Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2805
NOTE: Wq' proper=validating this form constitutes an encroachment permit CITY OF LA QUINTA' APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, "sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS } September 21, 1998 Subdivision Improvement Permit — Class I II DATE: Minor Improvement Permit Class IV `LOCATION OF CONSTRUCTION PGA West Tract 28838. southeast corner of Madison Street and Airport Bled. (Street address or Description of Location) PURPOSE OF CONSTRUCTION Rousth grade Phase 1 of Sketch (attach construction plans if appropriate) 'bract 28838; 77 lots DESCRIPTION OF CONSTRUCTION Rough grading to shape parcol loto.and street subgrade. SEE ATTACHED CONDITIONS. f DIMENSION OF INSTALLATION OR REMOVAL U 25 acres i•/— SEE APPROVED ROUGH GRADING PLANS. t.SIZE OF EXCAVATION, IF NEEDED Sae Plans. APPROXIMATE TIME WHEN WORK WILL BEGIN September 28, 21998 APPROXIMATE TIME OF COMPLETION November 10, 1998 ESTIMATED CONSTRUCTION COST $ 126,000. (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify,defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as,a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at ,least twenty-four (24) hours in advance of the time when work will be started. w. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta-andto pay for any additional replacement necessary as the result of this work. � `Signature, f Applicant or Agent / +e ?,!�, Rielly Homes, Inc.# 23 Corporate Plaza, $Te. 245, Newport Beach, CA 92660 (949) 719-4 Name of Applicant (please print) Business Address Telephone No. F & F Grading , Inc., P.O. Bou 1487, La Quint&, CA 92253 (760) 398-5530 Name of Contractor and Job Foreman Business Address Telephone No. . 727144 4809 Contractor's License No. City Business License No. Vnited _ Capitol IltsvvAnce Co. CLA1252398 Applicant's Insurance Company Policy Number .� ... k FEES: Subdivision Improvement Permit — Class I I I�°`� Public improvements: 3%of estimated construction c.st�� .+ " ub c prove tr / o Private improvements: 3% of estimated construction costs e Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 3780 s Permit Fee 100. Penalt�As Built lee 1000. Cashh-Dpos vSuurre#�y `B* ond' (2,,501 r.tan 1.aac:k Deposit if required TOTAL: 1 $ min -An Receipt No. Received by Recorded by Date 2805 PERMIT VALIDATION PERMIT NO. 2805 DATE APPROVED EXPIRATION DATE DATE ISSUED, ' By r I t it t�AX h I" --VV Telephone: (619) 777-7075 Administrative Authority : ; NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED. SUBDIVISIONS Wesi Subdivision Improvement Permit — Class 111 DATE: 1 TrztGl-- Minor Improvement Permit Class IV LOCATION OF CONS TRU TION Q 4 — lill_L�_— 1�^. • j' corner f • fl J 1lI�Ot1S0►'1 IStreat address or Description of Locetionl AiV d , RPOS , OF�ONST0UCTIONy / Jr Sketch (attach constructtiio{n`plljns if appropria 1 i (2 Tsw r /'n'7Z ATT DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COSTS (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing -permanent resurfacing and/or replacing improvements) In consideration of the -granting of this permit, the applicant hereby agrees to: Indernnity,.defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and a" penalties, liabilities or lou resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at lout twenty-four (241 hours in advance of the time when work will be started. Comply with ail applicaWe City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of Le Quina and to pay for any additional replacement necessary as the result of this work. . Signa re of Applicant or Agent '71 1i c 11 C- UL-/ Homcsl 7-4 Name of Applicant (please print) Business Address Telepho a No. F ��u Id..� f f7 L�fall `�`ZZS 03 ��-- ,!? Name of Contractor and Job Foreman Business Address Teleph ne No. S,O -/ 4 'vG Contractor's License Na. v4h C t"yYMV � . 60 • City Business License No. &i�A-i25239S Applicant's Insurance Company GEN.141A61LITy Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ PERMIT VALIDATION P rmit Fee �t` r a© PERMIT NO. it-SlaDATE APPROVED �(,�C EXPIRATION DATE L: TOTAS DATE ISSUED Receipt No. Received by Rer_nrrivrt by Date By Administrative Authority r ... 1 I � • .. • ,, . y r •'S• � • • • � � � I .. •f �j� •r' ' :ti. . . , AIRPORT.' BLVD.. �~ 2 12131141 13 14 1S 16117118119 120Mll2. 3 4 S 6 7 8' '9 10 11 12 13 14 11 11, 15 A' I 10 t 16 ` 17 8 LOT F 7 TRACT "m' 2ad3d-2 6. 7262524 23 28 27262524 22 29 28 27 26 25 24 2322 21 20 C ,19 f 5 ' 29 n r 4 30 38 3940 41 3031 32 33 34 35 36 37 38 39 40 I 3 3/ 36 37 W2 32 3S �. W 1 ' 33 34, 2 I r 56 sill SS I ;. 3 76' ` SS 16 15 14 13 12 M19 7 6 5 4 75.. S3 11 10 -8 159 Z" 74 60 52 " 17 32 33 34 3S 36 37 38 39 .73, 61. 51 18 1 4 724, SO - 19 30 62 I 49. LOT P 20 29 Q I '701 X63 4b), .,, 21 28 9 , `84. 471 22 27 - t68, 67 66 65� 46 23 26 . to y It �% 24 2S. 40 41 42 43. 44 "" 22I " -2139 , , 38 TRACT M0. 2=1 24 19` �J r - 25 +1 81, SCALE 1, -4W17 , ` 1 137 36 3S 1341 33 32 -31. 30 29 ,,2 27 18 ' .3— 2 3 4 'S.; ;6, 17� 8' 9 10 11 12> 14 ADDITIONAL ' DEDICATION MADISON ST. ; ; , - ..MDS Consulting CIT � - Y OF LA [1i1i1yTs .Planners .Engineers •Surveyors t - 79.799 Old Avenue.52 SEP 2 1,1998 760/771 7:4073'... { `la Quinta, CA 92.253 - �, TUBLIC W itiCk r CITY OF. LA QUINTA V'DATE: September 18, 1998 78495 CALLE TAMP.ICO PROJECT N0::,440-00 t, LA.QUINTA,.CA 92253 - SUBJECT: TR28838-1 ,ATTENTION: MARCUS FULLER # ' ,ROUGH -GRADING 1 PERMIT A THE FOLLOWING�ITEMS ARE,TRANSMITTED: HEREWITH VIA: DELIVERY 0 UNDER SEPARATE COVER ` ITEMS '' DESCRIPTION .Y ` 1 EA PREREQUISITES FOR GRADING PERMIT, ISSUANCE, COMPLETED, FOR YOUR USE 1 EA APPLICATION FOR PERMIT, PUBLIC.WORKS,:CONSTRUCTION.(ENCROACHMENT) 1 EA PERMIT FEE, $2,630,.BEING'RIELLY HOMES, -CHECK NO. 1 EA R,IELLY,HOMES,- LETTER OF SEPTEMBER.18; 1:998: 1 EA- 'I CONTRACTOR AGREEMENT, ESTABLISHING GRADING CONTRACT, AT $126,000.00- 1 EA' '.FDCP'APPL'ICATION, COMPLETED VEA DUST -CONTROL SURETY, $25,000, BEING REILLY HOMES CHECK NO. 1025 r f. �. THE ABOVE ITEMS ARE SUBMITTED: AT YOUR REQUEST `® FOR YOUR REVIEW ❑ FOR YOUR FILES t . ' ® FOR YOUR APPROVAL ❑ FOR YOUR USE' � ❑ FOR YOUR INFORMATION" +' GENERAL REMARKS: ;. - ,. .'® ENCLOSURE ❑. COPIES TO: , t r } BY: George Prine . - t MDS A ' Morse' Dokich : •. .: SchuRz y 't I �# rl,-! rt.equisites for Grading ''Permit Issuance �. . t The La Quinti Engineering Department assigns-'a specificcity staff member as a,;Project Manager to ,. every grading project that is proposed: If you have questions or heed assistance regarding any of the' q prerequisite items on this checklist; or re ardin the' City's plan checking g g g process; please contact the ' . �, • • Project Manager assigned to your project. Your Project.Manager is Marcus Fuller he maybe reached at (760) 777-708 1. Environmental Assessment :. ;.... �` , ❑.. 