I; For the construction of public or private curbs, driveways, pavements, sidewalks, •parking lots, :sewers, water, mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED`SUBDIVISIONS
A. { Subdivision Improvement Permit 'Class 111
DATE: 19;x•.-1%98 _ '' - ., Minor Improvement Permit Class IV•
LOCATION OF CONSTRUCTION TIBC 28640' Loto 66 69
~ 611Cf1Q LA r wtuCo' r ,
' (Street address or Description of Location). jr k
PURPOSE OF CONSTRUCTION 'Aubdiii lcm "Sketch (attach construction plans ifappropriate)
,• -
DESCRIPTION OF, CONSTRUCTION. ROuah stridinrt
'
..,DIMENSION OF, INSTALLATION OR REMOVAL 90e puna,. Sm., AMOM, PLUS. .`IUM •"ROTJGH
• ,, 4 C� NOe 20640" . -BX VA'�&t7�t�`A13D
SIZE OF EXCAVATION;•IF NEEDED RAO xt1`2+nw,. I�1.
��it �A
APPROXIMATE TIME.WHEN WORK WILL BEGIN 3,12!4%�8 • '' '
it � _ ,x� _. t %�/leo ;`,,, j,.. ' �' ... �♦��
APPROXIMATE TIME OF COMPLETION .. ''' � •
ESTIMATED CONSTRUCTION_COST $ .• = • '' � t'' •
(Including removal `of all obstruction, materials, and debris, backfilling, com-
paction
om paction and.placing-permanent resurfacing and/or replacing improvements) ��' �•
In consideration of ,the granting,of this permit, the applicant hereby 'agrees to:
• Indemnify, defend 'and save the City, its authorized agents, officers, representatives and employees, harmless from'and against any -and all,,
..
penalties, le or loss 'resulting from claims or court action and arising out of"any accident, loss•or damage to'persons or'propertyr
1 happening or occurring asoma+proximate result.of any work undertaken under the permit ;granted pursuant to lhis,application.', ,4y ` }'
Notify the .Administrative Authority at least twenty-four. (24) hours in advance of the time when work will be started'' 3
Comply with all applicable City Ordinances, the terms and conditions of'',the permit and all applicable rules and regulations of the City of
Ga,Quinta and to pay for any additional replacement necessary'as the result of .this work-M++�
Sig t re of Applicant or'Agent
T.D.'Aa>le t: Aavelormlien>r: F.O. BM171b' . Ld 4111Snta� }'• t-. ' E7b�)Y 771-r1841 r
Name of Applicant (please print) 'Business Address Telephone No.
Nuevo EnRlueaiina 70-811 Ct�t�r Club DT' Biarmud4 Waso, CA ' 'v.. 345-1778
Name of Contractor and Job Foreman.' Business Address r TelephoneiNo. .
438884
Contractor's License No. City Business License No. '
Soher#/Draka L'.'
�{
Applicant's Insurance Company r ;Policy Number 4.:;" `'� '
FEES: Subdivision Improvement Permit = Class'I I
MAY', 21:1998 �4
Public improvements: 3% of estimated construction costs `? „
Private improvements: 3% of estimated construction costs �
Minor Improvement Permit— Class IV: See attached schedule ®F LA 0UINTA
• Inspection Fee $ 226-20PERMIT. VALIDATION
Per Fee 100.00 2754
As—Built PERMIT NO. _
ZPejialtyj jeposit 11000.00
ICa'sFi'Dgposit'-Su etyjBon DATE APPROVED 5/21198"
�If GBC)UII�2d, Plan Check (?50.40) 5/21/99
EXPIRATION DATE
TOTAL: $ 576.20 DATE ISSU D
Receipt No., BJ/,�%r
Y '
Received by Date Administrative Authority
Recorded by
Telephone: (619) 777-7075
TAI.W
,iYMEMORAN�D'UM
4
' TO: - ' _Danny Johnson, Maintenance Manager , a f,
' # ',►i- i
t +- 'FROM: Marcus Fuller, As_sistantErig' eer I` " • _
;VIA: , . Steve'Speer, Senior Engin
'DATE: May 28,; 1998 -
"`
Block Party Permit.- Avenida Mendoza betvi!een,Call e'Arroba and Calle Colima
RE:Danny:.
s� ' -On ,Saturday, May 30, 1998; between j P M.'and X10 P.M., a block party has been scheduled on
Avenida Mendoza between CalleArroba and Calle Colum (53=500 to'S3=950): This party has been
authorized pursuant to a Block Party'Peimit, and'is being coordinated by Mr. Cole Cantrell, who'will
be setting up the traffic control equipment for the ev&it. Please have',City crews deliver the''fraffic
_control equipment between 7-8'A•.M. this Saturday, to Mr: Cantrell at•53-585 Mendoza. He can,be
reached at 564-2364. The equipment should be picked up the following mornin M
' ,.;. ,,�� '• •.: � � �• '' , '-' - ,� ' .. lease _
Y Please.refer to'the'attached equipment list for required traffic control�itemsy.Any questions, p
. ... calf _ `' . _ x • rr : F' } ;A � + . � Y x
r.. , • jib •`V l �4� ¢ " , - r • !' •. !" , 'r'~ ' •,. ::A.
;a' a
"
7 .ir• 'ts , f. -� � .. J h a • :" ' �` .a 1 r^ .t � ,. ~ - F:,r . fr • , .' - `�
F:\PWDEP-RSTAFF\FULLER\MEMOSU998\980528a.wp ,} +
Of
r
1 5'
'• 4
' - SPECIAL CONDITIONS--PERMIT NO. •2754
�- s
- --- T.D: Desert Development .---
t'
'In addition to the°standard permit conditions, the following shall apply:: • ,_ 'a
L.
Pursuant to Section 14.16.320-of the La Quinta Municipal'Code,(Ordinance.l0 § 1�(part),11982), all.'
}
work' shall be rperformed in accordance with -the latest edition of the Standard Specifications .For"•
r `
'.,,Public Works Construction (SSPWC) and as directed 'byand to the satisfaction ofthe City Engineer.
2:`
T.D. Desert Development, hereinafter referred to as "Permittee', shall be responsible'for providing r-
�•.;.
continuous dust and erosion control.'.` •-;
r
3:
Streets shall'be kept clean. They shall'be completely cleaned`at the end of each working day grid'
'
-more frequently if required: ' ' r ,
F • �
' • ' '. A{` ' ! • •�`/- i 1. r..i • I ~ ; I 1f, � Yf�r YW � ♦ Y • . r � El•
• 4..
