Loading...
2737ear'. �. With proper validation this,form constitutes an mCITY OF LA QUINTA ent permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like *public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: Subdivision Improvement Permit — Class I II Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION TrAet 25933 Sonrion Northnnet corner of Hiles Ane b Duno Palms Road (Street address or Description of Location) PURPOSE OF CONSTRUCTION Sitn Gradinn Sketch (attach construction plans if appropriate) rti DESCRIPTION OF CONSTRUCTION G1,1260 Site RhAsc 1 only Sao attachad conditions DIMENSION OF INSTALLATION OR REMOVAIPnr thrt MTOVnd Ot AhIrtx ftlnt�n SIZE OF -EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION 5-1.5-O8 ESTIMATED CONSTRUCTION COST $ 15.0(10 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Iridemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. r Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of�Applicant or Agent 0li.»hnnt/Ri11.inm 43-725 Montaroy Avo. Ste. C Palin Doaart. CA (760),836-0155 Name of Applicant (please print) Business Address Telephone No. AA1tnlA"d ttnontmet:ion 50-305 R". III Coatholla. CA (760) 398-55.44 Name of Contractor and Job Foreman Business Address Telephone No. 407117 Contractor's License No. 5203 City Business License No. Unl Artrn Inn. Co. SJ3002758 Applicant's Insurance Company Policy Number pA 1 n FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty QasFa�Deposit`-Suret'y';Bond if re'gc� Led, As—built TOTAL: Receipt No. Received by inn. 1. ,AOA $rI r� Date APR 16 1998 73liTY OF LA QUINTAL PERMIT VALIDATION PERMIT NO. 7717 DATE APPROVED 4/1.6/98 EXPIRATION DATE 12/31/98 DATE ISSUED l4— � ��- By� Administrative Authority Recorded by II Telephone: (619) 777-7075 SUR -CONTRACTOR'S AGREEMENT THIS AGREEMENT, made this 10 day of April 1998 by and between OLIPHANT, WILLIAMS Co., INC. a corporation, herein called "Builder," and DATELAND CONSTRUCTION CO.; INC. herein called "Subcontractor. WITNESSETH: WHEREAS, the Builder is constructing and erecting certain buildings and improvements consisting of a SINGLE FA 11LY SUDIVISION consisting of multiple phases totaling 132 units, phased and constructed per plans and specifications as identified in the attached Exhibit "A" (Plan and Phase list), located on Lots See Exhibit "B" , Tract 25953 in the County of RNERSIDE, City of La Ouinta , State of CALIFORNIA , as per plans and specifications and the addenda thereto (herein called the "project"); and WHEREAS, the parties hereto desire to enter into a subcontract with respect to the work hereinafter described, NOW, THEREFORE, in consideration of the mutual covenants herein contained, the parties agree as follows: 1. The Subcontractor shall furnish all labor, material, skill, equipment, supplies, and all other things necessary or incidentally required (herein called the "work") to perform and complete in accordance with the plans and specifications and addenda that portion of the project referred to as: PHASE 1 GRADING The Subcontractor acknowledges that the purpose of this agreement is to provide for the entire performance and completion of the work and to that end has examined all of the plans and specifications and addenda from beginning to end with the understanding that the work may be scattered throughout different parts of said plans and specifications and addenda. 2. The Builder shall pay to Subcontractor for the work the total lump sum of $55,000.00 , (Fifty Five Thousand and 00/100) payable as follows: .A. Progress billing will be accepted on a monthly basis for work completed prior to the date of billing. Invoices received by the 25th day of each month, accompanied by a billing statement, applicable labor/lien releases and builders project superintendents approval, shall be payable the 20th day of the month following. B. In the event Builder receives Preliminary Lien Notice from supplier, the progress vouchers shall be made jointly to subcontractor and the supplier. C. Progress billing amounts shall be determined by applying the percentage of work in place to the total contract price, as approved by builders project superintendent. D. A ten percent retention will be withheld from progress payments as per AIA Document A201. 3. Scope of Work: The Subcontractor agrees for the consideration shown to do work as follows: A. All materials and installations shall meet the requirements of La Quinta (including city business license), Cal OSHA, Cal - Trans, local fire marshal builder and any other regulatory agencies having jurisdiction over the work. B. The Scope of the Work shall include all material, labor, equipment, transportation, required to grade the site as indicated on, or reasonably implied from, the above mentioned plans and specifications, but not necessarily limited to: Clear grub, mobilization, prewater (1 month, 6" piping only), rough grade, stock pile, temporary retention basin, cut streets, wall grades, backfill retaining walls, bluetop pads. C. Clean all waste and debris resulting from this operation shall be removed from job -site by this subcontractor at regular intervals as directed by the project superintendent. D. Subcontractor shall cooperate with all trades so as to complete the project in accordance with the project superintendents time schedule. This time schedule is critical as time is of the essence. 4. The Subcontractor shall pay for all materials, labor, equipment and instrumentalities used on or in connection with the work when or as bills or claims therefore become due, and shall protect the premises, and the Builder from all claims and mechanic's liens on account therefore, and shall furnish Builder, prior to the payment of any sums due Subcontractor hereunder, with receipted bills and invoices for all materials or equipment furnished to or to be used upon the project by him to such date, together with releases of lien thereof if demanded, and together with Subcontractor's current itemized payroll to date. Such itennized payroll shall set forth the periods and amounts for each of Subcontractor's employees and shall be signed by each such employee acknowledging receipt of sums shown therein. This provision shall not be construed as a waiver of the right of Subcontractor to file mechanic's lien claims as against Builder in the event of Builders failure to pay the Subcontractor sums due hereunder, provided Subcontractor is not in default under the contract. 