Loading...
2715+' Subdivision Improvement Permit — Class III j '.DATE: ��$. ; - ` • Minor Improvement Permit Class 1V - y -LOCATION OF. CONSTRUCTION 7 35 £.TinPatn.dn•- billft4'' bald.' xi Ra'n@hiio') (Street address - eat of Location) PURPOSE OF. CONS TRU CATfON Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTR_ UCTION 4r"i sn truffle lw! t,hrdilith Y $a*-att4oh94• candit1aoa- '1�Qa ottdrbod -PlAni DIMENSION,OF INSTALLAyTION OR REMOVAL�'� * . ti• PA ID SIZE OF EXCAVATION, IF NEEDEDt:'►'+� "rlti� Y Z. APPROXIMATE TIME+WHEN WORK WILL BEGIN -1 FMA � 1998 ;t Al APPROXIMATE TIME;OF COMPLETION w' CITY �,� � l ` -ESTIMATED CONSTRUCTION COST ' (Including rertioval of all obstruction; materials; and.debris, backfilling,+com f �'"; �•, x�' ; '�" ,,» �+ paction and; placing permanent resurfacing and/or' replacing,improvements)., " ;i '`• In consideration of the granting - 6f this'.permit, the' applicant hereby agrees to: a Indemnify, defend1,and save the City its authorized agents, off icers„representatives and employees, harmless from and against any and all penalties,; liabilities or`loss.resultin from claims or court action and arising out of an accident, loss or damage to p p y`. ` c g f g y g persons or - pro ert k i happening or occurring as -a proximate result of any work undertaken under the permit granted pursuant,to this' application. t• 'Notify"the Administrative Authority at least twenty-four (24) hours; in advance of .the time when work will be startedi4 A 5: Comply with. all -applicable->City'Ordinances, the terms and conditions of the permit and all applicable rules and regulations of`the Ciiy,of,,- La Quinta and to9pay for'ani additional replacement necessary arthe result of this work.,,,- ` ,Signature of Applicant or Agent iiai .> n1T: Vdi-bft 055,' is tQuivta, CA,,92253�.0,60i.340-2716 Name of Applicant (please,print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. $37333 J ` ” 026 ,. Contractor's License No.' ;. -City Business License No. G xc Ll q60 Sti 101 R.einaorande ax�0i�&� ��C�� �3IMC�i�31 Applicant's Insurance,Co.nipany ! 'Policy Number a , • , 'FEES:, Subdivision Improvement Permit — Class III` ; Public.improvements: 3% -of estimated construction -costs = ' Private improvements:. 3%of'estimated construction costs Minor Improvement Permit'— Class 1V: See attached schedule' .. Inspection,Fee. t $ PERMIT VALIDATION Permit Fee' _ .. - PERMIT NO. 2713 Penalty Cash Deposit -Surety Bond if required TOTAL: $100 Receipt No. Received by Date Recorded by DATE APPROVED 2/12198 EXPIRATION DATE 2/12/99 rDATE ISSUED 2-_.�� 2 By Administrative Authority Telephone: (619) 777-7075 .w x- With proper valid tion • 4 °+y+ • Jhis,form.constitutes an .encroachment,pe'rmit ` t - ' CITY- OF- LA'QUINTA - APPLICATION- -FOR PERMIT ' PUBLIC WORKS. CONSTRUCTION (ENCROACHMENT) C� C O For the construction. of public or private curbs, driveways; pavements, sidewalks,' parking lots, sewers; water, mains 'and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS +' Subdivision Improvement Permit — Class III j '.DATE: ��$. ; - ` • Minor Improvement Permit Class 1V - y -LOCATION OF. CONSTRUCTION 7 35 £.TinPatn.dn•- billft4'' bald.' xi Ra'n@hiio') (Street address - eat of Location) PURPOSE OF. CONS TRU CATfON Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTR_ UCTION 4r"i sn truffle lw! t,hrdilith Y $a*-att4oh94• candit1aoa- '1�Qa ottdrbod -PlAni DIMENSION,OF INSTALLAyTION OR REMOVAL�'� * . ti• PA ID SIZE OF EXCAVATION, IF NEEDEDt:'►'+� "rlti� Y Z. APPROXIMATE TIME+WHEN WORK WILL BEGIN -1 FMA � 1998 ;t Al APPROXIMATE TIME;OF COMPLETION w' CITY �,� � l ` -ESTIMATED CONSTRUCTION COST ' (Including rertioval of all obstruction; materials; and.debris, backfilling,+com f �'"; �•, x�' ; '�" ,,» �+ paction and; placing permanent resurfacing and/or' replacing,improvements)., " ;i '`• In consideration of the granting - 6f this'.permit, the' applicant hereby agrees to: a Indemnify, defend1,and save the City its authorized agents, off icers„representatives and employees, harmless from and against any and all penalties,; liabilities or`loss.resultin