Loading...
2870NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) 1999 BLANKET PERMIT For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: December 16. 1995 LOCATION OF CONSTRUCTION Various City locations (Street address or Description of Location) PURPOSE OF CONSTRUCTION 911BtAta.R"CA And 0-00=4nca ralpAtr of Ram utility Ii_nan DESCRIPTION OF CONSTRUCTION Cur 41 X br HP31bolea at uaxinua InnAtinng tnA taalrQ natAPAazv xt3rpat rokn^frr frnm .Tien. I . 1999 to Dar • 31,. 1949. DIMENSION OF INSTALLATION OR REMOVAL Valrie*t SIZE OF EXCAVATION, IF NEEDED Vsrica�- APPROXIMATE TIME WHEN WORK WILL BEGIN VAriaas. APPROXIMATE TIME OF COMPLETION VAri•aq- ESTIMATED CONSTRUCTION COST $ N/A (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing, and/or replacing improvements) Subdivision Improvement Permit— Class III Minor Improvement Permit Class IV Sketch (attach construction plans if appropriate) In consideration of the granting of this permit, the applicant hereby agrees to: SEE ATTACHED CONDITIONS. SEPARATE PERMITS REQUIRED FOR CONSTRUCTION ON MAJOR STREETS, NEAR SIGNALIZED INTERSECTIONS, OR FOR WORK PERFORMED BY AN OUTSIDE. CONTRACTOR. Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident; loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Solo Anchondo, Permit Coordinator Signature of Applicant or Agent Southern California Can Co. P.Q. Box 3003 Redl.andm.. CA (909) 335--7956 Name of Applicant (please print) Business Address 9Z.3/j_V3 0 Telephone No. €RM& Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by $ 0 $ 0 — Date 2870 PERMIT VALIDATION PERMIT NO. 2870 DATE APPROVED 12./28/98 EXPIRATION DATE 12/31/99 DATE ISSUED 1/1/99 .001 By fI%af,� ens tili�L%�/'z� ✓T Administrative Authority Telephone: (619) 777-7075 The following General and Special Provisions are attached to and made a part of Permit No. 21?� GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be -accomplished within City of La Quinta rig lit of way ONLY: Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such.authorization must be secured by the'permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with. rubber street shoes to protect the paving during excavations. Rubber -tired equipment only. shall be used in backfill. operations in paved areas.. If the existing .' pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request, that these portions of road be resurfaced over their entire width. Resurfacing shall. consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. . r PROTECTION OF TRAFFIC: All excavations: and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta. City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained r the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal .pipe, concrete pipe, steel culvert -and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and -open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any -surplus material resulting, from .excavation. and backfill operations shall be removed from the right of way. All paved surfaces shall°be>broomed clean*of earth;"and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed" prior to paving. Water tanker shall be used, as required,. to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water. on City of La Quints roads, it shall • be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING, STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contactt.this office to obtain, the necessary permission. SPECIAL PROVISIONS ' t The following shall apply when indicated: R1 NOTIFICATION:.. Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction.. RZ UT LUY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way \ authorized by permit, the permittee shall .contact all concerned utility companies' relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. UTILITY CLEARANCE: (Surface Structures) No work shall be done under this. permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards and, Specifications, Ordinance`#461%:. PARKWAY GRADING. Area between the -property line and top of.the proposed concreteicurb shall'be graded to a slope of 1/4 inch to one foot (1'). GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ' R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be� removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete.gutter and. concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches,of A.C. paving placed on of class aggregate base. . Driveway construction shall conform to attached drawing. /1 R9 ) SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be -assured and maintained at all times. 10 - SOEL STERILIZER: The area to be surfaced shall be treated with soil sterilizer.. Rate of application shall commply with the manufacturer's specifications. Rll COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. 3 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. OF EX AVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. 1 ex avations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling ic. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No ex avatio 1 remain open for a period exceeding five (5) days. No excavation shall be made unless the construction materi is ac ly on the work site. R BA'C L RIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of produci adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated ater which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced y pproved san or gravel. S Ca R BAC L S Backfill shall be approved transi -mix sand or equivalent and shall be'placed in lifts of not greater than ree feet ( d vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative mp ion of 95 percent shall be attained with the structural section of the roadway. BAC PLACE NT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before floo i or maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material of subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction sh be n less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where pon ng or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting ' used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. . One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. eo TEMPORARY PAVEMENT REPAMS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after.a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the ' placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and c mpaction have b n co eted, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately<an L=� e atch of�� hes A.C. surfacing placed on a 0�sinch alass.�base shall be placed no laterays fter completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed,. bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. �r- NOTt: with prom Mdidetion this Ibrnt oortedunes an &mooden en., prmit REQUEST FOR ANNUAL BLANKET PERMIT CITY OF LA OUI APPLICATION FOR PUBLIC WORKS CONSTRUCTION Cl 0 DEC 2 2 1�i43 dfTAP1 GSLIC Wore�� E.RMIT (ENCROACHMENT) For tltf mnsttuetion of -public or prirsts curbs. *kvwm pnwn@ te. sidewapa, po *kV W% sews wstm mains and odor like pubiie wo&s irttprowrAnU in connection wish MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE:. 12 / 16. / 9 8 Fwwj— Class III u /a j� &tA5 a-�, � 1 Prrmt it CIw IV T LOCATION OF CONSTRUCTION The Gas C Van hereb a lies for a b anket permit to install new gas services and to do routine main & service maintenance on gas facilities within the City Wpmt after or Osatri 1d" of Laatlartl of La Quint a'. �• a�� .� ±- 1 Let L . 1- . -i 0 IPT1ON OF CONSTRUCTION ' AT VARTnTTS T.00ATTnEZ ANT) MAKE NECESSARY STREET REPAIRS DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION. IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN e- APPROXIMATE TIME OF COMPLETION s ESTIMATED CONSTRUCTION COST 3 (lndudkV reewwl of all obssruetion. mstsriift and debris, bsokfillina. com (attedt consauaion plans if approprisss) wo4� ecrW5 reiw,�eg -p r UP,-K,-frt kCt10 -, o,, pection and pkdng psrtttsrwm raurfseirp and/or rapMckq improrems m) In oonsidrstion of the Wmtirp of this prmit, dw spplicrtt hsraa setae to: lndwm#V- dOWW ared ON 00 City; is srftaind sere offiW% nommntstba ow wrokvan, he "M haw and aeailm any and am pwwtiaa. 1wMitm or lean rmdtft haw dam a cowl setiow and •" an of any aoadertt for or dnwa�e to Berretta or avow" Iteppewirq or oeerr►irN • a O�+weMe teeth of a" wort wedatataw Prefer itte Oarwtit /arepd OWNS" a this apoliestiow, Notify tree AdwAa maim Aw"ity at keel h wKv-fow 1241 Aare in drams of " thm whew wak "M be wr%@& Cam* wit# am awliewe cav onwmtest tree tear a" 000lotben of the pw"* and an p/ftel" r." and repAOLW ra of the City of i. Qriaas aad a orlr far airy adsitiemf r+Uwoe aootrry a ear ate�t of " aw SiOnbt" of Applicant ar ASntt PERMIT COORDINATOR SOLO ANCHONDO(-DO(335-7956 SOQTHERN CALIFORN2:.'aac e_ o n nnv �nn�• ett'nr�Nrler ra ol»�=0306 mama of Appmm (pkm prim► Busittsr Address TMsphons Na Noma of C, Use and Job Forsntrs Susinss Address Teiephatt Na Convanef s Lioenes Na Ciq Wrfirwtc Liosftst Na, ApplicwWs Inparence CompsnV _ Pblky Nelrttbr FEET: SubdWision Im ovwng tt Psrmit - Clas III - "ie Inwroeenwtts: 3% of Mdntasd consaveden costs Pt I improrwnsnts: 3% of eschrmed corntrttawn costa Minor Improransnt P+rmit — Class IV: See setsdtsd sdtsdtlls Inspection Fes E Fw tit Fat mar Cash Dspoeit4w" Bond if rsauirsd TOTAL: "' S Reasipt No. . Reoeiwd sy pets Recorded by PERMIT VALIDATION PERMIT NO 1?> DATE APPROVED , )2-15�T,7 EXPIRATION DATE DATE ISSUED Br ' Adminia rstiw Authority TELEPHONE: (6191 S64-2246 GENERAL CONDITIONS ,---PERMIT NO. 2870 --- The Southern California Gas •Company=7 BLANKET PERMIT JANUARY 1 - DECEMBER 31, 1999 In addition to the standard permit conditions, the following shall apply: 1. Work authorized by; this permit: shall be limited. to the maintenance and repairs "of existing underground equipment, installations, and facilities owned and operated by the! Southern California Gas Company hereinafter referred to as "Permittee". New equipment, installations, and facilities shall be authorized through separate permit*, (see Note below). All work shall be performed' by the Permittee. *Note: New equipment, installations, and facilities constructed for -single family home residential gas services located on- local residential streets shall be authorized by the Blanket Permit, provided all construction is performedbehind the existing curb and gutter or edge of pavement, and no cutting of existing street -pavement is required, or if street crossings are performed by a bore operation. PRIOR TOCOMMENCEMENT .OF ALL WORK, the Permittee shall notify the City at least 48 hours in advance `at (760) 777-7075, giving the location and description of the work to be performed, the dates and times the work will occur, and the -name of the foreman responsible for the work. A work authorization "number `will be issued for each 'occurrence .of work. WORK PERFORMED PRIOR TO CITY NOTIFICATION AND WITHOUT A WORK AUTHORIZATION NUMBER IS PROHIBITED. 2. SEPARATE PERMITS ARE REQUIRED FOR ALL, OF THE FOLLOWING: A. Work within any major, "primary; or secondary arterial street. Those streets include, but are not limited to: " Eisenhower, Drive, Washington Street, Adams Street, Dune Palms Road, Jefferson Street, Madison Street,'Monroe Street, Fred Waring Drive, Miles Avenue, Westward Ho Drive, Avenue 48, Avenue 50, Avenue 52, Avenue 53; Avenue 54, Airport Boulevard, Avenue 58, and Avenue 60. , B. Construction of all new equipment, installations, and facilities, and realignments or changes to existing facilities*,, (see Note above): ` C. 