Loading...
2457I' ll vv proper validation phis form constitutes an encroach merit -permit dw CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) � I For, the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit - Class III DATE S/1/96 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 75-110 Caleo (Street address or Description of Location) I ., PURPOSE OF,CONSTRUCTION Clear stand build Aad. Sketch (attach construction plans if appropriate) ' %= Bad & Breakfast DESCRIPTION OF CONSTRUCTION Imnroveaents per ` a"roysd eradinit plan Bee attached conditions DIMENSION OF INSTALLATION OR REMOVAL Balancinst 'N. Bziatina Site V -. SIZE;OF-EXCAVATION'' IF NEEDED �. ' APPROXIMATETIME+WHEN WORK WILL BEGIN 5/2/96 ` � } APPROXIMATE TIME OF COMPLETION 12/1/96 ESTIMATED CONSTRUCTION -COST $ $7.500. (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements)In cons ideratiori'of the granting of this permit, the applicant hereby agrees to: ,T ' Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any -and all penalties,liabilities or loss resulting} from claims or court action and arising out of any accident, loss or damage to persons or' property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started: Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result Signature of Applicant or Agent idrrnlra' J4 9wrr44►t 1#wrriA 7A -19A Cmlwn Rrw Tw ( s4nlFwe (`A Q99R*A f011141 -AtRA QA1A Name of Applicant (please print) Business Address Telephone No. a f Alberto Flores 38475 Jeffernnn 10dio. CA (619) 360-0255 ' Name of Contractor and Job Foreman Business Address Telephone No. 610003 497 Cont'ractor's License'No. City Business License No." TSR Insurance Company of Micbiaan 914A4 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit - Class I I I w { 1A)1 i - $C A CNEZO , Public improvements: 3% of estimated construction costs -r;-.IA-7 G17y W0it i. 11.406 "To A'1L # mQs /-0 jZQ/,y Private improvements: 3% of estimated construction costs PA Minor Improvement Permit - Class IV: See attached schedule 2, 451 Inspection Fee $ 1224- , PERMIT VALIDATION Permit Fee Penalty Cash Deposit -Surety Bond if required IF TOTAL: Receipt No. Received by Recorded by f $ 1224 Date 'PERMIT NO. - 2457 DATE APPROVED 5/1/96 EXPIRATION DATE 12/31/96 DATE ISS51[bFqt ED - ' By Administrative Authority TELEPHONE: (619►"4'6t 777-7075 rI The following General and Special Provisions are attached to and made a part of Permit No.S GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred; City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist,of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including 'corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility,of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREET'S: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The, following shall apply when indicated: Rl NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. LR2 T IUXrY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall'be the sole responsibility of the permittee. UTILITY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING:, Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on ' inches of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. OPARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of 1/4 inch to one foot (1). GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. 07 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.- R8 207: R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (___j of class aggregate base. Driveway construction shall conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600. feet in all directions shall be assured and maintained at all times. RIO SOIL STERILIZER: .The area to be surfaced shall be treated with soil 'sterilizer. Rate of application shall-commply with the manufacturer's specifications. J I1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. / R1 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. 1�a PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. 14 LIMff OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. /R15) BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: _Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. 