Loading...
2891NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class III DATE: Fobruary 2. 1999 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION TrAet 2.5399-3. La Qui.nta FAi, va (Street address or Description of Location) PURPOSE OF CONSTRUCTION RAai-n Auhdi-viaii.nn Sketch (attach construction plans if appropriate) daVat.nnnesztt DESCRIPTION OF CONSTRUCTION Rnuxh aza.dina SEE ATTACHED CONDITIONS. DIMENSION OF INSTALLATION OR REMOVAL SAa nlana. SEE APPROVED PLAN$. SIZE OF EXCAVATION, IF NEEDED CAP, "Isula. APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ 0- 495- (including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all 4 penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent R TT urrmA^ TIP P.n. An'r rein T,n thin tA., CA (760) 564-6555 Name of Applicant (please print) Business Address Telephone No. J.H. ThcmnRon h Some. Tne. Bermuda Dunce, CA 345•-6003 Name of Contractor and Job Foreman Business Address Telephone No. 330703 Contractor's License No. 1701 City Business License No. Frontier Pacific Insurance 000340-MC557 Applicant's Insurance Company Policy Number ; FEES: Subdivision Improvement Permit — Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 1,271.55 Permit Fee 100.00 Penalty, As -built Depc►ai.t 1.0AQ.00 xCashaDeposft:Surety.Bond & requ 'red Plan Check. CrAdit• (2 � 250.00) TOTAL: $ 121.55 Receipt No. Received by Date FEB 0 41999 PERMIT VALIDATION PERMIT NO. 2091 DATE APPROVED 2,/4/99 EXPIRATION DATE 2 /b Inn DATE ISSUED , , 2-1 -1gg By /1 ` r Administrative Authority Recorded by 11 Telephone: (619) 777-7075 Earth Systems Cbfff6ultants *Zone Southwest - 79-811 B Country Club Drive Bermuda Dunes, CA 92201 • (760) 345-1588 Client Name Client Address Client Phone DATE ,> JOB NO. -I PROJECT LOCATION <! CONTRACTOR OWNER 'WEATHER TEMP oat AM oat PM PRESENT AT SITE TEST NUMBER o . 1� S����•- �r45 ,e —LOT- NUMBER \ ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY Ibs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY Ibs/cu. ft. OPTIMUM MOISTURE CONTENT % 70feec-kehn cc 1,2 . 5A-°r o 10.1 rz 1.0 i� s 1 l+� 10.3 i/(a.1 3 Zik?S �•� l�.0 9� I y :.:-tech - �vctrs •� Cvk2S 1Z'.0 11-7.0 97 =S Zs 12.If IIG.� �!o I (o C-vares"y o f 117 S `q•� I ' �/ • •'74" i� � • °!-•S III-�� 9�.,' I • g� 11 �_ ►S o 9 SO 11•$ REMARKS: G b,vrl e L>l . c�l dl C J dl ✓' aalc w,' i-ti � w a/ c _ • c o a �� � , ' t � �-,� p I A ei ism �. FIELD• -REPORT CLIENT REPRESENTATIVE SIGNATURE TECHNICIANS SrGNATURE BD-FS-001 (10198) 2665 •. c . r cv w l ! lt f f{� v^�1;',�; r l}�"7ti} tr Y 4�(� r' ` r r ,; ,. •• l ,.. � 4/t ....ce•: r �,w`, 3 j! fA'�+!' T— it rth_74�isteros. ICo "sultarnts. 41 { 1S011tI1W@St, PROJECT • 79 811 B Country Club Drive `•�ud •(I0)3muesG9201 Be i CONTRACTOR ` OWNER ° Client Name54 P • . °° f. WEATHER EMP "Oat AM t Client Address f gat PM, PRESENT 4T'SITE p::d .tjjt7 Client Phone - • ` •1.: i d , FIELD TESTING . `, , 'REFERENCE'CURVE', TEST' LOT ELEVATION MOISTURE DRY. "' : MAXIMUM', MAXIMUM J . OPTIMUM '> l NUMBER •,' NUMBER CONTENT • DENSITY, DRY' • DRY MOISTURE •: • g % Ibs/cu. t. DENSITY • DENSITY CONTENT l s j� td %S g /o: o: Z '� � ' � • . • •• ' ... h '' Fit. ,•� � = . ; • . , • 3�0`�. 7,:oJ ion. �5 ,• • f `°tY�l -7 7.+00 �. 1o�.I;• VIC.•1-+ o ,�: off: y 4`7 '15+D FV 1 p 31' , REMARKS: 'e✓ 0 I O �J FIELD .REPORT CLIENT REPRESENTATIVE SIGNATURE TECHNICIANS SI NATURE 1 < e -FS-0Oi c10198l r' 2656- t�x�4 DAT y, ` Earth: Systems Co sultants 7� . 1t� Southwest PROJECT 7981TWO6. nUj 6wb°Drive•,' ertri Btida Danes; GA•92201 (•760) 345 1588' ` LOCATION L' GL: CONTRACTOR Client Name CA V WEATHER Client Address , PRESENT AT SITE r' Client Phone .w JOB NO.. OWNER 4Nu bat - PM TEST NUMBER ` OIr LOT 'NUMBER. ELEVATION FIELD TESTING REFERENCE CURVE' MOISTURE CONTENT DRY DENSITY Ibs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY .'..MOISTURE• DENSITY Ibslcu.`fl. ' OPTIMUM ' ' CONTENT %• io t Z •,, ��� -7.D �'3:� 065 -2 �PJ�c•J�" C) Z (0 •fl V00 •Z .� Oil CaF.s ^ ZS Cam: g off. b �1 Cv Zi I toy` /S1- 7.1� �� 7 Z REMARKS: 0- .f rel `o vi 0/ Y1 , r- S e t O `I o L¢0 no ip, 4-n ,'kn I- tl: h-le. q I t44 0c) Ln Coo CLIENT REPRESENTATIVE SIGNATURE BD-FS-001 (10/98) k4- M sultanft .79-811 B Country Club Drive Bermucli Dunes, CA 92.201 - (760) 345-1588 Client Name Client Address Client Phone TEST NUMBER LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY lbstcu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbsku. ft. OPTIMUM MOISTURE CONTENT % v- LN,% 31. 