5. The Subcontractor shall commence the work as soon as the project is ready for such work, or within (5) FIVE calendar days after being notified in writing by the Builder so to do and shall complete said work in a diligent fashion and as rapidly as the conditions of the project will permit; however, in no event will the Subcontractor be allowed more than REASONABLE work days in which to complete the work It is understood that the economical progress of the project depends upon the continued cooperation of each Subcontractor thereon. Subcontractor agrees that he shall be liable for losses occurring to Builder occasioned by any delays on Subcontractors part to complete the work promptly in accordance with time limitations hereof but that it would be impractical or extremely difficult to fix the actual damage to Builder caused by such delay. Therefore, should Subcontractor fail to complete the work within the time specified, Subcontractor shall pay to Builder, as liquidated damages and not as a penalty, the sum of $ AS DETERMINED per day for each and every day required to complete the work beyond the time above set forth. Subcontractor shall not be held responsible for any delays or interruptions unavoidably caused by riots, strikes, acts of Government, inclement weather or acts of God, and Subcontractor hereby waives any and all claims against Builder for damages for any act, omission or delay caused by Builder, or any other Subcontractor, and hereby undertakes the work subject to all conditions as they now exist or may arise. 6. Builder shall not be required to make any final payments hereunder until Subcontractor furnishes full releases or discharge of the liens with respect to materials and labor used by Subcontractor in the performance of this contract or until the time within which liens may be filled by any material -man or mechanic shall have expired If any liens are filed Builder may withhold the amount thereof from final payments due Subcontractor until liens are satisfied or discharged If an action is brought by Builder under this agreement as a result of any default or breach hereof by Subcontractor or if Builder is required to defend itself in any action to foreclose any lien for labor or materials furnished Subcontractor, Builder shall be entitled to reasonable attorneys fees and court costs. 7. Subcontractor further agrees that if any lien or liens shall be filed for work done or materials furnished by or for Subcontractor, Subcontractor shall, within five (5) days thereafter, at his own cost and expense, cause such lien or liens to be discharged, and Subcontractors failure to do so shall be an event of default hereunder. IN WITNESS WHEREOF, the parties hereto; having also read the additional Terms and Conditions as shown on the reverse side of this Sub -Contractor's Agreement, have- incorporated them herein and executed this instrument the date first above written. Oliphant, Waiams Co., Inc. By: Wes] . O ' t, Vice`President "Builder" State Lic #_&" City Lic # "Subcontractor" >ti r NOTE With, proper validation 1 ti" othis form constitutes an ' �CITy OF LA QUINTA encroachment permit - t Y P► APPLICATION FOR .PERMIT PUBLIC WORKS CONSTRUCTION' (ENCROACHMENT) OF OF r _CVVI , , •�'� � � .' , � .,� ;. ��:;• ,*r:., R 13FOr the steuction of public or. private curbs, driveways, pavements, sidewalks,yparking lots, "sewers, water mains � e' rp►Q - rTike public works improvements in'connection with'MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS • _ r fi: yf� * s AP r i 1 13 , 1998 9 8 Subdivision Improvement Permit — Class ^II I" t t *skf : 1 �$ •, DATE: Minor'lmprovement Permit Class IV _ LOCATION OF CONSTRUCTION, --Northwest,corner, of l'Iiles Avenue and Dune Palms•'Ave ` c a 41, (Street address or Description of Location) t Ly PURPOSE OF CONSTRUCTION Grading �� Sketch (attach construction plans if appropriate) s DESCRIPTION OF CONSTRUCTION t DIMENSION OF INSTALLATION OR REMOVAL SEE APPROVED .GRADING PLANv r r} .� r SIZE OF EXCAVATIONJF NEEDED, ' r cV �' A� N s APPROXIMATE TIME WHEN WORK WILL BEGIN 'APPROXIMATE TIME OF COMPLETION t " j • i " : s ;f ESTIMATED CONSTRUCTION COST $ 55 .000.00 (Including removal of all obstruction, materials, and debris, backfilling, com 4 ss •' paction and placing permanent resurfacing and/or replacing improvements) r z' ,..In consideration of the granting of this permit,'the applicant hereby agrees to: !• r• Indemnity,.defend'and save the City, its authorized agents, officers, representatives and employees, harmless .from and against any and all v i penalties, liabilities or loss resulting from claims or court action and arising out of, any accident, loss or damage to persons or property happening or occurring es a proximate result of any work under 'the permit granted pursuant to this application. • Notify the Administrative Authority at least twenty-four (24) hours in advance •of the time when work will be started. r - ,' Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules end -regulations of the City of • ` A 1 ' „!• La Quinta and to pay for any additional replacement necessary as the result of this work. '• -..� ' - y' ' I , _ Signature of 4pplicaht or Agent` OLIPHANT AND WILLIAMS ASSOCIATES, INC: 760-836-0155• 'Name of Applicant (Please print) +Business Address Telephone No. ' 4 4- 43=725 MONTEREY AVENUE;• SUITE'C, PALM DESERT, CA -..92260 ; Name of Contractor and Job Foreman Business Address ., Telephone No. B60117 Contractor's License No. • _ t City Business Licensef No.' Applicant's Insurance Company GEN. LIAI51l,1 Ty R e l 13 ri c e I n s. C o. Policy Number ' S J 3 0 0 2 7 5$ ,rr T'f' 1' • FEES: Subdivision Improvement Permit — Class I I I ' �• - ; � - +`, Public improvements: 3% of estimated construction costs +Private improvements: 3% of estimated construction costs i• + Minor Improvement Permit — ClassIV: See attached schedule ti r f})of Inspection Fee $ 1 �0 5O PERMIT VALIDATION .. .�� 1 ,' r Permit Fee � •' `. t �,Q � •N , - .� ��.�• '. PERMIT'NO. e a Penalty z r Cash Deposit -Surety Bond 'yU - DATE APPROVED - •. , if required � _ � ,, _ • .,.. EXPIRATION DATE TOTAL: $ ~� DATE ISSUED Receipt No. .. �.�. �. By j:,Received by r Date " _ Administrative Authority ' r� ' �I� Recorded by TELEPHONE: (619).777--7075 -� •+, The following General and Special Provisions are attached to and made a part.of Permit No. ° q• � + GENERAL PROVISIONS' . The following shall always apply: �.