Loading...
2817 (3)y of Permit N and mnde�a part t M}: +„ r attached to 4 e 4 Special p fovisions aTe ` ROVLS(ON5 , ,' and Y r- r following General , •, G� p►L Yr '± ` " _ r w x.. 'within City of La Quin a r 3ht'oi LL ; t Y _+ n sutho work to be accomphsh� e�ittee for his 'contr� rk tO Thr foll°winB shall'alwaye aPP Y:. OQ� This permioaertY• s the responsioby the4 rtuiace prior to starting ` •. M ' ;�+ ' ON YRNA aR leads within privatutitonrari must be set°red Y * not he Qermitncd to o4r to I „�. on m �OACSiViF erty owners. Such a Y constti►equipment sh with subbe; street shoes to Whenever canstru ction way ONLY • abutting Ptop, • ,i ', klaY g ers shall be tined ea„ If the eXysting' in on from Cleated trot cal outrig6 p ons is paved areas - led request szcure pe'rniss wool; < . mecb3m kfill o ersu rota shall . x O CONvCTIO� mooth•faced surer Pis' only shall be used in bat is marred, City, of La Qu of A.0 ; C ,Ay(Q`i ui meat or if the pavement o i6-hes t2') ` i'• TRA d Rubber -tired eq p o any Paved surface unless fate the term of this contract, shall consist of one coat of tw during excavations diiri°B width. Resucfacing • by the { ^protect the pawng . SPalted, or broken necessary "faced over their enure -, caded as deemed Pavemea[ is started' above, d barn, ed for the` _• +• ortioas of road be r co as specified To e,Iy lighted an laced and maintain " t' r thattheSe p ropriate seal, eas shall be P pur shall be P Y . surfacing Plus aPP excavations and va°tk Suitable detours and dd tout or delineations id.. r . bF TRAF'k'�C• woo. insPectors. , vane of any traffica steol culvert , PRO`E�Q ur La Quinw City ]Public b- notified 24 hours'tn ad `.'` Co"riigatea moral pipe• °Ong the tp me•"• d event it lbis " CitY EnB ect. The City ' ~ laces i0lun ' encemen[ of the prank• . e stNcturr includ'inB be fep T. duration of the project. t ,may dratnaB removal shall prior to comet * . Rp(NAGR U du`lrufng re whichC z t� Qu shall be notified P +• l `fir right ' r 5[R Ovation law proper drainage' CA"�sFtnictures encountered 8 drainage striieturesof debris at all ucoes (°t " , y shall be removed froID motion• ;v. ons and comp " . �, concrete Ye of cut exisnn� shall be kept fre + d backfiU' nperati 1 after backftll o� y to trm° and open drat t from excavation an �s Imypediate Y SW bbe e Drainage structures rial resulting other abjecdonable mate All excess mater►n shall Any Surplus in, of earth and � or better. dust conditions and JUGET pa � su •v ditches sh� ti� ul� o sto pe�e�ob site to keep dow°, ,• w roads, it shall of way., drainagas 4 " ' of La Qum; r f ' , gu ter hue er shall be u , water on City @xistin8 ,ior to paving water. and pumps are forctngee barritad�en necessary' ' f w pmmediately.at%r baCIA . ", ring opeigtidns are req�r � to Provide off strt t„ 1 'rim to provide limiter t,. r. OYFTLONS� If de-wawtOr) to conuo►this c shy be mainwinetl at all ctosa a street for ; v` TER flee ( of traffic PetmitLee that he uIDttst , _ . ° D the.feSQonsibility of the P` he closed• A minimum 0 "inn tbC event it is felt by the F i �,,,�cr� ties. fission. r• G ice'"_ NO street vb cs and emergeAcy tits a the necessary Perm CLOD the adjaininB PtoPerty contact This office too NS ` S access for erminre sh PRONWO r a _ any length of time, P SPECIAL• . + 4 t constrnttion. advance.of slarttnB r 48 hours in he following shall apply when 'tndicatedl notify the City at t619)m`7075 at least the City of La won o e�xistinB t of Y ` CAIIUN= PeYmitsee B �„y excavan relative to the lot be the .sole " NO't� F (Substructures) Prior to tnak>a. ' utility companies . ermit shall �,,���� concerned rations Conducted under this P` �. . M y y V, ti C SAS ( ermi a shall contact from oPetnu U►r►"`: the P resultia8 of the d by P all utilities are Clear, .• . - • autb°ru!C Damage*o existing �hstructures *:. , , ..- a t until _ ctures. substru of the Prrttcc `. 4 ; . « ' " done under th f p��ropo "'arfc be surfaced ' e tespOosibilitY a StcuWatrea) Nn work uWAY comp a existing road pavemenhaving an R sNC& (S � notify all coacery Crete Butter line and the, �e� sbbaar C° and site.. The Perrot between the pr°posed ifiches, of class `— fropfovement Standards prOp°sed FZO laced - work G: F Area of La Qu►nw Road t paving P , °II ity 8�'d� to a slope of • "` R4 YAV Wm then of A.C. P and in conformance `wth F U be wide than !^"`�' c000rete curb sh i value of not l ice y461. d top of the Pro 4 • ` . F ificatioas� Ord , opam brie an • t lished by ` Spat between the Pr r }.. re4 as established Area �.. a and/or } ` W A GRAD�G' t of plan and Profit . 4 r PARK � to oe foot W) check gfadea upon receipt shall he 4.1 w 114 innG. City of La Quints shall r curb and guar. a a� E • curb an�O y�tching Concrete B ear:. r onion of the egg concre P� d curb: ,l `� C'lic d'engin x AYS: , A p or to removal. Standard Y207.