1 Llf e 07- 09 5+sue I 32%- L-L PIT 4 7 -5, 31- 0Z M 7' 74o too 5F N 2, 3 5 IOU 6 Asa. I 35 ed 75 35 (7f le 4VvKf T 35, 35 55916 170 REMARKS: CLIENT E 'P�TATIVE SIGNATURE K - BD-FS-001 (10/98) FIELI? R PORT 0 TECHNICIANS SIGNATURE .Ne 1653 �'Earth.SystemsConsultants 14%:07? Southw6st,.'. 79-811 B Country Club Drive Bermuda Dunes, CA 92201'e (760) US -1588 t Client Name Client Address Client Phone DATE f zz JOB PROJECT. 1je L-1 A 'T CONTRACT OWNER THER TEMP Oat AM Oat PM PRESENT AT SITE NO. TEST NUMBER LOT NUMBER • ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY lbs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbs/cu. ft. OPTIMUM MOISTURE CONTENT % 3 ezkA ��iW /0y 909 ova 1 2 C7 O f 26 REMARKS: I DrLFS-001 I Z, 41 ZFI D REPORT k J41 ; TECHNICIANS SIGNATURE No. 1738 tv T, :Earth Systems ;,Consultants :'..."PoUthwestq, 79-il 1 B C'ounf� Club Drive Bermuda Dunes, CA 92201 • (760) 346-1588 Client Name Client Address ClientPhone DATE ,el-2-3 -ff JOB NO. - PROJECT - LocA'n6N OWNER WEATHER TEMP Oat AM Oat PM PRESENT AT SITE TEST. NUMBER LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY lbs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbs/cu. ft. OPTIMUM MOISTURE. CONTENT % 3e ea'-� 4, i w, "/1 ;ail REMARKS: �� J'0000 �-<lENT REPRESENTATIVE SIGNATURE BD-FS-001 (1Q198) . .. ..... . ... .. FI REPORT BLit :i' �TECHN=CIA���IGU�RE .4 1739, ........................... ............. T .41 SSt jj :,C6nsu1tanft`..­,,: SbuthwdSV4, 79 i B Country Club Drive Bermuda Dunes, CA 92201 • (760) 345-1588 Client Name Client Address Client Phone DATE, l JOB NO. .PROJECT &wf veL�/__3 LOCH ION Z,&_ (!�)u 1 CONTRACTOR . L) OWNER 'WEATHER TEMP Oat AM - Oat PM PRESENT AT SITE / TEST NUMBER LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE. MOISTURE CONTENT % DRY DENSITY lbstcu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbs/cu. ft. OPTIMUM MOISTURE CONTENT % vel �•� Lo �c 7 REMARKS: FI CLIENT BD-FS-001 (1(Y98) WV EPORT 1740. i •: d,Y'_" 5tj., t .+ '.'t alY'k. t4. N' A�..�" "-F �,: t.,= s,. ) 3" c- ti=_ *51n t -;},+ 5dt`: _ � 'S � .. ,�{ . {� {>.c�AY �,-. eG,i�F� � ; � f:r . ,t" 'YS . _ : ,�•v'�i, , gif, Eartii..Systems .Consultants rRWR SOuthWeS, ; , 79.811 B Country Club Drive w Bermuda Dunes, CA 92201 • (760) 345-1588 Client Name Client Address Client Phone DATE JOB NO. P/OJECT LOCATION ; CONTRACTOR OWNER FATHER TEMP Oat AM Oat PM PRESENT AT SITE /e— TEST NUMBER LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY Ibs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY Ibslcu. t. OPTIMUM MOISTURE CONTENT % 7 3 REMARKS: a CLIENT REPRESENTATIVE SIGNATURE BD-FS-001 (10/9e) FIELD REPORT t TECHNICIANS SIGNATURE N° 1660:. Eattk,,,Systeins Vonsultants Southwest.';.,.;,:,; 79-811 B Berindda"Dunes, CA'92201 (760) 345-1588 Client Name o Client Address Client Phone DAT� . .. I 1� ) JOB NO. 412 01 J/ PROJECT LOCATION CONTRACTOR' OWNER O 3r_6 S WEATHER TEMP Oat AM Oat PM PRESENT AT SITE e- 41 TEST NUMBER Q 10i'- NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY ' DENSITY lbs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbstcu. ft. OPTIMUM MOISTURE CONTENT % 17-4-*7 5 33 '7- /t-)C-). .72, /0-9 Mr 36- 11ou3 92- REMARKS: (Ate BD-FS-001 FIELD, REPORT CLIEN4tRESENTATA SIGNATURE TECHNICIANS SIGNATURE N2 1647 it r Y' s �Eartli, S.y'stems C n ultants �� "S0UtI1WeSt•, k • �� 79-811B Country.Club Drive gg� Bermuda bunes, CA' 92201 • (760) 345•.1588 i Client Name S Client Address F - Client Phone DATE JOB NO. PROJECT LOCATION' 1"'CONTRAbTOR OWNER WEATHER TEMP Oat AM Oat PM PRESENT AT SITE TEST NUMBER LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % , DRY DENSITY Ibstcu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY . Ibslcu. ft. OPTIMUM MOISTURE CONTENT % y 9 boy g toK ,, , g l0, 0 90 0 4 REMARKS: o r � F�D REPORT CLIENT REPRESENTATIVE SIGNATURE TECHNICIANS SIGNATURE BD-FS-001 f W8) N o 2131 a Y -16sultants, KISy.sf hi -d 0 '4,k iDrive 79-*811 B Country 6iu � , Bermuda Dunes; CA,92201 • (760) 345-1588 Client Name Client Address Client Phone DATE i'JOB NO. PROJECT LowioNF ti CONTRACTOR' OWNER WEATHER TEMP Oat AM Oat PM PRESENT AT SITE TEST NUMBER LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY lbstcu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbstcu. ft. OPTIMUM MOISTURE CONTENT % xb .2 y �y 903 gt. .. 6- /00.0 JA/ REMARKS: 4 k ee- t-s- l- Pgi 01-1E PRESENTATIVE SIGNATURE (1 8) BD-FS-DO1 :l FIELD REPORT TECHNICIANS SIGNATURE .NS 1975 4 ILI N" ';Fe 'SirsteMsVonsultants -Eatft 40 'SouthW6it- 79-811gCouiritry Club Drive - Bermuda Dunes, CA 9.2201 • (760) 345-1588 'p Client Name Z Client Address Client Phone DATE JOB NO. ,PROJECT LOCATION LA Qu I NTk CONTRACTOR OWNER WEATHER TEMP Oat AM Oat PM PRESENT AT SITE TEST NUMBER cL LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY Ibs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY lbsicu.. R. OPTIMUM MOISTURE CONTENT % sw It I c NZ_ Ap 11170,�q. �qg mc n- z p IZ/1 toz',' -Y-3 z7 1 11. k Okg 93 //1-0 IZ-1 /034 1.5 Afv, REMARKS: 17 -k /j Au CL)tNT REPRESENTATIVE SIGNATURE BDFS -001NMAL;/ I NE. 1494 . . ........... ..... .. .. . .. ..... ........ ..... z '= Earth YSystems -Consultants IS *8116 coumry. '61ub-Iii;ve Bermuda D6n". CA 92261,9 (M) 345-1588 Client Name. --- Client Address Client Phone DATE . I :i [I JOB NO. 'PROJECT LOCATION *,'v--'- CONTRACTOR OWNER WEATHER TEMP AM Oat Oat PM PRESENT AT SITE 211 FIELD TESTING REFERENCE CURVE LOT ELEVATION MOISTURE DRY M MAXIMUM MAXIMUM OPTIMUM NUMBER CONTENT DENSITY % lbs/cu. ft. DRY. T RY DRY MOITESTSTURE qj DENSITY DENSITY CONTENT < % lbstcu. ft. % 13 13 19 1013 A 3(1 0-v 0 4L:2 ' 9 ///, a gJ7- P3 I 'Zo 3,o . . . qg i2. /k .0 2 Z, REMARKS: -:F#t&r /PIC Z_ FIELD REPORT • E�PRESENTATIVE SIGNATURE TECHNICIANS SIGNATURE NS 1493;­� BD-FS-001 (10198) Jul .-99. -- •.- FROM:• .• . ALE •1 1 ... 1 aa.a/au..Wa■ aaar W■■■■■■aiat■ ■1■■nir■u■f u ar■aa■■..nau■aitRf.Rx■ R alRb/aR■■■L■/ aii■ a■iilx/.LIRiWUaa /■fai•11aRUilaaR■Unia _• YY///11■f ■■■■ R■Ngfanatlla/ /U/�Hf■/a■■ftl■■t■U ■■■■/1/YWR■N t■i■/ RRaiata■ia1W RR aL ■tygaatf t■aaU/./pi 1 trfr �U■� t■ tRa/Y■■tRai■ao ■ al/suR f/.■a laaa au■a/a■au■N/t. Raa. U■Oaiian■/RWf1■ .. •I � 1R■.// after '/U/■a �_ .a fV�las.Y/■■U■Na■n■ta U.aUii■////// 1■aa■ Rii■al ■■Wo�`...r1.Raa■lf.■ • • ■alUWf■tt/■p /a.rR ■>r■OalalRlai■ft ■t■/ a/aaa.nir/wa b... ■ R■aafaaaraa■■ U■aRa"ft/la■ ��1NR■R®■■■tRaaiYaRURay RRWL■tn ■■ ■R■ralatRRRI■Ra■ ■■01011611 xR■saan/■■mina■ oraRaa./n ■■a■■n.anRaaaR Ria■1/■a./aax■.afnaal■■ ■fu■anataaan ra■.■■ran■■asn ■aaa■n■...aa■at■a■■/x■ ■a/nU.tlan RULE ■Y■U■ ■aaU/na■mamm"g t.N/as aa/u■" Dam /1/RRaa■Uaf R■■ORRR1a■rxianRanain d■f■aRiat■fn wa■1a■■an1U■t aaaf■f■asfa ■Rr■.a■saataaa ME u■a■.fffn■■a /a■isa■miias�ijquai■anj raal/iYa //n Ugia■a/q faa■n W..Riad/U//U■e • aaUafM/ /■.ii■ ■/ORaas■/ a■■.■i liia■apypWilaaa as li 1.1 :.a,aa •p1 11 • aa��l Sim • rfwsf>oa� .va�ff�aw I aaMIDf�•fw� ass ., aasr • • • �cvx.■Ix�■eaa► fa■.A■r I •• r'-�raaa�a� 0. C� J08NAME: ' LC Quintd Fc', way+s SA VLE I.O.: ' # 1 (Breckervlyge Drive) . $61LxSCRkpr4: MOderOte O"VO Br0am SUty Fine Sons (5Nt) SPECIMEN Pgl6 UR A g C EXUDATION PRE55J1fi 787 . �394 104 REStSTMa vain 60 62 51 WANWN CIAL(O.000ti 17 — T 1 2 EXPA!"M Pewm 11 7r. MOl57uRE Ai TEST 73.6 10.9 -113.5 47.6 12.2 113.6 ` 8.7 13.5 .112.2. DRY DEPUM At W Jul 12 99 06:46p Earth Syst'en:s Consultants 760 345-7315 p.2 Earth Sysitems Consultants Southwest 79-811B Country club Drive Bermuda Dunes, CA 92201 (760)345-1588 (800)924-7015 FAX (760) 345.7315 July 12, 1999 File No. 00453-04 Report No. 99-07-721 R.J.T. Homes, LLC P. 0. Box.810 La Quinta, California 92253 Attention: Mr. Chad Meyer Subj ect R-Value Testing Project: La Quiata Fairways Proposed Single Fanily Residential Devei.opment . Spy€;lass Hill Drive, Grand Traverse Aver..ue, and Breckenridge hive La Quinta, California As requested by the: City of La Qi.inta, this letter has been prepared for your use with regards to the results of R-value testing perjbrmec: on a representative or soil from the streets within the subject site. The st.,iets include Spyglass Hill Drive (Lots 12-23), Grand Traverse Avenue (Lots 23-37), and Brackenridge Drive (Lots 3:3-49). The samples were returned to the laboratory and tested for R-value in general accordance with California Test Method 301. The testing resulted in R-values of 60, ;59, and 60, respectively. The paving; sections provided on the project plans are based on an R-value of, 50. Therefore, these values should be acceptable for the proposed improvements. If you have any questions regardin•; this :letter, please do ::lot hesitate,to contact this office. Respectfully Submitted, EARTH SYSTEMS C TS Southwest q�G S. CE U234 EXP. 3/ UO ' Craig S. Hill, C. E. Letter/tg,/ lvl�_ CA Distribution: 2/R.J.T. Homes, I-C 2/City of La Quinta INTA File - �� IBD File, 1 ESTABLISHED IN.1918'AS.A.PUBLIC AGENCY. o '/S:TRICI ... r 0ACHELLA VAL L EY"•WATER DISTRICT 'POST OFFICE BOX 1058 • COACHELLA,+CALIFORNIA 92236•0 TELEPHONE (760) 398-2651 ' " DIRECTORS OFFICERS TELLIS CODEKAS, PRESIDENT ' THOMAS E. LEVY, GENERAL MANAGER -CHIEF ENGINEER ' RAYMOND R. RUMMONDS, VICE PRESIDENT , •' • BERNARDINE SUTTON, SECRETARY JOHN W. McFADDEN , . • OWEN McCOOK ASSISTANT GENERAL MANAGER •; + DOROTHY M. NICHOLS s . REDWINE AND SHERRILL, ATTORNEYS ' THEODORE J. FISH July 7, 1999.+ :§ File: 0421.1 • � ' r 0721. 