18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at. intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. / R20J TEMPORARY PAVEAUM REPAIRS: After completion of backfill and compaction operations, a temporary patch �� consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the ,placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. STREET RESfRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. . Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the.impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 2457 --- TWO ANGELS INN / A: FLORES EXCAVATING. --- In addition to the standard permit conditions, the following shall apply: 1. All work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction.* 2.. Permittee shall be responsible'for providing continuous dust and erosion control. 3. Streets shall be kept clean. They shall be completely .cleaned at the end of each working.day and more frequently if required. 4. Contractor shall comply with the local noise ordinance. Operation and maintenance of. equipment within one half mile of human occupancy shall. be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30p.m. Saturday 8:00 a.m. to 5:00p.m. May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00p.m. ` Saturday ' 8:00 a.m. to 5:00p.m. Work shall be prohibited on legal holidays including Sundays. Work. is allowed on Saturdays.only if special arrangements, including payment of overtime inspection fee, have been made two (2) working days prior to the desired Saturday. 5. Permittee shall assume responsibility. for repair of any pavement breakdown at the haul road access to any public or private street and for any damage to other City streets or facilities. = 6. Advance warning signs and traffic ..control shall be installed and maintained in accordance with Cal Trans Standards. It shall .be the permittee's responsibility 'to detour and barricade this site. 7. Street closures shall not be permitted. A minimum of one travel lane on paved surface shall be maintained with flagmen at all times. 8. ,Prior to excavating, the permittee shall contact Underground Service Alert at .1(800) 422-4133. 9. Should additional work, materials, or modifications of the work be required in order to meet city.standards, safety. requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the permittee as. directed by and to the satisfaction of the. City Engineer at no cost to the City of La Quinta. 10. AI.I work shall be coordinated with the City, the City's contractor and/or others working within the area as -directed by and to the satisfaction of the City Engineer. Special Conditions - Permit No. 2457 Page 1 of 2 SPECIAL CONDITIONS --PERMIT NO. 2457 continued 11. When the work is within 500' of a signalized intersection, the permittee shall notify Riverside County Signal Dept. at (909) 275-6894 or Caltrans Signal Dept. at (619) 688-6845 as appropriate a minimum of 48 hrs prior to starting work. 12. All backfill and subgrade soil shall be compacted to 90% relative dry density, all. backfill soil within the top 2' of finish pavement surface shall be compacted to 95% relative dry density, ,all base material shall be compacted to 95% relative dry density. 13. Work authorized by this permit shall be as shown on the plan labeled "CUP 95-020 ,TWO ANGELS INN, GRADING PLAN". 14. All excavations at or near the travel way, shall be backfilled and paved if necessary at the end of each work day for .the protection of the traveling public. 15. All trenches that are -performed within the paved section of the street for laterals, services etc. shall be backfilled with controlled density fill (CDF). Class II base will not be permitted. 16.. -Permittee shall notify the City Engineering Department a minimum of 48 hours prior to any work in the' street (i.e-oaved areas) at (619) 777-7075 when the work involves lane closure(s) in a signalized' intersection or within 500 feet of a signalized intersection. Permittee may: be required to submit a site-specific traffic control plan for review and approval prior to commencing work at or near a signalized intersection. 