'SPECIAL CONDITIONS--PERNIIT NO.2781
- --- CenturyCrowell Communitiesi
In
addition to the standard permit conditions, the, following shall apply:-
1. " "Pursuant to'Section 14.16.320 of theta Quinti Municipal Code (Ordinance 10 § 1,(part),4982), all r
• work shall be performed. in- accordance .with the latest edition of the Standard Specifications °For
" Public Works Construction (SSPWC) and as directed•by. and to the satisfaction of the City Engineer: '
2: - Century, hereinafter referred to as "Permittee.", shall be responsible for rovidin._, continuous dust
P P g
and erosion control: ' ` f
3: Streets shall be kept clean. They shall be completely cleaned at the end of each'wbrking day. and.
• mole frequently if required.
} 4. Pursuant to Section 6:08.050 of the La Quinta Municipal Code (Ordinance 18 §J, 1982), throughout
.the work site; the Permittee shall comply, with City` regulated work hours`; Operation jand:
maintenance of equipment within one-half mile of human occupancy shall be performed oily: during
the following time periods:
•s
`A. x October l st to April'30: Monday -Friday ." 7:00 a.m. to 5.30 pm. -
'' Saturday X8:00 a.m. to 5:00 p.m:=
May, 1st to September`30: Monday -Friday 6:00 a; m to 7:00 p.m..
Saturday, '. 8:00 a.m.•to 5:00 p.m. vy T
Work shall be prohibited on legal holidays and Sundays.
�' .., sift•'. .,
J
c ' S. '; Work performed within 500 feet of a signalized intersection is restricted between the hours -of-9 a.m.
r
' • `. - 3 p:m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall -
t. x.t
.contact the Riverside Country Traffic Signal Maintenance Department at (909),275-6894 if signal. `
operation'at the intersection is,to be altered in any way. - - -
Pursuant to Section 14:16.110 of the La Quinta Municipal Code (Ordinance ,10 §1 (part), 1982)
Permittee shall assume responsibility for repair,of any pavement damage'to:any public or. private
street and for any damage to othei'City streets or facilities as.a result of work performed under this ' z
,w permit. r _ S ,
7. ' • �Pursuant,to Section, 14.16.250 of the La Quirita Municipal Code (Ordinance. 10 § 1 (part), 1982);,
L. advance warning signs and traffic control shall be installed and maintained in accordance with Cal
.
,Trans Standards or the Work.Area Traffic Control Handbook,(WATCH Manual). A traffic control w
plan,' if required; shall be prepared in accordance with the. WATCH -Marival and submitted•to.the '
City for review rand approval one (1) week, prior tb starting any construction." It shall,be the
' Permittee's,resporisibility to appropriately detour and barricade. all construction sites.
'* +.
SpecialyConditions'- Permit No. . 2781~ �" - 4 '' • • +,. + Page 1'o 4 F we t
`` �' -,• SPECIAL;CONDITIONS- PERMIT,NO. 2781 ' .?
' -- Century ;Crowell Communities---'.� '' r' ,` ,•' j
�j ,8. -Pursuant to Section 14.16.290 of the'',,La"Quinta'Municipal'Code (Ordinance 10�§ 1r'(part),'1982),
- street closures shall not,be,-permitted.- A minimum of one travel lane ofpaved surface `shalfbe w:
.maintained with fla -
g'all times:
. - '} � :'+: . •. � .. � ; • .' . , it ' 1 J i
• *
'9.,, ' Prior fo excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It sliall be the Permittee's responsibility to"notify the Public Works Department of anticipated
. excavation which'impact City'facilities, including butnot limited to traffic signal con_ duits and loops,
irrigation lines, electrical conduits, and storm' drain facilities. r `: r • '' A
'". 10:' : Should additional work; materials, or modifications`of the work be required in order to'meet`City x "
'standards, safety requirements, signage requirements, or fit actual field'conditions, the work shall ' " " • `
be performed by the Permittee as directed by, and to the satisfaction of the City, Engineer at no cost: =
k. r to the City of La Quinta., ''. • , ;` +a
•11. Pursuant to Section 14.16.:370 of -the La Quin
ta Municipal Code (Ordinance 10 § 1 (part), 1982); •. �'.
backfill compaction within street rights-of-way shall conform .with Section 306-1.3.,of,the latest
-r edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
'1 specified herein: Y•, ,
'Native material may be,used as backfill material provided that minimum compaction; achieved in'
the manner prescribed herein; is achieved. `Backfill shall,be performed by mechanical means` no
3s +
water densified compaction -via jetting'or-flooding or -other means shall be allowed:• It shall,be the
.Permittee's responsibility to provide appropriate geotechnical supervision; testirig;'and inspection,
-- onsite, at ail times during backfill operations. ";• - r
' z Backfill compaction "shall be achieved by the following conditions
A. " When a firm foundation'is not encountered due to soft, s on or other'unsuitableYmaterial `� -'
p gY. � '
r �•'• such material shall be removed to the:limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled witl.pipe bedding material., a Y"
r a '�. S r -' + `' - ,6, ' ' ,. -. ; ,� r ti -.• , t�• A, - ,.:.� • ' 'r
•;B. Backfill materials, shall',be"brought to or maintained at.a i appropriate moisture content for '
compaction. The appropriate moisturecontent range'shall be established atthe onset of.the .
- - project and ensured:prior to use of the materials through progress testing on the stockpiles. '
C. The first length of trench,backfilled shall be backfilled in the presence of thef City hispector:
Compaction shall be tested at random depths at approximate three-foot vertical intervals as.• ;;
backfill is placed'to ensure,the effectiveness of the compaction methods and to establish the
• •; depth of lift that. can be compacted.
