Loading...
2794 (4)_ W The following General and Speciai Provisions are attached to and made a part of Permit No. GENERAL PROVISIONS -`i:— '•� is - , , •k, Yt �%' . yr •t r r"•- � ry �� - •. - 3' *J'?' 1 T f •' The following shall always apply:•y •'$'�. �,'.� • ., '+••' tit �.. ' • { l'.i• �.. .'iy. •—• i t• , - L � r ♦ '- ENROACHMENT ON. PRIVATE PROPERTY: This permit authorizes work to be accomplished_ wi-thin City of La Quinta right of ' way`ONLY.' Whenever construction extends within_ private property, it is the responsibility of the permittee for his contractors to 7 ;°cure permission from abutting property owners'. Such auutorization must be secured.by the permittee prior to starting work. • ,' • ' Y t "' TRACKLAYING CONSTRUCTION'EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on - any paved surface unless fitted with smooth -faced -street pads. All -mechanical outriggers shall be fitted with rubber street shoes to protect the,paving during excavations.. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred; 'spalled, or, broken during the term of this contract, or if the pavement is marred, City of La Quints shall request +s .,'`' '• i - that these portions of road be resurfaced over their enure width.' -Resurfacing shall consist of one coat of two inches (2') of A.C. - .,, _ surfacing plus appropriate seal cost as specified above. R' PROTECTION OF TRAFFIC: All ezcavations'and work areas shall be properly.lighte-d and barricaded as deemed necessary by the -'City Engineer or La Quinta City Public Works imTectors.::Suitable detours and detour signs shall be placed and maintained for the o duration of the,project. ,The City shall be notified 24 hours in advance of any traffic detours or delineations. - CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes . - - necessary to remove or cut existing drainage structures, City of La Quinta shall be' notified prior to commencement of this work: Drainage structures and �open'drains-sha_ ll be kept free of.debris at all times for proper. drainage. , r t RIGHT OF WAY•CLEANUP:, Any surplus material resulting from excavation and backfill operations shall be removed from the right :ty of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after'backfill and compaction. Existing gutter fine and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be'used, as required, to sprinkle the job site to keep down dust conditions and shall be used f "� ' f � immediately after backfill'.. ,' a _ '. tie • � .. - .. + - - , "Nit' -•`. '-.. • 'S '.i ,'. q:.. tDE-WATER OPERATIONS:. If de -watering operauoos are .requtred and pumps are forcing water on City of La Quinta roads, it shall -• - be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades,whan necessary. CLOSING STREET'S: rNo street shall be closed. A min_ imum of one lane of traffic shall be maintained at all times to provide limited ^t .. • r ;' ^ access for the adjoining property owners and emergency 'vehicles. In the event it is felt by the permittee that he must close a street for • n x r • , -•. any length of time, permittee, shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS `+ . .The following shall apply.when indicated: - i,•� , .4 NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance,of starting construction. iTfII1TY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way ®'.!•l:authorized �.� . by permit, the permittee'shall contact all concerned utility companies relative to the location of existing ' • " substructures: Damage to existing substructures resulting from operations conducted under this permit shall be the sole ' 'responsibility of the permittee. , UTILITY. CLEARANCE:' (Surface Structures) No work shall be done under this permit until allutilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work.. -be - t - R4' . , PAVEMENT WIDENING:. Area between the proposed concrete gutter line and the existing road pavement shall surfaced r f t. c ,with inches pf A.C: paving•placed on" inches :of class aggregate subbase course having an., 'R' value of not less than _ and in conformance with _City of La QuintaTo;T Improvement Standards and Specifications, Ordinance_ #461. ` + . . ~ ^F• r RS ; PARKWAY GRADING:. Area between,the property line and top of the proposed concrete curb shall be graded to a slope of `.