2876stot'"Aklt9l•011 MUow-L AOo•O#WON
111/Ov1Ar 1A111/111WWpp ' el/(�. AO DIA,I3e1!
Ap oN 0.8"M
O1noto slvo = 1v101
Q402 " ]Iva NalvYldx! ,,�'�
CS� IJ fl o,ng ►ind►G
403
aow*d
lnovNv ilra AI
ON LIIntl3e 11 C�1YJ OS Z. Nvdsea gvu•d .
NalronvA lllga . ! e•! uo!wedlul
DIMpie1191 V0401441 WS -AI M117 -• IlwA•0 1vI vilif4 dwl iev111
11tot uellentlel/ss P/Io1I,1i/e 1e .Irvw/eAedlul e1•At,d
• ales ue!I2nA$ft ee M11WI1101• %C tq~m"Adwl Inn"li
III Inq - Alws awsumoisAdwo 1011fAlws Itbid
y
' tWtu�N'Vllee AvwwOp o1vIneol Iwo11W'd.
• 1� s3 � li 1 q +F 1 b�
oN •Iutell 4lou11n1 410 eN •wa11 I,00latquo�
hp `e
'ON M0401a1 11•ull uew•Iej go= 04.01 1616110412 Ie IuteN
c. �9 kbob bt
ep woVONeI ul/pptl ellwloA® 11u!d M�•101 I�t•gddr Is •uteN
_SsD9 C d �5% IS y ► ^ K
lelovr to tuwildev to Smsous14
•/OIA qV1 1� olAeO/ /III M Ale�eeeu tuo* FM M1/Mllm" Aug, 10$ Ass oa pis oul^O h
M AMI •Ip 6e ""/trio, PM MM/ gFP%lMe Ils pee 1111Pd w, if whbpoo pn "Was r o 'Iwrnllpl0 A1C1 �Ioleyll•1 IM MIA A t 4
-pO111M eg I" WOM VO*V ntllf *Is to 6MV00 111 pn11 Ilbl !Ay-AWUAI o" 16 A1111111MV MI1tnIV.W"v sill Allo•N
'llwoo"Wo 111A o1 IINApAd 0•WOA llW/ee /W IIorA' 1••1jM Wft 11«w Are 10 tIMH 1n40"04 e w Iis!""b s r aws"so el
AyeftlA M wN110 a• /ynu/0 n tie, ,WdpeseW Ap 4" eNanW O'.b4f. IrAeo /e IIMn Awasp M/g11w11 net M MIIIMee:l .46111 "
P pipe AW levier pm I/le,l nelllynl-.06holllue /YI IM10Weet/e/1 '/e/1111 'Iwd" Ponse41Ae ill 'A117 ow. 0Ne ebA wolso 'Apulikowl
:01 \bile Age/ey IU1e10de eyl 'yw,ed 1141 to Vi4U1! 641 10 U0111091Mee ul
(uwwMo/Mu! wllelde/ to/pw Oul•11AMII luwM#od Ilvlltld Wt 1101OW
ISIee'Mt!ItI11pt0'1/1q•p We'I101ullw'uellsnnWo 110l0 IOApwu NUIOn1lai11
t w _ � . ! 140J NOILJAYl=NOJ QildlNllsi
No1111/1409 40 !rill 91vw19oYde.
Novi# 111M 1tYo11A WIN 11110011 IILVWIXaMAdv
.... 010>liN !1'NOI1rAV]Xi So 1211
' 1rAOWiY YO N011V�1V18N-1 !0 NOIIiNiW10
t77
fjtt:111f�/Ty� di•N Lib' � t, + ` NOILJAYI/N09 90 1011d1Y3130
Ii1MIW/0011t weld uelponwoo I011ee1 lnlen jT.X. o N011JAYlENOJ 40 1200u ld
110461,1e1 to e01.113ee0 to uelpoe Nelltl
NO1A0n11L4N07 !0 NOILYWI
�'""••"�^• Al 11910 IIw1/4 Itiat"A0W1 MViW ., r .. 31r4)
10
Ill /nip - Ig10Ad wwlAodwl uaryA!V41'4
SNOISIA101f* O3AOVddv ove 9L4041A01141M1 MONIW 411AA uolloelvoo v1 owoweAglow 1111000 mgod mill wise put
VAIW ,es",.1teNIN 'nol 4u!*1w '111100"pilI '/IYIWAId �IAIAMAIIII 'oq,Ao olomd to b1149ld to UGI13RJIww /VI $00 -
(J.Ni1NNovolION3) N011oAN1$Noo SNUOM 3111PIAf'
A1WUSfj Voj NOI1dOtlddM Ilfiil ,peO,Ow.
v1N1n0 vi !O All'o _ u1 n1nplivpo WAe1 41111
vegp4oA ,wao VI!M '
1440"
------------------x --.. _ ,
ZO 3E)Vd SAS 103f08d 663>1 6ELbELZ6L9 9b EL 666Z/90/Z0
t
NOTE:
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: 1-7<-99
Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION 79- 892 Him 111 La Ouirtn CA 92253 V 9C -623
1&)m Depot Plata
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION CA"121tMuCt 11ROP 1L20tVUr,%nt Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION Gradi-,is}, Pnd Proll3ara ion. Scc ottathed coldlzlGao
and rzvinn
Sao apprcwod pl,�nc
DIMENSION OF INSTALLATION'OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 2-1-99
APPROXIMATE TIME OF COMPLETION 5-99
ESTIMATED CONSTRUCTION COST $ 49,IJ63
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) _
In consideration of the geanting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
A
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
`Signature of Applicant or Agent
IHOP Corp. 525 N. Brend Blvd. 3r6 floor Gluadnlo. CA (310240-6055
Name of Applicant (please print) Business Address Telephone No.
xzvat►,liom Conotruct on 3405 Arlinra ton true:. T3ivernide, CA 6S4_X170
Name of Contractor and Job Foreman Business Address Telephone No.
278222
Contractor's License No.
3042
City Business License No.
Oav10atoro kmi. Co. �c G1y32�t
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class 111
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
Received by
Recorded by
$ 1495.09
100.00
2250.00 Planchech crodit
1000.00 no -built C"090oit
345. G9
Date
PERMIT VALIDATION
PERMIT NO. 2016
DATE APPROVED 1-7—G4
EXPIRATION DATE
1-7¢2CC5
DATE ISSUED
By —
Administrative Authority
Telephone: (619) 777-7075
DAILY CONSTRUCTION REPORT
0 OF
l
DATE
r
DAY
. PROJECT
WEATHER Sine c " o�e.t,tt Ra.n Stow
JOB NO
To32 32-50 7085 85uu
-
TEMP. J�
CLIENT
. 51.0 . M410 Report Ho
WIND
- CONTRACTOR
'
f HUMIDITY
rnwj,-. ...
AVERAGE FIELD FORCE
Name of Contractor Non -manual Manual Remarks
CCows.
f
VISITORS
Time Representing Representing Remarks
I ,
DISTRIBUTION: 1. Proi. Mgr.
2. Field Office,
3. File
4. Client
PAGE 1 OF PAGES
BY / � � 1�072C [t,,a TITLE C4-u0�L?
DAILY CONSTRUCTION REPORT'
« DATE i'j- A- ' Y
• _ OAY IS MI
T W S
PROJECT 1 Al/op.
JOB NO.. 8 �� -WEATHER
sum°
clea,
ow��x
R.
✓'
s��o..
CLIENT TEMP.
To 32
32.50
0
7045
85 up
Rn No.
CONTRACTOR { WIND,.
miC
PROJECT MANAGER' HUMIDITYjHUqn
AVERAGE FIELD FORCE
Name of Contractor Non -manual Manual Remarks
VISITORS
Time Representing Representing Remarks
EOUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
A,
.
Soil 7,ni/
G s l
DISTRIBUTION: 1. Proj. Mgr. PAGE 1 OF PAGES '
2. Field Office
3. File
4. Client n n
BY f %ems U i TITLE � -141,n zk__T@'L .