- ; D. 'If lifts greater than one .foot are attempted in this trial length of trench; compaction tests''shall
` : ,betaken within the lifts,to ensure that the full depth of the'lift is'compacted. Upon satisfactory
completion of this portion of.trench;'the-City Inspector shall-, establish the,maximum'lift
• thickness to -be compacted for the remainder of the project:
%' Special Conditions '
-Permit No. M I • - 'Page 2 of 4
- '•r •."�•'w/. .. • 'A - + ' •, ~ . . ` . • J ' y r 1 � r : �= * f. S Y-ai V f � } �.
`l '• • ` • , S Y S • , S Y ' '
` ~ SPECIAL CONDITIONS--PERMIT. NO. 278L
Century Crowell Communities ---
•• r • ' .. '� '. �, , '• ••, r , - ` ' •. ''• � •,{i. .ren,,,,. •f.# t
�F°: In subsequent lengths'of trench, "the frequency of compaction tests shall equal one.,per each'lift
_ of backfill, per 300 linear feet of operi trench, at randomly selected locations•within the,open }
'le
hkth of trench.
G.,-..,The•depth of the randomly selected'compaction tests shall also be randomly "selected except -,"
that where multiple tests are required in a given length of trench, the tests-shall be no closer `
than.three feet (vertically) from`
each other .
H. " . If any-compaction test fails' previously placed backfill_ (in the same length of open trench or
P 'v
.': .previous lengths of trench) which.is represented by the failing test (as determined by i e City . µ
" Inspector), *shall beFtest_ed for compliance with compaction requirements.:-'.
L All costs incurred due to the conditions above shallbe borne by the Permittee: - Copies of all ,
test results shallbe furnished to the City Inspector.
_ 12•. + All excavations within City. of La Quii6 right-of--way shall be backfilled; and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
`n the City Engineer for the protection of th6,public. Lengths•of open trench shall not:greatly,exceed ,
that which can not be•backfilled in the,same'day. Excavated trenclies'shall not,be allowed open
f overnight, however, Permittee may. leave a length of excavated trench, not to exceed'twenty (20) feet
An length, open overnight at a point where construction will begin the next day, provided that this.
length of trench is completely covered by steel plating.
r u
'-
..13. All landscaping, irrigation," decorative'rock, decorative concrete, lighting, etc.,tlshall'be replaced to' .
its original condition:``
14 Access and-,egress to all local properties shall be maintained at all times.
15. ' Pursuant.to Sectiori 14.16.375 of the LaQuinta Municipal Code (Ordinance 10'§ 1 (part), 1982);"',,
_ permanent pavement replacement•,shall be completed no later than seven (7) "days after "the
v�{ completion of `the work:,- Permanent pavement replacement shall' conform -to the afollowing ;
conditions: • `a.
AExisting asphalt concrete pavement shallbe sawcut one (1) foot beyond trench edges.. Edges=
y - shall be straight and clean.
B:.: ; Permanent' pavement replacement structural section, within all trenches, shall be 1" thicker
than existing of asphalt concrete over the same existing thickness of crushed aggregate base
F or crushed miscellaneous base, meeting the requirements .of Sections 200-2.2 and 200-2.4 of
y - ,the Standard Specifications for Public Works'Construction. The replaced pavement and base
- r material shallbe compacted to 95% relative compaction and'i•.espectively tested, for each 300
linear •feet of trench. •Verify exact structural replacement section thicknesses with the City , -#
prior. to. installation.
Special Conditions - Permit No. 2781 Page 3 of 4'
- °CRs r- ... 2 F ' ";,. ` - .. , -..Y r .t,• `s. t .s -! 'r4 ,.
1 ' \ • 1e •,•F • , r�. � y Y .. < •� • a n. ' ./.. ^, L . k •, 3 � t e f
• SPECIAL CONDITION --NO.
- ` � �.• � ._:. � r... , _ S PERMIT 2781 , .. _ u •� ., .J".ti
Century Crowell•Communities -
Y x; C: .4 Perminent.pavemen.t replacement shall -be installed using,a City approve 3111''max metdium,,
` - asphalt,concrete as.the base course lift and a City approved `'/z" max medium finish course lift--
ti c a ,,
;'- for capping. Asphalt concrete mix design shall be approved by the City prior to its'placement.
sD:. : For transverse Vinches across improved streets, 'the.existing pavement surface,three (3) feet
on.either side of the ekcavated trench; shall be cold -milled to a -depth of.0.10', with a "butt"
joinf created along each edge o f the cold -milled area, and a new 0:10' lift• of,'/2'' max medium F=
asphalt concrete pavement overlay;applied throughout the cold -milled area:
J
-'E. 'For longitudinal trenches within improved streets, the -existing pavement surface, throughthe
'l wi wicold-milled, -.
ane dth thin lane line stn in
shall be
. ( ), to a de depth of 0.10 ,. with a butt ,
P g
p
• " joint created along each edge of.the cold-milled'area, and a new 0:-10' lift of/2" max medium,
asphalt concrete pavement overlay applied throughout the cold -milled area.
