Loading...
2721NOTE With,proper validation=' . ,l this form constitutes an' I CITY "OF LA ~QUINTA encroachment `permit. ,, a APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) OF For the,construction of public �c',private curbs, driveways, pavements, sidewalks, •parking lots, sewers, •'water mains and other like public works improvements in connection with�MINOR IMPROVEMENTS and APPROVED'SUBDIVISIONS Subdivision Improvement Permit —Class lll. ` DATE: Febxut±,rv` ��� %199$,; - x�:..L Mino`r'Imprbvement Permit Class ,IV LOCATION OF CONSTRUCTION' Avenue 52, Tract '•x4890' Citruq Course '. J l (Street address or Description of Location) PURPOS&OF CONSTRUCTION ROUAlt `R'ra4ing, for Sketch (attach construction plans.if appropriate) V' .-:pekir�teryall aloyA'Ayeque •52. ' k } DESCRIPTION=OF CONSTRUCTION To .prevare .sitcs:••iar verimetar' pal.I cbnetriictidrt" SEE ATTAMW CONDITIONS, ' . .DIMENSION OF,INSTAL'LATION OR,REMOVAL ` $ee �1���` s_ _ ,8 E '� PRO PIANS,?.. "RQUG>3 s �'": %z _ .�, 5= �• Git1lAINQ,•; S�:"�BE'x' . AND PAdIIdG FLANS, ` • . cy, . 4,�,:v� o. - . r - TRACT 1 X4890 ," ,Oji 111 D$ CONSULTING .. SIZE'OF EXCAVATION, IF NEEDED 'See pLins. 1O�ROr� `► � ' ' S/$/OOH REVISET BY (' `- • � ... J' �! 2698, 9, „ • APPROXIMATE TIME WHEN. WORK WILL BEGIN ? APPROXIMATE TIME OF COMPLETION 6/10/9>l ' i•. ESTIMATED CONSTRUCTION COST $ aD;470.Og' K .',.."L'�•<'; (Including removal of.all'obstruction, materials, and debris, backfilling, com 5 FEB 2,'tl,r 199 -.paction and placing permanent resurfacing and/or replacing improvements) w F Inconsideration of •the granting of this permit, the applicant hereby agrees to: Indemnify, defend•and save the City, its authorized 'agents; officers, representatives and employ es, harmless and against any and all penalties,; liabilities or #loss •resulting from' claims,oi court action, and, arising out'of any accident,,loss or damage to persons or,property happening 'or"occurring as a'proximate result of any work undertaken under the'permitlgrante(i'pursuant toithis'application."S • ' Notify the Administrati e'Authority at least twenty-four (24) hoursyin advance? of theltime,when .work will be started. • Comply with all'applicable.City Ordinances; the terms and conditions of the pe�rmi' and' alI-applicable rules and regulation's of the, City of 9 1, " La'Quinta and to pay 'for any additional `replacement 'necessary as the result of -this work.•f";�•' Signature of Applicant o'r"Agent Jaime 0:' id' on itruexiona P'.O. HCM 13$20 ' Pala Debart,'•'•CA -1-.1760) '568-5000 Name of Applicant,(please print) ;�. Business Address .`Telephone No. Jaea Rue` i'y same 4 L Name of Contractor and JobiForeman Business Address Telephone No. 5168951 796 ` Contractor's,License No. ' City Business License No. CAIFaxvi xtinurAnce Co. CAP 4003795702 Applicant's Insurance Company ,' '•, = Policy Number ! ' FEES: 'Subdivision Improvement Permit —Class III r Public improvements: 3% of estimated construction costs ,rr Private improvements: 3% of, estimated construction costs Minor Improvement Permit — Class IV: See attached schedule • 272-41. Inspection Fee $ 1214.10 PERMIT VALIDATION . Permit Fee 100.00 PERMIT NO. 2721 Penalty Cash Deposit -Surety Bond if required, TOTAL: Receipt No. - Received by Recorded by i r $ 1314.10 Date DATE APPROVED 2/24/98 EXPIRATION DATE 2,/24199 DATE ISSUED�� By... �/,,C,l1�f'�f1 Administrative Authority Telephone: (619) 777-7075 NOTE: - With proper. validation , this"form constitutes an t CITY OF LA .QUINTA- encroachment permit• ' 1-.. - ,.j ,APPLICATION FdR PERMIT ` PUBLIC WORKS CONSTRUCTION' (ENCROACHMENT) cg For the construction of public. or._private, curbs, • driveways, . pavements, -sidewalks, parking lots, sewers, -water mains+' • and other like pubfic works iinprovements in connection with MINOR IMPROVEMENTS and APPROVED SUBDI'JISIONS. '. DATE: O� Subdivision Improvement Permit - Class I I I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION (Street address or Description of Location PURPOSE OF CONSTRUCTION J 9 G B - Sketch (attach construction plans if appropriate) .w. 1 PESCFtIPTION OF CONSTRU lON 6 jT � � f „� ,. Q( DIME ION OFI STALLATION OR REMOVAL /1 9 5�-► HJT— SIZE 0 EXCAVATION IF NEEDED ✓ (( �f ' APPROXIMA TIME WHEN WORK WILL BEGIN _ G F uv Lefaoil cif. • • 1 j APPROXIMATE TIME OF COMPLETION (�} ESTIMATED CONSTRUCTION COST $ ` / vewl; tX 1 (Including removisl of all obstruction, matetials, Ind debris, backfilling, com ,1 1 2 +f paction and placing permanent resurfacing and/or'replacing improvements) + �3���' In consideration of the granting of this permit, the applicant hereby agrees to: • Indemnify, -defend and save the City, its authorized agents, off icers,`reprowntatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of. any accident, loss or damage to persons or property • . happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. -Notify the Administrative Authority at least twenty-four (24) houX-;4 e time when work will be started. Comply with all applicable City Ordinances, the terms and conditand all applicable rules a gulations of the City of La Quinta and to pay for any additional replacement neceitery awork. , plicant o A nt _ ' Name of Applicant (please t1 . Business Address Telephone No. ' .. 