Pursuant to Section 6.08.050'of-the LaYQ6in64Zimcipal Code (Ordinance.l8 § 1, 1982),•through6iit,
I
• � the . work site,, the Permittee shall comply with City regulated rwork �. hours.' 'Operations and
'
maintenance of equipment'within one mile of human occupancy'shall be performed only during
-
the following.time periods:
' r
` October 1 si to April 30: Monday-Friday 7:00 a.m. to 5:30 p me w
Saturday,
May 1st to September 30: Mday=Friday, 6:00 a.m"ro 7:00'p m
on
.; Saturday` , 8:00 a.m. to 5:00' .m.
Work shall,be prohibited on legal holidays and Sundays.
5'.
Work performed within 500.'feet of.a major an signalized intersection is- restricted between-the '
`
-hours of 9,a'm. - 3 p.m."Traffic control shall be set up after 9'a.m:-and removed before`3 p.m. The
f
Permittee shall contact the Riverside Country Traffrc. Signal Maintenance Department at (909) 275= ' , -
•
6894 if signal"operation at the intersection is to be.-altered in any way. z `. "' • ; t..
6. -
Pursuant to Section 14.16:110 of the La Quinta Municipal' Code- (Ordinance 10 § 1_ (part), 1982), '
-.Permittee shalt assume responsibility for"repair 'ofany pavement"damage to any public or-private :.
street and for any darriage,to other City'street's or facilities as a,result of work.performed under't' "
permit:
T
Pursuant to,Section 14.16:250"6f the't'a Quinta MunicipaliCode (Ordinance-10 § 1 (part), 1982), •~�
r
advance warning signs and traffic control 'shall-be installed and maintainedIin accordance with Cal f �'•,
r
►-
Trans Standards or'the Work Area•Traffic Control Handbook (WATCH Manual), A traffic control -
= t
plan, if required; shall,be prepared-in accordance with the WATCH Marival•and `submitted to the
a
City. for review and' approval one (1) week prior Ao. starting any construction. It shall.be the
Permittee's responsibility toapp ropriatelv'detour and barricade all construction sites:
Special Conditions* Permit No. 2754 Y a p. '+' ` t'.. Page I of.3 '
V SPECIAL CONDITIONS --PERMIT NO. 2754
T.D. Desert Development ---
8. Pursuant to. Section 1.4.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982),,
street closures "shall not b6 -permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works-Department,of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and.loops,
irrigation lines; electrical conduits, and storm drain facilities: .
1.0. Should additional work; materials, ormodifcations of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee. as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11:. Pursuant to Section 14.16.370. of the La Quinta Municipal Code (Ordinance 10 § 1 (part), .1982),
backfill compaction within street rights-of-way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction. (SSPWC), and as required by
the Public Works Department. Backfill shall be completed in lifts, not to exceed 1', compacted to
90% minimum relative compaction. Native material may be used, provided the material is suitable
for use as backfill.after construction operations. Controlled Density Fill (C.F.) may be used, as an
alternative. ;
12. All excavations within City of La Quinta right-of-way shall be backfilled; and temporarily paved if
within the existing travel way,,•at the -end of every workday as. directed by and to the. satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be' allowed open
overnight, however, Permittee may leave a length of excavated trench, not to.exceed twenty (20) feet
in length, open overnight at a. point where. construction will begin the next day, provided .that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, -,decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quints Municipal Code (Ordinance- 10 § 1 (part), 1982);
permanent pavement replacement shall be completed no later than seven. (7) `days after the
completion of the work. Permanent pavement shall be replaced as follows:
a) .- Sawcut and 'remove existing a.c. surfaces a distance of one foot (P) beyond all trench,walls,
including any :sloughing or cave in of adjacent -soils. Undermined a.c. , surfaces shall be
removed. All a:c. edges shall bpi straight, clean and vertical.
'b) Provide an existing section {four -and -one-half inches [4'/z"] minimum) of crushed aggregate..
or miscellaneous base material, ,compacted to 95% minimum relative compaction.
Special Conditions - Permit No. 2754 Page 2 of 3
VL
x ;f7 SPECIAL CONDITIONS -,-PERMIT NO. 2754* `
T.D. Desert Development
c),'. Provide'.'orie inch, (l.') .greater' thickness of existing aspfialt concrete (four. inches,- [4"] + ,
minimum) in a minimm uof two .(2) -lifts; the first lift'comprised of a base course a.c. material,
' of aCity approved mix clesign,'rneetmg the requirements: of Greenbook•class B -AR -4000; the..
�final 0.10' lift comprised of a wearing course a.c., material; of a City 'approved`mix design,-
w F' • meeting the requirements of Greeribook-class C2 -AR -4000. All pavement edges shall be flush ,
�.+ - l .
-, with adjacent a.c. su'rfaces. Each.lift-of a.c: material shall be, compacted to;95% minimum
': ;•: relative compaction.
u
> , ,,•
16: Permittee shall notify the'City of La Quihta Public.Works Department a minimum of 48 hours #"
. prior to commencement of any'construction at(7.60) 777-7075•.
:1.7..y Permittee shall stabilize any' soil ,that was disturbed (shoulder areas; etc.) as a, result of work
�+ performed under this permit with an approved dust control treatmerit..
,.18 , + Pursuant to Chapter 12:56 -of the La Quinta Municipal Code (Ordinance: l 0'§, 1.(part), 1982) .the City
has designated certain city.'streets as Truck Routes. The weight limit .for restricted streets (i.e.; streets . • .
not part of the Truck Route network) is three (3) tons;: -trucks exceeding, the weight limit may use a,
restricted'' street if making- a delivery or pjokup on the subject streeCor if -this permit specifically.
grants permission to use the street to deliver street construction materials'aind/or equipment. '
19: ", The,City�'of La Quinta reserves the right to revoke,,suspend or void this permit at any time. ' `~
`-20.-.1,.This permit authorizes rough"grading'of, tract 28640 (Lots 64 *69 Area l'l),' as -shown, on the i
_ approved plans, titled: "Rough,Gr`adirig Plan; Areal 1, Tract 28640;" bya atson & Christiansen;
.' .approved .5/,13/98. L F
y x.
