Loading...
2440With proper validation ' ,,this form coristitu'tes an encroachment permit ► .. CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS- CONSTRUCTION (ENCROACHMENT) r• For wth construction oaf/ or .private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS r f • :vy. Subdivision Improvement Permit — Class I I I DATE: 3[7/96r Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Canterra Drive, Canterra Circle J,t ~ Lote't20•-54. Tract 23913 (Street address or Description of Location) PURPOSE OF CONSTRUCTION Finish ttradinstSketch (attach co struction plans if appropriate) t'As shown ori th® 'DESCRIPTION OF CONSTRUCTION - 'Aa'aroved Gradinix Plan DIMENSION OF. INSTALLATION OR REMOVAL j �.�;,SIZE 017EXCAVATION, IF NEEDED "APPROXIMATE TIME WHEN WORK WILL BEGIN 3/9/96 � See attached conditions Lam• 1 i' MAR 1 S 1996+ APPROXIMATE TIME OF'COMPLETION "ESTIMATED CONSTRUCTION COST $ (Including removal of all obstructioiT materials, and debris, backfilling, com- paction andlacin p g permanent resurfacing -and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby�agrees,to: Indemnify, -defend and save the City, its authorized ages, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting., from claims or court action and arising out of any accident, loss or damage to persons or'{property happening or occurring as a proximate�"resultlofd"an work undertaken under the permit ranted ' • Y p g pursuant to this application. s Notify the Administrative Authority at least twenty-four (24) hours Iin advance of the time when work,will be started: }� Comply with all applicable City Ordinances, the terms and conditions of the permit -and -all applicable rules and regulations of the City of La Quinta and,to pay foriany additional replacement necessary as the result of this work. , ' Signature of Applicant or Agent Roster 9neallenberaet 74-350 Alessandro, A-1 Palm Desert„ CA' (619) 777-7766 , Name of Applicant (please print) ;. Business Address I %_r Telephone No. «' Name of Contractor and Job Foreman Business Address Telephone No. 488234 - 1858 Q ' Contractor's License No wr , , `' " City Business License No. All) it e%GrenAch_' '1' " +> fX.. ` 2131634 Applicant's Insurance Company • Policy Number t FEES: Subdivision Improvement Permit — Class 111 4 Public improvements: 3% of estimated construction costs _ Private improvements: 3% of estimated construction costs `f Mirior Improvement Permit —'Class IV: See attached schedule Inspection Fee $ 800. Permit' Fee 10. ' r Penalty Cash Deposit -Surety Bond if required t TOTAL: $ 810. Receipt No. Received by R Date Recorded by M PERMIT VALIDATION PERMIT NO. 2440 DATE APPROVED 3/7/96 EXPIRATION DATE q1161q& DATE SS ED Bv-�w Administrative Authority TELEPHONE: (619) 564t2246c 777-7075 t , x.ivt ,If Z0'a 7di01 '�e�MIMtYts9i Arww&Vr aiOMMOtOMW AQ sot=YRvc ai�o �ouvYtno '10M."Wdw avuvQMA Aws"d 92C. t . .w s.WA6tl �'r*�•�o wa 01 a,, ba"w --- ag `v mumIslow' �enwsa eapaa...s -^t a1- END wMawomnopumaas Qt fasry w�c, III as-- 'wrr'w�y !►.L»��t,f1 �p •�.WD�a..wn.s�ewe 9rw tom, 0)4) LL— LLL .a w+tallf1 i d o 0" am" co 0*0w x A r 40 air so amwwft so aft mOsm t� �...~. a' wow IS, rw .,� SAW— — o ••$ a sR 0. n w oft w w: tw. 40 raw" • am &mwi � wa w tawofs �_�+aw 08, '"e"ne001 VAIR s +wee avwwworft to &soft .. +ft..w .. rft,w slow" or. ra►w � a as An a tee. Iwo . �.�sda w w�ror� M ww ON "NOD 00 ty #AMU" �ftt� aw trod .E s ft� wi{ trflfMt a r U04IMS fit~ ��I� �� eaft�ma 4 •00 0 rM mea ets •� Mb* Aftft Nno f tip �ftr�a ob �ttlR` so IS rt knees# now fatl�+eay MlfYprefA 8�p M. Ni®f� sMR'eple maf Vhmmag fA ettitnr�t blpttwul I AM v&A3f f",y Qi t! UAD do SML i1t711 naAfw 'ti r e Mat ntfA tuft 43W ML l&VM"N&v QOM dt'MOla1vA; i9 78ti iA01�Y t�0 '1'1:1►21N1 !0 =mom d rircv-v twM�app���� �ildt� •s1 M �ttp �a4Si,� Ilk" -IWU.L is -oz MEMNON&^ eSb'P-4F �•toe0 L . ��su�'g�dM 1to�w� w� wmatwoD �, ffflfftla�q�a, A� � �+ w� tat ��� �ttuoifte� tafwyte 1a.es ..awe re ,,,� a , � AMA 1a1�4iO1i��N31 kOtL'1f!!lL�ttO� e71lI�W1 �i78f1� Ld1Y�d tlOd filOtlY�ilddV ��r►rro n sc AM LW.a tawwtaa.ftu •�•atsw•.ta.y,yry, 20 SSU '8 Z I30�i3SNSI-13NS 63000 1 M : Z L 9662-TO-6bW r J E 3 The following General and Special Provisions are attached to and made a part of Permit No. 7 /_/J GENERAL PROVISIONS The following shall always apply: ENROACHIMIENf ON PRIVATE. PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these, portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified. 