- W w rut pri of La Q� . .� OVAL FOR DRNR gutter shall be saw ce vrrtth City between the pco4r "{ :.x� ; �R7 rC ovved. Curb andlot C shall be cokb an nstructed to cO°fO + existin6 drain,a'ge. Pattern: Summating aggregate base ' r 4, ` Concrete driYe'waY approach cted as not to alter on t� °f class 1-- r _ coat 1. s shall be coostru of A.C. paving Prat " , >. ' pYS; A.C."driveway shall be 2 112 inches Y ` all limes• .. . • ' DWEW road paving bed drawing wined at 'line and the ext tkg conform to attnc {ed and ma►D ction s assu hall lions shall be Y t My� _ COsun t in all d'uec ap ti�tioa shall coMM .' Drivevmy t, a of 600 fee gme of P y t clearance rd aer, • ti s.i _ .osNCEs Sigh 1 b used with soil see + , e: f StGUT l�i.rr��'�. m be Surfaced sha0 a �. ,SOY, SLifieati��• �. r .� *. �;�� w ••` '.:"�'-�� •'.�'� ��, f .facturer'saY- ^� Fes`, '. • � }; -•',3 '+ �:i.1� , • _ COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of a r i k. La Quinta may conduct in this area during the period of this permit. Work`shall becoordinated with the State or City of La # Y Quinta forces to preclude delay or interference with State of City of La Quinta projects. , " i» ^ _ • r 4 ."'� �;.t 4 - R12 SURVEY MONUMENTS: Prior to excavation or beginning of constructiop, all survey monuments which exist on the � 4t'. p' • centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense•of the permittee. A complete set of notes showing the ties to "'':. �•' these monuments shall be furnished to the City Engineer prior to the removal of any monuments... This office shall be notified - ., upon completion or replacement of all survey monuments for proper project clearance. • " R13. -PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation.' Method , of pavement cutting shall be approved through the office of the City Engineer. (Under no' circumstances shall excavating . • t ." ,r ,; equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best t„'• facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be6 corrected. LIMIT OF EXCAVATIONS: xcava ns shall be limited to 1000 linear feet of open trench before backfill operations must egin.` All excavations shall be p y'barricaded with lights overnight, on weekends and holidays for the protection of the :^• � F "F: •; e�q ",.traveling public. The Public Wor ector shall determine the suitability of excavation barricading in each case. No `r excavation shall remain open' for Peri-od4xceedii3g five (5) days. No excavation shall be made unless the construction's - - - ' material is actually on the work site. rt, ; ` _' • = 6.r BACKFIQ.I. MATERIAL: kfill all be free of brush, roots or other organic substance detrimental to its use for purposes " • i./ of producing an adequately con fed backfill. Any material which the City of I a Qtiinta deems unsuitable (spongy or' i + saturated material) which'is ene me during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gray { r• - r '` BACKFILL SAND: Back all be approved transit -mix sand or equivalent and shall be placed in lifts of not greater than - three feet (3') and vibrated r vibrotamper of equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction o 5 percea hall be attained with the structural section of the roadway. 7�, BACKFILL PLACEMENT: kfill shall be applied in layers of not, more than 50 percent of the total depth of the trench before flooding or a maximum o ve-f (5) lifts where trenches are of excessive depths. Care -is to be exercised that the t backfill material is not subjected to tr e swell byflooding operations. Backfill'material shall•be.placed so that the resulting v " compaction shall be not less than 90 rcencor equivalent to the surrounding ground, whichever is(the greater compaction. a e e ' Where ponding or flooding is used i maximum settlement, adequate dikes will be constructed to retain the water; Where jetting is used, the jets. shall be o sufficie length toreachthe bottom of each layer and the water supply shall be continuous. ' 18 '"COMPACTION TEE: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 r { feet and a minimum of one (1).test on each road. • One'(1) copy of each test shall be forwarded to the City Engineer for ` approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the rJ ° 1' K , , ` '. '• . Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. ry One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. ' Compaction tests shall be made as outlined in Section 6.3A1 of the. Standard Specifications, Division of Ffiighways,'State of .. i• California. dated January .1973. t .,' 4a'' gM •„. ` ,R20 ..TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch c �' consisting of 2 inches of SC-800 •shall be placed on a prepared subgiade. The SC-800 temporary paving shall be placed after a iy e ti )' •."maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. a c " `• . r R21 PERMANENT PAVEM NIf REPAIR: 'After backfill and compaction have been completed, a temporary patch consisting of . two inches (2') of SC-800 shall be placed immediately. 