) Watering
(U) Wind fencing
(V) Vegetation
establishment
flushing may be used
o Either sweeping or water
vered once vehicle is full
o Entire surface area should eco -_____
_______ c --------
-- information on methods for application and
o Vendors can Supp1 y
required concentrations
require frequent applications unless a crust
o Would req , d over the site
can be develope
o Three to five foot barriers adjacent to roadways or urban reducing the amount of wind blown areas
can be effective u1
material leaving a site
o Should be used in conjunction with other measures
o Establish as quickly as possible when active operations have
ceased
erant, native vegetation is encourage
o Use of drought tol
.r •w_�r.. COI)6 0 Pf�
U.S. DEPARTMENT OF LABOR Appot10
Ow Ne, ��•A,S�T
Occupational Seloty and Health Adminitvalion
MATERIALSAFETY' DATA SHEET
nwtwrtJ ur1Ja VSOI Selety tng moom, lot SAIp Awi ina, .
Shipl,ul;difig, ON Shrpbrclklng 129 CPR 1916, 1114, 19111
SFCTION
oupl,lleJ Dri •••• •'---—•��•• [►MSRG[NCY7960rIONg1319 NO.
_A.`lERC�N FIRS 1—
ImO tyrIlir9, CA. 90601
1,41,,.1.CA1, A11U
f•��, ,A,I:AI.1•AM�LM---- -------.._.... ..._.. F .� •_� :�40�. �y1,� FI�Eg
SECTION II • HAZARDOUS INGREDIENTS
rAINTS. PORI$01VAtIM. L SOLVENTS 1 TLV ALWYc AND M6YALLIC COATINCtt X TLv
uatt IJCTA6 VOT A.PPLACULL _
_ _ _ �� C COATrhO! •r 1�
r 11. L C A MCT AL li�"11
~N
MAZAROOIJf MI,ITuaES OF DTIIct1 LIOVIOs. SOLIDS. up G•tS>:
lur..,.
. THIS•^ZODG'CT DOES —E8 -1;,O -
INGREDIENTS
'� •• -r `-' -"-
__•__ ____-- T CONTAIN REGULATED LEVELS Or HABARDOUS
I`1GREDIE?ITS AS DEFINED IN -OS1IA STANDARD 2 ' CFR
-• 9 1910.1000
SECTION III PHYSICAL DATA
•,—_..—.—_.
—..
�•1j. x,`11.% 1•(�,I,c 1',
..-. .... w..
!l.A.
mow.__. .• r.y .r.. •r.r
Sor
.
1.A.
�_ • :. Ih, 11 x/11 1f ),J M► I40"a Olt. 1
PC ncENT vcA _.
LATIIC
+flyVOLU
ots
..
DENS$Iv IAIIIoil
CVAPO1`1AT1Uh AAI[
—
I.r,1.,,u.�IT� I/v.vatc�� :IISCIALL
,.'• ,,
.
l APPLARANCL Af%U OvvI1 GPXY WITII •LOtl/N0 ODOR
SECTION IV • FIRE AND EXPLOSION•14AZARD DATA
.
rASn PO,hT 1mvinoC Wiest `` iLAMMAOa OMITS
�� 0
:r[CIAL f14YI ^�'—►�-•�+�+•--+r
FIOTINQ PF1GC j R•
u^'viv� i,Ac 74 6i lION MAS�"---�... r_.w..v _...�.►�.....«...« ._.. �....
L lOAAp1
't (Continued on rt'ier" iIdo) . •• •.
Fotm OSI(A•
Aff, MIT to
F.4
AMERICAN FIBERS
t I 10820 Roverly Blvd,, Suits 322
... Whittier, Wfornla 80601
(213) 6934072
PEC >HEE:
A/F 2000 is a fj bo.r bane dust pall:a;lve desk. r'rr:
for hydraulic aPD;icatton thrcugh conventional hydro_.
mulching equipment. A/F 200010 a
i�r,g of rt�il;icns u: +� Pulp prcduct;
�rhet; 31r":ra �113penAed in �
Three fibers, seml-^cist s±��,
pp+ i i.. d, form a du, ahle b, rrie: to'
wind and water orodion.
A/i 2000 is rr,sc�e ��,,.o:_ 100: pulp T!�ea.F
ury all .orKanj.(;, rorl.toxic, and bond nature:l;j-tnu�
eliminating need fo" ,:Outly binders.
Application dates May vary depondinb on r_.ir.fal1
wind,eloyes, ,a1•r(c4n, eta:. Aa a Sonora: rule, 1,r�00-
2,000 Pa per 3,�re is suf"cis nt to deliver a 1a3si.ng
barb:er to the element.5. Under normal' circumstances,
you ca:r raa3Jr�2Z;y expc.,;t.9-12 months of protectic,r;,
A/F 2000 fibers a"O AMAI enough to intcr-wcava
with the finest o!' pa.,-t'-c1�C and yet long enoug to
form 8 oontinucut mat on .the surface. ibis blend u*
fibers allows the applicator to create a subterranean
base to which the Bur -face mat may be anchored.
Once dried 0101-mally Same day), the Al? 2000
react* 4011 to the rrany expansions and contrac*, onz"
caused by temperatire.s and element&. The A/F 2000
mat allows noitture to Paso through, 811 the while
maintaining it's atrerfith and integrity.
A/F 2000 i3 not designed for trarric areas and
care should be taken to avoid breaches in the mat.
