Loading...
0101-250 (OFC) Title 24-1 TITLE 24 REPORT CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED R' Title 24 Report for: FOR CONSTRUCTION Guard House. at Traditions DATE 6 BY Palm Desert, CA *?a. vs Avee 5� Project Designer: Report Prepared By: Joan D. Hacker Insu-Form Inc. 68255 Corta Road Cathedral City, CA 92234 (760) 324-0216 Date: r; 10/4/01 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. Q� This program developed by Gabel Dodd/EnergySoft, LLC (415) 883-5900. EnergyPro, 3.1 By EnergySoft Job Number. User Number. 2655 I TABLE OF CONTENTS I Cover Page Table of Contents Form ENV -1 Certificate of Compliance Form. ENV -2 Overall Envelope Method Form ENV -MM Envelope Mandatory Measures Form LTG -1 Certificate of Compliance Form LTG -2 Lighting Compliance: Summary Form LTG -MM Lighting Mandatory Measures Form MECH-1 Certificate of Compliance Form MECH-2 Mechanical Equipment Summary Form MECH-3 Mechanical Ventilation Form MECH-4 Mechanical Sizing and Fan Power Form MECH-MM Mechanical Mandatory Measures Room Heating Peak Loads Room Cooling Peak Loads EnergyPro3.1 By EnergySoft Job Number 1 2 3 5 11 12 15 16 17 19 21 22 23 25 26 User Number. 2655 CERTIFICATE OF COMPLIANCE Part 1 of 2 ENVA PROJECT NAME DATE Guard House at Traditions 10/4/01 PROJECT ADDRESS Palm Desert PRINCIPAL DESIGNER -ENVELOPE TELEPHONE ' ,iBuildin Permit #. ?,: u 9, ._.;". DOCUMENTATION AUTHOR - TELEPHONE- Insu-Form Inc. (760) 324-0216 cneed byrDat .. 'EnforeemenYA en Use GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 215 Sq.Ft 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL Ej HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION a NEW CONSTRUCTION ADDITION ❑ ALTERATION EXISTING + ADDITION METHOD OF COMPLIANCE NVELOPE COMPONENT ® OVERALL ENVELOPE PERFORMANCE STATEMENT:OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building envelope requirements. The documentation preparer hereby certifies that the document is accurate and complete. DOCUMENTATION AUTHOR SIGN TURE DATE - Joan D. Hacker b2i The Principal Envelope Designer hereby certifies that the proftwor oseWit %d building design represented in this set of construction documents is consistent with the other compliance forms and sheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the envelope requirements contained in Sections 110, 116 through 118, and 140, 142, 143 or 149 of Title 24, Part 6. Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the state of California as a civil engineer or mechanical engineer, or I am a licensed architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATU DATE LIC. # 12lGNA,tZp �/. �3 /1�• OS •O/ G. ENVELOPE MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. ENV -1: Required on plans for all submittals. Part 2 maybe incorporated in schedules on. plans. ENV -2: Used for all submittals; choose appropriate version depending on method of envelope compliance. ENV -3: Optional. Use if default U -values are not used. Choose appropriate version for assembly U -value to be calculated. EnergyPro 3.1 . By EnergySoft User Number. 2655 Job Number. Page:3 of 26 ENVELOPE COMPLIANCE SUMMARY Part 2 of 2 ENV -1 PROJECT NAME Guard House at Traditions -- --- - - -- -- - - i vcnui..a is rums. Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments DATE 10/4/01 OPAQUE SURFACES 0 0.69 Mill Ther mal Brk Unctd Default Surface Framing Act. # Type Type Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 1 Roof Wood 215 0.028 0 22 X I I R-38 Roof R.38.2x14.16 Guard House 2 lWall Wood 126 0.059 0 3 Wall Wood 208 0.059 90 90 90 X I I R-21 Wall .21.2x6.16 R-21 Wall .21.2x6.16 Guard House Guard House 4 Wall Wood 150 0.059 180 90 L I R-21 Wall .21.2x6.16 Guard House 5 Wall Wood 208 0.059 270 90 R-21 Wall .21.2x6.16 Guard House I 20 0.550 1 270 0.65 Double NonMtl Clear Default Guard House I I ' I I I I FENESTRATION SURFACES --••��•...�- •• �•..•...• , ,vv,�w a n u� ern anu +- iu,uw 5 iT zite vemcal lazlnNI-KL;inenNI-KL;Uenitication is required. azng # Type -- --- - - -- -- - - i vcnui..a is rums. Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 24 0.600 0 0.69 Mill Ther mal Brk Unctd Default 3uard House 2 Window 20 0.600 90 0.69 Mtl Thermal Brk Unctd Default 3uard House 3 Window 20 0.550 90 0.65 Double NonMtl Clear Default 3 uard House 4 Window 20 0.600 270 0.69 Mtl Thermal Brk Unctd Default uard House 5 iWindow 20 0.550 1 270 0.65 Double NonMtl Clear Default Guard House EXTERIOR SHADING # Exterior Shade Type SHGCJ Window Hat. Wd. Overhang Left Fin Right Fin Len, Hat, I-Ext,RExt, Dist en. Hgt. Dist. Len. Hgt. 1 None 0.76 4.0 6.0 2.0 0.1 2.0 2.0 2 None 0.76 4.0 5.0 2.0 0.1 2.0 2.0 3 None 0.76 6.8 3.0 2.0 0.1 2.0 2.0 4 None 0.76 4.0 5.0 2.0 0.1 2.0 2.0 5 None 0.76 6.8 3.0 2.0 0.1 2.0 2.0 EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page:4 of 26 OVERALL ENVELOPE METHOD Part 1 of 6 ENV -2 (PROJECT NAMEDATE l Guard House at Traditions J10/4/01 INDOW AREA TEST A. DISPLAY PERIMETER B. GROSS EXTERIOR WALL AREA C. GROSS EXTERIOR WALL AREA D. ENTER LARGER OF A or B E. ENTER PROPOSED WINDOW AREA Q ftX6= 7961 Sf X 0.40 = 7961; sf X 0.10 = sf DISPLAY AREA 31 sf 40% AREA $ sf MINIMUM STND. AREA 31 sf MAXIMUM STND. AREA 1 7 1-04 sf PROPOSED AREA F. WINDOW WALL RATIO = Proposed Window Area Divided by Gross Exterior Wall Area = 13.07% IF E IS GREATER THAN D OR LESS THAN C, PROCEED TO THE NEXT CALCULATION FOR THE WINDOW AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 6. 1. IF E GREATER THAN D: MAXIMUM PROPOSED WINDOW STANDARD AREA WINDOW AREA ADJUSTMENT FACTOR GO TO PART 6 TO CALCULATE ADJUSTED AREAS. 2. IF LESS THAN C: MINIMUM PROPOSED WINDOW STANDARD AREA AREA ADJUSTMENT FACTOR GO TO PART 6 TO CALCULATE ADJUSTED AREAS. I SKYLIGHT AREA TEST ATRIUM HEIGHT $ FT IF <= 55 FT IF > 55 FT X = 0.10 0.05 X 215 = 1 STANDARD % GROSS STANDARD ROOF AREA SKYLIGHT AREA PROPOSED SKYLIGHT AREA IF THE PROPOSED SKYLIGHT AREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIGHT AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 6. 1. IF PROPOSED SKYLIGHT AREA >= STANDARD SKYLIGHT AREA: SKYLIGHT STANDARD SKYLIGHT AREA PROPOSED SKYLIGHT AREA ADJUSTMENT FACTOR GO TO PART 6 TO CALCULATE ADJUSTED AREAS. EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page:5 of 26 OVERALL ENVELOPE METHOD Part 2 of 6 ENV -2 PROJECT NAME ASSEMBLY NAME (e.g. Wall -1, Floor -1) R-38 Roof Front Wall Window Left Wall Window Window Back Walt Right Wall Window Window DATE 10/4/01 Fl. n 7H STANDARD AREA' (Adjusted) U -FACTOR UA (F X G) 215 0.057 12.3 126 0.084 10.6 24 0.49C 11.8 208 0.084 17.5 20 0.49C 9.8 20 0.49C 9.8 150 O.OB4. 