24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to.paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING ST'REET'S: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. IIMM CLEARANCE: (Substructures), Prior to making any excavation within the City of La Quinta right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. [T MM *CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEl UM WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class _ aggregate subbase course having an "R' value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of 1/4 inch to one foot (17. GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property . line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on ( ) of class'.aggregate base Driveway construction shall conform to attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL STERILIZEEL• The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the manufacturer's specifications. COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quints projects. <Lf12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEAIENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIlNIT OF EXCAVATIONS: Excavations shall be limited to .1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. RIS BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three. feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TEST'S: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting'of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 2440 --- SNELLENBERGER/SIMON CONST. --- In addition to the standard permit conditions, the following shall apply: 1. All work shallbe performed in accordance with the latest edition of the "Standard Specifications For Public Works Construction". No fill shall be placed which will cover or obscure asphalt concrete, petroleum product spillage, or other non-native materials. 2. Permittee shall furnish the name(s) and phone number(s) of the individual(s) responsible for maintaining dust control after hours, weekends, holidays, etc. 3. All streets shall be kept clean of all trackage or spillage from vehicles using this site. The roads shall be completely cleaned at the end of each work day, if necessary, and more frequently if required. 4. Construction operations and maintenance of equipment within one half mile of human occupancy shall be performed only during the following time'periods: October 1 st to April 30: .'Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a. in. Co 5:00 p. in. May 1st to September 30: Monday -Friday '6:00 a.m. to 7:00 p.m., Saturday 8:00 a.m. to 5:00 p.m. Work is prohibited on Sundays and all holidays observed by the City of La Quinta. Work is allowed on Saturdays only if special arrangements, including payment of overtime inspection fee, have been made two (2) working days prior to the desiied Saturday. 5. Permittee is responsible for repair of any pavement damage or other damage to access roads and other public facilities. 7. Should additional work or modifications be required in order to meet established City Standards or in order to fit field conditions, the work shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 8:. It is the permittee's responsibility to comply with the California Regional Water Quality Control Board's National Pollutant Discharge Elimination System (NPDES). 9. Any on* site haul road shall be effectively destroyed at the conclusion of the work to prevent use by unauthorized vehicles. - Special Conditions - Permit No. 2440 Page 1 of 2 SPECIAL CONDITIONS - PERMIT NO. 2440 continued SNELLENBERGER/SIMON CONST. 10. Permittee/contractor shall install- stop signs to stop construction traffic prior to entering any street from the construction site. 11. If buried remains are encountered during development, a qualified archaeologist shall be contacted immediately and appropriate. measures shall be taken. 12. All grading shall be performed per the soils report. 13. It is the permittee/contractor's responsibility to provide continuous dust control while the grading is being performed, or at any other time as deemed necessary by the City Engineer. Permittee shall provide soil stabilization on the entire site per the approved dust control plan immediately after completing the operation. 14. Street closures shall not be permitted at any time. A minimum of one lane on paved surface shall be maintained at all times with flagmen at all times per CALTRANS standards or the WATCH (work area traffic .control handbook). 15. All. excavations at of near the travel way shall be backfilled at the end of each work day for the protection of the traveling public. No trenches shall be allowed to remain open overnight. 16. Permittee/contractor shall comply with all requirements of the Community -Development Department related to but not limited to Archaeology/Paleontology Etc. . Special Conditions = Permit No. 2440. Page 2 of 2 Medium -Large Scale Construction/Demolition Projects than 5 acres, Fugitive Du tter (PM10) Mitigation Plan Date: -Jurisdiction: Project File #: Tri 2.291, Part 1 - Project Information oce 94-003 Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation. Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: Address: b ; . CPA . G Zz14Z Day phone number: (,,Iq_-1-1-1}-I1co(P Emergency phone number:_- ,,.,�- _ Grading contractor (Contact Person): �a;�Es F..S,�.�c,,; C.c• �5:.� ��5�� Address: Q.e. 3e: 099 c.. I ;tet , , CN 92Zaz Day phone number: Glq '-x_5399 Emergency phone number--< - Construction site street address: Construction site location: (Please include an &5x 11 location map) Construction site assessor's parcel number ('Fact #): -rr A 2�i 3 TS Parcel (Tract) size: -2 3 Acres or �.3^�9 Square feet Anticipated date of physical project initiation: Anticipated date of project completion: Anticipated costs for dust suppression: $'� (Attachment B - Must also be completed and mWled tot the appropriate address when construction activities have been completed) 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. Earthwork Information (Acreage/Cubic Yard; Project Area: Total Disturbed Surface Area: Cut: —p Fills Import: �. Export: �-- Phasing of Earthwork: Dam Date Phase I Grading (Acreage): From: 3_A4=q� To: y g(P' i < Phase II Grading(Acreage): From: To: Phase III Grading(Acreage): From: To: Phase IV Grading(Acreage):. From: To: (Attach additional' information df necessary) Part 2 - Ful'itiv_e Dust Control Action From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the corresponding letter beneath the following sources. In addition, please indicate. at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in -the Rough .Grading (RG) column. After, indicating what measures are to be implemented, complete the 'Details" section by. describing how and when the measures are to be implemented. Source . Details (e:e., frequency of application, number and type of dust control implements No. ' RG FG FC etc. Please be as specific as possible) - -. IZS A OWti� 1TS OaJ.J l��_ � P -l: 'Lu � 'i1i>✓ �.1A�L- T'tk�i_1L. . FIN ' �L —7L TAcL Dr- (Use copies of this page if additional space is needed) Source Details (e.gfreauencv of application number and tune of dust control Implements. No. RG FG f etc. Please be as specific as possible) aes—S, T im i G ►�c�. �2 � ..�. QS !>. Ste.S c e ti v3 cam— -� �: � �-o ►.a c,: a -p, i til '�'P(L � _ — — — z•t��WT � 3D P �A�{ ('-�Q_ pTeZ� �F � � I O �Iv Dc►�!S G,R�.� .} � c�.�S u,.�n �. Ct:NZT2� cyto N P.� i ►a> ' I .t ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the. sources of fugitive dust which are intended for emission control under the- City's dust control ordinance. The two right columns contain an inventory.and description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Source ' Control Measures Comments (1) Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement will sincrease the moisture content thereby moving increasing stability of material o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown . material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed %there vehicles exit unpaved areas onto paved areas o System can be adjusted to spray et3tire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available Sour a Control Measures (2) Unpaved (I) Reduce speed limits Roads (Cont'd) (J) Reduce vehicle trips Comments o 15 mile per hour ma)amum o Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent -------------------------:-------- ----------------=--------------------------------------------------------------------------------------- - (3) Storage (K) Wind sheltering o Choices include silos or enclosures Piles o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity (L) Wet suppression o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression. o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings ---------------------------------------------------------------------------------------------------------------------------------- (4) Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved Road areas Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping orwater flushing may be used (R) Cover haul vehicles o Entire. surface area �hould be covered once vehicle is full (5) Disturbed (S) Chemical stabilization :o Vendors can supply information on methods for application and Areas/ required concentrations Inactive Construction Sites (T) Watering o Would require frequent applications unless a crust ' can be developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount'of wind blown material leaving a site o Should be used in conjunction with other measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant, native vegetation- is. encouraged ATTACHMENT B - COST INFORMATION Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres)' Fugitive Dust (PM10) Mitigation Plan Date: Jurisdiction: 44a v71 Project File #: 7;2 23913 Project proponent: Ria � A=oc. , I t,1L. . Address: --743SD p..soA�, Pv.v.. D=am- �T, CA• �Zz�o Day phone number:,��q-�-1-]- ��cpCo Emergency phone number: In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: ppp`�cp�e..