4,4
r211
F Special Conditions - Permit No. 2154„ �” , . +' • *,,Page 3 of 3
. • . +'. '. 3.. r • q7 w J' • �. •� k ?r, �R � � - - �' R r M .l'
! �` NOTE•- ,
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DATE:Y 1998 �L ' l Wor Improverimerit Permit Class IV
LOCATION OF CONSTRUCTION
Rancho La Quinta
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Begin subdivision development Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION Rough gradin,; IIn'Ovt,lf (on-Wuc'
SEE ATTACHED CONDITIONS
DIMENSION OF INSTALLATION OR REMOVAL See plans.
SIZE OF EXCAVATION, IF NEEDED See plans.
' �ARci uo zt3to�Fo
SEE APPROVED PLANS, TITLED:^ TRA2i
T..
*4," BY
WATSON & C KIST NSEN,-H
-34=094. 3 4;7/6 QF,
APPROXIMATE TIME WHEN WORK WILL BEGIN - 2LZW419
APPROXIMATE TIME OF COMPLETION Vi D •
ESTIMATED CONSTRUCTION COST $�"' ^�
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration• of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or propefty
happening,or occurring as a proximate result of any work undertaken under the permit°granted pursuant to this "application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the e I of this work.
NCI�� Signature of Applicavor Agent
....T.D.Desert_Development P.O. Box 1716 La Quinta, CA 92253 (760) 771=1941
Name of Applicant (please print) Business Address Telephone No..
o Nuevo Eng. 79-811 Country Club Dr. ''Bermuda Dunes, CA (760) 345-1778
Name of Contractor and'Job Foreman Business Address Telephone No.
--438834.-
Contractor's
38834.-Contractor's License No.
Applicant's Insurance Company
FEES: ' Subdivision Improvement Permit — Class III
` Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
e,, Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $
Permit Fee -BAR•
eposit
tin I �os�iapaxit;!6�ourea>;C�aia>�
,Plan Check
TOTAL:' -s) n�,I•%C�
Receipt No.
Y e(aS
�2eceived dy Date
Recorded by
157
City Business License No.
NAD859493
Policy Number
F �
PERMIT VALIDATION
PERMIT NO. 2'1�
DATE APPROVED 2i
EXPIRATION DATE
DATE ISSUED
By
Administrative Authority
Telephone: (619) 777-7075
. � Hwy -
- `'� / ; - • � L -
• '�
- i. Medium -Large. Scale Construction/Demolition Projects
+
y (Greater than 5'acres)1
;Fugitive Dust (PM10) Mitigation Plan
,f
JirisdictionLaQu`hta ' '
Date� ,5/14zg8Proj ect File
,2�6y7�
Part 1' Project Information
..
_
t .d
Please• provide the information .below as completely. as possible `even if, d has. already;'been
.
provided on other forms related to this project. =Failure to provide complete in or
'
provision of, inaccurate `information may -delay the processing of your Fugitive bust (PMIO)
• i
Mitigation Plan (Plan). It is ,recommended that you submit your Plan concurrent withA your
.
grading or demolition:permit application.
1`I kr r
Project proponent:,,' T.. D. Desert �Develonment, ,L. P.
Address: R.0..Box ,1716 La Quinta, CA _.,92253 .F _
'Da'y phone number: (76 0) 771=194.1 Emergency phone number
(7,60)779-6978
Grading, contractor (Contact Person): Nuevo Engineering, Inc. (Pete` Peter`
,Address: 79-811 Country Club- Drive, Bermuda Dunes,,,,,.CA, -,92201
Day phone number.'(760) -345-1778 Emergency phone number: (760),-_345-1"i7-8
`Unnamed along
Construction site street address:La Quinta, CA '92253•x,
sion 'Dr: 'West t
Y
Construction site location:
(Please include an &5 x 11 location neap) Y
• 1 A
649-210-042/646-020-040,--=
Construction site assessor's parcel number (Tract#)� g640 .' .. 0411045 N.
Parcel (Tract) size: ' ` 23 Acres or ,.r' Square:feet
Anticipated date of physical project; initiation: 5/20/08
_
A
Anticipated date of project completion: a 12/31/98,
Anticipated costs for dust suppression: $ 24640.00
(.Vtacltment B - Must also, be completed and mailed tot the appropriate address when
construction activities have been completed) - '
r
• i
6
t�
s
1
1`I kr r
Project proponent:,,' T.. D. Desert �Develonment, ,L. P.
Address: R.0..Box ,1716 La Quinta, CA _.,92253 .F _
'Da'y phone number: (76 0) 771=194.1 Emergency phone number
(7,60)779-6978
Grading, contractor (Contact Person): Nuevo Engineering, Inc. (Pete` Peter`
,Address: 79-811 Country Club- Drive, Bermuda Dunes,,,,,.CA, -,92201
Day phone number.'(760) -345-1778 Emergency phone number: (760),-_345-1"i7-8
`Unnamed along
Construction site street address:La Quinta, CA '92253•x,
sion 'Dr: 'West t
Y
Construction site location:
(Please include an &5 x 11 location neap) Y
• 1 A
649-210-042/646-020-040,--=
Construction site assessor's parcel number (Tract#)� g640 .' .. 0411045 N.
Parcel (Tract) size: ' ` 23 Acres or ,.r' Square:feet
Anticipated date of physical project; initiation: 5/20/08
_
A
Anticipated date of project completion: a 12/31/98,
Anticipated costs for dust suppression: $ 24640.00
(.Vtacltment B - Must also, be completed and mailed tot the appropriate address when
construction activities have been completed) - '
. - , • sir _ , ' - ¢., ., — , r .< � : , . �. , 7 - ;
t ;1 All projects greater. -than one half (1/2),acre-are also subject to SCAQMD Rules 403 and.
403.1. w
�" 't . • ° } *' .n i' 'oma � " .4 � ! -. '__' ,,, 4
6
. - , • sir _ , ' - ¢., ., — , r .< � : , . �. , 7 - ;
t ;1 All projects greater. -than one half (1/2),acre-are also subject to SCAQMD Rules 403 and.
403.1. w
�" 't . • ° } *' .n i' 'oma � " .4 � ! -. '__' ,,, 4
`�v_ 't r'3 ,';;.ttr b .• % '\ Tr-<.. ` - `'t +5' .� '�nrt''-�`Jr
Earthwork Information `(Acreag_ tiCubic Yards):
tProject Area: 23 =Acres - Total Disturbed Surface Area: 23. Acres +..