'A'permanent patch of `inches A.C. surfacing placed on a inch class ` .• base shall be placed -no later than days after completion of temporary road repair. ` .' ;, !R22 - .FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied overall patch areas a '. determined by the City Engineer.' �" �• * t' ' R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon; o - w ,,• 'completion of permanent repairs. a ti , . R24 .TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall beA. t accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard. to the traveling ' public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing'coadition at its new location. •Fc - Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The •' , r' , " ' " �`" z`• entire width of the tree stump shall be removed and.disposed of so that no debris remains in view of the highway. The stump,< _ Note shall be backfilled and thoroughly compacted as specified in the following paragraph. -Where is becomes necessary to 'r • `- restrict traffic. the work shall be restricted to a maximum'of 500 feet at any one time., Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times.'; Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impactor field method. Compaction tests shall' comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. F`. c. •., >, •rr _ j• -, ,• 3^' • .} • ` _` i " + tJ 1µ. � � ri i �r'T '�•.y.. aL J , ` M , t -t r _ 1 ✓ ^. { _ ?' . �1 #. { •:� ,si. j, SPECIAL CONDITIONS --PERMIT NO. 2817; ,1 r r --- Catellus Residential In `addition to the standard permit conditions, the following shall apply: ' ' • Pursuant to Sg6tion.14.16.320 of the La Quinta Municipal Code,(Ordinance,10 § 1 (part), 1982);all �j t ' work'shall' be'performed in accordance' with the latest edition of the Standard Specifications -For'. - Public Works Construction (SSPWC) and as directed by and to the satisfaction of the'City Engineer: = a � wry yt � y y t � ' •� • •f � .i -;. , 1 Y '•C r' �ty �>! •/ws J -2 Catellus Residential, hereinafter referred Was "Permittee"„ shall be responsible for `providing ` continuous'dust and erosion control. - z ".A Y v , f 3_'Streets shall be kept clean. They shall be completely cleaned at the end of each working"day and '. ` •' more frequently if required. r +:4. - y Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18. § 1`, 1982); throughout the work site; the Permitte'e .shall ,comply with City regulated work hours. Y"Operation and - maintenance of equipment within one-half mile of human occupancy shall be performed only tiring " h the following time periods r October 1 st to April 30: ' =r Monday -Friday, 7:00 a:m. to 5:30 p.m. Saturdayt 8:00 a.m:'to 5:00 p.m. . • '♦' � 1 .{ t , if 1 , Y. .. _. • .,` _ 6 -' y - b' �Mayr l st'to September 30: �y Monday-Priday 6 00 a.m to, 7:00 p.m: { - Saturday' 8:60-a.m. io 5:00 p.m., E= Work shall be prohibited on -legal holidays and Sundays. . F y4' ` rL'Y �, ^ .,rx. -i ;;. .. - Y F r • ; • a .r •� ' +I - *ti 5: ' ' .Work performed within S0Qfeet of a'inajor and/or, signalizedi intersection s restricted'lietween the hours of 9 a.m. - 3 p.m.' Traffic control shall be -setup after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-- rM w t''^t 6894 if signal operation at the intersection is to be altered in anyway._- : ' ' �6: Pursuant to Section 14.16.1.10 of the La Quinta Municipal Code (Ordinance 10 §>1 (part), 1982), ,. Permitiee shall assume responsibility for repair of any pavement damage to any public or, private ' •� 7; street and for any damage to other, City streets or facilities as a result of work performed'' under this r# n permit. ,, S , _ ' 7.. =Pursuant to Section 14 16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 '(part), 1982), 1.11 advance warning sign's and traffic control shall be installed and maintaineddn accordance with Cal " , r wTraris Standards -or the Work Area. Traffic Control Handbook (WATCH Manual)., A traffic control ti 'plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the,, r City for review ; and approval one (1) week. prior ^to .starting. any construction. It shall be the..", Permittee's 're"sponsibility to appropriately detour and barricade all construction sites: F y K l Special Conditions,-' Permit No. 2817 + Page 1 of 3 ` ..-xf •ir . .. fit. � - ... .��• .. .:+`...��.V. +� c� SPECIAL CONDITIONS --PERMIT NO.2817 --- Catellus Residential--- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code, (Ordinance 10' § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall_ be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact, Underground Service Alert at 1-800422-. 