Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2399
NOTE,:- ' With proper validation this form constitutes an encroachment permit a CITY OF LA QUINTA APPLICATION FOR PERMIT w PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I I I DATE: 11-29-95 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Jefferson St., Arne 50 h Ave 52 (Street address or Description of Location) PURPOSE OF CONSTRUCTION 10k Run—TaMle PeetiVal Road Race on Dec. 2, 1995 DESCRIPTION OF CONSTRUCTION Cone off running lane 4 provide traffic control @ intersections DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 7100 am APPROXIMATE TIME OF COMPLETION 9400 ail ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Sketch (attach construction plans if appropriate) See attached dgnditions See attached traf c control plan See attache`. t urea layout Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or`occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and, conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the re ult of this work. Signature of Applicant or Agent Coachella Valley Recreation & Park District 45-871 Clinton St. Indio CA, 92201 347-3484 Name of Applicant (please print) Business Address Telephone No. Laura McGalliard / Philip Hoy Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. California Association of Recreation & Park District Insurance _ Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: $ 10 10 Receipt No. Received by Date Recorded by .I r 1995 PERMIT VALIDATION, PERMIT NO. 2399 DATE APPROVED 11-29-95 EXPIRATION DATE 12-2795 DATE ISSUED d By Admi�istrative Authority TELEPHONE: (619) 564-2246 'NOTE:' With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA CM OFLA QMTA OCT 1 21995 APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCFN1ChWtNW9RKS For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS I l Zq i� DATE: n-gVs-t 3X-, 1995 Subdivision Improvement Permit - Class I I I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION T ffPrson Str pt, A rpnna SO F. AVpnllp' Si (Street address or Description of Location) PURPOSE OF CONSTRUCTION 1 GK Run -ramal P FPctival Sketch (attach construction plans if appropriate) Rnnd Rarp nn Tlprpn}pr 1 QQS DESCRIPTION rAi AONSTRU�IO_N Street coned off for rttnning See attached Bourse layout 1 om nd ...,t— e�r-.---C___� DIMENSION OF INSTALLATION OR REMOVAL _Rex-n-rtte-e—shams-1 e responsib�for restoring -mite an a streets SIZE OF EXCAVATION, IF NEEDED�- APPROXIMATE TIME WHEN WORK WILL BEGIN 6:30 a.m. APPROXIMATE TIME OF COMPLETION 9:00 a.m. ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: c 1 CC o 0j, Indemnify, -defend and save the City, its authorized agents, officers, representatives.and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority 'at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quint: and to pay for any additionai replacement necessary as the result Athis work. Signatu a of Applicant or Agent Coachella Valley Recreation & Park District 45-871 Clinton St. Indio. CA 92201 347-3494 Name of Applicant (please print) Business Address Telephone No. Laura McGalliard/ Philip Hoy Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. California Association of Recreation & Park District TnGttrancp Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit - Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit - Class IV: See attached schedule gkInspection Fee h � ' Permit FPP Penalty Cash Deposit -Surety Bond- 0 required TOTAL: Receipt No. Received by Recorded by Date ^TION PERMIT NO. -1 DATE APPROVED �� za EXPIRATION DATE DATE ISSUED By Administrative Authority TELEPHONE: (619) 564-2246 1 1 i SPECIAL CONDITIONS --PERMIT NO. 2399 --- COACHELLA VALLEY RECREATION & PARK DISTRICT --- In addition to the standard permit conditions, the following shall apply: 1.. Permittee shall be responsible for providing continuous dust and erosion control. 2. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 3. Contractor shall comply with the local noise ordinance. Operation and maintenance of equipment within one half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30p. m. Saturday 8:00 a.m. to 5:00p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00p: m. Saturday 8:00 a.m. to 5:00p. m. Work shall be prohibited on legal holidays including Sundays. 4. Permittee shall assume responsibility 'for repair of any pavement breakdown at the haul road access to any public or private street and for any damage to other City streets or facilities. 5. Advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook. It shall be the permittee's responsibility to detour and barricade this site. 6. Should additional work, materials, or modifications of the work be required in order to meet city standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 7. All work shall be coordinated with the City, the City's contractor and/or others working within. the area as directed by and to the satisfaction of the City Engineer. 8. All streets, city property, facilities etc. shall be returned to their original conditions as directed by and to the satisfaction of the City Engineer: Special Conditions - Permit No. 2399 Page 1 of 1 Indio Police tf..' Water Station Water l Station 5K TURNS NORTH 10K CITY OF LA QUINTA OCT 1 21995 PUBLIC WORKS Jefferson Street Course Features: Polo Field, Street, 1A water Station \ Some Hard Shoulder All Races and Dirt Road ............................... 0 LAKE I\ ENLARGEMENT OF 2K FUN WALK ARENA 0 PASTURE ARENA 5K TURN- AROUND MadisonStreet------------------------------------------------------------------I �. _00 I I I Empire I Equestrian Park GATE 12 1A Registration' START FINISH All Races GATE 1CD0 D I=1 iC CID N Indio Police I \ O o ARENA PASTURE o 000 I ---- --- -- - - - -- - ---- Monroe Street PARKING LOT ENTER FROM AVE. 52 GATE 12 RODEO Indio Police ----------- North 10K ENTERS POLO FIELDS FROM AVE. 50 Indio Police ------------------------ Jr - 73L�ai� del, z!`�+•i'}E•�{= • y y . . COACHELLA VALLEY RECREATION AND PARK DISTRICT 45-871 CLINTON STREET • INDIO, CALIFORNIA 92201 • (619 August 10, 1995 MY OF LA QUIFNTA 0 C T 10 199 OCT 1 21995 Attention: Stan Sawa: PUBLIC WORKS PLANNING MEQiI &T The City of Indio and the Indio Chamber of Commerce will be holding the 1995 Tamale Festival on Saturday December 2, 1995. As a component of this all day event, the Coachella Valley Recreation and Park District is hosting the 1995 Tamale Festival 10k, 5k, and 2k Fun Run on Saturday December 2, 1995. The course for the race will be in and around the Empire Polo Grounds in Indio. The 5K and 2K events will remain in the Indio city limits however, we would like the 10K course to come out of the Polo grournds on .Avenue 50, gravel down to Jefferson Street, turn .left .(Nort.h) on Jefferson to Avenue 52 and head East on Avenue 52 and return to the Polo grounds (see attached map). Since Jefferson street falls into the .LaQuinta city limits we are submitting a request for closure of the north bound lanes on Jefferson street from the hours of 7:15 a.m. to 8:30 a.m. We will also have a traffic officer placed at the corner of Avenue 50 and Jefferson and Avenue 52 and Jefferson. In addition we will have one water station placed before the turn onto Jefferson and one water station placed right after the turn onto Avenue 52. The course outlined above is the same course used last year. Our hope is that the City of LaQuinta will make this a cooperative effort and not only approve this request but waive any fees that might normally be charged. CVRPD will submit a certificate of Insurance releasing the City of Laquinta from any liability from participation in the 10k,5k run. If you need further information regarding this event please feel free to contact me at 619-347-3484. Sincerely, Laura McGalliard Recreation & Park Superintendent P �, U -.J„ N 11-15-95 o ° 0 r 111ME. DRAWING #A 10' I MMUM LANE BETIIEBN Ynww STRIPE AND Corm 1 AVENUE 50 I/ AX IND10 0 0 0 OL> 0 0 0 0 01> ok 0 CITY OF IA QUINTA 6 CONES SPACED AT 100' O.C. LEGEND v O CONES SPACED AT 100. O.C. ar 0 OSEE CORRESPONDING DETAIL SHEET 5 D HAIIRICIIDE (TYPE 2) PAC (25 l�D) SPE® ISTIO) AT 1000• O.C. �� O'� ° 0 14• l@IllNI[ LIME ffi'1'IrESI�i IMIAN CURB AND CONES D D °2 ° ° AVENUE 52 O O O O 0<0 O O o x ESIGNED BY.. RIV COlQ1�iDED BY: SDS •�7771 /�3- DA . CO3PER DATE CITY ENGIINMM RCS 38022 /Z Q n CITY OP INDIO #V ENUE 51 E4 rn Z Mim. • � —vo 1 o0ooMOAF-1 CONES SPACED AT 100' O.C. 10, MBMIUM LANE BETWEEN YELLOW STRIPE AND COME CITY OF LA QUINTA CONS PLACSMSNT TRAFFIC CONTROL PLAN - FOR TAMMM FSSMAL SCS SPECIAL EVENT AAD 750' FROM IINEL7i0N v z 0 x CITY OF LA QUINTA W w w w ti N AVENUE 50 SM SPECIAL EVENT ARM 750' FROM INTERSECTION 10' MMRIM lL LANE - BETEEEN YEILOW STWE AND CONES -14-95 SIGNED BY: RM COMMENDED BY: SDS 0 0 0 A 0 0 DRAPING # 1 LEGEND 0 CONES BARRICADE T/SIGN ® OFFICER ® INDIO POLICE DEPT CITY OF INDIO 10AND ' �M LANE 1/r-w9EEN 7rELww STRIPE coNEs 0 0 0. 0 ok 0 Bi STOP CITY OF LA QUINTA - W17 STOP AEMAD 750' FROM INTERSBC kAPPROVZD--BY: CITY OF LA UINTA 7/Z AVZM 50 do JEFFERSON ST Y ENG RM RCB COSPER 80 TRAFFIC CONTROL PLAN FOR TAMALE FESTIVAL 14' NMREM M LANE — BETWEEN MEDIAN CURB AND CONES AVENUE 52 SCIS SPECW. EVENT AHEAD 750' FROM tSEMON LEGEND 0 CONES BARRICADE VIEGN ® OFFICER ® INDIO POLICE DEPT L11-15-96 ESIGNED BY: REV 010[iQiDED HY: SDS DRAPING # 2 0 0 0 0 0 0 1117 STOP AHEAD 0 750' FROM ERTE Cl 0 0 o.. � /— Rl STOP 0-.4m0 o r0 0 O O 0 ov �� 0 0 —10' im mklum LANE KEEN YELL011 STRIPE AND CONES SM SPECIAL EVENT AHEAD 750' FROM IIR'1'E MEMON A "LD1 ` CITY OF LAQUINTA /7/9,1' AVENUE 52 do JEF'F'ERSON ST L: sA BR DeTB TRAFFIC CONTROL PLAN FOR TAMALB FESTIVAL NGENEER RCE 9802 ■ K LEGEND CONES BARRICADE 'WISIGN I BARRICADE (Tips 2) C9A ROAD . CLOS® TO TJ= TRAMC DRAWING # 3 N E4 r -r z 0 as d Ey 510' IMHB Y LANE BETWEEN MUM STRIPE AND CONES 010 o o o o •o o o o o o 0 0 o d/ 0 0 AVENUE 52 11-14-95 IMGNED BY: RIV MNzNM D BY: SDS aPpRovan.:-- CITY OF LA QUINTA Z171fj- AVENUE 52 & VISTA BONITA DAVID M. ,CO3PBIt DATE CITY BNGINBBTi RCB 9802 PLTRAFFIC CONTROL AN FOR TAMALE FESTIVAL LEGEND 0 CONES BARRICADE W/SIGN I BARRICADE (TYPE 2) \ 1=04 F1 1.4 11 O' 0 0 0 0 0 CITY OF LA QUINTA CITY OF IA gU>HrA AVENUE 52 a 9 0 0 0 0 0 R17 NO LEEP TURN 100' FROM INTERSECTION �z 00 DRAWING # 4 THESE ITERS TO BE FURNISHBD AND INSTALLED BY THE CITY OF INDIO OR ITS DESIGNEE Ria NO RIGHT TORN 100' FROM INTERSECTION 0 0 0�0 0 0 0 CITY OF INDIO — CITY OF LA QUINTA —10' MIIdnm LANE N BE'i W= YELLOII STm AND CONES - APPROVED BY CITY OF =10: 11-1e—ss ESIGNED BY: MV ti o�DEo BY: am CITY ENGINBERR A APPRo`�D-eY. CITY OF LA UINTA AVENUE 52 do MADISON STREET OM DCITY BN6 CII�EER RCB 980 TRAFFIC CONTROL PLAN P'OR TAMAIX FESTIVAL LEGEND BARRICADE V/SIGN z BARRICADE (TYPE 2) VISTA BONITA C2 ROAD CLOSED z rn DRAPING # 5 THRO nwo TO BE FORNISIIED AND INWALIED BY THE CITY OF INDIO OR ITS DESIGNEE ME AViNUE 51 I� APPROVED BY CITY OF INDIO: ii -16-9 ESIGNED BY: RIV LIOZNDXD BY: CITY SNGUUM ATE ,7P BY: CITY OF LA QUINTA 271 MMISON ST do AVENUE 51 DAVID 9602 N. OSPER DATE CITY ENGINEER TRAFFIC CONTROL PLAN FOR TAMALE FESTIVAL RCE DRAWING # 6 R17 NO LEFT TURN 100' FROM INTERS C7l00N crrY of INDIO AVENUE 50 CITY OF INDIO CITY OF U QUINTA CITY OF INDIO 0 0 0 0 0 0®0 0 0 0 0 0 0p.4 0 00 0 0 1 � R16 NO RIGHT TURN 100' FROM U TERSECTI, C2 ROAD CLOSED 0 THESE rrZMS TO BE FURNISHED I AND D WALLED BY THE CITY OF INDIO OR ITS DESIGNEE C2 ROAD CLOSED LEGEND o CONES BARRICADE w/SIGN BARRICADE (TYPE 2) APPROVED BY. CITY OF INDIO: rev 11-28-05 ESIGNED BY: RJV COlgll TDED BY: SDS CITY BNGIN]= A APPRQVED �� CITY OF LA QUINTA MADISON ST do AVENUE 50 DAVID M. COSPBR DATE CrrY BNGINBBR RCB 380221 TRAFFIC CONTROL PLAN FOR TAMALE FESTIVAL MATERIALS LIST FOR TAMALE FESTIVAL revised 11-28-95 �x l� 1c, .5- DRAWING NUMBER ITEM DESCRIPTION TOTAL A 1 2 3 4 5 6 Barricade (Type 2) 38 9 4 4 3 4 7 7 Cones 180 180 SC5 "Special Event" 4 2 2 C2 "Road Closed" 3 11 1 1 C3A "Road Closed to Thru Traffic" 1 1 R1 "STOP" 2 1 1 R2 (25 mph) "Speed Limit" 9 9 R16 "No Right Turn" 1 1 R17 "No Left Turn" 2 1 W17 "Stop Ahead" 2 1 1 �x l� 1c, .5- w U Q July 22, 1996 78-495 CALLE TAMPICO — LA QUINTA, CALIFORNIA 92253 - (619) 777-7000 FAX (619) 777-7101 James R Kozero, Manager I Facilities/Acquisition/Construction Desert Sands Unified School District 82-879 Highway 111 Indio, CA 92201-5678 Re: Adams Street Low Water Crossing Dear Mr. Kozero: We take exception to your statement that "no work was performed during the period of January, 1995 through mid May, 1995" on the above referenced project. The enclosed schedule from Granite Construction indicates the contractor did begin work in January' 1995. ,However, the seasonal rains began, and DSUSD's representative, Mr. Layne Arthur, requested that the -City monitor the channel conditions) and make a recommendation as to when construction should commence. By late January, -1995, it was suggested by Mr. Arthur that we "consider commencing construction on April 1, 1995, with completion estimated by June." No inspection time was billed or invoiced by Tri -Lakes from February 4, 1995, until March 5, 1995. In late March, 1995, we were again requested by Mr. Arthur to investigate and review a $60,559.00 claim from Granite Construction for additional work associated with erosion that had occurred since they were directed to stop work. The subsequent time spent by Tri -Lake in March and April to investigate and review this claim, and to make a recommendation, was very valuable and resulted in a substantial cost savings to DSUSD. Granite Construction Company and Adkan Engineers/Surveyors began construction activities again on May 11, 1995. Enclosed per your request are copies of Tri -Lake's invoices from the period of January,:1995 through May, 1995. In reviewing our records and these invoices, we feel that all of Tri -Lake's charges are justified and acceptable. The City considers this matter resolved. However, should you have any additional questions or concerns, please do not hesitate to contact me immediately. Sincerely, J hn M. Freeland Senior Engineer Enclosure: Granite schedule • Tri -Lake invoices c: Public Works Director CPermif_File, No. _1493-- MAILING 493 -MAILING ADDRESS - P.O. BOX 1504 - LA OUINTA, CALIFORNIA 92253 (� F:\pwdept\projects\dsusd2.wpd LAKE, T fR` CITY OF LEO QU7NTA CONSULTANTS. INC. • MUNICIPAL'ENGINEERS J V N 13 X995 P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504 JJJ PUBLIC WORKS INVOICE Invoice # 11436 -- June -9,.1995 Page 1 Mr. John Freeland Senior Engineer City Of La Quinta P.O. Box 1504 La Quinta,' CA 92253 Project #: L9-008-95 Professional Services for the eriod.: May 1, 1995 to May 26, 1995 ------------------------------- -----;------------------------------------------ Professional Services Rate Hours Charge --------------------- ---- ------------- Inspector Lindsey*. 41.00 162. 50 69662.50 Total Professional Services ** Inv.oice Total * See Breakdown i PROD. NO.":^_^_^.J,1: N0. AMC �.. . ,6. - Z 79 Pa. s_ 644-01 Z ZZo 0l - 7- 05.53Z Z Z ZO.83 ** attached TG-1AJ • 6 lv PZ.50 • M VON��� .� i 69662. 50. • INVOICE TRI LAKE ,ramCONSULTANTS. INC. MUNICIPAL ENGINEERS P.O. BOX 606 • PERRIS. CA 92570 • (909) 943-6504 Mr. John Freeland Senior Engineer. City Of La Quinta P.O. Box 1504 La Quinta, CA 92253 m CITY OF LA QWNTA MAY 1 8 1995 PUBLIC WORKS Invoice # 11420 May 15, 1995 Page 1 v Project #: 1-9-008-95 TLC 92-1, Phase V Cove Improvements Professional Services for the period: April 1, 1995 to April 28, 1995 ----------------------------------------------------------- Professional Services ...,\Rate Hours - Charge • --- .