BELC2018-000478-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
C&t!t 4 4V Q"
DESIGN & DEVELOPMENT DEPARTMENT
BUILDING PERMIT
VOICE (760) 777-7125
FAX (760).777-7011
INSPECTIONS (760) 777-7153
Date: 1/23/2018
Permit Type/Subtype: ELECTRICAL/ Owner:
Application Number: BELC2018-0004 R CELESTE SHEAFE
Property Address: 78595 NAPLES. DR ® 78595 NAPLES DR
APN: 609553002 d./�-�� ��=���--a��� QUINTA, CA 92253
Application Description: SHEAFE /TESLA POWERWALS O E BATTERY
Property Zoning:
Application Valuation: $4,000.00 JAN 2 2 2018
Applicant: CITY OF LA QUINTA Contractor:
HOSOPO CORPORATION DBA HORIZON SOLAR POW.
27368 VIA INDUSTRIA STE 101 DESIGN AND DEVELOPMENT DEPARTMENosopO CORPORATION DBA HORIZON SOLAR POW
27368 VIA INDUSTRIA STE 101
TEMECULA,'CA 92590 TEMECULA, CA 92590
(951)537-6859
Llc. No.: 1004233
LICENSED CONTRACTOR'S DECLARATION
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
I hereby affirm underpenalty of perjury one of the following declarations:
9 (commencing with Section 70001 of Division 3 of the Business and Professions Code,
_ I have and will maintain a certificate of consent to self -insure for workers'
and my License is in full force and effect.
compensation, as provided for by Section 3700 of the Labor Code, for the performance
License Class: B. C46 License No.: 1004233
of the work for which this permit is issued.
,//
Date:
I have and will maintain workers' compensation insurance, as required by
Contractor: V�
v
Section 3700 of the Labor Code, for the performance of the work for which this permit
Is issued. My workers' compensation insurance carrier and policy number are:
OWNER -BUILDER DECLARATION
Carrier: HDI GLOBAL INSURANCE COMPANY Policy Number: EWGCR000228616
I hereby affirm under penalty of perjury that I am exempt from the Contractor's State
License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any
_
_ I certify that in the performance of the work forwhich this permit is issued, I
city or county that requires a permit to construct,.alter, Improve, demolish, or repair
shall not employ any person in any manner so as to become subject to the workers'
any structure, prior to its issuance, also requires the applicant for the permit to file a
compensation laws of California, and agree that, -if I should become subject to the
signed statement that he or she is licensed pursuant to the provisions of the
workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith
Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division
comply with those. provisions.
3 of the Business and Professions Code) or that he or she is exempt therefrom and the
n ��
basis for the alleged exemption. Any violation of Section 7031.5 by any applicant fora
Date: 7, Applicant:
permit subjects the applicant to a civil penalty of not more than five hundred dollars
($500).:
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS VLAWFUL,
(_) I, as owner of the property, or my employees with wages as their sole
AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO
compensation, will do the work, and the structure is not intended or offered for sale.
ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF
(Sec. 7044, Business and Professions Code: The Contractors' State License Law does not
COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE,
apply to an owner of property who builds or improves thereon, and who does the work
INTEREST, AND ATTORNEY'S FEES.
himself or herself through his or her own employees, provided that the improvements
are not intended or offered for sale. If, however, the building or improvement is sold
APPLICANT ACKNOWLEDGEMENT
within one year of completion, the owner -builder will have the burden of proving that
IMPORTANT: Application is hereby made to the Building Official for a permit subject to
he or she did not build or improve for the.purpose of sale.):
the conditions and restrictions set forth on this application.
(_) I, as owner of the property, am exclusively contracting with licensed contractors
1. Each person upon whose behalf this application is made, each person at whose
to construct the project. (Sec. 7044, Business and Professions Code: The Contractors' .
request and for whose benefit work is performed under or pursuant to any permit
State License Law does not apply to an owner of propefty who builds or improves
Issued as a result of this application , the owner, and the applicant, each agrees to, and
thereon, and who contracts for the projects with a contractor(s) licensed pursuant to
shall defend, Indemnify and hold harmless the City of La Quinta, its officers, agents, and
the Contractors' State License Law.).
employees for any act or omission related to the work being performed under or
(_) I am exempt under Sec. . B.&P.C. for this reason
following issuance of this permit.
2. Any permit Issued as a result of this application becomes null and void if work is
not commenced within 180 days from date of Issuance of such permit, or cessation of
Date: Owner:
work for 180 days will subject permit to cancellation.
CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is correct.
I hereby affirm under penalty of perjury that there is a construction lending agency for I agree to comply with all city and county ordinances and state laws relating to building
the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). construction, and hereby authorize representatives of this city to enter upon the
Lender's Name:
above -men toned roperty for Inspection purposes.
/
Date: Signature (Applicant or Agent):
Lenders Address:
Date: 1/23/2018
Application Number: BELC2018-0004
Owner:
Property Address: 78595 NAPLES DR
CELESTE SHEAFE
APN: 609553002
78595 NAPLES DR
Application Description: SHEAFE /TESLA POWERWALL STORAGE BATTERY
LA QUINTA, CA 92253
Property Zoning:
Application Valuation: $4,000.00
- i
Applicant:
Contractor:
HOSOPO CORPORATION DBA HORIZON SOLAR POW
HOSOPO CORPORATION DBA HORIZON SOLAR POW
27368 VIA INDUSTRIA STE 101
27368 VIA INDUSTRIA STE 101
TEMECULA, CA 92590
TEMECULA, CA 92590
(951)537-6859
-----------------.-----------------------------------------=----------------------------------
LIC. No.: 1004233
Detail: ADDITION OF (1) TESLA POWERWALL 2 STORAGE BATTERY TO EXISTING. ELECTRICAL SYSTEM WITH A 9.01kW PHOTOVOLTAIC SYSTEM + ADDITION OF
200A SUBPANEL. 2016 ELECTRICAL CODE.
FINANCIAL ,•.
DESCRIPTION ACCOUNT QTY AMOUNT
BSAS SB1473 FEE
101-0000-20306 0 • $1.00
Total Paid for BUILDING STANDARDS ADMINISTRATION BSA: $1.00 .
DESCRIPTION
ACCOUNT
QTY
AMOUNT
POWER APPARATUS
101-0000-42403
0
$25.33
DESCRIPTION
ACCOUNT
QTY
AMOUNT
POWER APPARATUS PC
101-0000-42600
0.
$25.33
DESCRIPTION
ACCOUNT
QTY
AMOUNT
SERVICES
101-0000-42403
0
$26.01
DESCRIPTION
ACCOUNT
QTY
AMOUNT
SERVICES PC
101-0000-42600.0
$13.00
Total Paid for ELECTRICAL: $89.67
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PERMIT ISSUANCE
101-0000-42404
0
$98.83
Total Paid for PERMIT ISSUANCE: $98.83
DESCRIPTION
ACCOUNTQTY
AMOUNT
` RECORDS MANAGEMENTTEE
101-0000-42416
0
$10.00
Total Paid for RECORDS MANAGEMENT FEE: $10.00
DESCRIPTION
ACCOUNT
QTY
AMOUNT
TECHNOLOGY ENHANCEMENT FEE
502-0000-43611
0
$5.00
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00
tiln #
ofla a Qulntd
Building M Safety Division
P.O. Box 1504,'76-495 Calle Tampico
6� 14.Quinta, CA 92253 -:(760) 777-7012
Building Permit•Application'and Tracking Sheet
Permit #
(�
Project Address:
,e
Owner's Name: ; 5 hk
A. P. Number.
Address:
Legal Description:
`(
City, ST, Zip: 1—a k t�
Contractor:
-C)
iclephone:
Address:Project
Description:
City, ST, Zip: )
C
oZS S.
