this foam constitutes an-
•rmit CITY OF LA QUINTA
tencroachmentpe
rJ APPLICATION FOR PERMIT •'
L PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)•
For the construction of`pulilic or private curbs,„driveways, pavements, sidewalks, parking lots, sewers, water mains
and other, like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
k t �
` 4 '
Subdivision Improvement Permit — Class III
DATE: 1-6-9b, Minor Improvement Permit Class IV
11 +. y,LOCATION,OF CONSTRUCTION Washington Street & Avenida Ultimo
.T fi 1 �t�• r � ,
(Street address or Deicription of Location)
PURPOSE OF CONSTRUCTION ' Install power Conduits Sketch (attach construction plans if appropriate)
� r
`i DESCRIPTION OF CONSTRUCTION Install 24-617 conduits
across Washington St. t See attached conditions
See attached plane
DIMENSION OF INSTALLATION OR REMOVAL
SIZE,OF.'EXCAVATION, IF NEEDED 5” k'id i 8e desR from
n _-R W t- R/W an araivhinattam lit.
APPROXIMATE TIME WHEN WORK WILL BEGIN .1-17-96
APPROXIMATE TIME OF COMPLETION 2-13-96
N ESTIMATED CONSTRUCTION COST $ 58.000
s (Including removal of all obstruction°•materials, and debris, backfilling, com- ; {
,�,'O-pactlon and placing permanent resurfacing and/or -replacing improvements) i I
Inconsideration of the granting of this permit, the applicant hereby agrees to: - • r'�
••' Indemnify, defend and save'the City, its authorized agents, officers, representatives and employees, harmless from and against any and'all ,
• i >•�.t' ' penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. +
Notify the -Administrative Authority -;t least twenty-four (24) hours in advance of the time when work will be started.
Comply with,all applicable City Ordinances, the terms and conditions of the p rmit and all applicable rules and regulations of the'City;of
La Quinta and to pay for any additional replacement necessary as the result this work.'plL
Signature of Applicant or Agent
'� mpelcis3"Ta station District 81-600 Ave 58 Lit Quints, CA 92253 398-3$S4.'
'n• Name'of Applicant (please print) "" Business Address Telephone No.—
1.; Irby Power Constructors 100 W. Keystone Bromley, CA 92227 344-4678
Name of Contractor and Job Foreman Business Address Telephone No. "
16338 N/A
1 Contractor's,License No. r City Business License No.
t Liberty Mutual TBI -151-020527-225
Applicant's Insurance Company ' Policy Number `
!
3
>I•
FEES: Subdivision Improvement Permit — Class III
Public improvements: 3% of estimated construction costs Oro
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
/
�i Inspection Fee $J t
r 'Permit Fee
i
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
Received by `
Recorded by
$ -0-
Py; ..
.. t.
Date
PERMIT VALIDATION
PERMIT NO. 2417
DATE APPROVED '1"16-96
EXPIRATION DATE 2-29-96
DATE ISSU D 1— 96
By
Administrative Authority
TELEPHONE: (619) 564-2246
r, �
MPICO - .LA QUINTA, CALIFORNIA 92253 - (619) 777-7000
FAX (619) 777-7101
Jo. 2417
;ues this permit rider .allow IID to stockpile soil adjacent to
ite with the following conditions.
imum of 8' from the E.P.
;imum of 6' high.
covered with plastic material to prevent airborne dust.
letely removed and the area stabilized,by 2-7-96.