�• t r , f' 1/4 inch to one foot • , ' , .44 CitCHECKING: •City'of La`Quinta shall check_ grades upon receipt of plan and profile and/or grades as established by - a licensed engineer. R7 • CURB REMOVAL FOR DRIVE_ WAYS: A.portion of the existing concrete curb atid/or curb and gutter (feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and • concrete driveway approach shall be constructed'in conformance with City of La Quinta Standard #207.. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2,1/2 inches of A.C. paving placed on ( ) of class aggregate base. ' Driveway construction shall conform to attached drawing.. ' •. • i,. «+tri.- +[.:. E •. > ,._ •' ' =. •t. - '~ •. a, .•t . ^. • • t R9 SIGHT CLEARANCE: - Sight clearance of 600 feet in all directions shall be assured and maintained at all times. ' • - r SO EL STERILIZER: - EL , The area. to be surfaced shall be treated with soil sterilizer: Rate of application shall commply with the manufacturer's specifications._ ^ ? _,A , _ COORDINATE WORK. The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 . BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is'encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFELL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be *placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (51 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall- be .placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever isrthe greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be. constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RIS COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City'Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California; dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR:- After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsioti shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 2794 ' --- Desert Homes LLC (Catellus Residential Group)*'--- r r. In addition i6. the standard permit conditions;,the following shall apply: Pursuant to'Section 14.16.320 of the La Quinta Municipal Code'(Ordimnce' 1'0r§.lw(part),' 1982), all ' work 'shall be performed inraccoidance with',the latest editionof the Standar"d'Specifications For Public�Works Construction (SSPWC) and as directed by and to the satisfaction of the City -Engineer: - r . 2. Desert Homes LLC (Catellus 'Residential Group); hereinafter referred ,to as "Permittee", shall be " responsible"for providing continuous dust arid'erosionc`oiitrol:' a .t- t . ! ,C .'% _•� A� 1. - ;. ',��i t 3. Streets shall be kept clean. They -shall be completely cleane&at the end of each,working'day' and '• more frequently if required. • ': ' Pursuant.to Section 6.08.050 of the Ea Quinta`Municipal`Code (Ordinance 18 §s,1;' 1982), throughout ` the work,,site; ,the Permittee shall ``comply with 'City regulated' work' hours." "Operation . and maintenance of equipment within one-half mile of human occupancy shall be performed only during ' the following time periods: " `iOct ober lst to'Apri130: Monday. Friday' 7:00 a:m.'to 5:30.p.in:'` Saturday • i �r'8:00 a m: to 5:00 p:m.i"�' ' .. ' ti .! •�' ,fit. `' ' t,' 'i� � _•A -' .� .y .• .. ... fit: r.r ,:r' -';1VIay 1 st to September 30: `ry` f ~ Monday -Friday:' 6:00'a:m.to •7:00 p:n:i'' _ = y= Saturday j= ''8:00 a.m. to 5.:00, p.m. s ' , Work shall be prohibited on legal holidays.-and'Sundays. - . • ! - 'M.Ii 'T , • y ' .,f+1.ww4 '• •;1 i�• '�A iY�•� - �r.. r •,4 tT . 5:Work performed within'500 feet of a maprand/or signalized intersection is'restricted between the `:•hours of 9 a:m. 3'p.m.' Traffic control shall be sefup after 9 a.m. and removed before•3'p.m. The Permittee &11`contact the Riverside Country,TrafficaSignal Maintenarice'Departmerit at (9' 275- - 6894 if signal'operation'at the intersection is to'"be' altered'in any way: t 6. Pursuant to Section 14.16.110 -of the L'a Quirita Municipal Code;(Ordinance,l0 §' 1 (part), --1982), Permittee shall assume responsibility for repair of any`pavement damage to any public or private. street and for any damage to other City streets'or facilities as aresult of work- performed under this ' permit: •7: Pursuant to Section, 14.16.250 of the La Quinta Mui icipal.Code (Ordinance 10 §'1, (part), ­1982),F ," advance warning signs and traffic control shall beinstalled and maintained in accordance with Cal ` T • Trans