� O__ry. ENROACHMENf ON PRIVATE PROPERTY: This permit authorizes'work to be accomplished within City of La Quinta right of s way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to y secure permission trom abutting property owners. Such authorization must be secured by the permittee prior to starting work. ' TRACKLAYING CONSTRUCTION EQUIPMENT:' Cleated tracklaying construction equipment shall not be permitted to operate on r t; . + `• any paved suiface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing n, pavement is scarred, spalled, or broken during the term of this contract, or if the,'averrent is maned, City of La Quinta shall request that these portions of read be resurfaced over their entire width. Resurfacing'shall`consist of one coat of two inches (2") of A.C. r surfacing plus appropriate seal cost as specified above. ' l 'PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors., Suitable detours and detour signs shall be placed and maintained for the + duration of the project: The City shall be notified 24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure.including corrugated metal pion pipe, steel culvert and ' r ' o'' concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes 'structures, ' necessar to remove. or cut existing drainage Ci of La r y g g City Quints shall be notified 'prior to commencement of this work. • Drainage structures and open drains shall be kept free of debris at all times for proper drainage., RIGHT OF WAY CLEANUP:' Any surplus material resulting from excavation and backfill operations shall be removed from the right , of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction.,. , Existing gutter line and drainage ditches shall be replaced to their original standard or better: -All excess material shall be removed prior to paving. Water tankershall be used, as required, to sprinkle the job site to keep-dotvn dust conditions and shall be used + a immediately after backfill. , e DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.' • ~ CLOSING STREETS: No street shall be'closd. A'minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency, vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee 'shall contact this office to obtain the necessary permission. ,." SPECIAL'PROVMONS ; `,r The following shall apply when indicated: - (R >1 NOTIFICATION: Permitteeshallnotify the City at (619)777-7075 at least 48 hours in advance,of starting co»struction: " UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way " `authorized by, permit, the permittee shall contact -411 concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ' ? UTILITY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are' clear of the f ` ' • L�Pro oed work site: The e,rmittee'shall'notifY all concerned utilitycompanies of the proposed work. R4 - PAVEMENT WIDENING: Area between the proposed concrete gutter line and.the existing road pavement shall be surfaced t . with inches of A.C. paving placed on - inches of class % aggregate subbase course having an "R" t' value of not less than and in conformance with: City of La Quinta Road Improvement Standards and Specifications; Ordinance #461. t ' PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a elope of ` -1/4 inch to one foot (1') R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. - x R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter( feet) shall be - removed: Curb and/or curb and gutter shall' be saw cut priorto removal. Depressed curb, matching concrete gutter and ''concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. r + r R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern.' Surfacing between the property , line and the existing read- paving shall be 2 1/2 inches of A.C. paving placed on ( ) of class aggregate base: - Driveway construction shall conform to,attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all'd'trections shall be assured and maintained at alltimes. R10 SOII. SIERHJZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall comimwith the manufacturer's specifications. l COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California -or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance t;:�trimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quint! -=ms unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall' be placed so that the resulting compaction shall be not less than -90 percent or equivalent to the surrounding ground, whichever is(the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the. bottom of each layer and the water supply shall be continuous. RIS COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City'Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can`be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivaleht.to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 2737 • � - ,a� .�• ,• t " Oliphafi&Williams Assoc: Dateland Const: ' L . In -addition to the standard permit conditions; the following shall apply: 1Pursuant to Section`14.16.320 of the La Quinta Municipal Code (Ordinance 10'§'T(part)' 1982), all ;.work shAll.be performed in=accordance with the latest edition of the Standard Specifications For 4 ' =� Public'Works Construction (SSPWC) and as directed by and to the satisfaction.of the City Engineer_ 2 - Oliphant/Williams Assoc., hereinafter referred to as "Permittee", shall be responsible for providing ' continuous dust'and erosion control. j ,'=- •� - 3w' .Streets shall be kept clean. They shall be completely cleaned•atthe end of each work ig•day and "„ more frequently if required: 4. 'Pursuant to Section 6.08.050 -of the La Quinta Municipal Code (Ordinaince 18 § 1; 1982), throughout' ,the lwo'rk site, -the Permittee 'shall comply ,with City regulated work hours.= Operation and" ` maintenance of equipment within one-half mile of human occupancy shall be performed'only during , 4 # = the following time periods: ' October 1 it to Apri130: Monday -Friday 7:00 a -.m to 5:30 p.m. Saturday 8:00 a.m. to.5:00 P.m.- May .m:May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. *+ r , Saturday 8:00 a.m. to 5:00 p.m. - ` Work shall be prohibited on legal holidays and Sundays. • ; M ."�t,,M `. 5. Work performed within 500 feet of a signalized intersection is restricted between the'hours of 9 a.m. F -r3 p.m. ,Traffic control shall be set up after 9 a.m. and`removed before 3 p.m. The.Permittee shall j 4 contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894`if signals operation at the intersection, i's to be altered.in any way. - F; 6.�.*. Pursuant to Section 14.16.110 of the, La•Quinta'Municipal Code (Ordinance 10 §1� (part), 1982),." Permittee shall assume responsibility for repair of any pavement damage to any_public�or private. • _ . �.*,� street and for any damage to, other -City, streets or facilities as a result of work performed under this., permit. - .. 1 _ •,,, ` ; 7 .r Pursuant to Section 14.16.250 of the La Quinta Municipal -'Code (Ordinance 10,§:1 (part), 1982),"', advance warning signs and -traffic control shall be installed and maintained in accordance with tai'.