Loading...
2733NOTE: F With proper validation, ' this form constitutes an ' encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED. SUBDIVISIONS Subdivision Improvement Permit — Class I I I DATE: April 2„ 1998 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION PGA Went Tract 28341-2 (Street address or Description of Location) PURPOSE OF CONSTRUCTION RouRh arads 42 — lot Sketch (attach construction plans if appropriate) subdivision DESCRIPTION OF CONSTRUCTION Rough %trade street and lots AEE ATTACHED CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL See aoproyed SEE APPROVED GRADING, DRAINAGE AND Qradine. drairasye & Paving ulans9, Tr. - 28341-2 PAVING PLANS FOR TRACT 28341-2, BY - - MDS CONSULTING. SIZE OF EXCAVATION, IF NEEDED Sea antaroved stradinst. dxai_naaa & n^vtnA ulann. Tract 28341-2 APPROXIMATE TIME WHEN WORK WILL BEGIN 3/30/98 APPROXIMATE TIME OF COMPLETION 4/30198 ESTIMATED CONSTRUCTION COST $ 94X000. (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: PAID APR 0 3 1998 CITY OF LA, QUANTA Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permitaand all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. /i 4� Qnatu're of Applicant or Agent RSL Land IIx Coxa. 56-140 PGA Blvd. '�✓La Qui -ata, cA (760) 564-1088 Name of Applicant (please print) Business Address Telephone No. James 0. Rue Construction P.O. Boa 13810 Palm Desert, CA (760) 568-5000 Name of Contractor and Job Foreman Business Address Telephone No. 516895 2727 Contractor's License No. City Business License No. Zurich Insurance Co. CP0829524200 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 2.820,. Permit Fee 100. Pyena;ttyAs—built Deposit 1,000. ! r!rlr.iYTgFf !,g Z;rd7 C a's�'i-D e p os ix�S u.�y�Bo m di if.. requf;,ed Plan Check ( 3.000.) Fees Credit TOTAL: $ 920. Receipt No. Received by Date 2733 PERMIT VALIDATION PERMIT NO. 7733 DATE APPROVED 413/98 EXPIRATION DAT/E� •4/V979 DATE ISSUED (� By t Administrative Authority Recorded by 11 Telephone: (619) 777-7075 •NOTE: With proper validation this form constitutes an ' L CITY OF LA ,QUINTA encroachment permit , APPLICATION' FOR PERMITS `'!$ • w. F_ PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) o "= K 0 For the construction of public or private .curbs, driveways, pavements, sidewalks, parking lots, sewers, wate6mains a and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDI'JISIONS FAQ i . l ,' . • . , .._ a I ' CSubdivision Improvement Permit —Class III, ;DATE: _ Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Z )Z;%3 L (Street address or Description of Location)• , . - , tach constrs• PURPOSE OF CON RUCTION. {`—���� �`� Z car Sketch (atuction plans if appropriate) •' -' • r 1. t , • � . DESCRIPTION OF ONSTRUCTION G� S ��,,,,__ (IDI ENSION OF I T LLAT 0 OR EM YAL S R ` ►t,t�`.� r 214i�(l.UC7 r I� f Z IAHA � r14Ui� ' t P61 wrl Rt TFL Z [�z [ Z EXCAVATIO IF NEE ED s a' z L.Al,,15 l f L Z63 APPR I ATE.TIME WHEN 0. K WILL BEGIN lY"l��J� ;�..: C4 APPROXIMATE TIME OF COMPLETION R L ' i ESTIMATED CONSTRUCTION COSTS (Including removal of all obstruction, materials, and debris, backfilling, com• 5 " paction and placing., permanent resurfacing' and/or replacing improvements) In consideration of the granting of this permit, -the applicant hereby agrees to: ' Indemnify, -defend and save the City; its authorized agents, officer representatives and employees, harmless from and against any and aft penalties, liabilities or loss resulting from claims or court action and arising out of, any accident, loss or damage to persons or property ti ihappeninq or,oecurring as a proximate result of any work undertaken under th rtnit ranted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in rica of th ime when work will be started, r + Comply with all applicable City Ordinances, the terms and conditions of the pe nd I plicable rules and regulations of the City of rLa Ouinta and to pay for any additional replacement necessary as the It t ' Ignatur of pplicant or Agent F { Name of Applicant (please print) "�' Business A rens Tel�phRIB po fax i3 f�tn vCTnL;Ci 1Gk:, (�:,Ti. i�R�(cTi )�DZF2�Ci�1 �ZZS -7 u, Name of Contractor and Job Foreman Business Address Telephone No. 51(0 P -SCE C;�nFicAn0 ' Contractor's License No. ', City Business License No. - 4_ ksLs ( Applicant's Insurance Company GEN. LIA61L3Ty Policy Number , �. t • FEES: Subdivision Improvement Permit — Class Ill t. Public improvements: 3% of estimated construction costs ` Private improvements: 3% of estimated construction costs Minor lmproyement Permit — Class IV: See attached schedule ;Inspection Fee "y $'- 2� &D PERMIT VALIDATION Permit Fee ( ba 4 , / V'iLT—Ck:_bS1f ', �.�� G PERMIT NO. DATE APPROVED 3 8 j'- 3: QO t if required EXPIRATION DATE 3 TOTAL: $ � Zp F w .v, — n �*• ,, ^,, , {DATE ISSUED Receipt No. ' + . Received by " Date Administrative Authority Recorded by TELEPHONE: (6191 77-1-767f; � - kT Fat .. Tom'°. _., - ' c '.'�. .- • 4- vM A R— 2 6— 9 8 -r H,u 1 1 1 9 e James O. Rue Construction Co.,,lno. R , P.O: Box 13810, Palm Desert,�CA. ✓�Lf 92.255 :�{-(� (760) 568.5000 Fax: (760) 771-3342 ' - 516895 Lieense U R , • To: KSL Development Corporation Mr. J. R. Mauro 3/23/98 55.920 PGA Blvd., La Quinta,`CA. 92253 Project: Tract 28341 Lots 1-41 Brac 64rn St. PGA , ." • ; r L� i' a,Plans: MDS Consulting y `# Description' qty, Unit". Amouht" �._ f '1'Mob,/Clearing/Pre-water 1 LS $32580.00 $32,580.00 �` r r '2 On-site Grading� Import by Scraper 1 LS .; ' $43,950.00'- $43,950.00- `3'Fine Grade Lots 1-41 & Street 1 LS $.20,500.00 $20,500.00 Sub Total. ' -58T;03ifix" 9 CJ�f{^ , ' .I. • .,_ • • - M { . "-iii, I. Y -� L i` a Course Paving 2" AC/5" AB. 61000 SF + 0.94 $57.340.00- 6" 57 340.00 6.. Concrete ® a Curb •1 Install Modified Wedge CCC 869 LF .12 $31,416.28 ti. -- 2 Curb Transition 1440 1:.' 3 Curb M hinMobilization'.- '.$1,440.00. �- �:. L • -- . ac a LS 1 • $1,000.00 4 Cut Gradesfdr. Concrete Curbs° LS 1 $3,160.00 '� - �i a' . ub Total' 37016.28 Grand To: ' structlon Notes' If Over -ex Is required It will be paid for by load count at $ 0.85 per cubic yard. I .,Excludes: testing, 'permits, Inspection fees. staking, engk}eering, cost of water. r + - utility Installation and relocation adjustments or alterations: clean-up of other trades, and the handlingof hazardous materials. ' 2L Rough Grading to be done to plus or minus .3 of a foot of planned grade vlevatloxis, , ~ 3 • Fine grading to be done to plus or minus .1 of a foot of planned grade elevations. 5.I This estimate Is based on three moves and should Contractors operadori be Interrupted or terminated ,by Client or as a result of Clients actions prior to the completion of the estimated worlt,'iddltional chi as K' ,F will be made to cover the added cost Incurred. 6% This prices quoted are based on unapproved_ plans and are subject to change upon review of approved plans ` . +►'"• i { ry• ': , ,' ' . or Bolls report 'r . This estimate Includes dust contrd exclusively In our areas of operations and only during the execution of the proposed woAc, any required water applications beyond this.will be extra work: s 8 it buried concrete or other obstructions are encounted that cannot readily be handled r. by earthmoving equipment being used, the removal of such obstruction shall b6 paid for ' '+ .` • as extra work. 9 ' This estimate does not Include adjusting manholes and water valvas to grade 10 This oetirn= door not Includo providing and applying.wood-killer; which If roqulrod will bo paid for as extra work. l ' 11. This e:amato does not Include temporary or permanent signs or asphalt striping. .12 This estimato does not Include prime & soil coati, which If requlred will be biped cur extra wo&* .. ,-; + _ ` +F,}. .. � "� '' ' � � � y • f.; .�.. ice.} ` �'_�•s •. �; ' .Lp � '• •. „ DEVELOPMENT CORPORATION '� R ` -ray- ✓ _ .--r - ; - • v _. "+�. [_ � �'; � ��.. y.�a, � MARCH 3.0, 1998 v~! L y CITY OF LA QUINTA PUBLIC WORKS / ENGINEERING- -- - 'P.O. BOX 1504 78-495 CALLE TAMPICO _ LA QUINTA, CA 92253-1504 ATTN: MR. MARCUS FULLER 'RE: ?TM 28341-2- T BRAEBURN AT PGA WEST DEAR MARCUS: - - WE ARE ENCLOSING THE ATTACHED "APPLICATION FOR PERMIT' WHICH WOULD ALLOW US TO� PROCEED WITH THE ROUGH GRADING OPERATION -ONLY, ON THE ABOVE REFERENCED _• -PROJECT.- IT PROJECT._IT IS OUR UNDERSTANDING THE GRADING, DRAINAGE AND PAVING PLANS FOR THIS PROJECT HAVE PROCEEDED THROUGH TWO, PLAN CHECKS AND THERE ARE ONLY. MINOR_ COMMENTS ON THE SECOND PLAN CHECK WHICH REQUIRE ATTENTION, NONE OF,WHICH AFFECT THE-`"'. PROPOSED GRADING ELEVATIONS FOR THE PROJECT. WE THEREFORE REQUEST THE CITY OF LA QUINTA ISSUE THE ROUGH GRADING PERMIT-WITH THE UNDERSTANDING THAT KSL LAND CORPORATION ACKNOWLEDGES:THEY 'ARE PROCEEDING WITH THE ROUGH GRADING OPERATION ONLY, FOR THIS PROJECT,"WITHOUT `FINAL APPROVAL OF THE GRADING, DRAINAGE AND- PAVING PLANS, AND-WILL TAKE` ­RESPONSIB FOR CHANGES IN THE PLANS UNTIL FINALLY APPROVED.- SINCE PPROVED: ' SINCE LY, t ' ,%`' -• _ _ R ER S �.�..- M - -.._ . - z • - - `•� rte. r - .