2742W� - - -
Ile following General and Special Provisions are attached to and made a part of Permit No. •2... •'
GENERAL PROVISIONS
Thi �following .ihall always apply:
ENROACEMIENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of
way ONLY. Whenever construction extends within private roe responsibility
Y P property,, rtY, it is the re onsibilit of the permittee for his contractors to
secure permission from abutting property owners. .Such authorization must be secured by the permittee prior to starting work:
TRACKLAYING CONSTRUCTION EQUIPMENT: 'Cleated tracklaying construction equipment shall not be permitted to operate on ;
1 -'
-
any paved surface unless fitted with smooth -faced street .pads. .'All mechanical outriggers shall be fitted with rubber street shoes to
,`$' ^ .�
protect the paving during excavations. Rubber - tired equipment only, shall be used in backfill operations in paved areas.. If the existing, y
-
-
pavement is scarred, spelled; orbroken during the term of this contract, or if.the pavement is marred, City of LaeQuinta'shaU request
• n
.
that these -portions, of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two in (27) of A C
3 ; , r ^',. •.
!surfacing plus appropriate seal cost as specified above. N
_ . _ •
PROTECTION OF TRAFFIC:' All excavations and work areas shall be properly. lighted and barricaded -as deemed necessary'by the
-
City Engineer or La Quina City Public Works inspectors. wSuitable detours -and detour signs shall be placed and maintained for the
-
duration of the project. The City shall be notified 24 hours in advance; of.any traffic detours ordelineations. r
#
`
CARE OF.DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and
o , -`t c
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. , In the event it becomes `.
necessary to remove or cut existing drainage structures, City of La Quinta shall.be ootified prior to commencement of this work.
t.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage. ,, .
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the iight "
r
f
of way.. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction.
-
Existing gutter line. anddrainage ditches shall be replaced to their original standard or better. All excess material shall be removed
' prior to paving. Wami'tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used
'
immediately after backfill. ;
D&WATER OPERATIONS: • If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall
+t •>
be the responsibility of the permittee (contractor) to control this water and to provide off:street barricades, when necessary, i-
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
t -
access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must,close a street for
any length of time, permittee shall contact this office to obtain the necessary permission.
:• - , F
' . SPECIAL PROVISIONS r ,
`
Ile following shall apply when indicated:
111^' NOTIFICATION: Permittee.shall notify the City at (619)777-7075 at least 49 hours in advance,of starting construction..
., ~, •' _
R2 , ., UTILITY CLEARANCE:„ (Substructures) Prior to making any excavation within the City of La Quinta right of way
authorized by permit, the permittee shall contact all, concerned -utility companies relative to the location of existing ):
substructures. Damage to existing substructures resulting from operations_ conducted under this permit shall be the sole
_responsibility of the permittee.
R3 UTILITY CLEARANCE: (Surface Structures) No work shall be done under this permit "until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement.shall be surfaced
v with _ inches of A_ .C. paving placed on inches of class aggregate subbase course having an 'R'
;.,
value of'not less than aad in conformance with City of La Quints. Road Improvement Standards and '
- .
- Specifications, Ordinance #461. 4, r •_ r
tR5 PARKWAY GRADING:: Area between the property line and top of the proposed concrete curb shall be graded to a slope of '
1/4 inch to one foot (I').•
R6 " '", GRADE CHECKING: City of La Quinta shall check grades_ 'upon receipt of plan and profile and/or grades as established by
a licensed engineer.
...�
R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter Meet) shall be
removed., Curb.aad/or curb and gutter shall be saw cutprior to removal. Depressed curb, matching concrete gutter.and' "
�.
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.,'-
207: -R8
R8DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
'
line and the existing load paving.shall be 2'1/2 inches:of A.C. paving placed on (____)'of class' t aggregate base. r "
Driveway constrtiction shall conform to attached drawing.
R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at times. 3
V .
'
R10 SOIL STERE IZER: The area to be surfaced shall be treated with soil sterilizer: Rate ttt
of application shall comply'with the
,
-
manufacturer's specifications.