F If grinding and cappingf operations . are not performed in � the same day V as base paving , ; -
` :operations, the base course,lift'of 3/4 max medium asphalt concrete shallbe,installed from ,
= saw -cut edge to saw -cut edge flush with the existing street surface. The -base course lift of.;
paving shall not be •left 0.10' low in anticipation of grinding and capping;
F. Any existing lane striping affected by,this resurfacing shall be 'replaced in . kind by ,the ,' ±
Permittee,las directed by and to the satisfaction of the City Engineer. Affected traffic signal "• '
a , loops shall be removed:and replaced in-kind: The finished pavement surface shall be'smooth
consistent; and shall conform to the surrounding grades.
J
X16 ; Permittee shall notify the City of La Quinta Public Works Department a miriurium of 48 hours prior s ;
4 s to commencement of any construction at (760) 777-7075. '' .,`�..� • �"
{,17." �, Permittee shall , stabilize any.- soil that was disturbed }(shoulder areas, etc.) ' as a .result of work•
performed under this permit with an approved dust control treatment.
Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982) the City
has designated certain city, streets as Truck Routes. The weight limit for restrictedstreets (Le.', streets
9 4
7.'not part of the Truck Route network) is three'(3),tons; bucksexceeding the weight'limit may use.a
restricted street if rriaking'a delivery or pickup on the subject street, or -if this permit specifically
ants permission to use the street to deliver street construction materials and/or a ui merit.
- °
19.'* The City of La Quinti reserves•the right to'revoke, suspend or'void .this it.at any time.
-, 20: Stock.pileTshall not exceed �3' in.total height from the existing surrounding area.% s
t R-3
« 21. Stock pile shall be permanently stabilized with an approved' material at the completion of the
operation. - . ' _kA
{. r A•
T ` Special Conditions - Permit No. 2781 Page 4 of 4'
�i. is i ` • ,z.` .. v. � ' F • .- .. •' � 'k.' ('� .1.. , ' r ,' ..
r �"1 �`� •,�1 .t. ix s. -� , , -. •i ' r r 'II �•'•=a ra.,. '1 ,t :N •r
Small Scale Construction/,Demolition Projects, (5 Acres or Less)1; "t}. a •
Fugitive Dust (PMIO) Mitigation Plan
• .. 7-9 2�:299
Date:' C /� 9�� -'Jurisdiction: .Q File #' FDcP 98-3� '
G
r •' , Part 1 Project Information d `
y ,: ,
Please provide the, information below as completely as_possible even if it.has already.'been~ '.
provided- on: other forms related to this project. Failure oto,,provide complete infoimation or
Fave Dust (PMIO
)Provision of inaccurate information•maY delay the processing ofyour . f
Mitigation Plan (Plan): It is recommended that you submit your Plan concurrent with,your.
grading or demolition permit application..,,
Project proponent: Ce►'1-iv2 Gp,ow=-tk:r'C, y'I T- (( ;;':-'; .L .
� V% V%1.
Address: • is'�S So.�7N 7 _ r
x w
Day.phone numbeO: 3 )1 ^ . Emergency phone number:(-140 O'
—S t
Grad ng`contractor (Contact Person):, rr ° ' �N C
Address: :(o rDTtt2%\/ctt,SID-e CA, g2So`�
Da hone number. q a9
Day p i �. X09 l9 Emergency phone number:
Construction site street address: �•
Construction site locations 'S�wGY °F T�/'.4 Z �r2 239-3s
` y ,
(Please include an 8•S x 11 location map)'. s&£
-.+:.—•y..;_ ' _ —� _. rte-, r . - - •,, .
,Construction site assessor's parcel number (Tract
Parcel (Tract) size:., S Acres or ~ Square feet e
Anticipated date of physical project initiation:
Anticipated date of project completion: ~ r
Anticipated costs for• dust suppression: 1-2 v62 `
(Attachment B - Must also be completed and mailed to. the appropriate address when
construction activities have been completed)
1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 ana
403.1: f
•
T
R
6
e r
1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 ana
403.1: f
:4 a.. Z,,. _ t. • " s i' - r a. f < 'i1 y,f, �'!J � � T. .il
4 CC�[1[.,
Part 2 ``Fugitive Dust Control Actions ..;'
From theinventory'of fugitive dust control measures provideain Attachment A, please indicate
which measures are to be.implemented during the project by placing the letter beneath: `the ` • ' '> Tx'Y
- fugitive dust sources , listed below. - Please indicate at which ' phase the.,ineasiire will , be ,
�`. implemented, either at -,-Rough .Grading (RGf, Finish Grading (FG), -or Final Construction f,
(FQ. Demolition projects should only indicate measures in the Rough Grading (RG) column.
" 'After indicating what measures are to be implemented, complete the "Details section. by
f. Y describing flow and when the measures are to, be implemented:
RG FG FC Details (ex.; frequency of application, number and type of dust control implements, etc.
_f Please' be as s*iric as possible)
°! Unpaved Roads r °
,� •- 4 , ` V Y� ���� J t-' ' `ILv`.\� _�O �r� ��`t'.S V/ �J F � �% t • . y � � r �.
r .
Cot eTto MC;N £04 �7"i— c:D ✓c gD,�r� S
� ' �' , ek ! ;� • '. � t, ' moi.}' � ' r'v.
wA I N t, A,.:.�
`��. c ? _ - � - . - ' ` � - " . �. , •L. • - ' ,ice ` :% } t r •
i S r ♦..
.Storage Piles
OG. IL ' 1J I�AJQ QC� M�•�, 1� ! x '�
• E - '1 a �. GO N'�1 iy UDy S c �5�. -tN A �i� T�'�-2. � C K
" ,► elf. ^� i= � .. ^" � y C '+ i'^re . ` • a',, • -' - i � ..