� or �LarOr� 'S'tl�;ct� , �cS-S SPAa+c�eaS As .Jex:!->M . Chemical stabilization: Wind fencing: Covering haul vehicles: t;,;. k,, P�2; ez E:,k Pc. Q_ Wheel washers: > ,,_ s Street sweeping: %AJ,-nA a � Paving: Wind sheltering: Coverings: Vegetation reestablishment: g .Alter project completion these records shall t7e transmurea ro uie t-qy where uie grading/demolition permit was attained and to the Coachella Dalley Association of. Governments (CVA G) at the address provided below. PM10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and. 403.1. - Part 3 - Agreement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of La Quinta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this project. I also agree to complete the record-keeping requirements included herein as Attachment B. once the project has been completed. re of Owner or AuthoriXd Representative I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and -the owner has authorized the implementation of all its provisions throughout project buildout. i nature of Urading Contractor or Authorized.Representative ate (If not the same as above) 3e 32 31 30 28 28 2T 28 . 3e aT 3e 35 34 � . ' CANTERRA CIRCLE � 2S ` a 40 CANTERRA DRIVE 54 20 21 • 22 23 21 40 S3 SS � 1%• 41 48 ' e so y °•� > S2 S8 s1% 42 a0 4T 1 18 w sl IB IT iS 43 4e • ,��. to CIRCLE L p� 100 LATIGO s8 11 O 12 ' H (��' 13 02 at so S8 OGO� 11 no OCOTILLO DRIVE 111 108 ( ` 83 84 as ee 87 8B 88 OIF, 112 Np 0 8 lor to. - I00 NUEVO DRIVE 9� T a To 113 e 73 2 ARBOLA CIRCLE To IDS 114 �9i` F 74 .. _ TT T8 04 Te. Ts /eo Rs 103 j Plan WOK118 L S P (a n 1 SOLD / / 102 0 Y x` Plan 2 Pla� / P l a n 2 LADERA DRIVE -� lot too eo LADERA DRIVE/���• Plan* 3 ,� SOLD Plan 4 MILES AVENUE 7 For City Use Only Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved C _ Conditionally approved (Conditions specified below) Denied (Explanation attached) v Signature of City Representative (Date) The following conditions of approval have been added to the Plan by staff in order to ensure an adequate level of fugitive dust controC S", f 1 (Attach additional information if necessary) I have read the above conditions of the Fugitive Dust (PM 10) Mitigation Plan_and I agree to implement of all provisions at the concentrations and.fr.equencies identinea. Signature ot Owner or Authorized Representative ate CONDITIONS FOR FDCP APPLICATION: TRACT 23913,, LOTS 20-55; 63-69 ON OCOTILLO, MILAGO AND CANTERRA ROGER SNELLENBERGER AND ASSOCIATES (RSA INC.) Applicant shall comply with all control measures as set forth in the approved FDCP application, .which shall include the following additional measure's. 2: The full amount of security furnished for the approved FDCP ($4,000.00) shall be available to .the City for any measure(s) deemed. necessary by the City to achieve adequate dust control, whether or not such additional measures are included by the applicant for this application. 3. Applicant shall .submit copies of all records/invoices related to cost accounting for the dust control measures assumed during grading construction. Said records shall be submitted within .30 days' after completion of all dust control measures as. outlined in the plan, including any measures made part of the plan as a condition to its approval. Security may be withheld pending submittal of this information. All such, invoices shall be provided, • along with the required completion of the PM10 Program Report Form, which can be obtained from the Public Works or Community Development Departments. 4. Track -out or other accumulations of soil material(s) shall be prevented onto any paved public streets outside,of the areas proposed for grading. Any construction access -and egress ways to paved areas shall be improved with pavement, aggregate base course or other similar method, for a distance of 120' from the pavement edge in order to minimize track -out onto paved areas. Any track -out or other accumulation of soil material(s) onto paved areas, whether public or private, shall be wet -swept or water flushed by the end of the work day, and shall be kept damp during construction operation hours until so removed. 5. Any unpaved construction access ways and approved travel ways within the site shall be kept watered down and compacted to retain moisture content during all construction traffic/activity, including building construction. Road lengths shall be watered each day, prior to any traffic activity and at the end of the day after all activity has ceased. All track -out shall be removed as per Condition #4. 