2. Archeology Study ... .. . •.. ❑ �' c 3 gPProved project.concept .. r ... ..:..... ❑A. . 4. Compliancewith specific prerequisite Conditions of Approval for grading ... ❑ ' ! 5: Approved grading, plati and'soils report .'!��%ft- ' ���.O FK.- ,❑,•_.. . 1 r*, Phb�69l_ c �- - 6. Third party approval(s) for offsite grading ... (�� ❑ n . 7., Third party approvai(s)-for=acceptance of drainage �� ❑. 8. Approved Fugitive Dust Plan' r ❑ - ~{ 9. -Approved Storm'Water Pollution Pref/v�eitiio`n Plan (SWPPP)' ......::. ❑ f`.. r '' ,10: NPDES.permit� 'oU . • ...1 .Wim~ .�� . O }< •=-J 11. List of Professionals:......... ❑ -Surveyor M_ 4.)S �SvL.7io ' ; . Soils Eng in eer%Technologist t� e1v'• -fri Archeologist .1.2. Application for Grading Permit .. ❑ j 13 Insurance�Certifi Cate. .. .. .,. . �.. ❑ . . `.. 14.` Business License . City Sk?v�lQL1C��.:. • ,- ' nr � � .FEES= - .� '.. rs• . -� ' . Y ►- •.. �'. • 15(a). Plan checking f • T :. t:-� a- 1 5(b) Grading Permit fee 376 JZ6000' A 1786*1-00 ..... .: ❑ '. { 16.:.Fringetoe Lizard fee ..... ' .......... •❑ ' ,+ r .. �r . �' rt � �„f y ! ` �. 4, _ f ,a, . '• L, � r y y __ x •.Ar. ' • r .. .. 17. , As-Built plan security deposit �: 7((� O.. ❑ `' CiVADESIOMORA0ING.DC1 • . . PROPOSAL AND SUBCONTRACTAGREEMENT =,. Midly Homes, Inc. { Contract # w, A Delaware Corporation -01 THIS CONSTRUCTION CONTRACT ("Contract") is made this 2 day of SEPT. 1,1998 between the following, parties: j _ CONTRACTOR: r RIELLY HOMES, INC. 23 Corporate Plazai Suite 245, Newport Beach, California 92660 SUBCONTRACTOR Name: F&F GRADING, INC. s r, Address: ' P.O. , BOX 1487. LA QUINTA, 'CA 92253 ' If the Contractor is also the Owner, all references to °Contractor" shall apply to the Contractor in its capacity as both contractor and owner. If the Contractor is not the'Owner, the name and address of the Owner are as follows: • Name: Ir 'RIELL"Y'HOMES & MADISON L L C' 1, • y, Address: ' 23 CORPORATE PLAZA4245 'NEWPORT BEACH,CA 92660 F ' PROJECT: Name: _ ' THE LERENDS AT' PGA WEST ' Address: MADISON & AfiRPORT, I A QUINTA, . , Job Number: " Subcontractor, at his own cost and pursuant to the plans, specifications, drawings and all detail requirements referred to hereinbelowi agrees to'., furnish and install all of the integrals and labor required for the completion of, the following improvements: .;TO SUPPLY,AND-INSTALL ALL`LABOR, MATERIAL''S AND EQUIPMENT -.NECESSARY FOR THE COMPLETION OF ROUGH'GRADING TO' -THE ABOVE -REFERENCED PROJECT.- TO ROJECT.TO INCLUDE: - MOVE IN, CLEAR &,GRUBB-LOTS'(TOTAL 77) AND HAUL.OFF-AND DISPOSE OF.SITE VEGETATION TO A- LEGAL DUMP SITE.- ' SCARIFY LOTS TO 18"'AND RECOMPACT'TO!90% PER'SOLL' REPORT BY.SLADDEN ENGINEERING DATE7/22/98 CERTIFY .TO CITY STANDfARDS WITH {BLUE TOP'+.- .101.1 CUT STREETS PER PLANS-& SPECS. - DUST CONTROL'.ZURING ENTIRE GRADING :OPERATION. MOISTURE- CONDITION _ PER SOILJNGINEER :WITH F&F WATER TPZ,, X5. EXCLUDES , CONSTRUCTION WATER, SOIL-:TESTING,'STAKING, PERMIT.FEES; & CURB, SIDEWALK.& GUTTER -GRADING. TOTAL'CONTRACT AMOUNT: $126.,000.00 EXHIBITS:"'.—z EXHIBITR'A CHANGE'ORDER/PURCHASE•,ORDER INSTRUCTIONS EXHIBIT '''B" BILLING .& PAYMENT ,SCHEDULE . EXHIBIT "C" -'PLANS & SPECS `. EXHIBIT "D ',SAMPLE OF 'CHANGE ORDER + ` =. EXHIBIT:°"E" - TAXPAYER',ID_'# (FILL OUT AND RETURN) u ' EXHIBIT' "F,". - SCOPE OF WORK EXHIBIT -"G" . MINIMUM -INS.'.REQU.IREMENTS ' * PLEASE NOTE =.NO MATERIALS WILL BE PAID FOR PRIOR TO BEING INSTALLED ON THE JOBSITE. -ALL MATERIALS.ON SITE REMA`IN.'THE RESPONSIBILITY OF THE SUBCONTRACTOR UNTIL THEY HAVE BEEN'INSTALLED. *' 10%'RETENTION-WILL' BE -HELD ON.EACH INVOICE SUBMITTED AND WILL BE PAID THIRTY (30) DAYS AFTER. OWNER HAS.RECORDED'A NOTICE OF COMPLETION. THE SUBCONTRACTOR DOES.'HEREBY AGREE TO COMMENCE'WORKING ON THIS PROJECT WITHIN '48 HOURS OF BEING -NOTIFIED BY THE CONTRACTOR SUBCONTRACTOR'AGREES.,10 PROCEED WITH HIS WORK IN A DILIGENT MANNER Dc rn(_N T 7T Rfr TI IA -r TTldr _T e- nr Tarr r.^rr.•r•� +•• .--•-•• " —. .-.. ..-. •— ._ _ , MOVE IN, CLEAR & GRUBB LOTS (TOTAL 77) AND HAUL OFF AND DISPOSE OF SITE VEGETATION TO A "y k - DUMPSITE. SCARIFY -LOTS TO 18" AND'RECOMPACT TO 90% PER SOIL REPORT BY SLADDEN ENGINEERING DATE7/22/98 CERTIFY TO CITY STANDWARDS WITH BLUE TOP + - .10" CUT STREETS PER'PL'ANS & SPECS. DUST CONTROL DURING ENTIRE GRADING OPERATION. MOISTURE CONDITION PER SOIL ENGINEER WITH.F&F WATER TRO69S. EXCLUDES CONSTRUCTION WATER, SOIL TESTING, STAKING, PERMIT FEES, & CURB, SIDEWALK & GUTTER GRADING. TOTAL CONTRACT ANOUNT:,$ 126,000.00 _• EXHIBITS: EXHIBIT "A" - CHANGE ORDER/PURCHASE .ORDER INSTRUCTIONS EXHIBIT "B" - BILLING.& PAYMENT SCHEDULE EXHIBIT "C" - PLANS &SPECS EXHIBIT "D" - SAMPLE 'OF CHANGE ORDER EXHIBIT "E" - TAXPAYER ID # (FILL OUT AND RETURN) EXHIBIT"F" -'SCOPE OF WORK EXHIBIT "G" - MINIMUM INS. REQUIREMENTS * PLEASE NOTE - NO MATERIALS WILL BE PAID FOR PRIOR TO BEING INSTALLED ON THE JOBSITE. ALL MATERIALS ON SITE REMAIN THE RESPONSIBILITY OF THE SUBCONTRACTOR UNTIL THEY HAVE BEEN INSTALLED. * 10% RETENTION.WILL BEHELD ON.EACH INVOICE SUBMITTED AND WILL BE PAID THIRTY (30) DAYS AFTER OWNER HAS RECORDED A NOTICE OF COMPLETION. THE SUBCONTRACTOR DOES HEREBY AGREE TO COMMENCE WORKING ON THIS PROJECT WITHIN 48 HOURS OF BEING NOTIFIED BY THE CONTRACTOR. SUBCONTRACTOR AGREES TO PROCEED WITH HIS WORK IN A DILIGENT MANNER RECOGNIZING THAT TIME IS"OF THE.ESSENCE IN FINISHING THIS PROJECT.. THE SUBCONTRACTOR SHALL NOT BEHELD RESPONSIBLE FOR DELAYS CAUSED BY OTHER INDIVIDUALS INVOLVED IN THE PROJECT, OR ACTS OF GOD. ACTUAL DATES OF STARTUP AND COMPLETION OF EACH SUBCONTRACTOR INVOLVED WILL BE PROVIDED BY'THE ONSITE,SUPERINTENDENT'OR HEAD*OFFICE. IF THE.SUBCONTRACTOR FAILS TO COMMENCE WORK OR PERFORM AS OUTLINED ABOVE, THE SUBCONTRACT WITH RIELLY HOMES WILL BE OPEN. FOR TERMINATION. PLEASE NOTE: NO EMPLOYEE OF`ANY SUBCONTRACTOR WILL BE ALLOWED ON SITE AND NO PAYMENTS WILL BE MADE TO ANY SUBCONTRACTOR THAT DOES NOT HAVE :1) A CURRENT INSURANCE CERTIFICATE IN OUR OFFICE'WITH AT LEAST THE M1NIMUM'REQUIREMENTS SHOWN ON EXHIBIT "G" OF YOUR CONTRACT AND 2) A CURRENT CITY'LI'CENSE.' ALL SUBCONTRACTORS MUST HAVE ORIGINAL RELEASES FOR ALL SUPPLIERS ACCOMPANY ALL INVOICES. * PLEASE'NOTE: OWNER DOES NOT SUPPLY, RENT, OWN OR OPERATE ANY TOOLS OR EQUIPMENT OR MACHINERY. OF ANY KIND. OWNER TAKES