-----'-------- Inspector Lindsey* .,41.0 159.00 69519.00 I M01 - - Ml ** Invoice Total $ 6,519.00 ----------- AMOUNT Z /314.50 TOTAL 1 .415 /9. jv II► AMT. TO PAY 6, 519.00 TRI LAKE CONSULTANTS. INC. • MUNICIPAL. ENGINEERS 0. BOX 606 • PERRIS. CA 92570 • 19091 943 650<t CITY OF LA QU�A LIV�JU:ii�E Invoice ,# 1196 -- --- APR 1 1995 Apr i 1 12, 199 Page 1 Mr. John Fr-eeland PUBLIC WORKS Senior Engineer City Of La Quinta P.O. Box 1504 La Qu i n t a, CA 92253 L9-008-95 TLC 92-1., Phase V Cove Improvements ofes ianal' Services for, the od• March 6 1995. to March 31 1995 • , , ------------------------------ :,. -------------------------------------.-....-.. I: rofessional Services ate Hol_ws Chai-gt ---------------- • Inspector Lindsey*. 1.00 162.50 6 C - Total Professional Se ** Invoice Total ** AMOUNT 7 . pro �/.6v2.50 $ R 'See Breakdown Attached APP 0 F • ACCOUNT NO. L% ,uc. TRI LAKE -.,..- CONSULTANTS._ INC. • MUNICIPAL ENGINEERS MAR 2 3 P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504R, :: PUBLIC Vi�0i._.'�`� INVOICEInvoice # 11395 ------- MIT March 22, 1995 f Page i Mr. John Freeland 64 City Of La Quinta P.O. Box 1504 La Quinta, CA 92253 Project #e L9-008-95 TLC 92-1, Phase V Cove Improvements Professional Services for the period: February 6, 1995 to March 6, 1995 ------------------------------------------------------------------------------- Professional Services Rate Hours: Charge • Inspector Lindsey* 41.00 140.50 5,760.50 Total Professional Servi ** Invoice Total ** * See Breakdown Attached 0 $ 5,760.50 $ 5,760.50 r: A CITY OF LA QUINTA February 6, 1995 -March 3, 1995 JOB #L9-008-95 - INSPECTOR PROJECT Agreement HOUR AMOUNT J. Lindsey Street 4.00 .164.002 Palm Tree Replacement 3.50 143.5. 61.50 Adam St. AD 92-4 1.50 3.50 143.50 Permit #ES2167 21.00 861.00 Permit #EG2180 Permit #0783 3.50 143.50 Permit #0042 & 0057 1.00 41.00 Permit #0062 0.50 20.50 Permit #2296 22.50 922.50 Permit #2300 6.00 246.00 Permit #2301 11.00 451.00 Permit #2303 25.00 1,025.00 Permit #2304 1.00 41.00' Permit #2306 2.50 102.50 Permit #2308 10.00 410.00 Permit #1953 13.50 553:50 Permit #2289 2.00 82. UO Permit #2299 0.50 20.50 Permit #2132 1.00 41.00 Permit #2235 2. 00 82.00 Permit #00.53 0.50 20.50 Permit #2269 2.50 102.50 Palm Royal Tr. #18915 1.00 41.00 A/C Failure @ Jefferson 1.00 41.00 Total:. 140.50-* $5,76o.50- 5,760.50 Agreement Amount Total Billed To Date: $ 262, 604. ()-0-.. .. 192, 354..50 . 1192-1 92- �. 3ej7.: c 'cz sa 1 SC TRI LAKE CITY OF LA QUINTA MA"CONSULTANTS. INC. •MUNICIPAL ENGINEERS FE 8 2 21995 P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504 PUBLIC WORKS INVOICE Invoice # 11380 ------- February 20, 1995 Page 1- Mr. John Freeland City Of La Quinta P.O. Box 1504 La. Quinta, CA '92253 Project #:. L9-008-95 TLC 92-1, Phase V Cove Improvements Plrofessional Services for the period: January 3, 1995 t.o February 3., 1.995 --------------------=--------------------------------------------------------- Professional Services Rate Hours Charge Inspector Lindsey* 48. 00 42. 00 29016.00 • 41.00 102.00 49182.00 144.00 6, 198. 00 • Total Professional Services APP FOR PAYMENT �,xrNo: OESCIp OUNT QW. TO;AY TMAL S f 6,198.00 ----------- 6,198.00 Y: • �4a•�'. JUR 78-495 CALLE TAMPICO — LA QUINTA, CALIFORNIA 92253 - (619) 777-7000 `/ 0. `a� FAX (619) 777-7101 March 29, 1996 James R. Kozero, Manager I Facilities/Acquisition/Construction Desert Sands Unified School District 82-879 Highway 111 Indio, CA 92201-5678 Re: Adams Street Low Water Crossing Final Payment Dear Jim: In reviewing our agreement, the City's monetary obligation is to pay $118,000 as its share of the project costs, less any inspection and engineering costs. Enclosed for your review and -records is a summary and support documents of the costs incurred by the city. • The'amount payable due you is as follows: City's monetary commitment $118,000.00 Less City's Inspection/Engineering cost -34,662.33 Amount due D.S.U.S.D. 83,333.67 Previous payment (Invoice #7137) -59,272.50 Balance Due 24,065.17 Should you or your staff have any questions regarding this matter, please do not hesitate to contact me. Sincerely, ohn M. Freeland Senior Engineer Enclosure City Invoices c: Public Works Director . Fred Bouma, Associate Engineer C Permit File No. 1493 MAILING ADDRESS - P.O. BOX 1504 LA OUINTA, CALIFORNIA 92253 C:\oft'ice\wpwin\wpdocs\dsusdfp.wpd r� U • SUMMARY OF BILLING ADAMS STREET/WHTTEWATER CHANNEL CROSSING PSI GFB Assoc. Tri -Lake Consulting Total: City Obligation Previous Invoice Inspection /Engineering Cost Amount to Pay: C:\office\wpwin\wpdocs\dsusdfp.wpd $3,169.50 13,736.49 17,756.34 $34, 662:33 $118,000.00 <59,272.50> <34,662.33> $24,065.17 0, LJ lie ADAMS STREET/WHITEWATER CHANNEL CROSSING PSI BILLING (TESTING) DATE INVOICE $ AMOUNT 12/31/95 431913 110.00 1/30/95 442696 105.50 5/31/95 489101 697.00 6/30/95 496303 952.50 7/31/95 510133 1053.50 8/31/95 523697 251.00 4N, i= zr 11420 Total: $3,169.50 GFB ASSOCIATES BILLING (DESIGN) DATE INVOICE $ AMOUNT 6/15/94 9406-15 $4,104.79 7/12/94 9407-02 6,992.70 9/13/94 9409-11 2,159.00 10/10/94 9410-12 480.00 11396. 1,250.50 Total: i $13,736.49 C:\office\wpwin\wpdocs\dsusdfp.wpd TRI -LAKE BILLING (INSPECTION) DATE INVOICE $ AMOUNT 2/20/95 11380 $1,472.50 4/12/95 11396. 1,250.50 5/15/95 4N, i= zr 11420 2;6-44.50 6/09/95 11436 2,220.84 7/11/95 ni.,Z,7 ,.; 0 11445. 5,145.50 8/15/95 3 _ z 11471 4,243.50 9/18/95 �p� 31 _-/ 11482 779.00 Total: $17,756.34 C:\office\wpwin\wpdocs\dsusdfp.wpd DESERT SANDS UNIFIED SCHOOL DISTRICT Accounting Department 82-879 Highway 111 i^ Indio, CA 92201 TO: *** INVOICE *** City of La Quinta P.O. Box 1504 La Quinta,.CA 92253 ATTENTION: JAMES LINSEY Invoice Number CITY OF LA QVWTA MAR 51996 PUBLIC Wor K" S PO#/CONTRACT# THIS INVOICE COVERS THE FOLLOWING: 3/_13/96 DATE Installation of the Adams Street Whitewater crossing - complete •$59,212.50 AVED FOR r � 7.7 .�. BY BY ACCOUNTNO. G:-:CRIPTION �� � /�,_, NAT. TO PAY �J`7 0 4 / ` Z .960 11500 6009700000 6200 Please make check payable to: Desert Sands Unified School District Please mail check attention: Accounting Office If you have any questions regarding this invoice, please contact Jim Kozero 3 NCR rev 1/92 (25)-53 0 I n Sinn ,4 �Y �y 9/LL/A/4, J ASso736, V 9 756.3 + . o l•�-G .3!. 16 0"3:3 i,. 2-7 2. 5 211 ,4 1 �7 _Ross/�l G t. � E •9sL Z/ 7 71Y o�•�o /Zl b 5h,1711 � l AS 'ozzoe o�'' os, .per z z 16 5r 2 5- (:!- sr' .v oZ z 9 OS -7 6 h7 a 7A 92 1� 17 Sd off' c'0'6 j/ 6 ohd b El b oL 266 2Q-4 Ob 'ho 7 71Y �. a ' Sz z 16 5r 2 5- / 8 9 OS -7 6 h7 a 7A 92 1� 17 Sd off' PROFESSIONAL SERVICE INDUSTRIES, INC. AMERICAN ENGINEERING LABS DIVISION Ewli 510 East 22nd Street / Lombard, IL. 60148 OFFICE PERFORMING SERVICES PALM DES£RTi CALIFOR':iA (519) 341-5790 FED. ID ?5-3505233 !3't110195 PLEASE MAIL REMITTANCE TO PO ?CX: 71168 Ci+IC„G0. IL 6C694-1163 CITY OF LA C'UINTA CITY OF LA DUINTA 78-495 CALLE TAP'PICO 78-495 CALLS TAMPICO .LA QUINTR. CA 92253 LA QUINTA CA 92253 ATTN: JCHN FREELAND '0 ASSURE PROPER CREDIT TO YOUR ACCOUNT. PLEASE RETURN REMITTANCE COPY. LA DUINTAe CA. .. .. L • v J TOTAL BILLING THIS INVO'&CE C V � 1 C (�09 553 Avr►�, Si • CR55,-K,1 cc F451 TERMS: NET 10 DAYS. A CURRENT MONTH, 60 DAYS 60 DAYt SERVICE CHARGE OF 1.5% PER .,, _ ,X g MONTH, WHICH IS AN ANNUAL 00,:-`Z PERCENTAGE RATE OF 180/0 ANALYSIS OF WILL BE ADDED TO ALL PAST YOUR ACCOUNT q DUE ACCOUNTS. DUPLICATE . 1 Itwo UV '110.Oc MAR 27 '% 02:07PM PROFESSIONAL SERV -7'=v, INDUSTRIES, INC. • 510 East 22nd Street �% vs Lombard. 1L. 60148 CITY OF LA QUINTA - 76-495 CALLE TAl;PICO LA QUINTA CA 92253 ATTN: JOHN FREEI:AND OFFICE PERFOAM,NG SERVICES PALI! DESERT. CALIFORNIA (619) 341-5790. FED. ID 37-0962090 02/15/95 REV I -SIk&S�AyqjWAI.Ce TO PO BOX, 711(38 'CHICAGO. 1 L 60694.-1 1.68 . CITY OF LA QUINTA 78-495 CALLE 'TAI.IP I CO LA QUINTA CA 92253 -77 ..cAtE, : ,war,::. , •. ��Ywut :82796 011311g15 42696 01 � ,F, :..: ;: 0.173-40277 _ ADA1•.IS ST RECONSTRUCTION � A98URE PgOPEq CAEOIi TO Y" ACCOUNT. PlEA9E RETUpn pwTTANCE GO/v. LA ..QU 1 NTA. CA. '°A ,_,, �+uMer�r ..:...�.,,,;,,r.�,x. ;; � c eco . v 1 '5 0002 MOISTURE DENSITY 'TEST . RELATIONSHIP w;�<•a 1'0 100.00 100,00 t 5 0002 EVAL-REPORT REV1EVI-CONSULTA71014-PER MR 1 55.010 5, g0C TOTAL BILLING THIS INVOICE- 105.90 0 EAMS: NET 10 DAYS. A �RVICE CHARGE OF 1.5% PER ' ' • NTH, AGE IS AN ANNUAL ANALYSIS OF QiS';;Sjja.'r 4T RCEE ADD RATE L AST YOUR ACCOUNT i FILL BE ADDED 70 ALL PAST UE ACCOUNTS. OFFICE COPY PROFF-OFFICE PERFORMING SERVICES- ,eSSIONAL SERVICE INDUSTRIES, ]INC. O-A.LM PE,SERT, ..C.A.L'I_F.ORNrA 6191 341-579C FED. ID 37-0962090 510 06/07/95 aml R Lombard, IL. 60148 PLEASE MAIL REMITTANCE TO PO BOX: 71168 CHICAGO, IL..60694-1168 7 ,C 1 T Y OF LA QUINTA CITY OF LA QUINTA 78-495 CALLS TAPPICO 78-495'CALLE TAMPATCO LA QUINTA CA 92253 LA !UINTA CA 92253 ATTN: JOHN FREELAND 827861 0 011 073-402717 ADAMS ST ROCONSTRUCTIO,': LA Q;jl.'ITAv CA , ASSURE PROPER CREDIT TO YOUR ACCOUNT. PLEASE RETURN REMITTANCE COPY. 12 ,,j000.3f.....NyCL..EAR DENSITY TEST$..—..PER HOUR 0113 TEST' EllAL—lEPIllT'!!.CONSi'i —PER' HR' 0004 ULTATION "-MC`lSTU-RE'_DE`,Y*SITY ELATIONSMIV 0004E'.VAL— REP Qlqj,"REVIEW- ON Su'LTA'TION—PER HR 0005 MOISTURE DEN:rfy. RELATIONSHIP 12 '0005 ....TEST' EVAL—REYOFT: RgVI'Ei"o"-.C.Ot*SULTAT,.&"ON—PER. HRS.. 16 0006 NUCLEAR, DENSITY 16 0006 TEST EVALREPORT REVIEW—CONSULTATION—PER HR 25 0007 NUCLEAR DENSITY TESTS — PER HOUR 25 0007 TEST EVAL—REPORT REVIE6—CONSULTATION—PER HR 31 0008 CONCRETE 'ANSPECTION..PER'HOUR 31 0008 TEST EVAL—REPORT ER P — lON REVIEW—CONSULTAlNHR ER TOTAL BILLING THIS INVOICE I TERMS: NET 10 DAYS. A SERVICE CHARGE OF 1.5% PER MONTH, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% WILL BE. ADDED TO ALL PAST DUE ACCOUNTS.- 401 *Apr� I- I ADW J. 0j24Z_-,jW-jCotilsr - 7 ANALYSIS OF YOUR ACCOUNT DUPLICA' un 4.0 29.00 -116.00 55.00- 5.50 100.00. 100.00 55 .00 5.50 1. 0 .100.00 100.00 .1. 55.00 5.50 4.0 29-00 116.00 .1 55.00 5.30, 4.0 29.00 116.00 .1 55.00 5.5; 4 29.00 116.00 55.00.1 5. 5" 697.0U . . ......... [ D J 917. -O'S PROFESSIONAL SERVICE INDUSTRIES, INC., OFFICE PERFORMING SERVICES PALM DESERT. CALIFORNIA (619) 341-5790 FED. ID 37-0962090 rM 07/10/95 510 East 22nd Street vffl Lombard, IL. 60148 PLEASE MAIL REMITTANCE TO CITY OF LA QtTMA PO 30 X :. 7116 8 CHICAGO. IL 60694-1168 JUL 1 2 M .PUBLIC WORKS CITY OF -LA CUINTA" CITY OF LA AUINTA ' 78-495 CALLE.TAPIPICO 78-495 CALLE TAMPICO ..LA' QUINTA' CA 92253 LA BUINTA CA.. 92253 ATTN: JOHN FREELAND CUSTOMER PURCHASE INVOICE INVOICE PAGE FILE NO PROJECT NAMF. NUMBER ORDER DATE NUMBER NO. .582786 06/30/95 4963 0073-40Z77 ADAMS ST RECONSTRUCTION LA- 9UINTA. CA TO ASSURE PROPER CREDIT TO YOUR ACCOUNT, PLEASE RETURN REMITTANCE COPY - DATE REPORT NUMBER DESCRIPTION QUANTITY UNIT COST AMOUNT A TIVITY.ON THIS FILE INV NO DATE AMOUNT 48910.1 053195 697.00 I, 1 APP OVED FOR PAY61.1i6Ep1T Y• ACCOUNT NO.. 461 - (n0%' &M - 5's 2, IProN APAM5.3 • INF OA(5 TO PAY :Z . 5� TERMS: NET /0 DAYS. A SERVICE CHARGE OF 1.5% PER MONTH, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18% ANALYSIS OF WILL BE ADDED TO ALL PAST YOUR ACCOUNT DUE ACCOUNTS. ORIGINAL • PROFESSIONAL SERVICE INDUSTRIES, INC. 510 East 22nd Street Lombard, IL. 60148 CITY OF LA QUINTA AUG 1 01995 rUBLIC WORKS CITY' :.OF LA"QUINTA. 78-495.CALLE TAMPICO LA QUINTA. CA 92253 ATTN:.JOHN FREELAND OFFICE PERFORMING SERVICES PALM DESERTi,CALIFORNIA•- (619) 341=5790: FED. ID 37-096209 0 08/07195 PLEASE MAIL REMITTANCE TO PO 80Xi.71168. CHICAGO -01 IL. 60694-1163. CITY": OF : LAS QUINTA: 78-495 ' CALLE TAlRPICO LA; QUINTA CA'r 92253 CUSTOMER PURCHASE INVOICE INVOICE I PAGE FILE NO. PROJECT NAMR NUMBER ORDER DATE NUMBER NO. :82786 7/31/.95 10933 101 1073-40277'ADAMS ST RECONSTRUCTION: LA QUINTA. CA ASSURE PROPER CREDIT TO YOUR ACCOUNT, PEASE RETURN REMITTANCE COPY DATE REPORT NUMBER DESCRIPTION QUANTITY UNIT COST AMOUNT 172 018. ONCRETE INSPECTION PER. HOUR 8.0 29.00 232.00 �71 2 3018 TEST EVAL-REPORT..REVIEV-CONSULTATION-PER HR I. 55.00' 5.50 )-M. 3019. UCLEAR DENSITY TESTS - PER HOUR 4.0 29.00' 116.00 019 EST.EVAL-REPORT.REVIEW-CONSULTATION-PER HR 55.00` 5:50 '-7 8. 020 UCLEAR DENSITY TESTS - PER HOUR 4.0. 29.00 116:00 :7 8 020. EST.EVAL-REPORT REVIEW -CONSULTATION -PER HR .:1 55.00' 51'50 )7 8 021 OISTURE DENSITY. RELATIONSHIP 1:0 100.00` 100.00 37 8 021 EST EVAL-REPORT REVIEW -CONSULTATION -PER HR. .3 55.00 5.50 37. 9 022 ONCRETE COMPRESSION TEST 3.0" 12.00' 36.00• '7 9 022 EST EVAL.-REPORT'REVIEW-CONSULTATION-PER HR .1 55.00 5.50 17.9 023 ONCRETE COMPRESSION TEST 3.0 12.00: 36:00 '719 023 EST.EVAL-REPORT.REVIEW-CONSULTATION-PER.HR .1' 55.00 5:30 X7'19 024 ONCRETE COMPRESSION.TEST 3.0 12.00: 36.00 7 9 024 EST.EVAL-REPORT.REVIEW-CONSULTATION-PER HR .1' 55.00 5':30 7,9 025 UCLEAR.DENSITY.TESTS - PER HOUR 4.0 29.00: 1'16.00 17.9 025. EST.EVALrREPORT.REVIEW-CONSULTATION-PER.HR .1. 55.00 5.50 )7 0 19 026 PHALT FIELD INSPECTION. PER HOUR 4:0 29.001 116600 )7 027.. OISTURE DENSITY. RELATIONSHIP` 1.0 100.00 1 00: 00 37J9 027. EST EVAL-REPORT.REVIEW-CONSULTATION-PER HR .1' 55.Go. ♦ Uo TOTAL.SILLIN6 THIS INVOICE 1053:50 I ROVED R PINY I I DuckrFmonly i 5r. TERMS: NET 10 DAYS. A • , • . • • SERVICE MONTH, CHARGE WHICH IS OF 1.5% PER � AN ANNUAL PERCENTAGE RATE OF lr/. ANALYSIS OF WILL BE ADDED TO ALL PAST YOUR ACCOUNT DUE ACCOUNTS.}'` .510 1 TAM►PZC RIFORMING SERVICES k� -F� _'L> _71 41-5790`.,. � G.AV,i" L F 37=09.67090 8 19 '09/ .5'. Ind gti66f; M. PLEASE MAIL REMITTANCE TO Fo. 9:0X2 ..7.1168 L 6N'o 4' f� --CA G C.M i j 7• 8 t OF L-A*.-,. •- Q U IN T.A 78-445., CALLE, TAMPI.Co. CA 92253;. 14 1whda UrMbLAZALIL� P, -Vn I I %rT, ov Lk. 0 u I hi kv CA MEMO ::r;:06095 71, 9:52::.0,,=: M gN.13 t� `--0 8 2 2 91'� 56 RMS:". Nff. 10 DAYS. A DIM m I 4 E� MICE CHARGE OF 1.5% PER I V ,V Alm I 5f , Wo Ilk cl I' '4A AP51: - (;o lci J. RMS:". Nff. 10 DAYS. A DIM m I MICE CHARGE OF 1.5% PER )NTH, WHICH IS -.AN ANNUAL4. RCENTAGE RATE.. Of 18% ANALYSIS Of YOUR ACCOUNT LL BE ADDED TO ALL PAST )E ACCOLINM COPY" REMITTANCE lJ4V()1:CE 0,,`''1'4 '941 02-- 19767 480 4 00 480,00 INDIO IVIAIN 02- 19767 o4� Co BANK OF AMERICA P.O. DRAWER GGG INDIO, CA 92202 CHECK NO. 16-66 of P.O. BOX 1504, (619) 777-7150 1220 78-495 CALLE TAMPICO, LA QUINTA, CA 92253 aaa PAY TO THE ORDER OF: Mcir HIEWTO&DATE AMOUNT AVISOC+ 6009 INDIANA Im"201. Rl VERSS Dr.:: CA 92506 AUTHORIZED SIGNATURE AUTHORIZED SIGNATURE "80 1.9 ? r. 746 ':U200066W: 09160wLS461.119 1p GFB & ASSOCIATES, INC. Land Development Consultants 6809 INDIANA AVENUE, SUITE 201 • RIVERSIDE, CA 92506 • (714) 781-0811 October 10, 1994 JN: R644 -0101B Invoice #'9410-12 ,.. CITY OF LA QUINTA 2 �� 78-495 Calle Tampico. . La Quinta, CA 92253 _ Attn: Mr. Steve Speer P.O.-Box 2843 -ADAMS STRET/WHITEWATER CHANNEL CROSSING CONTRACT BILLING SEPTEMBER 1994 OFFICE SERVICES: TOTAL INVOICE A P P R 0 V E D TiR PAYIIV BY BY ACCOUNTNO..1O' /� % • :. T44C.l O PAY W � _..... K•.� ✓! y Engineering as per contract and Purchase Order 2843 CONTRACT AMOUNT % COMP PREVIOUSLY BILLED CURRENT BILLING $9,600.00 100% $9,120.00 $480.00 TOTAL INVOICE A P P R 0 V E D TiR PAYIIV BY BY ACCOUNTNO..1O' /� % • :. T44C.l O PAY W � _..... K•.� ✓! y 2r 1,59 o 00 I b9 00 INDIO MAIN BANK OF AMERICA P.O. DRAWER GGG INDIO, CA 92202, 16-66 P.O. BOX 1504, (619) 777-7150 1220 78-495 CALLE TAMPICO, LA QUINTA, 'CA 92253 •PAY TO THE ORDER OF: m@cT HIE WTULuaa 'x" DATE 9/28/94 TUAWRIN Lou -e-sf,.309 INDIANA `201 CA 92506 • 02-19511 02- 19511 CHECK NO. 195 3. AMOUNT- " AMOUNT- ll,ll*****'2,l.