` '• t Trans Standards or the -Work Area Traffic Control Handbook (WATCH Manual). A traffic control s., plan,. if required, shall_be prepared'in accordance with the WATCH Manual and submitted to the T City for review and approval one (1) week prior to starting ,any construction: •' It shall be. the,. : l Pennittee's responsibility to appropriately'detour and barricade all cons_ truction sites. i 1#' . * •- •�\ .- ;. ,F � h " - � E .Fr .t.` :tit• - Special Conditions - Permit No. 2737 l , 1 F `' Page 1 -of 4 ' • - �, - ., ,I' • - ;' .. gra.. •,•�'�� •' SPECIAL CONDITIONS --PERMIT NO. 2737. - --- Oliphant/Williams Assoc. - Dateland Const. ' 8: ; '. Pursuant to Section 14.16.290,of,the La Quinta Municipal Code (Ordinance 10 §' 1 (part), -1982), street'closures shall not be permitted. A minimum of one travel lane of paved surface shall be*-.' maintained with flagmen at all times. 9...:,''� Prior to excavating, if required, the Permittee shall contact,Underground Service Alert at 1-800°422 4133.. It shall be theTermittee's responsibility to notify,the Public Works Department of anticipated ' excavation whichimpact City facilities, including but not limited to traffic signal conduits and loops;'. "" • =_ lines, electrical conduits, and storm_ drain facilities.- acilities:10. .'irrigation 10.'Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall ' be performed by the Permittee as directed,by and to the satisfaction of the City Engineer at no cost . 'to the City of La tQuinta. 1 =11. : Pursuant to Section 14.16.370 of the La Quinia Municipal Code (Ordinance .10. §;l (part), 1982), " ' backfill compaction within street rights-of-way_ shall conform with Section 306-1.3 of the .latest ' edition, of the Standard Specifications' For Public Works Construction (SSPWC_ , except as otherwise' i specifid herein. a t. Native material may be used as backfill, material provided that minimum compaction, `achieved in e i the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no =` .water densified compaction via, jetting or flooding or other means.shall be allowed. It shall be the'.'' Permittee's responsibilitY to provide appropriate geotechnical supervision, testing,and ins ection, - , w onsite, at'all times during backfill operations. Backfill compaction 'shall be achieved by'the following conditions:. A. When a -firm foundation is naencountered due to soft, spongy or other unsuitable`material; ,•. . such material shall be removed to the limits directed by the Geotechnical Inspector and/or the • City Inspector and the resulting excavation backfilled with pipe beddirigmaterial. B: Backfill materials shall be brought to or maintained at an appropriate moisture content for - .. compaction. The .appropriate moisture content range shall be established at the onset of the ° w project and ensured prior to use of the materials through progress testing on the .stockpiles. ' ' , •` C. »The.first length of trench backfilled shall be backfilled in the presence of the City Inspector`. . ' Compaction shall be tested at random depths at.approximate three-foot vertical -intervals as' • x". ' Backfill is placed to ensure *the effectiveness -of the compaction methods and to establish the - . , r ". depth of lift that can be compacted. ' D. If lifts greater than,one foot are attempted in this trial length of trench, compaction tests shall ., � •� � ; ' be taken within the lifts to ensure that the full depth of the lift is compacted: ;Upon satisfactory "• completion•of this portion of trench, the ,City Inspector shall establish the maxiiiium•lift'. u t+, .,thickness to be compacted for the.remainder of the project: • - � _ ya•`F' P �,. ? is r .t � u L Special Conditions - Penn -it No. 2737 �: .+ Page 2 of 4 ' Y - - ••ff e �',, 3 • '- SPECIAL CONDITIONS -=PERMIT NO. 2737 ' �' ` • = --- Oliphant/Williams Assoc. - ' Datelarid Const. --- r In subsequent lengths of trench, the frequency,of compaction tests shall equal one per each lift rr. of backfill, per 300 linear feet of open trench, at randomly selected locations within'the open, 'length of trench. 2 ft.vz,z * h, G. The depth of the randomly selected compaction tests shall also be randomly selecied`except that where multiple tests are required in a given length of trench; the tests shall be no closer• V� ,- than three feet (vertically) from each other. H: If any compaction test fails, previously placed backfill (in the same, length of open trench'orl J•" • previous lengths of trench) which is represented•by the'failing test (as determiried bythe (ity, - k Inspector), shall be tested for compliance with compaction requirements., U. All costs incurred due to the conditions above shall be. borne by the Permittee:` ' Co_ pie`s of all test results shall be furnished to the City Inspector: - 12. All excavations within City of La Quinta right-of-way shall be'backfilled, and temporarilypaved if `within,the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed' `• `;. that which can riot be backfilled in�the same day. Excavated'trenches shallnot be allowed open - +�' overnight; however, Permittee may leave alength of excavated trench, not to exceed twenty (20) feet N, ` in length, open overnight at a point where construction will begin the next day, provided that thisr x y> length of trench is completely covered by steel plating. s. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting; etc.,'shall be replaced to its•original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the•L-a Quinta Municipal Code (Ordinance 10 § I(part), 1982), f _ permanent pavement replacement shall be completed no later than seven (7) days after the. ,completion of the' work. Permanent pavement replacement shall conform to'the "following , conditions: _e A, Existing asphalt concrete pavement shall be sawcut one '(1) foot beyond. trench edges. Edges T shall be straight and' clean. { B:' Permanent pavement replacement structural section, within all.trenches, shall be l" thicker ' . a than existing of asphalt concrete over the same existing thickness of crushed. aggregate base 3! ` or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2:4 of. ` the Standard Specifications for Public Works Construction. The replaced pavement and base'- material ase'material shall be compacted to 95% relativecompaction and respectively tested, for each'300. r . t -linear feetof trench. Verify exact structural replacement section thicknesses'with the City prior to installation: •• Special Conditions - Permit No. 2737 Page 3+of 4 , I r F a - i in' •' T • ' :SPECIAL CONDITIONS --PERMIT NO. 2737 ' --- Oliphant/Williams Assoc. - Dateland Const. --- 14, _ = C. '. Permanent pavement replacement' shall be installed using a City approved 3/4 max medium 'asphalt concrete as the base course lift and'a'City,approved '/z" max medium finish course lift for capping. Asphalt concrete. mix