NO RESPONSIBILITY WHATSOEVER IN REGARD TO ANY CLAIMS OF ANY KIND RESULTING FROM ANY ACTIONS OF THE SUBCONTRACTOR OR ITS EMPLOYEES. THE SUBCONTRACTOR IS FULLY AWARE OF ALL CURRENT CAL -OSHA SAFETY REQUIREMENTS AND PRACTICES AND AGREES TO KEEP ITS EMPLOYEES INFORMED"OF ANY-ANDALL_UPDATES.DURING THE PERFORMANCE OF ALL WORK COVERED UNDER THIS CONTRACT. . OWNER WILL NOT TOLERATE ANY'ALCOHOL, FIREARMS, DRUGS, RADIOS, PETS, OR FOUL LANGUAGE ON SITE. IF SUBCONTRACTOR FAILS TO ABIDE BY ANY AND ALL OF THESE CONDITIONS, THE SUBCONTRACTOR WILL BE BARRED IMMEDIATELY.FROM THE.SITE AND ITS CONTRACT TERMINATED. This Contract is hereby acknowledged and executed: RIE LLY HOM S, IN r� A Delaware Corp ratio By: � "Subcontract" By: Subcontractor's Lice r:Z 71�ZV Its: V'. By: Please.return BOTH COPIES of this Contract duly executed for exe ion and return by Contractor. *CONTINUED ON REVERSE The following General. and Special Provisions are attached to and made apart of Permit No r s ! + y n GENERAL PROVISIONS ` The following shall always apply:. ENROACHMENT ON PRIVATE PROPERTY: ,This permit authorizes work to be accomplished within City of La Quints right of + .t• way ONLY. Whenever construction extends within private, property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. i TRACT LAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. i All mechanical outriggers shall be fitted with rubber sweet shoes to protect the paving during excavations: Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing '• • pavement is scarred, spalled, or broken during the term of this contractor if the pavt:ment is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C. surfacing plus appropriate seal cost as specified above. a _ PROTECTION.OF TRAFFIC: Allexcavations and work areas shall -be properly lighted and barricaded as deemed necessary by the ' r City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be and for placed maintained the duration of the project. The City shall be notified 24, hours in advance of any traffic detours or delineations. • ,� ,CARE OF DRAINAGE STRUCTURES:_ Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and r concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes ► necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. , Drainage structures and open drains shall be kept free of debris at all times for proper drainage, i. ' RIGHT OF WAY CLEANUIN Any surplus material resulting from excavation and backfill operations shall be removed from the right . '. , .. - of way. All paved surfaces shall be broomed clean of eartb:and other objecrioaable materials immediately after backfill and compaction. - Existing gutter line and drainage ditches shall be replaced to their original standard or better: All'excese material shall be removed " " prior to paving. Water. tanker shall be used, as required, to sprinkle the job site to keep down dust condition and shall be tised��` -, immediately after backfill: J . t DE -WATER OPERATIONS: If de-waterin operations are required and pumps are forcia wafer on Ci of La /' ` tet' ' B P 9 P P g City . Quinta roads; it shall be the responsibility of the permittee'(contractor) to control this water and to provide off-street barricades when necessary. re Al 1. , . ` + .. CLOSING STREETS: No street shall, be closed. A minimum of one lane of trif i shall be maintainedut'alC times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the p'er[�ittee that be trust close a street for ' ' • any length of time, permittee shall contact this office to obtaiti the necessary permission.l - { SPECIAL PROVISIONS. The following shall apply when indicated: f RI NOTIFICATION: Permittee shall notify, the City at (619)777-7075 at least 49 hours in advance of starting construction. 4 UTILITY CLEARANCE:, (Substructures) Prior to tusking any excavationwithin the City of La Quints right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operation conducted under this permit shall.be the sole ' responsibility of the permittee. UTILITY CLEARANCE: (Surface. Structures) No work shall be done under this permit until all utilities aro clear of the, proposed work site. The perm_ ittee shall notify all concerned utility companies of the proposed work. > R4 • PAVEMENT WIDENING: Area between the proposed concrete, gutter line and the existing road pavement shall be surfaced , �.. with with inches of A.C. paving placed on -. - ithes of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards and } - Specification, Ordinance #461. r`t ' ,^ • ,�t ) ., (RSj ` PARKWAY:GRADING: 'Area between the property line and top of the proposed concrete curb shall be graded to a slope of r� L/ 1/4 inch to one foot (1'). y r, R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer: ' { R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and'gutter (_feet) shall be removed.' Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb; matching concrete gutter and ' concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. RS DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property -� line and the existing road paving shall be 2 1/2 inches of A.C. paving placed -on ( ) of class aggregate base: Driveway contractiori shall conform to ittached'drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in alldirection_ 'shall be assured and maintained at all times. ' SOIL STERILIZER: . The area to be. surfaced shall be treated with soil sterilizer. Rate of application shall commply with the r • manufacturer's specification. r ' t COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. 12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the 9 centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by A licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than G� three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the. roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (51 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall- be.plai ed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is(the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed.to retain the water. Where uv jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. i R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R1 COMPACTION'TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of. California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21- - PERMANENT PAVE EENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quints road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. '..pU'-` ;f r _ of i "F!^'9 i'i` .