6•b � O tt mss• �C.s� �_ ' . _ - Name of Contractor ind Job Foreman Business Address Telephone No.' - V. ' Co tractor's License No. , City Business License No. 'np-P py Applicant's Insurance Company GEN. LIASILITy Policy Number FEES: Subdivision Improvement Permit —Class III Public. improvements: 3%'of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule 121t(D Inspection Fee $ HERMIT VALIDATION Permit Fee PERMIT NO. q Penalty Cash Deposit -Surety Bond -DATE APPROVED 'f 'if required i EXPIRATION DATE + `TOTAL: $ --' 3� l � {, _. 7 DATE ISSUED Receipt No. a By ' ' Received by Date' Administrative Authority Recorded by r TELEPHONE: (619) 771-7075 r (ODc�— i i" ♦ � r a .� d •.I •_ e 1 rr � • f i EXHIBIT "13" , t KSL'UEVELOPMENT'CORP. t R "THE CITRUS" -AVENUE 52 PERIMETER WALL SUBCONT_ ACT -AGREEMENT ' 'GRADING/ROUGH '' f '. DATE: FEBRUARY 23, 1998; + , y GRADING/FIN.ISH 12",R.C.P. & 24" X 24" GRATE. ..� s LUMP SUM'CONTRACT PRICE $40,470.00 + F 4 s, .y Mobilization /11, Grading Rir.Block Wall $ 9,000,0() w' Mobilization #2,'Backfll'131664k Wall, Finish 7 Gradc"and CIeSn Up $17,370.00 ' ` 'Install. 12'' R.C.P..&°24" x 24" Grate - $ 6,600.00' 3' Over Excavation'1'or Wall Footings !� 7,500,00 see- �, =.on a time {and equipment rental basis; not to exceed $7,500.` 'r 1 ,UNIT PRICES."+ ,•.. ,.f�' L ;s; ',r., �`:.. 4 `•, ?4,:. �- ' Import of Owner -provided till, ifneeded, using dump;trucks: $2/CYS "..• a. ..' Re_ntal•of Water Truck including operator & maintenance: $55/hr''`. "• �'` , PAYMENT SCHEDULE:', 't 90%._ - Upon Completion 1 ,$36,423.00 10%0 Retention'.,. r• .� $ 4,047.00 1 'here will lie no payments made by Contractor to Subcontractor until a W(irkcrs' Compensation and General Liability Insurance Certilicate has Been submitted. Subc6n.tractor must also Submit a cop r of ' I y a � • ` their Con tractor's. License renewal card prior to payment. Owner=Contractor mustbe'nanied as ,' • r � additionally insured ori Subcontractor's General liability Policy. . _ ',fit , c- ✓,• + R L ' 2. Owner/Contractor must'have labor and.materialreleases before payment of an invoice` 3.. INVOICES INVOICES WILL BE PAID IN'HIRTY (30) DAYS AFTER RECEIPTOF INVOICE CONTINGENT'UPON THE RECEIPT O:F ALL PAPEItWORK,FROM SUPPLIERS(S) STATING` ° AMOUNT(S) DUE AND SUBJECT TO APPROVAL BY,CONTRACfOR'S MANAGEMENT.' IF . PAPERWORK IS NOT RECEIVED, A JOINTCHECK BE ISSUED FOR THE %ENTIRE +, l" INVOICE AMOUNT. INVOICES ARE PAIWIN THIRTY=(30) DAYS AFTER APPROVAL FROM f ` ON-SITE SUPERINTENDENT. Ys.µ 4. If Subcontractor and/or.his employees are found•with aleh6l or drugs on the job premises, -the 'Subcontract could be terminated. Any expenses incurred, by Owner/Contractor as' a result oI such ` termin`ation,shall:be backchar'ged to the Subcontractor. + 5. ALL RETENTION AND CH ANG E -ORDERS MUST BE BILLED SEPARATELY:, RETENTION BILLS MUST BE ACCOMPANIED BY A.F'INAL RELEASE WITH A ZERO ,(0) <� BALANCE. i fir. � Ar,� y „ - ,. • _ .,, r f'yr . >t t �, 'JAMES 0. RUE CONSTRUCTION r * SUBCON'TRACTOR'S INI'T'IALS UA'I'E: The following General and Special Provisionsare attached to and. made -a part, of Permit No. GENERAL PROVISIONS . The following shall always,apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City_ of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee, for his contractors to. secure permission from abutting property owners. Such authorization must, be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not,be permitted to -operate on any paved surface unless fitted with smooth -faced street pads. All mechanical' outriggers shall be fitted with, rubber street shoes to protect the paving during excavations. Rubber -tired equipment only, shall be used in backfill operations in paved areas. If the existing pavement.is scarred, spalled, or broken' during the term of,this contract, or if the pavement is marred, City of La Quints shall request that these, portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall,be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified:24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any,drainage structure including corrugated metal pipe, concrete:.pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be.replaced in kind. In the event it becomes, . necessary to remove or cut existing drainage structures, City of La Quinta, shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper "drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill.operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other. objectionable materials immediatelyafter backfilland compaction.. Existing gutter line and drainage ditches shall be replaced to their original standard or better., All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site, to keep down dust conditions and, shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City. of LA Quinta roads, it shall be the responsibility of the permittee (contractor), to control this water and to provide off-street barricades, when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. 