design shall be approved by the City prior to�its placement. D. For transverse trenches across improved streets, the existing pavement surface, three (j) feet on eitlier•side of the excavated trench, shall be cold -milled to a depth of,6.10', with a "butt,' ' j offif created along each edge of the cold -milled area, and a new 0.10' lift of J/Z" max medium asphalt concrete pavement overlaylapplied throughout the cold -milled area. s . -E: -.For longitudinal trencheswithinimproved.streets, the existing pavement surface, through the ~, S ' lane width (within lane line striping), shall be cold ed to a depth of 0.10', with a "butt'.' t joint created along each edge of the cold -milled area, and a new 0.10' lift of '/2.! inax medium asphalt concrete pavement overlay applied throughout the cold-milled.area.' x F:. r •If grinding and capping operations are- not' performed. in' the same 'day as base paving. #� operations, the.base course lift of/4" max•medium asphalt concrete_ shall be installed from, t saw -cut edge.to saw -cut edge flush with the existing street surface. The base course lift of? : paving,shall not be left 0.10' low in anticipation of grinding and capping. r r F. Any "existing lane striping affected by -this.. resurfacing shall be replaced in kind by the • Permittee, as directed by and to the satisfaction•ofthe City Engineer. Affected traffic signal ' ' loops shall be removed and replaced in kind.' The finished pavement surface shall be smooth, - ; consistent, and sliall'conform to the.surrounding grades: F .16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior to'.commencement of any construction at (760) 77,777075.: • • N • + .• .` .. .. ter-. + _ t • 1,7'• -Permittee shall stabilize -any soil that "was, disturbed (shoulder areas,, etc.) as �a result.of work performed under this permit with an approved dust control treatment. ' 18. Pursuantto Chapter.12.56 of the La Quinta Municipal Code (Ordinance 10'§ 1 (part), 1982) the City, ; has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making'a delivery or pickup on,the subject street; or if this permit specifically grants permission to use the street to deliyer�street construction materials and/or equipment: . 19. A haul route and/or construction access plan shall be submitted to the City fo'r approval. 20:• Contractor/permittee shall keep project areas watered down'"on a daily basis to help prevent airborne dust and to aid water distributing equipment inkeeping the soil moist in the event of high winds:. ' 21. Nuevo Drive through the Quinterra development shall not be used as a coristructiona¢cess'or egress. 22. ; The City of La.Quints reserves the right,to revoke, suspend or void this permit at any time. ' • .• ; i .. Special Conditions - Permit No. 2737 J tw Page'4 of 4 -.. o)atrnoraimontsnrdatum 6�aa:u.eoa.IIoy.gq:R�,lIA_\�:Iga••e VI49:/G:I�: Wf-'o c._ 'm•cl rnla.•n.. ''�.';�`. - • . r IST BANK OF PALM DESERT, N.A. :{ a O . OLIPHANT AND WILLIAMS ASSOCIATES, INC. + ' 73-000 Highway Al MoPalm Desert, CA 92260 , ' . r„„ Q ' 77-900 AVENUE OF THE STATES i . r' PALM DESERT, CA 92211 90-4120/1222-;;. .� • _ +.; (760) 345-2626 ` . ” - 4113198,- 4 /13/98•- ` FAYTOTHEC1 O LaQuinta - - '• - 'rr ;h '*"2,750.00 ORDER OF ty f nYe4>Yalta+r$ra+eeY*aY3r:k$ra+estr9r4t�kde4e4ex4r3r$a$e4e4r4ede+?Jt+(ra+e:k>Fa+eaF4e>tr. •;`. Two Thousand Seven Hundred Fifty and 00/100 ' DOLLARS,, h City of La Quints 4 . r PO Box 1504 � �. � '. � , � '• •+ ;' J .K • . �' ` . Y, La Quints, CA 92253 MEMO},'`yaJ', K •� ti' a .,. - ` " , ' 11800 2 .? 2811' 1: L 2.2-24 i 2001:46 2 S•?O 3 23911' v OLIPHANT AND WILLIAMS ASSOCIATES, INC. ,4 . < . r 1 1 272 8' City Of La Quints ' ' 4/13/98 04/13/98 Bill # s .. r. 2,750.00 - � , Gil ��-��� l d � . • : : , 1 � . �> '. � �;,,: �, �' • ' i _ Checking=FirstBank ' �., a ±. 2,750. 00 ; k. OLIPHANT AND WILLIAMS ASSOCIATES, INC. �+ • f r 4/13/98 a? 27 2.8 -City of La Quints 04113/98 Bill # - , 2, 750.00 44 Checking-FirstBank• `. ," • e, "2,750.00 • r a .a SF5001-1 - - , J TO REORDER, CALL YOUR LOCAL_ SAFEGUARD DISTRIBUTOR AT 760-321-9959 M97LC001376 jam, � � _ , c �.. f� �' M � •, 273 'Medium-Large Scale Construction/Demolition Projects � � • F; (Greater than 5 acres)' , i3%98 Fugitive Dust (PIViflO) Mitigation Plan 4 { r - ..a its -L APRIL 8, 1998 - ..• LA UINTA 4, Y r M,j RF' Date: Jurisdiction. '4 Protect File:# M zr?e artProject Information t Please provide the information below.as `completely as•possible'even`if it has 'already been �` # ,provided on other forms related to this project. ,-Failure to provide complete information, or, ''provision,of inaccurate information may delay the processing'of your Fugitive,Dust '(PMID) k "F Mitigation Plan (Plan). It is reconiniended that you'submit your 'Plan �concurrent,witli your, ' x grading or":demolition permit application. ' .Project proponent:. OLIPHANT AND_WILLIkl ASSOCIATES, '''INC-. 'Address: 7'7-900 AVENUE OF. THE STATES,• PALM DESERT; _,CA' "' 9221,1'. Day phone-number:760-345-2626 _ , Emergency phone number. 760-34'5-2626 L' Grading contractor (Contact Person):. Dateland Construction ('Jim'.Richards aadresS: 50-305 Highway 11.1 , Coachella;,. CA 92236`' ",•` ,' ' Day phone number: 760-398-5544 Emergency phone number: 760-398-5544' _ Construction site street address:Northwest .corner Miles Ave' nue and Dune: Palms0. Construction'site location:` 4, (Pleas'e include an 8.5 x 11 location map) _ Construction.gite,assessor's parcel number (Tract #): 25953 .Parcel ;(Tract) size;.(7.30) Acre's or:• . -.Square feet Anticipated date of physical. project initiation: 4/13/98 Anticipated date of project completion:. 5/13/.98 r Anticipated costs for dust suppression: $ 5',000 - , (Attachment B - Must also be completed an mailed tot e appropnate address when'`', `.4 • constiuction activities have been completed) • .} r� Sp Project'Areai 7.30. A` . Total Disturbed Surface Area:. 7 '3p A { e p.:.Cut:` Fill: s -� yr7 t r P'..7 Import: h. Export: Phasing of. Earthwork:` Date Date' ' �; t• �` ; a. _ Phase IGrading-(Acreage): '7.30 ; From: 4%13/98 TO:� Phase II Grading(Acreage): From:. To: .Phase III Grading(Acreage): From: To.' .,Phase IV Grading(Acreage)r 'From: "I TO: -• (Attachnadditional:information if necessary £� Part Z Fugitive Dust Control Actions - • `�� ;lie From the inventory of. fugitive dust controlAmeasures provided in Attachment A, pleaseWidicate which 'measures 'are, to be implemented during the project"by=placing the corresponding letter. beneath the following sources. In addition, please indicate at which- phase the'rneasure will'be ; 4 implemented, either. at• Rough -Grading (RG),. Finish Grading (FG), or Final ;Construction, (FC). Demolition projects should only indicate, measures in •tlie Rough Grading (RG) column. t r •. Affer indicating what measures are to be implemented, complete the "Details! section by describing 1110w and when 'the measures, are -to be implemented r, y s `', YSource'' . ' Details (e freguencv of application number and tune of dist control implements ., + No. 