+�'1• "'.fie . . ? y;.; r SPECIAL CONDITIONS --PERMIT NO: •2805 --'Rielly Homes In addition to the standard permit conditions, the following shall apply: 1:` • Pursuant to Section 1416.320 of the La Quinta Municipal Code (Ordinance 10 §' 1 (part), 1982);• all Work shall `be performed'in.accordance with the latest edition of the -Standard Specifications For' ' - Public Works Construction (SSPWC) and as directed,by and to the satisfaction of the City Engineer: ,. 12Rielly Homes, hereinafter referred to as `'Permittee"•,'shall be responsible for providing contmuousr • , ,dust and erosion control pursuant to the• Fugitive Dust Control Plan. -_3'.. Streets shall be kept clean: •They shall be copplete'ly cleaned at the end of each working day and ._ ` • • ;, r . -more_ frequently if required. 4. Pursuant to Section 6.08.050`ofthe'La Quinta Municipal Code (Ordinance 18 § 1, 1982),ahroughout y: the work site, the Permittee . shall comply with City regulated work''hours.. Operation and .maintenance of equipment within "one-half mile of human occupancy shall be performed only during ; the following time periods; . October 61stto-April 30: Monday=Friday 7:00 a'm*. to 5:30' .p: ` r '' • '. z ;' Saturday. 8:00'a.m. `to 5:00 p.m: • + . ' '.May+St to September 30: Monday=Friday• .6:00 a.m to`7:00 P.M. +.Saturday 8:00 a.ni: to'5:00 p.m: Work shall,be prohibited on legal holidays and Sundays. 5. " .'tWork.peiformed within•500'feet of a major, and/or signalized intersection-is'restricted between th'e'. �''•• ` ~ ° hours of. 9 a.m. - 3 p.m. Traffic control sliall be .set up after 9 a.m. and removed before 3, p.m. The. `Permittee shall contact the Riverside Country.Traff,6 Signal Maintenance Department at•(909) 275- 6894 if signal operation at the intersection is to be al tered'in any way.'' -6. Pursuant to Section 14.16.1'1"0'of•the'La Quinta Municipal'Code (Ordinance 10 § 1 (part),,1982)i Permittee shall assume responsibility -for repair' of any pavement damage to any public or private. - ,�: street and for any, damage to other City streets or facilities as a result of work performed under this permit. 7 ! Pursuan't.to Section 14.16.250'of the La Quinta•Municipal Code (Ordinance 10 § 1 (part), 1982), 'advance warning signs and traffic control shall -be installed and rnaintained in accordance with Cal ; Trans Standards or the Work Area Traffic Control Handbook(WATCH Manual). A traffic contiol. -. T . plan, if required; shall be- prepared in'accordance with the WATCH Manual and submitted to the City for review and, approval. one (1) week prior'.to stirting•any,construction. It shall be•the' • Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Pemiit No. 2805 r ' S • Page l �of 3' ,. '� ..— r x�� V ? � p , r F � t - - r • - `. a '*+..r r � �. SPECIAL CONDITIONS --PERMIT NO: 2805 •' + , * y ---Rielly Homes x 1-.: 8. Pursuant'to Section 14.16.290 of the La Quinta Municipal,Code,(Ordinance 10 § 1 (part); '1982),, ` street closures shall not -be`permitted:'•' A minimum •of one travel lane of paved surface • shall be J - • ` 4. maintained with flagmen at all times. 9. " Prior to'excavating, if required, the Permittee.shall'contact Underground Service Alert at.1-800-422- -4133. It shall be the Permittee's responsibility to notify the Public -Works Departnmenfof anticipated r excavation which'impact City facilities, includingibut.not liiimited to traffic signal conduits�and loops; `:-•`' irrigation lines,, electrical conduits, and storm drain facilities. r16. `. Should'additionai work,'materials, or modifications of the work be required in order to •meet City. standards; safe ' re u><rements si age re uirements or-to'fit actual field conditions the work shall tY q P g q . , t� r be performed by.the Permittee as directed by and' tot he satisfaction of the City. Engineer at no cost , • to the City` o£La Quinta: + ;" 4 1 ll :` Pursuant to.Section 1'4:16.370 of the La Qiiinta Municipal Code (Ordinance 10§ 1 (part),.1982), 4 backfill- compaction within street rights-of-way shall conform with Section 3064.3 of the latest , edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by . ' b the Public Works Department. Backfill shall be completed in lifts, not to exceed 1';.cdmpacted t' . , r ' 90% minimum relative compaction.•Native material may be used, provided the material,is suitable, F ` for use'as backfill after construction operations. Controlled Density Fill (C.F.) may be -used as an alternative.- •4 r �, 12. ' Alfexcavations within City of La Quinta right- of -way, shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of a - the� ty Engineer for the protectioii�of the public: Lengths of open.trench shall not greatly exceed - F. that which cannot bebackfilled in the same day..Excavated"trenches shall not;be allowed open - `' r , overnight -however, Permittee may leave a length of excavated trench; not to exceed twenty,(20) feet in -length; open overnight at a point where construction will begin the next day, provided that this length of trench, is completely covered by steel plating, 13.� Al1 landscaping, irrigation; ydecorative rock, decorative concrete, lighting, etc.; shall be replaced to"1 .,.. 4. its.`original condition: 14. • Access and egress to all local properties shall be maintained at all times., 15. Pursuant to! Section 14.16.375 of the La;Quinta Municipal Code (Ordinance 10 § 1 (part), 1982); permanent pavement replacement shall" be completed {no late" ihan seven (7) days',after the `completion of the work: Permanent pavement shall be replaced as follows:. �- '. - a). Sawcut and remove'existing a.c.-surfaces a distance of one, foot (11) beyond all trench walls, _ • , including any • sloughing or ' cave 'in of adjacent soils: Undermined a.c. surfaces •shall be removed. All a.c. edges shall be straight, clean and vertical: x -b) Provide an existing section (four -and -one-half inches {4'Y21 minimum) of crushed aggregate + or miscellaneous base material, compacted`to 95% minimum relative compaction. ' . Special Conditions - Permit No. 2805 4' M- Page 2 of 3 • • ` 1 '� • •tt ' " . - [ • X14 - 1 1 � • ' . •' .. • ' . L y SPECIAL CONDITIONS --PERMIT NO 2805 . • :, - ` - , .--= Rielly Homes --- , c Provide an existin section plus one inch 1" four inches 4" miriimuhi of Asphalt concrete f $ ' in two;(2) or':more-lifts; the.`first lift(s){comprised, of a base course a.c. material,,of a City ' i � roved mix des>< meetin the re uirements'of Greenbook class B=AR -4000• the final 0.1.0 Approve •.R� y _ • "-lift comprised ofa:wearing course a.c. material, of aCity approved mix design, meeting the requirements of .Greenbook class ' C2 -AR -4000. All pavement edges shall' be flush with41 adjacent a.b.'surfaces.