'DAILY CONSTRUCTION REPORT
DATE . 3=/�- 9 9 y
_ t DAY S M T w S
• PROJECT —� f�a f., -
JOB NO. h' 7G, WEATHER
CLIENT TEMP.
CONTRACTOR WIND .
PROJECT MANAGER HUMIDITY
Baste -
Sun '
Clear
c
Rem Snow
To 32
32.50
16W7095
85 uo -
rt. ll
a
H.9n
Report No.
D
Mooer
HumiO
AVERAGE FIELD FORCE
Name of Contractor Non -manual Manual 7 Remarks
VISITORS Time Representing Representing' Remarks
DISTRIBUTION: .1. Proi. Mgr. r PAGE 1 OF PAGES
2. Field Office
3. File
4. Client
BY l l��i�/ Gs TITLE
s .
9
DAILY CONSTRUCTION REPORT
yOFTN�
- r
` DATE
DAY S I M I TJ'NTHS
PROJECT
JOB NO. 2 %lve WEATHER.
CLIENT r TEMP.
CONTRACTOR WIND .
a_PROJECT MANAGER HUMIDITY
ante
Sun
Cludr /
Overcast
Ram
Snow
To 32
32.50
5<
10.85
85 up
stdl
0!5<
H.gn
Repon No.
Mode,
Humtd
AVERAGE FIELD FORCE
Name of Contractor,
s ' 'love C,ow� ,
Non -manual
Manual'
Remarks ,
VISITORS
Time
Representing
Representing
Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION .ACTIVITIES
oY t
ro D ; . f 1 f toJ7 i
Leo 1 i' -r, � 1 -,e7d 5A^- ,'
"YgIA u fi' of ,o P ,i&
• t ,
DISTRIBUTION: 1. Proi: Mgr.
2. Field Office
3, File
4. Client
PAGE 1 OF PAGES
+ BY TITLE
DAILY CONSTRUCTION
REPORT
v s DATE__ 3- 34- 9 9
o S MIRW ITHI F S
F�[ r DAY
WEATHER
Project 7" /,/o - ` -
Job No: TEMPERATURE
Client ,
Contractor WIND
Project Mgr
HUMIDITY.
Brite
CKeafi
Overcast
Rain
Snow
To 32
32-50
50-70
70!
85 up
St ICI
Moder
High
lReport No.
Dry /
Moder
Humid
AVERAGE FIELD FORCE
Name of Contractor
Non -Manual
Manual
Remarks
VISITORS
Time
Representing
Representing
Remarks
EQUIPMENT AT THE SITE
CONSTRUCTION ACTIVITIES
C.4_ _� .sa l . / // / / _ _ —
Distribution: I. Project Manager
2. Field Office Page I of Pages'
3. File '
4. Client By: B Titles
f
The following General and Special Provisions are attached to and made a part of Permit No.
GENERAL PROVISIONS
The following shall always apply:
ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of
way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee• for his contractors to
secure permission from abutting property owners. Such authorization- must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated. tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber -street shoes to
protect the paving during excavations: - Rubber -tired equipment only shall be used In backfill. operations, in paved areas. If the existing
pavement is'scarred, spalled, or broken during the term of this contract; or if the pavement is marred,: City of La Quinta shall request
that these portions of road be resurfaced over their entire width. Resurfacing, shall. consist of one coat of two inches (2") of A.C.
surfacing plus appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the
City 'Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of•any traffic detours or delineations.
CARE, OF DRAINAGE STRUCTURES: Any drainage -structure including corrugated metal pipe, concrete pipe, steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes
necessary to remove or cut existing drainage structures; City of -La Quinta shall be notified ,prior to commencement of this work.
Drainage structures and open'drains shall be kept free of debris at all times for proper drainage:
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavationand backfill operations shall be removed from the right
of way. All paved surfaces.shall be broomed clean.of earth and other objectionable materials immediately after backfill and compaction.
Existing gutter line and drainage ditches shall be replaced to their original standard or better: All excess material shall be removed
prior to paving. Water tanker,shall be used, as required, to sprinkle the.job site to keep down dust conditions and shall be used
immediately after backfill.
DE -WATER OPERATIONS: If de -watering. -operations are.required and pumps are forcing water on City of La Quinta roads, it shall
be the responsibility of the permittee (contractor) to control this water and
provide off-street barricades. when necessary..
CLOSING STREETS:. No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close street for
any length of time, permittee shall contact this office to obtain the necessary permission:
SPECIAL PROVISIONS
The following shall apply when indicated:
NOTIFICATION: , Permittee shall notify the City.at (619)777-7075 at.least 48 hours in advance of starting construction.
- UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way
authorized by permit, the permittee shall .contact all. concerned utility companies relative to the location of existing
substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole
responsibility of the permittee.
UTILITY CLEARANCE: (Surface Structures) No work shall be done under this.permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility, companies of the proposed work.
R4 PAVEMENT WIDENING: Area between -the proposed concrete gutter line. and the existing road pavement shall be surfaced
with inches,of A.C. paving placed on inches of class aggregate subbase course having an "R"
value of not less than and, in conformance with. City .of La Quinta Road Improvement Standards and.
Specifications, Ordinance #461:
PARKWAY- GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
1/4 inch to one, foot (1').
R6 GRADE. -CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a •licensed engineer.
R7 CURB REMOVAL, FOR DRIVEWAYS: A portion of the'existing concrete curb and/or curb and gutter (feet) shall be
removed. Curb and/or curb and gutter shall be, saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quints Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road- paving shall be 21/2 inches of A.C. paving placed on O of class aggregate base.
Driveway construction shall conform to attached drawing.
SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times.
R10 SOEL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the
manufacturer's specifications.
Rll COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
Rig SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
3 AVEMEIVT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LI IIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of -open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKRLL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACKFML PLACEMENT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
�R19 COMPACTION TESTS: If so required -by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench. has been excavated. and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R22 FOG SEAL: A fog seal .coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed,. bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
SPECIAL CONDITIONS --PERMIT NO. 2876
--- TAVAGLIONE CONSTRUCTION -
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be' erformed.in accordance with the latest edition of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the'satisfaction of the City Engineer.
2. Tavaglione Construction hereinafter referred to as "Permittee", shall be responsible for providing
continuous dust and erosion control.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work'site, the Permittee shall comply with City regulated work hours. Operation and maintenance
of equipment within one-half mile of human occupancy shall be performed only during the following
time periods:
October 1st to April 30`. Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday. 8:00a.m. to 5:00 P.M.
May 1st to :September 30: Monday_Friday 6:00 a.in.to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on. legal holidays and Sundays.
5. Work performed within 500 feet of a signalized, intersection is restricted between the hours of 9 a.m.
- 3 p.m. Traffic control shall be set up after 9 a.m. and removed.before 3 p.m. The Permittee shall
contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal
operation at the intersection is to be altered in any way.
6. Pursuant to Section 14: 6.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage to other City streets or facilities, as a'result of work performed under this .
permit.
T. Pursuant to Section 14.16.250 of the La"Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic' Control.Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee"
responsibility to appropriately detour and barricade all construction sites.
Special Conditions - Permit No. 2876
1 ,
C
Page 1 of 4
SPECIAL CONDITIONS --PERMIT NO. -2876
--- TAVAGLIONE CONSTRUCTION
V. Pursuant to Section 14,16.290.of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be' permitted. " A mini 'mum of one travel lane of paved surface shall be
maintained with flagmen at all times.
9. ' Prior to excavating if required the Permittee shall contact Underground Service Alert at 1-800-422-
10
11
4133. It shall be the Permittee's responsibility to notify: the Public Works Department of anticipated
excavation which impact City facilities,- including but not1imited to traffic signal conduits and loops,
irrigation lines, electrical conduits; and storm drain facilities.
Should additional work, materials, or modifications of the.work be, required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and'to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
.'Pursuant to Section, 14.16.370 of the La .Quinta Municipal Code (Ordinance 10 § `1 (part), 1982),
backfill compaction ''within street rights, -of -way shall conform with Section 306-1.3of the latest
edition of the -Standard Specifications For Public Works. Construction; (SSPWC),. except as otherwise
specified herein.
Native material may be "used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be. performed by mechanical means-, no water
densified, compaction via jetting or •fl'ooding or. other means shall be` allowed. It shall I be the
Permittee's responsibility to provide appropriate geotechnical supervision, 'testing, and inspection,
onsite, at all times during backfill operations:
backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed' to the.limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe.bedding material. ;
backfill materials shall be brought to 'or maintained at an appropriate moisture content for
compaction. The; appropriate moisture content range shall be established at the onset of the
project and -ensured prior to use of the materials through progress testing on the stockpiles.
The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction .shall be tested, at random depths at approximate three-foot vertical intervals as
backfill is placed .to ensure the effectiveness, of the compaction methods and to establishthe
depth of lift that can, be compacted.
If lifts greater than`,one foot are attempted in this trial length of trench, compaction tests shall
be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City -Inspector. shall establish the maximum lift
thickness to be compacted for the remainder of the project.
Special Conditions - Perniit No. 2876• Page 2 of 4
SPECIAL CONDITIONS --PERMIT NO. 2876
--- TAVAGLIONE CONSTRUCTION -
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
G. The depth, of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other.
H. If any compaction test fails, previously. placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
L All costs incurred,due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City,Inspector.
12. All excavations within City of La,Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection. of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length.of excavated trench, not to exceed twenty (20) feet
in'length, open overnight at a point where construction will begin the'next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation; decorative rock, decorative concrete, lighting,' etc., shall be replaced to
.its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section .14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement.shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
A: Existing asphalt concrete pavement shall be sawcut.one (1) foot beyond trench edges. Edges
shall be straight and clean.
B. Permanent, pavement -replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over -the same existing thickness of crushed aggregate base or
crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the
Standard Specifications for Public Works Construction. The replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify exact structural replacement section thicknesses with the City prior
to installation.
Special Conditions - Permit No. 2876 Page 3 of 4
SPECIAL CONDITIONS --PERMIT NO. 2876
--= TAVAGLIONE CONSTRUCTION -
C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift
for capping: Asphalt concrete mix design shall be approved by the City prior to its placement.
D:' . ..For transverse trenches across improved streets, the existing pavement surface, three (3) feet
on either side of the excavated trench, shall be cold -milled to a depth of 0.10', with a "butt"
joint created'along each edge of the cold -milled area, and a new 0.10' lift of/z" max medium
asphalt concrete pavement overlay applied throughout the cold -milled area.
E. For longitudinal trenches within improved streets, the existing pavement surface, through the
lane width (within lane line striping), shall be cold -milled to a depth of 0.10', with a "butt" joint
created along each edge of the cold -milled area, and a new 0.10' •lift of t/2" max medium asphalt
concrete pavement overlay applied throughout•.the cold -milled area.
F. If grinding and capping operations are ' not performed in the same day as base paving
operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -
cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving
shall not be left 0:10', low in anticipation of grinding and capping.
F. I Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee,
as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall
be removed and replaced in kind. The finished pavement surface shall be smooth, consistent,
and shall conform to` the surrounding grades.
16. Permittee shall notify:the City of La Quinta Public Works Department• a minimum of 48 hours prior
to commencement of any construction at (760) 777-7075.
17
18
19
Permittee shall stabilize any soil that was disturbed (shoulder areas, etc.) as a result of work
performed under this permit with an approved dust control treatment.
Pursuant to Chapter 12.56 of -the La Quinta Municipal Code. (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or, pickup on the subject street, or if this permit specifically grants
permission to use the street to. deliver street construction materials arid/or equipment.
The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
20. This permit authorizes the construction of the site improvements for the IHOP restaurant, per the
approved site plans for SDP 98-623.
Special Conditions - Permit No. 2876 Page 4 of 4