17. Work hours at signalized iiiter-sections or within 500 feet of a signalized intersection are. typically from gam - 3pm to avoid peak traffic periods but may vary depending on. the location of the intersection: The permittee will be notified by the City of specific work hours (if different) during the 48 hour notice period. Special Conditions - Permit No. 2457 Page 2 of 2 4 MEMORANDUM TO: Saundra Juhola, Admin. Services Director FROM: Hector Guzman, Assistant Enginee I VIA: David Cosper, Public Works Directoi/City Engineer DATE: May 6, 1996 SUBJECT: C.U.P. #95-020 Two Angels Inn The developer of the subject project has provided the City with a Cashiers Check (# 114937) in the amount of $1,500. The check is security for the Fugitive Dust Mitigation Plan. Please keep this check in your Development file. c: File, Permit 2457 hg 0 ust m tigat on on or - <: J ...,. �Q 78120 Caleo Bay Drive, La Quinta.`"'� - 3 •- ' . `- Two Angels Inn `„� 1114 9 3 7 ` 3rold & Harriet Harris, Owners . f � , `+ harles Martin, General Contract ) � REMITTER Iy L L1� VIB CIA #5-020996-01 EL CENTRO, CALIFORNIA • =' May''3 , j g 96 9038 11 2� ,.*, PAY TO THE .. * *City of La Quinta* * c '• t -i'. $ *1;,500.OU* ORDER OF ` 1500dn' oohs Y + y i r .} Y-}� '�'-3"pOLLARS. of .. CASHIER'S CHECK. CASHIER'S - • ; ..'- �' -. - ' Al1THo IZED SI RE Ar e�•4,e �N�P� x•+i.. 3 711' -11: 12 . 2 2 38 4 201: 00 LIII 90.000'Su■ ..l„ 1 i L 4 9 0 N 5 CY3 a pf VD. O Cm NOTE: - With Drooer vaudauon this form commRm an afWOSCflRym oarmR CITY OF LA QUINTA APPLICATION FOR PERMIT -PUBLIC WORKS CONSTRUCTION (ENCROACHMENTI For the oonstrueoon of public or prmts CuML dtivewatn. Pavenens. sidewalks. Darkim lot. twom: wotr neige and other tike Oublie wofM i nWuv*mwm in eorueebon vette MINOR IMPROVEMENTS ane APPROVED SUBDlVIS10Ns PUJ E OF,CONSTRUCTOarCG§Kl 1 A DEscal ,:r 1 ENSIGN OF INST LL►AOVAL,9AL1=A ft - SIZE OF EXCAVATION..IF NEEDED APPROXIMATE TIME WHEN WORK WILL REGI SubliMsion ImOrovenent Permit — Clara 111 MInw Improt etmem Pftft u ClassIV APPROXIMATE TIME OF COMPLETION r ESTIMATED CONSTRUCTION COST t Undudinq rerno of sm. obsrumok matmuls. and debris, fitlinv, Obrl► Sketdi Iattmh a mtrutson plartti it apwoprwml CM OF LA QMTA MAY 0 11996 Deebon and Draenha pernfeeeenit rewrfaeinq and/or repts" morovsff g nd In consdastlon of the Ww" of this prim k the SPOlionc herby a¢em to Inearrmrtlr, amw ma wn we Clrb. na ftewwmw'som s, effkwL rgrwMotire ane 400i'I vw, rurwraU'freWAS e 4ems ON ae aft OwwtwL 14"Itin or Ms ROM" fmm efarw or men 'C"* mw/ new an of awm oocd ws. sm at down" is anew or papier .ire or aaeamrr! • • OMwnme rrM ct arw waR Wteenaaae Wryer oe omnwrs er�rree prrsrare a phfa aapnheaert. ^ahh tte Aderwraesne Awe_" ti Mea r&wwfaew 124, harm a a0wa et ae ane Once vmm tail to ereL ian+t Q.rsar/ q qo4� �!o-�3d Name ofAODUnnt IDlasse , UmButtoWn Addeo Telephone Ns Nano of Comractor ane Job Formren Burners Adds Telephpne No. X. 01 oo 0 Contractors License No. _rt Cry 8umm Licene No. "0— 1F= %d Iv I I A001want'sInsurance Can m GEu. l.aA 1LITh{ PrsllgrNunhOer FEES: Subonmmn lmpromement Permit —Cram 111 Public im0rownen= 3% of eetimstpd ONUUUCtion am Pflnte im0t o , moms: 3% of esttbshe o mnarucnw tons Minor lmorayeRent Permit —CIM IV. See attded tdheduM Inswcoon Fee Perim Fee PauNty Cath OsOout•Surety Bond it feOwred TOTAL Ream No. 122 Raahva0 W Oats—� fiatereed by 138 F PERMIT VALIDATION PERMIT NO. DATE APPROVED 1.41 EXPIRATION DATE 2 31 DATE ISSUED By Adminims0vs Authtrny TELEPHONE: (SIM §111aMMI 13 TO: FROM: DATE: MEMORANDUM Jerry Herman, Comm y Devi lopment Director Steve Speer, Senior Engine April 2, 1996 RE: Two Angels Inn CU 95-020 Please withhold $1,4� for engineering fees from the City check that will. be issued to the owner of the Two Angels Inn and cause the following fee amounts to be placed in the budget accounts as noted: The fees .will be applied as follows: $1,224 Encroachment Permit ($40;799 x 3% _ $1,224) Permit revenue account. $200 . Additional deposit for plan checking. (Me plans were quite rough on the first and second submittal; we expect plan checking to exceed the original deposit amount. Unspent,plan check funds will be returned to the Two Angels Inn owner.) Budget Account 101-000-251-094 $1;424 Mark Harold has indicated an additional $72 should be withheld for the building permit due to retaining wall and garden walls they will inspect. The additional $72 increases the Building & Safety fee amount from $13,111.28 to $13,183.28 2-4 C�I_n 140 F:XP W OEPT%STAFF%SPEER W IEMOSM0402A 03/1996 15: G0 6197777155 ,CITY OF LA OUINTA PAGE OF �� MEMORANDUM TO: JOHN YONAI, RSG ,FROM:' JERRY HERMAN, COMMUNITY DEVELOPMENT DIRECTOR DATE: APRIL 3, 1996 SUBJECT: ESCROW ACCOUNT FOR