I force and effect.
ig this matter, please don't hesitate to contact myself or Steve
P.O. BOX 1504 - 'LA OUINTA, CALIFORNIA 92253 _��
.4
Witl1 Goon validation
v Mb form c2nn"utaa an
•naeaonmunr oefeRR CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENTI
For tae oanftfuebon of p xmm or Doran omba. 0
and onto iib Ouello rreftta ialwaven,erm ,nconn na � ImunerppOVE61 swwaft � fam
sem• woor nlailr
Pled APPROVED SUgONLy
GATE: • I — — q v-
Subdhiaion 1"Nt`a�m.nt Pafmtit —Gaal 111 ��
LocAnoN of coNsrRUCnoN 1 AS N I1�1 -t"n I �°` i�"•.._w""a ca. w
1ltrew aeenrta ar ^---- �.
pun LL
011 If
OECSCR1 ON OF CONSTRUCTION
OIMEb1510N OF INSTALLATI
E2� `w, l � QR R OVAL _—
SIZE OF EXCAVATION, IF NEEDED S
APP OXIMA TIME EN WORK WILL BEGIN
APPROXIMATE TIME OF COMM.MoN
ESTIMATED CONSTRUCTION COST=
(Inetudinq nmere' of
obaatfebon, fttftifpla, and debet. baetfiDyq, Dor+•
IaDnvd.r OlaGnq, pamgnamt , and/or tooladey ufbeorenewal
lbftft (atsNt 6WOOK enbn pIw if appmp nmi
pz .
' Den of tRe Qansiey of Otb Oefenm the applipnr fm Nov GWM tae
o� or low f,ami O Ole � 0= M ores w � naw Aa w
emote 0 a e�
Mwlh I mea „a rN wara tNeeneaae WNW tote comw «mesad p sm mamma r oareir or onarw
'�aRr w Ued tweatrre„r f2ai nerr r r°otr°r'
4201Ren wet Y smumda le Pad'Am �,d Md be q,sm
to OWan
wo e to err for am � eM Comm ane ockum at o
� of the oenwR NW M
^off �e • ate Ram of am aoefrwe tar w "mommem M me CKV of
Sionatun of or 2 e� p°/�
Name of Aoa,rant Iolsafe Oftfm) S?• 00 �a �(� — 7� p' •'p
X 2'gY e w , ec YsroNe T•�ea+en. Ndr
Name or Contnaor arm Job Fofdnen 0122com - 544 -.44 1
x' (i® 333 � �X � L , 1, 8uawo nddry w Tdeotwfr Na
Contnetort l,rOne Ne.
�r M 1 A-rt�t A t M► ems• uom. t*L
ADO+wAnt t inwrano GALL
FEES:
l.ladlt_LTY
SuOdmtion �mpfprtq„ t Penmtr —cur 111
Public impfavemenm 3%of of mated canttructkIn rats
Pune-WO-mum 3%at eaei mum mr
MIRor i minor fnent Pang, — Clao 1 V: Sae attaamad atltedule
immcvon Fee
PMtnn Fee
Pemalty
Cash Oaoee+t•Swettr Bond
if flowed
TOTAL
Reeetpt No.
S
Reoaned by Date
Room dad by -------
BPI - 151- 020 CP 7- 225-
Pbtkv Number *%,45 —9 i
-t- ■ r -t Po
PERMIT VALIDATION
PERMIIT NQ
GATE APPROVED
EXPIRATION DATE
OATS ISSUED
777-7075*
iELFPHONY1
E1815ibgUr, Adstitsysard��
w
The following General and Special Provisions are attached to and made a part of Permit No. V/ 7
GENERAL PROVISIONS
• r
The following shall always apply: .
ENROACHIIWNT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City,of La Quinta right of
way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to
secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fitted with smooth -faced street pads. Allmechanical outriggers shall be fitted with rubber street shoes to
protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing
pavement is scarred, spatted, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request
that these portions of road be -resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C.
surfacing plus appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the
City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified. 24 hours in advance of any traffic. detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and,
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes
necessary to remove or cut existing drainage structures, City of La Quints. shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP: • Any surplus material resulting from excavation and backfill operations shall be removed from the right
of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction.
Existing'gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed
prior to paving. Water tanker shall be used, as required', to sprinkle the job site to keep down dust conditions and shall be used
immediately after backfill.
DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall
be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING. STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles. In the event it is felt'by the permittee that he must close a street for
any length of time, permittee shall contact this'office to obtain the necessary permission.
SPECIAL PROVISIONS
/The )following shall apply when indicated:
Rol NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction.
2 UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way
authorized by permit, the permittee shall contact all concerned utility companies relative to the location. of existing
substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole
responsibility of the permittee.
UTILITY CLEARANCE: _(Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with inches of A.C. paving placed on inches of class _ aggregate subbase course having an "R"
value of not less than and in conformance with City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
1/4 inch to one foot (P).
65) GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by'
a licensed engineer.
R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. 'Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
RS DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (___, of class aggregate base.
�
Driveway construction shall conform to attached drawing.
(IR SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times.
RIO SOIL STERILIZER:. The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the
manufacturer's specifications.
R1 , COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
�' PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations,lany damage to pavement straight edges shall be corrected.
LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
BACKFELL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of'the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before. flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch'
consisting of 2' inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
(r2 % FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
STREET RESTREPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
RIA TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall bey
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications; Division of Highways, State of California, dated January 1973.
SPECIAL CONDITIONS --PERMIT NO. 2417
--= IMPERIAL IRRIGATION DISTRICT. ---
In addition to the standard permit conditions, the following shall apply: ,
1. All work shall be performed in accordance with the latest edition of the Standard Specifications
For Public Works Construction.
2. Permittee shall be responsible for providing continuous dust and erosion control. All disturbed
shoulders & work areas 'shall be permanently stabilized.
3. Streets shall be kept clean. They shall.be completely cleaned at the end of each working day and
more frequently if required.
4. . Contractor shall comply with the local noise ordinance. Operation and maintenance of equipment
within one half mile of human occupancy shall be. performed only during the following time
periods:
October 1st to. April 30: Monday -Friday 7:00 a.m. to 5:30p. m.
Saturday 8:00 a.m. to 5:00p. m.
May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00p. m.
Saturday 8:00 a.m. to 5:00p. m.
Work shall be prohibited_ on legal holidays including Sundays. Work is allowed on Saturday only
if special arrangements, including payment of overtime inspection fee, have been made two (2)
working days prior to. the desired Saturday.
5.' Permittee/contractor shall assume responsibility for repair of any pavement damage to any public
or private street and for any damage to other City streets or facilities as a result of work performed
under this permit.
6. Advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control, Handbook (WATCH Manual). It shall be the
per.mittee's responsibility to detour and barricade this site.
7. Street closures shall not be permitted. A minimum of one travel lane on paved surface shall be
maintained with flagmen at all times.
8. Prior to excavating, the permittee shall contact Underground Service Alert at 1(800) 422-4133.
1
Special Conditions - Permit No. 2417 Page I of 2 .
SPECIAL CONDITIONS ---PERMIT NO. 2417
continued
9. Should additional work, materials, or modifications'of the work be required in order to meet city
standards, safety requirements, signage requirements, or to fit actual field conditions, the work
shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at
no cost to the City of La Quinta.
10. All work shall be coordinated with the City's contractor and others working within the area as
directed by and to the satisfaction of the City Engineer.
11. All backfill and subgrade soil shall be compacted to 90% relative dry density, all backfill soil
within the top 2' of finish pavement surface shall be compacted to 95 % relative dry density, all
base material shall be compacted to 95% relative dry density.
12. All excavations at of near the travel way shall be backfilled and paved at the end of every work
day as directed by and to the satisfaction of the.City Engineer for the "Protection of the traveling.
public...
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, signs, striping etc. shall
be replaced to its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Permanent pavement replacement section shall be one inch greater than. existing, over controlled
density fill (CDF). Class II base shall not be allowed as backfill in the roadway section.