�_. ` 55-920 PGA Boulevard La Quinta, CA 92253 • (760) 564-7166 Fax'(760Y564-7131 � • =? . r A'R,-26-95 THU 14:41 w CERTIFICATE OF INS 2/24/1998 P. 02 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF Coachella Valley Insurance Svc INFORMATION ONLY AND CONFERS NO RIGHTS UPON 81-557 Dr. Carreon Blvd Ste B8 THE CERTIFICATE HOLDER, IT DOES NOT AMEND, Indio, CA 92201 EXTEND OR ALTER THE COVERAGE AFFORDED BY THE (760)347-5552 Fax(760)347-2858 POLICIES BELOW. COMPANIES AFFORDING COVERAGE INUNM INSURED COMP IY A: Calfarm Insurance Jamee 0 Rue Construction Co COMPANY B: Fremont Indmnity Co Inc. James 0 Rue Individually COMPANY C: P O Box 13810 COMPANY D: no FPY( Palm Desert, CA 92255 COMPANY E; I COVERAGES Thio ie to eereify that peiieies of insuranem iistmd blow have boon issued Co the insured named above for Cho policy period indicated, notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may be iosued or may pertain, the insurance affordod by the policies described herein is subject to all the torme, exclusions and conditions of such popsies, Limits shown may have been reduced by paid claims. 1COINI INSURANCE POLICY NUMBER IMI DATES GENERAL LIABILITY Effective $ .Bodily Ind Oc A [X]Comp [X]XCU CAP 4007957 02 12/07/97 Bodily Ind Ag [X] OCP [X] BFPD Prop Dmge Occ I [X]Premises/Ops Prop Dmge Agg [X]Prod/Comp 0s Expiration $ 1,000,000BI&PD Comb Oc [X]Personal Injury 12/07/98 $ 1,000,000BI&PD Comb Ag [X]Contractual Liab $ 1,000,00OPers Inj Agg AUTO LIABILITY Effective A [X)Any Auto HAP 4007965 02 12/07/97 $ BI (Person) [ )All Owned (PP) $ BI(Accident) [ ]All Owned(other) $ Prop Damage [X)Hired $ 1,000,000 BI&PD Comb [X] Non -owned Expiration ]Garage Liab 12/07/98 EXCESS LIABILITY / / $ Occurrence [ ] Umbrella $ Aggregate [ ] Other $ 1,000,000Eaatr WORKERS COMP 06/01/97 Accidents B AND WN 97-710337-01 $ 1,000,00ODisease-Lmt EMPLOYERS LIAB 06/01/98 $ 1,000,00ODisease-Empl- $ Description of operations/locations/vehicles/other NOTICE OF CANCELLATION FOR NON-PAYMENT OF PREMIUM IS 10 DAYS CANCELLATION CERTIFICATE.HOLDER Should any of the above described policies be cancelled before the expiration date thereof; the,issuing company will endeavor KSL, DEVELOPMENT CORP. to mail 30 days written notice to the certificate holder named to the left, but 55-920 PGA BLVD. failure to mail such notice shall pose no LA QUINTA CA 92253 obligation or liability of any kind upon the company, its agents or reps. Autho ized Re resentative 1----- C-imAR-26-95 CERTIFICATE T H U 1 4 : 42 OF INS I I PRODUCER Coachella Valley. Insurance Svc 81-557 Dr. Carreon Blvd Ste B6 Indio,'CA 92201 (760)347-5552 Fax(760)347-2858 INSURED James 0 Rue Construction Co Inc. James 0 Rue Individually P 0 Box 13810 Palm Desert, CA 92255 P.03 2/24/1998 THIS CERTIFICATE IS ISSUED AS A -MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. IT DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. COMPANIES AFFORDI COVERAGE I COMP A: Calfarm Ind COMPANY B: Fremont In it Co su COMPANY C: COMPANY D: COMPANY E: JVXXffi1=MW0N1V=VXN=J COVERAGES I This is to certify that policies of ineuranco liated below have been issued to the insured nomod above Cor the policy period indicated, notwithstanding any requirement, term or condition of any contract or other document with reopect to which this certificate may be issued or may pertain, the inouranco afforded by the policies dooeribed herein is subject to all the terms, exclusions and conditions of such policiea. Limits ohown may have been reduced by paid claims, ICOI I INSURANCE 1 POLICY NUMBER INUI DATES GENERAL LIABILITY Effective $ Bodily In Oc A [X]Comp [X]XCU CAP 4007957 02 12/07/97 $ Bodily Inj Ag [X] OCP [X] BFPD $ Prop Dmge Occ [x]Premises/Ops $ Prop Dmge Agg [X]Prod/Comp Ops Expiration $ 11000,000BI&PD Comb Oc -[X]Personal-injury 12/07/98 1,000,OOOBI&PD Comb Ag [X]Contractual.Liab 11000,000Pere Inj- Agg AUTO LIABILITY Effective A [X]Any'Auto'- BAP 4007965 02 12/07/97 $ BI (Person) [ ]All Owned (PP) $ BI (Accident) [ ]All Owned(other) Prop Damage [X]Hired 1,000,000 BI&PD Comb [x] Non -owned Expiration ]Garage Liab 12/07/98 EXCESS LIABILITY / / $ Occurrence [ ] Umbrella $ Aggregate [ ] OtherLi 1,000,000Eaatr WORKERS COMP 06/01/97 $ Accidents B AND WN 97-710337-01 1,000,000Disease-Lmt EMPLOYERS LIAB 06/01/98.9 1,000,00ODisease-Empl IsF/ / $ Description of operations/locations/vehicles/other CERTIFICATE HOLDER IS NAMED ADDITIONAL INSURED. NOTICE OF CANCELLATION FOR NON-PAYMENT OF PREMIUM IS 10 DAYS CANCELLATION I CERTIFICATE HOLDER Should any of the above described policies be cancelled before the expiration date thereof, the issuing company will endeavor CITY.OF LA QUINTA''' to mail 30 days written notice to the ` P.O: BOX- 1504 certificate holder 'named to' the ' left, but failure to mail -such notice shallose no LA QUINTA CA 92253 obligation or liability of any kind upon the company, its agents or reps. �..1L�r4 nnrl bc•nraeevh 74� arc rri r� m ry! .,' m r Ir r 10 uo 0 4"1 rr, y.� Vi � • Q r m T? r ,. GasW1 Prerequisites for Grading" Permit issuance he La Quinta Engineering Department assigns'a specific city staff •member as a Project Manager to evey.grading°p'roject,that is proposed:, If you have questions or need assistance regarding. any of the prerequisite'items on this, checklist; or regarding.the City's plan..checking process, please contact the Project Manager assigned:•to your project. , Your Project. Manager is.' Marcus Fuller he maybe reached at (760) 777-2089. Environmental Assessment. } 2. Archeology- Study............ ........ .. .. .p t r 3; Approved project doncept . .. ......... .. r.. 0 4.,` Compliance with specific prerequisite Conditions "of' Approval for grading .. • (3 5, Approved grading plan, and soils report ......... . , ' , . p 6: Third ,party approval(s) for.'offsite'grading O 7.'Third party-approvai(s) for acceptance of drainage r:��A�..... O 1 8: Approved Fugitive Dust Plan R1. ............ p 9: Approved Storm Water. Pollution Prevention Plan`(SWPPP) -10. NPDES permit�.�-.Bhow 11, List of Professionals ' , p Surveyor M,OS� Cu�So L Imiq . . Soils Engineer/Technologist` SLA430 4 E J61ijUSC r Archeologist 12." Application 4or Grading Permit - . /-T11 13. Insurance Certificate � . S 4 14. `City Business License (' • t 15(a). Plamchecking fee " 15(6). Grading Permit fee .4 J co :. • ..... "ZCL Lb 16.. Fringetoe Lizard fee ...... , , , , , , ❑ a 17. As -Built plan security depositry ... .... . ', I C:IWMESiQNWRMNO.DC1. 0 • The following General and Special Provisions are attached to and made'a part.of Permit No.'���L,L-1� F t JF -i GENERAL PROVISIONS ! r' , The following shall always apply: tr �'� -' - It ENROACffi1ENT ON•PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of - way ONLY. Whenever construction extends within-private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners' Such authorization must be secured by the permittee prior to starting work. ^ t ? •TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on ' k any paved surface unless fitted with smooth-faced street pads. All mechanical outriggers shall be fitted with. rubber street shoes to • ' : { •s • r protect the paving during excavations.' Rubber-tired equipment only shall-be used in backfill operations in paved areas. If the existing a pavement is scarred,'spalled, or broken during the term of this contract, or if the pavement is marred,.City of La Quinta shall request. t - that these portions of road be resurfaced over their enure width. Resurfacing shall consist of one coat of two inches (2") of A.C. 'above. surfacing plus appropriate seal cost as specified z. .r ~ ` PROTECTION OFITRAFFIC: 4 All, excavations and work areas shall be properly lighted and *barricaded as deemed necessary by the , City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the . ' • duration of.the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. { CARE OF DRAINAGE STRUCTURES: Any,drainage's.tructure including c6ftgated metal pipe, concrete pipe, steel culvert and *' f concrete structures encountered during excavation which necessitate, removal shall be replacediu kind. In the event it becomes if necessary to remove or cut existing drainage structures, City of La Quints shall be notified prior to commencement of this work.' Drainage structures and open drains shall be kept free of debris at all times for proper'dramage:' ' , '� . RIGHT OF WAY CLEANUP: Any surplus material: resulting from excavation and backfill operations shall be removed from the right,. ' • of way. All paved surfaces shall be broomed. clean of earth and other objectionable materials immediately after backfill and compaction... - Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed ,3. prior to paving. Water,tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used ' immediately after backfill. r , DUWATER OPERATIONS:' If de-watering operations are. required: and pumps are forcing water on City of La Quinta roads, it shall -` • be the responsibility of the permittee (contractor).to control_.thi_s water and.to provide off-street barricades when necessary. CLOSING STREETS:, No street shall be closed. A minimum of-one lane of traffic shall be maintained at all times to provide limited + t . aCresa for,the adjoining property owners and emergency vehicles. In the event it is, felt by the permittee that he must close a street for • . ' office any length of time,'permittee shall contact this oce to obtain the necessary permission. ' SPECIAL PROVISIONS] . en cate -The following shall apply when indicated: ,; ° , ' f . t y; - t , RI NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. �• s. + .'... R2 ; UTILITY, CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized by permit, the permittee shall contact.all'concerned utility companies relative to the location of existing substructures. , Damage to existing substructures resulting from operations conducted under this permit shall be the'sole ' r ,` ,tti - f•t '.responsibility of'the permittee:, .4 • �„ R3 UTTLITY.CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the,• proposed work site. ,The permittee shall notify all concerned utility, companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced - + J. ; with inches of A.C. paving placed on inches of class aggregate subbase course having an "R' ti value of not less than , ' ,+ :. and in conformance with City of La Quinta Road Improvement Standards and .. *• r z .