Paved Road Track -out
Iw / 7f tt =a.,ic,g- -tc., i3sz c�SE� ! -� wasv-�' � r J
! • r. _ ":S'�(L��� ; J .A iL GOM ip
''r�•• � �— La'b�,� .� �• . t - ". i� .ice.,
141
.. `: Err 0 • 1 .,. C . - • _
,: - _{ Fx..M j`, ♦ r.
♦
RG TG' FC - Details (ex.: frequency of application, number and type of dust control implements etc:
`• ?
Please be as sMific.as possible) '-
,Land Clearing or Earth -gloving �•
tG Ty cU S E pyy T2
-I �- - '.t, .3 ti,' • ^
e..
- ., * t� tom••
'
^ y
Disturbed Surface Areas �: s •� s* t` cis r'{
' r ., ♦
�— 4T4 cL 72vc_ L r ger r L)SeZ D OJQZ N v
Tart 3 Agreement
~ r
I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true
and accurate and that• all measures specified in Part 2 will be implemented during project
♦ ''
construction. I -authorize the City of La Qu i nta 'to enter the above mentioned property',
for inspection and/or abatement purposes, aril I agree to hold harmless the City; and its
'representatives. from liability for any-- actions related to this project.' I also agree to
complete the record-keeping requirements included' herein as 'Attachment B once_ the
'
project h n mpleted.
AFS :_'
., , (P /.7 � • � r,'• �, '� {
'�
ture o r ut onzed Representative ate
t
Y-
' �„ •? t
I have read the onditions of the Fugitive Dust (PM 10) Mitigation Plan and the owner has ?
authorized the implementation of all its provisions•Ithroughout projectbuildout.'
,
i nature o , ra + ing ontractorate
not the same as above)
r _nAr
h - • .. ,. � ,. '-A : jam.. t .•
M
� .. T ti fir' .. f' r '
i.*• •'
,� 1' k7,
- L
=�For City 4Use Only4<.1� ; �'�•e
•' .T t ' ti • . { S .s ti) t ,1,�
,Based on'all of the provisions.contai.ned in this Fugitive Dust (PM10) Mitigation Plan" .,
the Plan is , . .
APProved
• ;# , ` Sy V Conditionally approved ,(Conditions specified below)
i � i+ ice: 'T• .. ' , , ` - s .1 ''r.
Denied (Explanation'attached)
• L T `� { Y F4. V :?r'q,
"Signature of City Rep°resentative (Date)
' The following conditions of approval have been added to the Plan b' staff in older to ensure "►
an adequate level 6f fugitive dust control., t ' ' - "•'
r
• •£ A�v%'l Z/•, `'L7'!��/%%CJS-t •• y {�R ' y -� !'{Y
. S' _ �r ' 'P'� _ .♦ • � , '' ter.
ii�t b�.� ' � ;` _ ,Y _ ,' 1 . �• � ,' 'r .- it ,, , N:.� -
(Attach additional intormationdf necessary
I"have read the above conditions of the Fugitive Dust (PM Mitigation Plari and.I agree.',
to iinplemerit all,provisions at the concentrations and frequencieSL identified.
o wner.o ri a Representative ate ► "`.
'+.
' a y + T' .. = iy .. j. Y� 4 '• ! fA4f Nk * L '. t
'.. ATTACHMENT A - REASONABLY-AVAILABLE CONTROL MEASURES
F-T`he left column'contains the sources of fugitive dust which are intended for emtssioncontrol
• sunder the Cits dust control ordinance.. The two right columns contain an invento ;.a•nd�u ;+:,a
s ;description of reasonably available fugitive dust, control measures for each of the sources.
Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan: �,F,�; ° `
t •P w
(Source No Reasonably Available i; " ''•
Source' Control Measures Commenter
A Watering o Application of water b means of truc hoses and/:,".`� • }
:Land O g PP y k,
Clearing/ or spiinklers prior'to any land clearing'or earth.
Earth-
-movement will increase the moisture content`thereby
moving increasing stability of material _
' o Once the initial land-clearing/earth movement. activities ^are
complete; a second round of watering can generate a thin
„ - crust which stabilizes the disturbed surface areas'provided• w
that it is not disturbed
o Security fencing can be used to prevent unwanted future ' „v 43
- - 'disturbances of sites, where ',a surface crust has been created `
(B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances
o Vendors can supply information on product application and"
i required concentrations J
'.
(C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas .
ah; , can be effective in reducing the amount of wind blown'' ,
material leaving.a site `
" o Should be used in conjunction with other measures .
f (D) Cover haul vehicles o,Entire surface area should be covered once vehicle is full'
(E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved"el j
`
areas
! o System can be adjusted to spray entire vehicle, including stored
' bulk material in haul vehicles r "'
(2) . f
'Unpaved (F) Pavingo Requires street sweeping/cleaning if subject to material - = _3 • '
Roads accumulation f
' (G) Chemical Stabilization o Vendors cat supply information as to application methods and . '
' concentrations "
o Not'recommended for roads with high'volumes or those used for
^=' heavy equipment .
(H) Watering o In sufficient quantities to keep surface moist
o Required application frequency will vary according to soil type, i
weather conditions, and vehicular use r
` • -f i ;3: � ~• '. , n, L. a i .t 'y�'a a r3 ... ;`F
(Source No) Reasonably Available
Source Control Measures
Comments
(2)
Unpaved (I) Reduce speed limits
o 15 mile per hour maximum .