Standards or the Work -Area Traffic Control'Haridbook (WATCH 1VIanua1). A'traffic'control ' ` • • `: plan, if required; shall be prepared in accordance with the -WATCH, Manual' and"submitted to rthe i City for review and approval one•(1) week.pr>tor'to starting any construction: It.shall'be the . h Permittee's responsibilityto appropriately •detour'and barricade all construction sites. Special Cditions Permit No."2794 ' ^ • , i + t1 ' Pa onge 1 of 3 1 i • . r tt't. , SPECIAL CONDITIONS --PERMIT NO. 2794 --- Desert Homes LLC (Catellus Residential Group) --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights-of-way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. Backfill shall be completed in lifts, not to exceed 1', compacted to 90% minimum relative compaction. Native material may be used, provided the material is suitable for use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an alternative. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven .(7) days after the completion of the work. Permanent pavement shall be replaced as follows: a) Sawcut and remove existing a.c. surfaces a distance of one foot (F) beyond all trench. walls, including any sloughing or cave in of adjacent soils. Undermined a.c. surfaces shall be removed. All a.c. edges shall be straight, clean and vertical. b) Provide an existing section (four-and-one=half inches [41/2"] minimum) of crushed. aggregate or miscellaneous base material, compacted to 95% minimum relative compaction. Special Conditions - Permit No. 2794 Page 2 of 3 • 1 ; :' �ti i'+ ,✓ � ! _ *,'', . / ,4 11tt 4 t ' t' f •« r -, ,,`. a. -SPECIAL CONDITIONS: --PERMIT NO.;2794 r i --= Desert Homes LLC (Catellus Residential GroutsM�// C) - .F- *, Vii•• Rrovide an existing section plus one in (1").[four inches (4") minunum];ofasphalt concrete , in two (2) or more lifts the -first IWO_ comprised of a base course a.c. material, of a City X ' approvedmLx:design3'meeting the requir_ ements of Greenbook'lass B=AR-4000;.the,firia10.10' Clift comprised•of a' wearingcourse a.c. material;'of a City approved mix design, meeting the - requirements=of •Greenbook' class 'C2 -AR -4000. All pavement edges'shall bea flush, with adjacen -a.c. surfaces. Each lift of'a"' material shall,be`compacted'to.95% minimum relative _ compaction. • 4 f . ' _ • J A) For trenches greater than two feet (2•')••in width, the Permitiee sliall perform a gimd and a:c. 4 : 10' depth.for•three feet (3.') m addition to'the pavement replacement secifed .overla ,of 0.r t. . " 4. -above - ""l 6. above:16. - Permittee shall notify'the City of La Quinta Public Works Department a minimum of 48 hours ;r '0rior to commencement of any construction,at(760)'777:-7075.-` Permitiee ° shall r'stabilize any, soil that was -'.disturbed (shoulder areas;'IetL as',a result; of work'--.-, 4 ' F . �performedyUnder thispermit with an approved'dust control treatment: s i18. a Pursuant to Chapter 1'2.56 of the La Quinta Municipal Code'(Ordinarice 10.§ 1 `art 98 , ; s r'„=' . r • (p ), 12 ; .)the .,,.. City � . • ; J .` ' . hasrdesignated certain city streets as Truck Routes. The weight limit for restricted streefs (i.e.;'streets� _ not part of the -Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a -restricted street if making a delivery o+r pickup on'"the subject'street, or if this,permif Jspecifically" ;grants permission to use'the street to deliver streetconstruction materials and/or equipment. f ` 19. , .The City of La Quinta reserves the right`to revoke; suspend or void this permit at any h , " 20. • This permit authorizes rough and finish.grading'of Tract 24890-6 at -die "Citrus". - +: �' rid .. `, R - r'. `' a wF,. • r �� ��. - •f .- .+. �� F, `+• `1 * ak" 1 +. • ••+ f. ^ .- ••°wl^ •. •�.N ' "'4 - s' • � I'eAM 4�-- • ,a.{ v i Special Conditions -Permit Noy 2794 ., . , ^ ' - , t '. Page 3�of 3 ` ' 141 7 Medium -Large Scal& Construction/Demolition Projects t' (Greater than 5 acres)', s ` Fugitiee Dust'(PM10) Mitigation Plan.. Date:" 9./y '48^ Jurisdiction: L.� :Q��NrA -Project File #: 77? ZYSIo- � Parti l Project Information, �.Facp: 98-39 "`. Please'provide the information below'as,completely-as'possible=even'•if it has already been- . ,, r.• provided on other forms related 'to this project. 