•Q
Telephone:. _ Z6
cw :tom
State Lia # 0p:
City Lic. #;
Arch, Engr., Designer:
Address:
City., ST, Zip:
Telephone:
, �, . •; _;
Construction Type. , Occupancy:
State Lie. #:
Project type (circle one): New Add'n Alter Repair Demo
Name of Contact Person:
'
Sq Ft.:
# Wits: #Units:
Telophonc# of Contact Person:
Estimated Value of Projcci: l
APPLICANT: DO NOT WRITE BELOW THIS UNE
N
Submittal
Rcq'd
Reed
TRACKIIVC...
PERMITFEES•
Plan Sets
Plan Check submitted
Item Amount
Structural Cates.
Reviewed, ready for corrections
Plan Cluck Deposit
Truss Cates.
Called Contact Person
Plan Check Balance
Title 24 Cates.
Pians pleked up
Construction
Flood plain plan
Plans resubmitted
Mecharileai
Grading plan
V Review, ready for corrections ftssue
Electrical
Subcontactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S.M.I.
II.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
"Review, ready for correctlonsfissue
Developer Impact Fee
Planning Approval.
Called Contact Person
A.I.P.P.
Pub. Wks. Appr '
Date or permit Issue
School Fees
'Dotal Permit Fees
�� l) . l �/�o►'�'l scan @ ����-zov1 Sol,r?0 wer d coy"
L n
RECEIVED
JAN 11 2018
CITY OF LA QUINTq
COMMUNITY ®EVELOPMENT
Powerwall 2 Anchorage Details - US
ue V4 r1
POWERWALL INSTALLATION DETAILS IN THE UNITED STATES
SS
`SHEET
TABLE OF CONTENTS
2
GENERAL NOTES SHEET
3
INSTALLATION FLOW CHART
4
BRACKET ATTACHMENT DETAILS TO WOOD STUDS-
TUDS-5
5
BRACKET ATTACHMENT DIRECTLY TO METAL STUDS
6
BRACKET ATTACHMENT DETAILS TO METAL STUDS
7
BRACKET ATTACHMENT DETAILS TO CONCRETE/CMU WALL
8
BRACKET ATTACHMENT TO UNISTRUT AT WOOD STUD WALL
9
BRACKET ATTACHMENT TO UNISTRUT AT METAL STUD WALL
10
IBRACKET ATTACHMENT DIRECTLY TO PLYWOOD'
TABLE OF CONTENTS
SCALE Sheet
03/30/17
N/A 1/10
GENERAL NOTES ,
1. ATTACHED DETAILS HAVE BEEN DEVELOPED TO COVER MOST INSTALLATIONS IN THE 50 UNITED STATES.
FOR CONDITIONS NOT COVERED HERE, CONSULT WITH A LOCAL ENGINEER OR YOUR TESLA CONTACT.
2. ALL FASTENERS SHALL BE GALVANIZED OR STAINLESS STEEL FOR EXTERIOR APPLICATIONS.
3. THE MAXIMUM EQUIPMENT WEIGHT IS 275 LBS.
4. THE VALUES OF op, Rp, AND � ARE 1.0, 2.5, AND 1.0 RESPECTIVELY, AS PROVIDED IN ASCE 7-10.
5. THE PEAK GROUND ACCELERATION (SS) USED IN THE CALCULATIONS IS 3.37g.•
6. POWERWALL ANCHORAGE DESIGN HEREIN IS BASED ON THE 2015 INTERNATIONAL BUILDING CODE (2015 IBC) — CHAPTER 16
AND ASCE 7-10 SECTIONS 12 & 13.
7. SNOW LOADS ARE BASED ON TABLE 7-1 AND FIGURE 7-1 PER ASCE 7-10.
8. WIND SPEEDS ARE BASED ON FIGURE 26.5-1A PER ASCE 7-10.
9. WATERPROOFING FOR ALL EXTERIOR APPLICATIONS SHALL BE PROVIDED BY THE INSTALLER/OWNER.
10. OWNER SHALL VERIFY WALL/BUILDING IS STRUCTURALLY ADEQUATE TO SUPPORT POWERWALL UNIT.
WHERE OWNER WOULD LIKE TO ADD SUPPLEMENTAL WALL STUDS TO AVOID LOADING EXISTING WALL,
AT METAL STUD CONSTRUCTION: USE 21 %2%16 GA. STUDS MIN, W/MAX HT. = 12'-0"
AT WOOD CONSTRUCTION: ADD ADDITIONAL WALL STUD TO MATCH EXISTING CONSTRUCTION.
11. SEE FLOW CHART ON PAGE 3 FOR APPLICATION INSTRUCTIONS.
TESLA POWERWALL GENERAL NOTES SHEET
03/30/17 SCALE Sheet
N/A 1 2/10
WOOD STUD
F
ANCHORING
DIRECTLY TO
STUDS ?
In
POWERWALL ANCHORAGE
WALL CONSTRUCTIONTYPE
METAL STUD CONCRETE/CMU/BRICK
DO YOU HAVE- MINIMUM FsEE DETAIL
18 GA STUDS Cl AND C2
ON SHEET 7
YES
NO, OR CANNOT SEE DETAIL
BE CONFIRMED MS1 AND MS2
,ON SHEET 5
ANCHORING INDOOR OR
'OUTDOORS ?
SEE DETAIL
INDOORS
OUTDOORS
17
W1 AND W2
ON SHEEP 4
IS IN WALL BACKING
ARE YOU INSTALLING
OR FACE—MOUNTED
NO
THE' UNIT IN HIGH
YES
ATTACHMENT OR
ATTACHMENT DIRECTLY
" WIND AREAS"
TO PLYWOOD
PREFERRED?
SEE DETAIL
MS5 AND MS6
IN—WALL
FACE— MOUNTED
PLYWOOD
ON SHEEP 6
ATTACHMENT
IS IN—WALL BLOCKING
OR FACE—MOUNTED SEE DETAIL SEE DETAIL SEE DETAIL P1
ATTACHMENT OR MS3 AND MS4 U3 AND U4 ON SHEET 10
ATTACHMENT DIRECTLY ON SHEET 6 ON SHEET 9
TO PLYWOOD
PREFERRED?
IN—WALL FACE—MOUNTED PLYWOOD
ATTACHMENT.
EDETAIL AND EDETAIL
W4 UEAND U
W3 2 ON SHEET 10
ON SHEET 4 ON SHEET 8
•* HIGH WIND AREAS, WHERE WIND SPEED EXCEEDS 115 MPH PER ASCE 7-10 FIG.26.5-1A: ALABAMA,
ALASKA, CONNECTICUT, DELAWARE, FLORIDA, GEORGIA, HAWAII, LOUISIANA, MARYLAND, MASSACHUSETTS,
MISSISSIPPI, NEW JERSEY, NEW YORK, NORTH CAROLINA, RHODE ISLAND, SOUTH CAROLINA, TEXAS, VIRGINIA.
