Loading...
2644With proper validation this form constitutes an 'e"ncroachment permit i' CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC ' WORKS CONSTRUCTION (ENCROACHMENT) For, the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and'APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class ill DATE:' August 18, 1997 Minor improvement Permit Class -IV. LOCATION OF CONSTRUCTION North side of Fred Warinsz' Dr. west• of .Galazy 'Way (Street address or Description of Location) PURPOSE OF CONSTRUCTION MH Rrade adjustments for Sketch (attach construction plans if appropriate) Belle. Vista prof ect . DESCRIPTION OF CONSTRUCTION Adiust to new szrdde SEP ATTACHED CONDITIOWS DIMENSION OF INSTALLATION OR REMOVAL N/A . SIZE OF EXCAVATION, IF NEEDED N/A APPROXIMATE TIME WHEN WORK WILL BEGIN 8/97 APPROXIMATE TIME OF COMPLETION 9/15/97 ESTIMATED CONSTRUCTION COST $ N/A (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all �. penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or,propePty happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least. twenty-four (24) hours in advance of the time when work will be started. Comply with all .applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quirita and to payfor any additional replacement necessary as the result of this work. Signature of Applicant or Agent _GTE 295 N._Sunrise Way Palm Springs, CA 92262 (760) 77$-3603 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business,License No. Applicant's.lnsurance Company. Policy Number, FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class 'IV: See attached schedule Inspection Fee Permit.Fee 0 - Penalty Cash Deposit -Surety Bond if required TOTAL: $ " 0 Receipt No. Received by Date Recorded by 2 - tift)04,4 PERMIT VALIDATION PERMIT NO. 2644 DATE APPROVED 8/18/97 EXPIRATION DATE 12/31/97 DATE ISSUED 8/18/97 By •�1F A,l• 4, 1v. -F Administrative Authority Telephone: (619) 777-7075 nnrt pruilmr vattuatlon this.fofm constitutes an encroachment permit `. '' CITY OF LA QUINTA ' APPLICATIONI FOR PERMIT ^ PUBLIC WORKS CONSTRUCT i . ,- ION (ENCROACHMENT)1 -��� .f ` For the., construction of � - ��.- •' � ' public 'or private curbs,; driveways, pavements, sidewalks, parking 'lots, sewers, water mains + and other like public works improvements in connection with MINOR. IMPROVEMENTS and APPROVED SUBDIVISIONS r� Subdivision Improvement Permit — Class IIIA )ATE: Minor Improvement Permit Class IV r. N/S OF FRED WARING DR W/O GALAXY WAY' s _OCATION OF CONSTRUCTION ' Street address or Description of Location) 'URPOSE OF CONSTRUCTION -MH GRADE ADJUSTMENTS FOR BELLA•VISTA.PROJECT Sketch (attach;constructioniplens if appropriate) IESCRIPTION OF CONSTRUCTION' - ADJUST TO NEW GRADE SEE,AT.TACHED DWG - �-- �aT's�tct•Fc,.o t o�tat"T�o�S ' IMENSION OF INSTALLATION OR REMOVAL N/A GTE W.O. j_ NSA it IZE OF EXCAVATION, IF NEEDED ' 'PPROXIMATE TIME WHEN WORK WILL BEGIN =tA922= PPROXIMATE TIME OF COMPLETION 9/15/97{ ,,•. r�:• '' v � it i STI MATED CONSTRUCTION COSTS N/A' ncluding removal of all obstruction, materials, and debris; backfilling, com Iction and placing permanent resurfacing and/or replacing improvements) ' N/A ' f• consideration of the; granting of this permit, the applicant hereby agrees to:, ' Indemmly, defend and save the City, its authorized agents, off icers,'.representatrvef and employees, harmless-from'and-against any and all penalties, liabilities or , loss resulting from claims or court action and arising out of any accident, loss or dam to ' age persons or property happen!ng or occurring as a proximate result of any work undertaken under the permit granted pursuant to this'applicauon. ' Notify the Administrative Authority at least twenty-four (241 hours in advance"of the»time when work will be,siarted. '•Comply with all applicable City Ordinances, the terms and conditions of the permit and•all appticable.rules and regulations of the City of La Quint and to pay for any additional replacement necessary as th t o this k. w 1 + - f - .a Signature of Applicant or Agent GTE 295 N. SUNRISE WAY PALM•SPRINGS CA 92262-5295 1 778-3603 me of Applicant (please print) Business Address l Telephone No. me of. Contractor and Job Foreman. Business Address Telephone No. itractor's License)No. r City Business License No. olicant's Insura1. nce Company Policy,Number #� . h ... - . ,�. ❑ - - - _ ES: Subdivision Improvement Permit — Class-- Publir.. improvements: 3% of estimated construction costs f ' Private improvements: 3% of estimated construction costs + _ Minor Improvement Permit Class IV: See attached schedule . II t lection Fee $ PERMIT VALIDATION not Fee; it PERMIT NO. �lof alty ` 4. r i Deposit -Surety Bond quired ' TOTAL: .$ ' eipt No. eived'by, ' , r+ Date xded by,, y- - DATE APPROVED EXPIRATION DATE Z 3/ ,' % DATE ISSUED By Administrative Authority TELEPHONE: (619) 564-2246 ®�� \180 B81A VISTA PRCEL'T- _ 3 5U?M = WAR DUFFY. " Abmm M.R . T0' i ff. MSN • - NAPLES DR �Aj i V �� 441.10 (86) TOP 441.10 t86) '•1'31583 4' 1.1592 6 74('V -M 741'W 58,w- � 58'Y -V ® ' 31584 2441.10 (86) -P4 M•540044 •3(594 2441. t86) (IPSO 4 'J756 756' '•181401 4'PVC 4 • ,-TOP 2441.10 t95) •31585 2441.10 (86) 131586 244LIO (86) M•181401 M 15 0t 441.10 (86) .. M�31580 16203 . '•181401, MH 737 4 4'PVC 4 • 4 PVC s 031-y . •31588 2441.10 c93)' 4'PVC 6 10.6'X5'X6'S. 5'Y -Y 1 736'V -Y '. - M-82034 MH •738 10'6'X5'X616' '31585 •1587.2441.10 (86) o �0 •31586 -31587 2441.10 (86) • . 31586 •3159 0 ® • 596 2 41.10.31592 M 40044 M 540044 - _ _ '•540044 _ 1 SO 4 _ .... .. l'PSO 4 1PSD 4 7 •V_y 43L5813 .