2527NOTE:
With proper validation
this'form constitutes an
encroachment permit,
CITY OF LA QUINTA
APPLICATION FOR: PERMIT
PUBLIC. WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of .public or private curbs, driveways, pavements, sidewalks,^park ing, lots, sewers, water mains
and other like' public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
•`*"' - r ; Subdivision Improvement Permit —Class III
DATE:- October 9. 1996_.-- , Minor Improvement Permit Class IV
'LOCATION OF CONSTRUCTION 1-M t91g l tAr A AlllttArmin 4"t^r€e^rt4" ...
"south on bath aticeets '
(Street address or Description of Location) -
PURPOSE OF CONSTRUCTION InatAll nawt-r ttuon1v fog Sketch (attach construction plans if appropriate),
nsW c616 :.
DESCRIPTION OF CONSTRUCTION Mater oedenta1. With
3E8 ATTACHED SMCR .
•—,DIMENSION.OF INSTALLATION OR REMOVAL 1rnit In 4411 xR11
SEE ATTACHED CONDITIONS
lslZi OF. EXCAVATION, I F NEEDED Trench is 220' 2onw""" -
APPROXIMATE TIME WHEN WORK WILL BEGIN 10/14/96 �.
APPROXIMATE TIME OF COMPLETION 800 I 10/2$/96�� ,,,..•, ,.
ESTIMATED CONSTRUCTION COST $ '
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction
om paction andlacin
p g permanent :resurfacing and/or replacing improvements)
In consideration.of the granting:of this permit, the applicant hereby agrees to: ='"ter �z. i•
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless frorri and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property"
' happening or, occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. q -.
t. 'Comply -with all applicable City Ordinances, the terms and conditions of the permit and all applicable'rulesand-regulations of'the City of t .,
La Quinta and to pay for any additional replacement necessary as the result of,<t'his work.
,» -•+�, _ ..��!c...-ice..
"�. Signature of Applicant orfA'genat
r
Name of Applicant (please print) Business Address Telephone No:
Cbthtsn Comm. Constr. 36650 Cathedral. Cvn. Dr... Cath^Aral clev. rA (6114 49R A77A
Name of Contractor and Job Foreman Business Address Telephone No.
478543 5.65 +
Contractor's License No. City,Business License No.
fi
CNA, 147775 ,0 r
Applicant's Insurance Company. Policy Number '
FEES: Subdivision Improvement Permit — Class 'I I I O
Public improvements: 3% of estimated construction costs
'.
Private] mprove ments: 3% of estimated construction. costs D �10
Minor Improvement Permit — Class IV: See attached schedule J ,`
Inspection Fee $ 40. O �GEF
Permit Fee 10. 2521
P IT ;
Penalty i`. �'
Cash Deposit -Surety Bond
DATE APPROVED 10/10/96
if required'
MIT VALIDATION
TOTAL: $ 50.
Receipt No.
Received by Date
Recorded by
EXPIRATION DATE 11/115/96
DATE IfSSUED
gy m/
'Administrative Authority
Telephone: (619) 777-7075
NOTE:
Wit9 aroaer •mdauon
ft form mnn"Um an
efurmctment oamn CITY OF LA QUINTA
APPLICATION FOR PERMIT
-PUBLIC WORKS CONSTRUCTION (ENCROACHMENTI
For Ire awutrueoon of puWk of prvaa aures, dritanvs• 08",ne+m. ache&" ollrtirtS 1oa. satyrs, wear nmirm
ane other like puolle worts i+noeorertrr+a in eonnaeaon wm MINOR IMPROVEMENTS and APPROVED SUBOIV1Si0NS
XC-ochran'Communication-Const .36630 Cathedral Cyn Dr 3'28--r6778
Nanr atcaa rsaor aro Job Forrmrt Swirws Addraae Tilaptpla N0.
X - 478543 865
Cammars Lama. No• cttr 6asirms Limm Ne.
7C CNA X C1 14777560
Avol=nrzinaranoCommv 432" L.Iae1L.1TY PbIkYNumtar
FEES: Suemwtran Imarevnnwa Permit —Clam 111
Pubue imw m+w= 3% of atiraad owaviftan am
Prteata imoroeeamm 3%of assntraod con mucwm aesm
Nlner Imororement Pana — CNam IV- Saa sttaerw telwoule
Inmccon Fee = I
Pwmn Fee 16
Paww
Cash oommt•Sutow Sand
it revusred
TOTAL:
Reowt N4
Reaw"m ev Daft
Reeerwd by
132F.