Roads
(Cont'd) (J) Reduce vehicle trips
o Access restriction or redirecting traffic to paved roads in.order to,
,reduce vehicle trips by, a minimum of.60. percent
---------------------------- ---------------- ---------------------
------------------------------------------------------
------------------
Storage (K) Wind sheltering
o Choices include silos or enclosures
Piles
o Enclosures should consist of three sided barriers equal to height of
material with no more than 50..percent porosity
(L) Wet suppression
o Application methods include: spray bars, hoses and water trucks
o Frequency of application will vary on site specific conditions
'(M) Chemical suppression
o Best for use on storage piles subject to,infrequeni disturbances '
(N) Altering loadin/loadout
o Confine loadin/loadout procedures to leeward •(downwind) side
procedures
of the material
o Most effective when,used in conjunction with wind sheltering
(0) Coverings
o Tarps, plastic, or -other material can be used as temporary
coverings
o When used, these should be anchored to prevent wind from -
removing coverings
-----------------------------------------------------=-------------------------------------------------------------------------------------
Paved. (P) Wheel washers
o Should be placed where vehicles exit unpaved areas onto paved
Road
areas
Track -out
o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(Q) Sweep/clean roadways
o Either sweeping or.water flushing may be used
(R) Cover haul vehicles
o Entire surface area should be covered once vehicle is full
------------------------------------------------------------------------------------------------------=------------------------------------
(5)
Disturbed (S) Chemical stabilization
o Vendors can supply information on methods for application and
Areas/
required concentrations
Inactive
Construction
Sites
(T) Watering
o Would require frequent. applications unless a crust
can be developed over the site
(U) Wind fencing
o Three to five foot barriers adjacent to roadways or urban areas
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(V) Vegetation
o Establish as quickly as possible when active operations have
establishment
ceased
o Use of drought tolerant, native vegetation is encouraged.
4, k •i . y -ice y '• � - at � � ,
' CONDITIONS FOR FDCP APPLICATION 98-36:it
CENTURY-CROWELL COMMUNITIES/ED KNIGHT
TT 27899 (MARBELLA), APPROX. 1 2 •AC:
'STOCKPILE PERMIT,',,
t - ,5 r w y e' }•.+y mss, �` a
G N� L: .
1.. Applicant shall' comply with all control measures as' set forth -,in the approved'
• application for FDCP.98--36,.and th`e following conditional measures. This dust `
' control plan approval' also applies to any .haul/encroachment permit(s)issued
by Public Works -for `this site:
` 2. The full•amount'of security.furnish_ed,for this FDCP (as'determined•by Public
Works) shall be available for'any measure(s) deemed'necessary by the City to
,y 4 achieve adequate dust control; whether'or-not such additional measures are
r. included in this' application. Security shall be in the form. of anon -expiring `
Certificate of Deposit or a self -renewing Letter, of Credit. Any requests for bond
z _ amount revisions' must be made in Writing to the PublieWorks 'Director.'
3. Applicant shall submit documentation for, -all costs incurred for -dust control
measures assumed under this approval.. Records shall be submitted within 30-
days
0 days of completion of, all dust control measures outlined'in and conditioned r
upon the -plan, or'rupo`n „any'request for release/reduction in posted security.
'_ Documentation shall,include a completed PM10 Program Report Form. _Securityv
may be -withheld pending' submittal of this iriformation'. Applicant shall have F °
completed all dust control measures, as verified by the assigned field inspector; -
,, prior to, release of .any posted security;
4: The contractor/vendor responsible for provision, of. any soil stabilizing agents
shall submit the appropriate Material Safety; Data any
along with approval' .
.- from the Water Quality Control Board,•to the Public Works Department prior to
-any --site application.. Application -of, stabilizing agents must be:in'coM' pliance'
with NPDES acid the State Water'Quality Control 'Board requirements.• The',soil.__ ;
r stabilization proposed with this application. shall meet requirements for a`dust ;
r
-suppressant ,as defined in Chapter 6.16;of� the LQMC, and shall be approved '
by the California' Water Quality Control 'Board, Region 7. '
:5. ' Adequacy of all -proposed and conditional control' measures,shall, be` determined. `
'by the assigned grading inspector. The -City may°release _`a portion of ' the
r i "bonded amount to'•the, applicantJor,any remedial -measures which 'th'e City,
deems necessary, •in.the event that approved measures are not effective. ry
E•nforce_rrment, of these conditions shall be at the discretion of the,: assigned,,'
- 'grading inspector, who shall .monitor,,and field -verify that the spirit and intent
-�. r - t. r: i, _ , r ., .a Y � • 'f ` »* - .. F .. - ^, � ,t .F-• ^� a .'�'f
of the FDCP and its attached conditions are'bein'g complied.with. Adjustments .~ -
,
'
to, application freq uencies,;,,qUzi ntities and, other aspects of this' FDCP ma bey `° • T'
madetysthe inspector, at,his/her discretion; in order to.as.'sure compliance.
d 6.-'
-Transfer of 'any, real property,or interests with respect to' this will 'n =
,
r,
,other ,.project
.- � have no effect ori the .validity'; of this plan approval or conditions:'
;�•
Imp.lementation'of'all measures'as=proposed and conditioned shall•b_e carried'
"out -for the duration: of, all ;construction 'activities, to the' extent� they'. are `Eb• : a
applicable.- However, nothing herein :shall! preclude any future. interest from
filing arevised FDCP, with ,the .City for the proposed activity..
•
y � _ �
7.
Prior toissuance'or', release of any permit authorization' to stockpile, 'the .
applicant, shall submit proper documentation, to demonstrate permission from
the owner�bf APN 604-061-009' 6 utilize that' property, for the purposes set out # '
y
in this FDCP application: �. ,�..