16. Permanent pavement shallbe placed no later than 5 days after the temporary asphalt is placed, or
as directed by and to the satisfaction of the City Engineer.
17. If thework is to be performed by forces other than that of the utility company the contracting
company shall be required to apply for an additional encroachment permit and .pay the appropriate
fee.
18. No work shall be allowed within the travel way until the written approval to do so is obtained
from the Public Works Department.
Special Conditions - Permit No. 2417 Page 2 of 2
v1
` >h
78-495 CALLE TAMPICO — LA QUINTA, CALIFORNIA 92253 = • (619) 777-7000
FAX (619) 777-7101
January. 18, 1996
Imperial Irrigation District
81-600 Ave 58
La Quinta, CA 92253
Attn: • H. Frank Crain
Re: Encroachment Permit. No. 2417
Dear Mr. Crain:
The City of La Quinta hereby issues this permit rider to nullify condition #18 of permit #2417. The traffic
control plan has been finalized therefore; IID may'proceed with work in the travel way. ,
All other conditions remain in full force and effect.
If you have any questions regarding this matter, please contact me at (619) 777-7075.
Very truly yours,
Hector Guzman _
Assistant Engineer .
hg
cc: _Mike, Hudson, C.L.Q.
_ File.. Permit No. 2417
MAILING ADDRESS - P.O. BOX 1504 LA OUINTA, CALIFORNIA 922530
t:7
4
78-495 CALLE TAMPICO - LA GIUINTA, CALIFORNIA 92253 (619) 777-7000
FAX (619) 777-7101
January 19, 1996
IMPERIAL IRRIGATION DISTRICT
Post Office Box 1080
81-600 Avenue 58
La Quinta, CA 92253
Attn- _ Frank Crain
Re: Encroachment Permit #2417
Gentlemen:
TELECOPIER: 391-5999
This letter is issued pursuant to your request to perform asphalt saw cutting operations on Sunday,
January 21, 1996.
Whereas traffic control for the subject saw cutting operation involves single lane passage through
the construction area requiring flagmen at each end of a single lane to detain traffic for alternating
short intervals while .traffic from the opposing. direction is using the single traffic lane, it is
recommended- this operation be performed on a Sunday morning when traffic volume is at its
lowest point in a given week during daylight hours.
The permittee for the subject permit is hereby authorized to perform asphalt saw cutting operations
in the traffic lanes and adjoining paved area utilizing a single lane through the construction area
provided all traffic control signs required by the traffic control plan for this permit are in place,
including "flagmen ahead" signs, and two flagmen actively control the traffic. The saw cutting
work shall be performed between the hours of 8:00 am and 11:30 am. on Sunday, January 21,
1995.
If you have questions regarding this matter, please contact me, or- Steve Speer, at (619) 777-7075..
Sincerely,'.
Thomas P. Genovese
City Manager
DMC:SS
cc: David Cosper, Public Works Director A
MAILING ADDRESS. - P.O. BOX 1504 LA QUINTA; CALIFORNIA 92253®��
A
TRANSMISSION VERIFICATION REPORT
TIME: 01/1911996 10:44
NAME: CITY OF LA QUINTA
FAX 6197777155
TEL 6197777155
DATE, TIME
01/19 10:43
FAX NO./NAME
93915999
N
.3 �
PAGES}
00:00:4
RESULT
OK .
MODE
STANDARD
6 k n
:_r,
T-itT 4 4 Qum&
MEMORANDUM
TO: David M. Cosper
Public Works Dire or
FROM: Steve Speer '
Senior Engine
DATE: January 18, 1996
RE: IID - Washington Street Trench South of Evac Channel Bridge
IID has requested permission to work on Sunday morning to perform the asphalt saw cutting for
the proposed trench work. Since the saw cutting operation is a relatively fast moving operation
that crosses all traffic lanes; IID desires to perform this operation utilizing a single lane passage
through the construction zone because it is simpler to implement and adjust as the saw cutting
work progresses.