6. No import or export"of soils is proposed as part of the grading permit. Any stockpiled soil on-site shall either be stabilized, covered or watered down at sufficient intervals in order to maintain a sufficient moisture content at all times. , 7. Any on-site employee parking areas shall be properly stabilized to accommodate such traffic activity. If on-site roadways are paved prior to any construction activities commencing, or currently exist, then construction parking shall be limited to those paved areas. '8. Disturbed but inactive development areas proposed for watering only shall be watered daily in conjunction with watering of access roads and developing areas. If the soil composition isnot conducive to formation of a hardened surface, an appropriate chemical binder'shall be applied'as a remedial measure. The City may release a portion of the bonded amount to the applicant for such work. Adequacy of all proposed -and conditional stabilization measures shall.be determined by the. assigned grading inspector; 9. All stabilized soil areas where grading, construction or other land disturbance will, not occur within 30 days'shall be staked, posted. or otherwise restricted in order to prevent any vehicular access onto or over those reas. All areas where. any such land disturbance activities occur shall be stabilized no later than four days after completion of the activity, in. accordance with the provisions and conditions for this. dust control.plan approval. 10. Enforcement of these conditions shall be at the discretion of the assigned grading, inspector, who shall monitor and field verify that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities and other aspects of this FDCP may be made by the inspector, _at his/her discretion, in order to assure compliance: r '. 4 MEMORANDUM Saundra Juhola, Admin. Services Director Hector Guzman, Assistant Engineer JO David Cosper, Public Works Director/City Engineer April 8, 1996 T: Tract 23913 - Quinterra Toper of the subject project has provided the City with a Performance Bond (#415864S) ount of $4,000. The bond is security for the Fugitive Dust Mitigation Plan. Please keep I in your Development file. ile; Permit 2440 4a�s insp. ICO 9FG�MDD BOND NO: 4158645 INITIAL. PREMIUM: SUBJECT TO RENEWAL. SUBDIVISION IMPROVEMENTS PERFORMANCE BOND Dust Bond KNOW ALL MEN BY THESE PRESENTS: LOM That we, Roger Snellenberget & Associates, Tnr as Principal, and DEVELOPERS INSURANCE COMPANY, a corporation organized and doing business under and by virtue of the laws of the State of California and duly licensed to conduct a general surety business in the State of California as Surety, are held and firmly bound unto City of La Qu nta as Obligee, in the sum of Four 'Thousand Do] 1 ars ` (s 4.000.00 ) Dollars, for which payment, well and truly to be made', we bind ourselves, our heirs, executors and successors, jointly and severally firmly by these presents. THE CONDITION OF THE OBLIGATION IS SUCH THAT: WHEREAS, the above named Principal, as a condition of the filing of the final subdivision map of (Tract/ Parcel) Map No. 23913 entered into an agreement or agreements with said Obligee to complete the improvements specified in said agreement or agreements. NOW THEREFORE, the condition of this obligation is such, that if the above Principal shall well and truly perform said agreement or agree ment's.during the original term thereof or of any extension of said term that may be granted by the Obligee with or without notice to the Surety, this obligation shall be void, otherwise it shall'rernain in full force and effect. IN WITNESS. WHEREOF, the seal and signature of said Principal is hereto affixed and the corporate seal and the name of the said Surety is hereto affixed and attested by'its duly authorized Attorney -in -Fact at Palm Desert Ca 92211 Eleventh March 96 California, this day of 19 . "PRINCIPAL" Roger Snellenberger. & Associates, Inc.. Roger Snellenberger DI 113 Rev. 2/91 "SURETY" DEVELOPERS INSURA-NCE COMPANY 1 'Diane M Nielsen Attorney -in -Fact 17780 Fitch Irvine, California 92714' (714)263-3300 . r 0 - l STATE OF CALIFORNIA COUNTY OF RIVERSIDE ON X I I ; 1996, BEFORE ME, LUIS GARCIA PERSONALLY APPEARED - Diane Nielsen personally known to me (or proved to me on the basis of satisfactory evidence) to be theperson(s) whose name(s) is/are sub- _ werVAQM comm. / "760 scribe to the within instrument & acknow- Wary PWC _ ecgroeyo ledged to me that he/she/they executed the aNsas,a-CCOUNIV same in his/her/their authorized capacity MY COMM. 69r..JUN 4o. Ivy (ies) and that by his/her/their signature(s) on the instrument the persons(s), or the entity'upon behalf of which the person(s) SEAL acted, executed the instrument. WITNESS my hand and official seal. Signature . ALL-PURPOSE ACKNOWLEDGEMENT .. POWER OF ATTORNEY OF INDEMNITY COMPANY OF CALIFORNIA AND DEVELOPERS INSURANCE COMPANY N° 245384 P.O. BOX 19725, IRVINE, CA 92713 • (714) 263-3300 NOTICE: 1. All cower and authority herein granted shall in any event terminate on the 31st day of March, 1996. 