'Failure to provide complete information or _ provision of inaccurate 'information ,may delay the processing of your- Fugitive,, Dust - (PMI 0),: Mitigation Plan (Plan). -It is recommended that'ryou:submit your. Plan `concurrent with your ` grading or demolition permit application. ;_ • ",Pr: ,, N No , S A Fq - •t'r _ r _ Project proponent: '�� �/L/ v��.✓ LL GK { , ..�: ���. Address• �_ _ y• Da hone number: Emergency hone. number: ,Grading contractor (Contact Person): y _ Address: Da phone. Emergency phone number: Y P 7�a 39� S :30 . Constructiona site street, address:' Construction site location: (Please include an &5x 11 location.map) S/L f�• Construction site assessor's parcel number (Tract 4):,.G �6 e -.Parcel, (Tract) size: 2 -��. Acres or `*,.. Square feet y Anticipated date of physical'project initiation:: _ " • _ r s LAnticipated date of'project completion: Anticipated costs for dust suppression: $ (Attachment B - Must, also be completed an mace 'tothe^appropriate address construction activitieshave been completed) • ,_ .. • .i ` -• _ ., n 1 .M' - • J'+., +•-_,S .. a t.. 1"All projects.greater than one half (1/2) acre.are also subject to SCAQMD Rules 403 and :Y , .. Part 2 -.Fugitive Dust Control Actions From the inventory of fugitive dust control measures_ provided in Attachment A, please indicate which measures are to be implemented during the project by placing; the corresponding letter beneath the following sources. In addition, please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FQ Demolition projects should only indicate measures' in the Rough Grading ()?G) column. After indicating what measures are to be implemented, complete the "Details" section by: .describing how and when the measures are to be' implemented. Source Details (e.g., frequency of application, number and type of dust control implements, No. RG FG, FC etc. Please be asspecific as possible) 10 G `,{ . f. .Y .� ' a , • . .� i T„ 4 • ' 1 e , • •' , rXri _ .. ' l.1 W ! , r T t (Use"'copies;4 this page ifradditim al spa`ceris needed) Source' '.Details (e.E., frequency of application, number and lune of dust control implements '"NoFC • etc. Please be as specihFas possible): c -7 ,r "- r � '�" K7 /;%�� ' �' ,��1'%j /,G �dlr/f ` +y ��� tj � „ 'J, A- e' .. * � T- ` � 4 , r ' c • � + • t . � w ` " F S � vp �. , � 4 � / %moi / /ice � C '� .'� _ ` • \' A�) i • •T�.,/ee�� /.�:�7t�/L' acv Q�� , G � i J } . +��: � .x �P? �SC'G(. / � • .(i�'��7'/! .+�3r17i'(r.... i�'p/,`y��/� �% t • �� 'r'r� y �; r.. ':�. ar � vY g, j.. ,•+ ."` .• _ ' .. �a: .+• - .� 'ter,. ' #'•` 'r' .i. •��. + +r. .mow. .. AI 14 - wl' '�' is .. _N, •E. 1. �* '.i. ... t +",; 'r _ rc � , W T �' ;,'�7.� �. "} - � •"` ,' s+'' .rte• _ � �• _ 1 'r' ^ ' x .�" +� .. A _ yv' - ^� it � r .. � y 'T � .� "• r .i ,. �Y . iY Y �?, � � , .. � ..r •� .•xre.K . �*Y '...'r ' t♦ - } t .. .' c ' . ' 7` } ` _ ; .. '.'s.. �' 'i:. y. . l' 'x' -, '' • r' . •' c ,y . -. f ...yj f .-� r 1' ,, 4 Zygy►0�4 , _ �NcLv Dis A. �L t,.o I ON 6--L CsA 7s ,_ r , (� 1� t •1 4 a= 1 - z _ 50T .AVENUE _ _ k o gdA�4S STREETLAJ cx LLJ W m 52 AVENUE w ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The: left column contains the sources `of fugitive ,dust which are intended - for emission control under the City's dust control ordinance. The, two. right columns contain an. inventory and 'description of reasonably availdble fugitive 'dust' control measures for each of the sources. Please use•this information as'a guide when preparing a Fugitive Dusf (PM10) Mitigation, Plan.. : (Source No) Reasonably Available Source Control Measures : Comments Land (A) Watering oApplication of water by means_of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement.wilLincrease the moisture content thereby - moving increasing stability of material, - o Once the,initial land clearing/earth movement activities are complete, a -second round,of•watering: can generate a thin. .crust which stabilizes the disturbed surface areas provided' that itis not disturbed' . o. Security, fencing can be used to prevent unwanted future disturbances of sites where,a surface crust has:becn created a - (B) Chemical stabilization . o Only effective in areas which are not subject to daily disturbances o Vendors can, supply information on product application and Y iequired concentrations (C) Wind fencing o Three to five foot barriers adjacent to roadways or urban arias