� i Specifications, Ordinance #461: RS " PARKWAY GRADING: • Area between the property line and top of the proposed conccete curb shall be graded to a slope of / 1/4 inch to one foot (1'). tR . _ - t' _ ae R6 : •`GRADE CHECKING:, City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by r a licensed engineer. t • ,ti r ' 47 _ CURB REMOVAL FOR DRIVEWAYS` A portion of the existing concrete curb and/or curb and gutter (_feet) shall be tau , % t -p •• r, " rremoved Curb and/or curb and gutter shallbe saw cut prior to removal. Depressed curb, matching concrete gutter and , concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.. R8 , DRIVEWAYS:.,. A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property rne,and the existing road paving shall be 2 1/2 inches of A.C. paving placed on ( - ) of class aggregate base. ,:;Driveway construction shall conform to attached drawing. R9 SIGHT. CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and'maintsined at all times. RIO •-SOIL STERHdZER: ,The area to be surfaced shall be treated-with roil *sterilizer. Rate of application shall commply with the ; manufacturei's specifications: ..< m`... . .. ,tom!^ , .',e' .. , •r � ! •,. 4 - � .A �ry„ ,��, M � �'f :,.,� R11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quints projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. RIS BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TEST'S: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill'and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application -of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RFSTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed; bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect.the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO.: 2733. --- KSL Land III Corp: --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.3 20 of the La Quinta. Municipal Code (Ordinance rO '§ 1 (part), 1982),• all work shall be performed in accordance with. the latest.edition of the, Standard Specifications For Public Works Construction (SSPWC) and as directed by *and to the satisfaction of the City Engineer. 2. KSL Land III. Corp, hereinafter referred to as "Permittee", shall be responsible for providing.,_' continuous dust and erosion control. 3. Streets shall be kept.clean. They shall be completely cleaned at the end of each working day and more frequently if.required. 4. Pursuant to Section .6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1,1982);'throughout the work site, the Permittee shall comply with • City regulated work hours. Operation and maintenance .of equipment within one-half mile -of human occupancy shall be performed onlyduring the following.time periods: October 1st to April'30: Monday -Friday- 7:00 a.m. to .5:30 p.m. . Saturday. 8:00 a.m. to 5:00 p.m: May 1st to.September 30, . Monday -Friday 6:00 a.m to, 7:00 p.m. Saturday.. 8:00 a.m. to 5:00 p.m.. Work shall be,prohibited on legal holidays and Sundays. 5. Work performed within 500 ,feet of a major and/or signalized intersection is restricted between the hours of 9a.. - 3 p.m. Traffic control shall be up after 9 a; m. and -removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in any way:' -6. Pursuant to Section 14.16.110.of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982); Permittee'shall assume responsibility for repair of any•pavement damage -to any public or private street and for any damage to other City streets or facilities as.a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the'La Quinta Municipal Code (Ordinance 10 § 1 -(part); 1982), . advance warning signs and -traffic control shall be'installed.and maintained in accordance with Cal ' Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual): A traffic control . plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and,approval one (1) week prior -to starting' any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites: Special Conditions - Permit No. 2731 Pagel of 3 .. SPECIALCONDITIONS--PERMIT NO.2733 =-- KSL Land III Corp.'--- orp. ---8. 8. Pursuant to Section 14.16.290 of the La Quinta Municipal. Code (Ordinance 10 §,1 (part), 1982), street closures shall not be .permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at, all times: 9.', or to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-.422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department -of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits; and storm drain, facilities. 10. Should additional work, materials, or.inodifications of the work, be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. ` 11. Pursuant to Section -14.16.370 of the La�Quinta'Municipal Code (Ordinance `10 § 1 (part), 1982), backfill compaction within street rights -of --way. shall conform with Section 30643 --of the latest edition of the: Standard Specifications. For Public Works Construction (SSPWC), and as required by the Public Works Department. Backfill shall, be completed in lifts, not to exceed 1', compacted to d' 90% minimum relative'compaction. Native material.may be used, provided the material is suitable for use as backfill after construction operations. Controlled Density Fill.(C.F.) may be used as an alternative. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed. by and to the satisfaction of the City Engineer for the protection of the public.. Lengths of open trench shall not- greatly exceed that. which can not be backfilled in the same day. ,Excavated trenches - shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, .provided that this length of trench is completely covered by. steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to , its original condition. 14. Access :and egress to all local properties shall be maintained at all time's: .15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), ,permanent pavement'�replacement shall be completed no later than seven (7) days after the completion of the work. Permanent .pavement shall be replaced as required by. the Public Works Department. 16. . Permittee shall notify the City of La Quinta;Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 777-7075. Special Conditions - Permit No. 2731 Page 2 of 3 rr �.,-�,a.n � •f S �� .. +rt. i +. _ .. .. � rnr ., � fr ��:. � - r . x - .r. �i y ., M�a Y� ,S k'l{ • � r � F Y� �,'y 4. - ,Tr._ x ` • r J . .. `?' f .. v. t ;. �i \ . t. 1, t� ,- , ♦ » � rr �.,-�,a.n � •f S �� .. +rt. i +. _ .. .. � rnr ., � fr ��:. � - r . x - .r. �i y ., M�a Y� ,S rr �.,-�,a.n � •f S �� .. +rt. r +. _ .. .. � rnr ., � fr ��:. � - r . x - �i y ., M�a Medium -Large -Scale Construction/Demolition Protects'-' (Greater'than•5.ucres)� ` - *' • r t Fugitive Dust (PM10) Mitigation Plan r . C`CT T!2 a' DateiJurisdiction: LAQyq!Ir►4 • "Project File #: fmcp 98 31 " �jPart-1 ,ProjectInformation. � ', • + � - '+ •^•"`•• - -*�': - Please provide the information below' as completely as possible even. if it has already been F ` . provided on other• forms related to •this project. Failure to provide complete information or . { provision of inaccurate iri ormation may delay_.the processing of your Fugitive Dust, (PMIO) ° , w Mitigation Plan (Plan). -' It t is.recommended that you submit your Plan concurrent with your, "•, ; } grading,ordemolition per i i application.` Project proponent: �"^ II tt Address: .s�`-; Z.p �,' ,� V� • L. _ QV 'lnJ• -A 9 2 253 Day phone number: Emergency phone number: Grading contractor (Contact Person):'.T4t`L-s- ® ', 2ue, QNS7'CC OW C6, _tvc Address:'i�,;(�X��, �fl ,Dts(�LT ` C l ZZ. - Da hone number: �Emer enc hone number: Y P %�0 SiO�"�LL^Q g. Y P 74-34 -SqSL Construction site street address: ' �'� ��� X41 Construction site.location: (Please include an &5 z 11 location map)' Construction site4assesso�r's parcel number (Tract #):''7&cl - �Z Parcel (Tract) `size: z Acres or 7 ` Square feet Z�Z *SZZ,, � - 'Anticipated date of h •sical project initiation: - P Y P J 4v '•zl�; 19% 'Anticipated date of project c6mpletion:�2 •�' Anticipated costs for dust suppression: $ ;(Attachment .B -,Must also be completed and mailed tot the appropriate address.when , r construction activities •have been completed) t ry 1 0/1 19 " 1 All projects greater than one half (1/2) acre are also subject io SCAQMD Rules 403 and 9r 403:1.. Ze. �• a 4. i • igy - [ • Project proponent: �"^ II tt Address: .s�`-; Z.p �,' ,� V� • L. _ QV 'lnJ• -A 9 2 253 Day phone number: Emergency phone number: Grading contractor (Contact Person):'.T4t`L-s- ® ', 2ue, QNS7'CC OW C6, _tvc Address:'i�,;(�X��, �fl ,Dts(�LT ` C l ZZ. - Da hone number: �Emer enc hone number: Y P %�0 SiO�"�LL^Q g. Y P 74-34 -SqSL Construction site street address: ' �'� ��� X41 Construction site.location: (Please include an &5 z 11 location map)' Construction site4assesso�r's parcel number (Tract #):''7&cl - �Z Parcel (Tract) `size: z Acres or 7 ` Square feet Z�Z *SZZ,, � - 'Anticipated date of h •sical project initiation: - P Y P J 4v '•zl�; 19% 'Anticipated date of project c6mpletion:�2 •�' Anticipated costs for dust suppression: $ ;(Attachment .B -,Must also be completed and mailed tot the appropriate address.when , r construction activities •have been completed) t ry 1 0/1 19 " 1 All projects greater than one half (1/2) acre are also subject io SCAQMD Rules 403 and 9r 403:1.. t ; � � + � - ; • Y . �, ' 1 y �, ' � *Y ;a'., • �i t .. Thr r .. • � .i •t .