'In the event it is felt by the:peiTittee that he, must close a street for ° any length of time, permittee shall contact this office to obtain'the necessary permission. SPECIAL PROVISIONS `. The following shall apply when indicated: ; R1 NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance;of &farting construction. R2 UTILITY "CLEARANCE: (Substructures) Prior to making any, excavation within the City of La.Quinta, right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing , I ubstructures. Damage 'to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3 UrIIM CLEARANCE, (Surface. Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. ' The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: 'Area between the proposed concrete gutter line and the existing road pavement shall be surfaced ' with inches of A.C. paving placed on inches of class aggregate subbase course having an "R" . value of not less than and in conformance with City of La Quinta Road; Improvement Standards and Specifications, ordinance #461: R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb 'shallbe graded to a slope of - 1/4 inch to one foot (1'). R6 'GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or, grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: - A portion of the existing concrete curb and/or curb and gutter _feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal.' Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard //207. R8 'DRIVEWAYS: A:C. driveways shall be constructed as not to alter existing drainage,pattem'. Surfacing between the property " line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on of class aggregate base. Driveway .construction shall' conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600 feevin all directions shall be assured and maintained at all times. . R.10 SOIL STERILIZER. The,area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the manufacturer's specifications. - R11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 L] IIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall• be .placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichevee iJthe greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and �e water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes' necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS--PERMIT NO. 2721 --- James Rue Construction --- In addition,to the standard permit conditions;"the •following shall apply: 1: Pursuant -to. Section. 14.16.320 of the La Quinta Municipal•Code (Ordinance 10 §,.1 (part), 1982), all work shall .be performed in accordance with the latest;edition of the Standard Specifications For- Public Works" Construction (SSPWC) and as directed by and to the satisfaction of the City. Engineer. 2. James Rue Construction, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 3. Streets shall be kept clean. They shall be completely cleaned at-the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance -18 § 1, 1982), throughout the work site, the Permittee shall , comply" with City regulated work hours. Operation and maintenance of equipment within one-half mile of humanoccupancy shall be performed only during the following time periods: October 1 st to April, 30;. Monday-Friday . '7:00 a.m.. to 5:30 p.m." Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday-Friday 6:00 a.m to 7:00" p.m. •Saturday, 8:00 a.m: to-5:00 p.m. Work shall be prohibited on legal holidays and- Sundays. r 5. Work performed,within 500 feet'of a major and/or`signalized intersection is restricted between°the hours of 9' a.m. - 3 p.m. Traffic control shall be set up after, 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in any way.. .. I 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10• § 1,(part), 1982), Permittee shall assume responsibility for repair of any pavement damage "to. any public or private street and for any damage to.other,City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14. 16.250 of the La Quinta Municipal Code (Ordinance 10• § 1 (part), 1982), advance warning, signs and traffic control shall be installed and, maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual): ° A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for-.review and approval one (1) week prior to starting any. construction. It shall be the Permittee's "responsibility to appropriately detour. and barricade all construction sites. Special Conditions - Permit No. 2721 Page 1 of 3 Y• SPECIAL CONDITIONS --PERMIT NO. 2721 --- James Rue Construction--- onstruction---8. 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part)' 1982), street closures shall'not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. ' 9.. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify. the' Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. - 10. Should additional work, materials, or modifications of the work. be required in order to meet City standards; safety requirements, signage requirements,+ or to fit actual`field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City.Engineer at no cost to the City of La-Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill. compaction within street rights-of-way shall conform with Section 306' 1.3 of the latest - edition of the Standard Specifications For Public -.Works Construction (SSPWC), and as required by the Public Works Department. 