• g
'Cut: 2647OCY ' Fill: ','21406CY + y
•Import: 0 - " •Export.
Phasing of Earthwork:
,a
Date Date K. `
t x >
�
r f
" F Phase I Grading,(Acreage): From: 5/20/98- ',To:,.`.1'2 / 313/ 98 ' :
Phase II Gcading(Acreage):. From: To:
Phase III Grading(Acreage): .From: To:
Phase IV Grading(Acreage):From:'To-
. ` '(Attar{t:additio'n 'I information if necessary)
+ r f
n Part'2 - Fugitive Dust Control Actions-
c r r
?From the�inventory' of fugitive dust control measures.,provided in Attachment A,please indicate
which measures are to be implemented during the project. by placing 'the corresponding letter y
:beneath the following sources.- In addition, please indicate at which phase the measure,:will be,,-,a•
implemented,' either • at Rough Grading +(RG), , Finish -Grading .(FG), or` Final Constriction
Demolition projects should'only indicate measures in the Rough-.Grading (RG) colunin:
T
'After 'indicating{ what' measures are to be implemented, complete the' -"Details' section,-by
- *,describing how and when the-measures are to be implemented
` y Source Details (e.e., freauency: oC apblication, number• and tyre of dust-control implements..
M j No: RG FG" FC' etc.
.Please be as specific m possible t,
1�"•»A A -A. One 4000 gallon 'water truck wi11.,be, workirigi each $day'.
•�. d 'J . 'as'r nelcessary..
2 H H H One,=4000 gallon water' truck will be♦rworkirig ,each 'day
as ' necessary r A ,�L ,
p e - r i. f v .K., I•
Wy-R - � . � � • � - r _ tea, �� +`''»
n M
71.m�m�
(Use cop
jes
Source �s Page jf 8d , , . ,; ,..s;
No.. ltG FG Detail e r Y drhonal' space w.:� .4
F' en s A r4
.rc - t` t etc: Please°6e-es s fa. li tion-� eed�e ' «'
if'icas o ibl mbe�and ofd
on
' I f a, ► r men =' y
6 r � h
All
,,ion Y a l a
44
r •� ,. � � - 'aye `` r , .4 ��j Y.; a .. � a i"' .r
T .' { S j . S' .. I • « ; L ^'r. 'aa , r .x. � SR rt r ..�� ,
I.nt
s`��.� 7a .'`• ',. � � - . ti t � � L,_ '+' f " ,h �+• y7 i j ,re a�}(((1�''r'+ +tr ` ^.
' • ice` s ,. ..r .'�a •h� .1
�r, •liar. • i:. c Y't h, .. �� ' , 'r. ♦r � T y
,
' 4. � \r *' f Y • t s • .t � � r Y' � .'S k � 4'� rl'y, �.- •�
« w y '� ri� •..•i •. ;fir. �+1 n .. , +:.�{, « 4} ,q. 4 , , s ,r a.�'
'.!`,� _ ,. • �. +- •• o .. be Y"{ Nx ' ',, 5 5 .4tit .
It
'pTart 3 Agreement ,,.
:• t +, .•,�._
s„y `.I certify that "the information contained in.this-Fuggitive Dust`(PM10) Mitigation Pl n js true r?
„.land accurate and thiit" all mea'sures:specified in Part 2 will 'be •implemented• during project'F_ ,
• construction. 4 authorize the City'ofLa , Qb i nta 'to enter. the above mentioned property,.,
; •for inspection and/or abatement purposes, and I agree :to` hold` harmless, the City and its
t • ••
' representatives: from liability for any, actions related to ;this :project 1 T ,also-, agree. to
complete the record-keeping requirements included herein as Attachment B, once the,
pro'emhas� been completed.
i k t
ignature �.. w�►er u P . e) ,
:�ec�resentative Y t t
SPAPlt( _ s
, s ; CONSTRUCTION. INC. t
Construction Manager For: r h�
+I have TP_9x f@rk_ 8k?6W9t6f the Fugi6e' Dust (PM 10) Mitigation, Plan -and the' ownei. has ".
F authorized the implementation of all its provisions throughout`project buildout
i na ure o ra ng ontractor or - ornze epresentative ate) ` F
(If not the same as above)
:4 jr�
' , o :.. 4 .` •+, + -fit r + l h, � ` ; S. .
`, ✓ ,:' F 1 • _..{' i"• Y ( r ! . _ ,h dF ?' 'i, .-{ fs .WN,
For City,Use Only, ' r 'r r , : , r�
Based oa all`of the provisions contained in this'Fugitive Dusv(PM10) Mitigation Plan .;, ems,
t the Plan a }
r.zr
'F t L+Nr. jn y �� �f �f
. '14Approved . •, _' ,' t.„;.+
Conditionally approved-(Conditions'specified below)
Denied (Explanation_ attached)" `' `, ° 17
> - Si ature of Ci Re resentative-(Date)
gn , City P F, y
The following conditions`of approval helve been added to the Plan by staff in order to ensure }
K ' pan adequate level of fugitive dust control;' ,-
� � l. !+ „� 'S�' /9�•T/1Zi/�'i/.) (.i�n/►�s��7S��''•-, _zG °r 4 , +.t .A
!rr i �. � •t -,r. - e\',"• .- v .r '' .h 1f _ J I, •'R. 17 �'cr' ..
Attach additional information if necessary).
n ,I have read the above conditions of the,Fugitive Dust (PM10) Mitigation Plan and I agree,
to imp)ent of all provisions at the concentrations a'nd frequencies identified �:::.
.• `. Cj e ' to _ 5� 1� r _t1,3•^
•
Si nature o er o ut orize Representative ate t
.. +.- it + '•, '1. �.. t • • • r i, 'ti' • R ,
' _ Z' 't; ,. • • :. .:. • !.' Yom.
• y _
- . ♦ ° - .,- ¢ q.� air Y A-�.. �a'� T 1 •
CONDITIONS FOR FDCP APPLICATION 98-34:
T.D. DESERT DEVELOPMENT/RANCHO LA QUINTA
TR•28640; 23 ACRES
-
- n r _ • �♦,.-r' - ' ,• '"� ".Ole ' Y. • -
GENERAL:
Y.
.',_�
1-.
Applicant shall comply with all control measures asset forth in the approved
application for FDCP 98-34, and the following conditional measur`esThis dust-.h:r.