*,p.00 --m- AUTHORIZED . SIGNATURE AUTHORIZED SIGNATURE 14ml122000rr.Li: 091,90MI1151.64"s GFB & ASSOCIATES, INC. Land Development Consultants 6809 INDIANA AVENUE, SUITE 201 • RIVERSIDE, CA 92506 • (714) 781-0811 September 13,,1994 CITY OF,LA QUINTA 78-495 Calle Tampico La Quinta, CA 92253 Attn:. Mr.'Steve Speer CIT`' OF ,% QJJINTA SEP 1.5 1994 �ti Ir U''�vIL3C VV P.O. 2843 aadooc�r� JN: -R644-0101B Invoice No. 9409-11 CONSULTANT SERVICES ADAMS STREET/WHITEWATER-CHANNEL CROSSING CONTRACT BILLING AUGUST 1994 OFFICE SERVICES: Engineering as per contract•.and Purchase Order•2843 • CONTRACT AMOUNT % COMP PREVIOUSLY.BILLED CURRENT BILLING $9,600.00 95% $6,961.00 $2,159.00 TOTAL INVOICE DUE AND PAYABLE $2,159.00. 4�J�•i r�l 8�`4�, •1`6 •i i Aa�Ily00 akt6 02- 19038 '?9 --"k.jQv 7( 1. 4 , '.*-?::'i5. 49 DATE PAY TO THE ORDER OF: 911 --fl 411t Ruco ff A`:'$09 4XVIIANA 4zj ,Lo ., Lo .?Geri, 02- -19038 CHECK NO. A) AUTHORIZED SIGNATURE i AUTHORIZED SIGNATURE 00003804 412200066L.11: 09L60ml5464u' 7? a AMOUNT INDIO MAIN BANK OF AMERICA K P.O. DRAWER GGG INDIO, CA 92202 16-66 P.O. BOX 1504, (619) 777-7150 I220 78-495 CALLE TAMPICO, LA QUINTA, CA 92253 DATE PAY TO THE ORDER OF: 911 --fl 411t Ruco ff A`:'$09 4XVIIANA 4zj ,Lo ., Lo .?Geri, 02- -19038 CHECK NO. A) AUTHORIZED SIGNATURE i AUTHORIZED SIGNATURE 00003804 412200066L.11: 09L60ml5464u' 7? a AMOUNT GFB & ASSOCIATES, INC. Land Development Consultants 6809 INDIANA AVENUE, SUITE 201 • RIVERSIDE, CA 92506 • (714) 781-0811 July 12, 1994 .CITY OF LA QUINTA 78-495 Calle Tampico La Quinta, CA 92253 Attn: Mr. 'Steve Speer JN: R644 -0101B ' Invoice No. 9407-02 CITE' OF LA QUIN'rA J U L 13 1994 (._P.O. ._P.O. 2843 PUBLIC WORKS oadoac�� CONSULTANT SERVICES ADAMS STREET/WHITEWATER CHANNEL CROSSING CONTRACT BILLING JUNE 1994 OFFICE SERVICES: Engineering as per contract and Purchase Order 2843. • CONTRACT AMOUNT % COMP. PREVIOUSLY BILLED CURRENT BILLING Not to Exceed • $9,600.00 Approx. 74/ -0- $6,961.00 Reimbursable 31.70 TOTAL INVOICE $6,992.70 BY Q( oJ O ACCOUNT NO. o7--III- w�u- JrrSCRIPTION Q^ AhAT, TO PAY -` Cl Gf d U2 7 9 P' 1 7-1 . r- .. 0 GFB & ASSOCIATES, -INC. Land Development Consultants 6809 INDIANA AVENUE, SUITE 201 • RIVERSIDE, CA 92506 • (714) 781-0811 June 15, 1994 JN: R644-0101 Invoice No. 9406-15 City of La Quinta 78-495 Calle Tampico La Quinta, Ca. 92253 Attn: Mr. Steve Speer P.O. #2833 oaeooc�� CONSULTANT SERVICES ADAMS STREET/WHHITE WATER CHANNEL CROSSING CONTRACT BILLING MAY 1994 OFFICE SERVICES: *Engineering & survey services as set forth in above referenced Purchase Order. CONTRACT AMOUNT % COMP PREVIOUSLY BILLED CURRENT BILLING Not to Exceed $3,950.00 100% -0= $3,943.00 Reimbursables 161.79 TOTAL INVOICE $4,104.79 2 Man Survey Crew Principal R.C.E. BY 16.0 hrs. z $145.00 1.5 hrs. 98.00 18.0 hrs. 9 82.00 YMENT Account No. 'UP / - 5 210 - 111 - O0 DESCRIPTION 1+ MT. ATO PA _ `'t � _T O00 ta/mac C:F �kS OF C1 PURCHASE ORDER 4 P.O. BOX 1504, LA.QUINTA, CA 92253 (619) 564-2246 SHIP TO: 7e'-495 Calle Tampico, La Quinta, CA 92253 F & Associates, Inc. 1809 Indiana Ave. #201 Riverside, CA 92506 ttn: - y P. Brewton. L_ No. 2833 IMPORTANT Show above Purchase Order number on all shipping contain- ers and correspondence. This order is subject to the terms and conditions shown on the face hereof. VENDOR NO. DATE REQUISITION NUMBER DATE DELIVERY REQUIRED F.O.B. POINT TERMS 6410 ITEM OQUANTITY ORDEREDRDERED RECEIVED UNIT DESCRIPTION WAREHOUSE STOCK NO. UNIT PRICE AMOUNT Provide engineering and surveying services for tine Adams St..Whitewater Channel'Crossin as detailed In, proposal dated.May 2, A994; includin but not limited to,. 5 -point dross sections at.25' statin s plus random points at grade breaks and other locations is needed to a curately assess the ekisting topography: Not To Exceed ITEMS ACCOUNT NOS. AMOUNT TOTAL SALES TAX TOTAL INSTRUCTIONS TO VENDOR NOT VALID UNLESS SIGNED BY PURCHASING OFFICER 1 . Submit all Invoices in DUPLICATE and mail to Finance Dept., P.O. Box 1504, La Quinta, CA 92253 2. Separate invoice must be submitted for each purchase order. i j 3. Delivery must be prepaid to destination indicated unless otherwise -r stated. PURCHASE ORDER 4a�w P.O. BOX 1504, LA QUINTA, CA 92253 (619) 564.2246 SHIP TO: 73-495 Calle Tampico, La Quinta, CA 92253 GtF.B. & Associates 6809 Indiana #201 Riverside, CA 92501 Im K1n VENDOR NO. . DATE REQUISITION NUMBER DATE DELIVERY REQUIRED F.O.B. POINT TERMS 4 6420 ITEM QUANTITY QUANTITY ORDERED RECEIVED UNIT DESCRIPTION - • WAREHOUSE STOCK NO. UNIT PRICE AMOUNT Engineering Design/Adams St. Whitewater Channel Crossin ITEMS ACCOUNT NOS. AMOUNT TOTAL SALES TAX ?- TOTAL INSTRUCTIONS TO VENDOR NOT VALID UNLESS SIGNED BY PURCHASING OFFICER 1. Submit all Invoices in DUPLICATE and mail to Finance Dept., P.O. Box 1504, La Quinta, CA 92253 2. Separate invoice must be submitted for each purchase order. , 3. Delivery must be prepaid to destination indicated unless otherwise stated. VENDOR -WHITE FINANCE - YELLOW PURCHASING -PINK ' 9 PARTMENT,C.OPYJ. G LDENROD Z Total Professional Services APP OVE Blei #40"T no Invoice Total* 0 SCRIFWN 11,456W -TION zvC5. AIMT. WAY A 13,2,Z7.5-9 * See Breakdown Attached $ 13, 222..5C.) $----------- 13,222. 50 TRI LAKE CONSULTANTS, INC. CrcY OF L,� :.,':: L.. MUNICIPAL ENGINEERS SCP 2 P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504 . PUBLIC V✓ .,S I INVOICE Invoice # 11482 ------- September 18, 1995 Page 1 Mr. John Freeland Senior Engineer City Of La Quinta P.O. Box 1504 La Quinta, CA 92253 Project #: L9-008-95 Professional -•-------------------------------------------------------------------------------- Services for the period: July 31, 1995 to September 1, 1995 Professional Services Rate ---- Hours ----- Charge -------- ---------------=----- Inspector Lindsey* 41.0 0 195. 00 7, 995. 00 Inspector Vela* 41.00 127.50 5,227.50 --------- . 322.50 13, 222. 50 Total Professional Services APP OVE Blei #40"T no Invoice Total* 0 SCRIFWN 11,456W -TION zvC5. AIMT. WAY A 13,2,Z7.5-9 * See Breakdown Attached $ 13, 222..5C.) $----------- 13,222. 50 I* • O. CITY OF LA QUINTA( July 31, 1995 -September 1, 1995' JOB #L9 -o48-95. INSPECTOR PROJECT HOUR AMOUNT J. Lindsey Permit -#2277 19.00 779.44 Project #92-44 14.00 41(--).00 Project #95-42 126. 44 5, 16'6. 00 Project #95-03 44. 00 1, 640. 44 57110 — Total.: 195.;00 7, 995. 00 M. Vela Project #95-42 88.5o � 3, 628. 50 Project . #93-43 39. 44 1, 599. 00 Total: 127.50 $5, 227. 50 r Agreement Amo, int $ 262, 644. o4 Total Billed To Date:. 239, 115.44 L!0. A1N/OL,. *ZV7 c N,st 1- - -553 779. °O 9Z-� nvew� T «i t0 47 - CA - " I 0 • —° F Rsaac 401- to 15 - 05 000 57110 — P R. PARKI - (OCZ- to -555 3079.f. 95.03 NU�LE55[,u�. 401- (n 17 -(005- 000 3 7 39- TOT/, -L'- 14 13, Z ZZ . So INVOICE RI LAKE ® CONSULTANTS. INC. MUNICIPAL ENGINEERS. P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504 Mr. John Freeland Senior Engineer City Of La Quinta P.O. Pox 1504 La 01_iinta, 'CA 92253 t CITY OF LA QUINT AUG 1 81995. PUBLIC WORKS Invoice # 11471 August 15, 1995 Page 1 Project #: L9-008-95 Professional Services for the period: July 3, 1995 to July 28, 1995 7 ---------------------------------------------- Professional Services Rate Hours • Inspector Hoffman* 41.00 12.00 41.00 37.00 Inspector Lindsey* 41.00 139.50 176.50 Charge No charge 1, 517. 00 5, 719. 50 7, 236. 50 Total Professional Services `' ,�, j $ 7,236.50 --- FOR PAYMENT LZ GTIOtj AMT. TO PAY 1,23(o . 50 ** Invoice Total ** $ 7,236.50 * See Breakdown Attached t] INSPECTOR J. Hoffman J. Lindsey CITY OF LA QUINTA July 3, 1995—July 28, 1995 JOB #L9—O08-95 PROJECT Permit #2277 Pro.j ect #95-02 Permit #2277 Project #95-02 Project #95-03 Project #92-04 Agreement f1mount $ 262, 604. 00 Total Billed To Date: 225,892.50 • HOUR AMOUNT 26. 00 1, C)66. C)C> ' 11. 00 451. CSC ) ------- 37. 00 ---------- 1,517 : Ci0 77.50 3', 177. 50 29. 00 15 189. 00 .4.00- 164. 00 29. 00 ------- 1, 189. 00 ---------- Total : 139.50 $5,719.50 AMOUNT TOTA' k 71236-50 I* INVOICE TRI LAKE CONSULTANTS. INC. MUNICIPAL ENGINEERS P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504 Mr. John Freeland Senior Engineer. - City Of La Quinta P.O. Box 1504 La Quinta, CA. 92253 CITY OF 1A QUlrf'>i'A JUL 12 PUBLIC w0 " Invoice # 11445 July 11, 1995 Page 1 Project #: L9-008-95 Professional Services for the period: May 27, 1995 to June 30, 1995 -------------------------------------------------------------------------------- Professional.Services Rate Hours Charge •.. Inspector Lindsey* 41.00 194.50 79 974. 50 Total Professional Services t 7,974.50 ----------- APP E FOR P, W..: L.[ 4 B ACCOUNTNO. SEE BRKV9. #.IYT. P-.. f. ZSCRIPTION; �"'�/lAtP�11VN TO PAY '7.974. so ** Invoice' Total ** f 7,974.50 * See Breakdown Attached r...� r �A 1t � �• 1 i CITY OF LA QUINTA May 27, 1995—June 30; 1995 JOB #L9-008-95 INSPECTOR PROJECT J. Lindsey Permit #2277 Project #95=472 Project #92-4 U HOUR AMOUNT 125.50 5,145.50 25.00 1,025.00 44..00 1. 804. 00 Total: 1-94.50 $7,974.50 ------- --------- ------- --------- Agreement Amount $ 262, 604.00 Total Billed To Dater 220, 173.00 �rOJ. NO. ,CC—UN i NC:- AMOU ..: t�rcv�s sr. z- ►�� z - 5-53 — r PR pp�c 95-oL 01- I -000 _ I 0 Z5. TOT/. :.7.974.$0 'A�, .q TRI LAKE - CONSULTANTS. INC. CITY OF LA QLTNTA MUNICIPAL ENGINEERS J V N • ' 3'995 P.O. BOX 606'• PERRIS, CA 92570 • (909) 943-6504 ' JJ+ PUBLIC WORKS iNVOICE Invoice # 11436 ------- June 9, 1995 P age 1 Mr. John Freeland Senior Engineer City Of La Quinta P.O. Box 1504 La Quinta; CA 92253 Project #: 1-9-008-95 Professional Services for'the er.iod.: May 1, 1995 to May 26, 1995 ------------------------------- ------------------------------------------------ Professional Services Rate Hours Charge • Inspector Lindsey* 41.00 162.'50 6e 662. SC> Total Professional Services ** Invoice Total * See Breakdown Attached TTI AL 6,662.50 AMC.... 6, 662. 50 + &(4PZ.50 , ARM -�� . . � } .o V-� INVOICE TRI LAKE CONSULTANTS, INC. MUNICIPAL ENGINEERS P.O. BOX 606 • PERRIS, CA 92570 • (909) 943-6504 Mr. John Freeland Senior Engineer City Of La Quinta P.O. Box ' 1504 La Quinta, CA 92553 CITY OF LA QUINTA MAY 1 8 1995 PUBLIC WORKS Invoice # 11420 May 15, 1995 Page 1 Project #:•L9-008-95 TLC %�-1, Phase V Cove Improvements Professional Services for the period: April 1, 1995 to April 28, 1995 -------------------------------------------------------- Professional Services •,_Rate Hours Charge --------------------- _____ _ • Inspector Lindsey* 41.0 159.00 6,519.00 Total Professional Services **.Invoice Total i� PPRO)/oe ...8rpjal,�Qyr,64fach ed DESC�/11�1 �T IusPEGTiOtiI AMT. TO PAY I 046,5j9- f _ 6,519.00 wtrtovrrr I ----------- �� 6, 519. 00 1. '14CITA t �, 519. L TRI LAKE CONSULTANTS. INC:. MUNICIPAL_ ENGINEERS P.O. BOX 606 • PERRIS. CA 92570 • (909) 943.650,1 J ` CM OF LA Q�NTA i. I'�l U a• C L: APR 1 4199 Mr. .john Freeland pUBLIC WORKS Senior-- Engineer City Of La Quinta P.0. Box 1504 La I;?l_tinta, CA 92253 Invoice # 1196 Apr,i 1 12, 199 Page ]. 'TLC 92-1, Phase V Cove Improvements ="r~Ofks:>ional Services for the od: March Com, 1995 ,to March :31, 1995 Qw w I=rofessi.onal Services ;, ate Hours Cl a.t q • Inspector, Lindsey* 1. 00 162. 150 G, 66c_. MOL MI ACCOUNT N06 I AMOUN Total Flrofessi *# Invoice Tot 3 6, 662. _j k See Br-eakdown Attached APP 0 F V.,.._.. . . aGCt%UW NO. 7 TRI LAKE S CONSULTANTS, INC. MUNICIPAL ENGINEERSMAR Z I��3 L'.,1- �� P.O. BOX 606 PERRIS, CA 92570 • (909) 943-6504 PUBLIC W01" %., INVOICE Invoice # 11395 -------"11 March 22, 1995 Page 1 Mr. John Freeland City Of La Quinta P.O. Box 1504 La Qu i nt a, CA 92253 Project #: L9-006-95 TLC 92-1, Phase V Cove Improvements Professional Services for the period: February 6, 1995 to March 6, 1995 -------------------------- ------------- ----------------------------------------- Professional'Services --------------------- Inspector Lindsey* LJ Total Professional Servi ** Invoice Total ** Rat e 41.00 * See Breakdown Attached 0 Hours Charge 140.50 5,760.50 $ . 5, 760. 50 $ 5,760.50 D FOR PAYMENT w E IJFX( P& m6PEeT i0n� AW. TOPAY $:5$ 7(o(j .5o 0 r CITY OF LA QUINTA February 6, 1995 -March 3, 1995 :TOB #L9-008-95 INSPECTOR PROJECT HOUR AMOUNT, J. Lindsey Street 4.00 164.00 Palm Tree Replacement 3.50 1. 50 143.5 61. 50 Adam St. AD 92-4 _ Permit #ES2167 3.50 143..50 Permit #EG2180 21.00 861.00 Permit #0783 3.50 143.50 Permit #0042.& 0057 1.00 41.00 Permit #0062 0.50 20.50 Permit #2296 22.50 922.50 Permit #2300 6.01 246.00 Permit #2301 11.00 451.00 Permit #2303 25. 00 1,025.00 Permit #2304 1.00 41.00 Permit #2306 2.50 102.50 Permit #2308 10.00 410.00 Permit #1953 13.50 553.50 Permit #2289 2.00 82.00 Permit #2299 �. 0.50 20. �' ` c ' 0 Permit #2132 1.00 41.00 Permit #2235 2.00 82.00 Permit #0053 0.50 20.50 Permit #2269 2.50 102.50 F'al.m Royal Tr. #18915. 1.00 41.00 A/C Failure @ Jefferson 1.00 41.0'0 ------- --------- ---------- Total: Total: 140.50 $5,76. o. 50 Agreement Amount $ 262, Total Billed To Date: 192,354.=. -',UNT NO. '92-1 401-604 -(005 -5.32 !� 9 2A 401- 1 01-45Z - K9 -:5- 1.50 5 TRI LAKE CITY OF LA QUINfA- S CONSULTANTS. INC. p MUNICIPAL ENGINEERS'. FEB 2 95 • P.O. BOX 606 • PERRIS, CA 92570 • (909) 943 6504 PUBLIC WORKS INVOICE Mr. John Freeland City Of La Quinta P.O. Box 1504 La Quinta, CA 92253 Invoice # 11380 February 20, 1995 Page 1 Project #: L9-008-95 TLC 92-1, Phase V Cove Improvements Professional Services for the period: January 3, - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1995 to February - - - - - - - - - - - - - - - - - 3-, 1995 - - - - - - -- Professional Services Professional Rate Hours Charge In.spector Lindsey* 48.00 42.002,016.0c) 016.00 • — 41.00 102-00 182_00 144.00 -4, 6, 198.00 Total Professional Services R PAYMENT $ 6, 198. c- o $ 6, 198. io n U • T4hf 78-495 CALLE TAMPICO — LA QUINTA, CALIFORNIA 92253 - (619) 777-7000 FAX (619) 7774101 March 22, 1996 James R Kozero, Manager I Facilities/Acquisition/Construction Desert Sands Unified School District 82-879 Highway 111 Indio, California 922.01-5678, Subject: Final Acceptance, Offsite,Improvements, La Quinta High School Encroachment Permit No. 1493 Dear James: Please. be advised, all terms and conditions of the above subject permit have been satisfied. Permit No. 1493 is inclusive of the Adams Street/Whitewater Channel low water. crossing and La Quinta ffigh School offsite street improvements. With the exception of certain improvements to Dune Palms Road at the Whitewater Channel (which the District was unable to perform due to the washout of the existing road crossing) all improvements are acceptable. Should you or your staff have any questions regarding this matter, please do not hesitate to contact me immediately. Sincerely, J hn M. Freeland enior Engineer Attachments: Permit No. 1493 . w/Field Reports & Correspondence 11 c: Public Works Director, w/o attachments Fred Bouma, Associate Engineer w/o attachments al'mes Lindsey, Assistant -Engineer -I -w/o aftachmeats Permit File No. 1493 MAILING ADDRESS - P.O. BOX 1504 - LA . QUINTA, CALIFORNIA 92253 C:\WPWIN60\WPDOCS\LQHSFNL.WPD L® w v • • RECORD OF TELEPHONE CONVERSATION Date Ate.f Z, U Time 7, .2 (am)4r►- Individual � ��,l�iQ ��/'//1/Q By _ ,/4 -et -6 S &vD sF Project No. FeeAt&1 I/ % /Vg, Z % 7 Project TitleST. 1/61i.) Title Organization �s fii S� Location _ .44 q U /N 72L f Phone No. ( 6% / ► 77S—' 3.5^00 9X -5 Subject %U (/O/C� -5 /,11,0 ITEMS DISCUSSED K.5 // O O � l� 14 (/i.6/ dill d� 1 r t Cy v b B ZA-� A sS' nl l , .✓moo Q2µ-.