RII COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of'La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall- be.pla6ed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is(the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and cite water supply shall be continuous.
R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City'Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for earh crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard, Specifications, Division of Highways, State of
California, dated January 1973.
R20 TEMPORARY PAVEINEM REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT PAVEMENT' REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRiPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
RIA TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
SPECIAL, CONDITIONS --PERMIT NO. 2742
;-- Capital Pacific Holdings --- - • '
r- r
fi. Jn'addition to the`s"tandard permit' conditions, the following shall apply: r
` 1 ' - Pursuant to Section 14.16.320 of the La Quinta Municipal'Code'(Ordinance 10.§ 1.( part),• 1982), aII-
Work shall be perforriied:in accordance with the latest edition of the Standard Specifications For
Public Works Construction( SSPWC by"and as directed b "''and to thesatistY En "faction of the Ci ineer.:
g
2:
'Capital Pacific Holdings, hereinafter referred to as "Permittee',~shall be responsible•for providing;
continuous dust and.erosion control. I
3. "Streets shall,be kept clean. ,They shall be completely cleaned at the•eiid of each working day and R .
more frequently. if required.
- , - jam. •� �., ~• ` - l
4. , Pursuant to Section 6.08.050 of the'La Quinta Municipal Code (Ordinance' 18 §,1, 1982), throughout
the , work : site, . the Permittee -shall comply -.with, City regulated work. hours: Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during.
the following time periods:
October lst to April`30: ,; Monday -Friday 7:00 a.m. to 5:30 p.m, '
Saturday 8:00 a.m. to 5:00,p.m:• ' •~ F '
May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m., .
Saturday • 8:00 a.m. to 5:00 p.m. k-
J
_ Work shall be prohibited on legal holidays and Sundays:
5. Work performed within 500 feet of a major and/or signalized intersection is restricted between the N
hours of..9 a.m. - 3 p.m. Traffic control shall`be setup after 9. a.m. and removed before 3 p.m. The.' ' `t
.Permittee shall contact the Riverside Country Trak Signal Maintenance Department at (909),275-
6894
909)275-
6894 if signal operation at the intersection.is.to be altered in any way. ,
;6. -Pursuant to Section 14..16.110 of the Lauinta.Munici al Code Ordinance'10 § 1 art 1982 ,
Permittee shall assume responsibility for repair of any pavement damage to any public. or private `t
street and for any'damage'to other.City streets or'facilities as a result of work per under this a
I" permit.
' 7. Pursuant to Section 14:16..250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982);- r
advance wffi
arning signs and trac`control'shall 1.be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic •Control Handbook (WATCH°Manual). 'A traffic control
a . plan;'if required, shall be prepared'in accordance with the WATCH Manual and submitted to the'
City for review and approval one (I) week prior to,starting any construction. It shall be the
Permittee's responsibility to appropriately. detour, and barricade all construction sites. • • ' t
Special Conditions -,Permit No. 2744 r , Page 1 ol`3 `
= SPECIAL CONDITIONS --PERMIT N0: X2742
Capital Pacific Holdings-7-
8..
oldings---8. Pursuant to,Section 14.16.290 of the -La Quinta Municipal Code (Ordinance 10 § 1 (part),?1,982), -
street closures,shall-not be permitted.' .A minimum•of one travel lane of paved surface shall be.,
+ maintained with flagmen at all times.
r. r. • s.
t 171
9 Prior to excavating, if required, the Permittee shall -contact Underground Service Alert -at 1-800-422-'
4133. It shall be the.Permittee's responsibility. to notify the Public Works Department of anticipated,.'R '
4 • �; excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits; and storm drain -facilities.