from claims or court action and arising out of an accident, loss or damage to p p y`. ` c g f g y g persons or - pro ert k i happening or occurring as -a proximate result of any work undertaken under the permit granted pursuant,to this' application. t• 'Notify"the Administrative Authority at least twenty-four (24) hours; in advance of .the time when work will be startedi4 A 5: Comply with. all -applicable->City'Ordinances, the terms and conditions of the permit and all applicable rules and regulations of`the Ciiy,of,,- La Quinta and to9pay for'ani additional replacement necessary arthe result of this work.,,,- ` ,Signature of Applicant or Agent iiai .> n1T: Vdi-bft 055,' is tQuivta, CA,,92253�.0,60i.340-2716 Name of Applicant (please,print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. $37333 J ` ” 026 ,. Contractor's License No.' ;. -City Business License No. G xc Ll q60 Sti 101 R.einaorande ax�0i�&� ��C�� �3IMC�i�31 Applicant's Insurance,Co.nipany ! 'Policy Number a , • , 'FEES:, Subdivision Improvement Permit — Class III` ; Public.improvements: 3% -of estimated construction -costs = ' Private improvements:. 3%of'estimated construction costs Minor Improvement Permit'— Class 1V: See attached schedule' .. Inspection,Fee. t $ PERMIT VALIDATION Permit Fee' _ .. - PERMIT NO. 2713 Penalty Cash Deposit -Surety Bond if required TOTAL: $100 Receipt No. Received by Date Recorded by DATE APPROVED 2/12198 EXPIRATION DATE 2/12/99 rDATE ISSUED 2-_.�� 2 By Administrative Authority Telephone: (619) 777-7075 .w NOTE: _ • With proper, validation ' this fo constitutes an `e ment permit CITY . OF LA QUINTA ` Q APPLICATION FOR PERMIT ' O�1►l► �9� ; PUBLIC WORKS CONSTRUCTION, (ENCROACHMENT)c�M For the construction• of public or private,curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains '1 s ` w`G and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS, Sulidivision Improvement Permit — Class III , r DATE; 1' Minor Improvement Permit Class IV. ` LOCATION OF CONSTRUCTION O— �3� C,G Re- aPAO • (Street address or Description of Location) • ` P RC I POSE OF CONSTRUONS ��- Sketch (attach'construction plans if appropriate) c v % - DESCRIPrTI N^CONSTRUCTION '''G _ C/LC��� "` "`�✓I/ •ru3Y`.` 14 DIMENSION OF INSTALLATION OR REMOVAL •�: SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME HEW WORK WILL BEGIff` eeIt C Z� —16 - APPROXIMATE TIME OF COMPLETION - - Uh ESTIMATED CONSTRUCTION COSTS =)°— ' (Including removal of all obstruction, materials, and debris, backfilling, com- paction and .placing permanent resurfacing and/or replacing improvements) _ In consideration of,the granting of this permit, the applicant hereby agrees to: » indcmnify, dafand'and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and atl • penalties, liabilities or lou resulting from claims or court action and arising out of, any accident, loss or damage to persons or property = happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. A Notify. the'Adminisiiative Authority at least' twenty-four (24) hours in advance of the time when work will be started. -Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of ' -' • La Quinta and to- pay for any- additional replacement necessary, as the result of this work. ` - • ' " v W Signature of Applicant or Agent ' ` V M i ►� 1--1v C- o : �o�c 1 SSr�-,tom Qu1 I,.Ty\ ' -3 y -2-2-G • t , Name of Applicant (please print) Business Address Telephone No. Name,of Contractor and Job ForemanBusiness Address Telephone No: ' � ���.�:�_3" `' • :. Sac Contractor's License No. • City Business License No.,. s Applicant's Insurance Company GEN. L1A151UTy Policy Num i - • - • FEES:` Subdivision Improvement Peimit —Class 111 t r , .1 Public improvements: 3% of estimated construction costs ry Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule �. Inspection Fee. $ - r PERMIT VALIDATION., - . Permit Fee PERMIT NO. Penalty, - + 21 (Z- Cash Deposit -Surety Bond DATE APPROVED r, ' if required . t 2 I) z I C'!'j ,•' EXPIRATION DATE 1 z 4 TOTAL: $~DATE ISSUED Receipt No. Received by Date By Administrative Authority Recorded by TELEPHONE: (619) 777--7675 T n + 11 . 