12. All excavations within City of La Quinta right-of-way, shall be backfilled, and temporarily paved if within the existing travel way; at the end of every workday as directed by and to the satisfaction of . the City Engineer.for the protection of the public. Lengths of open trench shall not greatly exceed ' -that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, .however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight'at a point where construction will begin:the next day, provided that this length of trench is completely covered by steel plating. 13.. 'All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc.,,shall be ieplaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. f t• 15. Pursuant to Section 14.16:3.75 of the La Quinta Municipal Code (Ordinance 10 § '1 (part), 1982), permanent pavement replacement shall be completed no later than seven ' (7) days after the completion of the work. Permanent pavement shall be replaced as required by the. Public Works Department. ' 16. Permittee shall notify the City of La Quinta Public Works Department a. minimum of 48 hours prior to commencement of any construction at (760) 777-7075. 17. Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of work performed under this'permit with an approved dust control treatment. Special Conditions - Permit No. 2721 Page 2 of 3 SPECIAL CONDITIONS PERMIT NO., 2721° • ,� --- James Rue Construction' r r - 18, Pursuant to Chapter -12.56 of the La Quinta;Municipal Code (Ordinance 10•,§ `1'(part), 1982)'the City has designated `certain city streets as Truck�Routes• The weight limit for.restricted streets (i:e.; streets not part of the Truck Route network) is three'(3) tons; trucks exceeding the weight-limit'may use a A.:'. x `-restricted street if makin ,.a deliverY,or pick on the:subJect street or if this, ermits ecifcall u , r �. `A..grants permission to -use the street to deliverstreet construction materials and/or equipment. 4 ' 9: .The City of.LarQuinta reserves the right to;revoke;auspend of -void this permit at any time* �x.. This permit authorizes rough grading along the Citrus Course.(Tract 24890)+Avenue. 52 frontage for pe `rimeter wall construction. ' z i; • " �. ` ;r. 1 rte. r r. �< $'. S-. .. "+ . ' .tom: - *•+ r- t' + #;^' `{ .. �` i � , .'4 +'r•'' ..- Y;` '� „ .. �f�; f • ; � - rf: � � b: }t..• t � '+ a oy ,, t ',r:i. ' •. r • .`fit 3.: f - Y s ' ' •r ' aV .-r Md i t" r' r` .f 1•, •� r . t.y^ _ ' : , - +j - 71, ? ?i �• .� - _ j - ,, '?•r • ..•+, y - - +3+ '" r ; is a ti .. + f' s< " r^ AV T Special Conditions - Perni t No. 2721 • ;'a �; y + � r Page 3 of.3 y '' r 1 a �- -'•� ! i 1-r tib., e , . . •_ � ( t - ,Small Scale Construction/Demolition Projects 5 Acres;or Les91 Fugitive Dust (PM10)rMitigati6n lan ,. Date: 2 z6�9 rJurisdiction: ' L'L File #: ,Part 1 Project Information- CNS v�,tG �.�r`-�) 4" i /f?'Z'y8go Please provide' the �informarion--below as ,completely as' possible even if u- has already been } provided on -other forms related, to this project. Failure toprovide, complete information o;: t ' 'provision of inaccurate information may delay the. processing. or your Fugitive Dust (PM10) - :1�fitigation `Plan (Plan. It is recommended .'that you submit your.Plan. concurrent with your 'gradin or demolition permit application Project proponent:. KSL, LAND,CORPORATION. Address:„55=920 PGA Boulevard, La Quinta,°•.CA r ;92253 Day phone number-760%564_7189 Emergency phone number.. Grading contractor, (Contact Person):James , 0'. Rue Construction'-.'Co.-In-6: Address: P. O. Box 13810, Palm,Desert; CA 92255 F DayEmergency phone number-760'/861-2767 phone number.” 760 568=5000 Construction site street address: Tract ,?_4890=7, Avenue 52,, La: Quinta, CA S i Construction site location:.. West, of Jeff_ erson St . , East of. Cetrino (Ple'ase include an 8.5,z Il, location map) ,. Construction site assessor's parcel number (Tract #): 24890-7 � Parcel (Tract) sue:` , , 31;. Acres1or13 , 440,', Square feetr ^ Anticipaied date of physical project initiation: Feb'. 26, 1998t to- Apr :6,' •,1'998 Anticipated date of project completion: March 6, -1998 to, A'pril� 17, 1998, Anticipated costs for dust suppression: (Attachment,B - Must also, be completed and mailed_ to the appropriate address when construction activities have been completed) , rt ` � F ir 1 _ jy t•���rri/ Y�.i ♦ �.,- ii: ,� f. •��: • � '><! f I• }, �.f y�� ,-. �/�r., � ��. K b` t / , . d 6 / , ®/ © J'��^! � 1 � `{Is�� F ••• , � •, i�'Ya ` .:•. ��•` i3��,r �_ : Y, » t ,r i. 1 ii� , :� / • 0 • fr ��. 'CA�7•r. r 4. +�f /A o / +/ / .,-.,y +'�' . _Ff.'a �� �V�,.�,'M�..?' ,+y i *i� + rl. l,. `C: j4 � � py•: �.� .�`fi �.�]�•• .4�� Y � *� 1 1 1 � t t i � '$; t� �►�1�: t� 4T /•- drt a: ,11'.{J., pr., i.M1� +�� 4x ��.NV.'• - ii ��,cfi'�i_•y� ] ii� {'r�ii x 4.�1,7a (r''`'"°�*, 1 .y' ..fd . 1 4.. �' f , 1:, ;q. 'ir' ''t KrrzSY �. irr 7 �'t:•5. it / 0 • / � : / ♦♦A,.+1+ � i�S,t•,. +,fP :qui V.t "7!c`j:"'A, a ���t$'-' �y;,,y!w�f'i�.��• u♦r C. TSb P. "�'t i •fir, JS.- s?'i4,7{'r �`• `� ���1{4l s' �� 4' Cr '�''jn 1` 1r i 1� T dr . � • _ _ . 1 ? _ K - a: '�APl'aal� 1r� ` � � 1'. t 1S•��� �e�a ♦j-. • 1 1 .��a.� _.1 . •�. 1 t .ra •3 � � uJ ��;� �,�,��;. �� a� ��� � i �� 33•a)' " ® ) �+ �> j "i, � ��5� kt�'" ' a �y�. S'eS ;0 �y'�•`� �� .® � . �,' rt. ar�r�s',,'-: r� ��k'��]rax?sh�' , � Yl+,. ;i. 'a ;�wijFs; ��r!