PERMIT VALIDATION
PERMIT NCL ZA52—%
GATE APPROVED Ad O 9l0
EXPIRATION DATE 9b
GATE ISSUED
Admitstra<ote Auosorer
777- 7075
TELE mm -161m loomw.
OATE•— %^9 7 pr
— 6 trnowehnePermit —lin III
- rarer Impvv mens Form Gass IV
LOCATION OF CONSTRUCTION • iY 67'4 t}
'
/l! 'TdE`PS JAG 7"//DA) - -So U 7-t/ OAJ ,6Q7 /_,o' STeta�' € TS
haat carer or ommipm M ter
E OCONN Install power s u p
p l'"Yoecabl-y 190b ewmauctamn
omm if sommotqno
o— ESCR-
IrnONOFa er pees al
A
W teoower- suggiv SEE ATTACHED
SKETCH LN OUINT,
CyTl' ��
$�''St°a PIc�' ° w4RCR4cV u t h r t
91996
SIZE OF EXCAV TITAN}, IF NEEDED r - r e n c
APPROXIMATE TTME IMHEH WORK WILL BEGIN — 1'
w
APPROXIMATE TIME OF COMPLETION
•, ESTIMATED. CONSTRUCTION COSTA '"':i r • •-
(lnetb diq°nnar� a! W o0liotittiorir ieuwials "&W apm, pql ppm ,
ndotaaon� peri�rw,t tswrfao�i� anger
ift mltYl�*ef Qslsrpwmsrt.�tlsa. aoouorrt Rya,,sablr,a�ess-teC .�.., -+
,!'Inaenr��y�y�erra'twrM.Cb:.rel
,r
..�,'•.Y.'
l�,,n-
,
• �,....
am a
`, �. a OpdeL �purlit�-. r,Mi elle from omw.w cart=ea0aa W'arrly M'd rq' amdet.' km •emm .
rl wfrtr O��A
-
+3- a� � w raver+eaa f~�. room" auesraert Mlt
- . .
_ v J
i'� NweN ere �aerrrieswal A11M�1► aC leem twrllMrM Mlellri « eaa Qty ' ,
�www -whet will Se olfaL�,;,. `.
..... , _.
, �`•�wh0''!,�T:+'^t.«s,,r,.:-r.. `•, - C,F....Yra .�... _
--oft C* ordw&�s w;tarw ewe at a4 earnuraar r eaorrb wUfa Norgrsosr� i1: it
-
tM Gb
_..6a OWw YMA:�.OA..fd M/ � reetasllMR �► ea'wa wilt � •
- S IPUMn of AopNont w
ell
X Continental Cablevision P 0 Box' 368 Palm'Desert 340-1312
Name or Ammant Iofasse onnt/ - Bsinem Addrose TiboAons NL
XC-ochran'Communication-Const .36630 Cathedral Cyn Dr 3'28--r6778
Nanr atcaa rsaor aro Job Forrmrt Swirws Addraae Tilaptpla N0.
X - 478543 865
Cammars Lama. No• cttr 6asirms Limm Ne.
7C CNA X C1 14777560
Avol=nrzinaranoCommv 432" L.Iae1L.1TY PbIkYNumtar
FEES: Suemwtran Imarevnnwa Permit —Clam 111
Pubue imw m+w= 3% of atiraad owaviftan am
Prteata imoroeeamm 3%of assntraod con mucwm aesm
Nlner Imororement Pana — CNam IV- Saa sttaerw telwoule
Inmccon Fee = I
Pwmn Fee 16
Paww
Cash oommt•Sutow Sand
it revusred
TOTAL:
Reowt N4
Reaw"m ev Daft
Reeerwd by
132F.
PERMIT VALIDATION
PERMIT NCL ZA52—%
GATE APPROVED Ad O 9l0
EXPIRATION DATE 9b
GATE ISSUED
Admitstra<ote Auosorer
777- 7075
TELE mm -161m loomw.
The following General and Special Provisions are attached to and made a part of Permit No. , 5Z -7
GENERAL PROVISIONS
The following shall always apply:
ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of
way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to
secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to
protect the paying during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing
pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request
that these portions of road be resurfaced over their entire width. Resurfacing"shall consist of one coat of two inches (2") of A.C.
surfacing plus appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the
City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes
necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage. .