1. 1 1 © � OF y� QtJ1N4' I S - o ck Y p�SLIC W OR �x1-,: tnd �<- L xi Sl t r� 17g,oPose� �Je Ste- v lK 1 F x (ST ► (Q cu cij ,. h The following Ge6ind and Special Provisions are attached to and'made a part of Permit No. ?i%7 f .'n ° � - . v..�. : -rf � a. t ,. .•ter 4 - .` GENERAL PROVISIONS , r' The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished `within City of La Quinta right of way ONLY. T Whenever construction extends within private property, it is the responsibility of the permittee for'his contractors to secure permission from abutting property owners. Such authorization must' be secured• by the permittee prior to starting work. k • .�. +_TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth faced street pads. All mechanical outriggers shall be fitted with 'rubber street shoes to t , protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing s •. , ; ..o i pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is`mar'red, City of La Quinta shall request that these portions of road be resurfaced over their entire width. `Resurfacing shall consist of one coat of two inches (2") of A.C. ' ,._ ,.., • surfacing plus appropriate seal cost as specified above. ` i PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the ;. •,..:• ,~ ` . City Engineer or. La Quinta City Public Works inspectors. Suitable' detours and detour signs shall be placed and maintained for the " duration of the project. The City shall be notified 24 hours in advance of,any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: wAny drainage structure incitiding corrugated metal pipe, concrete pipe, steel culvert and cf concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes t _ necessary to:remove or cut existing drainage structures, Cit y.of La, Quinta shall, be notified prior to commencement of'tbis work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. y . _ , RIGHT OF'WAY CLEANUP: Any surplus material resulting. from excavation and backfill operations shall be removedfroni the right of way. All paved surfaces shall,be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replacedto their original standard or, better. ,All 'excess material shall be removed " t , prior to paving. Water tanker shall be used, as�required, to sprinkle the job -site to keep down dust conditions and shall be used ` immediately after backfill. _ • fir" .. • � �;; d. a �. � ,t • I '�L. > •� w `' • . r DE -WATER OPERATIONS: If de -watering operations are required and puMips, are'forcing watei on City of La -Quint; road., it shall be the responsibility of the permittee (contractor),to control this water and to provide off-stieet�barricadeswhen necessary. .. ' ,, i •, ; CLOSING STREM: ' No street shall be closed:, A minimum of one -lane of traffic shall be maintained at all times to provide limited access for,the adjoining property owners and emergency vehicles:: In the event it is felt by the permittee that he -must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. ` '. �• r. .r SPECIAL, PROVLSIONS..,, t + 'The following shall apply when indicated: :•- Err h', R1 1 NOTIFICATION: 'Permittee shall nodfy,the City at (619)777-7075 at least :48 hours in advance,of starting construction. : 1 UTTHITY CLEARANCE. .I (Substructures) Prior to making any excavation within the City of La Quints right of way authorized by permit, the permittee shall contact all concerned utility companies.relative to the location of existing substructures., -Damage to existing substructures resulting from operations conducted' under this permit shall be the sole r. ..- ;+'responsibility of the.permittee.. }•-� R3. UTILITY CLEARANCE:'. (Surface Structures) No work shall be done under this permit until all utilities are clear of the - Proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced ' with . - - .:_ inches'of A.C. paving placed on. [ .. •. inches of class aggregate subbase coarse havingan 'R' F value of not less than . -. and in conformance with City of_La Quinta Road Improvement Standards and'. •. ,. .,Specifications, Ordinance #461: d RS• { PARKWAY GRADING: Area, between the propertytineand`top of the proposed concrete curb shall be graded to a slope of A • 1/4 inch to one foot (1'). ,,,- ' • s „ - t t, , R6 . GRADE' CHECKING: - City of La Quinta shall check grades upon receipt of plan and, profile and/or grades as established by ' .. a licensed engineer. 