' 8.o
Approval off this' dust- control plan doesvnot constitute`or otherwise authorize" y
'
any site. disturbance, preparation or construction. The developer is required!to,
obtain all necessary permits and clearances as'se't forth in,any. development ' • '
approvals -issued. and currently in effect pertaining to this site. This includes
any type, of t'esting,' monitoring,• or sampling , required as a _-condition `of. -
;"
development approval, such,as'that'conducted for archaeologic, hydrologic, and
geologic reportirig (purposes. No:removaf; spreading or other disturbance of
-.
soils' on this staging,area,_ or *of 'the entire Catellus -site in general,,shall be
;
permitted until,an approved Fugitive Dust -Control Plan (FDCP) is in place, for,
the project grading. .. ,, • �_ : .
SITEDEVELOPMENT:` • ,:' A . ,
. 9.
Track -out and otherxaccumulatiori. of soil materials) onto any paved areas + .
i ,.Y '✓
outside the limitsAof"work shall be minimized:;Any haul exit/en point along,
tee.
existing pavedr roads%areas shall be. wet;-swept/flushed to. remove -track-out.- `
.•
Wet sweeping/flushing of soil .accumulations .from 'all paved areas .shall 'be -
`-
conducted daily; and., kept damp at"all.tirfies until so removed... '
10.
,,All unpaved, access/travel ways. to' and from Ythe site. shall be kept watered
down and compacted to'retain moisture content- during all haul traffic/activity. t ,
At.a minimum,- temporary construction travel'.ways shall be improved to a 20 '
foot width. All. track -out .shall `be r'enioved' as per Condition{ 8.. •Any access ,. z
-associated. with'th6 , stoc kpi I e/sp reading area shall'be abandoned"and remedially.
. M.'•` . 3
';.• treated, with any further, traffic 'to be restricted "until -appropriate. permits for use . .
of.the,area have been. approved.
1 `
•`�• a
r � .. � ;
.y �{� =
' •
!
1. ,1. � t b ti'•; t . r t t 4 r x .ti�
',� �
All transported soils n. stationary storage piles shall be sufficiently stabilized,
watered 'do' n*and/or covered'as appropriate.' Minimum freeboard shallbe as
{
t
' • established ,by ' `the' � Public Works Department. AnyM borrow areas ~shall be.
s ,
routinely watered -and` chemicIally' stabilized. after borrow activities to:mitigate
z
t Fz
<< A
airborne dust. Borrow site(s)'or any other areas -from which soil is extracted for
-
„
stockpile es hall -. a stabilizedltin.'a-similar manher as set forhth in <this TDCPz. AJny
'�borrow.source areas outside the City limits;shall:'be"shown to have approved
y R
F permits and'dust'controlrreleases as appropriate for tlie-subject-jurisdiction, .4 1
prior;to:issuance of any; encroachment permit'Is).�; ' ' _ •' ;"
'�
"• .12.
No vehicular,, parking ,or -traffic of any,: kind is :permittedon or rover ''any,
♦I
ipreviously'stabiIized or 'other inactive'soil'areas.• t � ' • y; 4 � �r
+t�
n
r
rr^
-• r-
'. ' n - .: 'S .r" f� ,a'� •7. >�• ,
J,
+t .. •
f:- •� r
� Y
`� .. 4.. +
F,♦ « ., i *• ,•N�! ^-�' � Lt;: � yT,:• ` `f, •,
`lt �i a
'YI..,d
Y
*�~• t
:N•
fi r
• • ♦ y# ; . • ;� S a.
t
y_l `'
,{
.eft T�..i'.
�~. tY
, + ` •+
1' `
�1
� - 1M' N y' .. .j5 t , " - � .. � F _ .•}I,
•� ;
� t. i
.:� . a
y.E ,y `
K ' .., 1
,i `
�•
_ t•. s +.y`P• .' ..tom ... '� 7.
`.
.!�'.' .��`•
.t - � '
- • d { •
'y' �.r •' `-: r i ^r`:' �' '1, �` �,�.� t � ,•i
.3
- �- �.. Mr \•n
i �. .l•if ,!„ ..t
•'� r � � ply • Yt - - f ♦ 3 � -`I 1
'�
_ a � ...
1. � • t
•r}•
t•.. t „+'
, Y ••.
11 1 �„ r.
4', ' Y .�• ♦ 1 i y= '
•
� , + t
'F
^ N .i • Z
' ` ! rN �
•.
Y!•.t r Y� t i - r
� gk,
� '4..
i fi+
� ... '>` t+ � ^�
�YrF ^
' ` r ���•-.l .'�
rrl' )
t , •• ` ' '
i - x r'S•F, . -
A� .. r
.f.. w
t'. ,ka ax;L 1'
r }•r ?..
.. Y .G •.
`.}. � • +. .l;_ i
•1r,
"� - t
i 1_Y
,L.i •1 .. 4� `.,
•ir I J ... �.
y•. -
♦ ` d
•' .. , ♦ r. 3 as 1�
,
� . r. � h fir:• s .aMr
J
,
`t
.INS
�
�
• 2 r \. , , ; � � n • - f `r , y , t
� �•
+• w ,'G _ •
,� , 4
+ '
r
f
,+
•
d'� �
•Yr •
' 1
r .♦ •.�
Y � � �.
,l. .
t •.
+
` /-
r -
s4� t .. •1 �, .%fia
� : r •
.. � S
�`� 5 .