'RG FG - FC etc'.•Please be as specific as possible) ,• W ; j 1 A A A .. One, 2, 000 • gallon .water truck will be working daily` as .;needed. , � ` ' • 2, H 'H+ H One' 2, 000 gallon "water truck will •be working -daily,'as needed:. ' # i -,` �}'` .. .. ' � - �• • ,tom D �y '} .. " o. aka _ , .w r ��. '�� .. + - - .r,,.` - •'fir r' v L -�r. - .• _ ..` A Q_ - ,I '1 • y. F`L - _ -' . Y a, S -ii. - x, •. f di '�,,- ' Y '�' r , se -copies of this page -if additional space iss needed) * 1 Source Deils tC& ncy"of application, number'and tyke of dust corit�ol implennents ta • ; No- FG FC `"etc. Please be as syecific as possible) f s < f }sF .RG. "4' P' fP P Water,,and., gravelwi-11°�be a'vailable,where vehicles'exit� — — ti ' ` Y - unpaved onto+paved areas. JAI ♦ � r �!' fix' {. - ,' �Fw, • .y. .T. K 47 f 5 .i .'t ., f r • �, Y;A .� < _. • �' y f�ri C,� .r ..f `., 1 , • r t. fJ 1 � ft � r , ^ } w,.+. ,!; r �. �`t - ._ •� f x' , ", .. '• tom,• ,• 1 _ � ,y��~ a i' [,Y� , f s - � 3` -.:1. �> M. -' +F "7' ' !-'.fit r. ti R`_ �? .•}i M1',. rR ' .a' air rf +Y .. f� + *.x '♦ • - ' - .� ,.r • 'i 1 v 10. ,.', `'^ �. Vt•. 1 '�•. - .. l ', F,}�-yF .. � ,� ..' r! w x•, '4 •� ' r J. REAS The left column contains t{' BL�'�®NTT®1L°t,� ij and he, to sours + ES., under t Citys"dust control, Ordinance.cs Of �gttive dust. which v . . description of reQsonabl . are intended or ;� The two. right ,columns contain, an ''i f . emisst • Y available - on -control Please use this in formation a .ib'itive;,dust control measures _ or' t inventory -and, . ° ` guide:when preparing a Fugit 've D f each Ofthe, 'sources. y t Dust (PMIo '- 3 (Source No) Reas ' r _"Mrtigalio_n.P1an ;" t onably Available , � Sourre Control Measures' �} omments , * C nd (A)'Wate`ring arIng/ o Application'of w b , ater f `Earth- Y means of.truck,�'hoses arid ' ,or sprinklers prior'to a �• moving move any land clearing or. earth s ment will increase the moi sture c increasing stability ot; material ontent'thereby,: ` '# - . o Once'the initial land . clearing< /,earth movement actrvities`are • - complete, a second round of watering can generate a thi ' ~ crust which stabili ` zes the. disturbed surf thais not as r _.. o' Security fencing can be use- x Y t . ace;are Provided ded sed to prevent on r disturbances of ` µ'anted future. Site where a surfaceA. (B) Chem' )Chemical stabILiation �• ` " y crust has been created o '.Only effective in areas which ` 7 , are n r • o- Vend ' of sub•ect y ors can supply information on product a daily disturbances l ' required concentrations PP cation and ,r; r` x (C) 'Wind fencing Three o, to five foot barriers # adjacent 4 •; i x can.be effec 1 to road ' s or five in reducing the 'amount of urban areas material lea wind blown o- Should be ed leaving a site f - . used in conjunction witfi„other m A Cover haul vehicles. o easu'res Entire surface are a should be y ` ed once v (E) Wheel washer`s cover vehicle is full ; . o Should ybe placed w}i ` y areas ere vehicles est unpaved are' r as onto paved . ' o System can be adjusted to spray entire v bulk material'in haul vehicles vehicle, including stored ` Unpaved (F) Paving c Roads = o Requires street swe i accumulation ep 4g�cleaning if ubject'to material 3 (G) emi alStabilization, k Ch c Stabilizatio o Vend J - a n'ors >• , o . concentrations' information•as to appli tion methods and Y Not recommended for oad ' ' 1 ,- he r s with -high -or �.; Y. avy equipmenF,' es those used for ' ri Wate ) g o In sufficient quantities ` o Required a q ties to keep suiface moist FPlication frequency will vara weather conditions, and vehicul y according'to soil tYPe , k Y.� ar use' 1+ IT (Source No) Reasonably Available - ;'Source . Control Measures _ moi• a.,.i �.`Z •.. �-. Comments, . r. ` �.., 4Unpaved (I) Reduce speed limits o '15'mile per hour maximum Roads . ' • •r ,. a *' (Cont'd), t (J) Reduce vehicle'trips 4 o Access restriction or redirecting traffic to paved roads in order,to � reduce vehicle trips by a minimum of 60 percent (3): x , - r Storage- . (K) Wind sheltering o Choices include silos or enclosures , o Enclosures should'consist of three sided barriers equal to height of. Piles material with no more,than 50 pe"' porosity, Y .. .. , a try 'ZI - , L `t - - • < . ., '' _:� 'V . • (L) Wet suppression , .,o Application methods.include: spray.bars, hoses and water trucks •' o Frequency of application will,vary onsite specific conditions": (M) Chemical suppression o Best,for use on storage piles subject to infrequent disturbances • Y 5 (N) Altering loadin/loadout o. Confine loadin/loadout procedures to.'leeward (downwind) sidr�' -L_ - `• i of the material procedures' o, Most effective when used in conjunction with wind sheltering14 "" •N (0) Coverings _ o ;Tarps, -plastic; or other material can be used as temporary c • . ,. , ..coverings "o When used, these should be anchored to prevent wind from- , removing coverings _ ._ ------------' ----------- -..--------------- s R --- -- - --------------------------------1------ -4 -- - ---- 4Paved , ----s. - `--f P -Wheel washers - `' , r o Should be'placed where vehicles exit unpaved areas onto paved . ". ^ ,, .•'" ,' ,'•. : ; •Roadareas Track -out . '� " o 'System can be adjusted to -spray entire vehicle, -including stored . ',; L bulk material in haul vehicles •Y ` ' , Www . : - '(Q) Sweep/clean roadways' - .. - o Either sweeping or water flushing may be used ` .A •, ` ` '', _(R) Cover haul vehicles o Entire surface area should, be covered once vehicle'is full +- --. ----------------------- -------- ----------------T--rj---�`---------------------- y� M .-------------. (5) ------ - ,---------- a •. .� • Disturbed '(S) Chemical stabilization , o ' Vendors can supply information on method_ s for application and, • ;' : `'" 6 -Areas/ _ - • ' . _.required concentrations Inactive ` r Construction .. Sites, (T) Watering - o Would require frequent'applications unless a crust can be developed over the site i fencing reas' Three to five foot barriers adjacent to roadways or urban areas-",- (U) Wind o' can be effective in reducing the amount of wind blown can material leaving a site ,+ x . o Should be used in conjunction with other measures I "_ '' ;, (V) Vegetation o Establish as quickly as possible when active operations have t establishment ceased " ' ."