Y
TESLA POWERWALL
INSTALLATION FLOW CHART
SCALE Sheet
03/30/17
1"=1'-0" 3/10
•
•' 1
EXISTING 2x WOOD
• WALL STUDS, MIN
AT 12" TO 24" SPACING
F GYPSUM BOARD OR SHEATHING ' I
WHERE OCCURS, TYPICAL
E i
I I
i POWERWALL BRACKET. f
POWERWALL UNIT NOT
SHOWN FOR CLARITY f
MINIMUM 2Y2" PENETRATION �
INTO WALL STUDS
I
*�0- i I 2, ` r I FASTEN BRACKET TO WALL W/ (4)- Y"0
i
I i
i i I WOOD SCREWS W/ 2J¢" PENETRATION TO
I
I I I STUDS BEYOND. PROVIDE MINIMUM (1)
SCREW ® EACH CORNER f
IN ANY HOLE f
♦ /� I 12" MIN I i � �� POWERWALL WALL BRACKET
POWERWALL UNIT f
WOOD STUD ATTACHMENT: FRONT VIEW W1 WOOD STUD ATTACHMENT: SIDE VIEW W2
EXISTING 2x WALL STUDS MIN
AT 12" TO 24" SPACING
` GYPSUM BOARD OR
SHEATHING WHERE OCCURS TYPICAL /.
E f/
I i f I ' • 2x4 BLKG W/ (2) 16d NAILS INTO
EACH END OF BLOCK OR (4)-8d TOE fj
NAILS INTO EACH END OF BLOCK TO f
WALL STUDS f
POWERWALL BRACKET. r
i I POWERWALL UNIT NOT f,
I I
SHOWN FOR CLARITY f
co I _ ,, POWERWALL WALL BRACKET
" FASTEN BRACKET TO WALL W/ (4)-Y4"0
WOOD SCREWS W/ 2NZ" PENETRATION
TO BLOCKING BEYOND. PROVIDE
- �, MINIMUM (1) SCREW ® EACH' CORNER
r- i 'A — IN ANY HOLE f I I
POWERWALL UNIT . f
• _ I I
12" MIN
MINIMUM 2NZ" PENETRATION f
INTO WALL STUDS
` ////`��, d I�
WOOD STUD, W/ BLOCKING: FRONT VIEW W3 WOOD STUD, W/ BLOCKING: SIDE VIEW W4
NOTE: SEE GENERAL NOTES ON SHEET 2.
TESLA POWERWALL, BRACKETATTACHM ENT TO WOOD STUD
SCALE Sheet
03/30/17
1"=1'-0" 4/10
I
METAL WALL STUD (MINIMUM 25 GAUGE)
I I AT 12" TO 24" SPACING
GYPSUM BOARD '
,,, �'• i OR SHEATHING,
I
*WHERE OCCURS, TYPICAL'—
FASTEN
YPICAL FASTEN BRACKET TO BACKING W/
! µ "" I (8)—#14 SHEET METAL SCREWS.
PROVIDE MINIMUM (2) SCREW AT EACH
{ !2 MIN 1 I '-.CORNER, MIN 3—THREAD PENETRATION i
• z ! TYP �' I BEYOND STUD -
! i :
! !t POWERWALL BRACKET.•
'oo! ! "` t i POWERWALL- UNIT NOT
! I SHOWN FOR CLARITY `
ATTACH BACKING TO METAL STUDS W/ 12
1,? s GAUGE 3"x3" ANGLE CLIP OR SIMPSON' I �e
! — u ! SFC2.25 CLIP W/ (2)—#10 SHEET METAL
A a i SCREWS IN EACH LEG
I'
12" MIN
POWERWALL BRACKET j
PROVIDE 2)r"x%"x22 GA. BACKING STUD IN WALL WHERE POWERWALL UNIT.
POWERWALL BRACKET SLOTS DO NOT LINE UP W/ EXISTING ?
METAL STUDS
METAL STUD W/ BACKING: FRONT VIEW (NIS 3 METAL STUD ATTACHMENT W/ BACKING: SIDE VIEW
METAL WALL STUD /
IV (MINIMUM 25 GAUGE)
` I 2" MIN I I AT 12" TO 24" SPACING,
I TYPICAL I GYPSUM BOARD _ r/
OR SHEATHING
WHERE OCCURS, TYPICAL . .�
<kaeo
I FASTEN BRACKET TO BACKING W/(12)—#14
HEXHEAD SHEET METAL SCREWS. PROVIDE'
! I MINIMUM (3) SCREWS AT EACH CORNER i
X
POWERWALL BRACKET.
! I POWERWALL UNIT NOT
12" SHOWN FOR CLARITY
co
! ! MIN
{ i POWERWALL BRACKET V
! 4 i POWERWALL UNIT
ATTACH BACKING TO METAL STUDS W/ 12-
GAUGE
2GAUGE 3"x3" ANGLE CLIP OR SIMPSON• I .I
SFC2.25 CLIP W/ (2)—#14 SHEET METAL I I'
I I I SCREWS IN EACH LEG I"
PROVIDE-2V'x1Y4"x22 GA BACKING STUDS MIN IN, WALL WHERE
POWERWALL BRACKET SLOTS DO NOT LINE UP W/ EXISTING I I II
METAL STUDS
METAL STUD W/ BACKING: FRONT VIEW MS5 METAL STUD ATTACHMENT W/ BACKING: SIDE VIEW I
NOTES: '1. SEE GENERAL NOTES SHEET 2.
2. METAL STUDS SHALL CONFIRM TO ASTM A653' MATERIAL OR. EQUIVALENT W/ MIN YEILD STRENGTH OF 33 KSI
' TESLA .POWERWALL BRACKET ATTACHMENT TO METAL STUD
r SCALE Sheet
03/30/17
1"=1'-0" 6/10
FASTENER SCHEDULE "A"*
MANUF . MODEL DIAMETER EMBEDMENT
SIMPSON. TITEN -Ya„0 1Yz'' .
HILTI KWIK—CONN II + Ya„0 1Y
POWERS TAPPER'+ 4"0 1Yz
* USE FASTENER 'SCHEDULE "B” IF THE POWERWALL CLEAR HEIGHT FROM FINISHED FLOOR IS MORE THAN a
2'-9 AND/OR IF THE GOVERNING JURISDICTION `WHERE THE'POWERWALL IS BEING INSTALLED REQUIRES
A FASTENER ESR ;REPORT. (SEE WWW.ICC–ES.ORG) OTHERWISE, FASTENER SCHEDULE "A” IS PERMITTED. 77 --
CMU
.CMU OR CONCRETE WALL" .
1)�t MIN.—TYP/
i ! /
FASTEN BRACKET TO WALL4-
PER 'FASTENER TABLE PROVIDE ��'
� (1) SCREW AT EACH CORNER, IN,ANY HOLE i� \/
00
it
r POWERWALL BRACKET. {\
POWERWALL UNIT NOT
'SHOWN FOR CLARITY
POWERWALL BRACKET
, 12" MIN i
POWERWALL UNIT
VARIES, SEE FASTENER
SCHEDULE NOTES
r GROUND SURFACE
CONCRETE/CMU ATTACHMENT: FRONTVIEW . C1` "
CONCRETE/CMU ATTACHMENT SIDE VIEW ,,C2
NOTE:
1. SEE GENERAL NOTES ON SHEET 2.:
2. CONCRETE, MASONRY, AND BRICK XOMPRESSIVE, STRENGTH SHALL BE 2500 -PSI; 1500 PSI, AND 1700` PSI MINIMUM, RESPECTIVELY."
TESLA 'POWER -WALL 'BRACKET ATTACHMENT TO CONCRETE/CMU WALL
03/30/17 SCALE Sheet F.
1"=1'-0" 7/10
FASTENER SCHEDULE "B"*.