-` -:J .
control plan approval shall also apply to any encroachment or haul permit(s) r ; - ' "•
.. �,
,
issued b '- Public .Works. ` . ' . '' •
-2. ' ';The
full amount of security for FDCP 98-34 (as determined by Public Works)-*
shall be available for any measure(s) 7 deemed necessary by'the City to achieve`.,
-
adequate dust control; whether or,not such additional measures'are proposed,
with this application: *Any requests for bond amount must.`
•J
.revisions/reductions
be,made in writing to the Public Works Director:'The applicant shall implement
- '"
all methods set forth herein for the duration of the a project construction.
_r 3. = -
^
Applicant; shall submit copies,of all records related to cost accounting for the
•:
dust control measures assumed during all pre -grade activity andgrading
construction upon any request for release/reduction in posted security: Said ' -
.,,, x,
records shall be submitted within 30 days after completion of all dust control-
ontrol
measures
measures as outlined 'in and conditioned upon theplan. All such records shall `
accompany the completed PM10 Program Report Forrrm,-which can'be obtained
from the Public Works or Community -Development Departments., Com'pl etion -
�`
'of all dust control measures shall be verified by the assignedfield inspector: -•
,
x Y 4.
_ Adequacy of all proposed and conditional ^stabilization measures shall' be.
determined by the assigned grading inspector. The City may require remedial
.
measures beyond those identified or conditioned upon the project, which the
City,deems necessary in the event such approved' measures are not effective.
Enforcement} of these conditions shall be at the discretion 6f,'the assigned'
_
gradin g, inspect' r, vGho shall-rnonitor,and field verify that the spirit and intent
• '°; `3 �,
of the FDCP and its attached' conditions are.,being complied with. Adjustments` `
to application frequencies, quantities and other'aspects of this,FDCP may, be",.. '-
.;
_made ,by tiie inspector, at his/her discretion, in order to assure compliance. '•� -
„
n
.
- 5 t
The contractor /vendor responsible for- provision of all soil stabilizing agents' y V
shall submit the appropriate Material Safety Data Sheet(s), along with approval"
from the Water Quality Control Board, to the Public-Works'Department prior to'
any site application. Application of stabilizing agents must ,be in compliance
with, NPDES and the State Water Quality Control'Board requirements.
6.: '.. Jhe conditions of this dust control plan approval are applicable t6 -the full range
i of` 'construction' operations associated with the entire 23 acres _within 'TRS
°28640; and- shall -.remain -in-.effect for, the duration,'of' all construction z .
,+.. undertaken as part of development approval for the subject property.
Transfer of real property or, -other interests regarding this project shall not affect
'the validityof this plan 'approval. Implementation : of all proposed and : I
conditional measures shall be carried out for the *duration of all, construction
r ., .activity, as applicable. However, nothing, herein,shaII preclude any future party .,
of interest from filing,a revised, FD C P..with the City for any, portion •of the. site.
7. - ,Approval of this dust control plan ;does not in and of itself constitute, or
otherwise authorize. any, site ' disturbance, preparation or construction. , The_
`
".developer-is
developer'is required.to obtain any and all necessary permits and:clearances '
` as set forth- in any development` approvals issued and currently. in effect
pertaining,_to this site. This }includes; any type,of.testing, monitoring or sampling
required as a`conditionof development approval, such -as that conducted for,-,
w, -archaeologic, hydrologic,and geologic reporting purposes.
r _ f• _
,SITE DEVELOPMENT:
-8. `- Any. pre -watering, of areas proposedr for, grading 'shall..be in accordance with
recommendations. of -the .grading'contractor, based on the area soil: conditions- ; ;w
as described in the associated soils •report(s).TAt a minimum, pre -watering time
shall be for -three days. prior to any earth disturbance(s) • '
9.�r FDCP 98-34 indicates that cut and fill will be balanced over the entire site. Any '
transported soils and, stationary storage piles on-site shall be sufficiently
"stabilized, watered down and/or covered 'as appropriate.- Minimum freeboard
shall be as established• b.y the Public Works Departmen. All on and off-site'
r borrow areas shall be routinely ,watered and chemically stabilized after borrow
activities to mitigate ' airborne .dust, as. appropriate pending final grade
completion. n
10., Track -out and other accumulation of soil 'material(s) onto any. paved areas,_
inside or outside .'the limits. of all. work shall', be minimized. Any unpaved
't construction exit/entry points along. existing paved, roads/areas shall be
improved with pavement; aggregate base or similar material, for a distance of
. 120' 'from the -,pave ment edge into the site to `minimize "track -out.' Wet'
sweeping/flushing of soil accumulations from all paved areas (i.e., internal
project streets),'shall be conducted daily,' and kept damp during construction
hours until so removed_ .
;. 1 1�. �• Unpaved construction access and travel ways within the 'site shall. 6e prepared : -
{; for traffic prior to. commencing grading, activities and kept watered down and 3 ,
• ' .Y ' ) ,' to .--\ • • )• ., r •t , ' • M.1 ,� }' [`) • 1f ^• , t• '' .
h, - 4 !
i
` t ti
F- '_'
!- ,. - - .r .� �. '.i ♦ L lit ':
,�.
h
R �r f
'
F i
' j _ - l - . t � S, . !'13 ���� M 'M, 1N ��,� 4 •i Y •
r
r
compacte,d,to 'retain, moisture content during all construction traffic/activity,"
,k
including building,construction.! Track -out shall be removed per Condition, #10
1'2.'If,..approved
fAi t " '
on=site roadways` are- constructed to ultimate:, design
prior�to :
•completion
of `construction activities, then traffic and parking shall,tbe limited'3
'
'to those paved areas as feasible. -No vehicular parking or traffic any�•kind
4 ,
of is
* . J_ `
-permitted,omor over any previously stabilized or other inactive soil-
!,•� _
t . a)..) r,� ta;,. �i:t. h off
13.
•.AII: ,disturbed_ • areas where. no further. grading, construction,: or 'other • land):1
- •
disturbance will occur for at least 30 days, shall be stabilized vvith an f
'
•
.appropriate dust suppressant, as defined in LQMC Chapter'6.1s6,and,approved
by the California Water Quality Control Board, .Region 17. The suppressant shall
^be
applied no later �tha.n four days after completion of.the initial grading; and.,
:staked; posted'or'otherwise restricted, in'.order to prevent any access ori or fi "
..` across! th s' e<areas, ,r
IV
-r'r
I _�•e ,
3
.. y',
t ;'F/�
KLA ...� _ . `aw { .. - r ._ •. '/' .�•..