^Each lift of a.c. material shall be'compacted to 95% minimum relative r , compaction: r f _ * ;! d) . For trenches, greater than two feet,(2') in width, the Permittee shall perform a grind and a.c.. , ^lr overlay: of 0:10' depth for three feet (3') in addition to the pavement replacement specified . above. w _ 16. ` 'Permittee shall notify the. City of La Quints Public Works Departmeint a minimum_ of 48 hours ,a prior to commencement of any construction.at (760) 777-70.75: -` • 17 Permittee shall stabilize any soil .that was 'disturbed(shoulder, areas,• etc.) as a'`result of work "performed ander this permit with an approved dust control treatment. ' ,JL r y '18. Pursuanfto Chapter'l2.56 ofthe'La Quinta Municipal Code (Ordinance.l0,§ 1 (part), 1982) the City'' has designated certain, city streets as Truck Routes. The weight limitfo"r restricted streets (i.e:; streets ' not part of the -Truck Route network) is ,three• (3) tons; trucks exceeding the. weight limit may use a restricted street if making a delivery, or pickup `on the subject street, or i'f this permit specifically grants permission to use,the street-to:`deliver street construction materials and/or. equipment.. ' >.:19. The City, of La Quinta reserves the right to revoke„suspend oevoid thisapermit at any time. ; 20 This permit -'authorizes rough grading of Tract:2883&1, as shown on the approved plans titled: ; / "'k6ugh Grading Plans, ,Tracts 28838-1, 2, 3, 4'.','by MDS Consulting, ' _ t M, a `. - ' •` 4 - ° , t4 fin. '. _ «• - . r . 41 ,r 1 , d •-.a�, ' }i T _}• ', ( • r '. . F ., i' ./ '� � fir' ' e +'� ` -� � TT ` ; Special Conditions -Permit No. 2805_ Page 3 of 3 Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres), Z Fugitive,Dust (PM10) Mitigation Plan C IT.q 6r Date: 912-Z,19,8 jurisdiction: LAQIJ ) X2 4- Project File #: 7az z6o.7 a -t Part 1 - Project Information �p�P QS-oN2 ` Please provide the information below as completely as possible even *if it. has already been provided on other forms related to this project.' Failure.,to provide complete information or provision.of inaccurate information may delay the processing.of. your Fugitive Deist. (PMI0) Mitigation Plan (Plan).-- It is recommended that you submit your Plan concurrent with your grading or demolition permit application: 5 ' Day phone *number: 7(ol)SZ�$7SSSC Emergency phone number: ' . Grading contractor (Contact Person): 'FL--ux=-l9iZ -Address: l Project proponent: Address: '�Jll,'PUlli��l; �Utl�b� Sc7l1� z r Day phone *number: 7(ol)SZ�$7SSSC Emergency phone number: ' . Grading contractor (Contact Person): 'FL--ux=-l9iZ -Address: Day'phone number: 7(o : 3qb-SSoCEmergency phone number: .3 ¢S Construction site street address: Construction site location: (Please include an 8.5 x 11 location map) Construction site assessor's parcel number (Tract - Parcel (Tract) size: .ZS� (PH ( cres or ,Square feet Anticipated date'of physical project initiation:� I Anticipated date of project completion: KC)V p ` I q Anticipated costs for'dust' suppression: $ . (Attachment B- Must also be completed anAma�de 'tot the appropriate address when.- hen..construction. activities have been completed) construction. P9 SCM 'ECOVE 1ED ,x SEP22� SEP -2 CITY OF LAQUINTA ` CITY OF r• LA QU . INTA P . , CANNING DEPARTMENT . P LAN KING ....... DEPARTMENT - 1 All projects greater than one half (1/2)'acre are also subject to SCAQMD Rules 403 and 403.1. t I ,i tF' .ti t sr 7 r 3 a. Y`t k r y.: .Part 2" Fugitive Dust Control Actions From the'inventory of fugitive dust control measures provided in Attachment A, please indicate - which measures are, to -be implemented during the project by placing the -corresp'onding letter" beneath the following sources. 'In addition, please indicate: at -which phase,the.measure will be Y-. implemented, either at Rough • Grading - (RG), Finish Grading (FG), or 'Final Construction .. (FC). Demolition projects should only indicate measures in the Rough Grading (RG) colunin. ' After indicating what measures are 'to be. complete, the-'Details:'�.secteon describing,.h' w and when' the measures are.,to 'be, implemented. Source _ 'Details (e.g.& freauencv of application,,*number and type of dust control implements. - No. RG ;FG FC etc.- Please be as specific as possible) .. A• � "` a.. r: �" •• - - Gr ' . UCS.• `` t ! ' �• ^. • ` � • � a .� �_ �..•, , ' � f`� �v t>9t.. �Ja9-�t � a i--c� f'�P �il.lJ'X 1�a�i1'�y r" , NL 4,'� � ,�' .. e • 'y -�OV - ` v (4`-s t- r•. ''M • „ •. I 4. � frt. (y. < Use co ies of this a e if additional s ace.is' needed) P P g P » y.. ' Source " 'Details feg 'freauency of application, number and type of dust control implements No. RG" FG fC etc. Please be as specific as possible) ' ' A' i, •� '* ''{ A 7 •, � - t♦ i y•� 1. i �� - • i r T ase .. _ { w. r � � ' .. '-J•� +''A •�a. { w e` - .' ,�• .... .: A. - 'i -y-A ,.i'_ r - t �* r . y ` � .F F' _. , ' • �A'• - • •ltf •^ 16 S .. - .» Y - ��' r Y t�'; a y, • ATTACHMENT A- REASONABLY. AVAILABLE CONTROL MEASURES left column,contaihs •the. sources of fugitiveI dust which are intended for emission'control under the City's, dust control ordinance. The two right--columns contain an inventory and description of, reasonably available fugitive dust control measures-for each of the sources. xa ,;:'=Please use:this information as a•guide when preparing a. Fugitive Dust.(PM10) Mitigation Plan:` (Source No) Reasonably: Available J� '•Source_ Control Measures Comments', ; Land (A) Watering o Application of water by means of truck, hoses and/ _ Clearing/ or.sprinklers prior to any land clearing or earth a .Earth- movement will increase the"moisture content` thereby moving t increasing stability of material ' o Once the initial land clearing/earth movement activities are i complete, a second round of watering can generate a thin ; crust which stabilizes the disturbed surface areas,piovided f' r that it is not disturbed o Security fencing can be used to prevent unwanted future ` • : tiy' disturbances of sites where a surface crust has been created" (B) Chemical stabilization. o Only.effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations; w t (C) Wind'fencing o Three to five foot barriers adjacent to'ioadways or urban areas ' can be effect* reducing the amount of windblown „ r material leaving a site ' r ' o Should beused in conjunction witli other`measures (D) Cover. haul vehicles .0 Entire surface area should be covered once..vehicle is full' ; (E) Wheel washers o' Should'be placed,where vehicles e.dt unpaved areas onto paved ureas , • o' System can be adjusted to'spray.entire vehicle, including stored r . bulk material in haul vehicles Y Unpaved R (F):.Paving „ , - o Requires street sweeping/cleaning if subject.to material Roads accumulation n r (G) Chemical Stabilization o .Vendors.can supply information as+to application methods and - " concentrations f o Not recommended for roads with high volumes or those"used'for heavy equipment • . ' (H) Watering o In sufficient quantities'to keep surface moist ' rt o Required application frequency will vary according to soil type, n , ` weather conditions, and vehicular use..'