•�`v .yti; f t�$�',[��'�."crr S'i5 i11''.. 4 • ,�hY.S ,J..ti{t -•Ryb 1�F,�'-11 ��r�♦1- `r�l�.,5 �"�.y er �.'��c��K'•'s , �r r��Y: '� �• a _ti ' •asp' 'WM1f� '�.•�'i:i ® - d`�' - ,�� r':,� k � e o � r �" .e .FS ® •i� ^:S, •."Q' ®e o e ® `� ��,. n. � { f �-', `� R ,��„: w � ,w SA., 'S r,6'��•„�y?` a"� � ��•Wh'ia. �j�: ` ���:. '•' ��+a ��, �K���Lf * :� �*t: Vi ria e� � f i'"� w{l � tis r � �•'pi 2;4; rnF..; �..n�i. .•� ar f . S j. S',. Y t' ���. �. r�'f _.i. • , {'� i, rt ® v � ..,� . {res N•;. �' �,.i� / ^��1�".�sq �• �lY, w r r � e .a,' ,• ; si :� e... B1, �T/>''.., ,�Pr9"'�l 54.. 4 �t(.f1 � �: �•=-4 '�„d WQt w�:a !`1`a''r :: ,�gy'yt '+''ti. �•3' /f; �JA�'�� {r•'' fSF, fit' tr f r. - vy s v . . . •.� a ;d � -71 d u > 4t'' •zqi% j�T� •. !` i'a' { '�” %r'',,Tla� .i �� Y 7 (t?.. _h J �< 27F ,y,. r. kij9 4•4"i.'. 'Y`-r.Yn•`,ecMe1 - •}�'��o-b..,i. `'!- 4`�'{44<.val: �' � �iF � ? r` ` �i L •.ke•r, i. sj_S$�;.a��, ji. ��F��tr'� 4� M1%A � •�',�,r.�/ � ,`/ I�iF Jr. ��, �y�,�, . ... rn' � 4. o''VyC['G:%'�•,'�.p���w:.; . � Yi"i ,�MKiY -`� .d�y�k'L_{..� .t L�. i S �%t: IVA u!.00:10 0 7P �: L 2 2 24 L 200l:,46:2'S 70.4 LO.3!i' ENDORSE CHECK HERE X DO NOT SIGN / WRITE / STAMP BELOW THIS LINE FOR FINANCIAL INSTITUTION USAGE ONLY RG FG FC. Details (ewe., freauencv of application, number and tvRc of dust control implements, etc. ; -• Please be as specific as possible) r ,y Land Clearing or Earth -Moving n ' 1 x x Water t_r ick during (?rar3ing _ Disturbed Surface Areas + #' X x Water t'rairk nn ctanrl h _ Tart 3 Agreement I.certifv that the information contained in this FuLntive=Dust,(PMIO) Mitigation Plan is true and accurate and that all measures specified in Part 2 will.be implemented during project - `' construction. I authorize the City of La Qu i nta: 4o''eriter the above mentioned property, for inspection and/or abatement purposes, and I agree to hold harmless -the City and its representatives from liability- for any actions -related., to this. project. -I also agree to complete the record-keeping requirements included herein as. Attachment B once the _ project has been completed. r . r 2/24/98. 4. - i Ign re o er r u orize presentative ate ; 'I cotiditioris the Fugitive Dust.(PM10)'Mitigatiori Plan and the owner has,, - T , aimp! ,!of -all its provisions throughout project buildout. 4haivad 2/24/98 :. ra Contractor ate �+ #I- (If,not the same as above) F _ ,.� ; � '-` _off , � •+ _, • � �- �,^ fi r't. .. y n �_ n .. y,. � � . % . . � - - .. Z' ..rte 4 'f e. CONDITIONS FOR FDCP APPLICATION 98-28: KSL LAND CORP.- TR 24890-7, PERIMETER WALL IMPROVEMENTS .31 ACRES M.O.L:' GENERAL: 1. Applicant shall comply with all control measures as set forth'in the approved' application for FDCP 98-28; and theJollowing conditional measures. This dust control plan approval shall also apply to any haul/encroachment, permit(s) -issued by Public Works. 2. The full amount of security applied to ,FDCP 98-28 (as determined by Public Works) shall be. available to the City for ,any measure(s) deemed necessary by . the City to achieve adequate dust control, whether or,.not such additional measures are included in this application. Security shall be in the form of a. non -expiring Certificate of Deposit or_a .self -renewing Letter of Credit. Any requests for bond amount revisions/reductions must be made in writing to the Public Works Director. - 3. Applicant shall submit copies 'of all records related to cost accounting for.the dust control measures assumed during ;all pre -grade activity and grading construction upon any request for release/reduction in posted security. Said records shall be submitted within 30 days after completion of all dust control measures as outlined in and conditioned upon the plan. All such records shall accompany the completed PM10 Program Report Form, which can be obtained from the Public Works or Community Development Departments. Completion of all dust control measures shall be verified by the assigned field inspector. 4. Adequacy of all proposed and conditional stabilization measures shall be determined. by. the assigned grading inspector. The City may adjust the bonded Y ' amount for any remedial measures beyond those identified or conditioned upon the project, which the City deems, necessary in- the event succi approved measures are not effective: - Enforcement . of these conditions shall be at the discretion of the assigned grading inspector, who shall monitor and field verify that -the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities and other aspects of this FDCP may be required by the inspector, at his/her discretion, in order. to.assure compliance. 5. The conditions applied to this dust control plan are prepared to cover the full range of construction associated with the subject .31: acres of the proposed perimeter wall improvements for' TR 24890. The approval. provisions and conditions for this dust control plan.shall remain in effect for the duration of all construction undertaken as part of the approvals granted _for this project. t � '� S•Twar �w. 1 ... r •r . ,, � '• .� •• Ij ,`r ••,. . f':..• r':�, ,� yr 16 Transfer 'of any realproperty•or other interests with -respect to this project will`'.'.