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right
of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction.
Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed
prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used
immediately after backfill.
DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall
be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS:. No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must closea street for
any length of time, permittee shall contact -this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
RNOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction.
/ 2 UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way
(� authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing
substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole
responsibility of the permittee.
(fR3 UTILITY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the,proposed work.
R4 PAVEM NT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with inches of A.C. paving placed on . inches of class aggregate subbase course having an "R"
value of not less than and in conformance with City of La Quinta Road Improvement Standards and `
Specifications, Ordinance #461.
PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
1/4 inch to one foot (1'):
R6 GRADE, CHECKING: City, of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( _feet) shall be
removed. Curb and/or curb and, gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in 'conformance with City of La Quinta Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on () of class aggregate base.
Driveway construction shall conform to attached drawing.
SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times.
RIO SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the
manufacturer's specifications.
COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
Rl SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LEWr OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFILL SAND: -Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC -800 shall be placed immediately. A permanent patch of . inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
0
1
2
3.
SPECIAL CONDITIONS --PERMIT NO. 2527
--- COCHRAN COMMUNICATIONS ---
J
In addition to the standard permit conditions, the following shall apply:
All work shall be performed in accordance with the latest edition "of the Standard Specifications
For Public Works Construction.,
Permittee shall be responsible for providing continuous dust and erosion control.
Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more .frequently if required.
4. Contractor shall comply with the local noise ordinance. Operation and maintenance of equipment
within one half mile of human occupancy shall be performed only during the following time
periods:
October 1st to April 30: Monday -Friday . 7:00 a.m. to 5:30p.m.
Saturday .8:00 a.m. to 5:00p.m.
May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00p.m.
Saturday 8:00 a.m. to 5:00p.m.
Work shall be prohibited on legal holidays including Sundays.
5. Permittee/contractor shall assume responsibility for repair of any pavement damage to any public
or private street and for any -damage to other City streets or facilities as a result. of work
performed under this permit.
6. Advance warning signs and traffic control shall be installed and maintained in accordance with
Cal Trans Standards or the Work'Area Traffic Control Handbook (WATCH Manual). It shall be
the permittee's responsibility to detour -and barricade this site.
7. Street closures shall not be permitted. A minimum of one travel lane on paved surface shall be
maintained with flagmen at all -times.
8. Prior to -excavating, the permittee shall contact Underground Service Alert at 1(800) 422-4133.
9: Should. additional work, materials; or modifications of the work.be required in order to meet city
standard's, safety requirements, signage requirements, or to fit actual field conditions, the work
shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at
no cost to the City of La Quinta'.
Special Conditions - Permit No. 2527 Page 1 of 2
I
SPECIAL CONDITIONS ---PERMIT NO. 2527
continued
10. All work shall be coordinated with the City's contractor and others working within the area as
directed by and to the satisfaction of the City. Engineer.
11. All backfill and subgrade soil shall be compacted to 9.0% relative dry density, all backfill soil
within. the top 2' of finish pavement surface. shall be compacted to 95% relative dry density, all.
base material shall be compacted to 95% relative dry density.
12. All excavations at or near the travel way shall be backfilled and paved at the end of every work
day as directed by and to the satisfaction of the City Engineer for the protection of the traveling
public.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting etc. shall be replaced
to its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Permittee shall notify the City: Engineering Department a minimum of 48 hours prior to any work
in the street (i.e. paved areas) at (619) 777-7075 when the work involves lane closure(s) in a
signalized intersection or within 500 feet of a. signalized intersection. Permittee may be required
to submit a site-specific traffic control plan for review and approval prior to commencing work
at or near a signalized intersection.
16; Work hours at signalized intersections or within 500 feet of a signalized intersection are typically
from 9am - 3pm to avoid peak traffic periods but may vary depending on the location of the -
intersection. The permittee will be notified by the City of specific work hours (if different) during
the 48 hour notice period.
I
0
Special Conditions - Permit No. 2527
a
Page 2 of 2
1A,
J />
'CUB NANOHDL D'
Attn: Colony Contact:
Needs Approval for INTERNAL USE ONLY
Proposed Power Meter Authorized signalure Date
14925
i
-PROPOSED POWER SU/7FLY '
N
• Colony Ceblevlslon of Cailfornla
Phone: (61 9) 340-1312-