Loading...
2823 (3)• SPECIAL CONDITIONS -=PERMIT NO.2823 - t• '� KSL Land. Corporation In addition tothestandard permit conditions, the following shall'apply: Cyr r "Y - 1. ' y Pursuant to Section- 14.16.320. of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1.982), all work shall be •performed in accordance with .the latest edition of the Standard Specifications 2 For •Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. -' '2. KSL Land Corporation, hereinafter referred to as "Permittee",.shall be responsible for providing ' r continuous dust and'ero`sion control. _ Streets shall be kept clean- They shall be completely cleaned at the end'of each working day and more frequently if required: r , a 4'. Pursuant'to Section 6.08.050 of the La Quinta Municipal Code (Ordinance-18 § 1, '1982), throughout '. the work site; the. Perrriitteeshall comply - with City : regulated work hours. Operation and' maintenance. of equipment within one-half mile of human occupancy shall be performed only during the following time periods: , October 1 st to April 30: ' Monday=Friday ' 7:00 a:m. to'5:30 p.m. Saturday:, 8:00 a.m, to 5:00 p.m... May st st to September 30: Monday=Friday 6:00'a"m to 7:00 p.m.. }' Saturday/ 8:00 a.m. to`5:00'p.m: Work shall be prohibited -on legal holidays and Sundays. l f. 5. ,-Work performed within 500 feet of a major and/or signalized intersection is restricted between the ' , hours of 9 a.m. - 3 p.m. Traffic control shall be°set up after 9 a.m. and removed before 3 p.m. The ' Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- ' 6894.if signal operation at the intersection ig to be altered_ in anyway.`�r s, 6. Pursuant to Section.14.16.110 of the La Quinta Municipal Code (Ordinance'10 § 1 1982), ' •(part), Permittee shall""assume responsibility.for repair of any pavement damage to any public or private ; r street and for any damage to otherrCity streets or facilities as a result of'work performed under:this - -� - permit. + - 7: Pursuant to Section 14.16.250 Hof the La Quir to Municipal,Code (Ordinance 10 § 1 (part)i 1982); ' ., advance warning signs and traffic control shall- be installed and maintained in accordance with Cal • Trans Standards -or the Work Area'Traffic Control Handbook (WATCH Manual). A traffic control ' plan, if required, -shall be prepared in accordance with the WATCH Manual and submitted to the.*', City', for review and'approvall=6' (l) •week•prior to, starting any construction. •'It shall be the,. ; -Permittee's responsibility to appropriately detour and barricade all construction sites.' .• . Special Conditions - Permit No: 2823 �' w + �r ' ' _ cPage 1 of 3 r i $ LYl •, * .'= r ! L 1 r�Jv•. + — 4. Y .. AY. y' G . " SPECIAL'CONDITIONS==PERMIT NO.' 2823' • E . ---. KSL Land Corporation'--- Pursuant to Section 14-16.290 of the La Quinta Municipal Code (Or'dinance l Oh § 1 (part); 1982), �8. ` street closures shall not'be permitted: A minimum of one travel lane of paved surface shall be 4' - maintained with flagmen at.all'times. 9. Prior to excavating, if required; the Permittee shall contact Underground Service Alert at 1-800-422= - , - . 4133. ' It shall be the Permittee's responsibility to notify, the Public Works Department of anticipated ' excavation which impact City facilities, including but not limited to traffic signal conduits and }loops, irrigation lines, electrical conduits, and storm drain facilities. Should additional,work,.materials,'of modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work' shall ' be performed -by the Permittee as directed by and to the satisfaction of the City Engineer at no cost. to the City of La Quinta: - a • F r I Ly Pursuant to -Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), ' backfill compaction within street.rights-of-way shall conform with Section 306-1.3.of the;latest edition of the Standard Specifications For Public Works Construction (SSPWC), arid as required by,, . the Public Works Department: Backfill shall be completed in lifts, not to exceed 1', compacted• to ; • ' : �` h . .: 90% mirumum`relative compaction. Native material'may beused,-provided the'material'is suitable,'for use.as backfill after'construction operations. Controlled Density Fill,(C.F.) may be used A an Alternative. '. 12. All excavations within City of La Quinta right-of-way shall,be backfilled,, and temporarily paved if ^' ' within the existing travel way, at the end of every workday,as directed by an&to the satisfaction of the City Engineer for,the protection,of the public.} Lengths"of open trench shall not greatly exceed F ` that which can.not lie backfilled'in the same day. Excavated trenches,shall not be allowed open overnight, however, Permittee may leave a length'of excavated trench, not to exceed twenty (20) feet ` in length, open overnight at a point where construction will begin the next day, provided that this s r 'length of trench is completely covered by steel plating.; - .13 All landscaping,irri irrigation, decorative rock decorative concrete lighting,etc. ;shall be replaced to g �. P - _ its original condition. 14. ;Access and, egress to all local properties shall be maintained at all,times:~ M- • -• , + A .. • ` r., a i .. "! •M S . is - � , j - 15: • Pursuant to Section 14.16.375, of the La- Quints Municipal`Code (Ordinance 10 § 1' (part), 1982); permanent`pavement replacement shall be completed .no later than seven'(7) - days after the _ . completion of the work.•• Permanent pavement shall be replaced as follows: s - a). Sawcut_and remove existingaa.c..surfaces a distarice of one foot (P) beyond all trench.walls,' - .. including an slou rn or •cave in of 'ad'acent soils.' 