MANUF
MODEL
DIAMETER
EMBEDMENT
ESR# ,-
SIMPSON
TITEN HD
3/"0 '-
2-Y4"
ESR -2713 (CONCRETE) & .ESR -.1056 (CMU)
HILTI
KH—EZ •.. _
1 ;..
ESR --3027 (CONCRETE) & ESR`305j6 (CMU)
POWERS'
WEDGEBOLT +
318"o
1Yz"
ESR-2526._(CONCRETE) & ESR7.1678 (CMU) -1
* USE FASTENER 'SCHEDULE "B” IF THE POWERWALL CLEAR HEIGHT FROM FINISHED FLOOR IS MORE THAN a
2'-9 AND/OR IF THE GOVERNING JURISDICTION `WHERE THE'POWERWALL IS BEING INSTALLED REQUIRES
A FASTENER ESR ;REPORT. (SEE WWW.ICC–ES.ORG) OTHERWISE, FASTENER SCHEDULE "A” IS PERMITTED. 77 --
CMU
.CMU OR CONCRETE WALL" .
1)�t MIN.—TYP/
i ! /
FASTEN BRACKET TO WALL4-
PER 'FASTENER TABLE PROVIDE ��'
� (1) SCREW AT EACH CORNER, IN,ANY HOLE i� \/
00
it
r POWERWALL BRACKET. {\
POWERWALL UNIT NOT
'SHOWN FOR CLARITY
POWERWALL BRACKET
, 12" MIN i
POWERWALL UNIT
VARIES, SEE FASTENER
SCHEDULE NOTES
r GROUND SURFACE
CONCRETE/CMU ATTACHMENT: FRONTVIEW . C1` "
CONCRETE/CMU ATTACHMENT SIDE VIEW ,,C2
NOTE:
1. SEE GENERAL NOTES ON SHEET 2.:
2. CONCRETE, MASONRY, AND BRICK XOMPRESSIVE, STRENGTH SHALL BE 2500 -PSI; 1500 PSI, AND 1700` PSI MINIMUM, RESPECTIVELY."
TESLA 'POWER -WALL 'BRACKET ATTACHMENT TO CONCRETE/CMU WALL
03/30/17 SCALE Sheet F.
1"=1'-0" 7/10
r
MOUNT BRACKET TO STRUT W/ (4) Y4"0 HEXHEAC
iJ SCREW W/ STRUT NUT. :
I 1 %"x 1 %"x 12 GA WALL STRUT
( FASTENED INTO MINIMUM (3) WALL STUDS, WITH. (1)
i FASTENER ® EACH STUD. USE Y"O WOOD SCREWS K,
,4 o W/MINIMUM 2Y" PENETRATION INTO STUD. MOUNT '
I BRACKET TO STRUT W/ (4)-Y4"O HEXHEAD SCREW W/
STRUT NUT.
i z_ • i _ _
POWERWALL BRACKET.
POWERWALL UNIT NOT
i i Y SHOWN FOR CLARITY
7 4
g i GYPSUM BOARD OR SHEATHING,
WHERE OCCURS TYPICAL
12" MIN
EXISTING 2x WOOD WALL STUDS
AT 12" TO 24" SPACING
UNISTRUT ALTERNATE: FRONT VIEW U1
GYPSUM BOARD OR SHEATHING,
WHERE OCCURS TYPICAL
POWERWALL UNIT
EXISTING 2x WOOD WALL STUDS AT
•r �` 12" TO 24" SPACING
r
POWERWALL BRACKET 41.1
'
-. UNISTRUT ALTERNATE: SIDE VI . EWL@
" NOTES: 1. SEE GENERAL NOTES ON SHEET 2.
6 -
2. ALL WALL STRUTS SHALL BE UNISTRUT P1000 OR.EQUIVALENT.
UNISTRUT WOOD STUDS
TESLA POWERWALL
♦ SCALE Sheet
03/30/17
• 1"=1'-0" 8/10
1 2'-0" I MAX /
II 111 112" ! PLYWOOD i FASTENERS—
MAX TMP
( I I - WHERE ATTACHING TO WOOD STUD WALL, ADD
ADDITIONAL Y4" WOOD SCREW NEAR EACH CORNER
(!I V I I AS SHOWN.
t 1 WHERE ATTACHING TO METAL STUD WALL, ADD
ADDITIONAL #14 HEX HEAD SHEET METAL SCREW
NEAR EACH CORNER AS SHOWN.
�I� r
Ji" THICK MINIMUM PLYWOOD
00 c POWERWALL BRACKET.
POWERWALL UNIT NOT
SHOWN FOR CLARITY
(l)—#14 WOOD SCREW ® EACH CORNER OF
BRACKET, (4 TOTAL).. DRILL SCREW SUCH THAT
1 o I ! �I \ I f t THE SCREW TIP PROTRUDES A MINIMUM OF Y4.
12" MIN
I ' ' PAST THE BACKSIDE OF THE PLYWOOD.,
WOOD OR METAL STUD WALL
FRAMING BEYOND t '
BRACKET ATTACHMENT DIRECTLY TO PLYWOOq4P)'
TESLA-POWERWALL • BRACKET ATTACHMENT DIRECTLY TO PLYWOOD
03/30/17 SCALE Sheet
1"=1•-0" 10/10
® r 7100 W. Florida Ave ( Hemet CA 92.545
O I izon
91-1,926.1176 j HorizoE�Solarpnwer.cor:.i
S O L..A R P O W' E R E IV ® '
JAN 11 2013 CELESTE SHEAFE -15148
Lighting Loads 78595 NAPLES DR., LA QUINTA, CA 92253
CITY OF LA QUINTA
220-12 Living area sq. ft. 2025 013111MUMAMOPMEDIT 6075 VA
220.52A Two small appliance circuits (required) x 1500 VA 3000 VA
220.52B Laundry circuit (s) 1 x 1500 VA 1500 VA
220.52A Additional small appliance circuit(s) 1 x 1500 VA 1500 VA
Lighting Load Subtotal = 12075 VA
220.42 First 3000 volt-amperes of lighting loads @ 100% 3000 VA
From 3001 to 120,000 VA @ 9075 35% 3176.25 VA
Remainder over 120,000 VA @ 0 25% 0 VA
Lighting Load Total Volt -Amperes = 6176.25 VA (A)
Appliance Loads
220.55 Household Cooking Applicances
(Use.table 220.55) # of Cooking Appliances 1 1000 VA
Cooking Units Total Volt -Amperes = 1000 VA ( B)
220.53 Appliance Loads (nameplates)
Microwave x 1500 VA 0 VA
Compactor x 1200 VA 0 VA
Dishwasher x 1200 VA 0 VA
Disposal x 600 VA 0 VA
Central Vacuum x 1800 VA 0 VA
Disposal dish A 0 VA
Appliance Subtotal = 7040 VA
Appliance Subtotal ( N/A x 75% correction') = 7040 VA (C)
'Correction applied when there are >_ 4 units. If < 4, record subtotal at 100%
422.10A Water Heater A 0 VA ( E )
220.14 Pool / Spa & Misc (unidentifiable) Loads OF � C IDEP-�
Breaker 1T `✓ SAFE
