APPLICATION FOR PERMIT -
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public. or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water, mains
and -other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
}' Subdivision Improvement Permit — Class III
DATE: '11/17/98 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION 'Calle Guatamala
Lot,22, Block 5..
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Install and maintain a Sketch (attach construction plans if appropriate)
one inch (1") domestic water service line.
,.DESCRIPTION -.OF CONSTRUCTION Excavate to main,
install 1" lateral
- SEE ATTACHED CONDITIONS.
DIMENSION OF -INSTALLATION OR REMOVAL 4f K 41'
SIZE OF EXCAVATION, IF NEEDED 4' .X.Ge
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION NinetS► (90) dates.
ESTIMATED CONSTRUCTION COST $ 1100.00
(Including removal of all obstruction, materials; and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing. improvements)
In consideration of the granting of this permit, the applicant hereby agree's to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or'property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the -Administrative Authority at -least twenty-four (24)'hours in advance of the time when work will 'be started.
Comply with all applicable City Ordinances, the terms and conditions of the. permit and all applicable rules and regulations of the City of
La Quinta'and to pay for any additional replacement necessary as the result of this work.
Signature.of Applicant or Age's nt
Coachella Valley Water District. P.O. Box 1058,'Coachella, CA 92236 760/398--2651
Name of Applicant (please print) Business Address Telephone No.
Caachell Valley Water District same. as above
Name of Contractor and Job Foreman Business Address Telephone No.
n/$
Contractor's License No. City Business License No.
Applicant's• Insurance Company Policy Number
FEES: 'Subdivision Improvement Permit— Class III
Public.improvements: 3%of estimated construction costs
Private improvements: 3%of,estimated construction costs
Minor improvement Permit— Class IV: See -attached schedule
Inspection Fee $ 0 PERMIT VALIDATION
Permit Fee PERMIT. NO. 2856
Penalty
Cash Deposit -Surety Bond
if required Y
TOTAL:, $ -
Receipt No.
Received by Date
Recorded by
DATE APPROVED 11/19/98
EXPIRATION DATE 11/19/99
DATE ISSUED 11/19/98
Administrative Authority
Telephone: (619) 777-7075
i
U;
f`1
In
Q
NOTE:
With Proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways. pavements, sidewalks, parking lots. sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: Ll /";, � Y
Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION — LL e U ✓3 = 'e-4- P"
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION IN -STALL AAID InAINTAIA) .A Sketch (attach construction plans if appropriate)
ONE I NC 14 C 1 'r 12V
DESCRIPTION OF q0(� STRUCTION—(,_�61'� S.
I In i . I I I l i 1-o Ir,,
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION NIAIETY f 9D) LA YS
ESTIMATED CONSTRUCTION COST S I I0D.00
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and i.
penalties. liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or proprrt�
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
r'
Notify the Administrative Authority at least twenty-four 1241 hours in advance of the time when work will be staved.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City o:
La Quanta and to pay for any additional replacement necessary as the result of this work.
Signature of Applicant or Agent
COACHELLA VALLEY WATER DISTRICT P. 0. Box 1058 COACHELLA, CA. 92236 398-2651
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor ense No. City Business License No.
lo
Applicant's Insurance Company Policy Numoer
The following General and Special Provisions. are attached to and made a part•of Permit No.��
GENERAL PROVISIONS
The following shall always apply:
ENROACHMENT ON PRIVATE PROPERTY: , This permit authorizes work to be'accomplished within City of La Quinta right of
way ONLY. ° Whenever constructibn extends within private property, it is the responsibility of the permittee for his contractors to
secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT:Cleated tracklaying construction equipment shall not"be permitted. to operate on
any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall,be. fitted with rubber street shoes to
protect the paving during excavations: Rubber -tired equipment'only. shall be used. in backfill operations in paved areas: If the existing
pavement is scarred, 'spalled, or broken during' the term of this contract; or if the pavement is marred,' City of La Quinta shall request
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C.
surfacing plu's appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: :All excavations and work areas shall be:prbperly lighted:amd barricaded as deemed necessary by the
City. Engineer Hof La Quinta City Public Works inspectors. Suitable detours' and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES:. Any drainage structure including corrugated' metal pipe, concrete pipe, steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes
necessary to remove or cut existing drainage. structures, City of La Quinta shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP: Any surplus materilresulting from excavation -and backfill operations shall be removed from the right
of way. All paved surfaces shall be. broomed clean of earth and other objectionable materials immediately after backfill and compaction.