can be effective in reducing the°amount of wind blown material leaving a site o Should be used in conj unction ,with other measures . (D) Cover haul vehicles o Entire surface area•should be covered 'once vehicle is•full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System, can be adjusted to spray entire vehicle, including stored 'bulk material in haul vehicles. Unpaved '(F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation (G).Chemical Stabilization o Vendors can supply -information as to application methods and concentrations o Not recommended for roads with high volumes or.those used for heavy, equipment (H) Watering o Insufficient quantities to keep surface moist o Required application frequency will .vary according to soil type, weather conditions,. and vehicular use ' (Source No) Reasonably Available Source Control Measures Comments, (2) Unpaved (1) Reduce speed limits o 15 mile per hour maximum Roads .. (Cont'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to . reduce vehicle trips by,a minimum of 60 percent . -------------=-----------------------------------=----------------------------------------------------------------------------------------= (3)' Storage. (K) Wind sheltering, o Choices include silos or enclosures. " Piles 'o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity (L) Wet suppression o Application methods include: spray bars, hoses and water trucks o Frequency, of application will vary on site specific conditions. " (M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings, o Tarps, plastic, or other material can be used as temporary coverings . o When used, these should be anchored to prevent wind from removing coverings (4) Paved (P) Wheel washers o Should be placed where vehicles exit unpaved -areas onto paved Road areas Track -out o System can be adjusted to spray,entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o. Entire surface area should be covered once vehicle is full Disturbed (S) Chemical stabilization o Vendors can supply information on methods for application and - Areas/. required concentrations Inactive Construction Sites (T) Watering " o Would require frequent applications unless a crust " can be developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or. urban areas can be effective in reducing the amount of wind blown . material leaving a site o Should be used in conjunction with other. measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant; native vegetation is encouraged M Part 3 Agreeni`ent - _ L t h 'I certify that the information contained In this Fugitive Dust (PM10) Mitigation Plan is true '.�- :and accurate and that all measures specified in Part 2,wi11 be implemented during.project AI.;. construction. I authorize. the Ci of La' Qu i nta to enter the above mentioned property City '`for inspection and/or abatement purposes,. and I agree Ito" hold tiarmless'-ther.City, and"its.' representatives ,from , liability for any actions .:related to this project. `• I also agree ,to complete the, record-keeping requirements included. herein as Attachmenf'B ,,once , the r r project 'has' been completed. ignature o caner or ut orize epresentative I have�read the'conditions:of the Fugitive Dust (PM10) Mitigation. Plan and .the owner has fi ' "author-ized the implementation`of all its provisio's throughout roje buildout., )ntractor or Hutnorizeu nepreserijal1}ie , ,' r � • � !•� T �'. � � i . 4• + - tet. 'k". .. In the space provided, below please list the costs associated .with implementation of all dust control measures.: The. :il formation provided below should include all implementation costs (including labor),, for. dust control.throughout the project. Not all. measures -listed below will apply to all projects. Y -` grading/demolition permit was attained and 'to the., Coachella, Valley Association of , Governments (CVAG) at the address •provided below. . -PM 10Cost Monitoring f : " Coachella Valley Association of Governments 73-7.10 Fred Waring Drive, Suite 200 ' Palm Desert, CA 92260 w' 1 All projects greater than one 'half (1/2) acre are also subject to SCAQMD Rules 403 -and 403.E . ' t" :- . ' • t �r Y -` grading/demolition permit was attained and 'to the., Coachella, Valley Association of , Governments (CVAG) at the address •provided below. . -PM 10Cost Monitoring f : " Coachella Valley Association of Governments 73-7.10 Fred Waring Drive, Suite 200 ' Palm Desert, CA 92260 w' 1 All projects greater than one 'half (1/2) acre are also subject to SCAQMD Rules 403 -and 403.E . ' t" :- . ' • to implement of all prov' 'ons at the-concentrations,and trequencies identities. f K. !