HAROLD AND HARRIET HARRIS -TWO .ANGELS INN li The attached check in the amount of $85,392.72 is the balance of the $100,000 approved by Council on February 20, 1996, per the DDA, for the construction. of the above -noted project. The disbursements were as follows: M0,000.00 00,000.00 �Enginee g fees1,42 Building fees (all inclusive) -13,183.28 BALANCE $85,392.72 'These=fees will be aceredited.by the Finance Department -to: therappropriatDepartments: t l ' • i biL 0.0- L- A� Small Scale Construction/Demolition Projects (5 Acres or Less), Fugitive Dust (PM10) Mitigation Plan Date: 6-1 ) c, Jurisdiction: La- File Part 1 - Project Information eUOes—o 2-0 Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent,L ; Address:' 35 11 I:Nt^ ZZ G, Day phone number. Emergency phone number: J%;34,6 Grading contractor (Contact Person):Lam Address: Day phone number. Emergency phone number: a l .'Q� Construction site street address: .. 0•, Construction site location: (Please include an 8.5 x 11 location map) Construction site assessor's parcel number (Tract Parcel (Tract) size: Acres or Square feet Anticipated date of physical project initiation: , A1, 46 Anticipated date of project completion: Anticipated costs for dust suppression: (Attachment B - Must also be completed and mailed to the appropriate address. when construction activities have been completed) 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the letter beneath the fugitive dust sources listed below. Please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating what measures are to be implemented, complete the 'Details" section by describing how and when the measures are to be implemented. RG FG FC Details (e.e., freauency of application, number and true of dust control implements. etc. Please be as specific as possible) Unpaved Roads {� „ Storage Piles RG FG FC Details (e.e.. rreauencv of aDDlication, number and type of dust control implements, etc. Please be as specific as possible). [and Clearing or Earth -Moving 7 r Part 3 - Agreement I certify that the information contained in this Fugitive Dust.(PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. .1 authorize the City ofLa Qu i nta. to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related- to this project. I also agree to comp to the record-keeping requirements included herein as. Attachment B once the t has been completed. I have read the conditions of the Fugitive Dust (PM 10) Mitigation Plan and the owner has authorized the implementation of all its provi ' ns throughout project buildout. (If not the same as above) ATTACHMENT B - COST INFORMATION Small Scale Construction/Demolition ProjectsAan 5 acres or Less) Fugitive Dust (PM10) Mitigation Date: _ . Jurisdiction: Project File #: Project proponent: L9 Address: Day phone number:'w _N( `KD Emergency phone number: `Ck) In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation*costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: IG' Chemical stabilization: Wind fencing:. Covering haufvehi.cles: Z Wheel washers: Street sweeping: Paving: Wind. sheltering: Coverings: Vegetation reestablishment: T After project completion these records .shall be transmitted to the Jurisdiction where the grading demolition permit was attained , `and to the .Coachella Dalley Association of Governments (CVAG) at the address provided below. PM 10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 . Palm Desert, CA 92260 CONDITIONS FOR FDCP APPLICATION: FDCP 96-5;.TWO ANGELS INN CUP 95-020; ON CALEO BAY (PARCEL 8, PM 27892) 1. Applicant shall comply with all ' control measures as set forth in the approved FDCP application, which shall include. the following additional measures. 2. The full amount of security furnished for the approved FDCP ($1,500.00) shall be available to the City for any measure(s) deemed necessary by the City to achieve adequate dust control, whether or not such additional measures are included by the applicant for this application. 3. Applicant shall submit copies of all records/invoices related to cost accounting for the dust control measures assumed during grading construction. Said records shall be submitted within 30 days after completion of all dust control measures as outlined in the plan, including any measures made part of the plan as a condition to its approval. Security may be withheld pending submittal of this information. All such invoices shall be provided, along with the required completion of the PM10 Program Report Form, which can be obtained from the Public Works or Community Development Departments. 