„' �'
e,A
Fry . • ```'
r -' :,7s ... y
>: +.. } - :.�1 • u• :'. .4 .' - ' n' !� ! • err•
• •
7{F
«4• ! f.
•t i ;
., - .Y• r ,� .;
r „ `- 4 � .., '
1. !
• � A; ; ..fir". �' F '
4 . CI ` ' IC SY ..•
t' ATTACHMENT B COST INFORMATION
Small Scale Construction%Demolition Projects (5 ares or Les
Fugitive Dust (PM10) Mitigation. Plan'.' f _ r
Date: G, -( - q J' Jurisdiction: i. Project File'#:'��n �8 36
H�
Project proponent: �-,�� „S , r
y „ . CC h — �wrc�� •Cow. y►�v..��—rc E ? .
Address: 1 S CA .�
Day phone nu dry)R i-(oao-�• ,- Emergency phone numb
In the space provided below please list the costs associated with i►n plem'entationmo of all dust
control measures. The information' provided below should include all implementation °costs ; ;, '
(including labor,') for dust control throughout the project. Not all measures .listed below will
apply to all projects. r' -
'f
Watering: gJ L _-TiLvc.K 3co
Chemical stabilization:
Wind fencing: r.
Covering haul vehicles:
Wheel washers:
Street sweeping: p _
Paving: r
'f
Wind sheltering: _
Coverings:
Vegetation reestablishment:
{
f
After project completion these. records shall be transmitted to the Jurisdiction where .the
w grading/demolition permit was 'attained and to • the Coachella Valley Association .of "
Governments (CVAG) at the address provided below.
{ PM10 Cost Monitoring "
Coachella Valley Association of Governments
a}ry 73-710 Fred Waring Drive, Suite 200 1 '
` ;� A Palm Desert, C_ A 92260
�`, y* 4 ..'fit, �; - 'Y.. �?t �A'V � i:''�' t�I -.�, F• s�
;± CENTURY HOMES y ;4.
Century Crowell Communities
t i
June 16, 1998.
y
EC,
IVE., ''Mr. Greg Trousdell,
.Associate Planner o�I
,1UN
OR,
:'Community Development Dept. .
= CITY OF LA QUINTA CITY OF LAQUINTA 4
78-495 Calle Tampico PLA�lhINQ QEPARTMENT
La Quinta, CA 92253 r '�
t
w RE.. FDCP Application for Tract 27899 - � 1,4
L
7.
Dear Mr. Trousdell;
Regarding our Marbella project, Century Homes hereby requests approval-of a• ,
FDCP stockpile permit. The proposed movement of dirt for this project stems from our
finish grading operation. When the. rough pulls are done prior to grading the final swells
and contours, as estimated 20 to 30 yards are generated per house. This dirt then needs to '
be'removed to an off-site location. ,
The disposal site is.adjacent to our project and is a future subdivision site we 1
currently plan to development in a joint venture with the land owner. 's .
Should you require any additional information, please do not hesitate to call me at
(909) 381-6007.
Sincerely,. .ir.
4
R v Ed"Knight oject Director
Century rowell Communities r
'fir - .. .. .. • - ".. :i {. '.
` - y .. `
1535 South "D' Street, Suite 200 •San Bernardino, CA 92408! -=
(909) 381-6007 • FAX (909) 381-0041
t
�•
`
MRES AVENUE
111111040
-
]. J] ]a n Je ]9
°
7•
]e 'a 9 7,
]]
e
9
•
!2
w
I
i
II0
—KRISTEN COURT
37 «—KARA COURT—•—}
]
>:7e
a
]
a to
e1
s1
I
°
11
lJ
o
U
❑ ])
•
10
77 2a y I
•
I
i
]) e ]]
U
!
!
I
t]
2e
.i
n
71 Ma9 m e) ILJ.7I.
I 1v 2p a n 23 x.I
I
'A{
2p
n • u ]a
I zo
•
I]
•I ,. .
7J
a
C
i •
___DIANE DRIVE - -
----�. DIANE_. ---O. _-i
)
J
•
19 I
Jp J I \r 19
% Ja
2
1.
-_
i
1.❑
3
I
e
]
I
m
F
te,
F
v ] u ie
J'
;2
w n
I• - - '
I
n 7e n )e � o
•e
le 1! u u n 1p a
ap
-
�
�
m
34
m
❑
I
v
I
ESERT
EtFST
DRIVEac
�•iI
ee
—CIHOY COURT -7
.1
7
I
to
'•
—LAURIE COURT—.J
]J
71
] 0 79wattww
N
.• Ip
11`
mF I
E)
91 97
m I
U
.]
----,4
'
]
-__
❑ 9
9`�
t] I
i r
to
N I
I
~
N •♦ .,.' b .1 b �
]1
❑
xa
19 to
t) 1! --'
I '--
F
--i
x
'
1•
'J
e
1]
I d
p•
i
97 9a 9] 94 93
•'7'
0. I]
___
..
I ___
e
0
U
I .•
a
6I
ve
�
>9 ]D !) m 50
m
u
r_—OFSERI'-iR17
i
_
COURT—
,
.
7
.]•
eo
i
COUR'i�+`-+
al—VIOLET COURT -1
2aI.
e
)
1,
es
�
o
I
•
107 tax tw 10• 1w
ex w e. m m a]
22
1 21 :a 11v 11e I 1J 11a
!
I
1.
I �
" iIIrI
O
110 1 m
7a
n n I
i
u
ERR
U29RT20
D—.I1I
-7aINIII —7e CO1II
•]
.1e9
•
23
J
' --_—
------•
24
to
2'
II
2e 27
y-_-_4
-_
r4/I• �]
.