Existing gutter line and drainage ditches'shall be replaced to their original standard or better: All excess material shall be removed
prior to paving. Water tanker shall be used', as `required, to sprinkle the job site to, keep down dust conditions and shall be used
immediately after backfill.
DE -WATER OPERATIONS: If, de -watering operations are required and pumpslare forcing water on City of La Quinta roads, it shall
be the responsibility of the permittee'(contractor) to control this water and to provide off-street barricades when necessary..
CLOSING STREETS: -No street shall be closed. A minimum of one lane of traffic shall be maintained at all times'to provide limited
access for the adjoining.propertyowners and emergency vehicles. In the event it'is-felt by the permittee that he must•clos ' a street for
any length of time, permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
Rl NOTIFICATION:. Permittee shall notify the City at (619)777=7075 at least 48 hours in advance of starting construction.
(�PUTILITY CLEARANCE (Substructures)'Prior to making any'excavation within the City .of La Quinta right of way
authorized by permit, the permittee shall .contact all concerned utility companies relative to ,the location of existing
substructure's. Damage to existing substructures resulting from operations conducted under this permit shall be the sole
responsibility of the .permAtee.
UTILITY CLEARANCE: (Surface Structures) No work shall be done under this permit' until all utilities are clear of the
proposed work site. The Permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDENING:. Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with inches 'of A.C. paving placed on inches 'of :class aggregate• subbase course having an "R"
Value of not less than and in conformance with City of La Quinta Road Improvement Standards and
Specifications, Ordinance (l461. „
® PARKWAY.GRADING:.;Area between the property line and top of.ii a proposed concrete curb shall be graded to a slope of
1/4 inch, to one foot(1').
R6 GRADE -CHECKING: City of La Quinta shall •check grades upon, receipt of plan and profile and/or grades. as, established by
a licensed engineer.
R7 CURB.REMOVAL FOR DRIVEWAYS: A portion of the existing'concrete curb and/or curb"and gutter (feet) shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed `curb, matching concrete gutter and
concrete driveway: approach shall be constructed in conformance with :City'of La Quinta'Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed, as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C:: paving placed on ( ) of class aggregate base.
Driveway construction shall conform to attached drawing.
SIGHT CLEARANCE: Sight clearance of 600 feet iwall directions shall be assured and,maintained at all times.
SOIL STERILIZER: The area to be surfaced shall? be treated with -soil sterilizer. ,Rate of application shall commply with the
m u au facturer s specifications. ,
_1%
11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
LEWrXAIlat
ATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. ns shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveline Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavatain open for a period exceeding five (5) days. No excavation shall be made unless the construction
materian the work site.
BACKFILLXsand
IAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producinuately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated mich is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approor gravel.
be approved transit -mix sand or equivalent and shall be' laced in lifts of not greater than
BACKFILL Backfill shall pp q P
three feet (3') d vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative co pac 'on of 95 percent shall be attained with the structural section of the roadway.
)R BACKF' ,L LACE : Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench
before floodin or a aximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material ' t subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall b of less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where pond ing flo ing is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, a jets s 1 be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
Rl COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
PERMANENT PAVEMENT REPAIR: After backfill and compaction have been Fompleted, a temporary patch consisting of
ty4o/inches (2") of SC-800 shall be placed immediately. e m t patch of inches A.C. surfacing placed on a
11-1P7 inch f4as@. CW base shall be placed no later an days after comple ion of temporary( road repair.
spc
R22 FOG SEAL: A fog seal .coat consisting of an application of asphaltic emulsion shall be a lied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed,. bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
1 COORDINATE WORK: The proposed.work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during+the period of this permit: Work shall be'cobrdinated with the State or City of U
Quinta forces to preclude delay or interference with State of. City Of. a. Quinta projects.