�� / r0 oS� Ce,v f C© o ov, a An ,rte 00, Q C I P I) Co COMMENTS OR ACTION REQUIRED 1 ,J o D Fmk Form 4-7 4 M-495 c&t,oCALLE TAMPICO — LA OUINTA. CALIFORNIA 92253 OF (619) M-7000 WORK DIRECTIVE CHANGE FAX (619) m-7101 OWNER: C 114Y 0 A Qv ,4v fd CONTRACTOR: S RA").4 e COO) SA* CO. No. O O DATE OF ISSUANCE: OWNER'S PROJECT No. P ZZ % % ENGINEER/ARCHITECT:. 6F.9 � AT -5 c e/ * &s ENGINEER'S PROJECT No. CONTRACT FOR: . pda.+..s Si-ree-r� SMPvove.m 4 e, ss:•J� You are directed to proceed promptly with the following change(s): Desert tion: �Ud, additional sheets, if � ) >f �� Ns r ><� CAS 40NNW • Ale ••� Cp,aertf4i exp s t;'�� C�r� ZO LIe 00-jd e.A,�x,st•�qq r,d���4�/C, 3.ds><.��/ PED aArrie,IIA., 7y -,pe 1., CAlTr*•JS� �s S Purpose of Work Directive -Change: • Pro ✓� c%e. � ro f Ge �.'o .J # C v.�-fi.e � ,�'/o � Attachments: (list documents supporting change) C-4/Tr#.✓s S fi> ii9.4 l!F.S- 5 6 If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a Change Order based thereon will involve one of the following methods of determining the effect of the change(s): Method of determining change in Contract Price: _ Time and Materials _ .Unit Prices _ Cost plus fixed fee Other W M P Su P-,,— $ Grtte� 7�s � If the change involves amount is not to be authorization. RECOMMENDED: by date Fisk Form 153 in Contract Price: an increase, the estimated exceeded without further Method of determining change in Contract Time: _ Contractor's records Engineer's records _ Other Estimated increase (decrease) in Contract Time: Illy AAt— days. If the* change involves an increase, the estimated time is not to be exceeded without further authorization. OWNER: Cf� -A b, Ti SSV iO,C �Nsi�N�t.1/' . date feel cep IDS %-0 fobs Totd6 STATE OF CALIFORMA DEPARTMENT OF TRANSPORTATION SIGNAL, LIGHTING AND ELECTRICAL SYSTEMS PEDESTRIAN BARRICADES NO SCALE �p I -- Q V r a 2 M 6 wI "7' �otherwiss epeclfle0 Kro i -- 2" or V2- Std pipe Dost TYI, / TYPE II %"1 Adv ooh with nut and woshe• Deform the thread Finished grade I I . NOTES I I I I'� L Pipe Dost to M set I'-6"Doth from face of caro arses& otherwise ^ I I avocifled. I I % Sbevs See Note ! - i. Shen aldewaR la e•isting, faladtloh may consist of a threaded Pipe 'flange sewed by tour %" SxPMSbn anchor& Balt circle diameter �— PCC shall be 4" minimum far Type I barricade and S" minimum ' L__I . for Type 11 barricade ' 3. Steel sleeve to be constructed with O diameter IAo " larger than post. tall fhickrness of ebeve to be Dame de Dost or larger. - - - - e. Contractor may enDmlf alterrative detolls far approvd by the Engineer. SLEnpEVpEe' PeOdST, DETAIL Shot sol n" fled a NaWe6osn °plans wide STATE OF CALIFORMA DEPARTMENT OF TRANSPORTATION SIGNAL, LIGHTING AND ELECTRICAL SYSTEMS PEDESTRIAN BARRICADES NO SCALE �p I -- Q V r a 2 M 4 �w cFy0 t o4S 764% CALLE . TAMPICO — LA OUINTA, CALIFORNIA 92253 (819) 7n-7WO WORK DIRECTIVE CHANGE FAX (819) m-7101 is • No. OWNER: DATE OF ISSUANCE: 7l/Z/9.r C0'4y o >0C L A 4944',4v 4"a OWNER'S PROJECT No. P --o Z Z 7 7 CONTRACTOR: ENGINEERIARCHITECT: Sp,A ^�/4 a Co.v s f Co . G FB ass v c: KGs ENGINEER'S PROJECT No. CONTRACT FOR: Cil C You are directed to proceed promptly with the following change(s): Description: trach additioui aheeta, if r /4 e4 S Co 1r-vW • ,V to Covertfej A Gxt+-N ex�st�'� ,, Cwr� ��tffev ZO 4f 0^0-d e.ARx,st•Nq j;&%J4//e, --rW `.11 PED 84rr,te,0A., 7y-,041., CAI ^)S� �s-S• Purpose of Work Directive'Change: Pro v.'de. P ro �" 4 6.) # Co•�-fi►e/ ,�'/o � Attachments: (list documents supporting change) If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a Change Order based thereonwill.involve one of the following methods of determining the effect of the change(s): Method of determining.change in Contract Price: _ Time and Materials _ .Unit Prices _ Cost plus fixed fee Other F-stimatell increa decrease) in Contract Price: S G e v r+r ✓.'d a L...,.,I t uk 4 If the change involves an increase, thb estimated amount is not to be exceeded without further authorization. RECOMMENDED: by date Fisk Form 153 Method of determining change in Contract Time: _ Contractor's records Engineer's records Other Estimated increase (decrease) in Contract Time: A/o A~e– days. If the change involves an increase, the estimated time is not to be exceeded without further authorization. OWNER: afy ^-A I—A by /YI / Ti S�V:y at �Nsi�N�t✓' dateZ�/ z f s— i io N W 0) �oifl.r.IN specified TYPE II rteel coo �IDe Sign 1449-18-.76'9 Dri 11 "p hobs 1%' Std pipe r -e" r-4" Total6 Top of P slde.ok y v V r a 2 m I IL- — —Or 1%J' Std of" post 6 /-i TYPE %"Or rdv bait .Ith nut and .duller Deform the thread Finished grade _ I I NOTES 1 l Pipe post to be set r-6"Dock from face of curb unbss other.iee c ^ 1 1 1 I Sbeve ' specl fled. • See tate 7 2. Rten alOe.aR Is e.iating, foundation may eanslat of o itreoded pipe i i flange secured by four %- expansion a dhOre. Bolt CIrcle d OMtsr •. It PCC W-411 be s" mInNA.e for Type I barricade and S" minimum I for Type 11 bwrlcod& 7. Steel sbOve to be constructed .till d dtaaeter /p" larger : than poet. tail tnlck(e" of abeve to be Sane OS past Or larger. A. Controctor may submit alternative details for Opprovalby the Englneer. SLEEVEPOSTPeOdST DETAIL Shall so fled or elwu need o�s.lee STATE Of C4fORNIA DEPARTMENT Of TRANSPORTATION SIGNAL, LIGHTING AND ELECTRICAL SYSTEMS PEDESTRIAN BARRICADES NO SCALE y v V r a 2 m I AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks T�/1/1 VISITORS Time Representing Representing Remarsts i 2. Field Office �....� • v 3. File r Client BY Z TITLE 5 Ffek Form 8.1 DAILY CONSTRUCTION REPORT wte-r 62 -IV PATE PROJECT �dB7» JOB NO. LSLI1 CLIENT. � CONTRACTOR PROJECT MANAGER i4f PAY 5 S WEATHER S;'�' ck u..•.... ".. s.«... i S hi t; TEMP to �� ,� su so to Boas hs Co.)S fry -G mid 0 WIND MO. "-°" n'°°""° M e-4• d e HUMIDITY °" M 50 ZZ 7 00 �C /r AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks T�/1/1 VISITORS Time Representing Representing Remarsts i 2. Field Office �....� • v 3. File r Client BY Z TITLE 5 Ffek Form 8.1 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarns VISITORS Time Representing Representing Remarks - - .....y.. PAGE 1 OF r rraasw 2. Field Office 3. File 4 Client✓sp�-c.o 2 By TITLE Fish Form 8.1 CONSTRUCTION REPORT We&K O -/' 5 Z Y— f5 DATE -7— DAY 5 5 / C e- CYOS$/ iJ PROJECTi¢f JOB NO. Z2 7 '07,07 WEATHER s " u... u..•.... ".,� s..°.. CLIENT. � 0TEMP. SC%I 0 i S ' y_/ C TEMP To ]7 �Z su so ro �o as ns CONTRACTOR LL niyil 7e- rC CD,) -5 -tya G �i 8 WINO °' °"°°" ""'"° % PROJECT MANAGER 1� /IC !�'J e-4. HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarns VISITORS Time Representing Representing Remarks - - .....y.. PAGE 1 OF r rraasw 2. Field Office 3. File 4 Client✓sp�-c.o 2 By TITLE Fish Form 8.1 0 • C7 Project AdA-,-�s 4 G�i,9r•,✓�/ PUNCH LIST un It. Locstlon �Cw V Ail Wes fWa,,-d Ao Dr, Inspsctlon vm con&Kted st do" wviwt er �A �"� �S ..✓cls e � o'da* this dna CONTRACTOR -OWNER Omm: 3) s u S D REPRESENTATION ENGINEER Roject Mor/End. -o� Rnkbnt Project asp. The fonowlrg terra we to De oomcted of completed to comPlY with the couaw docum ntg: Na ITEM SPEC. SECTION OM No. DATE COMP, ENGR. / Re ,�. c 74 e w�eanl • s i4- � z t So � �o Z3 M4,kejl—1 -7 3 ��� e ose-ci : CoNc►e � ross,� 70 4 GJ 6.4Y r.^ 4- Q.Of4 Prn ✓f al Cop. 0181RISUTION: 1. PM*MLtWWW t Contrsetors Rspnssntatt" i CITY OF LA QUNrA July 24, 1995 All 2 51995 City of La Quinta PUBLICWORU P.O. Box 1504 La Quinta, 9'2253 Attn: James Lindsey RE: Adams Street Channel Crossing. Subject: Substantial completion of the project. James, GRRnrrE �nm union Puny Nc Granite has substantially completed the contracted work at the Adams ,St.reet Channel grossing.. Presently all of the work has been completed, except for the setting of the pedestrian barricade at the end of the sidewalk at the NE end of the crossing, which is extra work. 1 am requesting a punch list for all of the completed work. If you have any question please feel free to'call me' at 775- I500 Sincerely, GRANITE CONST WCTION CO. Jason Hadnot Project Enkineer cc: Job file • Palm Springs Branch 38000 Monroe St. Indio, CA 92203 Phone 619/775-7500 FAX 619/775-8228 VISITORS DAILY CONSTRUCTION REPORT Time Reoresentinq Representing Remarks -0 DATE 7— Z/- 75- / V 0 DAV 5 M w $ / L �dd y115 C/1 a 17/72 C%OS S� iJ PROJECT JOB NO. 22 77 WEATHER S��' u. u..•.... �.� s.•.,.. CLIENT. �� Sc�i OD .'S'+ r.' �' r0 2 5 solo 1085 ns TEMP. CONTRACTOR rg v COiJ S rK•G � � wlNo o•. M ""'"4 �� PROJECT MANAGER rG P d 2 D HUMIDITY AVERAGE FIELD FORCE Name of Contractor G r 4,0,1fe, Co j5+r. Non-manual Manual .3 Remarks 4�0.2� VISITORS Time Reoresentinq Representing Remarks / V DISTRIBUTION: t. Prof. Mgr. PAGE 1 OF�PAGES 2. Field Office J. File 4 Client BY TITLE Fisc Form 8.1 DISTRIBUTION: 1. Prol. Mgr. PAGE 1 OF__A/_PAGES 2. Field Office ]. File 4 Client BY TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT DATE • DAY 5 nn w g _/ �r�d � � � h�2I CYDS$, �J PROJECT ZZ 7 WEATHER c..•. u......�.� sw.. JOB NO. CLIENT. L SL%1 00 %S '� ri L' TEMP. 0', u 5 So ro 10 ss NS CONTRACTOR K -G , WIND °'°°"~° PROJECT MANAGER R, Me -4 d HUMIDITY 41 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remark% VISITORS Time Representing Representing RemarKs DISTRIBUTION: 1. Prol. Mgr. PAGE 1 OF__A/_PAGES 2. Field Office ]. File 4 Client BY TITLE Fisk Form 8.1 vw Lu z —i IN cr LLJ.- z z 0 z LA QUINTA I . :"'ph T R E E T CURV Q III M CD Z SEE SHEET 2 • WESTWARIC. DRIVE GFB'& ASSOCIATES9 INC. 6809 INDIANA -AVENUE SUITE 201 RIVERSIDE, CA. 92506 • (714)781"0811 • JmF:KIr.HKAARK RIV. CO. BENCHMARK PD-3—IE I" IRON PIPE V� DAILY CONSTRUCTION REPORT PROJECT �ugm-s C h 2I CYOS$i�J JOB N0. az 7 CLIENT. L� SCi►oo .'s'!'r.'� CONTRACTOR i'�i/1%i COiJ S'f1rK-C 'fi 8 PROJECT MANAGER Jai �G /IC m f,.4 otp— D�� ATE 7 DAY s nnIA]THI s WEATHER s.�• u.•.. u... ».,� s..,... to l] jj Su ro 11085 ns TEMP. WIND Sim HUMIDITY o.. Moo.. »� AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks VISITORS Time Representing G Representing Remand DISTRIBUTION: 1. Prol. Mgr. PAGE 1 OF PAGES 2. Field Office 3. File 4 Client BY TITLE Fist Form B•1 DAILY CONSTRUCTION REPORT (Continuauun anccu • PROJECTREPORT NO. JOB N0. - P7iZ� DATE %' L I CONSTRUCTION ACTIVITIES (Continued) i I /t• ��/vim I r DISTRIBUTION: 1. Proj. Mgr. 2. Field Office 3. File t• 4. Client Fisk Form 8-2 BY J SHEET OF 0--- TITLE TITLE v ,� _� - ,i �` _ � r , ,t �•� X14 \ � �,� ' 1 t �� � � \ ,� �, � i Q '� ` =, t L � A � . � �`. • 1 rte. _ � • ;�.. � � � ` ,_ � ' . �. �. • Vit: � , 1 � � 1 �+ � � .. �; � 1 - � � �. _ "' - .` �. v ,� _� - ,i DAILY CONSTRUCTION REPORT t PROJECT ��� 7115 i¢f ��I c3 /!/12 C►'OSSi �J JOB NO. z z 77 J CLIENT. L� SC�i voL �S 1-.'C -74 CONTRACTOR I"f?.�li C.DiJ S'tlK•G '7i B PROJECT MANAGER �Ce-A-d PATE /Sq _9s� OAr 5 " 1 W1 w S WEATHEREl cl •; u. s...,..TEMP. us,o io 10ss xA I WINO HUMIDITYoo` 'ys AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks G r,4..�.''f tai (�.�5-r-r. � S �! •-,g.�---� VISITORS Time Representing Representinq Remarks 2. Field Office 3. File o Client BY TITLE Fisk Form 8.1 `1 f I i� �l'u!L-sS .l. n ...Ey =,7 7! 03 �C ('Y/ (V V ow4 ► RL 11?a L IN-av v -74 .,Y:.� (Y Ups" S l4`j3 (Y- --)'11 M a rn �� �._.► �-z� H.J.. Hca p.�.c� -zr z+ �-- —� DAILY CONSTRUCTION REPORT PATE / `7 • N L DAY 5 Iw S PROJECT n �c� 5 .�� CSI c3 i%/I2 CYOSSi iJ JOB NO. ZZ 7 WEATHER SrnC4• U.•w ".,n S••uw 1012 7 5U 50 10 Polls k CLIENT. �� SG/1 00LL nn iS' r. r' TEMP. CONTRACTOR l^/i/1%i 7� W� S'fY�-G '7f/ WINO SP• "'°" nrooL.,�«0 PROJECT MANAGER • rC /IC �%I P,.4 d e HUMIDITY °i Moo.• AVERAGE FIELD FORCE Name of Contractor. Non manual ManuaP Remarks VISITORS Time ReoresentPnq ReOresentPnq Remarks DISTRIBUTION: 1. Prof. Mqr. 2. Field Office 3. File 4, Client 'Fisc Form 8.1 PAGE 1 OF—t/—PAGES BY TITLE ,(-76v? Cam rY1 °S' �z"M�zr�J �� '7�ff�-� a�r0A Ac o 07 '5-W f (u ,�f -v `.� _i i oec5j�L�/_ on Calk v --qZ r (Vwv fl- - -14 0 ?n ®F!S am ryc;" (�nO(v K vo 0.1.- R —aAv / o-r �lq/y.;l dry N � f s `a- Ivo � I �7 rV Orll z-t1.Nc7--> C25 j�2<��1/�P� /r7 5 r_p !K% rpt CJHl r c ZI 7& ay {�P7 3dV-ac-? Q<x QN C?(u("1"1oj ascvt�7.P� rV Orll z-t1.Nc7--> C25 j�2<��1/�P� /r7 5 r_p !K% rpt CJHl r DISTRIBUTION: I. Prol• Mgr. PAGE 1 OF_L—PAGES 2. Field Office ]. File o Client f BY TITLE Fisc Form 8-1 DAILY CONSTRUCTION REPORT GATE SC—! 3 • -// �dd i�?$ �� C!� rj/�� C►-OS$� iJ DAY S M w 5 PROJECT JOB NO. Z 2 7 WEATHER Son Ur• uv.aw"un S •uw CLIENT. L SCl1 0 0 i'S 'f }�, L To 22 125u, so ro �o es es TE CONTRACTOR r,1q 1%i 7i'_ rC CO^) 51'10 -1 -ti ♦ 11 WINO neowl ~' °i """° 113 PROJECT MANAGER , e_4 de-p,J HUMIDITY AVERAGE FIELD FORCE Name of Contractor1 Non manual Manuai Remarks VISITORS Time Reoresentonq Representinq Remarxs DISTRIBUTION: I. Prol• Mgr. PAGE 1 OF_L—PAGES 2. Field Office ]. File o Client f BY TITLE Fisc Form 8-1 VISITORS DAILY CONSTRUCTION REPORT Time Representing Remarets 7 _ %S nRepresenting PATE • 5 nn —// �dd ms 2 CYOS$� PAY I PROJECT JOB N0. ZZ 7 e.,�. c u..•.... �.,. s..,,.. WEATHER s.� CLIENT. �r . Si—, A 00 �S '�' ri � TEMP ro �: r2 eu So ro �o as es CONTRACTOR r,*,v/ CD/JS rK-G O WINO n'°°"P.° °" PROJECT MANAGER . iG I;A-d SO ni HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarkf VISITORS Time Representing Remarets nRepresenting 1. rielo utrice ]. File a Client 8Y TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT DATE • / DAY S M w S PROJECT �dd m5 /7 2 CYOSSI ") Z ^ JOB NO. G WEATHER s..n CLIENT. L� SL� OD is f r� tr TEMP. to l7 J25U yo ro goes x� CONTRACTOR ri��J/ Con)SfrK.G D -7 WINO s� �°� "'°°"~° °i PROJECT MANAGER fC e -4- 0(o HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual. Manuaj Remark} VISITORS T me Representing Representing Remarks 3. File a Client _ 8Y TITLE Fist Form 8.1 AVERAGE FIELD FORCE DAILY CONSTRUCTION REPORT �— ! . �emaras -�� - R's Time Representing DATE Remarxs 5 T w F 5 • , // �dd DAV JAI h 2I CYOs$� ITHI I I PROJECT Z 2 e.,.. ck. ; WEATHER s JOB NO. CLIENT. �� SL� 00 i�S ri � TEMP. to )2 u5 01 loss Kb. CONTRACTOR r/�yIlk- �+ Can) S'fY� G 11 n.°°o 'T / O WIND 01v "" Q PROJECT MANAGER ii l l G x m eAd e- HUMIDITY 7 AVERAGE FIELD FORCE Name of Contractor Non manual Manual �— ! . �emaras VISITORS Time Representing Reoresennng Remarxs 2. Field Office ]. File a Client TITLE 8Y Fick Form 8.1 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual , �� Remarks VISITORS Time Reoresenting Representing Remarks Fish Form 6•1 1. Prol. Mgr. 2. Field Office 3. File 4 Client BY PAGE 1 OF—/PAGES TITLE �rf S DAILY CONSTRUCTION REPORT PATE — ` 5 M T w 5 •DAY mS � � I I h 2 � G'roSS�:J PROJECT L / Z Z 77 e1.11 (41 liA (NI " 1 5..1M WEATHER s.� JOB NO. CLIENT. L Stmil 00 �/S'>t ri TEMP to u u Su So io ,o as eb Iw CONTRACTOR I^i%�J/ C.OiJS'�rKG �i� WIND sl�il %A006, ""0""0 °i MO°(1 PROJECT MANAGER 1.i �C/IC !%I e-4 df- HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual , �� Remarks VISITORS Time Reoresenting Representing Remarks Fish Form 6•1 1. Prol. Mgr. 2. Field Office 3. File 4 Client BY PAGE 1 OF—/PAGES TITLE �rf S DAILY CONSTRUCTION REPORT PROJECT nu�ms �I CYOS$�iJ JOB NO. 22 7 CLIENT. �� SCiI 000 CONTRACTOR rf#n!/7k1_ Ca^) PROJECT MANAGER R r fG x m P -4d e - PATE CS -u e 16 9s' DAY S nit1 4 1 IVVIXF S AVERAGE FIELD FORCE WEATHER Name of Contractor Non manual Manual D ,o ,Q R,,emmark• SOr0 l0aS NSTEMP.�•o� f3 �� WF// WINOHUMIOITY VISITORS v Time Representing Represenhnq Remarxi AVERAGE FIELD FORCE Name of Contractor Non manual Manual D ,o ,Q R,,emmark• f3 �� WF// VISITORS Time Representing Represenhnq Remarxi U15TR1BUTION: 1. Prof. Mgr. PAGE 1 OF__j__PAGES 2. Field Office ` ]. Fde A Client By TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT DATE • / DAY 5 M 5 PROJECT Z Bra. Uru Uwawr rrun S..uw JOB NO. WEATHER s..n SL`1 00 iS ' 1^i r L' TEMP. 