12.6 208 0.08 17.5 20 0.49C 9.8 20 0.49C 9.8 • If Window and/or Skylight Area Adjustment is Required Column E shall be 107 This Page Total 121 use Adjusted Areas from Part 6 of 6. no greater than Column 14 107 Building Total 121 EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page:6 of 26 OVERALL ENVELOPE METHOD Part 3 of 6 ENV -2 PROJECT NAME DATE Guard House a Traditions 10/4/01 VERALL HEAT GAIN FROM CONDUCTION 0 ooa a a© a o 0 PROPOSED STANDARD TABLE HEAT ASSEMBLY NAME HEAT U. VALUES GAIN AREA* U- GAIN (e.g. Wall -1, Floor -1) AREA TF CAPACITY FACTOR Y N BxCxE (Adjusted) FACTOR TF GxHxl 38 Roof 215 55 3.00 0.028 X❑ 0 335 215 0.057 55 674 vont Wall 126 55 3.23 0.059 0 ❑ 410126 0.084 55 582 Window 24 55 0.600 ❑ ® 792 24 0.490 55 647 eft Wall 208 55 3.23 0.059 ®❑ 677 208 0.084 55 961 Window 20 55 0.600 ❑ ® 660 20 0.490 55 539 Window 2055 0.550 ❑ 605 20 0.490 55 539 Back Wall 150 55 3.23 0.059 ®❑ 488 150 0.084 55. 693 fight Wall 208 55 3.23 0.059 ®❑ 6771 208 0.084 55 961 Window 20 55 1 0.600 ❑ ® 660 20 0.490 55 539 Window 20 55 0.550 ❑ ® 605 20 0.490 55 539 ❑ ❑ ❑❑ El El El El El El ❑❑ -E] ❑❑ 1-1 El El [:1 El EX -E] F-1 El El El El El El El ' if Window and/or Skylight Area Adjustment is Required, 5,911 6,674 use Adjusted Areas from Part 6 of 6. Subtotal Subtotal EnergyPm 3.1 By EnergySoft User Number. 2655 Job Number. Page:7 of 26 OVERALL ENVELOPE METHOD Part 4 of 6 ENV -2 - IPROJECT NAME Guard House at Traditions DATE 10/4/01 OVERALL HEAT GAIN FROM RADIATION OPAQUE SURFACES 0 o a o 0 0 © o a o a PROPOSED STANDARD ASSEMBLY NAME e.g. Roof -1) AREA SF WEIGHTING FACTOR U- FACTOR Absorp HEAT GAIN (BxCxDxExF) AREA• (ADJUSTED) U -Factor Absorp HEAT GAIN (CxDxHxlxJ) R-38 Roof 215 123 0.92 0.028 0.70 483 215 0.057 0.70 971 483 971 SUBTOTAL SUBTOTAL EnergyPm 3.1 By EnergyPm User Number. 2655 Job Number. Page:8 of 26 OVERALL ENVELOPE METHOD Part 5 of 6 ENV -2 PROJECT NAME DATE Guard House at Traditions 10/4/01 OVERALL HEAT GAIN FROM RADIATION FENESTRATION SURFACES © ©DDD©oo n F EnergyPro 3.1 By Energysoft User Number. 2655 Job Number. Page:9.of 26 PROPOSED STANDARD WINDOW/SKYLIGHT NAME e.g. Wind -1, Sky -1) ORIENT. WEIGHTING FACTOR AREA SF SHGC OVERHANG I HEATGAIN (BXCXDXExH AREA* (ADJUSTED) ) RSHG (or SHGC")SF HEAT GAIN (BxJxKx�) H I VH/V OHF Window N 0.61 2 123 0.69 2.014.1 0.49 0.85 1 053 24 0.51 123 918 Window E 1.07 2d 123 0.69 2.0 41 0.49 0.63 1 152 20 0.36 123 948 Window E 1.07 2d 123 0.65 2.0 6.9 0.29 0.76 1,305 20 0.36 123 948 Window W 1.05 2 123 1,131 20 0.36 123 930 Window W 1.05 2d 123 0.65 2.0 6.9 0.29 0.76 1,281 20 0.36 123 930 usedfor Skylights Only SHGC is Part 3 Subtotal 5,911 Part 3 Subtotal 6,674 u Part 4 Subtotal 483 Part 4 Subtotal 97 *If Window and/or Skylight Area Column I must be Adjustment is Required, use - less than column M Part 5 Subtotal 5,922 Part 5 Subtotal 4,673 Adjusted Areas from Part 6 of 6. 12,316 Total Heat Gain' 12 318 EnergyPro 3.1 By Energysoft User Number. 2655 Job Number. Page:9.of 26 OVERALL ENVELOPE METHOD Part 6 of 6 ENV -2 PROJECT NAME DATE Guard House at Traditions 10/4/01 WINDOW AREA ADJUSTMENT CALCULATIONS RX CHECK IF NOT APPLICABLE (See a Part 1 of 6.) ORIENTATION ❑B ❑C ❑D E❑ ❑F WINDOW ADJUST. FACTOR .(From Part 1) ADJUSTED WINDOW AREA (D X E) ADJUSTED WALL AREA B - (F + C) WALL NAME (e.g. Wall -1, Wail -2) GROSS AREA DOOR AREA WINDOW AREA N I E IS W ❑ ❑ ❑ ❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑ ❑❑❑❑ ' N/A TOTALS N/A R CHECK IF NOT APPLICABLE (See Part 1 of 5.) a ROOF NAME Roof -1, Roc �. TOTALS EnergyPm 3.1 By EnergySoft User Number 2655 Job Number. Page:10 of 26 rD n n © SKYLIGHT ADJUST. FACTOR (From Part 1) ADJUSTED SKYLIGHT AREA (C X D) ADJUSTED ROOF AREA (B _ E) GROSS AREA SKYLIGHT AREA N/A ENVELOPE MANDATORY MEASURES ENV -MM PROJECT NAME DATE Guard House at Traditions 10/4/01 DESCRIPTION Designer Enforcement 0 §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for Insulating material, Title 20, Chapter 4, Article 3. 