12 SURVEY MOB:. Prior to excavation :or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely.tied out so they may readily and correctly be
replaced by, a licensed, civil engineer or surveyor at the expense of,the permittee. A complete set of notes showing the ties to
.these;,monuments, shalh be furnished to the. City Engineer, prior to the removal of any monuments This office shall be notified
upon completion.or replacementof all suryeymonumentsJor proper.,project,clearance
3 PAVEMENT - CUTTING: Pavement will. be, mechanically saw. cut `to a straight to a straight edge. prior to excavation Method
of pavement cutting -shall be approved through the office of the City Engineer . (Under no circumstances shall excavating
equipment be. used .to excavate prior to cutting of pavement:) z Excavation; material shall be placed in such'a position as to best
facilitate,the.general flow traffic., Prior. to.final paving operations; any damage to pavement.straight edges sfiall be corrected.
..:•, ...
LIl�IIT O EXC ATIONS: Excavations shall be limited. to 1000'linear feet of open trench before backfill operations must .
begin. All c ations shall be properly barricaded with, lights overnight, on weekends and holidays for the protection of the
traveling pub The,Public.Works-Inspector: . shall'determine.the suitability of excavation. barricading in, each case.' :No
excava.io_ n ,s all sin,open for a period exceeding five ( days . No excavation shall be made unless the. construction .
material is ctually n the; work, site...
BACKFH L : „ Backfill. shall; be, free. of brush,, roots. or, other organic: substance, detrimental to its, use for purposes
of producing equately consolidated backfill ;Any material which.the Ciiy.of,L4 Quinta deems.unsuitable (spongy or
saturated mat i hick. is encountered during.excavation shall not used for backfill, but shall be. supplemented or. replaced
by an appro ed sand or gravel.
BACKFI:. Backfiu;. shall be approved transit mix sand ore . quivalent. and shall be;placed in lifts. of not greater than
LL
three feet (3') • d vibrated .using yibrotam er ,oij a uivalent a ui mint . Alternate methods'. may be.,substituted"' but in an case,..,.
a.P.. 0.
,5..q 9 P .... ,i Y . Y
a' relative co pac 'on.of 95 percent shall be attained;with tlie: structural section of the roadway...
YR BACKFII.L LA a Backfill shall be applied. in, layers of not more than.50 percent of the total depth of the trench
before 'floodin or.: a aximum.of.five-foot.(5') lifts. where trenches, are of.excessive depths.. Care is to be. exercised that the
backfill material t subjected: to extreme: swell by flooding operations -. Backfill,material shall be placed so that the: resulting
compaction shall b of less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction:
Where;ponding • . fl , ing is used fora maximum settlement, adequate•dikes.will.be. constructed: to. retain the'water: ':Where
jetting is,used, a jets s 1 be of'sufficient length. to reach the bottom of each. layer and:the,water supply shall;be continuous.:
Rl COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One,(1): copy -.of each test shall be forwarded to the City Engineer for
approval: -and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973. .
' ( COMPACTION. TESTS:...If so, required ;by ;the, inspector; compaction tests_ shall be made for, each. crossing, or service line.
One (1) copy of each test shall be forwarded to the City. Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall, be made as outlined. -in Section 6:3:01 of the Standard. Specifications, Division ,of.Highways,.State of
California,: dated January .1973.•
TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations; a temporary patch::
consisting of 2 inches of SC7800 shall be placed on a prepared subgrade..The SC-800 temporary paving shall be placed after a•
maximum of 3000 linear. feet, Of trench has.been excavated and backfill operations completed, but in:no case. shall the
placement of the temporary: payement.exceed; a five' (5)' day limit.
1 P� PAVEMENT REPAIR: After.backfill and compaction have, been ompleted; a temporary patch consisting of
nches (2") of SC-800 shall be. placed, immediately: e m t patch of inches A.C. surfacing placed on a
inch flew- base shall be placed no. late an days after comple 'on of temporary. road repair.-.
R22 FOG SEAL:'.:A:,fog seal .coat consisting of an application of asphaltic, emulsion shall be. applied over-all patch areas as
determined by the City Engineer..