� +y �.�� ' .r .} ,4 e , i .T w .. y. f .Y i.. . ' Part 2 -Fu gifive :D.ust ControFActions ". From the inventory of fugitive dust. control measures provided in Attac{invent A;"please'�ndicate �..' which measures"are to. beiimplemented during tfie project by'placing "the corresponding letter. - beneath z ` ' ' .. lease indicate at which hale the will be • ., _ " ' - •beneath the followcng sources. _ .In addition, p p t } implemented, either. at Rough, Grading (RG), : Finish _Grading' (FG), or Final Construction ' (FG). Demolition' projects should only in'dicate'measures in'the Rough Grading (RG).coluinn. �:. . After indicating what-iheasures are- to x be, implemented, complete the "Details" section by describing, how: and .when:,.the measures. are. to be: implemented: Source XDetails (u.} frequency d application, number and typofe dust control implements. a No. RG' FG FC "etc. • Please be as smdriic as possible) If QUCIr 00. ,.. 1» " y , r �. .,. ♦ Y.. « . • . �i i V� V—`! �/ ' �f .,(iL�Y �/ J � r «. ; w, �. k I . 4 • ,' n r rtf Zt 60 7MI, 7 b6a) �• i r �.:, \ IIIWI�I'�- ,Vyj � A)`' `I V'`� / ✓w/11 V' (Y it "�- 1 � _ CH �\ ///gyp #•� V \lV`V - •tea. 2. �, .. � r .r' ;�; /y, ' . 3` a ++ 'i�'J s M f t•. ! .t art-t.��"_ x�t i '_j AgreemenPrt 3 t ,_ p wx,� ,� ► �. . 4 I certify that,the "information, contained in this Fugitive Dust.(PM10) Mitigation Plan is true, , t. r and accurate and that all measures specified in Part 2 willTbe°implemented .during.project = - ' construction: Lauthorize the City of La Quinta., to enter -the above mentioned property. i for inspection and/or abatement 'purposes, and I agree to hold harmless the City and its -11 ' 'n•' representatives from liability, for any actions related ,to this project. I, also, agree to complete .the reci keeping requirements included herein''as Attachment . B; once °`the t x' project'has be��ccrleted. '} rte � �• . .. . •� �. r 1 .. • � f t' a r .r . ignature o wn r AuthorizedRepresentative , , , : ate` 4C:�2�cs�9-Trow -. t 1 � .. •� . •. t �, 4 �� • �,'ti .. t , ♦*,At t `I have read the conditions°of the Fugitive Dust (PM10) Mitigation Plan and the owner hast. t author' ed the implementation of all.its provisions throughout p# oject buildout,' a, ure bt GradiFfg-Contractor or Author,izedTepresentative ate 2, not the same as above) - t `• Vii. ! r � , .t< �'!" t ~ a .. � * r 34 rJ: �. sr(srf, tit' }F ;- �' 4. N+y a+ i• Tz'K �tf • t.. � - � t. s'%a t - , + . I F 3 I F - � ` • � '" [ • a z . � 4 r ? 'Na . - � .. t ` f•„ ,� v ,'f' � fit.. J f6. • , c� , P .� t,t J4 ., Mr,. x. £� +. � .� ,>,a . t - � " +' � ! -- i a r - � _. w • T • • ,F + t 4 , �. , r - � t f. rte. �� ' � • •., ``r '_ _ rs F • i •.'F .• bg+ - ..� i1.• � nye � - r• i `r .M j 4. •�,r.. r � a .Ryk, cy. .. "� .. � ' -aJft i 1�• d .. . - �� 1C 1 <' i r Vi 't . r5s • Y .1 . , 'r r '. ', ate.. .. r '. ry .. "` , - ' ' i ..x'•14 x',. i.-, .- .� '•t:+r .:'} � }'�:5 �' .• a _S � a ` ',. .� -x i r.. -.. ;rt. -j�� ..y,. _ .#.Y r .� w.` �. K _.r .+ . f` a'• i*,.. . l'� � Y � .. ... t'« +l.° '4 i,+_41 �•, � ., � i,. + ... '�' .+lt 'M •. r rjA F-A�;,�Mi�, For City Use Only ` k • • - 1• .'1 I 4 .. 4 i •} �..xr - '`�, ` 4, � � •r _ { � i�A Based on all of the provisions contained in this Fugitive Dust (PM10). Mitigation Planr` �r �.k _ r ' ;• � , ' � the. Plan is , . � � a � ; \ �° �r; r � '� � r s�_ `Approved iii; . � .: �- _� k. �� �'- � i � • < `: ZC.K +Conditionally approved•(Conditions'specified below) .• -Den ied (E)planationattached),' -. � y i `; ; "x'41 'r��� �+ +,;�,,,,z,� i •? , �a ,,� � ; .. t` t . - .. , y", } 3 •, + � Y 1 /.i-k•.'fY. �.. ���_ : /Wti L• • �•,,1* �.� � y T ��V � 5 r '� ` ..�+ � i." 4 r� � y�: r''/1 xSi of City Re resentative (Date)Y ' "_.' - 'x �a ature • , Thi conditions of approval liave been added to the Plan. by staff, cn`order to ensure following an.adequalelevel of fugitive dust control, a '.. .`ti -' ,� a . ' "4 • ". .'i Si' r _ <!'� tt ...+. .. . 1 ` �� � k � + YI •a.f� ' y' T 1, . .;, 4.. k' i + .•� � .1� • •. .•Vr' _ �' 'Kli4 t it i x•ki A'f7'GG4 c7 n OWS �5 a }'' ftp ✓ 1 +. ik' �' `r V '-mow t � r .'W y `, fi • .. � _ a ,x t y » ti 5 ,. i� ,�, • . ,.'.f .v ,F - • r�, }fie Y = ; !, .. ;•:,. r� -Addition (Attach alinformation if necessary) ,t ,i: t1 � -ate`.• ?"�4 r t �+ ,� r ^�t k a *,. `' a 1 I have,read a ab ve conditions'of the Fugitive Dust (PM10), Mitigation Plan and I agree to imple exit ofAl provisions at the concentrations and ',frequencies identified: - Y !~t � ;{ ,n ..k . .. ` ` , tk Y +. �.� 4 4 Ji;' y.'4 F �I `. f I ✓� I • .. t.,:.Y ,�. 'Sig re caner or• Authorized epresentative ate x 4F r r4tk ♦, ,.{ r ,ir Y' c w t k t' 41SY+yti f .h(..l '�r 'y..i td .Y 1."%^. .. ,• _♦ f! 44{-•,tx /k•i f.a"i "[ +^ a�', W,. ,•' rlm k`t �' .. }f y,.. L -• 14J Rj ., ''¢'{ + ' , .�, , ' , '- y. ., t •'•d �t ,fµ: .i a. .t <,` xT" _ '' ,, CO.NDITIONS� FORS FDCP APPLICATION 98-31 . KSL` LAND CORP. /JAMES RUE --CONSTRUCTION - TR 2834172 12 ACRES GENERAL! ' _ `1 .' z` Applicant shall comply with:all �coritrol measures asset forth. in the approved' r ,• x _ application for FDCP198'31, and the following conditional measures'. Tliis"dust``` 7. �•- +•'•� C�. ' - _ control Ian a-. ,..' , •ry- p pproval shall `also. apply to, apy encroachment ror haul permit(s) '. . issued, by. Public Works:'. ;• y 2. The juil of security for FDCPT 9&131 (as determined by• Public Woks famount shall be.available•for any measures) deemed `necessary, by the City to achieve - - 'r ° adequate `dust control; her,o such additional me"asures'are proposed` ` k ' +with this .application. Any requests forbond amount 'revisions/reductions must ; , - - be made` in writing to the. Public Wor'ks' Director:` The. applicant -shall implement ' } "� Mall methods set forth' herein -for the' duration of .they project -construction:' ` � 1,3: Applicant"shall submit. copies'of,all records" relatedto_cost accounting for•the` a s_ dust control, measures assumed during, all,, pre -grade activity and grading °.� -°- - �� r s, construction upon any request for release/reduction in posted securiiy..-Said. Y• " ,records shall be submitted-w.ithinr30 days after completion' of alldust control ' ' measure's as outlined in: and .conditioned` upon. "the' '46;,All such •records "shall - r' %�_ •Y x`.t accompany, the completed PM10 Program, Report Form,,,which can be obtained t l from. the Public Works or. Community.Development�Departments. Completion '- .-Of- all dust -control measures shall be verified by the -field inspector. '' yassig'ned -` s . 4. '• Adequacy of,' allproposed and conditional stabilization' measures 'shall' be . • `determined by the assignedgradin�g'ins'pecior. The City may -re . quire remedial ' measures beyond those -identified or conditioned upon the project;° which the s� rCity deems necessary in .the event such app'roved';measures are not' ti ' 7", :Enforcement.,'of these -conditions shall �be at the discretion 'of the, assigned r •t • � `grading inspector, who -shall monitor and field verify that -the- spirit -and.-intent `sof the-FDCP and its. attached conditions are being complied' with. Adjustments iolapplication frequencies, quantities'a'A other aspects,of this FDCP•may be'' �e :3 made by the inspector, at his/' discretion; in order`.to assure compliance. 'T 5:'; The .contractor/vendor ,responsible for provision of all'4s6il stabilizing agents • ' °'' shall submit the appropriate Material Safety. Data-Sheet(s), along with approval . from .the'Water Quality Control' Board, to the`Public.. Work1. 's Department, prior„ to ` any site' application. Application ,of stabilizing must .6e iri compliance ° ""'.,with,• _ NPDES and theState Water Qualit Control Board're uirements. "' .f, .a ''•'. `¢ � i'`, - F rrryK .' •' • - . • f ,f .•. "r .�•c' f .,a '..s ,�c - , M+=�•.•. t J. 61. he conditions of this dust control plan approval.are'applicable-to+the full,range� of:construction operations associated with the -entire 12 acre's'associated"with!, :5 '-TR, 28341-2, and shall; remain int effect for the• duration of 'al'l construction',, undertaken as part=of'development�.approval for -the subject property: Transfer of real property, or other interests regarding this pr'oject�shall not affect the validity ,.of 'this_ plan approval., 'Implementation 'of ' all ,,proposed and conditional measures shall be carried out for the -duration of -all construction. E activity, as' applicable.. However, nothing herein. -shall preclude any futuFe: party' of interest from -filing a.revised.FDCP with the City for any portion of,the'site. 7. Approval of this dust,control" plan does• not.. in, and 'of itself .constitute,or „4, otherwise authorize any `site disturbance, preparation or. construction. The, _ - developer is .equired to "obtain',any. and all necessary permits and clearances ' } ' as set ,fo.rth ,in any development approvals .issued and, currently in' effect = - r pertaining to this'site':.!This'includes'any'type,of testing, monitoriQ'g or 'sampling + required°as a'condition of development -approval, such. as that conducted for 'Y r • archaeologic, hydrologic -and geologic reporting purposes. f1 - SITE DEVELOPMENT: 8. 