4'133. It shall be the Permittee's responsibility,to notify the Public Works Department of anticipated excavation which impact City, facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should -additional work, materials, or modifications of the work be,required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions,- the work shall beperformed by the Pennittee as directed by and to the satisfaction of the City Engineer at no'cost to the. City of La Quinta. 11. Pursuant to"Section 14.16.370 of the La Quinta Municipal Code(Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of --way shall,conform_ with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. Backfill shall be completed in lifts, not to exceed V, compacted -to 90% minimum relative compaction. Native material may be used, provided the material is suitable for use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an alternative. '12. All.excavations:within City of La Quinta -right-of way shall be backf lied, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of. the -City Engineer for the protection of the public. Lengths of open trenchshall not greatly exceed that which can not be backf lled in the" same day. Excavated trenches shall not be allowed open overnight, however,.Permittee may leave a length of excavated trench, not to exceed twenty, (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench `is completely.covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14.. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal. Code (Ordinance 10 § 1" (part), 1982), permanent pavement' replacement shall be completed no.'later than seven (7) days after the completion,of the work. Permanent pavement shall be replaced as follows: a) Sawcut and remove:existing.a.c. surfaces.a distance of one foot (F) beyond all trench walls, including any sloughing or cave. in of adjacent soils. Undermined a.c. surfaces shall be removed. All a.c. edges shall be straight, clean and vertical. b) Provide an existing section (four -and -one-half inches" [4th"] minimum) of crushed aggregate , or miscellaneous base material, compacted to 95% minimum relative compaction. Special. Conditions - Permit No. 2817Page 2 of 3 1 G.` y ti a Y , 'A • i .y r r ; sfi !r A lrt < n �NO. SPECIAL CONDITIONS --PERMIT NO.2817 �' r L* Catellus Residential -- 4; ` ;F • .... ,'i - t - _ '. , }, s ,_ ,yi , t ... . t;J'f • -Ids. .. • c) Provide an existing section plus one inch (1") [four inches'(4") minimum) of asphalt.concrete w f r• in two-J(2) or more lifts; the first lifts) comprised of a base.co'ur se'a.c. material,,of a City • :'' ,• ' } approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0A 0, „# K r ,• ` lift comprised of a wearing course a:c.'. material; of a City appioved'r ' design;'meeting the,,,°•az' . t requirements of Greenbook class C27AR=4000. All pavement edges shall be flusli'with r ; adjacent a.c. surfaces. Each lift of a.c:•material`shall be compacted to'95% minimum relative 14 ' compaction: L• , `: y d) For.trenches greater than two feet (2') in width, the. Permittee shall performua grind and a, "yr • , f overlay, 6f 0.10' depth,for three feet (Y).in addition to the-, pavement specified"'! •., � � { above. ` 4 , , e) 'Multiple trench cuts, depending upon location and quantity, may require complete .grinding ; F ;w and 0.10' depth asphalt concrete removal and repaving;' at' the direction I of and "to the. satisfaction_ of the City Engineer. lOther,altehiative surfacing, such asslurry sealing,'may be aPPvt the direction of appropriate Homeowner's Associat'ion.and the City.Engineer.roed a}~ 16. •y Permittee shall notify the City of La Quinta Public Works Department a minimuni of 48 hours $w ` k prior to commencement of any construction at (760)' 777-7075. ' ,l 7. Permittee shall stabilize -any soil that was 4disturbed (shoulder areas,, etc:); as a,result of work performed under this permit with an approved dust control treatment: 18., Pursuant to Chapter 12.56 of the La uinta'Munici al lto& Ordinance' 10 §1(part),1982 the City r a, has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e.; streets not part of the Truck Route network) is three (3).tons; trucks exceeding the'weight limit may use a•`' restricted streef if making.a delive" or pickup.'on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials.and/or equipment. , ' <• . ' 19. The City of La Quinta reserves'the right tb_ revoke, suspend or void this permit at any time. r ` 0. 20. �, This permit authorizes removal and relocation of,existing storm drain improvements at the Citrus, Tract 24890-6. - , .r kN• s ... ' �• •�- . •_ . - •:. '.f. Yam• •?5. ' -' a••}' A .i. Special Conditions- Permit No. 2817 ; . . . 6,.. �+' " .� A� � �' Page 3 of , + `