'all J2 su Solo ion Its. CLIENT. �r CONTRACTOR l"/#/1%i 7�. L /C.D^) S'/1 r,,G' �i - D WINO s� PROJECT MANAGER �i, �G /IC 6 / d HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks VISITORS Time Representing Representing Remarks dJ#t I i r DISTRIBUTION: 1. Prol. Mgr. PAGE 1 OF I PAGES 2. Field Office 3. File 4 Client By TITLE It Fisc Form 8-1 DAILY CONSTRUCTION REPORT DATE • / _ DAY S w 5 PROJECT �dd �!S C h CrOSSi iJ JOB NO. LS� WEATHER fall u J2 u Usomrowr m,oaan Sn•s•u;wT CLIENT. TEMP. CONTRACTOR r,4,y17LLg— Co^) 5 -f rK•G -i8 WIND si•r neowl w%oma/ °r` PROJECT MANAGER �i �G K 0 / a HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non-manual Manual Remarks` G'r�•�,f�f� Cvas-tr- � 8 Bi4c1,��r'/� W VISITORS Time Reoreseminq Representing Remarks DISTRIBUTION: 1. Prol. Mgr. _ PAGE 1 OF_4�_PAGES Z. Field Office 3. File f o Client BY TITLE Fisk Form 8.1 I AVERAGE FIELD FORCE Name of Contractor1 Non manual P4anuai Remarks V e— (5vj5 VISITORS Time Representing Representing Remarks 2. Field Office ]. File 4 Client BY TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT DATE 5 nt w 5 _/ �t�B x'15 _ DAY PROJECT JOB NO. 2 � � Brgr G e WEATHER • Uvriwr inn Sru.. s n CLIENT. L SC%oo i'Sr.'�' ►ou n so,o Voss ks TEMP. CONTRACTOR I /'inli �7� COiJ S ']F'Y �-G 'f'i 8 WIND Sim PROJECT MANAGER i�4 �G /IC lyl e-4-d HUMIDITY AVERAGE FIELD FORCE Name of Contractor1 Non manual P4anuai Remarks V e— (5vj5 VISITORS Time Representing Representing Remarks 2. Field Office ]. File 4 Client BY TITLE Fisk Form 8.1 DISTRIBUTION: 1. Prof. Mgr. PAGE 1 OF PAGES 2. Field Office 3. File 4 Client BY TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT DATE • S M W S DAY. / — —/ ad�d PROJECT Z WEATHER ",no°en°s .�s W Cj"�7O JOB NO. CLIENT. Y(�Y o 2 M TEMP. sO CONTRACTOR Yga L� CD^JYK•G s� WINO °i PROJECT MANAGER e-A-a/ HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manuai �tRemarks VISITORS Time Reoresent,n Representing Remarks DISTRIBUTION: 1. Prof. Mgr. PAGE 1 OF PAGES 2. Field Office 3. File 4 Client BY TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT DATE DAY S M $ PROJECT �dd h?$ r! 2 CrOSS� iJ Z E Cow Un ts"un S .uw JOB N0. WEATHER CLIENT.i X^ OD r�sTEMP.��5u So ro lots tieCONTRACTOR I^�/1li CO/J 5--ty- ,G �i 8 WINO "'°"nPROJECTMANAGER 1i C iC me�4_ot� MufN10ITY AVERAGE FIELD FORCE r Name of Contractor Non -manual Manual Remarks VISITORS Time /Reeareresenting Representing wIRemarks 2. Field Office J. Fde e Client 8Y TITLE Fisk Form 8.1 0 / AVERAGE FIELD FORCE DAILY CONSTRUCTION REPORT Non manual Manual Remartcs VISITORS r � �� � f✓ Time Representing Representinq GATE • / �dd 771$ f� � _ DAY 5 w 5 /7/7e I G'rOSS� iJ PROJECT JOB NO. 2 7 7 WEATHER s,.. CLIENT. �i 5e—Aoo TEMP. t032 J25u bolo was n: CONTRACTOR L r WINO c7, v PROJECT MANAGER rG /K d HUMIDITY AVERAGE FIELD FORCE /} Name of Contractor V rAniil��, �/JS"�Yr Non manual Manual Remartcs VISITORS Time Representing Representinq Remarx% 2. Field Office J. File 4 Client BY TITLE Fids Form 8.1 2. Field Office ]. File e Client BY TITLE J Fish Form 6.1 DAILY CONSTRUCTION REPORT PATE PAY IS M W ITHI F I $ �dd i�5 C h 2I CYOS $i PROJECT Z JOB N0. / Br 1• C", UwrL Ar M� n S Yw WEATHER s.n CLIENT. Sr.i1 00 irS !', r L' TEMP To 12 su so ro roes ns x CONTRACTOR 7� CDiJ S'fY�•G 'fi B WINO n'°°""' or.• M,e.r ..'"rb Z PROJECT MANAGER �G /'C !�'J P d HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarkf -r/10o +wow/ (, --) e� VISITORS Time Representing Representing Remarks V G ��� 2. Field Office ]. File e Client BY TITLE J Fish Form 6.1 �- +v. C �. � �, ` ` � ��! J• • ` t ,. .: .. ` c� �� i `` r '` �- ;" "' ��, �� \ .. _ \ r ,. DAILY CONSTRUCTION REPORT (Continuatwii oneett PROJECT 0—A REPORT NO. JOB NO. DATE E 4-13 —c CONSTRUCTION ACTIVITIES' lContinued) 0 Cu -f-241 e,%-0 44 --VAAo& s `sS 1A 7 LO 02-, A -,j 2s -t5o 3 12% f q 28 13,0- 411 S x.35 `71 Y2, 4- 7�44 Ae-- GO -5191, Zg- 7t/,1,-) 0 70d 4�51,11 64-�f f CZE e, ile5 (on oc Co Ap- DISTRIBUTION: 1. Proj. Mgr. 2. Field Office 3. File 4. Client Fisk Form 8-2. SHEET OF Z— BY TITLE I v %I+% Environmental Geotechnical CITY OF LA QUINTA Construction Consulting • Engineering - Testing J U N 1 2 1995 PUBLIC WORKS REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: ATTN: JOHN FREELAND PROJECT: ADAMS ST RECONSTRUCTION CITY OF LA QUINTA LA QUINTA, CA. 78-495 CALLE TAMPICO LA QUINTA, CA 92253 DATE: May 31, 1995 OUR REPORT NO.: 073-40277-00009 FIELD DATA LOCATION OF PLACEMENT West of Wash Slope LAB. NO. CUSTOMER NO. TYPE CURING DATE TESTED DATE PLACED May .31, 1995 SUPPLIER Granite Construction TIME 10:45 am DELIVERY TICKET NOITRUCK NO. 99760 SLUMP, IN. 1 MIX NUMBER AND PROPORTIONS 056/ ` 3250 psi AIR CONTENT,% --- CEMENT 5320 sk AIR TEMPERATURE. •F 90 WATER 251 gal. CONCRETE TEMPERATURE, •F 87 FINE AGGREGATE 14,140 DATE RECEIVED IN LAB June 01, 1995 COARSE AGGREGATE 16,820 FIELD DATA SUBMITTED BY Marshal Hislop ADMIXTURE 161 MIX DATA SUBMITTED BY Granite Construction - COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6"X 129 LAB. NO. CUSTOMER NO. TYPE CURING DATE TESTED AGE DAYS COMPRESSIVE STRENGTH (PSI) 153 A wet rm 06/07/95 7 4420 153 B wet rm 06/28/95 28 153 C wet rm 06/28/95 28 �• SPECIFICATIONS 28 3250 Iype m m= re conu:al, kmieas omemse nmeo. REMARKS: REMARKS X Cylinders made by PSI representative. RCylinders made by Architedb or ntrectofe representative. Cylinders picked up by PSI X representative. Cylinders delivered to PSI laboratory. Test results comply with applicable specifications. Test results do not comply with applicable sper0catlons. Respectfully submitted, Professional Service Industries, Inc. PAUL R. HOERSTING THESE TEST RESULTS RELATE ONLY TO THE SPECIFIC SAMPLES TESTED. PSI IS NOT RESPONSIBLE FOR CONCRETE NOT TESTED BY PSI. REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. BRANCH MANAGER Information To Build On Pte = PSI .42-240 Green Way, Sufte C • Palm Desert, CA 92211 • Phone 619/341-5790 • Fax 619/341-5794 DAILY CONSTRUCTION REPORT 0 add �n5 C a nn� CroSS.:a PROJECT JOB NO. Z 2 7 CLIENT. CONTRACTOR* G �i 8 PROJECT MANAGER DATE —2—qs� DAY S M w S WEATHER FS.n TEMP. c,.. u.... w, �.,� S,- w i2 so s0 ro ,o es Ms WINO HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual M[aan]�uai Remarks J VISITORS Time Representing Representing L Remarxs Z. Field Office 7. File S o Client TITLE BY Fink Form 8.1 6 DISTRIBUTION: 1. Prol. Mgr. 2. Feld Office ]. File 4 Client Fisk Form 8.1 PAGE 1 OF PAGES BY TITLE DAILY CONSTRUCTION REPORT _ • DATE • ms _ 17/ict72 CYDS $i iJ DAY S nn w PROJECT JOB NO. WEATHER CLIENT. ���► ooL i>�Y1. 1012 J SU 1%010 11095 14 TEMP. CONTRACTOR i'fi/�liT�. ! S'fY�-G ?/ B WIND S� •'°^ n.00,P o" PROJECT MANAGER rG /°C /CD.J l / e -4 -de- HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks aw g� 17 VISITORS Time Reoresennng Representing RemarKs l/a,A��,� la.ex sem, P�c,�sem� f - 6 DISTRIBUTION: 1. Prol. Mgr. 2. Feld Office ]. File 4 Client Fisk Form 8.1 PAGE 1 OF PAGES BY TITLE _ • _FEW - . OR,. EM AM aw g� , 6 DISTRIBUTION: 1. Prol. Mgr. 2. Feld Office ]. File 4 Client Fisk Form 8.1 PAGE 1 OF PAGES BY TITLE DAILY CONSTRUCTION REPORT (Continuatwn onrau • PROJECT��'Y'—S �"� ���1�"�Q REPORT NO. JOB NO. z Z27 DATE CONSTRUCTION ACTIVITIES (Continued) `- y ..�/ , Lia M,"MM - M poll <C®tom ?mss MIMI , M. MA ✓ , M I ' �. • WIUIAVIA�AQWF AM Mw DISTRIBUTION: 1. Proi. Mgr. 2. Field Office 3. File 4. Client Fisk Form 8-2. SHEET ,7-- OF Z -- BY BY TITLE szz_ M M r • . DAILY CONSTRUCTION REPORT DATE DAY 5 M T�F'j� I I I ' -// �OJECT /E%dd 77?$ i¢ � _ I'!/12I CYOSSi.J JOB NO. Z u� / C4'�1 WEATHER CLIENT.� Lv0 ir� TEMP. �� susoro roas MSYY E CONTRACTOR I^�,.li L CDiJ S'fY�•G WINO H-"n- �i� -:—L, -- �'i BPROJECT MANAGER /, rG A M P �4 d� HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks r VISITORS Time Representing Representing Remarks . �✓ i • `LCA, �/. � • i' I. I � � � / _ / ♦ '� r "6111,111:111:19 • Fisc Form 8•1 Prot. Mgr. Field Office File Client By PAGE 1 OF__ -;F-- PAGES TITLE S I Y s DAILY CONSTRUCTION REPORT (Continuauun anrru PROJECT S S� /��/y / W Gf� REPORT NO. /95 •�J �� JOB N0. ZZ � / DATE � 7 CONSTRUCTION ACTIVITIES lContinued) WNW 7 MEET= 0 FIRMS I - siv i / S / 'I // L I I /lam j m 011 r ��� i '' ■ M — — lig�;°- i� L -ONE DISTRIBUTION: 1. Proi. Mgr. 2. Field Off ice 3. File 4. Client Fisk Form 8-2 SHEET �EOF BY TITLE UNLOADING TIME: A maximum qf, 5 minutes per yard of ready mix will be free. Additional unloading time will be charged at current prevailing rates. WARNING NOTICE: use ofread mix cp Crete ithout protective clothing could cause bodily injury. Every effort should be taken to avoid contact wit�i the skin. 7 RELEASE: I hereby agree not to hold ,bJ�NITE CONSTRUCTION WATER ADDED ON JOB AT CUSTOMER'S REQUEST: .GAL. COMPANY or any of its employees liaby. fdr, damages inside curb or WATER ADDED TO THIS LOAD BY AUTHORITY OF: property line caused by any of their equipment, as I have requested ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS delivery on the property for the maul listed and hereby acknowledge STRENGTH. ANY WATER ADDED IS AT CUSTOMER'S RISK. receipt of -same. f CUSTOMER HEREBY AGREES TO INDEMNIFY GRANITE CONSTRUCTION COMPANY FROM ANY CLAIM ARRISING FROM SUCH ADDITIONS. RECEIVED/RELEASED BY: PLANT TICKET NO. TRUCKLOAD SIZE P/C PRODUCT DESCRIPTION SLUMP GRRnITE/0,38-115 DATE CUSTOMER NO. SOLD TO CONTROL NO. � 9 DRIVER consrAumon INDIO PLANT MONROE STREET 04 YUCCA VALLEY O6 ❑ EL CENTRO PLANT P.O.NO. ORDER NO. GRANITE JOB NUMBER 6910, 5870RNIA ;1-2 55475 YUCCA TRAIL Y, CALIFORNIA 2095 HWY 111 EL CENTRO, CALIFORNIAomPAny i TIME DUE 619)365-2343 ( (619)337-3050 '• ❑ 02 GARNET PLANT 21500 INDIAN AVE. N 05 ❑ 29 PALMS ❑ 07 BRAWLEY PLANT REDI-MIX WEIGHMASTER Wei master PALM (619)347-3232 SPRINGS, CALIFORNIA ADDRESS: 7451 MOJAVE RD. (6 PALMS, CALIFORNIA (619)367-9536 695 W. MAIN BRAWLEY, CALIFORNIA (619)337-3050 CERTIFICATE D/L#: TAX: WEIGHMASTER CERTIFICATE: THIS IS TO CERTIFY that the following described commodity was weighed, measured or counted 1�y # weighmaster, whose signature Is on • this certificate, who is a recognized authority of accuracy, as orescribed by chanter 7 (commencind !th Section 12700) of Division 5 of the ❑ 03 1000 PALMS PLANT 72-475 V RNER ROAD ❑ ❑ 08 LPLANT CONTRACTOR'S LICENSE NO.: 89 1000 PALMS, CALIFORNIA 450 S. BROWN CALIPATRIA, CALIFORNIA (619)343-3411 (619)348-7600 UNLOADING TIME: A maximum qf, 5 minutes per yard of ready mix will be free. Additional unloading time will be charged at current prevailing rates. WARNING NOTICE: use ofread mix cp Crete ithout protective clothing could cause bodily injury. Every effort should be taken to avoid contact wit�i the skin. 7 RELEASE: I hereby agree not to hold ,bJ�NITE CONSTRUCTION WATER ADDED ON JOB AT CUSTOMER'S REQUEST: .GAL. COMPANY or any of its employees liaby. fdr, damages inside curb or WATER ADDED TO THIS LOAD BY AUTHORITY OF: property line caused by any of their equipment, as I have requested ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS delivery on the property for the maul listed and hereby acknowledge STRENGTH. ANY WATER ADDED IS AT CUSTOMER'S RISK. receipt of -same. f CUSTOMER HEREBY AGREES TO INDEMNIFY GRANITE CONSTRUCTION COMPANY FROM ANY CLAIM ARRISING FROM SUCH ADDITIONS. RECEIVED/RELEASED BY: PLANT TICKET NO. TRUCKLOAD SIZE P/C PRODUCT DESCRIPTION SLUMP USE DATE CUSTOMER NO. SOLD TO TXICD DRIVER DELIVERY ADDRESS P.O.NO. ORDER NO. GRANITE JOB NUMBER INSTRUCTIONS TIME DUE =0011117M UNIT oil Mg� PRICEC) AMOUNT i el(Dc INFORMATION: 4N. s ITE CO RUCTION CO. Wei master ADDRESS: PHONE: SUBTOTAL: D/L#: TAX: WEIGHMASTER CERTIFICATE: THIS IS TO CERTIFY that the following described commodity was weighed, measured or counted 1�y # weighmaster, whose signature Is on • this certificate, who is a recognized authority of accuracy, as orescribed by chanter 7 (commencind !th Section 12700) of Division 5 of the California Business and professional Code, administered by the Division of Measurement Standards of the California Department of Food and FORM #1003 Agriculture. 1, ,)� COPY I UNLOADING TIME: A maximum qf, 5 minutes per yard of ready mix will be free. Additional unloading time will be charged at current prevailing rates. WARNING NOTICE: use ofread mix concrete ithout protective clothing could cause bodily injury. Every effort should be taken to avoid contact with the sCin. f S' RELEASE: I hereby agree not to hold GRANITE CONSTRUCTION WATER ADDED ON JOB AT. CUSTOMER'S REQUESTS GAL. COMPANY or any of, its employees liable for damages inside curb or WATER ADDED TO THIS LSADIBY AUTHORITY OF: k1 r-4-' +e''r property line caused by any of their equipment, as l have requested ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS delivery on the property for the material listed and hereby acknowledge STRENGTH. ANY WATER .ADDED I,AT C ST MER RISK. receipt of same, � CUSTOMER HEREBY AGREES STI IN MN Y NITE ppwa� p y + CONSTRUCTION COMPANY FROM - A AR G ROM �"C \,�,: �� SUCH ADDITIONS. R�CEI EDIRIA": �-I-fl rLHIV I 1IUnC I IV V. I Huhn LUM14e% }, K(U 1110 ;1 UCJI,M �K I S7 Jltul U t ;K UA I t CUSTOMER NO. SOLD - TX/CD DRrVER A�T A 7 DELIVERY ADDRESS P.O.NO. ORD R NO. \ GRANITE JOB NUMBER / !II'• w �INSTRV IONS TIME DUE t.7 1 t't irft�t .! - ►..; t=:i't's 11,E , 1. t- t i tilj'. .Till] !. ; PRODUCT PRODUCT DESCRIPTION UNIT OF UNIT AMOUNT • •ffis • fit r IN INFORMATION: t -�I � GRANITE�CONSTRUCTION CO. Weighmaster ADDRESS: PHONE: - ��[ �� SUBTOTAL: D/L#: TAX: r WEIGHMASTER CERTIFICATE: �. r *^• THIS IS TO CERTIFY that the following described commodity was weighed, measured or counted by a weig master, whose signature is on • this certificate, who Is a recognized authority of accuracy, as prescribed by chapter 7 (commencing with Section 12700) of Division 5 o! the California Business and professional Code, administered by the Division of Measurement Standards of the California Department of Food and FORM #1 003 Agriculture. GRRnITE\ CONTROL NO. i 01 PLANT PLANT INDIconsTRumon ❑ 04 ❑ EL comPRng 38-11 STREET 38-115 5YUCCA 5475 YUCCAS RAIL YUCCA VALLEY, CALIFORNIA 2095 HWY I IPLANT EL CENTRO, CALIFORNIA iM (6 91075ALIFORNIA (619)3652343 (619) 337.3050 ❑ 02 GARNETPLANT 21500 INDIAN AVE. N 1:3 05 PALMS 07 ❑ BRAWLEY LANT REDI-MIX WEIGHMASTER PALM SPRINGS, CALIFORNIA (619)347-3232 7451 MOJAVE RD. 29 PALMS, CALIFORNIA (619)367-9536 695 W. MAIN BRAWLEY, CALIFORNIA (619) 337.3050 CERTIFICATE ❑PALM03 S PLANT 720475 ❑ 08 CALIPATRIA VARNER ROAD ❑ 50 S. BROWNLANT CONTRACTOR'S LICENSE NO.: 89 1000 PALMS. CALIFORNIA- CALIPATRIA, CALIFORNIA (619)343-3411 (619)348-7600 I UNLOADING TIME: A maximum qf, 5 minutes per yard of ready mix will be free. Additional unloading time will be charged at current prevailing rates. WARNING NOTICE: use ofread mix concrete ithout protective clothing could cause bodily injury. Every effort should be taken to avoid contact with the sCin. f S' RELEASE: I hereby agree not to hold GRANITE CONSTRUCTION WATER ADDED ON JOB AT. CUSTOMER'S REQUESTS GAL. COMPANY or any of, its employees liable for damages inside curb or WATER ADDED TO THIS LSADIBY AUTHORITY OF: k1 r-4-' +e''r property line caused by any of their equipment, as l have requested ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS delivery on the property for the material listed and hereby acknowledge STRENGTH. ANY WATER .ADDED I,AT C ST MER RISK. receipt of same, � CUSTOMER HEREBY AGREES STI IN MN Y NITE ppwa� p y + CONSTRUCTION COMPANY FROM - A AR G ROM �"C \,�,: �� SUCH ADDITIONS. R�CEI EDIRIA": �-I-fl rLHIV I 1IUnC I IV V. I Huhn LUM14e% }, K(U 1110 ;1 UCJI,M �K I S7 Jltul U t ;K UA I t CUSTOMER NO. SOLD - TX/CD DRrVER A�T A 7 DELIVERY ADDRESS P.O.NO. ORD R NO. \ GRANITE JOB NUMBER / !II'• w �INSTRV IONS TIME DUE t.7 1 t't irft�t .! - ►..; t=:i't's 11,E , 1. t- t i tilj'. .Till] !. ; PRODUCT PRODUCT DESCRIPTION UNIT OF UNIT AMOUNT • •ffis • fit r IN INFORMATION: t -�I � GRANITE�CONSTRUCTION CO. Weighmaster ADDRESS: PHONE: - ��[ �� SUBTOTAL: D/L#: TAX: r WEIGHMASTER CERTIFICATE: �. r *^• THIS IS TO CERTIFY that the following described commodity was weighed, measured or counted by a weig master, whose signature is on • this certificate, who Is a recognized authority of accuracy, as prescribed by chapter 7 (commencing with Section 12700) of Division 5 o! the California Business and professional Code, administered by the Division of Measurement Standards of the California Department of Food and FORM #1 003 Agriculture. 