'10. Should additional. work, materials,f'or modifications of the work be required in"order to meet City
` standards, safety requirements; signage requirements, or to fit actual field conditions, the+work shall
be performed by,the Permittee as directed 'by and to the satisfaction of the.City Engineer at no cost n
to the City of La Quinta:
'11. Pursuant to Section 14.16.370 of the La-Quinia Municipal Code (Ordinance 10'§11 (part), 1982), `
backfill compaction; within street rights -of --way shall conform with'Section 306-1-:3 of the latest `
edition of the Standard•Specifications For Public Works Construction (SSPWC), and as required by
the Public Works Department. Backfill shall be completed in lifts, not to.exceed 1; compacted to '
90% minimum relative compaction.. Native'material'may be used, provided thematerial is suitable
for use as -backfill after, construction operations. Controlled Density Fill (C.F.) may be used as an' r:
alternative.,
12.' ' All excavations within City of•La•Quinta right-of-way shall be backfilled, and temporarily paved if
' within the existing travel way, at the end .of every'workday as directed by and,16 the satisfactiori.of
the City Engineer for the, protection of the public. -Lengths of open trench•shall not greatly exceed r
that which'can not "be backfilled in the�same day., -Excavated trenches shall not be allowed open - •�.
overnight, however,. Permittee may leave'a length' of excavated trench, not to exceed twenty (20) feet
in length, open overnight at'a point where construction will begin the next day, provided that this
'. length of trench is completely covered by -steel plating. • ;
ry
-13. ` All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be.'replaced to n
its original condition.
14. Access and egress to all local properties shall be `maintained at all times. `
15. Pursuant to Section 14.16.375 of the La Quinta Municipal_Code (Ordinance 10 § 1 (part), 1982),
Y permanent pavement replacement shall be completed no later., than seven (7) days after_ the
completion of the'work. Permanent pavement shall be replaced as follows:
(a) 'Existing .c. pavement shall be removed a minimum -of F outside of all previously.cut edg s';
straight, vertical, sawcut edges shall be provided. f -
kb Base a.c' avement, meeting the requirements of Greenbook B-AR40003/4" max:'medium '
or other City"approved mix design, sliall,be installed in one* lift; not to exceed 3
cc
Special Conditions Permit No. 2744._ "' `' k' ,` qPaget of
SPECIAL CONDITIONS--PERMITNO.2742
Capital Pacific Holdings ---
(c)' Finish �a.c. 'pavement; meeting the requirements of Greenbook C2 -AR -4000 4('/2" max.; f `
_ • „
inedium); or other'approved mix design, shall be installed in one lift of 0.10' depth.
l' (d) " Permanent pavement depth shall be,a minimum of I" greater than the existing section
pavement edges•shall be flush with the existing a.c., surfaces adjacent to it.
Additional finish,. pavement requirements may `be"required by the Public - Works Depa'rtm'ent,`;: -,,-, M
including grinding and cap ping, overlays. - -
,
16 Permittee shall notify the City of La Quinta Public Works Department a'minimum of 48 hours
ter, ., t - .
prior.to commencement of any construction at (760) 777-7075.
r -17.- Permittee shall stabilize any,soil that was, disturbed (shoulder areas,'et .) as, a resulf of work-=
performed under this permit with an approved dust control treatment.
c ., � ,. •.r • it f - ` �;:L • '..q, ♦.
- 18.f h.Pursuant to Chapter 12.56 of the La Quinta Municipal'Code (Ordinance 10 § 1 (part); 1982) the City ,;
f�
has designated certain: city streets as Truck Routes. The weight limit for restricted streets (i:e., streets ,
'.. �. not part,ofthe Truck Route network) is three (3).tons; arucks exceeding the weight limitmay' use a '
restricted street if making .a delivery or pickup on the subject street, or if this permit' specifically
grants permission to use the'street to deliver street construction materials and/or equipment
+.19. The. City -of La Quinta reserves the right to revoke, suspend or void this permit at any tim' e.
20. This permit, authorizes the removal and replacement of existing concrete' curb 'andx gutter
''improvements
within the "Citrus" development, Tract 24890.
Special Conditions Permit N6. 2744' • y _ , rl Page 3 of 3,`