= have ' no<.effect " on the .validity( of =Ith'is plan . approval or 'conditions'. - ' r ii•nplementation of all measures,as 'proposed, and. conditioned, shall be carried" ,outfo'r the; duration 'of all construction activities, to ' thre extent. they, are 'applicable:.,However, nothing herein shall -p•reclude .an y.' uture interest from ., - ` filing'a`revised`FDCP with the City.for"any portion'of the•site.i. " 'Approval 6. of this dust contr6l'xplan . does not in and of: itself constitute or. otherwise authorize ariy',site disturbance, preparation. -or construction: The 7 developer is required to obtain.all necessary. permits and clearances as set forth " -in any development approvals issued and 'currently in,effect,pertaining,to'this -site,.-, This includes any.typei of'testing, monitoring'or-sampling r'equired'as a condition of development approval, such as that conducted for`'archaeologic, • 'f ., hydrologic'and geologic reporting purposes: �= SITEDEVELOPMENT. c ' 7. Pre-watering"of"all areas,"proposed for grading. "shall be in accordance with recommendations ;of•the grading,contractor, based,on.the`area soil conditions ,as,described in.the,associated soils report(s).' At a time " b' „ ,minimum;,pre-watering .. -shall be.forrthree days. prior to any earth disturbance(s): ' 84.' r Track -out- and other accumulation 'of• soil material(s), onto. any paved. areas •--outside.,the limits.of grading -shall. be minimized. Wet sweeping/flushing offs -oil - . accumulations from all paved areas shall,be conducted daily; andkept damp ► during construction hours until so -removed.- removed. -9. -9. ". FDCP 98-28.does not -identify -any import or. export'material.••Any transported r •, s soils and on-site stationary storage pilesahall be`sufficiently stabilized; watered = =t i;-down,and/or covered'as appropriate.' Minimumrfree'board for- haul, vehicles shall , `be as established`by,thre Public Works Department. ,... , • Rte_• � . • • •' . r. ,• � , - 10. ?. All disturbed areas where -no .further grading, construction or, other land ] . , disturbance :will occur shall be`stabilized with an appropriate dust suppressant, . . ' as definedr in L•.QMC• Chapter'6.16':and .approved' by the California Water Quality ' Control Board,Region_7. The suppressant shall be applied'_no later than four days,aftee such disturbance, and staked, posted o'r'otherwise. restricted,in order , -to prevent. any access on -or across those L - .areas: Disturbed-, but inactive 'development areas` subject to additional 'grading _ ,or L' construction activity shall be watered daily un.til'an:adequate crust is formed. Alternatively, an appropriate'dust "suppressant shall be applied: , ; s,1-4 yrs ^ lie V, — _;•, r ,-ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left 'coltundcontains� the sources' of fugitive 'dust which are intended for emissioncontrol 'under the City's dust control ordinance. The two right columns contain an . inventory `description of reasonably:available fugitive dust control measures for.each of the sources. - 4 Please use this in formation as a guide when preparing a, Fugitive Dust (PMIO) i f itigation Plan --i,.. r ,,'.(Source No) Reasonably Available �� 9 } Source' ' Control Measures _ Comments ' Land. (A) Watering o Application of.water by means of truck, hoses and/ ' Clearing/ or sprinklers prior to any, land clearing or earth. Earth.movement will increase the moisture content thereby, moving increasing'stability of material . r.° o Once the initial land clearing/earth movement activities are . - complete, a second round of watering -can eenerate'a thin R crust which'stabilizes the disturbed surface areas provided, that it is not disturbed 3' z o Security fencing can .be used to prevent unwanted future ;" 4 } disturbances of sites where a'surface crust has been created (B) Chemical stabilization o ,Only effective in areas which are not subject to daily disturbances .+ _ e o Vendors can supph• information on product application and ' 4 required cone; ntrations , r ` (C) Wind fencing o'Three to five foot barriers adjacent to roadways or urban areas,' can be effective in reducing the amount of windblown material leaving a site o Should be used in conjunction ,with other'measures _ -• (D) Cover haul vehicles o Entire surface. area should,be covered once vehicle is full h ; t (E),Wheel washers o Should.be'placed where vehicles exit unpaved areas'onto paved 4 areas t. , o System can be adjusted to spray entire vehicle, including stored r -bulk material in haul vehicles z Unpaved (F) Paving o Requires street sweepinif g/cleaning subject to material 11{ Roads accumulation - *.` (G) Chemical Stabilization o Vendors can supply information as to application methods and . . concentrations ti o Not recommended for roads with high.volt mes or rhos :, used for " heavy equipment w - '. �� - „ _. •� r .,: ,fie _ ` (H) Watering o In sufficient quantities to keep surface moist .. ; p o Required aplication. frequency will vary•according to soil type, �r weather conditions, and vehicular use.', ,, 10, . .. sl _ � 1. �. • `' t,. _ •.�( �': r � � •1 (Source No) Reasonably Available ".Source Control Measures Comments Unpaved (1) Reduce speed limits o 15 mile per hour maximum 4 , Roads. a' s (Cont'd) vehicle trips o Access restriction or redirecting traffic to paved roads in order to ' .(J).Reduce reduce vehicle trips by a minimum of 60 percent µ Storage (K) Wind sheltering o Choieesinclude silos or enclosures y F. Piles', t o' Enclosures should consist of three sided barriers equal to height of f • _ material with no more than 50 percent porosity �. (L) Wet suppression ds include sprav,bars, hoses and water trucks o Application methods -,- o Frequency of application will vary on site specific conditions (M) Chemical suppression; „o Best for use on storage piles subject to infrequent disturbances' t (V) ,aJ erine loadiri/loadout o Confine loadin/loadout procedures to leeward (downwind) side . procedures of the material o Most effective when used in conjunction with wind shelteizng• (0) Coverings o Tarps, plastic. or other material can be used as.temporarv. coverings i o When used, these should be anchored to prevent wind from removing coverings. --------- --------, —; -------------------- -----------------------.---------- ;---------: -----------------, - i (aja <,--- Paved (P) wheel washers . o ,Should be placed where vehicles exdt unpaved areas onto paved,: a Road' areas M r 4 " Track-out o Systein can be adjusted to spray entire vehicle, including stored x bulk material in haul vehicles ' (Q) Sweep/clean roadways o Either sweeping-or water flushing may be used (R) Cover haul vehicles • o Entire surface area should be covered once vehicle is full ,- (5)---------- r . Disturbed --- ---- ---------------- -------------------------------------------- (S) Chemical stabilization —---------------------------------------------- 7" o Vendors can supply information on methods for•application and Auras/ required concentrations "Inactive Construction sites ('I') Wateriag o Would require frequent applications unless a crust { - - can be developed over the site' ' ".f (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas •_ o- can be effective in reducing the amount of wind blown , material leaving a site o•Should be used in conjunction with other'measures a • ,. • (V) Vegetation o Establish as quickly as possible when active operations have r establishment ceased o Use of drought tolerant, native vegetation is encouraged ' ' t � -AYE, } Y - ,1, : �� A• •, ATTACHMENT B .- COST INFORMATION"' F Small Scale Construction/Demolition. Projects (5 acres o'r'Less)' 1 ` . Fugitive Dust (PM10) Mitigation Plan r^ Date,Jurisdiction: ` ProjectTile #:i R ' _ ♦ �! - - , .J , '� t • . � .y,i � ,5 !.. , . ' � ♦ .� to ;V 1 - z In the spaceprovided below please list the"•costs-associated with implementation of all;dust control measures. . The, informarion�Provided below should_ include .all implementation costs , (including labor) for dust control throughout the project. Not all measures .luted below will A app h to all projects. L„ ` I x, t. After project completion ..these records `s ralll` be' transmitted to 'the Jurisdiction where' the ' gradingjdemolition permit .,was . attained and to the. Coachella Dalley Association of. Governments (CVAG),at the address provided below. �. PM10 Cost Monito ,ring •- Coachella Valley Association of Governments', 73-710 Fred Waring Drive, Suite 200 Palm°Desert, CA 92260, �, ; r a, z In the spaceprovided below please list the"•costs-associated with implementation of all;dust control measures. . The, informarion�Provided below should_ include .all implementation costs , (including labor) for dust control throughout the project. Not all measures .luted below will A app h to all projects. L„ ` I x, t. After project completion ..these records `s ralll` be' transmitted to 'the Jurisdiction where' the ' gradingjdemolition permit .,was . attained and to the. Coachella Dalley Association of. Governments (CVAG),at the address provided below. �. PM10 Cost Monito ,ring •- Coachella Valley Association of Governments', 73-710 Fred Waring Drive, Suite 200 Palm°Desert, CA 92260, �, ; r r �L z In the spaceprovided below please list the"•costs-associated with implementation of all;dust control measures. . The, informarion�Provided below should_ include .all implementation costs , (including labor) for dust control throughout the project. Not all measures .luted below will A app h to all projects. L„ ` I x, t. After project completion ..these records `s ralll` be' transmitted to 'the Jurisdiction where' the ' gradingjdemolition permit .,was . attained and to the. Coachella Dalley Association of. Governments (CVAG),at the address provided below. �. PM10 Cost Monito ,ring •- Coachella Valley Association of Governments', 73-710 Fred Waring Drive, Suite 200 Palm°Desert, CA 92260, �, ; KSL LAND, CORPORATION CITY of f A 01ITNTA n r QATE t VOtG� NO, ` WIN Ia ,111x,19011,0806, 4M0�UWT y�� � OEDUC£�ION� ��g ,�BA'LANCE 2-24-9822498 CITY -OF LA-QUINTA/BON 1000:00 .00 .•1000.00 CHECK 2-25-98 DATE NUMBER CHECK 11707 T'OTAL> 1000.00 .00 1000.00 PLEASE DETACH AND RETAIN FOR YOUR RECORDS 47 - DEVELOPMENT CORPORATION _4 � �Y A, - T - . ` r , t ' v .. .. ? Y .Y mss'.. ` S � i4 , •��.� �. September 1, 1998 Mr. Marcus Fuller *, b Assistant Engineer _ - _- - .4 r Public Works/Engineering Department Y 78-495 Calle Tampico La Quinta, CA 92253 . 