0 • r DAILY CONSTRUCTION REPORT DATE • _ DAY 5 w�Tllj F 1 5 PROJECT as C 17/J2 CYOS$�;J Z ^ 8,.h Cw, A, Hun b.0 JOB NO. L WEATHER S.. CLIENT. L, Q, SGl, co .'S r. %' TEMP. to �2 42 su so to @e Mb CONTRACTOR ridyJ -*_ C.D.s S'fr K -G WIND — PROJECT MANAGER n -A me-AdHUMIDITY °'• "" "�'� AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Re/tmarts G r a.J "- f e__ -0— VISITORS Time Representing Representing Remarsts Z. Field Office 3. File 4 Client 8Y TITLE Fi* Form 8-1 id PROJECT DAILY CONSTRUCTION REPORT (Continuauun oneett REPORT NO, /7 JOB N0.Z27� J DATE CONSTRUCTION ACTIVITIES (Continued) ,r �,�• s ,� - r." �'a a rra Vi�A j rwt�% Dr -- 24 7 Z3 -f aL .�-�.�.✓a Z �� J -4A.,J - e� ,1 /✓a d rnt_ �✓ s S , �o d� .�.y ela -bpfelA,I11 W' � , X _ -fro ►v as, (0,o ,w d';' DISTRIBUTION: 1. Proi. Mgr. 2. Field Office 3. File 4. Client Fisk Form 8-2 SHEET SOF 7 -- By TITLE S I r i yCONTROL �RAnrrE NO. I � �n ��On Ot lornpAnwNcE INDI1 PLANT STREET VALLEY 06 EL CENTRO HWY 1 PLANT 38-115 MONROE INDIO, CALIFORNIA 5YUCCA 5475 YUCCA TRAIL 2095 YUCCA VALLEY, CALIFORNIA EL CENTRO, CALIFORNIA , 1 (619) 775-8270 (619)365-2343 (619) 337.3050 i " 02 GARNET PLANT-, li OS IJ 29 PALMS 07 BRAWLEY PLANT 695 W. MAIN 21500 INDIAN AVE. N PALM SPRINGS, CALIFORNIA 7451 MOJAVE RD. 29 PALMS, CALIFORNIA BRAWLEY, CALIFORNIA ' REDI-MIX WEIGHMASTER (619)347.3232 (619)367-9536 (619) 337-3050 I y CERTIFICATE 03 1000 PALMS PLANT j'� I—Y 08 CALIPATRIA PLANT 1 Imo/ 450 S. BROWN 72.475 VARNER ROAD I� 1000 PALMS, CALIFORNIA CALIPATRIA, CALIFORNIA ' CONTRACTOR'S LICENSE NO.: B9 (619)343.3411 (619)348.7600 t UNLOADING TIME: A maximum pf, 5 minutes per yard of ready mix will be free. Additional unloading time will be charged at `z,.. Ing rates. current preval WARNING NOTICE: use of. read mix concrete ithout protective clothing could cause bodily injury. Every effort should be taken i to avoid contact with the sCin. LEAVEJOB ARRIVE PLANT RELEASE: 1 hereby agree not to hold GRANITE CONSTRUCTION WATER ADDED.ON JOB AT CUSTOMER'S REQUEST: GAL. COMPANY or any of its employees liable for damages inside curb or WATER ADDED TO THIS LOAD BY AUTHORITY OF: property line caused by any of their equipment, as I have requested ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS delivery on the property for the material listed and hereby acknowledge i STRENGTH. ANY WATER ADDED IS AT CUSTOMER'S RISK. receipt of same. . CUSTOMER HEREBY AGREES TO INDEMNIFY GRANITE CONSTRUCTION 'COMPANY FROM ANY CLAIM ARRISIN$3 FROM RECEIVED/RELEASED BY:/ SUCH ADDITIONS. � :_ 1 I /P NT TICKET NO. t TRUCK LOAD SIZE P/C PRODUCT DESCRIPTION SLUMP USE DATE (3746.` 'i. 1 6— VIL- ICUSTOMER NO. ;1 15oLu IV (3r':?;r',tail..+3 �,i. i��lJL.t_i:f•t ("A3 if f1',( f-+ f::01.)i.:Q1 i'.`al!i S TIME DUE INSTRUCTIONS r' By t_id 11111. t=t ro . t -t I c,* 1 ! �`--�' ' �'� J.' � 10 ') 7 ':i ! 2 :,11i1%t...t...-•-i,_:::llrl �vY0ro , Pr 640)✓\l ��3f Ra . A10 HECKINFQRM : , NAME: ADDRESS: PHONE: D/L#: WEIGHMASTER CERTIFICATE: THIS IS TO CERTIFY that the following described commod : CONSTRUCTION CO. Weighmaster SUBTOTAL: TAX: BY: I_ i Ity was weighed, measured or counted h welghmaster, whose signature Is on • this certlgcate, who Is a recognized authority of accuracy, as prescribed by chapter 7 (commencing tVlth Section 12700) of D/vls/on 5 of the California Business and professional Code, administered by the Division of Measurement Standards of the California Department of Food and FORM #1003 Agriculture. r: • TOC., r`*-�1 L oe - 31 -nom-:: s acz"0 — _:, GRRnITECONTROL NO. COnSTRumon❑'01 38-1106 PLANT MONROE STREET ❑ 04 YUCCA VALLEY ❑ 06 EL CENTRO PLANT (MMPRny INDIO, CALIFORNIA YUCCA TRAIL L•� YUCCA VALLEY, CALIFORNIA YUCCA 111 2095 CENTRO, EL CENTRO, CALIFORNIA 1 (619) 775-8270 (619)365.2343 (619)337-3050 ❑ 02 GARNET PLANT05 ❑ 29 PALMS ❑ 07 BRAWLEY PLANT REDI-MIX WEIGHMASTER 21500 INDIAN AVS. N SPRINGS, CALIFORNIA 6ALM 19 347-3232 7451 MOJAVE RD. PALMS, CALIFORNIA (619)367.9536 (6 695 W. MAIN BRAWLEY, CALIFORNIA (619)337.3050 CERTIFICATE ❑ 03 7200 PALMS PLANT 475 VARNER ROAD ❑ ❑ 08 450LPLANT S. BROWN CONTRACTOR'S LICENSE NO.: 89 1000 PALMS, CALIFORNIA CALIPATRIA, CALIFORNIA (619)343-3411 (619)348-7600 UNLOADING TIME: A maximum Q1.5 minutes per yard of ready mix will be free. Additional unloading time will be charged at current preval Ing rates. WARNING NOTICE: use of,read mix concrete ithout protective clothing could cause bodily injury. Every effort should be taken to avoid contact with the skin. WATER ADDED.ON JOB AT CUSTOMER'S REQUEST: GAL. RELEASE: I hereby agree not to hold GRANITE CONSTRUCTION COMPANY or any of its employees liable for damages inside curb or WATER ADDED TO THIS LOAD BY AUTHORITY OF: property line caused by any of their equipment, as I have requested ADDITIONAL WATER ADDED TO THIS CONCRETE WILL REDUCE ITS delivery on the property for the material listed and hereby acknowledge STRENGTH. ANY WATER ADDED IS AT CUSTOMER'S RISK. receipt of same. CUSTOMER H149EBAL AGREES • TO INDEMNIFY GRANITE CONSTRUCTION 'COMPANY' FROM ANY CLAIM ARRISING FROM RECEIVED/RELEASED BY: SUCH ADDITIONS. PLANT TICKET NO. I TRUCK I LOAD SIZE PIC PRODUCT DESCRIPTION SLUMP USE DATE TO ADDRESS ADDRESS PHONE:_ D/L#: GRANITE CONSTRUCTION CO. Weighmaster SUBTOTAL: BY: TAX: THIS Is TO CERTIFY that the following described commodity was weighed, measured or counted by's weighmaster, whose signature is on this certificate, who Is a recognized authority of accuracy, as prescribed by chapter 7 (commencing with Section 12700) of Division 5 of the California Business and professional Code, administered by the Division of Measurement Standards of the California Department of Food and Agriculture. TIME DUE e ■ / 6 FORM #1003 • L �' t ,� '/ ' � �' t DAILY CONSTRUCTION REPORT DATE — i/ L DAY s nn w g PROJECT /E%p�c7Y)1$ f�� C/1c317/J2� CYOS$i�J JOB NO ZZ WEATHER 5��� c`• »..� S w. . ro )] a IOU so io .o es hs y„ CLIENT. L� I1 voLL �+ ii1/ 1 TEMP. CONTRACTOR WINO Sim 1,00". »0" nNo PROJECT MANAGER r o" Moon » ...� A5; HUMIDITY ! AVERAGE FIELD FORCE Name o1 Contractor Non manual Manual Remams G ra.�.'-f �• (��S-f'r. � /e rs�-clot (I VISITORS Time Reoresenting Representinq Remarsti DISTRIBUTION: I Prol. Mgr. PAGE 1 OF PAGES 1. Field Office ]. File 4 Client�,/f BY TITLE Fisk Form 8-1 I J , I DAILY CONSTRIPTION REPORT •add Tris .¢f C d i!/l2 G'roSS�:J PROJECT JOB NO. Z 2 7 CLIENT. L�� vo CONTRACTOR PROJECT MANAGER R l rG x GATE DAY 5 M W JZ $ WEATHER a ." I cu......, s -w TEMP. all 1 2 SO !0 1,05s I M n.ow. wlwo 17ae /� HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarus VISITORS Time Reoresentinq Reoresentinq Remarus 1 1 u DISTRIBUTION: 1 Prol. 1,94r. 2. Field Office 3. File 4 Client Fhh Form 8.1 BY PAGE 1 OF LPAGES TITLEf 7 , 8/ / /I / / ' •a_ e� DISTRIBUTION: 1 Prol. 1,94r. 2. Field Office 3. File 4 Client Fhh Form 8.1 BY PAGE 1 OF LPAGES TITLEf DAILY COWRUCTION REPORT (Continuauun aneau PROJECT �''�� a �r�fs� � REPORT NO. Z/s • JOB NO. yZ 776- �- DATE CONSTRUCTION ACTIVITIES (Continued) i - i �� / W, ► ' / r. DISTRIBUTION: 1. Proi. Mgr, 2. Field Office 3. File 4. Client Fisk Form 8-2 BY SHEET OF Z' TITLE ' ' �'\?+ ti. �\(, i V a R.` ♦� � \ X11 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks G r,4..;l.'-f e__ �a (5r -4-d- VISITORS Time Reoresentinq Reoresentinq Remams C �ilili���• Mali//.1 �Y.'`l�S��Sa/3C.J�_� y��•''"�— — . DAILY CONSTROTION REPORT / DATE MOMi DAY 5 nn IT V 5 .¢f PROJECT Z � 7 arnr C4• Uw•�w• w�n 1•,... WEATHER s n JOB NO. CLIENT. L SL%CO is'�Yi �' TEMP. re`s IN sono joss 0CONTRACTOR l^/9/1Ji S`'fY�-G �i d WIND St... • »°n ntow. o o•` MOOi• »""� 1 PROJECT MANAGER rG /r /yL'�O�J l l e -A a e— HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks G r,4..;l.'-f e__ �a (5r -4-d- VISITORS Time Reoresentinq Reoresentinq Remams C �ilili���• Mali//.1 �Y.'`l�S��Sa/3C.J�_� y��•''"�— — ��, �' � ♦ ✓ • to MOMi DISTRIBUTION: 1 Prol. Mgr. 2. Field Office ]. File a Client Fish Form 6./ BY PAGE 1 OF 'PAGES TITLE S DAILY COI10TRUCTION REPORT (Continuaimi onrI PROJECTS ' �r%+�-O �iY'oSsl.�c,� REPORT NO. •1040 -Z -2- p JOB N0. / � ZZ % DATE 5 —21 — l CONSTRUCTION ACTIVITIES (Continued) I s� =�SfinS_��It� ► ��� ' ✓ s MM i Lam: • � �;. -'--- -= • W.91 M ,I.A 7 l 1 ♦ �� 11�11 113 MAM Itoi 40J Mi v ' �.'- �� 1A ' tom. / L I � / ' Ji iii,•- � MINIM .nWAOMM M/ DISTRIBUTION: 1. Proi. Mgr. 2. Field Off ice 3. File 4. Client Flak Foran 8.2 8Y SHEET r__— OF --L-- TITLE "1 � �� � �a . .*; .\ ... . e...` � i� . • w i � � � 1 � P _ _ _ � ��. `... _� 1 � � �, � y r -' C �` 1 �e�. (. � � {� • `r � �� � � 1 ` � ` � + , 'I s 1 �- 7 "1 � �� � �a . .*; .\ ... . e...` � i� . • w i � � � 1 � P _ _ _ � ��. AVERAGE FIELD FORCE • Name of Contractor G r Q,a,►�� C7,j6 Y-. Non -manual Manual 4 6; Remarks DAILY CONSTATION REPORT • �0 VISITORS DATE Remarstt /Representing G S nn w F 5 �dd 7!J$ i¢ C h 2I CroSS�.J IT111 DAY 1 JX PROJECT 22 7 7 WEATHER s��• c"" u^""' «.,, s,.Y.. JOB NO. CLIENT. � � Sc!, oo o .'s + r, � � TEMP. su so ,o roes xe .w CONTRACTOR ^iyLLe- WINO "rOO'«0" Avow.wo PROJECT MANAGER ?, rG x HUMIDITY AVERAGE FIELD FORCE Name of Contractor G r Q,a,►�� C7,j6 Y-. Non -manual Manual 4 6; Remarks rra,,, VISITORS Time Remarstt /Representing G w/Representing 2. Field Office 3. File 4 Client BY TITLE F ' Fisc Form 8.1 ti. �,i t - � � . t DAILY CCf#TRUCTION REPORT (Continueuun oneeu PROJECT t1V '�'// �'`�7 �/rOfs'��^—m+ REPORT NO. JOB N0. DATE CONSTRUCTION ACTIVITIES lCominued) �� i • ' J ' - WER -1� / Us u C = MOMMAM I WARM /`. RT _<y 'Ar ............... R DISTRIBUTION: 1. Proi. Mgr. 2. Field Office 3. File 4. Client Fkk Form 8-2 0 BY SHEET ZOF TITLE �S `••!'� Wim. .\� ` t-� ��0:Ir r.110 GFB-FRIEDRICH & ASSOC., INC. • CONSULTANT TO PUBLIC AGENCIES 6809 INDIANA AVENUE • SUITE 201 • RIVERSIDE, CALIFORNIA 92506 FAX (909) 7814435 • (909) 781-0811 FAX TRANSMITTAL LETTER Date: 5 - 50 - a5 TO: Name: 70�no Frec.�an Company: G'+�y LA Qu i n �i Fax Number: tot -1 I l -'IO!t Telephone Number: Co t4 FROM: Name: — 1�u� 7ae'rr,-, Total Pages Including Transmittal Letter: 1 Please Caller " at (909) 781-0811 if All pages are Not Received. Remarks: at) • Gl". = 4.11 - DAILY CONSTATION REPORT • PROJECTd Jn .¢ JOB NO. Z 2 7 CLIENT. �� �C� CIOL iS+c CONTRACTOR I^f?i1Ji Tt— CO.) S Y -Y1 -G D PROJECT MANAGER f /C A M e_4 at e— PATE — Z DAY I s XI nn s AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks .4 e__ Coj6+y-- 5 A a*vv:Z7 k, I v 9c-� VISITORS Time Reoresentinq Reoresennnq Remams uta 1 nitsu i iun: i. rrof. mgr. PAGE 1 OF_I PAGES 2. Field Office 3. File 4 Client BY TITLE S r Fisk Form 6.1 .•, WEATHER 7 u So 10 ioa5 tlS TEMP. WINO Eo n.eo.i 0.0HUMIDITYMoo.. »wwa ` AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks .4 e__ Coj6+y-- 5 A a*vv:Z7 k, I v 9c-� VISITORS Time Reoresentinq Reoresennnq Remams uta 1 nitsu i iun: i. rrof. mgr. PAGE 1 OF_I PAGES 2. Field Office 3. File 4 Client BY TITLE S r Fisk Form 6.1 AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks COas+r. 5 s101 -e" 4^4 R.e�bA-e VISITORS Time Reoresenting Representing Remarks 2. Field Office 3. File o Client Fisc Form 9-1 BY TITLE • DAILY CONSACTION REPORT DATE —5 5 Nt w 5 • DAY PROJECT Z � � WEATHER JOB NO. L, Z �!1 CD iS -� )-, L J7SU SO70 70aS XSCLIENT. TEMP. ro"p, CONTRACTOR r'iinJ: C.D�J S'fY-G '1i B WINO "'0"nr°°",.°PROJECT """° MANAGER IC /IC !�'JP�4 d� HUMIOITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks COas+r. 5 s101 -e" 4^4 R.e�bA-e VISITORS Time Reoresenting Representing Remarks 2. Field Office 3. File o Client Fisc Form 9-1 BY TITLE • PROJECT JOB NO._ DAILY CONSTRUCTION .REPORT (Continueuun oneuu REPORT N0.zz 1 i 2Z7 -7 DATE CONSTRUCTION . . P-11111111/ /, ' 9 0 U `" i � r �� S� I mm�� / ; / / �♦ DISTRIBUTION: 1. Proi. Mgr. 2. Field Office 3. File 4. Client FWt Form 8.2 SHEET Z OF1= ' BY TITLE 0 tM1 0AY-25-95 THU 11:GFB & ASSOC. 818435 P.02 GFB-FRIFDRICH ' & ASSOC., INC. CONSULTANT TO PUB[ IC AGENCIES 'Vater Resources • Infrastructure Plaaax�ing 'Public Finance Districts May 25, 1995 City of La Quinta 78-95 Calle Tampico La Quinta, CA 92253 Attn: Mr. John Freeland, Associate Engineer RE: Adams Street Crossing MEMO TO CITY OF LA QUINTA ON SLOPE FACE Dear John: Per our phone conversation yesterday and the follow up conversation with Mr. James Lindsey and my review of the design sheets., the side slope on the channel reconstruction should be at 0.5:1, not 1.5:1 as shown on the Typical Section on Sheet 7A. • All other dimensions and elevations shown on the plan are consistent with a 0.5:1 slope face. If you have any further questions, please feel free to call. Sincerely, GFB--FRIEDRICH & ASSOC:, INC. DONALD W. -BIRGIft P.E. DWB:sm 6809 INDIANA AVENUE • SUITE 201 • RIVERSIDE, CALIFORNIA 92506 FAX (909) 781.8435 • (909; 781.0811 • Environmental Geotechnical �® Construction • Consulting • Engineering it Testing CITY OF LA OUTINTA J U iii U IJJ5 IL,C WORKS REPORT OF FIELD COMPACTION TESTS TESTED FOR: ATTN: JOHN FREELAND PROJECT: ADAMS ST RECONSTRUCTION CITY OF LA QUINTA LA QUINTA, CA. 78-495 CALLE TAMPICO LA'QUINTA, CA 92253 DATE: May - 25, 1995 OUR REPORT NO.: 073-40277-00007 PAGE 1 OF 2 TEST DATA: (00004) Silty sand fine grained OPT. MOIST. = 9.2% TEST NO. TEST DEPTH ELEVATION SOIL ID NUMBER MAXIMUM LAB DRY * DENSITY WATER CONTENT WET DENSITY DRY DENSITY PERCENT COMPACTION COMMENTS' Spec. 95% Min 1 811 Top zone 4 115.0 7.1 108.7 101.5 88.3 1 - B 2 811 Top zone 4 115.0 7.0 109.4 102.2 88.9 1 - A 3 811 Top zone 4 115.0 7.7 117.7 109.3 95.0 1 - A 4 811 Top zone 4 115.0 10.5 106.9 96.7 84.1 1 - B 5 811 Top zone 4 115.0 6.1 116.8 110.1 95.7 1 - A 6 811 Top zone 4 115.0 10.5 121.1 109.6 95.3. 1 - A TEST LOCATION: Adams Street / Wash 1 Sta.: 25+00 west edge of road 2 Sta.: 26+00 west edge of road 3 Sta.: 27+00 west edge of road 4 Sta.: 29+00 west edge of road 5 Sta.: 29+00 east edge of road 6 Sta.: 27.+00 east edge of road NOTES: TESTS PERFORMED PER ASTM D2922-91 8 ASTM D3017-88(93) -COMMENTS: 1. FILL MATERIAL A: TEST RESULTS COMPLY WITH SPECIFICATIONS DENSITIES SHOWN: Lbs. per cubic foot 2. BACKFILL B. PERCENT COMPACTION DOES NOT COMPLY WATER CONTENT: Percent of dry weight3. BASE COURSE WITH SPECIFICATIONS PERCENT COMPACTION: Based on maximum dry 4. SUBBASE C. RETEST OF PREVIOUS TEST density obtained on sample indicated by 5. SOIL CEMENT D. MOISTURE IN EXCESS OF SPECIFICATIONS soil ID number. 