If single lane passage is to be utilized, it is recommended that it be implemented during a time
frame when traffic volume is at is lowest point during daylight hours, which occurs on Sunday
mornings.
LQMC Section 6.08.050 authorizes exceptions to the code restricted work hours if unusual or
compelling circumstances impact the nature of the work. The authorization may be issued by the
City Manager or his designee. I have prepared the authorization letter for your signature with a
copy to the City Manager.
Meeting with the City of La Quinta 1-12-96
Removal of Overhead along Washington
Design Distribution
City Permit to cut Washington
Cut and conduit - Washington
Conduit: Vault to Ralph's
Conduit: Obispo to customers
Change out Tx on Obispo
Vault on w/s Washington
Pull Wire: Obispo to customers
Install switch / wire - Tie N-12 to N-13
Pull wire: City Hall to Sub. (N-11)
Pull wire: Ralph's to Sub. (N-13)
Remove overhead: City Hall to Sub.
Remove overhead: Ralph's to Washington
Rebuild Substation to provide capacity for
continued growth in the City of La_Quinta.
C.ILAOUNTAWAR4AMj B
Footage Approx. COSTS
$/Ft. IID CITY
$ 1,800
I OF
$ 2,550,000
$ 100
$ 2,133 (Traffic Control)
.$43,80 0
$ 2;200
$ 2,133 (Dueto lane
$ 700 Closures)
$ 2,782,591 $ 51,066
Pmded 111286 1:28 PM TFL
$
88,682
438
$100.00
550
$ 4.00
$
1,500
$
20,000
550
$ 2.51
$
1,381-
450
$ 14.00
$
6,300
2100
$ 25.34
$
53,214
2100
$ 25.34
$
53,214
2100
$ 10.00
$
21,000
550
$ 10.00
$
5,500
I OF
$ 2,550,000
$ 100
$ 2,133 (Traffic Control)
.$43,80 0
$ 2;200
$ 2,133 (Dueto lane
$ 700 Closures)
$ 2,782,591 $ 51,066
Pmded 111286 1:28 PM TFL
Washington Conduit Crossing Value Engineering Study
Option #1: Open cut Washington Street (installing steel plates over the cut at night). Estimate 9 Days
1) Keep Washington Street open, traffic flowing in one direction with flagmen directing traffic.
2 Work hours 9:00 AM to 3:30 PM due to traffic volume on Washington Street. (not acceptable for safe )
3) IID or contractor to cut and repair retaining wall.
Option #2: Jack and bore under Washington Street . Ayala Boring - Option A, Utility Boring, Inc. - Option B
1) Work hours 7:00 AM to 5:30 PM maximum (City of La Quinta restriction).
2) IID (or contractor) to construct concrete and steel "I" -beam "backstops" required for jacks. Backstops to
consist of four (4) "I" -beams set in concrete ata 20 foot depth with two (2) exposed at three (3) feet, and
two (2) exposed at one (1) foot. Two (2) additional beams welded front to back creating a "U" pocket.
3) Two (2) - 42" steel casings required, each containing 12 - 6" conduits.
4) Six to eight sack grout mix required for flow.
5) IID to provide conduit and spacers.
6) IID (or contractor) to cut and repair retaining wall.
Option #3: Open cut Washington Street (complete closure of street). Estimate 6 Days
1) Will allow crews to work full eight (8) hour day.
2) IID (or contractor) to cut and repair retaining wall.
Option #1 Option #2A Option #2B Option #3
Traffic control signs @ $237 per day $ 2,133 $ - $ - $ 1,422
Conduit, 6" schedule 40 @ $1.65/ft. x 3,000' $ 4,950 $ 4,950 $ 4,950 $ 4,950
Cut window in wall 2�Mt
6,560 $ 65600:::; 560 $ 6,560
cut .. .