'Construction work performed by an outside contractor for the Peimittee. D. Construction work performed within 500"feet of any major intersection,'see Condition.#7. 3. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 .§ 1 (part), ' 1982), all "work shall be performed in accordance with the latest edition�of the Standard Specifications For Public Works Construction (SSPWC) and',as directed.by and to the satisfaction of the City Engineer. 4. Permittee shall be responsible for providing continuous dust and: erosion control. Special Conditions - Permit No. 2870 Page I of 3 GENERAL CONDITIONS =- PERMIT NO.2870 --- The Southerri•California Gas Company -.-- r BLANKET PERMIT - JANUARY 1-.DECEMBER 31, 1999 ' 5. ,Streets shall be kept clean. They.shall be completely cleaned at the end of each working day and more frequently if required. ` 6. -Pursuant to Section 6.08.050' of the La Q&nta Municipal Code,(Ordinance 18 § 1, 1982), throughout t the work site, .the' Pennittee shall, comply, with City regulated work -hours' Operation and ' maintenance of equipment within one-half mile of human,occupancy shall be performed only during . the following time periods: October 1st to Apri130: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday '8:00 a.m., to 5:00'p.m.• May 1st to, Septeinber 30: - • Monday -Friday 6:00 a.m to 7:00 p.m. . .a • - Saturday 8:00 a.m. to 5:00'.p,m. . ' Work 'shall be prohibited on4egal holidays and Sundays., 7. Work performed within 500 feet of a`major or signalized intersection is restricted between the hours of 9 `a.m. 3`,p.ni. -Traffic 'Control,,shall;be set up after 9 a.m. an removed before 3 p.m: The Permittee shall. contact the Riverside Country>Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection i' to'be altered,in any way. 8. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (.Ordinance- 10 § 1 (part), 1.982), Permittee shall assume responsibility or repair of any pavement damage to any public or private street and for any damage to other City streets .or facilities as a result of work performed under this - permit 9. Pursuant. to Section f4.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall.be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan; if required, shall' be .p'repared in accordance with the WATCH Manual and submitted to the City'for review and approval one (1)•week prior.to starting any construction. It shall be -the Permittee's responsibility to appropriately detour and barricade all'coristruction sites.. 10. Pursuant to Section 14.16.290 of the La Qpinta Municipal Code . Ordinance 10 § 1 (part), 1982 , street closures shall not• be permitted. , A minimum of one travel' lane of paved surface shall be maintained with flagmen at all times. 11.. Prior to excavating, if required' the Permittee.shall contact Underground Service Alert at 1-800-422- 4133: It shall be the Perinittee's responsibility to notify the Public Works Department of anticipated , excavation which impact City, facilities; including but not limited to traffic signal conduits and loops, irrigation lines,• electrical coiiduits,•and storm drain facilities. Special Conditions - Permit No. 2870 Page 2 of 3 _ GENERAL CONDITIONS -- PERMIT NO.2870 --- The Southern California Gas Company --- ,, BLANKET PERMIT - JANUARY-V- DECEMBER 31, 1999 12. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Pennittee as directed by and to the satisfaction of the City Engineer at no cost T -to the City of La Quinta.. - - - 13. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction, within street rights'of;way shall conform with Section.306-1.3 of the latest edition of the. Standard -Specifications For Public ,Works Construction. (SSPWC); and as required by the Public Works Department. f - } 14.f All excavations within City_ of La Quinta right-of-way shall be backfilled, and temporarily paved'if within the existing travel way, at the end of eveyworkday -as, directed'by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same'day.- Excavated trenches shall not.be allowed open overnight, however, Permittee may leave a length of excavated trench, not exceed twenty (20) feet in length, open overnight at a point,where construction will begin the next day, provided that this length of trench _is completely covered by steel plating. • 15. All landscaping, irrigation, 'decorative_rock, decorative concrete, lighting, etc., shall be replaced to its original condition. r 4 ' 16. ' Access and egress to all -local properties shall be maintained at all times.' 17.. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), .1982),' " permanent pavement replacement shall be"completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall meet requirements of the Public Works Department. . tl 8. Permittee shall notify the City -of La Quinta Public Works Department a minimum,of 48 hours prior to commencement of any construction at (760) 777-7075. 19. - Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of work'. performed under,this permit with an approved dust control treatment. 20. Pursuant to Chapter 4 2.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city. streets as:Truck Routes. The weight limit for restricted.streets (i.e., streets not part'of the Truck Route network) is, three (3) tons; trucksrexceeding the weight limit may use a restricted street.if making a delivery .or pickup on the,subject street,•or if this'permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 21. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 2870 a Page 3 of 3 , a