• : '' •,k� • o Use of drought tolerant,. native vegetation is encouraged • . r - M, ' Part 3Areerrient I certify that the information,contained.in this Fugitive Dust (PM10),Mitigation Plan is true ; ` '.and accurate ,and that all measures s ecified in Part 2 will be implemented* , project ' p P g. P J constructions I authorize the City of La Qui ntat to enter the above mentioned property' s :. ` ;• for inspection and/or' abatement purposes; and I agree, to hold harmleis the City and,its representatives `from' liability for any actions, related` to this project, ,.I :also :agree -oto ` complete'the record-keeping requirements included herein. as Attachment B once` the , k t'projec4on ompleted. P, s t;ignater or 'ut .prize epresentative / t . . f f Ott V y•d -I have read the conditioni`of ,the Fugitive Dust (PM10) Mitigation Plan'and the owner has' authorized the implementation of all its rovisions�throu hout ro ect buildout. P P g P J:: // ; ) natu o ra ing ontracto o Authorized Representative. ate , w , (not,w he°same as above), ` - y 1 • n ' _ tis , y - ^ J• 4 ~�_u .fi r . 'r. F .. t.t 1 f. r f J M,� •j � j 5 ` - r y .+ 1 '.� �' • r h i .. - r ^., f v h ! l 1 f , • ;'. at 74d �} �1 •� i a • CONDITIONS FOR MCP APPLICATION 98-320 OLIPHANTMILLIAMS ASSOCIATES TR 25953; 7.3 ACRES (PHASE 1 ONLY) GENERAL: 1. Applicant shall comply with all control measures as set forth in the approved application for FDCP 98-32, and the following conditional measures. This dust control plan approval shall also apply to any encroachment. or haul permit(s) issued by Public Works. , 2. The full amount of security for FDCP 98-32 (as determined by Public Works) , shall be available for any_measure(s) deemed necessary by the City.'to achieve adequate dust control, whether or not such additional measures are proposed with this application. Any requests for bond amount revision`s/reductions must be made in writing to the Public Works Director. The applicant shall implement . all methods set forth herein for the duration of the project construction. '3. Applicant shall submit copies of allr records related to cost accounting for the dust control measures assumed during all 'pre-grade activity and grading construction upon any request for release/reduction in.pgsted security. Said" records shall be submitted within. 30 days after completion of. all'dust control measures as outlined in and conditioned upon the plan. AI.I such, r.ecord,s shall accompany the completed PM 10 Program Report Form, which can .be*obtained from the Public Works or Community .Development Departments. Completion of all dust control measures shall be verified by the assigned field inspector., 4. Adequacy, of all.'proposed and conditional stabilization measures shall be determined by .the assigned grading inspector. The City may require remedial measures beyond .those identified or conditioned upon the project, which the City 'deems necessary in the event such approved measures are not effective. of the assgned Enforcement of these conditions shall be at the discretionassigned • grading inspector, who shall monitor and field verify that the spirit and. intent of the FDCP and its attached conditions-are being complied with.- Adjustments to application frequencies, quantities and other aspects of this FDCP may be made by the inspector, at his/her discretion, in order to assure compliance. 5. The contractor/vendor responsible for provision/application of all soil stabilizing agents shall submit the appropriate Material Safety Data Sheet(s), along with approval from the Water ,Quality Control Board, to the Public Works ' Department prior to any site application. Application of -stabilizing agents„must be in compliance with NPDES and the State Water Quality Control Board requirements. Y 6. The conditions of this, dust control plan approval are applicable to the full range of,construction operations associated with the 7.3 -acres within TR 25953; and . shall remain in effect for the duration of all.coristruction undertaken -as part of µ development approval for the subject property. This approval'is applicable for ."' Phase .1 area grading only; subsequent FDCP approvals will be required. Transfer of real property or other interests regarding this, project shall not affect the. validity- o.f' :this, ' plan approval. Implementation of all. proposed' and conditional measures shall be carried out for the duration of all 'construction y activity, as"' plicable. However, nothing herein shall preclude any future party of interest from filing a revised FDCP. with the City for any, portion of the site. 7. Approval 'of this' dust control plan does. not•in •and of itself constitute. or ' otherwise authorize any site disturbance, preparation or construction.- The ' developer is required to obtain any and all necessary permits and clearances , as set forth, in any development approvals issued and. currently, in effect pertaining to this site: This includes any type of testing, monitoring or sampling required as .a condition of development approval,such as that conducted for archaeologic, hydrologic and.geologic reporting "purposes. SITE DEVELOPMENT: ' 8. Any.pre-watering of: areas-proposedfor grading shall be in accordance with recommendations' of the grading contractor, .based on .the area soil conditions as ,described -in the associated soils report(s). At a minimum, pre -watering time _ shall be,for three:days�prior to any'earth disturbance(s). . 9. FDCP 98-32 indicates no excavation .or fill over the -site. Any transported soils and stationary storage piles on-site shall be sufficiently stabilized, watered, down and/or covered as appropriate. Minimum . freeboard. shall be as established by the Public Works Department. Any on-site borrow areas shall be-• routinely watered and chemically stabilized after borrow activities to mitigate - airborne dust, as appropriate pending final grade completion: 10.. Track -out and other accumulation of soil materials) onto any paved, areas outside the limits of all work shall be minimized. Any unpaved construction . . exit/entry points along existing paved roads/areas' shall be improved with pavyement, aggregate base or similar material, for a distance of .120'. from the pavement edge into the site to minimize track -out. Wet sweeping/flushing of soil accumulations from all paved, areas (i.e., Dune Palms Road, Miles Avenue and any paved internal project areas) shall be conducted daily, and kept damp during. construction hours until so removed. Frequency of cleaning shall be . -determined by the assigned field inspector as,per Condition #4. , t 11. Anyunpaved construction access and travel.ways to. be used within the site r shall be prepared.for traffic prior to.commencing grading activities and kept +" watered down and compacted to. ,retain moisture content ` during all. -construction traffic/activity, including building construction. Track -out shall be removed 'per Condition #10.11., r ' .12. Any on-site temporary facilities (sales, construction, model complex, etc.) shall- hall-'be `b6provided with paved,,compacted or.otherwise stabilized parking and access ` ' . during their operation, with .those improvements to -be. constructed to -the- applicable Public Works` Department standards. ; 113. If: approved, on-site roadways are constructed.. to ,ultimate design prior to - completion of construction activities, then traffic and -parking shall be limited t .. to those paved areas -as feasible. No vehicular parking or* traffic'of any kind is 'Permitted on or over any previously stabilized or other inactive soil areas. 