. s • A (Source No) Reasonably Available Sou ree Control Measures mmen J (2). f .. •k+ f. Unpaved ~.(I) Reduce speed'limits 0 15.mile per hourmammum , Roads -, (Cont'd) (J) Reduce vehicle trios r o Access restriction or redirecting traffic to paved roads in order to ` reduce vehicle trips by a minimum of '60 percent Storage (K) Wind sheltering o Choices include silos'or enclosures Pileso - €�. • Enclosures should consist of three sided barrier's equal to height.of. Enc , ' material with no more than 50 percent.porosity } `(L) Wet suppression - o'Aoplication methods include: spray bars, hoses and water. trucks T ' " • ' ,' :. o .Frequency of application will vary on site specific conditions (M). Chemical suppression o..Best for use on storage piles subject'to infrequent disturbances . ', ,.. (N) Altering loadin/loadout o, Confine loadin/loadout procedures to leeward. (downwind) side' c • :... procedures of the'material o`Most-effectiv' when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary, - _ • {- D • coverings - ' • • - o When used, these should be anchored to prevent wind from e ' ' R--------------- removing coverings ' - ----------------- -+..- �- - ------------------- (4) ---------- „ ..-.• .------ ••----r Paved ' (P) Wheel washers " o Should be placed where vehicles exit unpaved areas onto paved. Road ' Track -out - ' , areas ' o System can be, adjusted to spray entire vehicle, including stored bulk material, in haul vehicles (Q) Sweep/clean roadways ; o 'Either sweeping or water:_flushingmay be used • ..," ;,' .,.• (R) Cover haul vehicles -- o Entire surface'area should be covered once vehicle is full --------- ----- ------Disturbed ,. (S)• -;------•------ Disturbed --- i------------ - -- -------------------------------------------------- (S) Chemical stabilization o Vendors can supply information on methods for application and r Areas/ j required concentrations 'Inactive v s . . Construction ....Sites x • ; V (T) Watering, ,. o Would require frequent applications unless a crust 'can be developed over the site ' (U) Wind fencing, o Three to five foot barriers adjacent to roadways or urban areas. ' • ' can be effective in *reducing the amount of wind blown ` material leaving a site , 4 fi o "Should be used`in conjunction with other measures }' (V) Vegetation o' Establish as quickly as possible when active operations'have s establishment 'ceased • o�Use of drought tolerant, native vegetation is encouraged. ` ATTACHMENT B -,COST INFORMATION ; Medium-Large.Scale Construction/Demolition Projects - (Greater than 5 acr6)1 ` Fugitive Dust (PM10)•Mitigati6n Plan. D C 0i q= .9 Jurisdiction: L0-QVi� Project' File,#• �oGP _Sw�Z F • rf �' •7 _ R -In the space provided below please list the costs associated with implementation` of all dust = control measures.. The, information provided. below, should include. all implementation costs ' (including labor) for.dust control -throughout the -project:.= Not all, measures -listed below will apply to all projects. Watering: Chemical stabilization:' `Wind fencing: r = Covering haul vehicles: Wheel washers: Street.sweepin_ g: ,. . • �. Paving:,t Wind sheltering:,, p. - a, Coverings: F Vegetation reestablishment: ,.After - project completion these ' recordsshall , be; transmitted to the. -,City' where :the grading/demolition 'permit -was -was attained and, to the `Coachella Falley • Association• of ` Governments (CVA G) at the address provided below.*.' ' V +i PM 10 .Cost Monitoring ''. Coachella Valley. Association of Governments • 73-710 Fred'.Waring Drive, Suite 200. ...y. i I • . .Palm Desert, CA 92260: �1'All projects greater than one half (1/2) acre are -`also subject to SCAQMD Rules 403 an t- . 403.1. AIRPORT BLVD. r F Q' — 110111112 12 13 1141 151 16 17 18 11912012'111 •1 2 3 4_ S 6 7 Jill 9 13 .14 11 10 10 :. 18 9 _ - 17 a LOT F _ I 18 -7 TRACT N0. 29838-2 6 23 2 29 28 27 26 23 24 232221 20 C 19 29 28 27262524 S 4 30 41 31 37 38 39 3031 32 33 34 38 36 37 38 39 40 3 36 Ld 2 32 35 1 W '• 1 33 34 2 56S5 3 N 1 76 75;: s7' 58, I 54 16 S3 15 14 13 12 11 10 9 8 7- 6 S 4 Z r 74 S9 ., 60; 3i - 17 37. 32333435 36 38 39 O 73 I 6/ 31.1 18 1 30 72 h 30 19 71 62, 48 LOT,P 20 29 Q I 761 63 ' 48 21 28 89 84 47 22 27 68y 87 Be 46 _,. 23 .16 24 25, , 39 40 41 4243 '�'� _ r 22 s� �r 38 y TRACT NQ 28838-1 j 25 '26 14 f 17y , ' 37 36 3S. 34 33 32 3/ 30 29 27 28 16 ' v- , 15 17 :Z' F3. '4.. _5 s6 iji g '8: 1.0 -1-1 Y2 13 k ADDITIONAL DEDICATION MADISON ST. _ a 441 c • Iry + + t CONDITIONS. FOR FDCP APPLICATION. 98=42: 'REILLY HOMES •R. -PGA WEST TT 288381; ± 25 ACRES, 77 LOTS GENERAL: d • - 1. }Applicant shall comply *with all control -measures,as set forth in the approved ,. ..FDCP 98-42 ,application,•.and the following, conditional'measures. This dust_'- ` v --,control plan-approval,shall alsoapply to any encroachment or haul „permit(s) ' issued by Public Works. t• _ 2.� The full amount of security; for, FDCP 98=42 (as :"determined by Public. Works), 4 .. shall •be available for -any measures) ,deemed necessary by the .City to achieve , ..� • ' ;.. '. adequate dust control, whether or riot such additionakmeasures are'..proposed with this application. Any requests for bond amount revisions/reductions must be made in writing to'the, Public Works Director. The applicant -shall implement, 'all Ymethods set `forth herein 6 ford the duration of - the 'project construction. r k Security shallbe in the form of -'a non -expiring. Certificate of ,beposif,or a, - . 'renewable Letter of Credit. 3.• �' Applicant shall submit copies -of all records related to cost.accounting for the dust _control measures, assumed during"all pre -grade' activity and grading • 'constructio'n upon -any; request for release/reduction in,.posted security. `Said,' records shall be submittedwithin 30 day s•after"completion of all dust control' ;- measures as,outlined in and conditioned upon the plan: Allsuch records shall til accompany the completed .PM 10 Program Reports Form;. which can be. obtained from ,the Public Works or Community, Development Departments. Completion of all -dust control measures shall be verified by the assigned.field°inspector, A - 4:�. 