..-,F
ti
U{
f.
�
-�'
, mak, r•
i.
.. .. e. .
•max,,.:
.. • h6r v �
+r { � .`F .�
."
`�-.. � yi r - .... -
� r r { .y1
x v� � �'r<!E
r
`
• _
F
� « . :. .. i
•
r • • -
3 M r{
rt Vit{ f!2t '
•
(/�{Wy
•.
a.
h,
k,
~
ISSIOM
N
`
_
s
EISENMOMEA
DRIVE
V1 A
�-r- - .
-
.r � 1. _ .
.,.�
to +
,
{
f
� . •.!. ,y... �... -
..
1
.., , Yr. �
•-
-
_
'
Z'�•'
.�,', ; i >� .
'�.•—
CABPIILLO MAT
SITE_` G
•�;-
�
;a;^
;
p
14
50TH AVENUE
�
y
r•
` '� -
y VICINITY • MAP
al
NTS
IN THE CITY OF`LA •QUINTA; r CALIFORNIA r
_
ROUE : GRADING `PLAN s
�• • a �
r �
������ •,
-H' ..
�i . .
PLANNING AREAS
..
4
(780) 34'5-4727
_--. z...
.:. TRA 2.8�f 4
C T : N�0 0
°� -
t ,
at
_
�^ #
IN THE E 1/2 OF SECTION,31.s THE NN 1/4 OF`
•Po -102-70' NEAR THE INT.OF
SECTION 32. T 5 S. R 7 E: SBM
.
' 315.0• WEST ON AVE 50, 46
SOUTH OF PPMT29850. FLUSH -
,Fpa
<7 T.O. DESERT DEV '
M•�-
n
ELEV . -43.772
k. Mt V C'. .;'
[
.
"v2-• _.� S '
T.
„
*i �lr •i�r
'
r
,
--
r ... ,, i
A.
�v
, Y
1 2-,l
• J'
r ` •, ` `• ,�
I
'•• � � w
r, ,
ay'1
'
�; �
•
it I • , t2-
�`
,•
x.
..
� •
f4 { r
� w
r•
� .a'
�_ �
-`q.2-!
y•ri�,y--•
,
r r _�
j'
ay
At
ATTACHMENT A REASONABLY AVAILABLE. CONTROL MEASURES
•t fi ," The deft column contains the sources of fugitive; dust which are-intended'for emission control '
under the Citys dust control ordinance.- The two right, columns 'c`ontacn an inventory, ands` ,
r4 ' description of reasonably available fugitive dust":control `measures for -each of the sources ,='
Please use this information as a,guide when preparing a Fugitive Dust (PA;f10) Mttigatio`n'Plari• E,;;
.. ,�' ' ' ..' f•t _ � .r,' gi R V , . � ,, � • f .. ' . Y • s' , .. ,-� .. ". � # a�7 �. 'rr'.4,. r r ;
" (Source No) Reasonably Available i • ' ' i r:
�' + °" ..ice t* �� d
�0
1
Source •Control,Measures.-w . , Comments
t ; Und (A) Watering o 'Application of•water by means of truck, hoses and/
. ,
Clearing/ or sprinklers prior to any°land ,clearing'or`earth .°� ` • -
' *. Earth- = • ' movement will increase the moisture -content thereby
• movingincreasing stability of'material' a ! }
-o: Once.the initial land clearing/earth movement activities are +'
'complete, a second round,of watering can generate "a thin `+
'crust which stabilizes the disturbed surlacc meas provided
t ' that it isnot disturbed • r '
R' r • i.� dT o Sec_ iirity fencing can be,used to prevent unwanted future
disturbances of sites where a surface crust has".been created
(B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances
Vendors can•'supply information on product application and
required concentrations;'',
(C) Wind fencing'- o Three to five foot barriers adjacent to roadways or urban areas; r
- r
can be effective in reducing the amount of wind blown ' {
material leaving a. site .•a, ,
o .Should be used in conjunction with other measures •
(D) Cover haul vehicles oA, Entire surface area shoo uld :be covered once vehicle is full
?' .(E) Wheel washer's, „ ' . o, Should be placed where vehicles exit unpaved areas onto paved _
areas d t: , R• '�
o System can be adjusted to spray entire.vehicle, including stored~ `
bulk material in -haul vehicles
14
• ' Un aved F Paving o Requires street sweeping/cleafiing if subject to material °
Roads'' accumulation
t
(G),Chemical-Stabilization o, Vendors can"supply information as to application methods and,,",i.
- ' concentrations
=V ,r o Not recommended for roads with high volumes or those used for , f
heavy equipment
• ,r . 1. , M . >. ;. }. F :h
4' t a(H) Watering .' o In quantities to keep surface moist
o'Required application Srequency will vary according to soil type,
,. ,
# w
• , . Bather conditions and vehicular uses*-
ar + - �:R •'� .•. 1 r`•j ' n •• ` ' ;: i �. ,fir, ��e' 7 ; .
` • r. if .,,r 1' h • a.. - : t- "` •+ i'��. �' " ,'A 4 �'•� .
w 1.
I♦ � n'
e. -'` ♦ S{ C.
a��'>Li �'�'.1
r ih.�-�v
..FY
- C 4 n� IL.r
ie, l r
�
- • .. .. ; fi.•,t, �}y
SAS iy/ 4 a
„-
ource No) Reasonably Available ,r
•� Sources
Control Mea"sures
Commm ,• M „'* ."� �4., r "k
��}
' Unpaved
(I) Reduce speed limas'," "
;0 15 mile per hour maximum
'Roads
'' r
, • _° ,f dJ
L: (Cont'd)-
,
•'(J) Reduce vehicle trips
o :Access restriction or redirecting traffic to paved roads`in orrdcr to %, 1 rrY y;
'
.:
reduce vehicle trips by a minimum of 60 percent _° ' "
tF . • t
1
a ,
- - -•f 4 'f • 7 7
Storage
(K) Wind sheltering
o Choices include silos or enclosures-
y``r ;piles
• ,
o Endosures should consist=of;tliree sided barners'equal'to.height of ,�
e
ti
material with no more than 50 percent.porosity-' s
`i
'
(L) Wet suppression
o Application. methods include: spray bars; ho'ses'and water trucks
o Frequency of application will vary, on site,specific conditions
'
(M),Chemical su ression''
( ). PP
o Best for us_e on store a ilex sub'ecti to infrequent disturbances
g P l 9
'
(N) Altering loadin/loadout
o Confine loadin/loadout procedures to leeward (downwind)^side
"
procedures
of the' material
'
o . Most effective when used in conjunciion with wind sheltering' r
(0) Coverings
o - Tarps, plastic; or other material can be. used_ as temporary.
s
coverings
o When used, these should be anchored Co prevent wind from
removing coverings "
'{' - (-- -----,----------------`
-------------- . - F, --------
------, s --- ----------, -- ;------, ---- ----- --' ----- - --` ----' -
• '-Paved
(P), Wheel washers '-'.
o Should be placed where vehicles exit unpaved areas onto paved+`
,'
'Road'
{ ,�
areas
Track -out
o System can,be adjusted to spray'entire vehicle, including stored
bulk'material in haul vehicles
r ..` ''"'-' . •"..