Misc 40 XWAG &�?�®j�® 7040 VA (F)
' A��� NS►avUC'(ION 0 VA 0 VA (F)
AF0� GO f 0 VA (F)
Total Volt-Amperesof((A)(B)(C)(D)( )(A'?,�►�gY 88.57 Amps (G)
220.14C A/C or heating loads D
AC1 50 +
s41a*v 67a zaet
Alan Gillett
1004233,C46
in
i
Total = 8800 240 45.83 Amps (H)
Total Service ( H) + ( G) = 134.40 AMPS
sR" •
Dn>MTw'n cn nmp wnM n M wnD m n cn D m m
I--) C D m m c z n p z w p m m�;J> D p m m c m X p�= 0 M x 0 0=
mmcpccCD -ummcT zmm(--=-zi mz-cnopmOmmcZm
�m�c�i 0v ��D D W G���m�� �DM M(=m��m-Dj0
A _ xr�7Dmn z
n Az��z0p DC(-�w�z����i�cDi�pc�nmz� O-0i
O m{z��:L7QD C/)>D--4 OOcnz-izrDn
Oi0Cf) - -Z M71c)AM mn=mcmn !! W M-00MU W On
cn�A0m-OOo0i0cMM00 M 0,0 -0c czi�0
vDi�mm�z�o�OU) 00mZz00 rn0„ZWOmOwv
Mc_- CD �co > DOZOCD� Dn W C -)I= Om
mmzzC n�mm�On r -mC�� OOnOmmmOz
�- DO -4M m?O �nOD- zcn0Ompm00
M -� O O z rr- Z cn cn Z —i 0 m O O m m 2 � M C M m z m
M;Z1 mcm�nO ��O-j0U7 m0�z -M 0
mcn IM13 o�D =-nn r<nC) cnXO
cn M
pO'�zymmM00mmm mO70Mcncn -� 0O0cn > �n
c:"cn>mczj I rT n� mp�0p �O. =w 0zm
cn>>Z C -)M �� o zmDm OD MC/) nm
cnzr`cnrnzr�0- mem'-� -zG Om�m0cn
z 0- X m m m M rnm 0C p m> w n -< z bu
a mzODOwmzcnm O�Nm rnm 0zcn�Dw
cn c m O
ocmiO�MoZn0NZ mZpmo mD nw=ci�zcn
D r m o O r o D v O m m rn D O O m z O 0
r 0 0 m rn z
M ---i0 70 M zM0 ;10c -"Z ?m AO -H x c/1 cn �w ct)>
D W v D O rn n In- 0 -00 m-0 0 m
r0 r=�Cmi �� --{ �D
m = O 0 m
z►
p Q n
� X 0 cn 0� m g-1* m -i v �
0�o0cZCDn`-mmwOZ M
mG>DMDxMx W-1 XZDo T�
-z�j�
.00x0G0(/)iMooZmDmOOmm=
cCa
<
DOCZi
r -i N2
rn Dx Z c� c')Ol
D Z
0H
M v m 0 m m= D p fTl O`
J a
rrY
mm�0 0-ncn 0G)>C) Cn -(
p
--j 70 w A=��mG)=mX O
m rn 0 n
O m
_
M
N (rn') m m Cmc Z-0 C-) M n O r
�cnc;)o70mzc /nn
rfl M> 0 C
m a p SI D O DO
m
n (n
�OpOmzTmcnOO-Ei-Dm n
m� z X(=
c
A m EZ< z
= O m Cc/) m U) 2�� .x 0 � Q T r
M -4 x�O-<m0� nmmmn cn fTl
wmr���w OO��O
U) cf)
-I c
--A
-imwm�mDm v -cnOnO
m
V y.
€
O
0 D m m m m m O
D z= b m0 0 z O m
y
X= x m= '
m p 0o A o m �_ z
=
D r Om D D
-0 0 5, 55 0 O � r z m5 -> O* rn
O 00
0 4zM-M0-<wMp0cn
' m m m m v z rn -0
m
c"� Z� M x
W n w U�O0M n_{ �-i n
o
Z rT! cn<z M n T
M 0 O m m CO rn m m
m m
z
p m 0 7 m m
M m z
xm
0 =
M n D
710
Mz
in
x
ID
L
z
I
L
HOSOPO CORP. OWNER
h
7100 W. Florida Ave CELESTE SHEAFE
o r i zUHemet, Ca 92545 78595 NAPLES DR.
t.,Z (951) 926-1176
�` LAQUINTA, CA 92253
S 0 L A R P 0 W E RCSLB- C -as #1004233 �' ' PHONE: (760) 609-7524
JOB#:15148
78s9,- jwML v'
X01
W N Cf)
E�: Z Z Z
2
r
O ,--.
rn
z,,
-mi
D Z
-0 -0 CO --A
D w D m
m
z0c-)GO
_m
M � A D
r M
U) cf)
-I c
cf)O�
z
O
y
m
M
O 00
D O
y
m
m
o
z
z
W z
xm
O
cn
Mz
Wm
=
m
c� z
zG)m n
m
z N
OO
�
<
O
Q°cn
D
Or
m
m
cOz
o z z
z
m70
<O
-A
S
D
g
ni
�m
�
�m
i>
cmo
D cn
in
x
ID
L
z
I
L
HOSOPO CORP. OWNER
h
7100 W. Florida Ave CELESTE SHEAFE
o r i zUHemet, Ca 92545 78595 NAPLES DR.
t.,Z (951) 926-1176
�` LAQUINTA, CA 92253
S 0 L A R P 0 W E RCSLB- C -as #1004233 �' ' PHONE: (760) 609-7524
JOB#:15148
78s9,- jwML v'
X01
W N Cf)
E�: Z Z Z
2
D--_.
rn
z,,
-mi
-0 -0 CO --A
D w D m
z0c-)GO
M � A D
r M
O
U)
M
N 0> m
O
X
O
C5 I-
D 0 D
m
0
M
=
c� z
zG)m n
m
z N
0 M r
�
m
r''zz
M 20 O
o z z
D 0
G) --i
�U m
D cn
L.00 dp
TESLA POWER WALL SITE PLAN &
DATE: 1/9/2018 REVISIONS: _ GENERAL NOTES
DESIGNER: S.S. _ SHEET 1
CHECKED BY: X.X
Au C Ui zi� *Do y
9. 1
TESLA SPECIFIC NOTES
1. THERE WILL BE A TEMPORARY DISCONNECTION OF SOLAR DURING
THIS RELOCATION. CUSTOMER IS RESPONSIBLE TO CONFIRM WITH
THE ORIGINAL SOLAR INSTALLER AND/OR SYSTEM OWNER THAT THIS
RELOCATION OF THE MAIN POINT OF INTERCONNECTION WILL NOT
VOID ANY APPLICABLE WARRANTIES OR VIOLATE ANY APPLICABLE
CONTRACTUAL OBLIGATIONS.
2.INSTALLATION OF A CATS HARDWIRED CONNECTION OR POWERLINE
CONNECTION FROM ENERGY STORAGE SYSTEM MONITORING HUB TO
CUSTOMER'S INTERNET ROUTER. NO WIRELESS CONNECTIONS
PERMITTED.
3.COMMISSIONING AND TESTING OF SYSTEM TO INCLUDE A
SIMULATION OF GRID OUTAGE WHILE CUSTOMER IS HOME TO
SIMULATE PROPER OPERATING EXPERIENCE DURING GRID OUTAGE.
REVIEW OF MONITORING PLATFORM WITH CUSTOMER TO SHOW
VISIBILITY INTO SYSTEM OPERATIONS VIA COMPUTER AND SMART
DEVICES.
4.D000MENTATION AND PERMANENT LABELING OF ALL NEW CIRCUIT
BREAKERS INSTALLED IN PROTECTED LOADS PANEL TO IDENTIFY
THE CIRCUIT AND APPLIANCES CONNECTED.