1 Chad Meyer, Project Manager '. RJT. Homes,,x LLC Post Office: Box• 810 La'Qu'inta, 'California'92253 ' Dear Mr. Meyer: '• ' Subject:`_ Tract"25389-3, Desert Fairways • Irispection•Nos. 5499 and'•5500 �. s Status of your.project,as•of July 7; 1999; is approved`forhservice at 90 percent as'of, July 1,.1999. Y Should you, have any questions.please contacteme'at,(760):398-2651, .• extension 539., ' Yours, very. truly.. Roland Bustamante Principal hnspector RvB:rmc\svc\}inspect\Jul\st5499 4.,* TRUE CONSERVATION- ;� . USE WATER'.WISELY,; ,'• t f Jul 12 99 09:00e - 100�589 P,2 i (7801' 398-5875 } 9cbedolad Dated 7 1�.. T W TH F �°lAtAI.I>�IGa1TIOlY DDTRICi 01-M Avemte M 1.0. Bo=1ou IA Qgh" CA 9= q6&,i bear or (mo) ;*14M INSPZCMK RKPORT OF'trNDEib<MtDUN=VgpMAD ZUC!' WAL pAC=r= " � �� �10�d trsavfor+ruo' i�ltttC+a! nrtep/ ttiasded,of nsdetEr+etaad/ d electrical - . taailteiq wn pbfirated h Iwperi el 1rii Min I wft ss I nesoed by: _ Company: R . T ./ '"bC"y taedcd� WORK ORDER: NO. W o S C 1'.cv No.� BTLCIAL I M$77&V000N5 . , . AN vm&wvmmdk etbead tadiltht eaeadaw above . zzfa * sew IaWIMd _Ace Opereslesai BAVi PASSED MSPLCTION _Have.Beat A�proMei Peadii� ib�talWioo dPwnd - . r _BAVI MIX IrASSED INMCM:V &a to the teilee�,� ddidendee: • V yell ba" gNotim" w sad b ubedlik a m4 ecdott a�'tsr Q have hem ekreesed, $oan astad lobby (Cohatmfte) at ('iaaPM= v Cm ioa (Babioeerbw et (7601m a3L • • Nor Intorasdu Abell wo& otdtr whtbbr, pima eaaunct the worm 01' der Commi . cmbie�to. (saaes> as n� �w,�sa. • RD18RT MARRIIJQ K.WgSt W' I DM@ At[.AS LiGASPL lower lmpaw / Dim MICE ly CQMmm Aa n rstnb�s, It /r etu r r t�'till a• 1, Dr+rdgw(�) e. C.aa+ t.►a aep* aid porb"m ay ""Vvy "p goo atwl lv often a sift w"iW NwNNW &9P and OffBw c oftc loa m&w . f+uttadlabot dieia uadt►=►'M+t/iw�'r► plraawl !t' N ate Ityetiai In�eba DIaMd'a f�►b'd Ps1f0 to oecwry ' • m� �u alto tkets Purdt�to �I de �4mam f v trAleb s w,imrr taMia re{aw1 Am ba niaL and JI liw. etreadeYt dwMa lmdaenarsf a Apo Drat P" PartAer. dtop,r �f 4 aptid saw, am A=dw s=fw iadf ~sw by W Dfdriw wW be 7M►yptt/b/r fb Mf Ual�tr��t0� �� ��4'1 �l6��11' SAC belt�.cr �� ■m•c+eslypW Md "ftwtW Awdm.ellbrp w i pw& anal syaaA &w &Mae "via uMa pmumm . .. uopodiop 310 !o uud y C: is 't'' - . 0'1Z � f stIIOg 7Prti t D ` iwt Oft • SttT-ti98/O9L' • 6u.�xo.�uTbv$ x�or+gmp - �6aSbu� • seguoN •p TonwK • , �Rte�sou�s- . nod !uvgz mm aDtgttoa o% mta; Too; •smold 'Peal-UhS2 u0130wao;uS. i:o0T21Pvv Atli sT 6,204g tI • V.Iuj:o;-TT113 ZZO dq• PlgdRa09 Sim put PunD26=spun pMOtttd I M ,32-viuTK6 v,2 ;c, 'dgi-► sqz UT £-6H£SE gas-1s 04a ` ;.;•, 20; 867.411TOW; uoTgngTYgsTp P*Ovtd 994 Ijuxo;l:TsO ajo 'asnnbe. anox-sed f i ���.• E-6B£QZ 1601�5 �ga�FQn9 f luu mna AN 2080 • CSLZ6 1[a '�gujnb ••I • oaTdm*�, •tt�a 580-8L , - 908t" �6-•O'd ygut hD I'l YO A350 • utwnnfl 'zvgaeft ' � 66ST, let xt:+r 5eZ9-ewe v0'seuudS wild Agm esuunS t4JON 96Z 2"MSS 4MV40N 910 • . !• � �, . �-„s hry . :•a, '1fc'1 NJIS SS3 d;Sd 31aa; Earth tysfbffi§'C6ffi§u1tants Southwest , 79-811 B Country Club Drive Bermuda Dunes; CA 92201 • (760) 345,,1588 f Client Name A Client Address Client Phone -.DAT _ _ _ _..... JOB -NO. 4� PROJECT _ wc( S. LOCATPON _ T ' CONTRACTOR U I'l OWNER WEATHER EMP oat AM oat PM PRESENT AT SITE � y , TEST NUMBER 5AfC e.- V S ✓ c, e... LOT NUMBER ELEVATION FIELD TESTING REFERENCE CURVE MOISTURE CONTENT % DRY DENSITY Ibs/cu. ft. MAXIMUM DRY DENSITY % MAXIMUM DRY DENSITY Ibs/cu. ft. OPTIMUM MOISTURE CONTENT % f0 `C..� (� (p . s %Q�• C7.. ��D ��0. 0 A--...-. -Z (�t +% 01.0 io 5 . `1(0 7t 110. Q i6 0 340Q -7'0 161 �A s 11040 G . V 109.1 U 1.1 pe H A,� O l.cl 10(0•Ll 97 01 10 m-3 41 REMARKS: f_eW yvV J t "Q t 4 _4 / O i 4 • O � _9i - S! G C/1 " ,,Jew . lj ,'A'z I s d r ,L/e, 4 e Ar u c Cl k �r�I- o t FIELD REPORT oo --T C - i� i� t� t CLIENT REPRESENTATIVE SIGNATURE TECHNICIANS SIGNATURE �'-BD•FS•001(10/98) _. --- - ...• 2656 •� 0, NOTE:, With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION. (ENCROACHMENT) 0 For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water. mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS t Subdivision Improvement Permit —Class I I I DATE: 2— 2- 9 9 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Tract 25389-3• La Quinta Fairways (Street address or Description of Location) - PURP E F CONSTRUCTI N =gf2Ai±E Sketch (attach construction plans if appropriate) Y DEP P 1 OF CONSTR TION -DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED, APPROXIMATE'TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ 4.2 , 3 8 5 _ 0 0- (Including removal of all obstruction, materials,.and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting' of this permit, the applicant hereby agrees to: Indemnify,defend and save the City, its authorized agents; officers, representatives and employees, harmless from and against any and all - penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result•of.any workundertakenunder the permit granted pursuant to this application. Notify the.Administrative Authority,at.least twenty-four 124) hours in advance of the time when work will be started. ' Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable es end regulations of the City of .La"Quinta and to pay for any additional replacement necessary as the result of this w R ' Signature of Applicant or Agent RJT Homes", LLC P. 0. 