(Q) Sweep/clean roadways
o Either sweeping or water flushing may be used • ` " '' -
R Cover haul vehicles'' .r,
o• Entire surface area should be•covered once vehicle is full.
---- -- -- ------
------ ---- - -- -- ----- —
- --- --------------------------------- ------ -- ----- --- ---- ♦.r
s Chemical
-o Vendors informationonmethods for'application and
• . Disturbed
, (S) stabilization ,
cad supply
Areas/
re_quired concentrations
.Inactive
i
,•'Y� ,. t .,
t
' • 4 Construction,p
4
-
Sites
' Yxx H
(T) Watering
o. Would require -frequent applications unless a crust
n.
,
p ' t• ; r r r'
can.be-develo ed "over the site
(U).Wind fencing ,'
o 'Three to five foot barriers adjacent to roadway's or.urban areas ,
•
can be effective in reducing the amount of windblown
-
material leaving a site
'
- Should be used in conjunction with other measures
o
(V) Vegetation ::.
o Establish as quickly as possible when active operations have
F'
establishment
ceased
o -Use of drought tolerant, native vegetations encouraged, ;
In
r !
stabilization:
,, �a •_`•�
! •' f .,� rc`�3kr �', �
;Chemical
Wind• fencing:
A'ITACHMENT'B F . ;� ,
`
-COST INFORMATION ' `-: f
n
Medium=Large Scale'Construction/Demolition,Projects :'•°'x t ` ;`� 4
'
(Greater than 5 acres),
_
,� , w► }
Fugitive Dust (PM10) Mitigation. Plan '",•..,
s
f
Date:'
5/14/98 � 141
Jurisdiction: La Ru int a" Project' File #':k-
Street', sweeping:
•��' ' -
.. . • , *F mf �iU. < - +' .J. r
.�
a .
Wind_ sheltering:
t +_
4
Y,
In the'space provided below please list.the 'costs associated with implementation of all;dust f
control measures.', 'The information provided below should include all implementation -costs'
± ;(including labor) for dust control throughout the project. Not alNneasures listed below -will
apply to'all projects. �. _
r !
stabilization:
;Chemical
Wind• fencing:
n
4 Covering haul vehicles:
W r t^
_
s
Y,
In the'space provided below please list.the 'costs associated with implementation of all;dust f
control measures.', 'The information provided below should include all implementation -costs'
± ;(including labor) for dust control throughout the project. Not alNneasures listed below -will
apply to'all projects. �. _
Watering: •. �$ 2464.0.
r !
stabilization:
;Chemical
Wind• fencing:
n
4 Covering haul vehicles:
W r t^
Wheel washers:'
Street', sweeping:
41
Paving:
Wind_ sheltering:
t +_
4
Watering: •. �$ 2464.0.
r !
stabilization:
;Chemical
Wind• fencing:
4 Covering haul vehicles:
Wheel washers:'
Street', sweeping:
Paving:
Wind_ sheltering:
t +_
4
Vegetation reestablishment:
4
- N
4
,a
"After project completion these records, shall -.be transmitted to_* the,, City where the
�;J grading /demolition permit was -attained and to ' the Coachella Dalley.' Association..'of
.Governments (CVAG) at the address provided below.�-
,' , 4 PM10 CostfMonitoring
Coachella • Valley Association,of Governments -
�.• 73-710 Fred Waring Drive, -Suite 200
Palm Desert, CA 92260 ,.: • Y
1All projects greater than one half (1/2) acre are also subject to SCAQMDRules;403 and
LL , 403.1.
x• r' i1.!.' � jam! ♦ . ( - t - .. `. `�` • t f ♦ 4r ♦ S ..
Ak
78-495 CALLE TAMPICO — LA OUINTA, CALIFORNIA 92253 - (619) 777-7000
` r"c FAX (619). 777-7101
May 10, 1994
TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS
IN THE CITY OF LA QUINTA
RE: PM 1.0 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL
PLANS
Dear Developer/Builder:
The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992.
Among the required control measures was the enactment by Valley cities of dust control ordinances
.which require builders to implement dust control actions during construction, demolition and paving
activities: In conjunction with City staff members, we ask your help with the reporting requirements.
A significant aspect of the PM 10 Program ,is the need to report statistical information to the Federal
Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources
Board. In response to this requirement, a Dust Control Reporting Form has been created, a -copy of
which is attached. It is requested that if any project developers -have amounts to report for any PM 10
mitigation, these forms must be filled out. This form is intended to supplement Attachment "B of the
Fugitive Dust Control Plan by providing specific cost figures related only to dust control measures.
The South Coast AQMD has requested that the retroactive operative date be January 1; 1993, for
reporting purposes. This means that each jurisdiction is.requested to review projects since that date
where PM 10 control measure expenses have been incurred by developers, whether or not they have
been incorporated' as part of a Dust Control Plan, and forward this. data to CVAG as soon -as practical.
Your cooperation in completing these forms as part of the grading permit 'procedure will help assure
that the Coachella Valley and the development. community as a whole receive deserved credit for the
effort to attain Clean Air Act standards for PM 10.
Very truly yours,
RRY HERMAN
Planning & Development Director
JH:WHN:bjs
Attachment
MAILING ADDRESS - P.O. BOX 1504 -. LA OUINTA, CALIFORNIA 92253
PM10 Program Report Form
.I.', c22CMaL nCFCRMX=OB
Project Developer Name:
Address*:
Phone:
Project Site Project Title
,
Address:, Tract No.:
.,,Acreage:
Grathnq Subcont-ractor if diffe-rent)
Name:
Address:
Phone:•
PEASES? MM NO
;
I. so how many?
Tyne of Development/Project: Commercial
Single Family_
?Sulti Family_
Demoln itio
other.