14. All previously disturbed areas where no further grading, trenching, construction - or other land disturbance will occur for at least 30 days, shall be stabilized with, •, + - an appropriate. dust suppressant, 'as defined in. LQMC Chapter.,. 6.16 .and _ 4 • o ' ,approved by the -California Water Quality,Control Board, Region 7 and the City of La Quinta. The ,suppressant shall be applied no later than, four days after ,completion of the initial grading, -and staked, posted, or otherwise restricted in'-, order to prevent• Aany access on or across those areas.' • � � rtG r • � ,. n Y r '�'� '� 1 � ' 116 • m+R �� ♦ 12 4 Rri 45 zt v- a,}�" j�� . • ,' r � yJ` .. R. . ,� .. '7'•-'„r' 3 +.'� �Sx'h �,ti i. `. , too ce- low r r ' � 7 s .' - ''� ? ., �' x- r f r .t ' L �. .. ! • ... . k ;1 .. � � r' . ti � a };i F' �' tt, � t A 3. • -I � �;� ,.. 4.. l � S V J i; r i + }: .L, ` r r • 1 \ �' t � �_ }' �.5,.. .) .a _ . .E , � : (:� - .. a r _ � roc... • 3 � t � R Iii c �r _ � _ i �. � . __ \ `` t ♦t •-` .: , s .. _ tri i .•t.. \ c ♦ r. r .w .�ej .,;r �3 • r wy �. i _ .., I ” ♦ • i. r'� �„ v roti :. _ _ - , T �. - .. -r � � 3 z q .•�L*' ,ter' ' • :s ,. + � ,rte -- t.. ` ' w '��a .. � S .. i. % yri-, r {�-. }r l••V • vii r - - ��, ♦. . E-• '1. � h .. �" ,s _ ,,♦ , i . n •� ter• f,.,, fi%` t' c•. e Yea, � � � � a , .. � .. • _ �r �. .. .,c .. .. - ' . | | �| �| |' | l |' |- | �| | ' |� � |' | � / �LOT . -6- | . ` . OUNE PALMS ROAD ' . , � y - ` .. .• r� r. iz• �.: .. _ � •tf •.. �. � l r. r r'L�.,, rf y1a A �A�l.L—IME COST INFORMATION e a Thi j` .. ,_ - \ •i C r. i_ �.t • •• L� � ._ s i• 'i.. 1 n � .. _ �* 1 r ;i � f� • . Medium-LargeScale Construction/Demolition Projects �'` 4 n''arJ,'�h • - ;(Gieater'than`5'acres) t ', r , �:'' -• ' 'Fugitive Dust (PM10) Mitigation Plan Date; April- 8, 1998 La inta ProJect,.File, ,�UrIShcCtlon: _Qu Pte- �'- rk ai i . ;• L \ •% ri` { •f _ . h✓'., r. � r r S In,the^space ,provided below!please list' the costs. associated with implementation of all- dust'. control measures: The information provided below should include till implementation costs. *'.. (including labor). for`dust'control through out the project. Not all measures listed belowtwill , N apply to. all projects. , • ,t V 4 Y • Watering: .$5,000 jF • Chemical stabilization: 'Wind fencing: _ 4 -Covering haul vehicles:. -Wheel washers: . Street sweeping: 1?avingi s , Wind sheltering: , : ,: �• Coverings: ,. Vegetation reestablishment: y" ; ri ` After project � "completion' these" records shall be transmitted, - to. the City where they y grading/demolition permit, was .attained -and to'the.. Coachella Valley Association of .' Governments (CVAG) at the address•provided below. ►t �' ` r PM10.Cost'Monit6ring Coachella Valley Association of Governments ' 73-710 Fred Waring Drive,'Suite 200 +� Palm Desert; .CA 92260` `A 1 All, projects, greater than'one`half (1/2) acre"are also`subject to SCAQMD Rules 4U`and I% 403.1.. - to � .Y'•' M v . .Y • . ' ' � w�s�! •.. r # r}�> SEP -17-1999 16:52 FROM:OLIPHANT -OMPANIES"- 760-345-55a1, T0:7607777155 .` ;•,.P.001r'002- - f R BIZ✓�/hunt =ccnc Till za�ns= ,,• .._ a: < ,, AsSoolciatfes Ina',.. : �.. 77.90.0Avenue of the States Palm Dzsert, CA 92211..,{ J (760) 345-2626. • �. Fax -(%60) 395-5501 r • r,_ FAX TRANSMISSION COVER SHEET r: w 31 }TO.,' 1 •: tet. aV"'r'•+Q�`i A4e n: 3' • FAX NO.: SENDER: ' E S)INCLUDLVC THIS CO P.G () • i f. XO-USHOULD R�:CE1'YE .' ' ""IF YOU DO NOT RECEI ifL ALL THS PAGES, PLEASE CALL (760) 345-2626 COMMENTS:. �c y - . .ems 1 ✓r ;4 '..� 4 �w 1 i• _ • � • � , j• J . f �. •} �_ .. a .1.. ! .{ ! •r , } • Tr SEP -17-1999 16:52 FROM:OLIPHRNT COMNNIES 760-345-5501 TO:7607777155 P.002!002 y PW O Program Report Form etoper 1rama: Desert Sonrisa Associates, L.P. �r fthe'States P.D. CA 22$�lone760-345••2626' FAd e,N W Corner Miles @ Dune Pam Tlt1e ;LaQuinta, DeserSonrisa CA No.: 25953tract Ac,:eage:ont-actor (iw differeat) ` name: Dateland Construction CO.,Inc.... , 50305 Highway • I I 1 Addi`ess:Coa ell C 2 Pbone: 760-3'985544 PF.ASES? If so how many Type of Develop:sent/?roject:'co=e=j,&l single ya'ni.ly� M:1ti.Familp� Demolition Ot'set .. Date of .. ProjeG',/YApP4o§t1Y?;: Date 01 Project/Phase AWPXt 99 rx. COST zM0p=:rCJA r • . If actual costs are not available, pleaseestimate to the best of your ability. 1. pATBR: A:naunt: Total Coat: 5,051.89 2. 3QT -.COSTS.- .COSTS:A. A.Water Mr=k: Number, on Site:Total —^ Cost: 9,290.59 Sourly Rate: Hours: - . r B. Street sem: Aumbet om Site: Total Cast: Sourly Rate: ` Fours: C. T.ozary 7r.:igatioa: Total Cast: 1;100.00 D. Wird ,Peacing: Li.aeai Pt. t Total at: ' Cost/7t. { X. Cbe icaLl iateria]. Stabilization: Total -Cost: Cast per Sq. rt.: P..vegetataon cc et: Material: - Tatal Cast: . 2,184,00 Maiatenaace: G.• Other: Tyke: Total Cost: = 5ouzly Rate: Hours : 3. LAWR COST: Hourly bate: 8/hr Total Cost: 3,76-0_,Qfl ` Eours: 470. 4. ADMMfXS=J=Oti cc=. Total Cost: 188.00 STS., - , add items 1 - 4 f or. total coat . ' TO= COST: 21,57 -4.48 - I 57.4.48- ?r. -ASE ?. -ASE RE3'4F N ?CRM AT CJ63P�T�.C�N OP ?RO.TEE CT OR ?F-ASZ OR AMMALLr FROM TNZ ( I CATS OF _ ?qO r.C+/?0.SE START Up. Jl31/99 • P.O. Box, 1504 78-495 CALLE TAMPICO (760) 777-7000 . LA QUINTA, CALIFORNIA 92253 (TDD) (76'0) 777=1227 September 21, 1999 Anne McCormies Oliphant and Williams, Associates, Inc. 77-900 Avenue of the States Palm Desert, CA 92211 RE: Tract 25953- Sonrisa Dear Anne: As requested enclosed is cashiers check, #078484, in the amount of $5,000.00 that was collected as the dust control security for Sonrisa. The PM10 program report form has been received and the Community Development Department has approved the release of the security:. Please feel free to contact me' at (760) 777-7047 if I can be of any further assistance Sincerely, ,Hector Guzman Assistant Engineer I-=" hg " PC: Tract 25953 -.II Permit File - 2737 T:\PWDEPnSTAFnGUZMAN\Lettm"\990805.LTP-wpd