Wa ....
shin:::;::::>
Pton
Street •-
Lab:::
9 Labor %'& M
Y
2 Flagmen 9 days $ 11,808 $ 9,184
S acers for open cut $ 4,026 $ 4,026
Plating @ $600.00 per day $ 5,400
Hyd. jacks @ $150.00 per day $ 1,350
Cn
on
struc
Crete/
I bea
ackst
P (
q
w red
Installation - IRBY crew - 3 days each 6 days $ 19,680 $ 19,680
Removal -IRBY crew - 2 days each 4 days $ 13,120 $ 13,120
Material: "I' -beams, 8 x 23' each @ $25/ft. $ 4,600 $ 4,600
"I" -beams, 4 x 12' each @ $25/foot $ 1,200 $ 1,200
Concrete, 6yd/beam x 8 beams x $60.00 $ 2,880 $ 2,880
Rebar Cages $800 each $ 6,400 $ 6,400
Cut oversize hole in wall due to two casings 1 day $ 3,280 $ 3,280
Additional vault required on west side of Washington due to $ 22,050 $ 22,050
four (4) foot separation required between casings.
Spacers for conduit in casings $ 9,974 q9.
AYALA BORING, $490/ft. x 2 casings x 125' $ 122,500
includes casing, conduit placement
and grouting.
UTILITY BORING INC., $285/ft. x 2 casings x 125' $ 64,500
includes boring and grout only
IRBY crew to place conduit 3 days
Open cut Washington Street - Labor & Mat. 6 days
$ 19,680
2 Flagmen
6 days $ 7,872
OPTION TOTALS
$ 65,747 $ 217,194 $ 169,034 I$54,594
C..000INTA1WASHCROSAS 1 of t
Up0abd 111288 10:18 AM TFL
,TEES: :PLATED, AND THE WORK SITE LEFT IN
JOB # 5005830 SHEET 6 OF 7
-
�vE1,,Q
IMPERIAL IRRIGATION DISTRICT
IMPERIAL, CA. -
POWER DIVISION
Itil
WATER-
POWER
MARSHALL SUBSTATION -
ADVANCED WARNING SIGN PLAN
WASHINGTON STREET CROSSING
DATE: REV. BY:
DESIGN: F.CRAiN IPLANNED
DRAWN:
DATE: 12/18/95
CHECKED BY: APPROVED: :- -
'i
r.
10 REMOVE, STOKE, AND RESET (AT SAME LOCATIONS) _
SCR 28 CA RSONITE DELINEATORS,R7 SIGN, TYPE N-4
MARKER, AND BREAKAWAY.POST.
OFLASHING BARRICADES AROUND. TRENCH AREA
DURING NON -WORK HOURS.
UNDER
GR UND-
SERVICE ALERT
OFF SOUTHERN CALIFORNIA
Call: TOLL FREE
1 00
4-22-4133
TWO WORKING DAYS BEFORE YOU DIG
,,►QE�,9�
IMPERIAL IRRIGATION DISTRICT
IMPERIAL, CA.
POWER DIVISION
'
WATER
POWER
UNDERGROUND DISTRIBUTION
for
JOBSITE TRAFFIC CONTROL
WASHINGTON STREET CROSSING
DATE: REV. BY:
F.0 R
DESIGN. AIN IPLANNED
DRAWN: R.Z.R.
DATE: 11-08-95
CHECKED BY: APPROVED:
inn
i
i
i CE •
1 .._
I
CITY EXCINEER
IRS*
I
MM CONDUIT 1
m MOM
422-4133 ml
M mill
�►t i
i
I
El
®®®
_em.
l
IMPERIAL IRRIGATION DISTRICT
IMPERIAL, CA.
COACI M VALLEY DMSION
UNDERGROUND PRIMARY
WASHINGTON STREET CROSSING
R TABOM HrXu CUT
YA,ER
pwa
1 DATE.
ESI MND
DRAW
DATE:
OJECKED BY: APPROVED: