2713NOTE: J=
With -proper validation' Q
' this form constitutes an;
CITY OF LA QUINTA
encroachment permit . • 1%
APPLICATION; FOR• -PERMIT s
.. ti
PUBLIC, WORKS CONSTRUCTION • (ENCROACHMENT) .
For ,the construction of 'public or private curbs,, driveways;' pavements, sidewalks, parking lots, sewers, water mains"
and other like'public works improvements'in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
- ; F " k •' 4TH - ., - . i • , ^'1 •
+ Subdivision Improvement Perm=it .Class. III 1
DATE:
6� 11f1*'y'9,.' 1998 , r ?;• .;; r:,,, .::
"Minor Improvement Permit Class'I'V�,,-
LOCATION`OF CONSTRUCTION Ad=s Street and Mils' Ave.. "
(Street address or Description of Location) tf ,
-
PURPOSf•OF CONSTRUCTION Traffic sistual' Sketch (attach construction plans if appropriate) `-
modification
' DESCRIPTION OF CONSTRUCTION ' R,eiocate °eX3eCiria' ` .r'
traffic• siszris°°l atindArd 'and modift sionAl• tri
neii cond3izurstion• - 8) Ej ATTACUW CONDITIONS
DIM ENSION:dF INrST�ALLATION OR REMOVAL icer• at�oroved' �qt' ~� to
PARD'
SIZE•OF EXCAVATION, IF NEEDED
no
APPROXIMATE TIME WHEN WORK WILL'BEGIN
�
z/10/ s ,� F� 8
,APPROXIMATE -TIMEOF COMPLETION • CUi�b�
'ESTIMATED CONST,RUCTION,COST $ 24.6 '`' - �V 9A
f " (Including removal of all obstruction,, materials, and debris, backfilling, com
ItA. ' paction and.placing.permanent resurfacing and/or,replacing improvemen"ts), "�� `'j�
-In' consideration of, the granting of,this permit, the, applicant hereby, agrees 'to: -
Indemnify -.'defend and save the City,.. its authorized agerits,::officers'; representatives and employees; harmless from and against any and all '
penalties,liabilities or loss resulting from' claims or court action and arising out of any accident, loss or damage to persons'or'property
happening or occurring as''a•proximate,result"of any work undertaken under'the,permit granted -pursuant to this•application i,
Notify -the Administrative Authority at least twenty-four. (24) :hours'in'•advance of the time when work will;be started: i
Comply with,alI applicable City Ordinances;,the terms and'conditions•of the permit and all applicable rules and regulations of the City of
-; La 6uinta and.to.pay for -any additional replacement necessary as,the•result of this work. "', •.
'.Signature of'Applicant or Agent
Centuxj-C, oxekl. •'' 1535 S.''"D" `St.. Sa>r� Bern erdinoi .CA (909) 38'1-6007•
Name of Applicant (please print) Business Address Telephone No.
*Sl.Prara, Pa0:ifbi A1.66t�rical. ` 2542 A,vAlan SI;.- RivR rgl.d P. �:A
Name of'Contractor an`d Job Foreman Business Address ± Telephone No. '
264048 "521iR ' l �' 01375
Contractor's License No;.. i- City Business License -N,0.
`• Fireman's Futid' ., "1 ,, 80624319
Applicant's.lnsuranceCompany r `s Policy Number
:�.
FEES: Subdivision..lmprovement'Permit — Class lll'
••Public improvements: 3% of estimated construction costs
Pri.vate,irimprovements: 3% of estimated construction costs '.
Minor, Improyement Permit — Class IV: See attached schedule +++ z.
t ;E � -
Inspection Fee �, $ 738 �w PERM IT.•VALIDATION,
, , • ',
• Permit Fee' j ,'y,� '�� *t 100. ` PERMIT NO. 2713
Penalty, .
:CashcD.epos rrSri ret�B:and.
�, DATE'APPROVED 2/9/98
of re-qucred (As bu: lX s) 1,000. „12/31/98
EXP,IRATION DATE.
1:838. .i
TOTAL:'.. $ DATE ISSUED
Receipt No.
By—
Received by 'Date •Administrative Authority
Recorded by Telephone: (619) 777-7075-
" + :
-The. following General' and Special Provisions are attached to and made a part of Permit No �•� I ,
t., .,GENERAL PROVISIONS k
`
. iThe following shall always apply:
•y
`
�
r t4 e
't • '4-fig. �`%
,•
V,y
, , r•• t _ .s
i ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be ta accomplished within City of La Quinright of, "
• .�
a `way ONLY. Whenever construction extends within private property, itis the responsibility of the permittee for his contractors for
'secured
„ secure permission from abutting property owners. Sucb authorization must beby the permittee prior to starting work. `
`
•". i -
r
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying•coastruction equipment shall not be permitted to operate on:,s-
�
V,—
any
� au sued surface unless fitted with smooth-faced'street ads: All mechanical outri ;
'y y P p ggers shall be fitted with rubber stree_ i shoes to
•
r
, protect the paving during excavations. Rubber tired equipment only shall be used in backfill operations in paved areas. If the existing
•
�'� pavementis scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request '
+that these. portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C.''
•
• i _
a `
surfacing plus appropriate seal cost as specified above. " *„ '
•'
a
• T r ! . r
[{
.. .n i w -" �tt ,.� h. •. • rJe '. al �� ..
f =
+ PROTECTION OF TRAFFIC: `All excavations and work areas shall be properly lighted and barricaded as deemed necessary, by the r
r
Cit
' y Engineer or La Quints City Public Works inspectors..`. Suitable detours and detour signs shall be and :.
T
placed maintained -for the
duration of the project.' The City shall be notified 24 hours in advance of any traffic detours or delineations. • •.i, ?' >
,
*
• ' CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe;'concrete pipe, steel culvert and -
i t '
_
concrete structures encountered during excavation which necessitate removal shall be replaced'in kind. Jn the event it becomes
necessary, to remove or.wt existing,drat
y, nage structures, City of Ia' Quinta shall be, uopfied prior to commencement of this work.
:Dr drains shall be'kept free of debris at all time
ainage structures'and open s'for proper drainage. .. '
t RIGHT OF WAY', CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right `
of way. 'All.paved surfaces shall be broomed clean ofearth ind-other objectionable materials immediately after backfill and compaction.
Existing gutter line and drainage ditches shall be replaced .to their original standard or better: -All' excess material shall be removed,
u
prior to paving., Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall. be used
i.
,immediately after backfill. ,�. _ v
'
'•' "¢ ' ?` DE-WATER OPERATIONS: If de-watering operations are required and pumps are forcing water on City of La Quinta roads, it shall
"b the responsibility of the permittee (coniiactor) io control this water and to provide' off-street barricades when necessary.
CLOSING, STREETS: No street shall be closed. 'A minimum of one lane of traffic shall be maintained at all times to provide limited
• ; ° •, •t�F
"' "rpt access for the adjoining property,owhers and emergency vehicles! In`the`eveut itis felt by the pertpittee that he must close a street for
any leugth'of time, permittee shall coniact this office to obtain the necessary permission.'
SPECIAL PROVISIONS
..
r'•
., -11 r i. .
in tcatedf •s`,,
The following' shall 5pply when d
r
.
4
•
R NOTMCATIONt Permittee shall notify the City at (619)777-7075 at least.48 hours in advance of starting construction.
•
LTTIIITY CLEARANCE:r' (Substructures) Prior to maktng.any excavation within the Citya of La Quinta.right of way
' +'
lam • authorized by permit, the permittee shall�contact,all concerned utility companies relative to the location of existing
• .x. =
substructures. Damage to existing substructures resulting from operations•conducted under this permit shall be the sole
•
responsibility of the permittee. a 1 11 ' • - ' •
'
/ IiiJ trinurY CLEARANCE: (Surface Strucmres)'No work shall be done undei.,this permit until all utilities era clear of the
?
v proposed work site. The permittee shall notify all concerned utility companies of the proposed work. r, "
R4 . PAVIIKIIVT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced' '
^inches
with - inches of A.C. paving placed on '. of class aggregate subbase course having an "R" r
"
value'of not less than . '° t' and in 6hformance with Ci of La
ty Quints Road Improvement'Standards and
:Specifications; Ordinance #461: °s
PARKWAY GRADING: ' Area between the property line and top of the proposed concrete curb shall be graded to
a slope of '114'inch to one foot (1')
(}
r .•
° R6 GRADE CHECKING: 'City-,of La Quinta shall check grades upon receipt of plan and profile and/or as established by w•
grades
J a licensed engineer. o •. r, .. .. q, }
117 . CURB REMOVAL FOR DRIVEWAYS:: A portion of. the existing concrete curb and/or curb and gutter (_feet)'shallbe r
removed: Curb and/or curb aid gutter shall be saw "cut prior to removal.:-Depressed curb matching concrete gutter and
°r " •'
x ? concrete driveway approach shall'li constructed in conformance"with City of La Quinta Standard #207. '
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alta; existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2T2'inches of A.C.7paving placed on of classaggregate base. '
Driveway construction shall conform to attached drawing. > r ..
R9 / SIGHT CLEARANCE: ' Sight,clearance m
of 600 feet in all directions shalI be assured and maintained at all ties. "
RIO SOIL STERILIZER. The area to be'surfaced shall be treated with soil sterilizer. Rate of application shall commply with the
`•
* "manufacturer's specifications. ` • - '
r,
a • 4
.. .' v .. • •• , M e .. i
RII i COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
r212 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
RI PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavemeni straight edges shall be corrected.
R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall, be.plaeed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is(the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
Rl8 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City'Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3:01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
1121 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2') of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
RD23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris_ remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
".�.
SPECIAL'CONDITIONS--PERMIT NO. _2713
--=
Century. Homes/Sierra Pacific ---
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code .(Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition" of the Standard Specifications For .
Public Works Construction (SSPWC)"and as directedby and to the. satisfaction of the City Engineer.
2. Century/Sierra, hereinafter referred to as "Permittee", shall be responsible for providing continuous
dust and erosion control".
Streets shall be kept clean. They shall be completely cleaned at the end of each working'day and
more frequently if required.
4.. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 §J, 1982), throughout .
the ` work site, • the Permittee .shall comply with. City regulated work hours:: Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during
the following time periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May • 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m',
Saturday 8:00 a.m. 'to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
5•. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m.
- 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m.* The' Permittee shall,
contact -the Riverside Country Traffic Signal Maintenance at (909) 275-6894 if signal
operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16.110 of the La Quinta Municipal 'Code (Ordinance 10 §'1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street. and for any damage to other City streets or facilities as' a result of work performed under this
permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),.
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the
City for review and approval one (1) week prior to starting any construction. It shall be the
Permitted's responsibility to appropriately detour and barricade all construction sites.
Special Conditions - Permit No. 2713 Page I of 4
SPECIAL CONDITIONS--PERNHT NO. 2713'
` --- Century Homes/Sierra Pacific
8. Pursuant i6 Section 14. 16.290 of the La Quinta Municipal Code (Ordinance 10'§ •1 (part), 1982), "
street closures shall not be'permitted... A minimum of one travellane of paved surface shall be
maintained with flagmen at all times. '
9. Prior to excavating, if required, the Permittee shall contact Underground- Service Alert at 1=800-422-
'4133. It shall'be the Pefmittee's responsibility to notify the Public Woiks Department of anticipated
excavation which'impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities. -
10: Should additional work, materials, onmodifications'of the work be required in order to meet City . -
standards, safety requirements,
'signage requirements, or to, fit actual field conditions; the work shall
' be performed by the Permittee as directed by and to the satisfaction of,the.?City Engineer at no cost
to the City of La Quinta.
• 11. Pursuant to Section 14.16.370 of the La-Quinta Municipal Code (Ordimance10 § 1 (part), 1982),•
backfill compaction within street rights -of way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction. (S SPWC), except as otherwise '
specified herein: -
Native material may be used as backfill material provided• that minimum compaction; achieved.in
the manner prescribed herein, is achieved. • Backfill shall be performed by mechanical means; no,
,. water densified compaction via jetting or flooding or other means shall be allowed., 'It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations. - -
Backfill compaction shall be achieved by.the following conditions:
A. When a firm foundation is not encountered due to. soft; spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe•bedding material.
B. Backfill materials shall be' brought to or maintained at an appropriate moisture content for
compaction.- The appropriate moisture content range;shall be established at the onset of the
project and- ensured prior to use. of the. materials through progress testing on the stockpiles
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at,approximate three-foot vertical' intervals %as
backfill is, placed to ensure the effectiveness. of the compaction methods and to establish the
depth of lift that can'be compacted.
D. If lifts greater thanone foot'are attempted in this trial length of trench,compaction tests shall
be taken within the lift's to ensure that the Rill depth of the lift is compacted. Upon satisfactory
_ • completion of this portion of trench, the CityInspector sha11 establish the maximum lift
thickness to be compacted 'for the remainder' of the project. -
Special Conditions - Permit No. 2713 `t Page 2 of 4
1
r'
SPECIAL CONDITIONS -=PERMIT NO: 2713.
--= Century Homes/Sie-rra'Pacific+---.:
�' - • - r �, , • n y . 'r� is . - `rYti ,•• �+-'`A
F. rIn subsequent lengths of trench the fre ueric of com action tests shall equal one er each lift
,., q, y. P _q , per,
< of backfill; per 300 linear" feet of open trench, at randomly selected locations,withiri the open
x length of trench.
G. `• The depth of the "randomly selected compaction tests •shall,also be randomly selected' except ' - -
t - that where multiple tests are required in a given length of trench, theltests shall be no closer, ,
than'three feet (vertically) from each other.:
H" If any compaction test fails; previously placed backfill .(in the `same length of open trench or. t.
"t. previous lengths oftrench):which.is represented.by. the failing test (as determined -by the City -
In'spector); shall be. tested for compliance with compaction requirements:
' All costs incurred -due to the conditions. above shall be, borne by the Permittee: Copies of all
{ test results shall be furnish_ ed•to the City Inspector:
12. All excavations,within City, of La'Quinta right-of-way shall be,backfilled, and,temporarily paved if
within the existing travel way, at'the end of every -Workday as directed by and to the satisfaction of
• • the City Engineer for the protection' of the public: -''Lengths of open trench shall.not greatly "exceed
?, that which: cannot be backfilled in the same day. Excavated trenches shall not.be allowed open '
jY Y .,
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty.(20) feet .
.p in length,•open overnight at a point where construction willaiegir the next day; pirovided'that this
., _
3, length of trench is completely=covered by steel plating: �:Y,•r " _ ti
.,13. All landscaping; .irrigation; decorative rock, decorative concrete,. lighting, etc., shall be replaced to
its original condition.
.` 14.' Access'and egiess to all local properties shall be maintained'afalltimes.
' 15. 'Pursuant to Section 14.16:375:of the La Quinti Municipal Code (Ordinance 10 § 1 (part),.1982),
permanent pavement replacement shall -be completed . no' later than ' seven ,(7) days after the-
` completion' of the work. Permanent pavement replacement shall conform to 'the' following r ,;
' conditions: N +' ' .