'Uridermined- a.c. surfaces shall be . ' g y. t g J ' removed. All a.c. edges shall be straight, clear' and .vertical. - ' ., k b Provide an existing section four -and -one-half inches 4'/z" minimum of crushed aggregate = .' -`. .:� • ' or miscellaneous -base material, compacted to.95% rriiriiinum relative compaction. , ' ` ,• �, ' Special Conditions - Permit No. H23 •a . Page 2 of 3 ' 1 ., j, •:� � "'f� to � t • '• } .. n, � 1 3. �_ '. � - ` � . SPECIAL CONDITIONS-=PERMIT-NO.2823 i ♦` "� ' ° --- KSL Land Corporation'--- T: k c) , ` Provide an existing section plus one inch (1"),[four inches (4") minimum] of asphalt concrete ` . ' in'two (2) or more lifts; the first lifts) comprised of a base course a:c: `material,' of a ' City . ', ti ; approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0.10' r lift comprised'of a:wearing course material, of a City approved�mix design,-meeting.the , requirements of'Greenbook class C2-AR-4000:•All pavement edges shall be"flush with z �, ' .y;' •, adjacent a.c.'surfaces. Each lift'of a:c. material shall be compacted to 95% minimum" relative, e r compaction. k . t d) ",'-For trenches greater than two feet (2') in width, the Permittee shall perform a grind'and a.c ,� '� •T',"t'. overlay of.0.10' depth for three feet (3') in addition to the pavement replacementspecified .above. f ' e) ': 'Multiple trench cuts, depending upon location and quantity, may require complete grinding ,`y ' ,. and 0.10' :depth asphalt concrete •removal and repaving, , at the direction'; of and to,the f satisfaction' of the City Engineer. Other alternative, surfacing; such as slurry sealing, may be _ approved at the -direction of the appropriate Homeowner's Association and the,City,Engineer* } 16. Permittee shall notify the City of La Quints Publie' Works DepartmenYa minimum of 48 hours .f prior to commencement of any construction at(760) 777-7075. «17:-., Permittee shall stabilize,any soil that was disturbed (shoulder`, areas, etc.) as, a- result 'of work performed under.this permit .with an approved dust control'treatment: +l8.- -Pursuant to Chapter 12.56 of the La Quinta Mur icipal Code (Ordinance,10 §,l (part); 1982) the City r o4 hasdesignated certain city streets as Truck Routes.' The weight limit for restricted streets (i;e.; streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight•limit may use a, restricted street if makin a delivery or pickup on the`sub'ect street or if this ermit specifically g ry p P J P p Y grants permission to use the street.to'deliver;street construction materials and/or -equipment. '< 19. The City of La Quirita reserves therright to revoke,. suspend or, -void this permit at any time.' `T .. 20. This permit authorizes construction•of an 8' wide meandering sidewalk�along Avenue 52, from Calle , L Rondo to Jefferson Street, as'part of the ;`Citrus" Tract 24890 perimeter improvements. Ae _ f.. ,fit t w# :' ..Y . - ♦- ,• - ' `• r r � :"'- .7., •;^ ..5 special Conditions - Permit No, 2823: Page 3 of 3 ' ''/ The following General and Special Provisions are attached to and made a part of Permit No. �23 GENERAL PROVISIONS The following, shall always apply: 1, �•,.." ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever, construction, extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT;. Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface, unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract, or, if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width.. Resurfacing, shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and .barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert -and concrete structures encountered during excavation which necessitate removal shall be replaced in kind., In the event it becomes necessary to remove or cut existing, drainage structures, City of La Quinta. shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY, CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or,better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be, used - immediately after backfill. D&WATRR OPERATIONS: If de -watering operations are•required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when .necessary. CLOSING STREETS: No street shall be closed. A. minimum of one lane of traffic shall be maintained at all times to provide, limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the pe7ittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: 51 NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48, hours in advance,of siarting. construction. ' UTIIITY CLEARANCE: (Substructures) Prior to making. any. excavation within the City of La Quinta right of way authorized. by permit, the permittee shall.contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole , responsibility of the permittee. ® UTIIITY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed, on inches of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ` PARKWAY GRADING: • Area between the property ,line and top of the proposed concrete curb, shall be graded to a slope of 1/4 inch to one foot (1'). R6 GRADE CHECKING: City of La Quintashall check grades upon receipt of plan and profile and/or grades as established by, a.licensed engineer: CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter -and concrete driveway approach shall be constructed in conformance with City of La Quinta' Standard #207. , R8 DRIVEWAYS- A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on of class • aggregate base. Driveway, construction shall conform -to attached drawing. ( (� SIGHT CLEARANCE: 'Sight clearance of 600 feet in all directions shall be assured and maintained at all times. SOIL STERELUM : The area to be surfaced shall be treated with soil sterilizer. Rate of application shall.commply with the (" manufacturer's specifications. 1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of -La Quinta projects. 12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days.+ No excavation shall be made unless the construction material is actually on the work site. R15 BACK ILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACIFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a.relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKF LL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall, be .placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is{the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and tl�e water supply shall be continuous. 18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for eaQh crossing or service line. �L One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 -inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. - R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be .backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.