2. This Power of Attorney is void if altered or -if any portion is erased. 3. This Power of Attorney is void unless the seal is readable, the text is in brown ink, the signatures are in blue ink and thi3 notice is in red ink. 4. This Power of Attorney should not be returned to the Attorney(s)-In-Fact, but should remain a permanent part of the obligee's records. KNOW ALL MEN BY THESE PRESENTS, that, except as expressly limited, INDEMNITY COMPANY OF.CALIFORNIA and DEVELOPERS INSURANCE COMPANY, do each severally, but not jointly, hereby make, constitute and appoint ***Paul W. Lewis, Ann Willard, Diane M. Nielsen, F. T. Kieley., Jr., jointly -or severally*** the true and lawful Attorney(s)-In-Fact, to make, execute, deliver and acknowledge,'for and on behalf of each of said corporations as sureties, bonds, undertakings and contracts of suretyship in an amount not exceeding Two Million Five Hundred Thousand Dollars ($2,500;000) In any single undertaking; giving and granting unto said Attorney(s)-In-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitution and. revocation; and all of the acts of said Attorneys) -In -Fact, pursuant to these presents, are hereby ratified and confirmed. ' The authority and powers conferred by this Power of Attorney do not extend to any of the following bonds, undertakings or contracts of suretyship: Bank depository bonds, mortgage deficiency bonds, mortgage guarantee bonds, guarantees of Installment paper, note guarantee bonds, bonds'on financial Institutions, lease bonds, insurance company qualifying bonds, self -insurer's bonds, fidelity bonds or bail bonds. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of INDEMNITY COMPANY OF CALIFORNIA and DEVELOPERS INSURANCE COMPANY, effective as of September 24,1986: RESOLVED, that the Chairman of the Board, the President and any Vice President of the corporation be, and that each of them hereby is, authorized to execute Powers of Attorney, qualifying the attorney(s) named in the Powers of Attorney to execute, on behalf of the corporation, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assis- tant Secretary of the.corporation be, and each of them hereby is, authorized to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporation when so affixed and in the future with respect to any bond, undertaking or, contract of suretyship to which it is attached. IN WITNESS WHEREOF, INDEMNITY COMPANY OF CALIFORNIA and DEVELOPERS INSURANCE COMPANY have severally caused these presents to be signed by their respec- tive Presidents and attested by their respective Secretaries this 1st day of April, 1993. INDEMNITY COMPANY OF CALIFORNIA -� By QM. VJI�7Lt` / Dan F. Vincenti, Jr. �P APO President p0 pPOR o, O r ocT.a ATTEST W Ise? 0 By Walter Crowell Secretary STATE OF CALIFORNIA) . ) SS. COUNTY OF ORANGE ) DEVELOPERS INSURANCE COMPANY - - By VAI tAIGtIA� ` / DantF. Vincenti, Jr. resident ATTEST Walter Crowell Secretary . 91Nsu,g , Q�P4p'.0 4 C, W `? MAR. 27, ,O p IBTa ; D ° 4/FO On July 15, 1994, before me, the undersigned, a Notary Public in and for said State, personally appeared Dante F. Vincenti, Jr. and Walter A. Crowell, per- sonally known to me (or proved to me on the basis of satisfactory evidence) to be the persons who executed the within instrument as President and Secretary on behalf of Indemnity Company of California and'as President and Secretary of Developers Insurance Company, the Corporations therein named, and acknowledged to me that the corporations executed it. WITNESS my hand and official seal. �.. OFFICIAL SEAL J. ALVARADO is6 COMM. #1023169 dky NOTARY PUBLIC - CALIFORNIA Signature ORANGE COUNTY Notary Public I/My Commission Exp. Apr. 17, 1898 CERTIFICATE The undersigned, as Senior Vice President of INDEMNITY COMPANY OF CALIFORNIA, and Senior Vice President of DEVELOPERS INSURANCE COMPANY, does hereby certify that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore, that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney, are in force as of the date of this Certificate. This Certificate is executed in the City of Irvine, California, this 11 t h day of March 199 . INDEMNITY COMPANY OF CALIFORNIA �PAMy �O+OpPOq,(f� OCT. S, By o L.C. Fiebiger w Senior Vice President i/ rop ID -310 REV. 1/95 DEVELOPERS INSURANCE COMPANY \NSUq � By?40aPOB4 f ; -+ WAR. 2T, o p L.C. Fiebiger IeTe Senior Vice President