'Any -'pre -watering of;areas proposed for,grading shall be in accordance with recommendations of the. grading;,contractor;;based on the area soil -conditions "= 4 as described'in the associated soils report(s). At a minimum,. pre-watering,time ,. shall be •for three days`prior,to. any earth7disturbance(s). - 9. FD CP,98-31 -indicates 8,942 -C -.Y. of. import will -be required for the site. Any ; transported' soils,. and•. stationary', storage,` piles on- *'shall 'be; sufficiently r r. stabilized, watered' down arfc!W.covered as appropriate.' Minimum freeboard jshall be as'•established ,by the •Public Works Department,,Anyr on and. off-site , 'borrow .areas shall be routinely watered and chemically stabilized after borrow activities, to.- mitigate airborne -'dust;'' as . appropriate pending -final grade ► ,` • completion. This -'approval' applies to any off-site borrow sources, whether,", in . .. or out'of`the City -limits?-- x.10. Track out and other accumulation of .soil materials) .onto any paved areas outside the limits of "all work .shall be .minimized. ,Any -unpaved construction r' a ` Mexit/entry points,along'iezisting paved-'roads/areas shall%te improved with H :pavement, aggregate`base or"similar material, for aidistance of 120' from the` Pavement edge into the -site, to minimize track -out. Wet sweeping/flushing of i. soil, accumulations from all paved areas (i.e., .internal project streets) shall be; conducted daily, and. kept damp -during -construction construction hours.until'so_removed: - a _•I„ 'Unpaved construction access a.ndaraveI ways within "the site shall be prepared r 'for traffic, prior to'commencing grading activities and kept watered down and'- , ' 3 J. •. Y. i' ' s "� . . I � a 1 , _ ., r- •r 1 f. i �e A" , • p.. 4 ..i ir, rt A - compacted to retain rtioisture content,during allYr construction traffic/activity; y T including building construction:`Track-out shall "be_ removed per Condition#.10. f 12.. ke Any on-site temporary facilities Isales,.construction, model complex, etc•). shall." j R . be provided with paved;, compacted'or otherwise stabilized parking- and access - ` r. during -their operation, with:-those improvements to be constructed to the ; r' applicable Public Works bepartme-nt'standards. '13. ' IVapproved' on-site roadways. are constructed' to � ultiMafe desigm��prior to . • i ," completion of construction activities,, then"traffic and- parking shall` be limited; to: those `paved areas-, as feasible. No'vehicular parking .or, traffic hof'any kind is r :.. `ermitted•on•or over an 4 p y.previously, stabilized.or.other inactive'soil•areas. ., ... .ter+ - '- -' .:4 '-`_.r .. . -'•` t �` =14. ,. �-''' '•. L;,. f .T •.''..+'^ • i All previously disturbed',areas;where no .further-grading,- construction-or other. $. 4 " disturbance will occur for at least 30'.days,,shall "be stabilized ;with an <l `_land appropriate-dust suppressant, as defined`--i,n LQMC Chapter 6.`16.and ap11 proved .. • by the .California Water Quality'Cont"rol .Board,. Region,7 The suppressant shall +' be applied no later. than four days after completion of,,the initial grading, and "v . . 'staked, posted or .otherwise restricted in "order. to prevent any- access: on. or across those areas. ' All previously. disturbed areas where further grading, construction or ,other'land` r disturbance will occur within:30 days shall' be continuously maintained under - the .provisions ,of this FDCP ,until `building,, construction.,begins_ and has:. . rw progressed-to thepointi.where,fugitiv' dust`is negligible. ". ' „, M .i , •,` •fr • f• .. anY '� ' 4 w. �., r•� Y #. f .. .l . D.. J i 4 ./•. • _ '4 A ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES. The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain, . an inventory and description of reasonably available fugitive dust control measures for each of the sources.. . Please use this information -as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Source Control Measures' Comments Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ . or sprinklers prior to' any land clearing or earth - , Earth- movement will increase the moisture content thereby moving increasing stability of material . o Once the initial land clearing/earth movement activities are complete, a second round of watering can,generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted_ future disturbances of sites .where. a surface crust has been created (B) Chemical stabilization o Only effective in areas which'are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire"surface`area should be covered once vehicle is full (E)Wheel ,washers, o Should be placed "where vehicles exit unpaved areas•onto paved" areas o System can be adjusted to "spray:entire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation (G) Chemical Stabilization o Vendors can supply; information as to application methods and concentrations o Not recommended "for roads with,high volumes or those used for "heavy equipment " (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, . weather conditions, and vehicular use (Source No) Reasonably Available • Sou Control'Measures Commin ., a Unpaved.. t (I) Reduce speed limits 0 15 mile per hour maximum ` ., Roads 'r = (Cont'd); +• `. (J) Reduce vehicle trips . , ^ ' or Access restriction or redirecting traffic to paved roads in order to. reduce:vehicle trips by a minimum of,60 percent w; , Storage (K)'Wind sheltering' o Choices include silos or enclosures. a, ' ` •', „ ; piles o Enclosures should consist'of three sided barriers equal to height of material with no more than 50 percent porosity n .(L) Wet suppression ` o Application methods include:, spray bars, hoses and water trucks ' o 'Frequency of application will'vary'ori site specific conditions: . t� (M) Chemical suppression o Best for useonstorage piles,rsubject to infrequent disturbances Altering loadin/loadout .o Confine loadin/loadout procedures to leeward (downwind) "side' .• - procedures of the material o Most effective when used in con unction with wind shelterin (0) Coverings ',;. s. o Tarps, plastic, or other material can be used as temporary, coverings o When used, these should be' anchored to prevenfwind from - • :- removing coverings ,- ----. --------- ----------------------- ------------ , i` -----------'--- � (4 Paved., (P) Wheel washers. o Should be`'placed where,vehicles,exit unpaved areas onto paved _ s Road" 1 r areas • . = Track -out o System can be adjusted to spray entire vehicle, including stored`- x ,' bulk material in haul vehicles _ (Q) Sweep/clean roadways o'': -Either sweeping or water. flushing may be used , ` (R) Cover haul vehicles , o .Entire surface area should be covered once vehicle is full „ • ' ., ------ -- --------------------------------------------------- - - --- -- ------------- r4* s �:- IIJJ f:' }e ;-------------------------------------...;� f;' Disturbed (S) Chemical stabiliiation " o Vendors can supply information on methods for application and L" Areas/,. ' ' 'required concentrations' + •, j Inactive ; Construction T• Sites (T) Watering' o. Would require + frequent applications unless a, crust can be developed over the site Wind fencing o Three to Ni foot barriersadjacent to roadways or urban areas •(U) can be effective in reducing the amount of wind blown. y., .. , . � ,. moi. material leaving a site , o Should.be used in conjunction with `other measures (V) , ., > o Establish as quickly as possible when active operations have; ,- . .Vegetation establishment ceased r :;• j , ;' .. . { o Use of drought,tolerant; native vegetation is encouraged , i '- arJ_ ,+. �f {� .�.�� '" `� . i } �.�+. •� �1 ,'"' � . � .tt , .. i * _- ate. t• "L �„ ' ATTACHMENT B -COST INFORMATION{ .t ..rr`,S • - . Flit: .t` }� F �i. r,+.i . 'Medium -Large Scexle Construction/Demolition Projects",,,. ' *� i (Greater4han 5 acres)}" V; `.' 4 •r Fugitive Dust (PM10)'Mitigation Plan �r� rr�d_ or•.. x a, Date: j Jurisdiction: `:LA--0-mJT-A -Project File,#: '^`y,,, •. ,z x. _ � rL ':rte'+� �' �' e •• r .R -".• 'r`', r ' 7n the -space provided below please Iisvthicosts associated witli` imp1ementati6n•'of all dust ' control measures.`` The information provided, below should 'include all implementation ;costs (including, labor) for dust control throughout the project. `:Notall measures listed below will F aPP1Y to all projects.. i s L r { ..ie LLiry t,' IN ,M 1• F. L n r Watering: ; ,F C �� '� C -P_ + Chemical stabilization:: -•���. "�" ` Wind fencing: .Covering haul ;vehicles: r Wheel washers: ' • ;. * p . Street sweeping: Paving: -------------- Wind sheltering: Coverings: ,.. Vegetation reestablishment: F ` rn .c. ,Afterproject7completion .these records shall be rtransmitted to the -City, where the , grading/demolition, permit ' was, attained yW 'and to .the 'Coachella Valley Association of ,' • ' Governments'(! G)'at the address provided below.: ' PM10.Cost Monitoring. ` '..� ;Coachella Valley 'Association of Governments ' 4 73-710Tred Waring Drive, Suite 200 u _ r Palm Desert,.CA_ 92260-. ' ;1 A11 projects greater than ,one half (1/2) acre are also 'subject to SCAQMD Rules 403 and `' 403.1. ' f r All OF�,�� a 78495 CALLE TAMPICO — LAS OUI.NTA, CALIFORNIA 92253 . - (619) 777-7000 { ,FAX (619) -1777-71.01' May 10; -.1994 TO:. ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS` = IN THE CITY. OF LA QUINTA C RE:. PM .10 PROGRAM REPORTING REQUIREMENTS~ FOR FUGITIVE.DUST CONTROL PLANS.,F f t a Dear Developer/Builder: The Coachella Valley.PM 10 Program has been in. its implementation, phase since- December, 1992. Among the required- control measures was the enactment by Valley cities of dust control ordinances which require builders to implement dust -control ' actions during construction, demolition and paving ' activities. In- conjunction with City staff members, we ask your, help with the -reporting requirements: A• significant aspect of. the PM 10 Program is the need to report statistical information to the Federal ; Environmental Protection Agency'via the South Coast AQMD and the State of California Air Resources ` A, Board.' In response to this requirement, a Dust Control Reporting Form has, been created, a copy of which is. attached. It is requested that if any project developers have amounts to report for any PM10 mitigation, these forms must be filled out. This form is intended to supplement Attachment °B" of the Fugitive Dust Contiol Plan by providing specific'cost figures related only to dust control measures. The' South Coast AQMD has requested -that the retroactive' operative' date be January 1,` .1993, for Y reporting purposes. This 'means.that each jurisdiction is requested to review projects since that.date where PM 10 control measure expenses have been incurred . by developers, whether -or not they have r been incorporated as .part of a Dust Control'Plan, and forward this data to CVAG as soon as practical. " - Your cooperation in. completing these forms as. part of'the.grading permit procedure will help assure i that the Coachella Valley and the development community_ as a whole'receive.deserved credit for,the effort to at Clean Air Act'standards for PM .10. Very- truly yours; RRY HERMAN Planning-&, Development Director JH:WHN:bjs Attachment r ' MAILING .• ADDRESS, P.O. BOX. 1504 - LA OUINTA, CALIFORNIA- 92253; LTRWN.011 I. GENERAL IHF'ORIM=ON t. Project Developer Name: address:* 'Phone: Project Site Project Title- Address: Tract No.: Acreage: Grading Subcontractor (if different): Name Address:. Phone: r PHASES? MS If , so how many?. Type of Development/Project: C zwercial Single .Family= Multi •Family_ Demolition Other Date of Project /Phase 'Start -Do:. Date of Project/Phase !Completion: II. COST INPOPIQTIOS If,actual costs are not available, please,estimate to: the best.of.your ability. 1. RAMM: :Amount: Total Cast: 2. BQUMIXIiT COSTS 8_ Rater Truck:` Number on Site: Total Cast: Hourly Rate: - Hours: B. Street Sweeper: Number on Site: 'Total Cast: Hourly Rate: Hours: C.' Temporary .Irrigation: Total Cost: D. Wind Fencing: Linear Ft.: Total Cast: - - Cast/Ft. B. Che=i6a Material, Stabilisation: °- Total Cast: Sq. Ft. Cost per Sq. Ft.: Y. Vegetation Cost: Material: Total Cost: Maintenances G. Other: Type: Total Cast: Hourly Rate: Hours: . LABOR COST: Hourly Rate: Total Cost-: Hours: 14. ADMINISTRATION- COSTS: � Total Cost: r- III. TOTAL'COSTS: Add items -1 - 4 .for total cast. ^OTAL' COST: ?TL SE RETURN FORM AT COMPUTION OF. ,PROJECT:'•. OR ?SSE OR AMMALLY FROM THE DA= OF ?RO�MCT/?EASE START AQP. • 1 U31/94. t. .—MlEMORANDUW,'_ TO 'Saundra Juhola, City Clerk f ` , l t t FROM: Marcus Fuller, Assistant En irieer I g F . �'' { y, 's . T'. • ` • . ,r ;'.fir -• �`' � ! ` t �. � J . -DATE: 'April 20, 1999 , RE: ust Control Security, Tract 28.341-2/29003 14{D, .. , t � .,. _ _:, , a` , ' •• _ - 1 4 .� . ~ � T e �.. fie, - . � `• �.' - ,. -� a ,Ji` r' rr. •�y - '' a r. a e '�� _ .KSL Land Corporation has conveyed these Tracts to Brookfield Heritage, Inc. As such, KSL has requested that its du st,control,;security be released. "In order to facilitate this release,. Brookfield' Heritage, Inc. has submitted replacement dust control security.. Please note,that the original security.- S °` .t amount of $12,000 can now be reduced to $8,950 as a+'result of the completion of portions of the �. Tract ' ..' Brookfield Heritage' Inc. has submitted a certificate of deposit'iri'the amount.of $8,950. to be held ` �,. aFP °• ,r '�•. ... t. , as.dust control security during development of Tracts 28341-2/29003:.Please" accept this certificate rl ' of deposit,account #14232;00031, issued from Bank of America; as dust`control security.until such ' time as itis no longer needed..Please release the'existing security, a certificate of deposit in.the •amount.of $12,000; to: Cynthia.Zamorez . ; :KSL Land Corporation #� r .»• _.. y' .. 56,140 PGA Blvd: Y . La;Quinta, CA' 92253. - . (760) 564-71`83' '..�, ,•� tri `, � + � � i. r cc: r Project File 28341' 2 II Permit 2733 _" • � ''t` y a - - •- a }� + - 4 �F ••�� • y K:\PWDEPnSTAFFIFULLERWIEMOS\1999\990420b.wpd ; x _ �, a• fi Hh'K. ,(.1y`Jb �+b;4JH11LiKVVKY 1tLU }IUI'Itti , • I'YV.bbb e Y .l,e i y ' . �.. 1, .� w •� i 3 t ^: b,,}, 't�3'f3 i •� a•�', i} 'L_ •It :E.' } {' . f} px" �f173 ....... U �, • �f � � f �� ' t3 ii i `,�I } .i� :) �A~+1 � 3.j :A'i ��1• � � i ,i t }f ,..!�'q y� f;'j�q !l.. i- 3 ^' ¢ ifi:?' i �'I j� i �'i,�1. ,::I� �1 a< �' �tl'!`\�`�i��f3 � ?}�i is�t S - �; ' r..t='a , •_r J I ' `II 'I � .33' ' �� � ,V � it } ii�m . } ,•. • q"�<IjyS;:!?e',(I r i i:ii3 . ' . LiiEE57 7 �>� �k`� � : _ •'t;t' >f•, ' _ '3'• }3•. 11�t y i�'t .. Y r; � Ry♦' } } t� � ..� S >3 7 ,;:IQA,i»S i�:'G+' f 1�i>!j�lt•nk?<}t}. 0 1 f911��'f�'�' �,.qY i� ' -� ?,' ,- T � '; �„ s i ^. .•,moi. -: *FACSIMILE ; • � , �; •��+ �� T .� . Number_ of pages, including this page. 2 iTf • �:. , 1 ATE, April 5, 1999 TO. NfiTclus.Powler Ptx4c-2. �:' , ;, a {• 3 rFI&M: ' CITY OF LA QLINTA r.r, �, Grp �, , �•� ' �k v ; FAX #: • 760-777-7155 K' • nu r 0.� 'C u. t. rk F'RO1VI: Carol Fora 1 DIRECT #:' • 619-794-6172 ': •: ", '' ti ` " FAX.01: 619-793-2395' _ *• `' a _` 'r `` # r ,`, # . ` ; y. SiIX3JLCT: HERITA ^� " "` •1 copy of Workman's Comp• and Employers Liability Tris.' Certificate s �. ♦ :�her .versation regarding ttie FDC#deposit currently posted' by,K,SL for Brae Bum, the° tal'1.34 acres ,(Tr. 2041-2, Lots A'& B). The tricfs total•11.87 acres. All theg Brae Burn are currently. being built. Is it possible to reduce the deposit amount lov�� for the slabs oneach lot? + .�• - , � 4 .~' - .iw � J . r ' - r • r � M t .1, '�, - 'i. .. r. M1• , :Y n . - • `, l� .. s � 'tit ' d4J^' • • M ' ^- • . , - ". ty . ♦ � •". . i Yj +•6 !ir'Kr. f 7 7' 41h'n'IDRWIV.ICLL i"RJI'ILJ s I Rl. OJO ' r{ ; it•' ' ♦ . � :I'")a �,` %. ij`. n, "li;� y.. a� � •� •� 1, 19�j1i I I " h IJ I'. }' ' .e $ .as ili! R 'I .}! �. "! � bi; �tN 3 Ci•"':I '3 i!' i:^ r. 1; }3�•�'3�3}� i +� 0. iL I, i. �( _ "�.. �. �ih y,'�: f is i � I'.� .. t ' � � . I . I I I =, ' : �� �}i � „ i ��• ,iii+jM���i; '�} a .� c I�, i6I,, it . }� •, {hi �' „``� � :'. � �•'r � f If' i � �.- �}i � f! r�i�J} jl I I . .N.Ea3�tty�).iii�) -..C� �i, � q�,' � }� i !i! .. �b' .. •}` f �' •:� �.� rt1}" r. 3 i "(:'�i r�, �M ,,3•y f I x! s 1. t "I 1. . I'si �} I1�:iif: :I I.i:�'�II c,r `�'. i.`:a c = ., w, . ri •. r . �; � £3, i .3 i� 3£3� - 2 FACUMILEY ° Dumber4"of pages; including this-page:1 .3 • - is '., L• . -• - _ . a 1 f . i.�. DATE: '� : April 7,..1999 .. ;. J�got ,. TO: Marcus Fuller it right his time! " r ^ •', r ' FIRM: ' • CITY OF LA QUIN•TA FAX #:'j, a �� 760 -777 -?155 FROM: Carol Ford DMECT'#; 619-794-6172 . .r FAX #, 619-793-2395-, wS71B1'ECTr �. •d "WTAGE a@ PGA WEST =''TR• 28341=2 KSL-currently has posted a CD for the FRCP for this tract in the amount of 512;000: Brookfield" f ' k Herita I& will be replacing tlus security,,W-ith anew CD in the amount of $8;950. This ` consists ..revised amount i z 11:87 total acres for tracts 28341-2 &29003, ,,+ -1,34 total -acres of streets IMAM are currently paved 1.58 total acres of Phases 1,& 2 foundations currently being, installed '. t `8.95 total`acres for FRCP deposit yX ` $1,0001acre $8,950.total deposit l R I am currently obtaining the new CD. Please let me know_ if there is any problem with the ib o ' e- calculations. Q $. Thanks, Marcus: 7 4 4 % 4 4i PF N + 1 4- ^Z, 4- 4 "S. W �A V is oA, C7 a* 4--, 1 , -V, - 4r, A.h. lk V A -j- ",,k tT + X w, g r11 V. x, 41 t Zr t I j A �n,41 'J f 4 A,; % ;a: Z ;7 A. I Ik"IN A ell, "I q A 40 7. 4L �7' --t •L ank of America• 71 IMO D600`"it "Recov, A, epo,$- RESi ANM -j — �iDATE ,r- y San25 W-5 r4gour J N& MA h.' 4, IT 14i �11 WRA ,T ,I—nc .,I. MV W66E�95G:QMOM Z/U;Tl DAY 'k, - M M iTEA 5 4 •j, 6w _7 w 2321S MMOV9, 1,s- gi W, IGN TITRE M d- samelorm �.I�Onqllfons,,,otjthi his TIQjq�,,deposivjw e nv6sted. "kir, -the, 4utomatically, upon ma untyor,6Kth*&_6ffdbtjv d an th 111.be�r W P. alwor-a-Aeposit. laaysjorjetm .,Wit made'du S bf8Wd4d"'d -1-8s;1entale"Wday 'Jot.t& p�qrpipe perjo&(The--grace periodAsq b""c. c! e wig .s terms Pj - qsjin s be'theifitibri5sUr t If, da or,,mpre �beg inn ihg`dh_,'4hb,,m'atu rity'datO ),-,Th6,5i winterest ffdbt�:"Ciiil,.th"e'��""cl'a'te,YOUr�,tuhdt 4 ----1 1A - I , I -,ftitdi Ill _.. -, "K regelp, vested V 4A M , , "' , !� I- • ANT;.1 N FORM pAirt.of Q eposit-ir6i Pyjhis�irebeiptjs'.P v t, interes AM WWORMS •ly—NAt"Glibsumes coposit�ano��,iRi"rrel't,,feemainrini�t,ne Interesucompoun-ded'.1.1 V10• 0 11 F MR, IN AM, .�accoun IMPOR If ou withdraw'.N " wo. A04 Pre Itmaturesilasuostantial ihte 1w Ic . , !'­ -.1 Ampose -K e Im BO 'k �PERABLE EXCEPT, INACCOAbANCEWTH11' ,_ena!W,�,WIy: be d' t, ARP EJF ­--t4jNMNEG t,.�4 "r, wr t N Member FDIC 40 rv— _T 4 - _A ;I 7 # I;y Al. '4 8' 4F". 