'Box -810 La Quinta, CA 5 1 - Name of Applicant (please print),! Business Address 'J.H. Thompson & Sons,,Ind. Bermuda Dunes, CA Name of Contractor and Job Foreman Business Address 734478 FEES: Subdivision Improvement Permit — Class I I I Minor Improvement Permit'- Class IV:. See attached scl Inspection Fee, $ I 2�71 - I ✓/ Permit Fee I w 100b and I TAB Receipt No. ,.,Received by Date - Recorded by i le Tele one No. 3 5-6003 Telephone No. PERMIT VALIDATION PERMIT NO. DATE APPROVED' t EXPIRATION DATE DATE ISSUED By Administrative Authority ,!k. Telephone: (619) 777-7075 2 '22 9,41 N'.7HTHOMPSON FAX 7603450525 P. 2 Ha J.lh- l� on ions inc,, General Engineering Contractors .BERMUDA DUNES TELEPHONE: i790) 346-d66l3RUARY 1 79-807 COUNTRY CLL'i3 DR., SUITE 2 i.icsnea No. 734476 BERMUDA DUNES, )CA 92201.1126 Z FAX; (760) 345.0525 RJ"I' HOMES N0BOX 81J L WU1NT'A, CA, 92253 AT"I'N'- FRED, RAIRY kE: GRADING 'I'k#25Z89 ;5 KAlfiWtaYS -DEAR FREE, I ENCLOSED -1S 'f, UR PRICE TO CRADL. ANU FINISH THE 60 LID) S I-AiRv.'AYE, Al'LA QUXN1A.` LU'T" LSS HAS BEEN Okl_E"fFU F'RUM '-HE E+�:L) DUE BE:TNG 'THE OFFICE- 'FRAILER aA ;'E. MOVE IN CLEAR ANU GRUeb 14 ACRES i PRE—WAI'ER. 1.4 ACRES MASS —EX 9,865 CY F.1N15H PADS -Ft( UtsH UitAljc EiU EA FINI$'H S31"REE'TS'-ROUGH GRADE 1U4,739 SF 'L Lm '506, W TIWT Vo- 81D EXCLUDES: F•1fiE,S,; CClMWA��'I]ON TEST, r'crl'gI'" ANL) INS{ kC f:! ON .FEka. i L)S T I U. WURCHA L CONST'RUC'FION WA I*EI"4 AND R . 2 i i i'MPutt"1' OR kXNfJH r GF, • c � . � 1, �� ,. � �!! C E . NISH REAR .YA��L•)S WHIC:HFX`Si�:�LF'S uF l 11Nl,LUUE� FLAT F'/-lUu(3NLY W/1`�i' SLUT* * 1N .LP Q HEL1 BALANCL , ROJ'EC'f', 4.' . B.W. EXQ.LUUES EsC'lAL PR C'Eti U , 'SxNCw of VVEh E�t'AV��"I"TUN 13u "TOMS' AND REMOVAL. 10 EXIS••i ING .CRi4JUA ':ION LINES. 5. 81D BASED ON ONE MOVE: IN ONLY, i Akl"ERNGa fI. RE.MUVAL OF- AC OF 1=91TE $2,240.06 ONSIT E ws3U0 SINCERELY, J`H T•HUMPSON t4 S0NS,,'1Nl::.: U H . 0M N , JR.. Prerequisites :for Grading Permit Issuance The La Quinta Engineering Department. assigns a specific city staff member as a Project Manager to every grading project that is proposed. If you have questions or need assistance regarding any of the prerequisite items on this checklist, or regarding the City's plan checking process, please contact the Project Manager assigned to your project. Your. Project Manager is Marcus Fuller ; he may be reached at (760) 771-7089 1. Environmental Assessment ...... ....... 1 1 2. Archeology Study . ............... . .. .... ..... 3. Approved project- concept . ........:. ............:.. .... V� 4. Compliance with specific prerequisite Conditions of Approval for grading ... 5. Approved grading plan and soils report: ....� �- 6. Third party approval(s) for offsite'grading .......... 7. Third party approval(s)for acceptance of drainage ............ . 8. Approved Fugitive Dust Plan ❑ 9. Approved Storm Water Pollutrrion Prevention Plan (SWPPP) .......... 10. NPDES permit ...... ............. l e ro FC,CC I' 11. List• of Professionals . ®V� Surveyor Soils Engineer/Technologist Archeologist eoy%+ r4ccf- a 12. Application for Grading'Permit .... ........ �❑� 13. Insurance Certificate ... ................ . 6e1V4__1Z*-14. City Business License ..... .......... ...... ❑. • FEES 15(a). Plan checking fee ..... ............... ........CL 15(b). Grading Permit fee ................ .. . .: ......� 16. Fringetoe Lizard fee . : ............. ..... 17. As -Built plan-securiiy - eposit. ................ .. ....... .. CAWMESIGMGRADI N G. DC 1 30�. �' ,,,�.