4' R7 .+. CURB REMOVAL FOR DRIVEWAYS: r portion of the existing concrete curb and/or curb and gutter Meet) shall be removed: Curb and/or curb and, gutter shall_ be'saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance`with Cit of La Y... Quinta Standard /t207. _ _ „ 'R8 • ..` DRIVEWAYS: A.C..driveways shall be constructed as not'to alter existing drainage pattern. 'Surfacing between the property line and the existing road paving shall be 2.1/2 inches of A.C. paving placed on �� of class aggregate base. Driveway construction shall conform to attached drawing.' . ' R9 - SIGHT CLEARANCE:: Sight clearance of 600 feet in all directions shall be assured and maintained at all times., R10 p SOIL STERI IZEEL The area to be `surfaced shall be treated with soil sterilizer. Rate of application shall commply with the 1 x t, manufacturer's specifications..,., • - � •- - '� >>•` its - � ,, _ '- •• -. r RI1 COORDINATE WORK:. The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING:, Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate ,prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush,. roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL. PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall, be. plaeed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever isfthe greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RIS COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. -One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench' has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion.of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or haurd to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. { SPECIAL'CONDITIONS--PERMIT NO. 2715 r _ --- Mumbil Inc. --- -. u = f m addition to the standard ermit conditions the following ' • P g'shall�apply 1 , o ,`� 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10,§ 1 (part),' 1982), all t ' ..work shall,be performed,in accordance- with` the latest editiori of the Standard Specifications For Public Works Constructiori (SSPWQ and as directed by and to the satisfaction-of the City Engineer. - s • ' 2 ; Mumbil; Inc., hereinafter referred to as ".'Permittee", shall be'responsible for providing continuous . dust and erosion control. • i r 3. , . Streets,shall -be kept clean. They shall', be completely cleaned at the-end of each working day and = ' `more frequently.if required.'+-' 4.. 'Pursuant to Section 6:08.050 of the La Quinta Municipal Code (Ordinance' 18 §4,,j992'), throughout '. a , 4i the. work site, the Permittee shall comply with •City regulated work' -hours. t Operation'and- , ' - maintenance of equipment within one-half mile of human occupancy shall be performed'only during , . , the following time periods: t October 1st to April 30: t '� .Monday-Friday. ,7:00 a.m.Ao 5:30 ti Saturday ' 8:00 a.m: to 5:00 p.m. L , May 1st'to September'3b: , 6:00 a.m to 7:00 p.m. .Monday-Friday - • , a1 Saturday 8:00 a.m. to` 5:00'p.m. , t . Work shall be'prohibited on legal holidays and Sundays. Y5. • ,Work performed within'500 feet-of a major:and/or signalized,intersection,is'restricted between the ' hours of 9 a.m: - Ip.m. Traffic control shall be set up after 9 a.m. and removed before 3 p Mk,The • : ` Permittee shall contact the Riverside Country Traffic. Signal Maintenance Department at (909) 275- r 6894.if signal operation at the intersectionris to-be altered tri any way. ` 16.. , Pursuant to Section, l4.'16.110`ofthe.La''Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permitteeshall assume responsibility-for repair of any pavement damage to,any public•or'privat.e street and for any damage to other.City'streets or facilities as a result of work performed under this . • permit. 