6. OTHER E. MOISTURE BELOW SPECIFICATIONS * (00004) ASTM D-1557, Procedure A TESTINSTRUMENT: Troxler, 3411-B STANDARD COUNT M: D: REMARKS: PSI DID NOT MONITOR THE FILL PLACEMENT. ADJUSTMENTDATA M: 00 D: 00 TECHNICIAN: Randy Rodriguez Respectfully submitted, Professional Service Industries, Inc. THESE TEST RESULTS RELATE ONLY TO THE SPECIFIC TEST LOCATIONS NOTED. PSI IS NOT RESPONSIBLE FOR ANY OTHER LOCATION OR ELEVATION. PAUL R. HOERSTING REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. BRANCH MANAGER hyOrmation Jo 8utid On. PSI M100d (M)F PSI .42-240 Green Way, Suite C • Palm Desert, CA 92211 • Phone 619/341-5790 • Fax 619/341-5794 Environmental rid�� Geotechnical Construction • Consuiting • Engineering • Testing REPORT OF, FIELD COMPACTION TESTS TESTED FOR: ATTN: JOHN FREELAND PROJECT: ADAMS ST RECONSTRUCTION CITY OF LA QUINTA LA QUINTA, CA. 78-495 CALLE TAMPICO LA QUINTA, CA 92253 DATE: May 25, 1995 OUR REPORT NO.: 073-40277-00007 PAGE 2 OF 2 TEST DATA: (00004) Silty sand fine grained OPT. MOIST. = 9.2% TEST NO. TEST DEPTH ELEVATION SOIL ID NUMBER MAXIMUM LAB DRY t DENSITY WATER CONTENT WET DENSITY DRY DENSITY PERCENT ' COMPACTION COMMENTS' Spec. 95$ Min 7 811 Top zone 4 115.0 8.7 118.9 109.4 95.1 1 - A 8 811 Top zone 4 115.0 10.4 121.2 109.8 95.5 1 - A 9 811 Top zone 4 115.0 9.3 119.0 108.9 94.7 1 - B TEST LOCATION: Adams Street / Wash 7 Sta.: 26+00 east edge of road 8 Sta.: 25+00 east edge of road 9 Sta.:.24+00 east edge of road NOTES: TESTS PERFORMED PER ASTM D2922-91 8 ASTM D3017-88(93) 'COMMENTS: DENSITIES SHOWN: Lbs. per cubic foot WATER CONTENT: Percent of dry weight PERCENT COMPACTION: Based on maximum dry density obtained on sample indicated by soil ID number. * (00004) ASTM D -1557, -Procedure A TESTINSTRUMENT: Troxler, '3411-B REMARKS: PSI DID NOT MONITOR THE FILL PLACEMENT. TECHNICIAN: Randy Rodriguez 17-j 1. FILL MATERIAL A. TEST RESULTS COMPLY WITH SPECIFICATIONS 2. BACKFILL.B. PERCENT COMPACTION DOES NOT COMPLY 3. BASE COURE WITH SPECIFICATIONS 4. SUBBASE C. RETEST OF PREVIOUS TEST 5. SOIL CEMENT D. MOISTURE IN EXCESS OF SPECIFICATIONS 6. OTHER E. MOISTURE BELOW SPECIFICATIONS STANDARD COUNT M: D: ADJUSTMENT DATA M: '00 D: 00 Respectfully submitted, Professional Service Industries, Inc. PAUL R. HOERSTING THESE TEST RESULTS RELATE ONLY TO THE SPECIFIC TEST LOCATIONS NOTED. PSI IS NOT RESPONSIBLE FOR ANY OTHER LOCATION OR ELEVATION. REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. BRANCH MANAGER faforrnation .To Build On PSI A-IM2(3)F PSI . 42-240 Green Way, Suite C • Palm Desert, CA 92211 • Phone 619/341-5790 • Fax 619/341-5794 • • DAILY CONSTRUPrION REPORT • PROJECTKidd m5 :�� C 17/!2 CroSS.:� JOB NO. 22 7 CLIENT. L, CIO CONTRACTOR I "q")i 7_, CDiJ S'fYN-G 'li 8 PROJECT MANAGER ? J rG x PATE S� Z ` / DAY WEATHER s��� u.. u....... �..� s..,... to l2 TEMP. J2 5U S0 !0 1106% M, WINO SI. Moos ..gar. n.00.. Ho HUMIDITY or. M wwwe /0 AVERAGE FIELD FORCE Name of Contractor Non manual Manual / Remarks _1551— 7111 "Rca VISITORS Time Representing Representing Remancs 2. Field Office 3. Fvie 4 Client ^/ BY TITLE Fisk Form 8•1 AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarkf VISITORS Time Representing Representing Rlmarkt UISTHItSUTIUN: 1. Prol. Mqr. - PAGE 1 OF�_f AGES 2. Field Office 3. File 4 Client 8Y TITLE Fisc Form 8.1 CTION REPORT DAILY CONSTR S Z 3 9S DATE 5 M w $ • / �dd 7nS C DAY h C►'OS$i iJ PROJECT 77/ B•.tUr Uvw• inn Snw. WEATHER s,.n JOB NO CLIENT. L Sr;ilOO r, sr TEMP. roa jil 5u so 10 Boa "YY CONTRACTOR WIND Sid. MiX q~° 0— •. PROJECT MANAGER 1� �C /`C !y'J e4de- HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarkf VISITORS Time Representing Representing Rlmarkt UISTHItSUTIUN: 1. Prol. Mqr. - PAGE 1 OF�_f AGES 2. Field Office 3. File 4 Client 8Y TITLE Fisc Form 8.1 KCAL -SECTION i"-6' i 24.70.00 END CURB 8 GUT' ` 0" C.F. OF CONC�CygNN F� FS 24+50.00 BEG. CURB TRANSITION SIDEWALK 4 PT. CUT LINE FOR — EXIST. CHANNEL REMOVAL • VFX 516 FS 56 6 F v 24.00.80 JOIN EXIST. C8G 1' JOIN EXIST. SIDEWALK C. iOwl I_ f CHANNEL PROPOSED \ _! 127' OS EXIST. CONC. CHANNEL\ LINING �\ 7— EXIST. GROUND C H A N N E TY 24+75_ u _ lo') N I f l R j 1y a�A! 70 SEE JOINT DETAIL .. y BELOW (TYP.) i PROPOSED 60 ADAMS STREET -' 551 FS RECONSTRUCT 6" CHANNEL 50 LINING TO CLEAR PROPOSED \— STREET IMPROVEMENTS EXIST. GROUND EXIST. CONC. CHANNEL \ LINING \� 40 4+50 (I" =10') �y 70 y 6F oy PROPOSED ADAMS STREET — • 60 . \—tel' \ s?. 2F EXIST. GROUND f2o4 S RECONSTRUCT 6" CHANNEL Qs LINING TO CLEAR PROPOSED 50 STREETIMPROVEMENTS Sgs� r IFS S STREET -- s. i EL --- • EXIST. GROUND 24+25 (I" = IO EXIST. WWF I' MIN. LAP 6 RECONSTRUCT CONC. LINING 6" CONC. WITH 4x4xW4xW4 / WWF TIED TO EXIST. • CUT LINE FOR EXIST. CHANNEL REMOVAL 24+00.80 JOIN EXIST. C8G JOIN EXIST. SIDEWALK EXIST. POWER POLE PROTECT IN PLACE EXIST. WATER VALVE PROTECT IN PLACE EXIST. 6" CONC. CHANNEL LINING 23+8 TO BE REMOVED TO LIMITS JOIN EXIST. SHOWN AT RIGHT \ EXIST. REINFORCING, TO BE CUT \ AND BEN INTO NTO NEW CONCRETE 1.5 I' MIN. LAP WITH NEW REINFORCING I PAST BEND POINT 1% eO• CHANNEL LINING RECONSTRUCTION JOINT DETAIL N.T.S. Alm E 5 C. LL OuT Q RECOMMEND APPROVAL DATE -curacy ng atter CHECKED BY . e + T DATE BY MARK APPR. DATE _ )onsible oval by ENGINEER REVISIONS COUNTY DATE )!i. _: •. • DAILY CONSTRUCTION REPORT DATE DAY S w S PROJECT '..r�' S nc `''�>��`�( /t•/VA'SiV JOB NO. 2 % 11 WEATHER a.•. r... s„w. CLIENT. �� �� Shoo/ �i�S�Y TEMP to,7 , su so +o +oe as�� CONTRACTOR G AV,Ve, _ ' WIND PROJECT MANAGER E c r- Poe_ A-d_'Q— HUMIDITY or" M AVERAGE FIELD FORCE Name of Contractor fid ✓ Non manual Manual Z Remarks sr vvJ �y o A, VISITORS Time Representing Representing Remarks Fisc Form 8.1 2. Field Office 3. Fde a Client 8Y TITLE � 1 r IN, ` 4 s STAKES SET BY COMP. BY CHKED. BY STATION ELEV. GRADE CUT FILL NOTES STATION ELEV. GRADE CUT FILL NOTES 2'3 Z 3 y9,/ u�vf. 3 ,?,W4ot _ 5 �5�J G/ b2 _ d Bcl. r_ Svc. Z�►d� 3 2y-I3S SG��� .3 ?� i -7-7 _ 3'i S �_� _ AN O Ll-rs- 7z. 1. E /P Cafroil rF S �'J�s'' L `ten -,•%Z 2'S �a �'r �= �'- �r/. -. ke_Do P3i 4`/ /5- -0 It3SFA 3 NAT !p V v Q ✓o 17 � • 5; NL— IX 6820 AIRPORT DRIVE • RIVERSIDE • CALIFORNIA 92504 • 909/688-0241 • FAX 909/688-0599 • • PROJECT JOB NO. CLIENT -- CONTRACTOR PROJECT MANAGER DAILY CONSTRUCTION REPORT AVERAGE FIELD FORCE GATE Non -manual $ MW $ Remarks 10 _j DAY Time C u+�q„, N.,n S,, . WEATHER s.7 To 32 J2 5ON 0 85 Fl TEMP. 1 WIND neo , Po o" NyTq HUMIDITY AVERAGE FIELD FORCE Name of Contractor G Non -manual Manual Remarks 10 _j VISITORS Time Representing C Representing Remarks Iff EQUIPMENT AT THE SITE 6 )3 wgeJ CONSTRUCTION ACTIVITIES or &,--I_ 0 DISTRIBUTION: 1. Proi. Mgr. PAGE 1 OF PAGES 2. Field Office 3. File 4. Client SOY BY TITLE Fisk Form 8.1 • DAILY CONSTRUCTION REPORT DATE $ M WJXJ $ ,f�' '�,, /�� PROJECT �'"rmeg ` 4w 1w4-7 DAV `Z�7 WEATHER Brae c uwca "un S,-. JOB NO. S." CLIENT. S�i,mo �rS'�jYi1 TEMP. to)2 3250 50y0 ;08-51 95 CONTRACTOR.C�3'KS 7 WINp 5t i nova., r a TC PROJECT MANAGER pC t<L � C - HUMIDITY or. M AVERAGE FIELD FORCE Nam, eLof Contractor Non manual Manual Remarks VISITORS Time Representing Representing Remarks Fisk Form 8-1 3. File o. Client BY TITLE f �' ', `. �. 0 PROJEC- JOB NO. CLIENT. CONTRA PROJEC' DAILY CONSTRUCTION REPORT AVERAGE FIELD FORCE Name of Contractor Non -manual Manual �r�,' Vie__- C�-►s ftti-�-�� S Remarks (� ►�o-�l•�•�- DATE $ M T I $ DAY I ZITHI WEATHER Remarks s��• u: U.. io 77 !7 5 SO 10 70 SS B5 ' TEMP. WINO Sum Mwe, ..41n.oa� wo o�. HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual �r�,' Vie__- C�-►s ftti-�-�� S Remarks (� ►�o-�l•�•�- P� VISITORS Time Representing Representing Remarks N Fisk Form 8-1 2. Field Office 3. File 4. Client 8Y TITLET~f k • • PROJECT M/, DAILY CONSTRUCTION REPORT (Continuatwn onrau REPORT NO, 5--4 JOB NO. �Z% 7 ( DATE CONSTRUCTION ACTIVITIES (Continued) s 6 -Al OZI!jla�l d� /t i'6seAe 6 SAV& { souk w4 .�►t � u� r l d Ssoel�w DISTRIBUTION: 1. Proi. Mgr. 2. Field Office 3. File 4. Client Fbk Fenn 8.2 BY SHEET 27— OF 'L— TITLE �. - � , .�.. �. i rte. � �' �� � q- � � � -�. ,. _. 1 , �' ;. _ � � ... � .l � � � • _ 1. A • PROJECT 4O4QV JOB N0. CLIENT. CONTRACTOR • PROJECT MANAGER DAILY CONSTRUCTION REPORT AVERAGE FIELD FORCE �� Name of Contractor DATE r w T 5 "JAI VISITORS OAV A I ly. WEATHER Time Representing s��• u.•..,' u... N.,n s. A ro ]] J2 SU Solo' 10 B XS .W TEMP. WIN Sim M e r..pn Rpprr No °r` M rrywp O HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks VISITORS Time Representing Representing �/,O�—I�/4-- ,/Remarks DISTRIBUTION: 1. Prol• Mgr.PAGE 1 OF ? PAGES 2. Field Office 3. File o Client By TITLE Fisc Form 8.1 • PROJECT �S DAILY CONSTRUCTION REPORT (Continuatwn ane:e tt REPORT NO. JOB NO. JAW?— 7—. 7-7 DATE s ��— CONSTRUCTION ACTIVITIES (Continued) W01 0111 s DISTRIBUTION: 1. Proi. Mgr. 2. Field Office 3. File 4. Client Fisk Fort 8.2 BY SHEET Z- OF ?-- TITLE N . I L • PROJECT 10 JOB NO. P ZZ i CLIENT. CONTRACTOR PROJECT MANAGER • 0 • DAILY CONSTRUCTION REPORT PATE /E Name of Contractor S T W FS /f ITHI DAY Al 1 57'41/ . . WEATHER s"' • 0-1 U—c", w.,. s„y.. TEMP.to S2 j2 su so ro io es R X WINO St,u M H Yn n"C's NO °i N1 MyTq ¢� HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks 57'41/ . . VISITORS Time Representing Representing Remarks Fisc Form 8.1 2. Field Office 3. File o Client BY TITLEf �xS DAILY CONSTRUCTION REPORT • PROJECT d4-- 5 JOB NO. O -Z-77 CLIENT.- CONTRACTOR LIENT. CONTRACTOR �9/�A-����2.► PROJECT MANAGER R-v,�— /y'1rGi4-dem • • AVERAGE FIELD FORCE �— Z 2 _ DATE VISITORS Time Representing $ M W $ DAY WEATHER U—ca, 04". s-, . TEMP. O m !0 6 NS?y r WINO V;, n4 1 NO _ HUMIDITYMyTq AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks VISITORS Time Representing Representing Remarks DISTRIBUTION: 1. Prol. Mgr. PAGE 1 OF—/—PAGES 2. Field Office J. File 0 Client BY TITLE Fisc Form 8-1 • r: c DAILY CONSTRUCTION REPORT DATE $ M W $ DAY PROJECT !` I /`i�ryN iiYOff,�� J 0 NO. IP --306— ZZ WEATHERSyne Gc� U.".c CLIENT_ S dol D1ilf'tr� TEMP. rose 42 51.) So 10 loss e5 CONTRACTOR G rA�•' 7 wlNo PROJECT MANAGER �� fC/�� %�i-Q HUMIDITY o" "" • NyTO AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks VISITORS Time Representing Representing Remarks G Fist Form 8.1 2. Field Office 3. File o Client f BY TITLE 110 DAILY • PROJECT JOB N0. Z — 4 CLIENT. G�'� '� L.4 69 V, CONTRACTOR R,4Nr CO S.'3� rwC f /o.J PROJECT MANAGERe-- 0 0 AVERAGE FIELD FORCE CONSTRUCTION REPORT T s OATE`U — DAY WEATHER Is.." CI TEMP. all JJ S SO ,0 WINO s,ai a • n.00e, No I HUMIDITY on M �.wwa Z- Name of Contractor Non -manual Manual �Rernark• VISITORS Time I Representing Representinq Remarks A//" EQUIPMENT AT THE SITE A10 -R CONSTRUCTION ACTIVITIES 7,., r, T..�sA A4 f,'.* No mor . Bid DISTRIBUTION: 1. Prol. Mqr. PAGE 1 OF PAGES 2. Field Office 3. File 4 Client �/ X By TITLE Fkk Form 8•1 • 0 DAILY. CONSTRUCTION REPORT PATE OAY s s PROJECT �v'�"'�-S JOB NO. Z —it/. WEATHER z"' c'`• u....... 046.. s..... CLIENT. Gi�� 0 �� U� TEMP. to u u su 30 10 Pass ss 1 CONTRACTOR /Qi4N/ CO S*rt.4 f ro.a WINO sWo "'0" 14.90..«o PROJECT MANAGER �r �GK /% HUMIDITY °i Z to AVERAGE FIELD FORCE Name of Contractor Non•manuat I Manual Remarks VISITORS Time ReoresentPnq Representing Remarks EQUIPMENT AT THE SITE p Mme- / fid ,~ Z, CONSTRUCTION ACTIVITIES /o - 1-110 u -o or C- o.d s ' N - • L a S S 4-1 .J o Z - D LUo r /3 ' `Z.S� r/L o DISTRIBUTION: 1. Prol. Mqr. PAGE 1 OF_L—PAGES 2. Field Office ]. File 4 Client04 BY TITLE o' Fisk Form 13•1 • • C 0 DAILY. CONSTRUCTION REPORT w-etJC DATE Z -3 ! S 5 5 MAY PROJECT �v—S 4272� JOB NO. ^ Z — *i • WEATHER 5 �' u.•. .�•• CLIENT. Or .I -A 0 (.4i TEMP to» .12 su so to toes xe \ »�a� CONTRACTOR C4 --J, '� Co-)S.'f'r-4 A, 1, WINO Sill n.00.s toof PROJECT MANAGER'II -q— HUMIDITY 0. v "" """'° > 1 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Re/marks rA VISITORS Time Re presenting Reoresennnq Remerxs EQUIPMENT AT THE SITE ,1 19 �O CONSTRUCTION ACTIVITIES AI b "r.4..► '-�� J -sem b ") iY v Go Ar- 'L - � .� O�� r✓ — -D o r o s', 19i P ->�o r- G CC- 6 s ' .�►- 9 o O DISTRIBUTION: 1. Prol. Mgr. PAGE 1 OF PAGES 2. Field Office I ]. File ` a Client TITLE 8Y Fiefs Form 8•1 r • EQUIPMENT1 DAILY CONSTRUCTION REPORT DATE. • CONSTRUCTION /I DAV S M w /E%o�d yr15 L CYDSSi.J � C/Jc3 /7/72 I IV] MOM 04, 1111 AOR PROJECT JOB NO. 07 . �� Bm• C4. uwan' r..n Yww WEATHER CLIENT. L SL�► OO I S Yi TEMP. '012 n s io io 10 as ns CONTRACTOR I"/i/1Ji COiJ S YK,G B Sim I n.pw n•••�� w0 WIND f °i PROJECT MANAGER /R► �C Pfd D HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manuas Remarks VISITORS T;me Representing Representinq Remarks r • EQUIPMENT1 t CONSTRUCTION /I IV] MOM 04, 1111 AOR WA --- "MIC M I ■I_� If. ' 1 • .�LANEW& t la..� d �s . DISTRIBUTION: I Prol. Mqr. PAGE 1 OF PAGES 2. Field Office 3. Fite C Client TITLE 8 Fisk Form 8.1 VISITORS Time Representing Represennnq Remaras *//41— 4j// EQUIPMENT DALJam- Al DAILY CONSTRUCTION REPORT o '//ice DATE FA ua. • DAY 5 M w 5 // /�%p�c7 ir1$ i¢ C I!/72I CYOSSi iJ PROJECT JOB NO. Z Z / WEATHER "" u..•.��.•, s..,.. CLIENT. L� TEMP. F CONTRACTOR rgpli� S CD/JYw-G O WINO PROJECT MANAGER .rG P� aI HUMIDITY AVERAGE FIELD FORCE Name of Contractor I; rQa.'-f Nan manual Manual RemafK% VISITORS Time Representing Represennnq Remaras *//41— 4j// EQUIPMENT DALJam- Al o '//ice / , I FA ua. NO CONSTRUVION : UWAi/ 11111161� AM Eft 1111:1111,1111�. 11111 -wi:ij FM PEW i ■s' i i DISTRIBUTION: t. Prot. Mqr. 2. Field Office ]. File 4 Client Fisk Form 8.1 PAGE 1 OF PAGES c BY TITLE ■ N 1 wi STREET X155 z SEE*SHEET 2 :R l , _� ovs. No. SINEM N.C.E. No s73 5 W E STWA R C _..�� �.......�re o r i. No. -0023076 - DRIVE GFB. & ASSOCIATES, INC. 6809 INDIANA AVENUE SUITE 201 RIVERSIDE, CA. 92506 (714)781-0811 I" IRON PIPE W W CURV DAT CR ' 3 R= 35.00 L= 54.93' 12' 2. 30, w z ' T= 34.95' w - -d z a N to o ZL_.-A QUINTA H I G l_ I M I C.V.W.D. DRAWING APPROVAL �I Z STREET X155 z SEE*SHEET 2 :R l , _� ovs. No. SINEM N.C.E. No s73 5 W E STWA R C _..�� �.......�re o r i. No. -0023076 - DRIVE GFB. & ASSOCIATES, INC. 6809 INDIANA AVENUE SUITE 201 RIVERSIDE, CA. 92506 (714)781-0811 I" IRON PIPE W DAILY CONSTRUCTION REPORT GATE • / DAY 5 M S PROJECT �dd MI 147' C421717el CroSS�:J JOB NO. ZZ 7 WEATHER °sem • 1033 o su».�.t•^ o .»10 .•a� s .e y I CLIENT. TEMP. u n•olw• CONTRACTOR ^gyil� WINO rPROJECT MANAGER HUM , ... `0 AVERAGE FIELD FORCE Name of Contractor Nan -manual Manual Remarks VISITORS Time Representing Representinq Remarks l • • EQUIPMENT CONSTRUCTION IBM iiL 101-:010-M-112 MEW - r I i i a i / mum Me �IANWA / • / -- %t���i DISTRIBUTION: 1 Prot. Mqr. 2. Field Office J. File 4 Client Fisk Form 8.1 PAGE t OF PAGES AF% / I r .I /--111� / �C'r DAILY CONSTRUCTION REPORT (Continueuun onevu • PROJECTAC'14'^^— (0-- �^^�� ��'�SSsiJ�1/ REPORT NO. I" JOB N0. P 7iZ? DATE -7— 21 j —?Us CONSTRUCTION ACTIVITIES lContinued) �X, E M M.9 -,__ W Sfa1��4= %��/ iMill / '� t. — - /• .ate �c�� _ _ 20r W-41 m 6 d 1 ..� err, F L ol DISTRIBUTION: 1. Proi. Mgr. SHEET y0 y 2. Field Office 3. File 4. Client BY t TITLE Fisk Form 8-2 DAILY CONSTRUCTION REPORT PROJECT �dd �►5 �7F C h 2I CroSS�:J JOB NO. Z Z 7 7 CLIENT. CONTRACTOR I^/�iilli CO/J S'fYK-G "7i O PROJECT MANAGER R /C /IC • GATE DAY I S M0�1 w ITHI F 1 5 WEATHERc.... to N J7 SU W 70 110111% NV TEMP. Sau Nva" n.ow«o WINO HUMIDITY AVERAGE FIELD FORCE Name o1 Contractor Non -manual Manua Remarks VISITORS Time Representing Representing Remarks A/- EQUIPMENT AT THE SITE �r My r `a/'/ IJill lii�AMP EMMA' L1�r rr r � I , •� , JEJ DISTRIBUTION: 1 Prol• Mgr. 1. Field Office ]. File a Client Ffs1k Form 8-1 PAGE 1 OF /PAGES • � i�sifr��fr -:':PL -4A e?r? 5iNCL v ov v w --:�v J .1, ry be 'zt DAILY CONSTRUCTION REPORT GATE / • DAY s w s PROJECT m00% ` �f C'/ia rine CYDSSi:J Q JOB NO. Z 2 7 7 WEATHER 5.