� .. ,. . 751'Y -V Y -Y FRED WARING OR u r 3715--- 715 � TO TO CL WASHINGTON ST - TO C/L OF WASHINGTON ST _ . TOP - g The following General and'Special Provisions are attached to and made a part of Permit No. �Cp GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. - TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall beproperly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified. 24 hours in advance of any traffic detours or delineations. CARE OF.DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide'off-street barricades when necessary. CLOSING STREET'S: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: Rl NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. UII 1XrY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way . authorized by_ permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. / IZ3 J U ILM CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. PARKWAY GRADING: Area between the property tine and top of the proposed concrete curb shall be graded to a slope of 1/4 inch to one foot (P). R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and -concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. RS DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (___) of class aggregate base. Driveway construction shall conform to attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOH. STERILIZER. The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the manufacturer's specifications. Rll COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. . SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIIVIIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFII.L MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction: Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RIB COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (l) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ' R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, Flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. 1. 2. 3. 4. 5 ,9- 7 L1 SPECIAL CONDITIONS --PERMIT NO. 2644 --- GTE --- In addition to the standard permit conditions, the following shall apply: All work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction. Permittee shall be responsible for providing continuous dust and erosion control. Streets shall be kept clean. They shall, be completely cleaned at the end of each working day and more frequently if required. Contractor shall comply with the local noise ordinance; Operation and maintenance of equipment within one half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30p.m. Saturday 8:00 a.m. to 5:00p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00p.m. Saturday 8:00 a.m. to 5:00p.m. Work shall be prohibited on legal holidays including -Sundays Permittee/contractor shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Advance. warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). It shall be the permittee's responsibility to detour and barricade this site. d. Street closures shall not be permitted. A minimum of one travel lane on paved surface shall be maintained with flagmen at all times. Prior.to excavating, the permittee shall contact Underground Service Alert at 1(800) 422-4133 9. Should additional work, materials; or modifications of the work be required in order to meet city, standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. Special Conditions - Permit No. 2644 ' Page I of 2 SPECIAL CONDITIONS ---PERMIT NO. 2644 continued 10. All backfill and subgrade soil shall be compacted to 90% relative dry density, all backfill soil within the top 2' of finish pavement surface shall be compacted to 95.% relative dry density, all base material shall be compacted to 95 % relative dry density. 11: All excavations at or near the travel way -shall be backfilled and paved at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the traveling public. 12. All landscaping, irrigation, decorative rock, decorative concrete, lighting etc. shall be replaced. to its original condition. 13. Access and egress to all -local properties shall be maintained at all times. 14. Permanent pavement -replacement section shall be. one inch greater than existing. 15. Permittee shall not the City Engineering Department a minimum of 48 hours prior to any work in the street (i.e. paved areas) at (619) 777=7075 when the work involves lane closure(s) in a signalized intersection or within 500 feet of a signalized intersection. Permittee may be required to submit a site-specific traffic control plan for review. and approval prior to commencing work at or near a signalized intersection. 16. Work hours at signalized intersections or within 500 feet of a signalized intersection are typically from 9am - 3pm to avoid peak traffic periods but may vary depending on the location of the intersection. The permittee will be notified by the City of specific work hours (if different) during the 48 hour notice period. 17. All backfill shall be mechanically compacted in lifts of eight (8) inches or less. Jetting or flooding of backfill material will not be allowed unless otherwise specified by the City. 18. Contractor/permittee .shall stabilize any soil that was disturbed (shoulder areas Etc.) as a result of work performed under this permit. 19. Trenches in the street section shall be permanently paved within. five days after completion of the work unless otherwise approved by the City. Special Conditions - Permit No. 2644 Page 2 of 2