7. ' Pursuant to Section-, 14.16.250,-of the -La Quinta Municipal Code'(Ordinance 10 § 1 (part), 1982), ` ,`advance warning si s_aridtraffic control shalf. be installed and.maintained in accordance wi&Cal 1. Trans Standards or the Work Area Traffic Coritrol'Handbook (WATCH Manual): A traffic control . plan, if required, , shall be prepared in accordance with the WATCH Manual and sub"miffed to the' City-- _ ,, ' . .rt r-,- • for review and approval `one (1) week prior to starting any construction: It: shall be the Permittee's -responsibility to appropriately detour and barricade all construction sites. '' ' • . j y _ , rl Spec_ia1 Conditions - Permit No. 2715 r Page 1 of 3 r - Via' • •• -♦ • •di �•/ •, •. • ` .F'. /rYrl. t4. 1' ' Ir 9:-f�i. t♦ +•4^i/•i'`' +; V t { f+ �P \ SPECIAL CONDITIONS --PERMIT NO. 2715 --- Mumbil, Inc. --- 8. Pursuant to Section 14.16.290 of .the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982), ' street closures shall, not be permitted. A minimum of one travel lane hof paved surface shall be, maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-,. 4133. It shall be the Permittee's 'responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. . 10. Should additional work, "materials, or modifications. of the work be required in order to. meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 1.4.16.370 of the.La Quinta Municipal -Code (Ordinance 10 §;1 (part); 1982); backfill compaction within street rights-of-way shall conform with Section 306-1.3 of the latest edition of the Standard,Specifications For Public Works Construction, (SSPWC),;and as required by the Public Works Department. 12. All excavations within City of La Quinta right -of way shall be backfilled, -and temporarily paved if within the existing travel way, at the end -of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open. trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where constructionwill begin the next day, provided that this length of trench is completely covered by -steel plating. 13. All landscaping, irrigation, decorative yock, decorative concrete, lighting, etc.,. shall be replaced to its original condition. , 14. Access and egress to all local properties shall be maintained at all times.-. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 §-1 (part), 1982), permanent 'pavement replacement' shall be completed no later than seven (7) days after the completion, of ;the work.. Permanent pavement shall be replaced as required by the Public Works Department. 16. • 'Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior - to commencement of any construction at (760) 777-7075. 17. 'Permittee shall stabilize any soil that was disturbed'(shoulder areas, etc.) as a result of work performed under this permit with an approved dust control treatment. special Conditions - Permit No. 2715 Page 2 of 3 I . „ _ 4 •"*4` .,,1 ' .. OW + �. r . "� r ` ni . t + , si'r • =•r'1 pis-. - r SPECIAL CONDITIONS --PERMIT NO:'2715 • ,� ' W `r .� f'I _ �. t --- Mumbil, Inc:.---. !r .�. , w •` y' r ' 18. --*Pursuant to Chapter�.12.56 of the La Quinta Municipal Code (Ordinance 10 §j (part), 1982) the City :'has •designated certain city streets-as'Truck Routes. The weight limit for:restricted streets (i:e., streets', .• not part of the Truck Route network) is three'(3) tons;`trucks exceeding the weight limit may,use a restricted street if making a delivery or pickup 4orf the, subject street, or -,if this pe`rmit,specifically ' grants permission to use the sireet to deliver street�construction'materials-,andfor equipment a 19. 'The City of La Quirita reserves the rigtitto revoke, suspend or, void this pei-mit'at•any time 4 4 . '. .. 1- .. 4 • . • i. .'� 7 20: _ t: This penriit..authorizes the.relocation o£an4underground electrical "service.at.78=035'Ca11e.Estado, withm—the alley behind the'El .Ranchit r o ." -e restaurant. � . ',. , •* ' • . 16 ..1A „�... r * +' ,' ` -b•. + '_ t .. 1 j S ,-_- - J� ,,•i e r .K •'' 11 • `, • M H �,> '4 - •• • 4 + .. - •+ ,�. t i > � t: ,M a it • } � ' � ' j'.. '' r r �� 4 • r ,. j` moi• f I1 .. Special Conditions - Permit No. 2715 j' > Page`3 of 3