• Y ignature o caner or ut onze epresentative �'^ ate _kF CiV t.•i3'! '�:' � +9 r ' • �I. ,I•I j' *•' tet•• ; - — .-.-• �, o • t r ` �;' S `t ., , � r' , .1 3 €.r ' T •,,1k "� i � . eA a , ,t � •-. CONDITIONS FOR FDCP APPLICATION, 98-39: S' F GRG DESERT .HOUSING / THE RANCH. SPECIFIC PLAN.- TR LAN. TR 24890-6; +722 ACRES �� r GENERAL: 1.. Applicant shall comply with all'control measures.,as set forth in the approved • application for, FDCP 98-39, and the following conditional measures. The f II .amount of securit .f r F,D P u y o C 98-39' (as determin'b&'by -Public Works)`'. tishall be•available'for any'me'asure(s)- deemed, necessary by the City to`achieve • .r, adequate' dust,control.-.whether or not such additional measures are.proposed' '1 r•+ with this application. Any "requests fo'r bond amount revisions/reductions 'm'ust �. be'made.in writing.to,the Public Works Director. The applicant shall implement F is :all rh6thods set forth herein . for `the durations of, the project;.,construction• w ;. ,. "Security,.'shall be,. in Tthe form -of' a pori-expiring Certificate'. of; `Deposit ora t- ,''` renewable Letter-of Credit. ,• 3" 3 <3 . Applicant shall subrriit copies of alL records related to cost accounting'for.the `. dust control measures assumed during all' pre-grade activity. and' grading -t' construction upon an; request for .release/reduction' in • osted security. Said r . P Y Q . P � Y • . �. records shall be submitted-within 30.,days.after completion of all dust'control measures as outlined inland conditioned, upon the plan: >AlI `such- records shall [ " . -accompany the"completed.PM10•Program Report Form, which can be.obtained *from. the Public _Works or Community. Development Departments. Completion . of all",'dust control- shall be verified'by the assigned field inspector: 4.'' rAdequacy of, all proposed and 'conditional stabilization'{ measures shall-be determined'bythe assigned grading inspector. The City may require remedial °• -` • measures, beyond those'identified or conditioned upori;the project, which the " City deems necessary in the event such approved measures are not effective: ,Enforcement of these conditions shall- be at the discretion of -the assigned "grading inspector, who shall monitor and -field verify that thie spirit and• intent of the FDCP and its attached conditions are being complied withf Adjustments 'to .application frequencies,• quantities and 'other aspect's'.of this FDCP 'may be. _ ;.made by,the inspector; at•his/her. discretion, 'in^{order to assure compliance. r ` T 5. 'The contractor/vendor responsible for provision of 'all-soil, stabilizing agents shall submit the appropriate Material Safety-Data-Sheet(s), `along with approval s from the Water `Quaiity Control'Board, to;the Public Works Department prior. to:. 1' any site ,application. Application of stabilizing agents must. be. in compliance - ` ` with NPDES and the'State•Water Quality"Control Board requirements. ' 6.. The conditions of this dust control plan"approval are applicable to the full range ' of .construction operations associated with the entire ±22 acres within TR 24890-6, and -shall remain in effect for the duration of 'all, construction undertaken as part of development approval for.the subject property. Transfer of real property or other interests regarding this project shall not affect the validity of this plan approval. Implementation of - all proposed -and conditional measures shall be,carried out for the duration of all construction activity, as applicable., However, nothing herein shall preclude any future party of interest from filing a revised FDCP with the City for any portion of.the site. • -- 7... Approval of this dust control plan does not in and of itself constitute or.. -.otherwise authorize any site disturbance, 'preparation or construction! The developer is. required to obtain any and all necessary permits and clearances ' as set forth in any development approvals issued - and currently in effect pertaining to this site. This 'includes any type of: testing, monitoring or sampling required,.as a condition of development approval,such as that conducted •for archaeologic, hydrologic and geologic, reporting: purposes.'; - SITE DEVELOPMENT: 8. Any pre -watering of areas proposed for grading.shall be in accordance with. recommendations of the grading contractor, based. on the area soil conditions as described in the associated soils report(s)'. At a minimum, pre -watering time shall beJor three days prior to any earth disturbance(s). 