�z"Lct +-4 t,�c� 01i'27/99 114:00 FAX 602 237 1693 HENSLER RJT Homes -CA 001 • ®' "` ZOO'dI 8£TZ'Oh .1u/XT LU-£T 66!LZ/TO I , • A04DR e • 9 PA'TE---0E-.0 lL•lN8Ui CE °"Oita* srnDucfTa - • mfffflm'm Is mo ASUPO,Y M&Y ARID WNFMS W IUW M TTE CH17 MATE I BILL L1&'iIK AUMATES, [Na fl go mwm �dert ALa�M2V�A 8Y Sub m CQlWAM AFC C'OV WSE Dow CQ sm A m emffirm "wq raa ' �t�v�n I �aaannr R!Y Homm LLCI, 1426 E thfm m* D" ' Pro* i AZ 85W4 G f T�bB�`TU�EiTIFi"4Ur OF'LI$i�i SEl: V'PAGE WTN'MUM Td TMINSURM r ABOVE"F0Ff*5 PDXf P06 DIDICATED. NO?WD'1IST4► DiWG ANY REO sEmark TEAM Cat C� NC 10 OF AW =W..RA(-'T CAA C-rAM 000.,t-W WTn+ REEF= Tp NJKr,4 TM�S LuMFjCAT'ElAAV BE k-li iFD OR MAY PERTAN W.E WA RANGE AFF OFUD BY 7! E P=Lt IMSM D, HBO BN 18 HUBJECf TO ALL THE TEAM ff Ulral= AND 00NWMN9 OF'a' W PCL M, UM 6HO'WN MAY VWE M04 RUDJaD BY PAW MAATS TYPE CV 1118DSmsm I POIII.Y NUY68T FOLW WFEMM pin pour owaxnm l�wm'1 LYm m A QW901 LIAHLrll _ TiW - 0112b l99 OT l26 /00 0;T7ENAL A(iLROAM - i 2, 000 Mo PROD= - co"? ACA 5 1 OOO, Ho X MMEXUL OPIMU LwdjT' PF 6MIU, 6 AM 3ULM S 1, 0DD , 0n0 EAOH OOWRFi N% S 1, 000. 000 X ORWS A MVrRACMS PAOT I FIRE OAWA0! pM cmAna E 50, 000 NED OP 007 enP ewswj 8 6,000 WnCraMeE UmLDY 000mm sw= L!= S ANY AITIO WDILY MAW S AL' OWN= 0000 8011Z U AUr06-- RM AV I� ��vr�acvdelG a NONOY�N� AUF09 PROVE V DAKW a e j . I OARAflc-lTAl31lf!Y - .I ' - AUTO ONLY - EA =DENT 8 - AflT APO OTHM THW AUTO COYLY: . UM ACAD6NT - - I _ i I ' AtiORE0AT3e 8 I Emus Lw" I .. EACH OCdlRHENCB, 6 AGMAEGATC a UMIELIA FORM I � OTHM TWN UO►'dIA POW IVOWERB Cc1m"BATN AND , OM Lim ER a?LOTe'RS LM UN EL EAGN ACL7Dwr 8: @1'DISEA.9E -;ELT LUT 9 THE PROMEW tl� '. • ± P WWAFeaf,rYG REM EL Qvua -"DEB is ' OT11Ei � I A t ECXOL REW CERTIFICATE HMI I DER 13 ADDITIONAL,1NGIIiED IN AMMM TD. GENEFX LIABWTY:PER MR Wem P-m- 8Rmi-D ANY CF TIE AwdE nest} M POLICIES EE CAMMED BFfvFIE M CITY OF LA I.(RdHA - E7fPtA0.MIL DATE ngPVP THE =NO CUPW MLL W06AVCR TO VWL PA: na ls" ` � 0 nas YWirm ourim m T_YF c4A71r7Ci7E HDi05T wmm m THF, UYT. 194M CALCE TA>MPiCO put FAaWAR TO TLLL AAYI kM7= SMU NPORG NO CAMAMN DR LUBILDY LA QUIRTA I CA OF AlT XND UPVW — ANT, RS A RERiESENTQTNF3. Z/Z d scla.ON } s9�OlsZ£Gf iR�9£ l 86s1 'll'��r - State Water Resources Control'•Board . N ' John,P. Caffrey, Chairman `` • - PeterM. Rooney.,- 'Division of Water Quality, Storm Water Unit Pete Wilson •.Secretary for 901 P Street Sacramento, Califomia 958.14 • (916) 657-0919 FAX (916) 657-1011 - Governor Environmental. Mailing Address: 'P.O. Box•1977 •.Sacramento,'California • 95812-1977 Protection Internet Nddress:,http://www.twrcb.ca.gov E October 07, 1998 r " CHAD MEYER ., RUT HOMES LLC r , ; PO BOX 810 LA'QUINTA;�CA 92253 RECEIPT'OF YOUR -NOTICE OF INTENT Tlie'State Water Resources Control Board (StateVater Board) has receivedandprocessed your NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE'.GENERAL PERMIT TO DISCHARGE STORM WATER'ASSOCIATED WITH CONSTRUCTION ACTIVITY..'Accordingly; you are required to comply with the permit requirements. `Your WDID identification number is:,7 33S309862. Please use this number in any future communications - - regarding this permit. - - �` SITE DESCRIPTION When,construction is complete of ownership Fas been transferred, dischargers are required to notify the - . Regional Water Board by submitting a Notice:of Termination (NOT). All State and local requirements must be met in accordance with Special.Provision No. 7.of the General Permit. •:I have enclosed a NOT for your future - use. if you do not notify the State Water Board that construction activity has been completed you will continue to be invoiced for the annual fee each October: If you have any questions regarding permit requirements, please contact your Regional Water Board at (760),346-7491. .Sincerely Audiey Shimizu ° Storm Water.Unit Division of Water Quality -Enclosure ,� Co. Recvaled Paner • . r . 02/04/99 14:17 FAX 602 257 1695 HENSLER . �� RJT Ha(ueS—CA l� G01 I��f�Om6ii�;f;d'lY::� ISSUE DATEiYMrpD/YY) �tiV 'il" •!1'� THIS BINDER IS A TEMPORARY INSURANCE CONTRACT, SUBJECT TO THE CONDITIONS SHOWN ON THE REVERSE SIDE OF THIS FORM. PRODUCER - All American Agency FaciliLies,(CO) 3 03-3S _ Parker Road, Suite 506 Aurcra , CO 80014 . CODE SL&-CODE ] COMPANY ''RONTIER PACIFIC TNSURANC BINDER NO. PK38134 DATE PFPECTIve TIMP DATELXPIRATION I 01/26/1999 _ 12:01 X 2:L1AA1 AM 101'NCON PM �03/27,/1999 THIS HINDER IS ISSUED TO CCTEND COvERAGE IN THE ABOVE NAMED CDMPANY PER EXPIRING POLICY NO: EESCRIPTION OF OPIAA71ONSIVPKICLESIFROPEFITY (Incipd+m3 L—Ii—I i INSUHEO RJT HOMES, LLC 1425 E W111VERSITX DR PHOENIX AZ 85034 ,l 'I.V�GrV��iWI'!U(i rlV::l,surr.