�Ca• un cn�. w i.,... S CLIENT. L� C{loo :sr,',' TEMP toll '135u 13010 you M CONTRACTOR 'ft'L Ti d WINOs ^'�^ ",ao PROJECT MANAGER 1� .'c /IC M e-4 d e HUMIDITY oX. ma", �Mwe L� AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks VISITORS Time Reoresentinq Represennnq Remarks DISTRIBUTION: 1 Prol. Mqr. PAGE 1 OPAGES Z. Fteid Office ]. File e Client BY TITLE Fist Form 6•1 �nb! � - o - \ - � �=� ' � p• Q-3�1��n � • Gum ?��I �------• zp-g 23, Al -- L ► I �� -tr? �1 i Sn'o ��' C('•7n�� •� -� oY 1 �f/1. c�� S i^ ®--- — -Zr c�? -';3y01 a4 ; -_ • z,3o �- � � a'S �5����%9rY3 9no1.�-�0�0 �Z—r�7�� 6� i �-t e'le /& / r ---7 e; ►v ovz•or-rte 5- j E1.r 5-r*(;;, 3 L f ry v -v -�) S b L i.: _L Ago - CZE?n °f�5 -�� �-,� �� Oji r-�►� _+ C� :, i �4 l'cl r r► - �{�� zt Dm CrV btu { ..._ %7 �Jl n Q/ (�' �%_ iI7�/ ^i `syr � ® ice/ � E +I I` � �,/� ✓ SM � �Ct �1S v / 5 ty -�+ �L Ski, -=f o ___ :1 ► f\Q d l� Cs L_ it`zt a- - N( o<1,r.1 41 it C7 N 7 .� � , m...Z n �l arc t -L .5 I . _ 1 i roc-- it Ta , L4c), C�, lil AID 7' Uig %% Tor ctj Go'zr�N►% �ZoLI_�,v(, NorL� �x�.1� Sv>3�2�n� cvt��ru = Lt S �.T���nr�I��o,�ay G 0/0 -� 6 /ti PLS c -c PrL t o 7O 73AS� WG &4 viivCG „R -�' en 1P j4! /tis7�z0Co. 73- 7-A Y -C CA) -E7 7 T JMJ � fr ���� � 2 �` _�J- Ta , L4c), C�, lil AID 7' Uig %% Tor ctj Go'zr�N►% �ZoLI_�,v(, NorL� �x�.1� Sv>3�2�n� cvt��ru = Lt S �.T���nr�I��o,�ay G 0/0 -� 6 /ti PLS c -c PrL t o 7O 73AS� WG &4 viivCG -�' � �i✓ rC.' YL �'l� %���Gf'L---�'�'[/ � fr ���� � 2 �` _�J- � ��l2pGC� t Ta , L4c), C�, lil AID 7' Uig %% Tor ctj Go'zr�N►% �ZoLI_�,v(, NorL� �x�.1� Sv>3�2�n� cvt��ru = Lt S �.T���nr�I��o,�ay G 0/0 -� 6 /ti PLS c -c PrL t o 7O 73AS� WG &4 viivCG • • EQUIPMENT DAILY CONSTRUCTION REPORT i 3 — cis - DATE CONSTRUCTION 5 M w s DAY PROJECT JOB NO. ZZ 7 WEATHER $;'�• c'`• u...•w�., s.•.. CLIENT. L� SCA oo iST17-7—TEMP. ro a �� IU eo io ,o as ns CONTRACTORWINO °i 444 -4113 PROJECT MANAGER HUMIDITY . AVERAGE FIELD FORCE MV Name of Contractor Non manual Manuai Remarkf 3 � t VISITORS Time Representing Reoresenthnq RemarKs v • • EQUIPMENT i CONSTRUCTION MV r —09 UWA12— � Irl DISTRIBUTION: 1 Prot. Mgr. 2. Field Office 3. File 4 Client Fisk Form 8.1 PAGE 1 OF PAGES gY TITLE��'� 0 is VISITORS Time Representing Representing Remancs DAILY CONSTRUCTION REPORT : PROJECT JOB NO. CLIENT.. CONTRACTOR PROJECT MANAGER • • Cro 00 / -b ,'-s + 1-., G DAILY CONSTRUCTION REPORT DATE DAY s nn w s > 5� Ct_ WEATHER TEMP. loll 4259 So /o ;o as MS T WINO so'. ,..o„ nom„ ftO I�So�✓ HUMIDITY o,. AVERAGE FIELD FORCE Nene of Contractor Non -manual Manual Remarks VISITORS T;me Representing Representing Remarsts EQUIPMENT AT THE SITE v CONSTRUCTION ACTIVITIES /li f DISTRIBUTION: 1. ProI. Mgr. PAGE 1 OF-4—PAGES 2. Field Office ]. File o Client Y I Imam TITLE 8 FWg Forret 9.1 • • AVERAGE FIELD FORCE Name of Contractor Non -manual Manual � „ Remsrrc. �/ (,A) M VISITORS Time Reoresentinq Representinq Remartt EQUIPMENT, DAILY CONSTRUCTION REPORT GATE • DAY PROJECT JOB NO. +� Z2 / WEATHER CLIENT. �� S L'if00 /s'ri C TEMP '0 33 175 or ros xs CONTRACTOR I^gy1- k- WINDMOMs' ° �"' n.oaw• °i� �O PROJECT MANAGER �G /ICd HUMIDITY • • AVERAGE FIELD FORCE Name of Contractor Non -manual Manual � „ Remsrrc. �/ (,A) M VISITORS Time Reoresentinq Representinq Remartt EQUIPMENT, MENEM= .. - -- .,fflF.� rrr� - M71 RPM wo a.. eff"R DISTRIBUTION: (Prot. Mqr. Z. Field Office ]. File 4 Client Fisk Form 8.1 PAGE 1 OF—�—PAGES .7 • AVERAGE FIELD FORCE Name of Contractor Nan -manual Mensual Reem r," VISITORS T;me Qepresentonq Representinq Remarrs EQUIPMENT DAILY CONSTRUCTION REPORT DATE — 7 • DAY 5 M w g �ms 4L CroS5$,; PROJECT JOB NO. ZZ 7 Ck.• u..•.�� M.,, s.•.. WEATHER CLIENT. L� /►00 �s '>+")'i � TEMP. 7 U Solo OWS new.CONTRACTOR E I f%l/ COn)S'7r�G'fid WINOPROJECT ""'"' 3 MANAGER 1� ! C /C P d HUMIDITY""°°" .7 • AVERAGE FIELD FORCE Name of Contractor Nan -manual Mensual Reem r," VISITORS T;me Qepresentonq Representinq Remarrs EQUIPMENT CONSTRUCTION DISTRIBUTION:. DISTRIBUTION: I Prot. Mqr. PAGE 1 OF__�_PAGES Z. Field Office 7. File 4 Client BY TITLE Ffsk Farm 8.1 • :5 - 0 0 AVERAGE FIELD FORCE Name of Contractor Nan-manuel Manual Remarks lne7 VISITORS Time Reoresenting Rearesentinq Remarks EQUIPMENT AT THE SITE Lo -4- Z4 L DAILY CONSTRUCTION REPORT �d 74 CONSTRUCTION ACTIVITIES DATE • DAY I" w1. / PROJECT JOB NO 77 -!$-� WEATHER —1 CLIENT. TEMP. la&% Kt0" 1 4250 Isola Il CONTRACTOR Grgvil tows fto w4NO 0 3 PROJECT MANAGER -- I-le— R, a A M e -.,I- d e - HUMIDITY 0 0 AVERAGE FIELD FORCE Name of Contractor Nan-manuel Manual Remarks lne7 VISITORS Time Reoresenting Rearesentinq Remarks EQUIPMENT AT THE SITE Lo -4- Z4 L �d 74 CONSTRUCTION ACTIVITIES Agri ;172 --D A DISTRIBUTION: I. Prot. Mqr. PAGE I OF --./—PAGES 2. Field Office 3. File 4 Client By TITLE Fisk Form 8-1 DAILY CONSTRUCTION REPORT DATE / OAS S M S PROJECT �dd ms C h 2I ej-&-v iJ JOB NO., Z Z WEATHER °sw Ck« Vw cw". • Yw.. Ste% oo �S r. r• a J2 su so 11014% Ns CLIENT. L� LL C TEMP. CONTRACTOR i,4,%i 71L Co.� 5 fN'K-G '7i O WIND s�° "'0" n••••4«•/J PROJECT MANAGER /� r rG A M P—ad e- HUMIo1TY 3 / • • AVERAGE FIELD FORCE Name of Contractor Non -manual Manual ,Q Remarks VISITORS Time Reoresentinq Reoresentinq Remarks EQUIPMENT / • CONSTRUCTION i i 2, pd - W, 95p, r DISTRIBUTION: 1. Prot. Mgr. 2. Field Office ]. File 4 Client Fisk Form 9.1 FF PAGE 1 OF 4 PAGES w M�- U O Q w DAILY CONSTRUCTION REPORT GATE • N � C CroSS.:� PROJECT JOB NO. ZZ % CLIENT. Z-, -5-1 A oo CONTRACTOR rf��J: 7� CDiJ S'frK•G �i 8 PROJECT MANAGER 7?,IGx DAY s w s WEATHER E Cl u ■�N.,, s..,,.. J7 sU SO r0 W as as TEMP. ,w Avows r10 WINO HUMIDITYMoe. 3 6 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks VISITORS Time Representing Reoresentnnq Remarks A111 - 2. Field Office 3. File o Client BY TITLEf Fisk Form 8-1 AVERAGE FIELD FORCE DAILY CONSTRUCTION REPORT Name of Contractor Non manual Manual Remarks -- 30 1-5 DATE 5 nn w 5 • F/tefr FA -6 DAY PROJECT 77 WEATHER S. - JOB NO. CLIENT. Li SL 100 /S ri' TEMP. to 32 3 su so to 110911 n CONTRACTOR rg,,,1 CD.�S YwG ♦D WIND Su„ "''" n.00,.«o °i Joa°°" G�AAe--Au PROJECT MANAGER f ofCIA Me-4-0�� HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks F/tefr FA -6 h�J . VISITORS Time Representing Representing Remarks G�AAe--Au EQUIPMENT AT THE SITE <- — CONSTRUCTION ACTIVITIES / 1 f• v WAS r air rom '00' ,K DISTRIBUTION: t. Prol. Mgr. �(, �j�F�^-t✓r d 2. Field Office p � 3. File / e Client BY ._ Fish Form 8.1 !t PAGE 1 OF_.Z—PAGES TITLES AVERAGE FIELD FORCE DAILY CONSTRUCTION REPORT Remarks VISITORS Time Representinq Representinq Remarks DATE S nn w 5 • DAY PaoJECT Z Z 77 a.o.t.,. �,.. ,,......, �..� 5..,... WEATHER S JOB N0. L CLIENT. � / SLi1 00 is ?' ri C TEMP ra �7 su so ro vols ns CONTRACTOR L WINO PROJECT MANAGER 1� �G /C !�'J P,.4 d HUMIDITY AVERAGE FIELD FORCE Name of Contractor G r 4^-7,Ye_ Co j6+r. Non manual Manual -:5- Remarks VISITORS Time Representinq Representinq Remarks DISTRIBUTION: 1. Prol. Mqr. PAGE 1 OF / PAGES 2. Field Office 3. File _ C Client BY TITLE Fisk Form 8•1 AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remark! VISITORS Time Representing Representing Remarks UISTHIOUTION: 1. Prot. Mgr. PAGE t OF __/ PAGES 2. Field Office J. File e Client BY TITLE Fids Form 8.1 DAILY CONSTRUCTION REPORT DATE . 5 nn TS • -// �dd m5 C DAY I h 2I CYOS$i;,) PROJECT 2 A y L / B.a Cie• Unw��.n bww WEATHER s n JOB NO. CLIENT. L >L%f 00 is '>+" 1'i ►° ]7 a su so ro loss TEMP ne CONTRACTOR r,#,V/ COiJ S'fr►,.-G 'fi WINO PROJECT MANAGER r �G /IC e4de- HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remark! VISITORS Time Representing Representing Remarks UISTHIOUTION: 1. Prot. Mgr. PAGE t OF __/ PAGES 2. Field Office J. File e Client BY TITLE Fids Form 8.1 DAILY CONSTRUCTION REPORT • �io�d �n5 i¢ C 2 G'rOSSi:� PROJECT JOB NO. Z 7 CLIENT. L��► oo CONTRACTOR r,4,Vi TLLe— Co.,,) S--fYK•G -7i'd . PROJECT MANAGER rG iK !�'I e -4 0(p - DATE DAY I 5 M w ITHI I S WEATHER s;;.'u.•." u. �..� s..,... ro 77 �� su TEMP. So ro roes x Sm••.aw n.oa. wo WIND O.r wrree.. HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual /1 Remarks VISITORS Time Representing Representinq Remartts .00 G '0Clj urairtroulrurC r. rrol• Mgr. _ PAGE 1 OF__4—PAGES 2. Field Office ]. File 4 Client BY TITLE �1�f Fisk Form 8-1 4v . " suayo p al'3 'C a3l110 Pla!3 'L Vs W,oi "d Q rn n'a`c ('O Q saieuwab 6uuuasaioay 6uuuasaiaay aui!l SdO11SIA L4 seuusay tenueyy Ienuew•uoN iosaeisuo0 to aweN 3Jk1O3 (31313 30VW3AV AlialwnH a p t+'2 �, H30VNdw 1:)3rOUd ONIM A' �'�"� S (�O'J ; N�� li01�tfHIN00 a,,,,,V ro,w r ,•oa, ,...s dw31 , y�.S �. se sem or os ns tr tt Ci ki3Hl`d3M Z 2 oN eor ..,,.,5 ,,.� ......� .. .�„8 !/U L(Ja fi! _57W i p u .03r0 kici Gl Ado / 0 S M S 9 31p0 lUOd3U NouonUISNOO AIIVC3 �• ,. 1 �• AVERAGE FIELD FORCE Name of Contrmor Non -manual Manuai Remarks 49r,4^2,1 - e— 2r � VISITORS Time Reoresentinq Representing Remarks vrer�.oa1 rv��. i. rrol. mqr. ' PAGE 1 OF Ei PAGES 2. Field Office ]. File 4 Client BY TITLE Fisk Form 8-1 DAILY CONSTRUCTION REPORT DATE -3 r �� • DAY 5 nn w 5 PROJECT 2 2 7 rl r1JOB WEATHERCLIENT.� NO. Lf OO /Yi TEMP. �oss MsCONTRACTOR i�,%i7� CO.) -5 --G 'fi WINOnPROJECT 0-- MANAGER G/C t�A- HUMIDITY —3`� AVERAGE FIELD FORCE Name of Contrmor Non -manual Manuai Remarks 49r,4^2,1 - e— 2r � VISITORS Time Reoresentinq Representing Remarks vrer�.oa1 rv��. i. rrol. mqr. ' PAGE 1 OF Ei PAGES 2. Field Office ]. File 4 Client BY TITLE Fisk Form 8-1 r IN ' PROJECT DAILY CONSTRUCTION REPORT (Continuimuii oneew REPORT NO. m J JOB NO. T Z Z 7 7 DATE CONSTRUCTION FAMA Ml� 01 RIM s /:1 "I WE I ✓ I DISTRIBUTION: 1. Proj. Mgr. 2. Field Office 3. File 4. Client Fisk Form 8.1 BY SHEET Z—z OF '2-- TITLE. TITLE IL AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks e-^) . VISITORS Time Representing Represennnq Remarks W/AK //V/, vw,r",ov „v,tr: i. rrol. mgr. PAGE 1 OF—L—FAULb 2. Field Office 3. File a Client BY TITLE Fisc Form 8.1 DAILY CONSTRUCTION REPORT DATE DAY 5 nn w g 7n5 � � h 2- I CYOS$i;J PROJECT�dd Z 2 a..,. C,.. ,,.....,, .,.. s. �.. WEATHER s JOB NO. CLIENT. OO /�S '>+" 1^i TEMP. to �� su so ,o ,o as ke AX' CONTRACTOR LL I^�^li 7� COQ S'fY�-G �i 8 WINO s""�°" n'°°"..° o'. M """b 211 PROJECT MANAGER rG /IC m P�-de- HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks e-^) . VISITORS Time Representing Represennnq Remarks W/AK //V/, vw,r",ov „v,tr: i. rrol. mgr. PAGE 1 OF—L—FAULb 2. Field Office 3. File a Client BY TITLE Fisc Form 8.1 AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks G r a..� .'- f e_ (�Oas -E r- �, rye`, f// 0� � 1, 1v,j 6 VISITORS Time Representing Representing Remarks 2. Field Office 3. File a Client 8Y TITLE Fisk Form 8.1 DAILY CONSTRUCTION REPORT GATE •DAY 5 " 5 � S 4� C a h�2 G'YOS$� iJ PROJECT Z / tIr C l' Uw tAI M�.n S N1w WEATHER s..� JOB N0. CLIENT. �%1 v0 /IS 'f y-,' L'. TEMP. ro �� � s so io toes Ms CONTRACTOR i �"'�^li L CDiJ S 'f Y w•G WINO s'11 ��^ n.o,.ltia 'f i 8 .7 o" ""'"'° PROJECT MANAGER �'G /IC !�'I P-4 at f— HUMIDITY AVERAGE FIELD FORCE Name of Contractor Non manual Manual Remarks G r a..� .'- f e_ (�Oas -E r- �, rye`, f// 0� � 1, 1v,j 6 VISITORS Time Representing Representing Remarks 2. Field Office 3. File a Client 8Y TITLE Fisk Form 8.1 r 1 •' f r 1 DAILY CONSTRUCTION REPORT (ContinudUUn anrru PROJECT Qd'�s�/C���N'�/ REPORT NO. JOB N0. / - Z� 7 7 - DATE CONSTRUCTION ACTIVITIES (Continued) I y / I I% / .♦ % / DISTRIBUTION] 1. Proi. Mgr. 2. Field Office 3. File 4. Client Fisk Form 8-2 SHEET 7'—OF Z"" - BY L�%✓�S TITLE '� REPORT OF FIELD COMPACTION TESTS OUR=F- W� /,J '/ c7: -77CLIENT: �A t 0 / TE r .. I �'�. PROJECT: '`� ..� GAUGE INFORMATION AND DAILY STANDARD CALIBRATION NUMBERS VARIATION. PEACENT,+f- GAUGE ADJUSTMENT �TARIA� ON FROM NUCLEAR COUNTS FROM SHENTS CALIBRATION TEST DEPTH, IN ELEVATION OF TEST GAUGE TYPE TAOXLER/CAMP8ELL� MOISTURE:.�J�r) MOISTURE: MOLSTURE MOLSZtJRE COMMENTS DENSITY: ' DENSITY: DENSITY: DENSITY. MOOEL NO- p L PROCTOR INFORMATION SOIL ID X VISUAL CLASSIFICATION OF SOIL L tJ a c_ MAX. DRY DENSITY, PCF OPTIMUM MOISTURE. % - 0 10 COMPACTION REQUIREMENTS,% w MOISTURE'* REQUIREMENTS,- GENERAL LOCATION: QUOTIENT/ PCF . SOIL ID NO. TEST DEPTH, IN ELEVATION OF TEST MOISTURE CONTENT, ^/, WET/DRY DENSITY, PCF PERCENT COMPACTION COMMENTS TEST NO. READING =D-.1 Lt, M- D- TECHNICIAN: MM' S: I - FILLMATERIAL " A- TEST RESULTS COMPLY WITH SPECIFICAT70N5 2. BACXFI L B -COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPEC1FICAT10NS• y �{ 3 - BASE COURSE C - RETEST OF PREVIOUS TEST / O /•I KA, 4 SUBBASE O - MOISTURE IN EXCESS OF SPECIFICATIONS 5 SOIL CEMENT E- MOISTURE BELOW SPECIFICATIONS 6 OTHER . . J � ^ 7 i M- D- M- D- TECHNICIAN: MM' S: I - FILLMATERIAL " A- TEST RESULTS COMPLY WITH SPECIFICAT70N5 2. BACXFI L B -COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPEC1FICAT10NS• y �{ 3 - BASE COURSE C - RETEST OF PREVIOUS TEST / O /•I KA, 4 SUBBASE O - MOISTURE IN EXCESS OF SPECIFICATIONS 5 SOIL CEMENT E- MOISTURE BELOW SPECIFICATIONS 6 OTHER . . J � ^ / i M- D- M- D- TECHNICIAN: MM' S: I - FILLMATERIAL " A- TEST RESULTS COMPLY WITH SPECIFICAT70N5 2. BACXFI L B -COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPEC1FICAT10NS• y �{ 3 - BASE COURSE C - RETEST OF PREVIOUS TEST / O /•I KA, 4 SUBBASE O - MOISTURE IN EXCESS OF SPECIFICATIONS 5 SOIL CEMENT E- MOISTURE BELOW SPECIFICATIONS 6 OTHER . . J � D- M- D- TECHNICIAN: MM' S: I - FILLMATERIAL " A- TEST RESULTS COMPLY WITH SPECIFICAT70N5 2. BACXFI L B -COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPEC1FICAT10NS• y �{ 3 - BASE COURSE C - RETEST OF PREVIOUS TEST / O /•I KA, 4 SUBBASE O - MOISTURE IN EXCESS OF SPECIFICATIONS 5 SOIL CEMENT E- MOISTURE BELOW SPECIFICATIONS 6 OTHER . . J � REPORT OF FIELD COMPACTION TESTS COMMk#TS: I FILL MA IERIAL A- TEST RESULTS COMPLY WITH SPECIFICATIOMS 2 BACRFLLL ' . B -COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPECIFICATIONS 3 BASE COURSE C - RETEST OF PREVIOUS TEST 4 SUBBASE OUR REPORT NO.: E l+c' ' �.! I7 4io Z -77 ("rc�/{Ir� tl E- MOISTURE BELOW SPECIFICATIONS ' CUENT: PROJECT:, �.�•C ,�,( 1 NUCLEAR GAUGE INFORMATION AND CALIBRATION DAILY STANDARD COUNTS CALIBRATION NUMBERS FROM SHENTS VARU►T10N, PERCENT,+f• GAUGE ADJUSTMENT LAST VARIATION FROM !� +i GAUGE TYPE: TAOXLER/CAMPBELL J "- MOISTURE MOISTURE MOISTURE MOISTURE: MODEL NO M(. DENSITY: 4;r So DENStiI: DENSITY: DENSITY: PROCTOR INfORMATION SOIL ID x VISUAL CLASSIFICATION OF SOIL MAX. DRY DENSITY, PCF OPTIMUM MOISTURE. Yo' \jc_ I i. o MOISTURE REQUIREMENTS, GENERAL LOCATION: COMPACTION REQUIREMENTS, % READING QUOTIENT/ PCF . SOIL ID NO. TEST DEPTH, IN ELEVATION OF TEST MOISTURE CONTENT, 7OENSCOMPACTION PERCENT COMMENTS TEST NO. t D- S�-� D- M- .� D- M- D - I fM- D- TECHNICIAN: COMMk#TS: I FILL MA IERIAL A- TEST RESULTS COMPLY WITH SPECIFICATIOMS 2 BACRFLLL ' . B -COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPECIFICATIONS 3 BASE COURSE C - RETEST OF PREVIOUS TEST 4 SUBBASE D - MOISTURE IN EXCESS OF SPECIFICATIONS 5 SOIL CEMENT E- MOISTURE BELOW SPECIFICATIONS ' 6 OTHER DAILY CONSTRUCTION REPORT DATE • -// _ DAY S M PQ* $ PROJECT�dd h 2I G'YDs$i %J Z ^ C4•• '"'ca, S..uw JOB N0. 2 / WEATHER s..n '\ s� G% oo .'s + Y,' TEMP. to 12 J25U so io ro a nb CLIENT. CONTRACTOR r^y -*— ('.DiJ S'fI*I�-G "fi 11 WIND s"" n.oawo PROJECT MANAGER �G /IC !I P -1 -de- HUMIDITY °i AVERAGE FIELD FORCE Name of Contractor Non -manual Manual Remarks Y-. VISITORS VISITORS Time Representing Representing Remarks i. Field Office --- 3. File / 4 Client.Jf pQ 8Y TITLE Fisk Form 8•1 0