QV Rl3) STREET RESTRIPING:.. Where streetstriping ;is still; visible on streets. to.be'excavAted', 'such "striping shallbe replaced upon .
SPECIAL CONDITIONS--PERMIT'NO. 2856
--- CVWD --- .
8.. Pursuant to Section 14.16.290 of the. La Quinta Municipal .Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travellane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the, Permittee shall contact Underground Service. Alert at 1-800-422-
4131" It shall be the. Permittee's responsibility to notify the Public Works Department of anticipated.
excavation which impact City facilities,. including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm: drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements; signage requirements, or to fit actual_ f eld conditions, the work shall
be performed by the' ermittee as directed by and to the .satisfaction of the. City Engineer at no cost
to the City of La .Quinta
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfll compaction within street rights -of --way shall. conform with Section 3064.3 of the -latest
edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by
.the Public Works Department. Backfill s' be completed in lifts, not to exceed 1', cornpacted-to
90%minimum relative. compaction. Native material •may be used, provided the material is suitable
for use as backfill after.constructionoperations. Controlled Density Fill (C.F.) may be used as an
alternative.
12.. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travelway, at the..end of every workday as directed by..and.to the satisfaction of
rO
the. City Engineer for the protection of the. public.:. Lengths of open -trench shall not greatly exceed
that which can not be .backf lied in .the same day. Excavated trenches, shall not be, allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where. construction will begin the next day; provided that this
length of trench -is completely covered by: steel plating.
13. ::,All landscaping,.imgation, decorative rock; decorative.concrete, lighting, etc.' shall.be:replaced to
its original condition.
14.. Access and; egress to all local properties. shall be maintained at all times.. ..
15.. , Pursuant to, Section ' 14.1.6.375 of the La, Quinta Municipal Code (Ordinance 16 §.1 (part), 19,82), .
permanent. pavement. replacement; shall, be completed no later than; seven (7) days :after the
completion ofthe.work...Permanent pavementshall;be replaced as follows:
a) Sawcut:and remove existing a.c:. surfaces: a distance of one foot (l') beyond. all trench walls,
including any sloughing or cave 'in of adjacent soils. Undermined a:a.. surfaces shall be
removed. All a.c. edges shall be straight, clean and vertical.
b) Provide an existing section (four -and -one-half inches [4'/2"] minimum) of crushed aggregate
or miscellaneous base.material, compacted to 95% minimum relative compaction.,.
Special Conditions - Permit No. 2856 Page 2 of 3
SPECIAL CONDITIONS --PERMIT N0.2856
--- CVWD ---
In addition to the standard. permit conditions, the following shall apply:
1. Pursuant to Section 14'. 16.320 of the La Quinta Municipal Code.•(Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For .
Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. CVWD, hereinafter referred to as "Permittee", shall be responsible for providing'continuous dust .
and erosion control.
3. Streets shall be kept clean. They shall be completely cleaned at the 'end of each working day and,
more frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout.
the work site; the Permittee shall comply with City regulated ' work hours. ' Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during
the following time periods:
October 1 st to April 30: Monday -Friday. 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May.1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8.:00 a.m. to 5:00. p.m.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed within 500 feet of a major and/or signalized intersection is restricted between the
hours of 9 a.m. = 3 p.m. Traffic control shall be set up after.9 a.m. and removed before 3 p.m. The
Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-
6894 if signal operation at the intersection is to be. altered in any way.
6. Pursuant to Section 14.1.6.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any'pavement damage to any public or private
street and for any damage to other City streets or facilities as a result of work performed under this
permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982); . .
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). ' A traffic control
plan, if required, shall be prepared �in accordance with •the WATCH Manual and submitted to the
City for review and approval one (1) week prior to starting any construction. It shall be the
Permittee's responsibility to appropriately detour and barricade all construction sites.