9. FDCP 98-39 indicates that cut and fill will be balanced over'the entire site. Any transported soils and stationary storage piles on-site shall be sufficiently stabilized, watered down and/or covered as appropriate. Minimum freeboard shall be as established by the •Public. Works -Department. Any on or off-site borrow areas shall be routinely watered and chemically stabilized. after borrow activities to mitigate airborne dust, . as appropriate pending final grade , completion. 10. Track -out and other accumulation of soil material(s) onto any paved areas inside or outside the` limits of 'all .work shall' be minimized. Any unpaved construction' exit/entry points' along. existing • paved roads/areas shall be improved with pavement, aggregate" base, or.similar material, for a distance -of 120% from the pavement edge into the site to minimize track -out., Wet, sweeping/flushing of soil accumulations from all paved areas .(i.e:, internal project streets) shall be conducted daily, and kept damp during construction - hours .until so removed. , 11. Unpaved construction access and travel 'ways within -the 'site shall be prepared for traffic prior to commencing -grading activities, and kept watered down and 1 4 y• , `compacted to retain moisture, content during :all construction traffic/activity;-.` , including building construction: RoadIength•s shall 'be watered'each•day, prior-, "� ','• ,. to any. traffic activity and at the�end of the dayafter. all'activi"ty Fias'ceased: + W*Y Trac k-out•shall. be" removedi per Condition #10. s. i" 12. ' '•At 'a minimum; travel areas shall 'be ,improved to a 20 foot width and 'be ; 4, �.. : - established and maintained as set' -forth in Condition •#11 for the duration, of all grading and other construction operations,, a"s- deemed necessary.by the:City., " r' .r k. 13:- No.•vehicular,, parking or traffic of any kind`'. is _permitted on `,or ;.over,any`; ' previously 'stabilized .or otherinactive soil areas. Any -on-site employee and equipment parking/storage areas shall be properly stabilize'd,•compacted and/or �• paved to,acco'mmodate.such traffic activity until such time as on-site roadways are constructed to ultimate design, or,otherwise paved•, Any temporary office =� . acilities, (sales, 1,14 construction, -etc.), shall •also • be provided with . paved,-; , compacted or otherwise stabilized, parking and access during?'their r`• ' ' ;operation: ` 14. ,,AII_ disturbed areas where no further- grading,` construction',gr' other, land,., ,-disturbance will,:occur for --at ;,east' 30. days, shall 'be stabilized; with 11 an - appropriate dust suppressant,- as defined•:in LQMC°Chapter 6. &6 and, approved ,. •4! . ,, .." • 'by the California Water,Quality Control Board,'Region 7.Jhe suppressant shall ' f.. be applied, no later than *four' dawaftei• completion of the -initial ,grading,' and staked; posted•or otFier,wise',restricted in order to prevent any accession or across those areas _ -` r a' `4 el, e.... • s. .. - . ' w w� ,_:fin 71 78-495 CALLE TAMPICO - LA DUINTA, CALIFORNIA 92253 - (619). 777-7000 ` r"�� FAX (619) 777-7101 -May .10, 1994' TO: ALL ACTIVE'AND PROSPECTIVE DEVELOPERS/BUILDERS IN. THE CITY OF LA QUINTA RE: PM 10 PROGRAM REPORTING REQUIREMENTS 'FOR FUGITIVE DUST CONTROL PLANS Dear .Developer/Builder: 4 r The Coachella -Valley PM 10 Program has-been, in its implementation phase since December, 1992. Among the' required control" measures was the enactment by Valley cities of dust control ordinances which require builders to implement dust control actions during .construction, demolition and paving activities.. In conjunction with City staff members, we ask your help with the reporting requirements. A significant aspect of the PM 10 Program is the need to report statistical information to the