Should the barrier be breached, it is eamily mended
by over-sprayi-Ija t"e Im.nedlate area with A/F 2000.
ATTACHMENT B - COST INFORMA'T'ION
Medium -Large Scale Construction/Demolition Projects
(Greater than 5 acres),
Fugitive Dust (PM10) Mitigation Plan
Date: Jurisdiction: Project File #:
Project proponent:
Address: \
Day phone number: ,:�'�l"� _5vz1 Emergency phone number: 3e!> t .1 J
In the space provided below please list the costs associated with implementation of all dust
control measures. The information provided below should include all implementation costs
(including labor) for dust control throughout the project. Not all measures listed below will
apply to all projects.
Watering: ��pVc��t,.•� Z%5c;'C�
Chemical stabilization:
L Z_71_
Wind fencing:
Covering haul vehicles:
Wheel washers:
Street sweeping:
Paving:
Wind sheltering:
Coverings:
Vegetation reestablishment:
After project completion these records shall be transmitted to the City where the
grading/demolition permit was attained and to the Coachella Valley Association of
Governments (CVAG) at the address provided below.
PM10 Cost Monitoring
Coachella Valley Association of Governments
73-710 Fred Waring Drive, Suite 200
Palm Desert, CA 92260
1 All projects greater than one half (1/2) acre are.also subject to SCAQMD Rules 403 and
403.1.
LW C�
78-495 CALLE TAMPICO - LA OUINTA, CALIFORNIA 92253 - (619) 777-7000
�f FAX (619) 777.7101
May 10, 1994
TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS
IN THE CITY OF LA QUINTA
RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL
PLANS
Dear Developer/Builder:
The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992.
Among the required control measures was the enactment by Valley cities of dust control ordinances
which require builders to implement dust control actions during construction, demolition and paving
activities. In conjunction with City staff members, we ask your help with the reporting requirements.
A significant aspect of the PM 10 Program is the need to report statistical information to the Federal
Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources
Board. In response to this requirement, a Dust Control Reporting Form has been created, a copy of
which is attached. It is requested that if any project developers have amounts to report for any PM 10
mitigation, these forms must be filled out. This form is intended to supplement Attachment "B" of the
Fugitive Dust Control Plan by providing specific cost figures related only, to dust control measures.
The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for
reporting purposes. This means that each jurisdiction is requested to review projects since that date
where PM 10 control measure expenses have been incurred by developers, whether or not they have
been incorporated as part of a Dust Control Plan, and forward this data to CVAG as soon as practical.
Your cooperation in completing these forms as part of the grading permit procedure will help assure
that the Coachella Valley and the development community as a whole receive deserved credit for the
effort to attain Clean Air Act standards for PM 10.-
Very truly Hyours,
RRY ERMAN
Planning & Development Director
JH:WHN:bjs
Attachment
�e
MAILING ADDRESS - P.O. BOX 1504 • LA OUINTA. CALIFORNIA 92253 %�
PM 10 Program Report Form
I. GENERAL INPORMBTION
Project Developer Name:
Address:
Phone:
Project Site Project Title
Address: Tract No.:
Acreage:
Grading Subcontractor (if different)
Name:
Address:
Phone:
PEASES? YRS NO
If so bow many? _
Type of Development/?roject: Ccumerci.al
Single Family_
Multi Family_
Demolition
Other
Date of Project/Phase Std -Do: Date
of Project/Phase
Camnletion:
II. COST INFORMATION
If actual costs are not available, please
estimate to the
best of your
ability.
1. AAMM: Amount:
Total
Cost:
2. EQU72MENT COSTS:
A. stater Truck: Number on Site:
Total
Cost:
Hourly Rate:
Hours:
B. Street Sweeper: Number on Site:
Total
Cost:
Hourly Rate:
Sours:
C. Temporary Ir_igation:
Total
Cost:
D. Aired Fencing: Linear Ft.:
Total
Cost:
Cost/Ft.
B. Cbemical./Eaterial Stabilisation:
Total
Cost:
Sq. Ft.
Cast per Sq. Ft.:
F. Vegetation Cost: Material:
Total
Cost:
Maintenance:
G. Other: Tyne:
Total
Cost:
Hourly Rate:
Hours:
3. LABOR COST: Hourly Rate:
Total
Cost:
Hours:
4. ADM =STRBTION COSTS:
Total
Cost:
III. TOTAL COSTS:
Add items 1 - 4 for total cost.
TOTAL COST:
?LEASE RETURN FORM AT COMPLETION OF ?ROJECT OR ?EAS^c OR ANNUAI..T.Y FROM THE
DA= OF' PRO. LC T /?'-'-ASE START UP.
3131194
T-iht 44a�w
MEMORANDUM
f
TO: Saundra Juhola, Admin. Services Director
FROM: Hector Guzman, Assistant Engineer I
VIA: Chris Vogt, Public Works Director/City Engineer
DATE: November 19, 1996
SUBJECT: Century Crowell Communities - Del Rey @ La Quinta Norte -Tract 26188
The developer of the subject project has requested the release of Dust Control Bond (No. 156898S)
in the amount of $16,000. All soil .stabilization measures have been satisfactorily completed
therefore, the bond is no longer required. Please mail the bond to the following address:
Doris Benoit, Secretary of Operations
Century Crowell Commmunities
1535 South "D" Street, Suite 200
Sari Bernardino, CA 92408
cc: File, Permit .2254Lt
f*\pwdeptlsteBlgumteolmemos.961961 1 2 0b