'Adequacy ' ,• • q y 'of.' all proposed and conditional stabilization- measures shall, be determined •by, the assigned grading inspector:.The City may require -remedial` , measures beyond those identified`or'conditioned'upon the,proJect, which the City'deems`necessary in the event such approved measures are not effective:. • ' Enfo'rcernenf of these, conditions shall be at the discretion of.the"assigned, grading inspector, who shall monitor and field verify that%the'spirit and intent `. t-, T "` of the-FDCP and,its'attached conditions. are being_ complied, with.. Adjustments '",'a �•= y _ .to, application frequencies, quantities,and`nther aspects of�this "FDCP-may' be ': 'made by the,inspector, at his/her discretion; in order to. assure compliance.' .' The contractor/vendor' responsible for provision of all -soil stabilizing agents • t. shall submit the.,appropriate MateArial Safety Data°Sheet(s), along with approval , 5 �from'the Wate'r.Quality Control Board,,to•the Public Works -Department prior;to...,;" any site application. Application of stabilizing agents must be: in compliance` ;with, "NPDES and the State:Water Quality Control Board requirements. ti . „ • ! , .iia � nr„ . t. Y �'+g.,'•'r_'x; , 1, i:x �r , .. F �•• - } •� rrf �A - The conditions;of this dust control plan-approval,are applicable'to the full range - a of "construction. operations associated with the entire '25 acres and 77 16tsYt'.�.1.�,.r r ' within TR 28838-1, .,and' shall remain in , effect' for the =duration of . all,,' ..construction:' undertaken as part of development approval for the subject".,,', - r . property: e - , ;., Transfer of real.property or other interests regarding Jhis shall not affect " project the validity ;this . plan., approval. Implementation' of all proposed , and 4 '. "of: 'conditional measures shall, l a carried, out for the duration of all construction ':, Activity, applicable: However, nothing hereinshall preclude. any ;future,party ;as -of.interest from filingrasevised' FDCP•with the City for,anyportion of the',site.' ' 7: Approval of. -,this dust, control ,plan 'does' not 'in •and• of. itself 'constitute' orr . y � otherwise authorize ny site disturbance; preparation 'or`construction. The- a t developer is required to, obtain any arid all necessary permits and clearances . Y• r yas set" forth in 'any development approvals ;issued,and currently in effect". .pertaining to this site. This include's„any type.of testing,, monitoring or -`sampling ” 'required as a condition development approval, such as that conducted for,".r. r • _ 'archaeologic,•hydrologic a:nd geologic -reporting purposes. SITE DEVELOPMENT: 8., 1 6 Any pre -watering of- areas proposed for grading shall - in, accordance with • ,6.e recommendations of, the grading contractor, based•on'the area soil conditions �Q as described, in the.associated soils report(s). At -a minimum, pre -watering time shall be for'three days prior fo. any eartt',distW.urbance(s):. 9. FDCP. 98-42 indicates that 9;127 CY of, export material will'be removed from f _ the site to future tracts. These tracts are not identified and•'no applications are y . ,. currently being processed by the City for Reilly Homes or' any known affiliate. 'Before any,.soils cavi be exported, 1) :Reilly!rHomes must apply,, for `any,' a encroach -meet or haul permiebs required by Public. Works, 2) ,state the location '1 ' and ultimate ,disposition of'` export material, "and .•3)- provide tproof, , of: ' • . r ";_ authorization to locate said export oWany•property'not,part of this approval. ` transported soilshall •be -.'sufficiently Istabilized " (watered• -down anal/or ,All covered) so as 'not to dust,�during loading,, transport and spreading'. ;create Minimum freeboard. shall 'be established- by the"Public Works Department. -Any' :* "3 'on/off-site storage piles shall be covered or`suitably. stabilized ' at all,.times. _ =+ ' These requirements' shall be "applicable to,any haul/encroachment. pe'rmit(s).r . issued by' Public Works., .r 10. Track -out, and other accumulation of soil material(s) onto an aved.� ublic y- p .. ' ".. � ' gip. • i" . �' •, '- streets outside of areas proposed for grading shall ,be minimized'(i.e,,.Msdison` ` ` Street, Airport Blvd., iriternd paved: roadways). An'y construction3access, to., Airport, Madison, or other existing paved roadways shall ..be improved, with = pavement, aggregate base -material or other similar method, for a distande of " f 120' from the pavement edge, in order to minimize track=out onto those paved roads. Wet sweeping/flushing of soil accumulations from all paved areas.'(i.e.-, _ internal project and. aforementioned streets) shall be conducted daily, and kept damp during construction hours until so removed at the end of the work day. ' 11. . All unpaved- construction access and travel ways within the. site shall be prepared for traffic and kept watered -down and .compacted to retain moisture content during all construction traffic/activity; including building construction. Road lengths, shall 'be watered at intervals each day,, commencing prior to any traffic activity and terminating at the'end .of the work day after all activity has • - . ceased. All track -out shall be removed as per Condition. #10. t ' 12. At 'a minimum, travel areas shall be improved to a 20 foot width: and be ' established and maintained as set forth in Condition #11 for the duration of all _ grading and other :construction operations as deemed necessary.by the City. 13._� Any on-site employee and equipment.parking areasahall• be properly stabilized, compacted and/or paved 'to. accommodate such traffic .activity. If on-site • roadways are constructed to ultimate design or otherwise paved prior to any ' construction activities commencing, then construction traffic and parking shall. . be limited to those .paved. areas. No vehicular parking or traffic of any' kind'.is ' permitted on or over any previously stabilized or other inactive' soil areas. Al[ temporary office, facilities (sales, -construction, etc.) shall be provided with paved, compactd or otherwise stabilized,,parking and access during their operation, with those' improvements to" be constructed as required by Public Works, Department standards. This requirement shall .be in