Special Conditioris : Permit No. 2856 Page 1 of 3
SPECIAL CONDITIONS--PEFMT NO.2856
--- CVWD ---
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities,. including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by
the Public Works Department. Backfill shall be completed in lifts, not to exceed 1', compacted to
90% minimum relative compaction. Native material may be used, provided the material is suitable
for use as backfill after construction operations. Controlled Density Fill (C.F.) may be used as an
alternative.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where. construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the
completion of the work. Permanent pavement shall be replaced as follows:
a) Sawcut and remove existing a.c. surfaces a distance of one foot (F) beyond all trench walls,
including any sloughing or cave in of adjacent soils. Undermined a.c. surfaces shall be
removed. All a.c. edges shall be straight, clean and vertical.
b) Provide an existing section (four -and -one-half inches [4%"] minimum) of crushed aggregate
or miscellaneous base material, compacted to 95% minimum relative compaction.
Special Conditions - Permit No. 2856 Page 2 of 3
c) Provide an existing section plus one inch (1 ") [four inches (4") minimum] of asphalt .concrete
in two (2) or more lifts; the first lift(s) comprised of a base course a.c. material, of a City
approved mix design, meeting the requirements of Greenbook class B-AR-4000; the final 0.10'
lift comprised of a wearing course a.c. material, of a City approved mixdesign, meeting the
requirements. of Greenbook class C2=AR-4000. All pavement edges shall be flush with
adjacent.a.c. surfaces. Each lift of a.c. material shall be compacted to 95% minimum relative
compaction.
d) 'For trenches greater than two feet (2') in width, the Permittee shall perform a grindand a.c.
overlay of 0.10' depth for'three feet (3') in addition to the pavement replacement specified
above.
e) Multiple trench cuts, depending upon location and quantity, may require complete grinding
and. 0.10' depth asphalt concrete removal and repaving, at the direction of. and to the
satisfaction of the City Engineer.
16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours
prior to commencement of any construction at (760) 777-7075.
17. Permittee .shall stabilize any soil that was disturbed (shoulder areas, etc:) as a result of work
performed under this,permit with an approved,dust control treatment.
18. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain'city streets as Truck Routes -The weight limit for restricted streets (i.e., streets
.not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically
grants permission to. use the street to deliver street construction materials and/or equipment.
19. The City of La Quinta reserves the right to, revoke, suspend or void this permit at any time.
20. This permit authorizes installation of a-1 " domestic water line on Calle Guatamala for service to Lot
22 of Block 5.
Special Conditions - Permit No. M6
Page 3 of 3
M iw d x r 1w lw
' OZ lu / arc i
N r
1 _ I_ ' NIy NIo
�" P 79 67 66
m _
54 3. 2 1. 7 79
5 4 3 2 1 m
�� _IP IN I� AIw IN'' WI -I NI=. NI$(203111
0
N u u u m ^
—It* plc PROPOSED I
CALLE GUATAMALALa
°' c^\o wars
u N - N.�\ Q� FOUNDATION
m I$ I$ Im I$ las I� ols SIP I�I:� GIs m 3 g
o.
Z l31415` 16 '17 ..IB 9 20 2t 22 23 24 o i
O 12 11 IO 9 8 J S a 3 2 t
A
Im
1 t W
4227071 N
6•DIP-98
•
CALLE
HUENEME
I
o N
IN
la
! Im
m 13 14
15 —
17
18 79
20
21 22 23 '24
u It
10 9
8
7 -.-5
a 3 2-1
Z
o
(22707/
6•DIP-90
Ln
N
CALLE
ILOILO
1
13 .la
'il
15 lb
17 18 9
20
21
22
23
24
ro
12
10 9 .
8 7
Lq
5
a
3
2
t
p
la -
No
I
rn 01
N
w
-
(A
=
-
D6•DIP-98
cez7De/
�D
o
m Qo
ao
PRIVATC LILAC Ivor
_
CALLE
Y
JACUMBA
N
_
I:
Iu
IP
F0
Im JN
Flo
III=
o
-IN
I�
�Ir
P
ti
C
,
olx
Z
,
�1
13
12
la
15
16
17 '18
9
20
21
22
23
4
?O
D
11
10
9
8 7"
5
4
3
.2
1
L`
�IW
PIN
NIA
IB
� I� Im
,�I�
la
IN
I•
I�
IN
� � �I
� •
(22
1
6•DIP-9B
Fw
n
z
g
CALLE -
o
KALIMA
1
o a
gIN
.