RELOCATE CIRCUITS TO THE NEW
PROTECTED LOAD SUB PANEL WITH
INSTALLATION OF ALL NEW CONDUIT, WIRE
AND OTHER COMPONENTS AS NECESSARY
WITHIN 25' OF EXISTING LOCATION.
BRANCH CIRCUIT WIRING MODIFIED,
REPLACED, OR EXTENDED MORE THAN 6
FT. SHALL BE REQUIRED TO HAVE AFCI
PROTECTION. ART. 210.12(B)
ALL WORK SHALL COMPLY WITH NEC
(480.1-480.10) AND (690.71-690.85)
BATTERY STORAGE SYSTEM NOTES
(E) PV SYSTEM: -
(34) KYOCERA KU265-6ZPA MODULES
(1) FRONIUS PRIMO 7.6-1 INVERTER
ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL
COMPLY WITH THE FOLLOWING APPLICABLE CODES:
2016 CA BUILDING CODE, PART 2
2016 CA RESIDENTIAL CODE PART, 2.5
2016 CA MECHANICAL CODE, PART 4
2016 CA ELECTRICAL CODE, PART 3
2016 CA PLUMBING CODE, PART 5
2016 CA EXISTING BUILDING CODE, PART 10
2016 CA GREEN BUILDING STANDARDS CODE, PART 11
2016 CA REFERENCE STANDARDS CODE, PART 12
2016 CA FIRE CODE
BACKFED BREAKERS MUST BE LOCATED @ OPPOSITE END OF BUS
BAR FROM MAIN BREAKER OR MAIN LUG ON GRID SIDE. WHEN A
BACKFED BREAKER IS THE METHOD OF UNTILITY INTERCONNECTION,
BREAKER SHALL NOT READ TINE OR LOAD'.
PER CEC 250.64(C): CONDUCTOR SPLICES ONLY ALLOWED WITH
COMPRESSION CONNECTORS OR EXOTHERMIC WELDING
VERIFY (E) LIFER GROUND NEAR MSP. IF (E) LIFER IS NOT ACCESSIBLE
OR VERIFIABLE, INSTALL A NEW 5/8"0 X 8' LONG GROUNDING ROD
AND BOND SOLAR SYSTEM EQUIPMENT GROUNDING ACCORDINGLY.
CT
------------�
I I
I
8 I
A�q
I
I 2
I I
t00A
1
TESLA
POWER WALL 2
- CAT 5 HARDWIRED
INTO ROUTER NO
WIRELESS
CONNECTION
PERMITTED
—CrLQ
b
11
ITY OF LA QUINTA
glLDING & SAF\E�TY DEPT.
IFOR CONSTRUCTION
I
DAT BY
CT
Conductors
QPV
OEXISTING
WIRES
1
200A X 1.2 = 240A
(1) POWERWALL BATTERY TOTAL BACKFEED = 26.04A
200A BUS W/ 100A MAIN
1
3 #10 AWGTHWN-2
0.75"
EMT
0.0844
16%
1 #10 AWGTHWN-2EGC
O
3 #3 AWGTHWN-2
1.00"
EMT
0.3285
38%
1 #8 AWGTHWN-2 EGC
CT
CURRENT TRANSFORMER
1
TESLA
CONDUCTORS
Q
POWERWALL
BREAKER
30A 2P BREAKER
INCOMING
UTILITY
SERVICE
I
M
I
I
120/240V
1 -PH, 3W
TESLA WALL 2 EQUIPMENT
QPV
BREAKER
40A -2P, 240V
1
200A X 1.2 = 240A
(1) POWERWALL BATTERY TOTAL BACKFEED = 26.04A
200A BUS W/ 100A MAIN
1
QSUB
2
PANEL
BREAKER 240V
QANEL
SUB
BREAKER
100A 2P BREAKER
1
MAXIMUM ALLOWABLE AMPACITY = 35
TESLA
BACK UP SUB PANEL TO MSP
WIRE AMPACITY 2016 CEC
POWERWALL 2
AC 5KW, 240V, 13.5 KWH
1
TESLA
CONDUCTORS
Q
POWERWALL
BREAKER
30A 2P BREAKER
1
2016 CEC 310.15 (8)(3)(a)
BACKUP
TESLA 200A ATS / METER
1
6
GATEWAY
DESIGN AMPACITY = 100
(E) MAIN SERVICE PANEL &
1
QMAIN
SERVICE
PANEL
METER: 200MAIN BUSBAR
W/ (N) 150 CENTER FED
MAIN BREAKER.
QMONITORING
TESLA MONITORING UNIT
1
CIRCUITS 30A OR LESS
Qg
(E) LOADS
RELOCATED TO SUB PANEL,
TOTAL LOAD NOT TO
EXCEED SUB PANEL RATING
GATEWAY
1
PANEL BREAKER
100A 2P BREAKER
POWERWALL BATTERY BACKFEED CALC:
PER NEC A.705.12(D)
5000W / 240V = 20.83A
MSP BUS BAR = 200A
20.83A X 1.25 = 26.04A
200A X 1.2 = 240A
(1) POWERWALL BATTERY TOTAL BACKFEED = 26.04A
LARGEST OCPD: 240A -150A = 90A
65.67A < 90A
SOLAR BACKFEED CALC:
31.7A X 1.25 = 39.625A
(E) PV TOTAL BACKFEED = 39.625A
TOTAL SYSTEM(S) BACKFEED:
26.04A + 39.625A = 65.67A
SUB PANEL BACKFEED CALC:
200A X 1.2 = 240A
240A -100A = 140A
40A + 30A = 70A
70A < 140A
BATTERY TO BACK UP SUB PANEL
WIRE AMPACITY 2016 CEC TABLE
THERMAL DERATE FACTOR
310.15(8)(16)
2016 CEC TABLE 310.15(B)(2)(a)
NUMBER OF CONDUCTORS2016
CEC 310.15 (13)(3)(a)THWN-2
- 75'C
10 AWG
30
0-3
35 AMPS X 1 X 1
MAXIMUM ALLOWABLE AMPACITY = 35
DESIGN AMPACITY = 30.00
BACK UP SUB PANEL TO MSP
WIRE AMPACITY 2016 CEC
NUMBER OF
THERMAL DERATE FACTOR
TABLE 310.15(8)(16)
CONDUCTORS
2016 CEC TABLE 310.15(B)(2)(a)(C°)
TH WN -2 - 75° C
2016 CEC 310.15 (8)(3)(a)
3 AWG
30
0-3
100 AMPS X 1 X 1
MAXIMUM ALLOWABLE AMPACITY = 100
DESIGN AMPACITY = 100
L1J
z :�Ei CV
J Q
J (D LLJ
(D _Q =
z Q C!)
C�
_J
I �
L.0 o
w
O
Qx
J ao
C/)� `3
W N_
wo
W
uI CnU
Cn LL,U
M N
�A VJ
N
L W
U o
w
u=JUo
J co
of U3CL
Q m
LLI LLJ <
�ZZLL,
�
LU 11
u; o m
O cw1O°0—
O"''
CL) N
U
Q o
O mv�o
Nn
(L o 0) m
LL m
in �UCo,U
Oo°'°_'m
OJ
.r. N to U)
TYPICAL SYSTEM'CAYOUTS
WHOLE HOME BACKUP
t_.......__.. .. ,
�• � � � �_� �Op[ional
r Z=.