4. Track -out or other accumulations of soil material(s) shall be prevented onto any paved public streets outside of the areas proposed for grading. Any track -out or other accumulation of soil material(s) onto any paved areas, whether public or private, shall be Wet -swept or water flushed by the end of the work day, and shall be kept damp during construction operation hours until so removed. No blowers or other dry sweep methods are. permitted. 5. Any soils associated with import/export activities shall be sufficiently stabilized (watered down) so as not to create dust during loading, transport and spreading. Minimum freeboard shall be as established by the Public Works Department. On and off-site storage piles shall either be stabilized, covered'or watered down at sufficient intervals in order to maintain a sufficient moisture content at all times. 6. Enforcement of these conditions shall be at the discretion of the assigned.grading inspector, who shall monitor .and field verify that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities and other aspects of this FDCP may be made by the inspector, at his/her discretion, in order to assure compliance. 7. Employee and other parking areas shall not be permitted on any unpaved areas unless properly stabilized by methods approved by the Public Works Department. 8. Disturbed but inactive 'development areas proposed for watering only shall be watered daily in conjunction with active site watering. If the soil composition is not conducive to formation of a hardened surface, an appropriate chemical binder shall be applied as a remedial measure. The City may release a portion of the bonded amount to the applicant for such work. Adequacy of all proposed and conditional stabilization measures shall be determined by the assigned grading inspector. 9. All stabilized soil"areas where grading, construction or other land disturbance will not occur within 30 days shall be staked, posted or otherwise restricted in order to prevent any vehicular access onto or over those -areas. All areas where any such land disturbance activities occur, shall be stabilized no later than four days. after completion of the activity, in accordance with the provisions and conditions for this dust control plan approval. . PM 10 Program Report Form I. GMMRAL ncroRh%=off Project Developer Name : L Address: ?hone: GR 3yb Project Site 7b ZD - C(kO 67 Project Title TWt) *J(OES (U&I Address: LA&Lskm 9ZS3 Tract No.: acreage: Grading Subcont-ractor (if different) .Name: A. "4 Address: .. OLX 1 Phone- 3(po OZ PHASES? YES No Y If• so how many? Type of Development/Projec-�:.C--=mercialX-Single Family_ Multi Family_ Demolition other Date.of Project/Phase Std-Uo:1&A+1qbkte oi. Project/Phase Comnletion; � II. COST INFORMATION � If actual costs are not available, please estimate to the.best of your ability. 1. WATffit: Amount: Total Cost: 2'. BQUT?H= COSTS: A. Rater. Truck: Number on' Site: , Total Cost: Hourly Rate: Hours: B. St-eet Sweeper: Number on Site: Total Cost: Hour'y.Rate: Sours: C. Temporary Irrigation: Total Cost: D. Rind Fencing: Linear Ft.: Total Cost: Cast/Ft. S. Cbemical/Haterial Stabilisation: Total Cost: Sq. Ft. Cost per Sq. Ft.: F. Vegetation Cost: Material: Total Cost: Maintenance: c G. Other:. Type: Total Cost: Hourly Rate: Hours: 3. LABOR COST: Hourly Rate: Total Cost: Hours: 4. ADIQN=ST4BTION COSTS: Total Cost: III. TOTAL COSTS: 8 Add items 1 - 4 for total cost. _XYVM COST: '� ?LZASE RETURN FORM! AT.CO"LZT_ON OF PROJECT CR PHASE OR ANNUALLY FROM THE DAT- OF ?ROjZCT/?FASE START U 3131/94 3U_i: CD ' rpt 11 �1 l i,��..1���• :.i � ��- 2 ZS yrs`,QPLAZA U 11N17.•' SMOPP1vG ;yn WC5,1CFvrpA ` �� } _ AYAF SEMMOIf, pJ J� !i /C4 MEG Clh'E c 'CCB lA6All ` i' �ej � _ 4�� „ � . fir., o,,,:s• �,.� `�. � ,! � � �.... ;a� ?