1.ii -- •.Y' a - Re: Fugitive Dust (PM 10) Mitigation Plan Jefferson Avenue Dear Mr. Fuller: Enclosed is an executed copy of the Fugitive Dust Mitigation Planfor grading and �in-connection ;= Y withtheconstruction of certain improvements in the right-of-way and private parkway -North of '-52na or Jefferson Street to the Citrus entrance. '- In February of this year KSL Land Corporation posted a check in the amount of $1,000.00 for r the Fugitive Dust Mitigation Plan in connection with grading on' 52"d. Street. In as -much -as the grading and walls are complete in connection with this permit, we respectfully request your favorable consideration in allowing the $1,000.00 deposit currently on file with the City to be '- applied to the enclosed application. _Tlank you for your consideration in this request. :Sincerely; 'J es C. Wa es oject Director - - - f"' _JCW/jm 55 920 PGA Boulevard La Quinta, CA 92253 (760) 564-7166 Fax (760) 564-7131 -Small Scale'Construction/Demolition Projects 1 5 Acres or s Le A� Fugitive Dust'(PM,10) Mitigation Plan Q' Date:,''-' .. Jurisdiction: - ' File #:. Parr` .... .., Y .�F, - -^ K} L'!. •���+Z'`'j{}f 4: Y T. S } •*x � _L Project Ynf_ormation � • , � r •N -U" J. �-R'1¢"1` �'•� � •-� ' . s - : Please `provide the information below, as completely as possible even cf it 'has already been. provided on,other'forms related to this project.' Failure to provide complete.'informatnon or provision 'of inaccurate .information 'may delay the. processing of your, Fugitive'Dust `(Pmio)} ; K , ,Mitigation Plan (P,lan), It is recommended that you'submit your Plan concurrent. with your. f '.grading or demolition permit application. r • n F Project proponent: -., _• -- ; '' � - • . t, �'. K. S. L. Land Corporation.. `•' Address: ' 55-920 PGA Boulevard, La,Quinta, CA 92253t•':` Day phorte'number: 760 564-7189Emergency phone number:._ ­(760)','568 --3677, Grading contractor (Contact Person) - ...,James Rue Construction, '� ;Address: 'P. 0. Box 13810,'" Palm Desert, CA 92555 Day phone number:.( 760')' 568-5000Emergency,phone'num.bgr:(. 760) 861 2767 Construction site street address: Tract 24890 Jefferson Street ? Construction site locatiom"West of Jefferson, North of 52nd Street (Please include an 8.5 x 11 location map)',' Construction site assessor's parcel number (Tract*): Parcel -(Tract) size: .'l .85 Acres•or;- 80.448 Square feet' Anticipated date of physical project initiation: September 8 , 1998 Anticipated date of project completion: November 18 1998. . Anticipated costs for dust suppression: (Attachment B ; Must also be completed and mailed to the appropriate address when t.. construction activities have been completed) , f • � ± �e . sir d .. { 1 t .t , i � . 1 `, k H J R ' • i1 • y - � t y J' •! � ,yJ' ��� ✓ � •, 1,A11 projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and a• 403.1. •+ . yrs ,, ..� • ,r_Y,,y `, t ,t9 it - ' ,• . • ' . .. • '.kY ? �` as - _ , - � • 'ia ` . ' ti Fy,C Details (e.e- ft'euue�ggiicatlon; number and t= of duct control imatements, etc. a " `' Please be as siwitir as possiblel ', : '►K �' •: Land Clearingoc Earth=hlo'ving u4 'X` X�Water Truck during Grading { ' ✓ cwt Y-� Y .. ._ � f. }``'S+Ii:R? r .. , , • .. v Disturbed Surface Areas s• ,�t ;" # X' X. ° _ -Water Truckoon Standby ' Part 3 • Aereeni-e I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate andYthat all measures specified in Part2 will be implemented during project ._X;, cottstiuction. I authorize the City of La Quinta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold'harmless the City, and its representatives from liability' for -any actions related to this project. - :I also agree to • ' complete the record-keeping requirements included -herein as Attachment_' B once the project -has been completed. Sign -azure o - er or.Authonzed Representative. ate I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan'and the owner has A`+ authorized the',implementation of all its provisions throughout project buildout tgnazure o, ra tng 'ontractor � •ate ` ` (If not the same as above} - * r `kAmt i. ... . i i •• r i•} , . ' •" r, y yew - t.. . , .r � , .• - .. .s'• c• � [ ..� .y. c0.+; "'2 :r . r •i >. Partl - Fu ive Dust Control Actions ' ' ' � i • { /� ' - .1 r 1, r �. L •t C .. .. _ _. ( ; From the inventory of fug�•tine dust control measures provided .in Attachment A, please ndicfate` , which measures are to be implemented during the project 6y placing the letter beneath the '. fugitive, dust sources listed, below. Please indicate at which phase the measure''will b`e, . " implem'ented,.either at Rough Grading (RG), Finish, Grading (FG), or Final Construction should only i,uiicate measuresin fhe Rough Grading (RG) (FC).;'Demolition projects column... •'..; . After indicating .what -measures are to be implemented' complete the "Details." section by.. describing how and when the, measures are io be-implemented71 FC Details 4.2- frequency of 11pnlicatioi, number and tvoe of dust control im Cements, etc. ' Please be as specific as mssible) Unpaved Roads' `. X X Water ,Truck Stand By J y Storage Piles �.- � �P' . '' _ ~ •- .� r,J • f y • a ` , ..- .� h {- i 4 Paved Road Track -out .X X_, Street Sweeper+ T n' r X ,X� Water Truck 77 I?+ �. r 't, `�. '� L .• ,�� - ` - .. '• ',� � �'� i .. __ fit• t