Solar
Solar inverter
------------------------- Main panel
7 = S L n
~ Powerwall Whole home
t backup
s
PARTIAL HOME BACKUP
Optional
f � I
'
POWERWALL ;
.w
Fol
Backup Gateway
Tesla Powerwall is a fully -integrated AC battery system for
Grid
;r
residential or light commercial use. Its rechargeable lithium -ion
service disconnect
y
-
battery pack provides energy storage for solar self -consumption,
?
Gad shifting, and backup.
' '• :
Powerwall's electrical interface provides a simple connection to
'
any home or building. Its revolutionary compact design achieves
market -leading energy density and is easy to install, enabling
s r
owners to quickly realize the benefits of reliable., clean power.
PERFORMANCE SPECIFICATIONS
MECHANICAL SPECIFICATIONS
_........... . ....................... __._._._...._... _.................. ---................. _............... -- .... _....... __...... -"---..._..._._.—.....__.._._—_...
AC Voltage (Nominal) 120/240 V
.............. ..... _._.......... _........ __..... _......... — ..... --.......... _._._...-'- ....--"-'- - ....._....—------- -- ...... —... _
Dimensions 1150 mm x 755 mm x 155 mm
(45.3 in x 29.7 in x 6.1 in)
Feed -In Type Split Phase
•_—_.___._...—..._. _...__...... _...
• y .
_... _._................ ... _.......... _.................................................................. _...... __..._.............. -... ......... ......... _-.... -••-... -_-_.._....--____-----.._....-__-__.......
,
Weight 125 kg (276 lbs)
GridFrequency 60 Hz
... _..... _-........... -...... ........ ...... _......... _... _......... _....... _.................. .-------- —_._.._._...._..._..
_....
` --- ---------- - - -- ---- - =— ------- -- - ------------............
Mounting option's Floor or wall mount
yam'
Total Energy' 14 kWh
-._....---...-'---------__.__._—_..._.—_ ....... ---._._-----.._._.._.._.___._...._._..�.._......__.._-__._--
..----.._...._--....---...._....-..._.._..__..__............_.._.._.._..---.........................._.._.._...._....................._................_........_.._..__.._..................---.........._.._..
Usable Energy' 13.5 kWh
755 mm 155 mm
-
—
(29.7 in) , (6.1 in):
Real Power, max continuous 5 kW (charge and discharge)
- ----
it
Real Power, peak (10s) 7 kW (discharge only)
,
Apparent Power, max continuous 5.8 kVA (charge and discharge)
... _..... _........ _.......................... ----........... _.......... _..--... -... .......... ....................... .............. .............. __.................. __.... _... _.............................................
1
Apparent Power, peak (10s) 7.2 kVA (discharge only)
T = 5 L Pi
._......__.._...._..-----.._.........._.._._.........-----......._._......._.. - - ----....-....--- .._—.......... -- ' -
Maximum Supply Fault Current 10 kA
L
-
- - ......-- - ._.._...... - ....-' ......-...._..._......----- .........._...._.. -' -.._.....................----.._.........._........_.._.
Maximum Output Fault Current 32A
1150 mm
(45.3 in)
Overcurrent Protection Device 30 A
I{r
_..^._.:_.__............._.._..__.-.._......__.... -_.._....._..__..._..:......_......--'-'--........... _._......__..............-'-- .... _.............
Imbalance for Split -Phase Loads.........................._..._100%.........................._.................................... ... _......... ... ....
Power Factor Output Range +/- 1.0 adjustable
- --------------- - --- —— --------- — - ----'---......._ ..........
Power Factor Range (full -rated power) +/-0.85
....................
_._....... _.._._.-._._...._.........__....-........_............._........................._._..........._.....---._.................._.............._.__........._._....................._
Internal Battery OC Voltage 50 V
t
_.... ---- .... .............. --._.._._.._.__...----...... -
Round Trip Efficiency' .2 - 90%, .,
Warranty to years
ENVIRONMENTAL SPECIFICATIONS
' :'Values provided for 25'C (77°F), 3.3 kw charge/discharge power.
........ _._.__.-........_._._._...._.... _ __ __. __..__._.._., _..._ ...__ _ _......... ......... .... ..._... - ........ .... _.._
2 A to battery to AC. at beginning of life.
Operating Temperature -20°C to 50°C (-4°F to 122°F)
...
..
_.._. ......... _-
Operating Humidity (RH) Up to 100%, condensing
-
Storage Conditions -20°C to 30°C (-4°F to 86°F)
-
COMPLIANCE INFORMATION
- Up to 95% RH, non -condensing '
•
State of Energy (SoE): 25% initial
_.....__.........
. -
Certifications ` + UL 1642, UL 1741, UL 19731
__.._-.___.__, ..._._ .- _._.__ _. ._......___.__..._..._......__......._._..
Maximum Elevation - 3000 m ( 9843 ft)
•
UL 9540, UN 38.3
�. _ .._.� �,•,,.,, ,,;: r .,_.._,._.._..___ _... _...... .............. .................P ... _Y _ _. ...................
Environment Indoor and outdoor rated
Grid Connection T Worldwide Compatibility
Enclosure Type - NEMA 3R
.- `•
Emissions � FCC Part 15 Class B, ICES 003 •
'
a
. 4
Ingress Rating IP67 (Battery 8 Power Electronics)
Environmental RoHS Directive 2011/65/EU
IP56 (Wiring Compartment)
Seismic AC 156. IEEE 693-2005 (high)
Wet Location Rating Yes '
_
#
Pollution Degree Rating PD3
Noise Level @ 1 m . -0 dsA at 30-'f' 86'F) _
+i
T = S L n
ESLA.COM/ENERGY
TYPICAL SYSTEM'CAYOUTS
WHOLE HOME BACKUP
t_.......__.. .. ,
�• � � � �_� �Op[ional
r Z=.
Solar
Solar inverter
------------------------- Main panel
7 = S L n
~ Powerwall Whole home
t backup
s
PARTIAL HOME BACKUP
Optional
f � I
?•' Solar
Solar inverter
-------------------------
Sub panel Backup Gateway Main panel Utility meter Grid
' y Powerwall Backup loads ! 'Home loads
T = S L Pi NLS - BACKUP - 2017-07-17 riESCA.CO. I/ENERGY
Fol
Backup Gateway
Utility meter
Grid
including
service disconnect
y
?•' Solar
Solar inverter
-------------------------
Sub panel Backup Gateway Main panel Utility meter Grid
' y Powerwall Backup loads ! 'Home loads
T = S L Pi NLS - BACKUP - 2017-07-17 riESCA.CO. I/ENERGY
r POWERWALL
Backup Gateway
The Backup Gateway for Tesla Powerwall provides energy management
and monitoring for solar self -consumption, load shifting, and whole -
home or partial -home backup.
The Backup Gateway controls connection to the grid, automatically
detecting outages and providing a seamless transition to backup
power. When equipped with a circuit breaker, the Backup Gateway can
be installed at the service entrance.
The Backup Gateway communicates directly with Powerwall, allowing
you to monitor home energy use and manage backup energy reserves
from any mobile device with the Tesla app.
PERFORMANCE SPECIFICATIONS
_..._.._._........_—...._..__.....---...__.....—.........__..__....._........_.__........._................. _....... ........ _.._............... _........... _.......
AC Voltage (Nominal) 230 V, 120/240 V
Feed -In Type Single 8 Split Phase
Grid Frequency
......................... _......... . ............... _.....
Disconnect Current
50 and 60 Hz
200 A
Maximum Input Short Circuit Current 10 kA
Overcurrent Protection Device' 100-200 A; Service Entrance Rated
- ..._...---.... - - - --- ------ --- - - ----- ... _.... _.......