_ _'�r';. ,<:' • 3' i -ems'. - � ;� + •fr AL. � S f��H�: V'I� QTYM A Date: My OF LA QUV MAY 0 11996. ATTACHMENT B -COST INFORMATIO;�BLIC WORKS Small Scale Construction/Demolition Projects (5 acres or Less) Fugitive Dust (PM10) Mitigation Plan Jurisdiction: Project File #: Project proponent: L Address: "1333. Ill ZZ Ga : Day phone number: bll *34t. d.ICID. Emergency phone number: In the space provided below please list the costs associated with. implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: Chemical stabilization: Wind fencing: Covering haul vehicles: V(00L 9 Wheel washers: Street sweeping: Paving: Wind sheltering: Coverings: Vegetation reestablishment: After project completion these records shall be transmitted to the Jurisdiction where the grading/demolition permit was attained and to the Coachella Valley Association of Governments (CVAG) at the address provided below. PM10 Cost Monitoring Coachella Valley -Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 .1 A Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the letter beneath the fugitive dust sources listed below. Please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG). column. After indicating what measures are to be implemented, complete the 'Details" section by describing how and when the measures are to be implemented. RG FG 'FC Details (e.g., frequency of application, number and type of dust control implements. etc. Please be as specific as possible) Unpaved Roads Storage Piles Paved Road Track -out RG FG FC Details (e.g., frequency of application, number and type of dust control implements, etc. Please be as specific as possible) Land Clearing or Earth•Moving ll_ I� fi� Disturbed Surface Areas Part 37 Agreement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of La Qu i nta. to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the. City and its representatives from liability for any actions related to this project. I also agree to comp to the record-keeping requirements included herein as Attachment B once the t has been completed. mature ot Uwner Or Authonzed Kepresentative (tate) I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorized the implementation of all its proviwns throughout project buildout. 01 not the same as above) . � a. i. i�q . w' I� ! � Ar !� 1 PM 10 Program Report Torm I. r.MCMIAL INFORMATION Project Developer Name Address: ?hone: G 3yb Project. Site7V Vo -CAL& 64K -i Project Title -WO #JQe5 as C Address: ��� Z. w 3 Tract No.: Acreage: Grading Subcont—ractor (if different) Name: fps Address JISNJ� &L45! -,GI hone- _-2*0 �Z PHASES?- YES ND` 74 Is so .how many? Type' of Development/Project: C--zmpercialX Single .Family Xulti. Family_ Demolition Other Date of Project/Phase Stara-Un:1#A4q&te of Project/Phase Comvletionlp%.% II. COST EYFOPHATION If actual costs are not available, please estimate to the.best of your ability. 1-=:. Amount: Total Cost: 2. EQUtph= COSTS: A. Rater Truk: Number. on' Site-: , Total Casts 091l.J. C1.d Hourly Rate. Hours: B_.Stxeet Sweeper: Number on Site: Total Cost: Hcurly Rate: Hours: C. Temporary Irrigatioa: Total Cost: D. Rind Fencing: Linear Ft.: Total•Cost: • Cast/Ft. S. Chemical/Xaterial Stabilisation: Total Cost: Sq. Ft_ Cost per Sq. Ft..: F. Vegetation Cost: Material: Total Cost: Maintenance: Type: Total Cost: Hourly Rate: Hours: 3. LABOR COST: Hourly Rate: Total Cost: Hours: 4. ADMINISTRATION COSTS: Total Cost: III. TOTAL COSTS: Add items 1 - 4 ' for total cost. 71(� COST: • PLEASE 'RETURN 7OR21 AT CJ2-Lo_L2TT_ON OF PROJECT OR ?RASE OR ANNUAL:.Y FROM THE DA= OF PHASE STAT QP 3131/94 I - 17 , !:-. . ' 1 Small Scale Construction/Demolition Projects(5 Acres or Less)1 Fugitive Dust (PMIO) Mitigation Plan Date: Jurisdiction: File #: Part I - Project Information Please .provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your.Plan concurrent with your grading or demolition permit application. Project proponent Address:" Day phone number: Emergency phone number: zftik) 40b Grading contractor (Contact Person): Address: Day phone number: ko Wtam Emergency phone number: i. 14 JVL IL Construction site street address: -710>-11W CAVA41. Construction site location: (Please include an '&5 x 11 location map) Construction site•assessor's parcel number (Tract .d i Parcel (Tract) size: Acres or Square feet. Anticipated date of physical project initiation: Anticipated date of project completion: _b Anticipated costs for dust suppression: (Attachment B - Must also be completed and mailed to the appropriate address when construction activities have been completed) 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. i