'fir L Iq ';J- Y X 4- "*d c- n D PEN t APR,2'1'W9':- • ' , Medium-Large Scale Construction/Demolitiori Projec 11s (Greater than 5 acres)' CITY OF LAQUINTA +:.. ' Fugitive Dust-(PM10) Mitlga.tion..P.lan �.... PLANNINGDEPARTMENT Date: 99 Jurisdiction: C'ii�oF �� �yiur�+Project File #: �o�,P 99-GS ' Part I Project Information Please provide the information below as completely as possible even. if it..has already -been' r' provided on other forms related to this project. Failure. to provide complete in ormation or .Y ' provision of inaccurate -information may delay the,processing of your Fugitive Jiust (PM10) �• Mitigation Plan '(Plan). It is recommended that. you submit your r Plan concurrent with your., grading or demolition permit application. F ' ,�. roect Project orient: . � ._.. � •:.._ . -....... rM;:• � ,hy z P P200,�',�i�GT,.r-/S Address: ivy A'l S G��,C vT� o?Ol; : 7� �1i9.�, �j} -Day phone number: /q�,¢�j;.8`,� Emergency phone number.,. r Grading contractor (Contact Person):/� Address: Da hone number:.. Y P _. _ -Emergency phone number: ..... _ . , .:....... _.:.... ; . • Construction site street address: Construction site location: • (Please include an 8 S z 11 location map) Construction site assessor's parcel number (Tract #): aS341-02 X003 Parcel (Tract) size: J Acres or ' , Square feet Anticipated date of physical project initiation: s H ,e�ci�ov�c Anticipated date of project completion: CaNSrvo'� D ,e,�rr�Ns, , Anticipated costs for dust suppression: $ (Attachment B - Must also be. completed an -mate to t e appropriate address. when construction. activities have been completed) ` covers w13 Ole 1-All pro'ects greater-than one half .(.'/2)'acre are also-subject to SCAQMD Rules 403 and.'. 43.1. If..�••" �• . �,r ., �. .- r _ ... `x< .r ,cit' :.�t ,; ��' tr � _ _ � • . ,. • . . 1. , ^ri 4 -�.? ' �`�.'.. ��: (` Ear hwork Information (Acreage/Cubic Yards): Project Area• Total Disturbed Surface Area: • Cut• ,+ . ,.... ..._ Fil_l:. , ,� , ;, :� f ,��; •y�:.'`,; . _ 4. Import: Export: } -Phasing of Earthwork:' r� y • / Date Date Phase I Grading (Acreage): From: T6. t Phase II Grading(Acreage): From: To: :t, 7.. Phase III Grading(Acreage): ' From: `I'o: Y '• x. J . •. �. I .. ,. �� TTI , Xy. �:� \ y . Phase IV Grading(Acreage): From: To:. ' (Attach additional information if necessary) ' �Pa-rt 2 £Fugitive Dust Control Actions From the inventory: of fugitive dust control measures provided in. Attachment A, please indicate which measures are to be implemented during the project by placing the corresponding letter beneath the following sources. Inaddition, please indicate.at which phase the measure will'be .. , ""implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading' (RG) column;.:. ... After indicating what measures are, to be implemented, complete the "Details" section by describing how and when the measures -are. to be implemented. Source Details (e.a.a frequency or application, number and type of dust control implements. �No. 'RG FG FC etc. Please be as specific as possible) ti ; • . r ;` � + _ .... , . �� �� _. zvlel , . +'. ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES , K `,• • ' : The left: column contains the sources of fugitive dust which are intended for `emission , control +, k .t under the City's dust control ordinance.:' The two right columns contain an "inventory and: description of reasonably available fugitive dust., control measures for each of the sources. Please use this information.as a guide.,when preparing a Fugitive Dust (PM] 9) Mitigation Plan. ' �.. .. i. . ..y ter' ' ¢ �• ,,,.-•,��r t ' (Source No) Reasonably Available'. �'+, r' Source Control Measures'- Comments f Land '; . i (A) Watering o Application of water by means of truck, hoses and/,` Clearing/ ; ` (if. sprinklers prior to any land clearing or earth Earth-' arth movement will increase the moisture content thereby, - t.' -moving'" increasing stability of material ,`, �" ' ` •' ''``3 � �' ` � t o Once the initial land clearing/earth movement activities are complete, a second`round of. watering can `generate a thin .� crust which•stabilizesthe disturbed surface areas provided' that it is not disturbed' _ _ xr. o Security fencing can be used to prevent unwanted future - x Sec ity ` disturbances tcs .where: a surface. crust -has been created " of.si (B) Chemical stabilization' . o Only effective in areas which are not subject to daily disturbances:. o Vendors can supply information on product application and ;r r required concentrations �. C Wind fencing ,o. Three to five foot barriers adjacent to roadways or urban areas . .� O g � _ J Y _ t Y can be effective in reducing the amount of windblown r� material leaving a site' ,' r o Should be used in conjunction with other measures - •(D) Cover hat l vehicles o Entire surface area should be covered once vehicle ,is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas -. o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles x ; r`' -• " Unpaved (F) Paving` o Requires street sweeping/cleaning if subject to,material ` Roads accumulation'. • " k (G) Chemical Stabilization o Vendors can supply infoimation as. to application methods and n concentrations , r o Not recommended for roads with high volumes or those used for', ^f heavy equipment` (H) Watering o Insufficient quantities to keep surface moist. a o Required application frequency'will vary according to soil type, ''' weather conditions; and'vehicular use f _ �. gra. �. a - -. r� ' s � ❑1. + - (Source No).Reasonably Available - " * t t" *' • rSource Control Measures mm n Unpaved`' (1) Reduce speed`limits o X15 mile per hour maximum "I �" Roads ,. .. '• ,�> ' (Cont'd) , (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to a , • £ . •• reduce vehicle trips by a minimum'of 60•percent r_-- „ . Storage " `4 (K)' Wind sheltering o Choices include silos or enclosures Piles o Enclosures should consist of three sided barriers equal to height of ' material with no more than.50 percent porosity ' c (L) Wet suppression o Application methods include: spray bars, hoses and water truck sy ••- o Frequency of application will_vary on site specific conditions , ' ',:(M) Chemical suppression 'o Best for use on storage piles'subject to infrequent disturbances.,, r ;r ' (N) Altering loadin/loadout o -Confine loadin/loadout procedures to•leeward (downwind) sides s �: procedures of the materials o Most effective when used in conjunction with wind sheltering... _ (0) Coverings 'o Tarps,'plastic,'or other material can be used as temporary r ' r , ' coverings o When used, these should be anchored to prevent wind from ,, . y • removing coverings • +Paved• Wheel washers ' o 'Should be placed where vehicles exit unpaved areas ontopaved- , -,,,(P) Road ' areas ' Track -out o System can be adjusted to spray entire vehicle,,including stored ' bulk maierial in haul vehicles (Q) Sweep/clean roadways o _Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full ; -_-_«-«----------------------------------- ««-------------«--- ,-------_--_«------__-----_ «_�_ �-- Disturbed (S) Chemical stabilization o Vendors can' supply information on methods for application and Areas • - required concentrations } _.... � ' Construction Sites r. ' ...(T) Watering A. Would require frequent applications unless a crust ' can be developed over the site (U) Wind fencing o Three to five foot'barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures Vegetation o Establish as quickly as `possible when.active operations have establishment ceased t ;. o Use of drought tolerant, native vegetation is encouraged t +r.. a * �. *1a t 4� 4' - - - • �'[ fyi X: ATTACHMENT B - COST INFORMATION ,. Medium -Large Scele:Construction/Demolition Projects ; (Greater than 5 acres)'.' ' FugitiWDust •(PM10) Mitigation Plan t Date: Jurisdiction: Project`File #• '''. _,4: a� Project proponent: •Address �d 0� Day phone number: 1(od 5-6 -Igs-g Emergency, phone,nLimber: •4 a •,_... ,. ..•,• ' N the space provided below please list the costs associated with implementation of all dust... control, measures. -'The information provided below, should' include all implementation'costs',.'', (including labor) for dust control throughout the project. Not al[' measures listed below will " s..., } apply to. all projects. z, ;Watering:. y CIO.... c517E� .. , • ` L✓ :� Chemical stabilization: , , Wind,fencing:: A%A { .. 'Covering haul vehicles: - : Wheelmashers: Street sweeping:AIA T ._ .,Wind sheltering: • ,. 4 a. Y r rw. Vegetation reestablishment:A/A J^ _After project completion these records shall be transmitted to' the . City ' where the '. { a Val! Association o jl P • . Valley. , .. f ' 'Governments CVAG at the address rovided below. adin demolition 'permit was' attained , and to the, • Coachella 'PM10 .Cost Monitoring ,r A Coachella Valley Association of Governments., `13=710 Fred Waring Drive, Suite 200 f M `Palm Desert, CA 92260 , x` !XII projects greater than one half'(1/2) acre are also subject -to SCAQMD Rule's -403 and 403.1 R L.� - - ' < ' ��+5 k.+•. ,. • - , - .. ,f •, �:4� J.S• y, }�Y'a«t S. i}! cj_: -r Part 3 -`Agreement A ., Y �,j ,.,. �. 'c; I:certify that the information contained in this Fugitive Dust (PM 10) Mitigation Plan.U;tru.e_, and accurate and that all measures specified in Part 2. will be implemented during project', construction. I authorize the City of 'La,'Quinta to enter the above mentioned, propert Iy.°•gin' , °'.: for inspection and/or abatement purposes, and agree to hold harmless the' City and ,its: representatives- from liability for-- any actions related to this Project.:' I",also; agree .to..:h .. complete the record-keeping requirements included herein as Attachment B. once. the, project has been completed. ' r'• :' '. +' J•` . - . , _ .l v. ff,.. .1•f'; �rY f. aC�a.3y L. ;,- ignature o or ut onze epresentattve (Date). have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the ownerhasn; - authorized the implementation of all its provisions throughout project buildout - .