Federal Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources Board. In response to this requirement, a Dust Control Reporting Form has been created, a copy of ' which is attached.. It is requested that if any project developers have amounts to report for any PM 10 mitigation, these forms must be filled.out. This form is intended to supplement Attachment "B" of the Fugitive Dust,Control Plan by providing specific.cost figures related only to dust control measures. The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for reporting purposes.. This, means that each jurisdiction is requested to review projects since that date where PM 10 control measure expenses have been incurred by developers, whether or not they have . been incorporated as part of a Dust Control Plan, and forward this data to CVAG as soon as practical., Your cooperation in completing these forms as part of the grading permit procedure will help assure that the. Coachella Valley and the development community as a whole receive deserved credit for the effort to attain Clean Air Act standards for PM 10. Very truly yours, f r RRY HERMAN . Planning-&- Development Director r JH:WHN:bjs ' Attachment MAILING ADDRESS - P.O. BOX 1504- - {LA DUINTA, CALIFORNIA 192253' LTRWN.011 I. GZM:ZAL DIFORI&TIOB ` Project Developer. Name: Address: :4 Phone: Project Site' Project Title. r Address: TractNo.: Acreages Grad.i.ng Subcontractor ( if, dif!ereat ) Name: Address:� Phone: PEAS£S? YESNO'. If so how many? -- . ,` Type of Development/Project: C:mamerci.al Single Family_ x„tti•YAM iI' Demolition Other Date of Pro jet/PhraseStar_-Uo: Date of Project/Phase Completion: r II. COST nU?OR WIOB t If actual costs are not available, please` estimate to the -best of your ability.' 1. WAT�t: Amount`: Total Cost: 2: EQUIPMENT COSTS: X.'Aater Truck: -Number on Site: Total Cost:. . Hourly Rate: Hours: B. Street' Sweeper:' Number,on Site: Total Cost:, Hcurly Rate: ' Hours: C.. TK:mporary Irrigation: ':Total Cost: D..Wind'Fencing: Linear Ft. Total, Cost: Cost/Ft. B. Chemical/Material Stabilization: Total Cost: Cost per Sq. Ft. ,F. Vegetation Cost: Material: Total Cost: ? Maintenance: t G. .Other: L Type: Total Cost':, Hourly Rate: Hours: 3.- LIBOR COST: Hourly Rate: r. Total Cost:' Hours: 4. ADMI+"iISTRATION COSTS: Total .Cost: III. TOTAL COSTS: Add items'l - 4 for total cost. TOTAL COST: ?L.cASE RETURN ,FORM AT' COI-TLET_ION OF ?ROJEC_ OR ?EASE OR ANNUALLY`F.ROM THE DATE OF ?ROjz-CT/?EASE START UP. 3/31,/94 SEP 01 '99 11:40 FR CATELLUS`RESIDENTIAL 714 251 1933'TO 17607777155 P. 01!04 JllL-15-39 WEG, 05 It PSS MDS CUNSULTINU rMA Iry t 14 •L'J1 UJ1w a t LOT AREA SUMMARYAll . -fli6t 24890.6 s a u ; LOT NO. ACRES w, 1. • 0.38.1.. 16568.3 3 0:277 070.8' a . 0.277 - 12072.8 - s7. 0.377 za7. 6 0.2 �, • 12072.6 - 0.277 12070.6 $ 0.277 y 12072.8'„ g 0.277 12072.8' 10 0,277 12072,8 11' 0.277 12072.8 12 0.277 = 12070.8 13. O.a77 k ZO 14 0.277 12C72.8 15 .. '' 0.277 18 - 0.277 12072$ 17 0.277 12070.8 18 0. .8 •19 s 0.277 17077-8 - - 20 0.288 • 2532.1- 12532.1- 14725.1 " 14,17,215. 1 22 -" 13243.4 237-77-0.20711685.4. `• 24' 0.268. 11804.9 25 0.268 11686.31 ' 26 0.269 11884.4 27 0.262 - 11426.6 28 0.287. 12507.9 , 26 0.341 '14863.4 30 0.331'.' . 14407.6. 31 0.265 11557.0 .. 32 ivao 33 0.280 1476.8 34 0.250 35 0.371 16181.8 .36 0.339 14760.2 37 0.418 18060,9 ,j -36 10005.5 9 0.301 191 ;. 40 0260 .. 11325,2 41 0.308 13418.5 42 0.407?.8 • 17707.2 • Q,0 1Z912, i SEP .01 '98.11:40 FR. LATEL�LUS RES I DENT I AL 714' 251,'19.33 TO 1760'7777155 P. 02/04 MDS, MULLING• FAX NU, r,.w tip s s t :. ' r. � r • 44 0.287,:, 124$2.1 - 45 0.262 _ 11406,4 ' 46 . 0.263'.. 1143 .4 47 a.?63 �: 17aa1.a 48 0.263- 11439A Y. 49 0.283, 11439.4 60 _ 0263 11438.4 31 O.Z63 11439.4 ' 5 4.x83.:7 11439.4 63 _ 0.283 11439.4 54'` Y219 t 11439.4 - - 05- U. 11441.2 86 0.283 11439.4��. , ,.x.,. 67 0.283,' 11439.4 0,283 ..� J' 11439.4 i ; , E 1,, ° 69 0.269: 71439.4 00 t . 0.263 11439x4 i ; t 61 0.263 11443,8 4 62 0.1" 11581.4 a r y 63 ` 2$Q. ` • 12206- ' s 78 0.888 '29953.0 Privste Street ` 3.227; 0558.4 . +` ' 8876-0 - f :. A 0.204- j 0.241;.. w10491.6 x . k .. B , - Y l -• - ... .. . '` ` '{-' Y• ISN ).^ .. - 'L4. seri ..• cF ' ! — .} .. •a lY i • . }R .� ,!'-, •. - _ .. ' I r 2 •' ' '� t' • ��' - ^ - r ,. - . • } r a I + ` 1, _ t; a • ;' ' •. ,`, 7 • •'' `•'r - f?'1 y. s - , 'x . 1. "• 17