Overvoltage Category Category III
-------- ---------- . ...........---.-............ ... _..__......... _...... _.... _.... __........... -_.... ...... ......... _............ ........... ---............ ............. _... ....... _......
AC Meter Revenue grade (+/- 1 %)
MECHANICAL SPECIFICATIONS
....... ......... _........ _........... _._.............. ......... .... _._........ .......... ........ _...._._._.._._._......... - ........ _.._..... ...
,_.. ----
Dimensions 740 mm x 378 mm x 129 mm
- (29.1 in x 14.9 in x 5.1 in)
-- Weight 16.4 kg (36 lbs)
-- Mounting options Wall mount
- 378 mm 129 mm
(14.9 in) (5.1in)
Connectivity
._.... -._......... __.................... _................ _.................... _....._.........
Ethernet, Cellular (3G), Wi-Fi
_.......... _.................... _..... _.........PP_......................._............................. _.............. .......
User Interface
..............
Tesla A
-.... ...... - -----...... _..-- .... -_......_..----
Operating Modes
- ..--.._.._._—._.-._..— ---... --------._.._.__-
Support for solar self -consumption,
SPECIFICATIONS
load shifting, and backup
Backup Operation
Automatic disconnect for seamless
---- ----
backup transition
-- --- ._.._.... -- -- - ---......... ---..... ....... -.__......
Modularity
Supports up to 10 AC -coupled
........ ........ _....... _.... _.._................. _..... _.... -_-...... - ......... ..._
Powerwalls
.... ............--
Warranty
10 years
Circuit breaker required for installation at service entrance.
740 mm
(29.1 in)
COMPLIANCE INFORMATION
_ ..... —....... ---.................... _._... _.......... _... _.... ...... _.........
Certifications
_......_............ —................ _..... __................................ _... _......._................ _.... _... - ........ - -
UL1642,UL1741,IEC 61000-6-3,
- -
ENVIRONMENTAL
SPECIFICATIONS
IEC 62109-1, CSA C22.2.107.1,
--------------___.---_.-._-__.__-_--_---.
____..__...-...._._.-..__._.____._._..--_..._
EN 55024, EN 301 489-1,
Operating Temperature
-20°C to 50°C (-4°F to 122°F)
...... -....... _.._....._.....-_-...----...... . __ .......
EN 301 489-7, EN 301 489-17
Operating Humidity (RH)
Up to 100%, condensing
Grid Connection
-._...__-_.--..__...__..,—._..--..._-....
Worldwide Compatibility
_..-........ ..... .---......._.._.._... --..-...._...._._...
Maximum Elevation
3000 m (9843 ft)
Emissions
FCC Part 15 Class B, ICES 003
Environment
Indoor and outdoor rated
Environmental
RoHS Directive 2011/65/EU,
Enclosure Type
..-.......................... _......... - .._._._._._..__...
NEMA 3R
WEEEDirective 2012/19/EU,
I .... ..... ...................... ._.....__...__...._........_......_.._.-__-_.._.._._..__...__....._.._...__._,...._,___......._......_._....__:.._.__.....___.
_
Battery Directive 2006/66/EC
Ingress Rating
IP44
Seismic
AC156, IEEE 693-2005 (high)
Pollution Degree Rating
PD3
T S S L n
2017-07-17
-rESLA.COM/ENERGY
Step 10: Make AC Power Connections
1. Determine whether the installation requires that neutral be bonded to ground in the Backup
Gateway. In most cases, if the Backup Gateway is to be located between the electrical service
entrance and the main electrical panel, neutral should be bonded to ground. Otherwise,
bonding should be removed.
The Backup Gateway ships with neutral bonded to ground. To remove bonding, disconnect
the green wire between the ground bar and the neutral terminals.
Figure 39: Backup Gateway Ground Bar (top left) Bonded to Neutral (bottom right)
2. Connect the electrical service from the service inlet or from the main panel (depending on
the backup configuration) to the Backup Gateway source connection terminals according to
the following table and diagram (Fig 40). Strip the ends of the wires and insert them in the
corresponding Backup Gateway terminal lugs. Tighten the lugs to 30 Nm (22 Ib -ft).
NOTE: For electrical service connections to the Backup Gateway, use 16-120 mm2 (6 AWG to
250 kcmil), 90 deg C minimum copper (Cu) wire.
36 Powerwall Installation Manual
IVN
Dom°" C
Q2e' to 1 Qin 1 paaapet a
Source Connection
S1 _ S2
L1 L1 L2 L2 N N
Load Connections
O
Figure 40: Backup Gateway Power Connectors (shown with breaker installed)
3. Connect Powerwall to the main or sub electrical panel of the installation (depending on the
backup configuration) according to the following tables, for your electrical service type.
NOTE: For AC power connections to Powerwall, use 6-10 mm2 (10-8 AWG) 90 deg C
minimum copper (Cu) wire.
100 V, 120 V, 200 V, 220 V, 230 V, 240 V Single -Phase Service
Backup Gateway AC Wiring
Service Connection
Backup Gateway Terminal Wire Gauge
Line 1
Sl 16-120 mm2 (6 AWG - 250 kcmil)
Line 2
S2 16-120 mm2 (6 AWG - 250 kcmil)
Neutral
N 16-120 mm2 (6 AWG - 250 kcmil)
36 Powerwall Installation Manual
IVN
Dom°" C
Q2e' to 1 Qin 1 paaapet a
Source Connection
S1 _ S2
L1 L1 L2 L2 N N
Load Connections
O
Figure 40: Backup Gateway Power Connectors (shown with breaker installed)
3. Connect Powerwall to the main or sub electrical panel of the installation (depending on the
backup configuration) according to the following tables, for your electrical service type.
NOTE: For AC power connections to Powerwall, use 6-10 mm2 (10-8 AWG) 90 deg C
minimum copper (Cu) wire.
100 V, 120 V, 200 V, 220 V, 230 V, 240 V Single -Phase Service
Main/Sub Panel Breaker Terminal
Powerwall Terminal
Wire Gauge
Line 1
Ll
6-10 mm2 (10-8 AWG)
Neutral
L2
6-10 mm2 (10-8 AWG)
� CAUTION: For single-phase service, Neutral is not connected to the Powerwall N
terminal. It is instead connected to the Powerwall L2 terminal.
T E S L.,. Fri 37'
120/240 V Split -Phase Service
Main/Sub Panel Breaker Terminal
Powerwall Terminal
Wire Gauge
Line 1
Ll
6-10 mm2 (10-8 AWG)
Neutral
N
6-10 mm2 (10-8 AWG)
Line 2
L2
6-10 mm2 (10-8 AWG)
208 V Service
Main/Sub Panel Breaker Terminal
Powerwall Terminal
Wire Gauge
Line 1
Ll
6-10 mm2 (10-8 AWG)
Line 2
L2
6-10 mm2 (10-8 AWG)
4. On the Powerwall side, strip the ends of the wires and attach them to the corresponding
leads on the AC power harness using the provided wirenuts.
S. Plug the AC power harness into the AC connector in the Powerwall wiring compartment.
Ensure that the connector clicks into place.
n41
I�IhII�I'
Figure 41: Powerwall 2 AC Power Harness Connection
NOTE: The Powerwall connection to the main electrical panel requires a 30 A circuit breaker
with a short circuit current rating of 10 kA. This breaker serves as the disconnect for the
Powerwall, and must be wired in accordance with local wiring codes and regulations.
Powerwall Installation Manual