�
v
AIo
'
24'D.LP.-98(228491
�CCNr[RL4jC
-
- . y WASHINGTON
�REET
2/ alr .-911. (228481
N
x
m
T1
N
�j�y
/AI7.
�'
\`1►
Z
r-
N
•
N
TIN
1-
u
1
2 1
74
5
•
3 2pp 1
79
73 fi7 66
w q
3
�" IP
IN
I�
IN
-I
D
C20341)
.
•IW
o
WI- NI�
IV!.D
I
8•D.I.P.-9♦
N
N
u
m
' (22707)
LA
Le
CALLE
GUATAMALA
- 6'DIP-98
_
`!
PROPOSED
gars
•
N
�I
N
rOl1NDATIDN
N
3'
. � 6
-
Z
l3•
14
15
16
17
18
9
20
21
22
23 24.
m
o
c
n
i
•
D
12
11
30
9
8
7
5
4
3
2 t
n
0
W
(22707f
6•DIP-98 -
^)
CALLE
HUENEME
o ry
IW
I:
I
laI10
I�
h ^
I>'v
Is
e
13
14
15
16
9
17 IB
8 7
19
20
21
22
23.
24
`
'
�I�
to
I�
ImI�
IP
lu
5
I$
q
IRI
3
Ig
2
1
to
r1
�I8
D
N
- <22707>
-
6'DIP-98
I
N
CALLE
ILOILO
gIP
72
$la
old
l3
12
14
it
15 16
10 9
. 17
8
18
7
9
20 21
22 23 24
n
I's
Is
lu
5 4
3 2 .1
a'
0
a
; Iw as
CD
NIP
N
jI
o
tt270e)
6-DIP-
PRIVAfC LINE _ _II
— _ _ — _ _ - _ -
_
ULL
CALLE
JACUMBA
_
o
c
I:
IOU
la �I�
Im AFlo
, I-
alti
. Iw
N
of
d
a o
13
1�2
14
11
15 16 17 18
10
9
.,
20
21
22
23
Z
,
a�
�I
NIp
2
1
F11
�I
n
�
O
Flo
ZC
U
o CALLE
KALIMA'
SIN a
I
- L
CCNiERUNCP,-98
6' 21'D.LP.-98c228�9) 1 `
1
O L.228�9)� A!oo �
1
WAS H I N GTON
STREET'
24•D.I.r.-98 12ze:e)
4
`
N
71
DAILY CONSTRUCTION REPORT
DATE 2 — /' 7 9
DAY S T W�
PROJECTT�c
JOB NO._$�
WEATHER
CLIENT
'TEMP.
CONTRACTOR
WIND .. "
PROJECT MANAGER
HUMIDITY
Ea
sun
pear
Overcast
Ram
snon
To32
32.50
50.70
70.85
B u
st a
Milder
H,gn
Raoon No.
Or
Mode,
Hum,d
AVERAGE FIELD FORCE ,
Name of Contractor
a. r y Gayl o->• Co-21 s f.
Non -manual.
Manual
Remarks
VISITORS
Time
Representing
Representing
Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
C r i
7 Su e i i/ w v 2b"312 QZ22, Z -Yt o f
Q r 74=fa i if Ui -L a 7' 32-F
v e C- ¢-i.'
f�
q
DISTRIBUTION: 1. Proj. Mgr.
2. Field Office
3. File
4. Client
PAGE 1 OF PAGES
BY TITLE
r
4
i
1 .
DAILY CONSTRUCTION REPORT
DATE �—^- 9L}
DAY 5 nn ' r w g
PROJECT 90- 2
Jt-t� 2� J�10 WEATHER
JOB N0._ �� �1
S.
ucu
ovrrc,n
Rem snow
' +
CLIENT TEMP.
to 32
22.50
50.70
7045
sr+
Mods
Hgh
q,pon No.
CONTRACTOR .WINO '
or
Moon,
Hum+d
PROJECT MANAGER HUMIDITY
AVERAGE FIELD FORCE
Name of Contractor Non -manual, Manual Remarks
VISITORS ,
Time - Representing Representing r Remarks
DISTRIBUTION; 1. Prol• Mgr. PAGE 1 OF PAGES