0 §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. ❑ §117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). a§ 116(a)l Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. X❑ §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have Insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page: 11 of 26 _ .: .... - r .._.. CERTIFICATE OF COMPLIANCE Part 1 of 3 LTG -1 PROJECT NAME Guard House at Traditions DATE10/4/01 PROJECT ADDRESS j Palm Desert k -- PRINCIPAL DESIGNER - LIGHTING TELEPHONE ^'=Building`Rermit #'��., DOCUMENTATION AUTHOR TELEPHONE Insu-Form Inc: 760 324-0216 cnby�Dac#; f Enforcement .. en GENERAL INFORMATION A Use DATE OF PLANS . BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 215 Sq.Ft 1 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL E] HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION. O NEW CONSTRUCTION ADDITION ❑ ALTERATION EXISTING + ADDITION METHOD OF LIGHTING Ej COMPLETE BUILDING ® AREA CATEGORY [:] TAILORED PERFORMANCE COMPLIANCE TATEMENTOF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATU E DATE Joan D. Hacker Golittv The Principal Lighting Designer hereby certifies that the propose building design represented in this set of construction documents is consistent with the other compliance forms and workslieets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146 or 149 of Title 24, Part 6. Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its I preparation; and that am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business Professions and Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING DESIGNER - NAME SIGNATU DATE LIC. # 'moi V iO•C>y •d1 LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures f' �'. A INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. LTG -1: Required on plans for all submittals. Part 2 and 3 may be incorporated in schedules on plans. LTG -2: Required on all submittals. LTG -3: Optional. Use only if lighting control credits are taken. LTG -4: Optional. Use only if Tailored method is used. LTG -5: Optional.. Use only if Tailored method is used. EnergyPm 3.1 By EnergySoft User Number 2655 Job Number. Page: 12 of 26 LIGHTING COMPLIANCE SUMMARY Part 2 of 3 LTG -1 NAME Guard House at Traditions DATE 10/4/01 Code LUMINAIRE DESCRIPTION TYPE DESCRIPTION # watts Per Lamp DNLLNJIJ DESCRIPTION TYPE # OF LUMINAIRES nwno Lam + Ballast Total I Watts # Watts 60w Recessed Incandescent 60 No Ballast 1 6001 60 0 (2) 4 ft Fluorescent T8 Elec F32T8 2 32 Electronic 1.0 2 0 124 J"fFY 4+. i {:7s?3.Swyg1S. Y 'i'�t NP-.�.'°..TA.�it .,a#+a .'s8 r x�';S'4�AY'9t +ice+, 2¢•R��Yl �i EnergyPro 3.1 - By EnergySoft User Number. 2655 Job Number. Page: 13 of 26 Lighting Schedule on Plans subtotal from this Page 184 SK6w Exterior Lighting Meets Total ,84 ❑ 43 Efficacy and Control Requirement of �30(c) Portable Lighting (From LTG -1) ❑ControlRequirements of IJ 31(f) Less Control Credit Watts (From LTG -3) . , Adjusted Actual Watts 227 MANDATORY AUTOMATIC CONTROLS CONTROL LOCATION CONTROL CONTROL TYPE NOTE>TO: (Room #) IDENTIFICATION (Auto Time Switch, Exterior, etc.) SPACE CONTROLLED�FIELD { CONTROLS FOR CREDIT CONTROL LOCATION (Room # or Dwg. #) CONTROL IDENTIFICATION CONTROL TYPE Occupant, Daylight Dimming, etc. FtELD.. LUMINANOTE=TO< TYPE # OF LUMINAIRES `1E NOTES TO FIELD - For Buildin-g De artment Use Onl J"fFY 4+. i {:7s?3.Swyg1S. Y 'i'�t NP-.