1e I I : ] ❑ m
\/. •L_—'—' -�_-_DE9ERT STREAM DRIVE L..—.�
J DESERT STREAM DRIVE •— -- - / xo x1 a 21 24 1 n 1 20 1 2: 1 2e 1 29 ]o 31 O'vrp evv'o I
eR[9T109 °�� 1•CLL PYW
L21 xx x] 2. x! xe n a n 1eY9CRMIDe 19 1e 1 17 16 Is v 21 20 10 1
I--- ASHLEY —•---- .PLACE
I'
0 9 10 11 12 1l I. 1 x] 2. 7] xe 21
PROPOSED FUTURE C?Y PARK SITE
` FIurr07,JP_ 7r_ Qr.&-7 1 V E
y
T,I 1..E "Tcz:.
•� �No[..KED
CENTURY HOMES
/i m A6w.. rsr!/i -
r
)
111111040
1e I I : ] ❑ m
\/. •L_—'—' -�_-_DE9ERT STREAM DRIVE L..—.�
J DESERT STREAM DRIVE •— -- - / xo x1 a 21 24 1 n 1 20 1 2: 1 2e 1 29 ]o 31 O'vrp evv'o I
eR[9T109 °�� 1•CLL PYW
L21 xx x] 2. x! xe n a n 1eY9CRMIDe 19 1e 1 17 16 Is v 21 20 10 1
I--- ASHLEY —•---- .PLACE
I'
0 9 10 11 12 1l I. 1 x] 2. 7] xe 21
PROPOSED FUTURE C?Y PARK SITE
` FIurr07,JP_ 7r_ Qr.&-7 1 V E
y
T,I 1..E "Tcz:.
•� �No[..KED
CENTURY HOMES
/i m A6w.. rsr!/i -
r
)
+ The Information Provided k Deemed Reliable,'Bui Is Not Guaranteed. "
S ' 20_T . T 05S
R' 07E
'Q SW'_
• s
Parcel
" 604 061 009 * ` Pos Int �y -� w
RefAPN 000 000 000.
•
�•+�ki
,•
'Caldera Manuel R Et Al ' . - " }
Land; + -, $745,126 N !
•
l �
CoOwner
�_-'
r
�}• :w[ A .-. �• �
_
_ �Y
�;.
,
i
�S. •�•
.�
� - 'k • �
i
17.64, ''Yedr'Built
{Marl
: 74900 Us Highway 111 #223 Indian -Wells Ca 92210,
• 4.'
:4745,126
•f
'Xfered'
04/O1/93.� Doc#` .124885"
'`
`
7 _� -
.s%•
F. .St
+
,'
ry
� Type
s
No
\� -
'; - MetroScan/Riverside (CA) . •.,
' %Imprvd
`'
+ The Information Provided k Deemed Reliable,'Bui Is Not Guaranteed. "
S ' 20_T . T 05S
R' 07E
'Q SW'_
• s
Parcel
" 604 061 009 * ` Pos Int �y -� w
RefAPN 000 000 000.
Owner ,e,
,•
'Caldera Manuel R Et Al ' . - " }
Land; + -, $745,126 N !
CoOwner
Eldred Christine; R '' w
Struct ;
t
;•;�
,Site
'x45955 Dune Palms Rd La Quinta'92253
Other
Acres A
17.64, ''Yedr'Built
{Marl
: 74900 Us Highway 111 #223 Indian -Wells Ca 92210,
• 4.'
:4745,126
•f
'Xfered'
04/O1/93.� Doc#` .124885"
'`
,.Total
` ='Exempt
Type ,^ :
:Unpaved
Price •
- ' ,+ Deed . v Gift � •'
� Type
<Pool : ,'
No
LoanAmt:
r� . y ""Loan.
' %Imprvd
`'
Lender
InfTyp : �` -
%Owned
' :100 '
AddOhSF -.
„VestTyp
':, r
Tax Area
2 ..r
0-011 `, . .Y
,
Use
: RO1 Res, Single Family Residences'Tax
GarSgFti
: $11,482.64
-
Plat
Map Grid.
849 J1'�`4
Roof Type
Census .
:'Tract , 45201'' :' Block : 7V +'
OwnerPh'
Sewer, Type
+ The Information Provided k Deemed Reliable,'Bui Is Not Guaranteed. "
S ' 20_T . T 05S
R' 07E
'Q SW'_
• s
€Tenant Ph f
;•;�
Bedrms :2 ,
Stories
•,1,
Acres A
17.64, ''Yedr'Built
1957.
�BthFull : 1 `,
Fireplace
: No +" .
,'LotSgFt .'
_: 768,398 "'Street
Type ,^ :
:Unpaved
'
Bth3Qt : 1 "
<Pool : ,'
No
Bldg SF
:1,501
Waterfront '
`'
<
BthHalf : "+; , '�
'RmAddtns
- : Yes• =
AddOhSF -.
Gas Service
a
Developed',
a-
> '
CntlHt'- : Yes +
AddPkgTyp-.: , .
GarSgFti
_
�;
Water, Source
:Developed' y
'
Cnt1A/C . Yes-
Roof Type
w�
":Composition
Gar Type
. _
Sewer, Type
r '
Developed
�•.
-
i' r •
Agri Preserve
_.
ti, r
y t,
-
+` ^}
. •^ln.
- ' t E
.T • .i
.. f`
w' ;� cif, •`�
+ The Information Provided k Deemed Reliable,'Bui Is Not Guaranteed. "