`
Date of Project/Phase Star` -de: Date of Project/Phase
Crmtletion:
IZ . COST nTFOP1QTIO3 .
If actual costs are not available, please
estimate to the
best of your
ability-.
1. WA=R: Amount:
Total
Cost:
2. EQU7MU T COSTS:
A. .Water Truck: Number on Site: '
Total
Cast:
Hourly Rate:
Hours:
B.- Street Sweeper: Number on Site:
Total
Cast:
Hourly Rate:
Hours:
,C. 7znmporarq Irrigation:
Total
Cost:
D. Wind Fencing:. Linear Ft.:
Total
Cyst:
Cost/pt.
B. Cbemical'Material Stabilisation:
'Total
Cost:
Sq. Ft.:
Cost per Sq. Ft.:
F. Vegetation Cast: Material:
Total
Cost:
Maintenance :
G. Other: Type:
Total
Cost:
Hourly Rate:
-Hours:
3_ LABOR CAST: Hourly Rate:
Total
Cost:
> Hours:
4. aDMI2aSTRA7I0N COSTS:
Total
Cost:
III. TOTAL COSTS:
add items I - 4 for total cost.
TOZNL COST:
?TLZASE RETURN ?CRM AT COMPT. TION OF PROJECT
OR ?EASE' CR eiNNUA . Y FROM TEE
DA's' OF ?RO-j-r-CT/?.ASE START QP. .
3131/94
3
Il ' ••�. -1 xft' Y Y., !' ; y' , ;` '•`..� F. + -{ f _ - 'r't"# t �4, y-:,, '.
Loll
'�. O
1 , F
;MEMORANDUM- OFI
Aj-
}r sP ti , •;. ; ,
TO. fr Saundra Juhola', City Clerk
' FROM: Marcus Fuller, 'Assistant Engineer. I
DATE: 'k June 12, 1998
' RE: ,Trach 28640, Dust Control Security
,t
'z' � _ T ^• ^ti.! � :. a j• ,.� t" • - - w: .{. .,.
x s° "Please hold the attached, letter of credit, No. 1255, in the amount of,$23,000.00; required as�dust , `r
r'control security for Tract 28640 at Rancho La Quinta. 'Please hold this ecurity until advised ;
otherwise by this Department:
t kcc* Permit 2754
u . Tract 28640 File 11
v- ����`�� aj .'t.'� .. .. .^�'� J.'•'f.r• .. ,a � - �� .'�. ray ,�.! v •
;;� '': 1 - . , sr._, •'� it �`' { � - �
Lis.
���r y t e �'. of •� V` .r. •' � _ •'t .. • •- . •t �f 1. a_• i.
'*�'+ � �r �� � ; $ .• �>t " t {r. a^ •'r, �+, , � � .1 r .ark � f t •fr.. .
Jh
•tom t' .1 • �' +" ._e ~. •i •.. J ! i� � � ,�+�- t' � -
✓, ,+{ � ',7 1,�, '. .,'i • M 1" ... . y •_ '' i. ; .tip t t .t L
{,
d
F:\PWDEPT\STAFF\FULLER\MEMOS\1998\980612a.wp
• ' - it .� A, a.T�,r - +. .t.' ,_,t •" '# ` ` ..y.. 't,�+,z" ... . ��`t\Y y r xl-S� y .' '� • '
f b v ., F ff ♦ i r r l
PALMpESERT
TIONA�
^ ` t ' f r � ,{f ' ' � t+ 4!• '. '�' , r � � r c, ; �� ! ft, mss' � ' ,'
kiep
w r , •- - ,. �, - * • � � a•" , T � �'. " � +'mow, 6
.r!` •• •'A44' f , ■• r,yl . •1. •iti - '•y 4N• ,..
• - may: r.. - _ ayy. - � rv.- {. -
Ma 18, 1998
jIRREVOCABLE STANDBY LETTER OF CREDIT NO. =1255 `
�' - f .• e
71
^, •. v q
or t
Beneficiary: Amount: $23;000.00 f `'��
�f City of La Quint,
78-495 Calle` Tampico
,. La Quinta; CA .92253
' To•Berieficiary: _ t' t. f
' -o :We hereby establ_ish.`our irrevocable•Standby Letter'of Credit in your favor; yby order
4 . t r
r ; of T.D.'Desert Development Limited Partnership, (TDDDLP); 530 Beacon' Parkway.
` { " W: #800;" Birmingham; Alabama 35209...,
'-~ tt•o The.amount set'forth'above will be available to you by submission of your,Sight
Draft(s), through proper clearing channels (consuIv our°bank); accompaniedrby this
} . , t ; original..Letter'of., Credit and.beneficiary s officially=signed-statement certifying fiat:
T.D. Desert •Development LimitedPartnership(TDDDLP), a Delaware Limited Partnership, has failed to-
' perfonm'the dust abatement for rough.grading of Tract 28640 adjacent property known as Rancho La '.. • } ' `
Quinta and that TDDDLP. has been notified itiwriting of the failure to perform at least ten (10)' days prior.
' to'drawing(s). , t w ` ; ' 4 `' S'•. ?. ,
q This letter of credit guarantees that all oi•'any portion of the: fluids available pursuant to Letter of Credit No. '
• .. `. 1255, will be paid upon-•the written demand of theCity and that such written demand need not present
documentation of any type as a condition of payment, including proof of loss.
3
Each draft must state on its face, ",Drawn under Palm Desert'National Bank Letter.'
of Credit No. •1255 dated`Mayl8,-`1998:
1 Drafts, may not be presented >for purposes which pre-date this Letter or, under any
i - Circumstances, later than the. expiation of the Letter on'May 18, 1999. *--This
Letter o'f Credit shall- be'auto`matically'renewed fora like term until such time that -
4 ` the City authorizes its expiration or until',sixty (60) days after the _City. receives. -
' notice from the financial institution of intent to allow the expiration of the Letter of y
r - r
Credit., This Letter;of Credit;is transferable only upon,our prior approval and', _
payment of an appropriate transfer fee:: '
- • fl• -} v: yam,..
A ' 13-745 EI Paseo, Palm Desert, California 92260,(619) 340-1.145
*. i _tom