�.'°..TA.�it .,a#+a .'s8 r x�';S'4�AY'9t +ice+, 2¢•R��Yl �i EnergyPro 3.1 - By EnergySoft User Number. 2655 Job Number. Page: 13 of 26 LIGHTING COMPLIANCE SUMMARY Part 3 of 3 LTG -1 PROJECT NAME DATE Guard House at Traditions 10/4/01 TABLE 1A - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET n F n n ROOM # DEFAULT AREA OR ZONE ID /s SF TOTAL WATTS B X C Guard House 0.2 215 43 TOTAL 215 43 TABLE 1 B - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET FA] 0 0 0 o a o �__,_ LUMIN. TASK # OF TOTAL TOTAL ROOM # TOTAL AREA OR ZONE ID I (SF) Designer needs to provide detailed documentation that the ligl level provided by the overhead lighting meets the needs of the space. The details include luminaire types, CU, and mounting locations relative to work areas. TOTAL I 0 BUILDING SUMMARY - PORTABLE LIGHTING BUILDING SUMMARY TOTAL AREA (SF) TOTAL WATTS (FROM TABLES=1A+19+1C) (FROM TABLES 1A+1B) BUILDING,TOTAL 215 43 r EnergyPm 3.1 By EnergySoft User Number 2655 Job Number. Page:14 of 26 LIGHTING COMPLIANCE SUMMARY LTG -2 PROJECT NAME DATE Guard House at Traditions 10/4/01 LUMINAIRE NAME 0 NUMBER OF LUMINAIRES 1 2 WATTS PER LUMINAIRE Includin Ballast)Y CEC DEFAULT N• 60.0 0 ❑ ® ❑ El El D El El ❑❑ ❑❑ ❑❑ El E-1 0 62.0 Total Watts 60 124 Subtotal from this Page 184 Y Building Total 184 Portable Lighting (From LTG -1) 43 Less Control Credit Watts (From LTG -3) C �I Adjusted Actual Watts 22 1ALLOWED LIGHTING POWER (Chom 9132 MUM COMPLETE`BUILDING=METHOD" BUILDING CATEGORY (From Table 1-M) WATTS COMPLETE ALLOWED PER SF BLDG. AREA WATTS AREA,CATEGORY. METHOD 'Ai AREA CATEGORY (From Table 1-N) Office & WATTS AREA ALLOWED PER SF (SF) WATTS 1.10 215 236 PAGE TOTAL 21 236 BUILDING TOTAL 215 236 AREA WATTS _ r " TOTAL ALLOWED WATTS (From LTG -4 or from computer run.) EnergyPro 3.1 By EnergySoft User Number 2655 Job Number. Page: 15 of 26 LIGHTING MANDATORY MEASURES LTG -MM PROJECT NAME DATE Guard House at Traditions 10/4/01 DESCRIPTION Designer Enforcement 0 § 131(d)1 For every floor, all -Interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. § 131 (d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. RX Fluorescent Ballast and Luminaires. Certified: All fluorescent fixtures specified for the , project are certified and listed in the Directory. All installed fixtures shall be certified. F§ 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. a§ 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. - 0 § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight In the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot Diagram of shading during different times of the year is included on plans. a§ 131(f) Control of Exterior Lights: Exteriormounted fixtures served from the electrical panel Inside the building are controlled with a directional photo cell control on the roof and a corresponding relay in the electrical panel. F] § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page: 16 of 26 :ERTIFICATE OF COMPLIANCE Part 1 of 2 MECH-1 rKUjr-6I NAMt Guard House at Traditions PROJECT ADDRESS Palm Desert PRINCIPAL DESIGNER - MECHANICAI ATION AUTHOR Insu-Form Inc. GENERAL INFORMATION DATE CLIMATE ZONE 10/4/01 1 15 TELEPHONE 6Bullding'P1eimit' ' METHOD OF MECHANICAL ® PRESCRIPTIVE F--] PERFORMANCE COMPLIANCE PROOF -OF ENVELOPECOMPLIANCE PREVIOUS ENVELOPE PERMIT 2 ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE rChedced by!Date. TELEPHONE (760) 324-0216 DOCUMENTATION AUTHOR GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 215 Sq.Ft. 1 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION [] ALTERATION EXISTING + ADDITION METHOD OF MECHANICAL ® PRESCRIPTIVE F--] PERFORMANCE COMPLIANCE PROOF -OF ENVELOPECOMPLIANCE PREVIOUS ENVELOPE PERMIT 2 ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building mechanical requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATU E DATE Joan D. Hacker 4 �, a The Principal Mechanical Designer hereby certifies that the pr pos d building design represented in this set of constr ctio documents is consistent with the other compliance forms and w, or theets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in Sections 110 through115, 120 through 124, 140 through 142, 144 and 145. Please check one: in I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, or mechanical engineer or I am a licensed architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1. PRINCIPAL MECHANICADEQ NER - NAME SIGNATJJ DTE 4 V. 0 �o-v�.al G- a MECHANICAL MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures J,y&"f A . INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. MECH-1: Required on plans for all submittals. Parts 2 may be incorporated in schedules on plans. MECH-2: Required for all submittals, but form does not have to be completed if location of mechanical equipment schedule is indicated bn the form per Section 4.3.3. MECH-3: Required for all submittals unless required outdoor ventilation rates and.airflows are shown on plans per Section 4.3.4. MECH-4: Required for Prescriptive submittals. MECH-5: Optional. Performance use oniv for mechanical distribution summa . EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page: 17 of 26 10 CERTIFICATE OF COMPLIANCE Part 2 of 2 MECH-1 PROJECT NAME DATE Guard House at Traditions 10/4/01 SYSTEM FEATURES MECHANICAL SYSTEMS SYSTEM NAME DHW Heater Guard House NOTE:TO MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME Guard House at Traditions DATE 10/4/01 CHILLER AND TOWER SUMMARY Efficiency Tons PUMPS Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control D Y TANK INSUL. Energy Factor or Recovery Efficiency Standby Loss or Pilot System Name System Type Distribution Type Qty Rated Input (Gals.) Vol. Ext. R -Val. 6 6SS ORD -WHITE M -I- Storage Elec. Standard 1 5,120 6 0.89 n/a n/a CENTRAL SYSTEM RATINGS HEATING COOLING System Name CARRIER XHB 183 D System Type Room PTAC Q . 1 Output 15,800 Aux. kW 0.0 I Eff. 5.86 HSPF Output 17,800 Sensible 12,46C9.4 Efficiency EER Economizer Type No Economizer EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page: 19 of 26 (MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME Guard House at Traditions DATE 10/4/01 VAV TERMINAL BOXFAN BASER ARD Min. CFM Motor Drive S tem T e Ratio Type DeltaT CFM BHP Eff. Eff. Type Output I i I EXHAUST FAN EXHAUST FAN Room Name Qty. I CFM BHP Motor Eff. Drive Eff. Room Name Qty. I CFM BHP Motor Eff. Drive Eff. EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number Page:20 of 26 MECHANICAL VENTILATION MECH-3 PROJECT NAME DATE Guard House at Traditions 10/4/01 MECHANICAL VENTILATION E a a a o a a a a a o ZONEISYSTEM Guard House Guard House COND. MIN. AREA CFM CFM (SF) PER SF (B x C) 215 0.15 32 PER I CFM PERSON I (ExF) m MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Guard House at Traditions 10/4/01 SYSTEM NAME FLOOR AR215 Guard House NOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach 300 SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: - OUTDOOR DRY BULB TEMPERATURE (APPENDIX C) - OUTDOOR WET BULB TEMPERATURE (APPENDIX C) - INDOOR, DRY BULB TEMPERATURE SEE ASHRAE CHAPTER 8, 1993 OR APPENDIX B COOLING HEATING OF 26 OF of of 70 OF 112 78 741 2. SIZING: -' DESIGN OUTDOOR AIR - ROOM -LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS -. RETURN FAN - SUPPLY FAN - SUPPLY DUCTS SAFETY/ WARM-UP FACTOR 32 CFM (MECH 3; COLUMN 1) TOTALS MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY / WARM-UP FACTOR) 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN _ FAN DESCRIPTION Fan DESIGN BRAKE HP 0.100 a a EFFICIENCY MOTOR DRIVE 77.0% 100.0% NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for constant volume systems or 1.25 Watts/cfm for VAV systems. 0 NUMBER OF FANS 1 1,22 10,704 0 535 0 0 535 12,998 1.2 15 727 14, 046 Btu / Hr 0 PEAK WATTS BxEx746/(CXD 97 1,482 '7,354 n/ 368 0 0 368 9, 57 1.43 13,687 10,391 Btu / Hr CFM (Supply Fans) 300 TOTALS 1 97 300 TOTAL FAN SYSTEM POWER DEMAND 0.323 WATTS / CFM Col. F / Col. G EnergyPm 3.1 By EnergySoft. User Number 2655 Job Number Page 22 of 26 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAMEDATE Guard House at Traditions 10/4/01 --1 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies a §111 Any appliance for which there is a California standard established In the Appliance Efficiency Regulations will comply with the applicable standard. r§ 115(a) Fan type central furnaces shall not have a pilot light X❑ § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated In accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and Insulated In compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: 0 § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be Installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; Incorporate an automatic holiday "shut- off" feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or RX § 122(e)1 B An occupancy sensor to control the operating period of the system; or I § 122(9)1 C A 4 -hour timer that can be manually operated to control the operating period of the system. X❑ § 122(9)2 Each space conditioning system shall be Installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint § 122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with Isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or_shut off independently of other Isolation areas; and shall be controlled by a time control device as described above. § 122(a&b) Each space conditioning system shall be controlled by an Individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling Is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints In degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. ❑ § 112(b) Heat pumps shall be Installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page:23 of 26 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE Guard House at Traditions 10/4/01 Description Designer Enforcement Ventilation ❑X § 121(e) Controls shall be provided to allow outside air dampersor devices to be operated at - the ventilation rates as specified on these plans. U § 122(f) Gravity or automatic dampers Interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. X❑ § 122(o All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air openings. X § 121(f)4 .: Air Balancing: The system shall be balanced In accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or - Associated Air Balance Council (AABC) National Standards (1989); or a §121(f)2 " Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or ❑ § 121(03 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or ❑ § 121(04 Another method approved by the Commission. Service Water Heating Systems X❑ §113(b)2 If a circulating hot water system is Installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water Is not required. X] § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. X] § 113(b)3C Lavatories In restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit_ the flow of hot water to a maximum of 0:75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1By EnergySoft User Number. 2655 Job Number. Page: 24 of 26 ROOM HEATING PEAK LOADS Project Title Guard House at Traditions Room Information Desion Conditions Room Name Guard House Time of Peak Floor Area 215 Outdoor Dry Bulb Temperature Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value 1 AT of x x x X X X x X X X X x x X X x x x x X X x X x x X x x x X X X X X X X X X XI 0.02841 x x x X X x X x x x x x X X x X X X X x x X x x x x x x X X X x x X X X x X Y 44.0 = - - = = a o = 0.05921 44.0 0.60001 44.0 0.5500 44.0 44.5 _ Jan 12 am 26 of Btu/hr -------- • - -----..____-•• �••��y.. a.. uncnu, sunace to anouter room. Page Total: 354 Infiltration: 1.0o x 1.072 x 215 x s.o x 6] x a Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 354 EnergyPro 3.1 By EnergySoft User Number. 2655 Job Number. Page:25 of 26 ROOM COOLING PEAK LOADS Project Title Guard House at Traditions Area Date 10/4/01 ROOM INFORMATION DESIGN CONDITIONS Room Name Guard House Time of Peak Jul 5 pm Floor Area 215 Outdoor Dry Bulb Temperature log �: Indoor Dry Bulb Temperature 74th Outdoor Wet Bulb Temperature 77 9F Conduction -38 Roof R.38.2x14.16 21 Wall .21.24.16 tl Thermal Brk Unctd Default -21 Wall .21.24.16 ouble NonMtl Clear Default -21 Wall .21.2x6.16 -21 Will .21.:2x6.16 Area 21 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.02841 1 0.05921 DETD 1 47.5 37.7 = 26.4 36.1 = 26.5 = 35.1 = 55.1 = Page Total Orientation Area X X X X x X X X X X SGF X X X x x X X X X X SC Weighting X X x x x X X X X X Factor = = = = = = (North) 24.0 43 0.768 0.761 (East) 20.0 24 0.768 2.044 (East) 20.0 24 0.724 2.288 (West) 20.0 200 0.768 0.428 (West) 20.0 214 0.724 0.449 Page Total Btu/hr 290 281 1,015 444 582 312 679 3 602 Btu/hr 603 754 795 1,316 1,389 4 856 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0 x 215 x 0.856 Watts/sqft x 3.41 Btuh/Watt x 0.999 = 628 ccu ants 1.0 X 215 X 250 Btuh/occ. I 101 sgft/occ. X 1.00 = 538 Receptacle 1.0 x 215 x 1.500 Watts/sqft x 3.411 Btuh/Watt X 1.00 = 1,101 rocess r1.o x 215 x o.000 Watts/sgft x 3.a1 Btuh/Watt x 1.00 = 0 Infiltration: I 1.00 x 1.072 x 215 x 8.0o x o.00 /601 x chedule Air Sensible Area Ceiling Height ACH LT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 10,7241 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccu ants 1.00 X 215 X 2001 Btuh/OCC. / 100 sgftlocc. = 430 ecetacle 1 nn x xWatts/sgft x BtuhlWatt = rocess 1.00 x 215 x o.000 Watts/sgft x 3.413 Btuh/Watt = o Infiltration: x x 0 x x / 6] x ®_ ehedule Air rrt Area Calling Height ACH . pyy