effect whether'or _ not included in any approval. for such facilities under a minor -use or other permit "process. " 14': 'Disturbed but, inactive development areas shall be watered daily in conjunction z, » with watering of access roads and active developing areas .until an appropriate chemical binder; as approved by the California Water_ Quality' Control Board,. - Region- 7, has been applied. The City may release a portion of the bonded . amount to the applicant for. such work. Adequacy of all proposed- and conditional stab iIizatiori measures shall be determined by the assigned grading r inspector. - "All previously' disturbed areas where further grading, construction or -other land disturbance will -not occur within 30.days. shall be -staked, posted or otherwise restricted in order to prevent any "vehicular access onto or over those areas, and shall be stabilized no later than four days after completion • of the disturbance, in accordance -with the provisions and conditions for this dust control plan approval. • •t 1 / _ _ y 1. � .. • e ' 1 / / /• ��\�1Y7 h � yti • ' . + •, •s ' i � '�4 � A , t • f , 78-495 CALLE TAMPICO —'LA OUINTA,CALIFORNIA 92253' - (619) 777-7000: _May • 10, 1994 y ' FAX (619)' ; 777-7101 t` y n r 3 s TO `---'-ALL ACTIVE -AND PR OSPECTIVE•DEVELOP..ERS/BU:I-LDERS IN'THE CITY OF -,LA QUINTA• - _ - RE:.~ PW -10' PROGRAM REPORTING REQUIREMENTS FOR ' FUGITIVE DUST. CONTROL • PLANS -Dear Developer/ Builder: ., The�`Coachella Valley' PM '10 Program has been in its implementation phase since December;�•1992, Among the required, control measures was the eniactinen't by Valley, cities of dust control ordinances... which require builders• to. implement dust control actionsr during construction, demolition and paving activities.. In conjunction ,with City. staff members, we.ask your help with the reporting requirements. 4 - �u, u •A•significant aspect of the PM 10.Program is the,need to report statistical informalion'to`the Federal Environmental Protection Agency via the South Coast AQMD and•the State of California Air Resources 'Board. In 'response yto.this requirement, a Dust Control Reporting. Form has been created, a copy'of ` which is attached. It is:requested that if any project'developers have amounts to report for any PM 10.- { ' -mitigation, these forms must,be filled out. This form -is intended to supplement Attachment "B" of•the , Fugitive Dust Control Plan by providing specific cost figures related *only to dust control measures. The 'South Coast AQMD, has requested that the retroactive, operative, date be January 1; 1993, for reporting purposes.- This means that each jurisdiction isIrequested to review, projects since that date''` where PM 10 control' measure expenses have been incurred by developers, whether or.not they have - , , beenincorporatedas parrof a Dust Control Plan, and4orward this data to CVAG as soon is practical: r: --,Your cooperation in completing these' forms as part of the -grading' permit procedure' will help assure.., that the CoachellaValley' and the development community `as a whole receive deserved credit for the effort.to attain Clean -Air Act standards4or PM 10: ' Very truly yours, ,• , ; .: r �.., ' RRY 'HERMAN z . Planning & Development.Director JH WHN:bjs .VI Attachment • .., a ' —MAILING ADDRESS - P.O. ,BOX 1504' - LA OUINTA,' CALIFORNIA • 92253" TTRWN nlj - ,. - PM 10 Program Report Form ' ` •F� • + ' 'I.: GZXXRAL ' 12eORHATIOB' Project Developer Name: address: Phone: Project Sites _ 1 Project Title •..' Address:.. Tract No.:Acreages ` Grading Subcontractor (if..di.fferent) Name: 3+ µ. ��Address: .. ` Phone: ., �S _ } Isoshow many? 4 j Type of .Development/Project: czumercial Single Pamily_ M lti. Pamilp_' Demolition Other Date of Project/Phase start-Dn: Date of Project/Phase Comflletion:;:' • ° • "II. COST nWOR11ATI08 ` °If `actual costs are not available; please'estimate to the. best of-yo, f your ° .. � ,..... ' 1. wAtT7ffi�t7_ ,�+ P,mount: . -total Cost: • ' " h'• t• M`� 2 • I RQV PH30T COST.7' ,, • j•. ^- e_ . • ,- •' , e x I ,• t ,,i 'x A. Water Track: ,Number on Sites` Total Ccst: ' Hourly. Rate: °• T: Hours : �•J - { , B. Street Sw+eepe , Number :on "Site: 7 `' Total Cost: ' . Hourly ,Rate: " flours : 'x y C. TC7.mporaiy; Irrigation: '. t Total ,'Cost: Y ' s•. D. wind. Fencing: Linear Ft. Total+ Cost: co _ B. Ch emicalhSaterial Stabilization: Total Casts ' Cost.per Sq. Ft. o. F. Vegetation Cost:- Material: �, Total Cost: 'Ki 4ntenance: YCost: • , Y ''G: , e ,` Other: Type: ""Total . _ Hourly Rate.- ate: • Hours: Hours : J " •, , 3. LABOR COST: ` Hourly Rate: Total, Cost: •-t' Hours: L 4'. ADMINISTRATION COSTSb Total Cost III. TOTAL COSTS:, J add items;:1 - . 4 for -total •cast. TOIL COST: *LZASE .RETURN NORM, AT, COMPL2_TION OF PROJECT OR ?EASE` OR ANNUALLY r^ROH THE • . DATT OF.. ?ROJECT/.?HASE,'START Up. s 4 ,•.3/31/94 NOTE:,, V 0 0 With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT % PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS m J Subdivision Improvement Permit— Class III DATE: ° Minor Improvement Permit Class IV -LOCATION OF CONSTRUCTION ?V4A. CtUtbCaOt t1ndicon Stroot and: (Street address or Description of Location) PURPOSE OF CONST,RUCTIO,md N � � �o Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION uounc ur` taao ru c tclpo varcol. 10to SES ATTACEVID CO vDTTIO, DIMENSION OF INSTALLATION OR REMOVAL �`� X� i' cwoo -4n SRO APP O RID116% (11 I G SIZE OF EXCAVATION, IF NEEDED 600 11"3112" APPROXIMATE TIME WHEN WORK WILL BEGIN !�Cptaol)oz ` X1990 APPROXIMATE TIME OF COMPLETION t,�O oc_bor Lu, mu ESTIMATED'CONSTRUCTION COST $ XTO°TUU. 4, (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss"resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring asa proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. w 'Signature.orApplicant or Agent Rielly BFtz�=, c.# 23 Car orntI?7a���o �. �� , ? --- ore Tk,-6a%, CA 92660 Name of Applicant (please print) Business Address Telephone No. 7 t V Cre dl.c3 , Inc., P.O. Boy 1407, Ln �ztinz"a CA 92253 (760) 390-55"W Name of Contractor and Job Foreman Business Address Telephone No. 727144 U109 Contractor's License No. City BusinesstLicense No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See -attached schedule 3734' Inspection Fee Permit Fee Penalty_ Tom, ���rr, ) n Cash,- Deposit;SuretyyLBgnd, if required TOTAL: $ 2ac_�0.00 Receipt No. Received by Date Recorded by "PERMIT VALIDATION " PERMIT NO. u DATE APPROVED EXPIRATION DATE DATE ISSUED By i �, . Administrative Authority 1 -Telephone: (619) 777-7075 I.