•. signature o Grading Contractor or Authorized epresentattve ate ' (If not the same as above)411 ,* wu N. f ; " f Vq n ` �' % . • - Y� ` fir. I � � � t>• i C 4 v • t •hex �Y't � �. •• s = '. � .. f.. Y �F• r f t,.:. ��. .. to implement of all provisions -at the concentrations and trequencies wentinea. _ + ignatur o wrier or Authorized epresentative ate y. a, ^ • ' r . .l. .i}_ ' - - ~, .. •�� - '.- - yet r 1 r ,. ♦ .. , r , d :fir t .. t1'"', .CONDITIONS FOR FDC' APPLICATION -99 68;,x?' BROOKFIELD'HOMES/PGA .UVEST'= ,REFIL'ING FOR FDCP'98-31; TR.28341=2/29003,x± 12 `ACRES' . GENERAL: ". . , .' ,;�� ¢r•�' R 1 Applicant shall comply'wi"th all-control'measures as-setforth ,in lthe approved',' .� ` ' p- application for .for �FDCP 99-68, and the following conditionalrme.asures.'This dust 'control,'plan'.,approval°shall also incorporate by reference,the�requirements of ' .� FDCP•.98-3T,` attach'edas'.Ex'hibit A`; to the .,extent'they are applicable to z construction. operations' un`deetaken,by'Br,00kfield homes °f or, the �subject"'site . ' .2:• Applicant all provide surety ,as required by, Public. Works to..replace bonding. for *DCP 98-31!'.in. 4an `amount adequate'.to. address control' measures -as, °. provided for in FDCP 99-68 The fu114amount-bf security for FDCP 99=68 (as ` ,{ deterrriined.'.by-Public••Works)`sh`all be ;available 'foie, any�measure(s) deemed s t necessary by the City to achieve adequatddust`control, whether: or not such ;•additional measures are `proposed With'this.appli6ation,.� " i�, •. v,; , ^ {, .f' y � •£ � Vis. � • + .°-• � ', Rti r, .J - ,., r` -fir>. �.• `• _.. ,ti4 ,.� �Y ^rte :,,iih �3, ry -r{ ; . ° t' c ; :v r t r 1,' •r'. , E, ,� ♦ •:.lf } \ kir '... r l .. ! h .. I « ' nk •t y.ti :. ,. t'. a '- V,•yt 1 .' '• ,• at YJ ,++ 4 _. +.. • i • . " i .� .r . � \ c .. . r : t r,t ''R.,s. 'r } i a A ♦ 3 � ... ,�, _ c - ,� ♦ + .°t .• _�.. �:` 4, ?' 'r •. ' _ r, •``rte . - ly..+;,- P.i�;'. _ ••� net ra• '� . } >* , 1 •�. r :� ', � -� } ,y , CONDITIONS FOR FDCP APPLICATION, 98-31: ' KSL LAND CORP. / JAMES RUEYCONSTRUCTION TR 28341-2; 12 ACRES GENERAL: _FDCP,99-68; EXHIBIT A r 1. A`pplicantYshall comply with' all control .mea`sures as set forth in the' approved application -for FDCP 98-31, and:the ,following conditional measures. This dust ` - - .control plan approval, shall also apply to any encroachment or haul permits) . issued'by Public Works. .. 2.1 The-full amount of:security:for FDCP 98-31'(as dete.rmined'by.Public ,Works) " • i shall'be available for any, measure(s) deemed necessary by the City - to .achieve' adequate,.dust control,' -whether or, not such, additional measures, are proposed - tt with this application. 'Any -requests for bon,d amount revisions%reductionsmust . . be, made in writing to the Public. Works: Director. The applicant shall implement T all methods set_forth.herein forthe, duration of the project construction:.;' 3. 'Applicant shall submit copies of -,,all records related to cost accounting for the 'dust .control .measures assumed during all pre -grade activity and grading , construction upon.•any-request -for release' 46duction in -posted security. Said records shall be submitted within 30 days 'after completion, of all dust control �' • ,m,easures.as outlined in.and conditioned upon,the'plan. All such records shall accompany,the completed PM0,Program Report Form- which can be obtained y from the` Public- Works or Community Development-Departments.•Completion 'r of all dust control measures shall, be verified by the assigned field inspector. - r 4... Adequacy `of all 'proposed' and conditional stabilization measures shall be " determined by the assigned;grading.inspector. The. City m'ay require remedial. measures beyond those ,iden'tified' or conditioned upon the project, which the t < City deemsYnecessary,in the.event such approved measures are not effective. _ , Enforcement of .these conditions shall . be' at; the discretion of the assigned • - grading inspector, who shall monitor.: and field verify that the spirit and intent `4 _ of.the. FDCP and its attached conditions are'being 'corriplied with. Adjustments n t,• 1• •• . --to application frequencies,, uantities'and other aspects of,this FDCP. be 2 , 4 "made by the inspector, at his/her discretion,.,in order to -assure) compliance... •f . ; 5. The contractor/vendor, responsible for provision of- all `soil stabilizing agents • w shall submit the appropriate Material Safety -Data Sheet(s)., ,-along with .approval - from the Water.Quality,Control�,Board;'to"the Public Works Department prior to r r " 'any site application. Application of stabilizing`,agents must be in -compliance .► .r °' with NPDES and the State' WaterQualityControl Board requirements: . ►' 6• The conditions of this dust control plan approyalaare applicable to•th'e_full range•'- ' " of construction operations associated with •the entire 12 acres associated with " TR •28341-2, and shall, remain fin effect for the 'duration of, all. 'construction­�; undertaken as part.'of development approval for thesubject property: Transfer of. real property or other interests. regarding, th'is.project•shall.not affect's :- 4th'e validity of this plan approval. ,.Implementation of °all proposed .and`':; y ' 'conditional measures shall be carried out for the duration of all construction ? .. ;�. activity,,as,applicable. However, nothing. herein shall preclude any future party . - of interest from filing a,revised•FDCP with the City'for an•y.portion of the site. _ t , 1;4 ,„- . •7. Approval. of this-d'usv,control plan'.does not in mand'of itself constitute_ 'o' ' ' otherwise authorize -any site disturbance, prep aration•or construction. The ,; developer -is required to obtain any.and all,.necessary permits and clearances as set forth in`. any development approvals•'issued *and currently in' effect ertairiin to this site. This includes an type of testin monitorin or sam Ian ' P 9 Y YP... g, g' P� g; •. t .,required as a condition of development approval, such•as that conducted for > archaeologic, h d_rolo ic and 9eolo is re orting.Pur oses:' .. y._. i'SITE DEVELOPMENT: d ' 8: Any'pre-watering of areas proposed for grading shall be in•accordance.wth' r 'recommendations of the grading contractor, based on the area soil conditionst r f. as°described in the associated soils report(s). At a,minimum; pre -watering time; : ` shall .be for three days prior to any earth_ disturbance(s): 9. FDCP 98-31 indicates •8,942 C.Y. of import willberequired .for the, site:. Any.'- ny._ transported transported soils and;'stationary storage ,piles.,on-site, shall' be„sufficiently., stabilized, watered down'and/or covered as appropriate: Minimum -freeboard - shall be .as established'by the Public Works Department:' Any'on'and •off-site, . borrow areas shall be routinely watered and chemically stabilizedafter•borrow.--, ' t�. .. activities . to mitigate. airborne 'd'ust, • as 'appropriate pending, final grade ,• r * - . completion. This approval 'applies to,any off-site borrow sources, whether in V ' . .. or out of the. City limits. •y, t �' t . •10'. .:,Track -out and other. accumulation of'soil material(s) Tonto any paved areas; �• -~ outside the limits of all work shall be' minimized: Any 'unpa`ved:.construction,, { , :: exit'/entry points along existing paved, roads/a'�easshall be , improved -with,.' r t : pavement, aggregate base or similar material, for a,distance of, 1'20'.,from....the- .� pave_ rrient,edge into the site to minimize track -out.- Wet. sweeping/flushingof - l` .soil accumulations from all paved -areas (i.e., internal project streets)- shall be _ conducted daily, and kept damp during construction hours until so -removed'. 11-.f Unpaved construction access and tr'ave'l ways within the site'shall be'prepared for traffic prior to commencing grading activities and kept, 'watered down and ..compacted to 'retain, moisture content during, all construction traffic/activity, including building construction. Track -out shall be removed per Condition #10.1- 112.1,1 0.11,2., Any on-site temporary facilities (sales, construction; model complex, etc.)shall be provided with paved, compacted or otherwise stabilized parking and access during their operation, with .those improvements to be constructed to, the applicable Public .Works Department standards. 13. If approved on-site roadways are constructed to ultimate. design prior to completion of construction activities, then traffic and parking shall be limited to those paved areas as feasible. No vehicular parking or traffic. of any kind is permitted on or over any previously, stabilized or other inactive soil areas. 14. All previously, disturbed areas where no further grading, construction or other land disturbance will occur for at least 30 days, shall be stabilized with an appropriate dust suppressant, as defined in LQMC Chapter 6.16 and approved by the California Water. Quality Control Board; Region 7. The suppressant shall be applied no later than four days after completion of the initial grading, and ` staked, posted or otherwise restricted in order to prevent any access on or across those areas. All previously disturbed areas'where further grading, construction or other land disturbance will occur within 30 days'.shall be continuously maintained under the provisions of this FDCP until building construction begins and :has progressed to the point "where fugitive dust is negligible: 1