A. Ekisting asphalt concrete, pavement shall be sawcut one (1) foot beyond trench'edg6.` Edges'.,
shall be straight and'.clean:
-
R. Permanent pavement replacement structural section; within•all tre_riches, shallbe 1'' thicker
-±
'than existing of asphalt concrete over tlie'sdm4e existing�thickne-ss of crushed aggregate base'
or crushed miscellaneous base, meeting the requirements of.Sectioris 200-2.2 and 200-2.4 of. _' r
' �• �' the Standard Specifications for?ublic Works Const'r'uction. The replaced- pavement and base
material shall be compacted to'95% relative compaction and respectively.tested, for each 300
s.
linear feet of trench. Verify 'exact structural replacerrient `section thicknesses with the. City w�
prior to installation. .„
' `' . " { t ,
�, J' tSpecial Conditions Permit No. 2713 - : : s ` '� Page 3 of 4
r ' ' k ' • ,r • ` ' '' 'SPECIAL CONDITIONS --PERMIT NO. 2713
'Century Homes%Sierra Pacific
jC,i', Permanentpavement• replacement all be installed using a City'appz:oved /4 max medium
asphalt concrete as the base course lift and'a City approved 1/2". max' medium finish course' lift {,
for capping. Asphalt concrete mix design shall be approved by the City prior'to its placement:.
D. For transverse trenches across improved streets:'the existing pavement surface, three (3) feet.: ' r
on either side of the excavated trench; shall_be cold=milled to a depth'of 0.1'0', with'a "butt"
:joint created along each .edge'of the cold milled area,, and a new 0.10• lift of/Z" mak' inedium `
K r asphalt concrete pavement overlay applied throughout the cold -milled area.
E. ' For longitudinal trenches within improved streets, the°' existing pavement surface,.through.the,
Y, + lane width (within.lane line" striping), shall 'be cold -milled to of ;depth'of .0.10', with a "butt"
joint created along each edge of the°eold-mihed•area; and a new'0:'10' lift of �/2" max medium '•
. asphalt concrete pavement- overlay applied throughout theecold-milled•arear"
a a ' : — •+
F. ,' t If, grinding and capping operations,'are'•not performed in the same, day,as base paving
�• operations, the base course lift of 3/4" 'max medium'asphalt,,concrete shall be installed.from
r asaw=cut edge�to saw -cut edge flush with•the existing street su face.. The base course lift of'.: '
w-
. paving shall not be left`0.'10' low m�anticipation of grinding'and capping.
p x.
F. Any existing lane striping . of ected+ by thisresurfacing shall be replaced dri kind..by the
a
"Permittee, as directed by and'to thee. satisfaction• of the City Engineer. 'Affect_ ed traffic. signal •
loops sliall be removed and replaced in kind: -The finished 'pavement surface shall be. smooth, -
consistent, and shall conform to the! surrounding'gr ades.
%.16. Permittee, shall notify the City' of La•Quinta Public WorksDepartment a minimum of 48 hours prior
:1
to•commencement of any construction at`(760) 7.77-7075..21,
17. Permittee shall stabilize any soil�that'was.disturbed (shoulder areas, etc.)`as a result of.work
' performed under this permit with an approved=dust control treatment:
18: ,Pursuant to Chapter 12.56 of the La. QuintalVlunicipal Code (Ordinance 10 § 1" (part), 1982) the City
"has designated certain city. streets as, Truck Routes. The weight limit for restricted streets (i.e., streets' <'
'. not ait'of the.Truck Route network),is'three 3 .tons' trucks"exceeding thii,wdight limit may use a'
r . restricted street if making a delivery or pickupon the subject street, or if this- permit .specifically ..
grants permission to'use the'street to deliver street' construction materials and/or equipment: Y
a
"y 19 . YThe.City of La*Quinta `reserves the right to, revoke; suspend orJvoid this permit at any time
A.
.., Ra• ,- � _ � :.. a •, �,.�a .. ', •. � J f .�
- }Special Conditions -Permit No. 2713 » i .* y b' . k ' Page 4 of 4 }
- — 1