•,ii d•. .I .'i I,fl., tir,,fp),If,. ..a. TYPE OF INSURANCE COVERAG&FOFMIS AMOUNT CEDUCTIM.E COINSUR PROPERTY CAUSES OF LOSS BASIC a BROAD SPEC. - I I GENERAL LIAPILITY GENERAL�-LIABILITY CLAIMS MADH I X i OCCUR 'PROT. OWNEP'S6CONTRACTOR'S 'DEFa1vSE COSTS ARE IN ADDITION TO APPLICABLE LIMITS _ $5r000 PER CL•kTM DEDUCTIBLE APPLIES TO LOSS & LOSS EXPENSE PIETRO OA7E FOR CLAIMS MADE: GSNERALAGGREGATE 0000mmERCIAL PRODUCTS — COMPlOP AGO Es2rjp(� PERSONAL B ADV. 114JURY 11 0001 000 EACH OCCURRENCE a1 000 coo FIRE DAMAGE (Any one fire) 5 5Q, 000 MED. 1 VO4SE (Anyone pecan) E 5,000 AUTOMOS;LE LIABILITY ANY AU70 AU, OWNEC AUTOS SCHEDULED AUT03 HIRED AUTOS NON -OWNED AUTOS GARAGE uAWLITY - - ' COMBINED SINGLE WkT 4 BODILY- INJURY (Per pecan', S BODILY IN:URY (Per"cidenp 5 PROPERTY DAMAGE £ MEDICAL PAYMENTS S PERSONAL INJURY PROT. $ L}NINSUREG MOTORIST 5 S AUTO PHYSICAL DAMAGE DEDUCTIBLE COLLISION. OTHER THAN COL; ALL VEHICLES SCHEDULED VEHICLES - ACTUAL CASA VALUE STATED AMOUNT 3 OTHER LESS uABILI7Y UMBRELLA FORM OTHER TFAN UMBRELLA FORM, f - PIETRO DATE FOR CLAIMS MADE: EACH OCCURRENCE S AGGREGATE $ELF.INBUREO RETENTION S • WORKER'S COMPEN$ATION AND .. EMPLOYEA'S LWBWTY - STATUTORY LIMITS i3,iYisin ;;:e;;l°;' ✓<' i:i .•li EACH ACCIDENT S DISEASE -POLICY LIMIT PISEASE-EACH. EMPLOYEE 8 5 5PECIAL cowwrinRIOTHER rOVERAOES PREMIUM_ $78,585-00 + $2,357.55 S/L TAX + $275.05 S/L FEE, 25'; MINIMUM EARNED PREMIUM. rzrc� a'• ••'i�•: •,u�, a•rrt' �•t r•r r:, ry,., ..1,71, .,la•rv�na �r dv r, ,,,l,t . i' .d':II„rJ,f' Jb', .i'. . l:,.Y '.. � 1 ,.Il'�J:•l�v,. �1,1/•. trl,e ..VM ,�.:��y..:r.• ,JWI Ili VIA'!"j �. r,'i,�, r.. ,.:i err. i. ..,, .1 �:", i, -1. 'I•r...:..• �Y± r•' ;. LOSS PAYEE r ADQ1710NAL INSURED• LOAN I — —� AUTHORIZED REPR5 WE - W - r C� ry y�� .1� „1n. ,,Ki r..ti:,y,l, ,il•i �l,ri�l .'�1;:11: I7Yli. ,rl'u :,li, '7� � /718A .,M r�;�rr •r ..Hz :�1 :' V;j.y uii-m !�:' ,:fl1�' :ij,l; .'I::.�in ter. ':;l: �n� .,., �i:Vim• ;,t 1��1;. ,�.,. ,,,� :y:, 'q;1,�ir.,n.,r'1y. r,q,,;:�',r:7�:' 0 The following General and Special Provisions are attached to and made a part of Permit No. v 1 GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not.be permitted to operate on. any paved'surface unless fitted with smooth -faced street pads.. All mechanical outriggers shall be fitted with -rubber street shoes to protect the'paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width.. Resurfacing shall consist of one. coat of two inches (2") of A.C. surfacing plus appropriate seal cost as specified. above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted .and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors.' -Suitable detours and detour signs shall be placed and maintained for the duration of the project.' The City shall be notified.24 hours in advance offany traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including, corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate. removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this Work., Drainage structures and open drains shall be kept free of debris -At all times for.proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation. and backfill operations shall be removed from the. right of way. All paved surfaces shall be' broomed clean.of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down •dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de' -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water.and to provide off-street barricades when necessary.. CLOSING STREETS: No. street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the'event it is felt by the permittee that he 'must close a'street for any length of time, permittee shall, contact this office to obtain the necessary permission. . SPECIAL PROVISIONS " The following shall apply when indicated: R NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance', of starting construction. R2 UTILITY CLEARANCE: (Substructures) Prior to making any -excavation within the City of La Quinta right of way• authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing- _ substructures. Damage to existing substructures resulting from operations conducted under this' permit shall be. the sole responsibility of the permittee. R6 R7 R8 UTILITY CLEARANCE: (Surface Structures) No work shall be done under this.permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an "R", value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. PARKWAY GRADING: Area between the property line and *top of the proposed' concrete curb shall•be graded to a slope of 1/4 inch to one foot (1'). GRADE: CHECKING: City of La Quinta shall check grades upon receipt of planand profile and/or grades • as, established by a licensed engineer. CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed.. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard 11207. DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall. be 2 1/2 inches of A.C. paving placed on ( ) of class aggregate base. Driveway construction shall conform to attached drawing.' SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained. at all times. SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the manufacturer's specifications. COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall he coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. 12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. LIMIT OF EXCAVATI NS: xcavatigns shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations sh b properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public orks Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain ope r a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the ork ite. R BACKFILL MA B c fill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequatel onsolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which ' ncountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or rav � n BACKFII.L SAND: B kfi and or shall be approved transit -mix equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrate sing vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 9 rce shall be attained with the structural section of the roadway. R BACKFILL PLACE ackfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maxi in of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not su cted to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not ess an 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flo ing is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the je shall b of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RI COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: 'A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed,. bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. . Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 2891 --- RJT "Homes --- In addition to the standard permit conditions, the following shall apply: '1. ' . Pursuant to Section 14.16.320 of the La •Quinta Municipal Code'(Ordinance.10 § 1 (part), 1982), all work shall be performed in. accordance with'the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. RJT Homes,, hereinafter referred to as "Permittee", shall be responsible for providing- continuous dust and erosion. control. 3. Streets shall be kept clean. They shall be completely cleaned.at the end of each:working day•and more, frequently if required. 4.:. Pursuant to Section 6.08.050 of the La Quinta Municipal,Code.(Ordinance 18 § 1, 1982),throughout the. "work "site, the Per mittee sha11: comply with City , regulated work hours. Operation and maintenance of equipment within one-half mileof"human occupancy shall be performed only,durm the following time periods: October 1 st to April 30: Monday -Friday. 7:00 a.m. to. 5:30 p.m. Saturday 8:00a.m. to 5:00 p.m: May 1st to September 30: Monday -Friday, 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p'.m. . Work shall be ,prohibited. on, legal holidays and Sundays. 5.. Work performed .within 500 feet of a major and/or signalized intersection is restricted between the hours of 9 "a.m. _ 3 p.m, Traffic control 'shall be. set up after 9 a.m: and removed before 3 p.m. The Permitiee shall contact the Riyerside"Country Traffic: Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in any way. . 6. Pursuant to,. Section 14.16.110-of the La,�Q'uinta Municipal` Code (Ordinance 10 § 1, (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any.public or private street and for any damage to other City'streets or facilities as a result of work performed under this permit. 7: Pursuant to Section 14.16.25.0 ,of the,La Quinta Municipal Code (Ordinance.l0 "§ 1 (part); 1982); advance warning signs and traffic control, Shalt be installed and maintained in accordance with Cal .Trans Standards or°the Work Area Traffic Control Handbook (WATCH Manual). A traffic control, : plan, if required, shall'be"prepared inaccordance with the WATCH Manual,, and submitted to the City for review and approval one (1) week prior to .starting any construction. _ It shall be the Permittee's 'responsibility to appropriately detour. and barricade all construction sites. Special Conditions.- Permit No. 2891 Page 1 of 3 y" SPECIAL CONDITIONS --PERMIT NO.2891 -=- RJT Homes' --- 8. Pursuant to Section 14.16.290 of the La Quinta'Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be, permitted: A. minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. 'It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional .work, materials,' or modifications of the work be required in order to meet City standards, safety requirements, signage-requirements, or to fit actual field conditions, the work shall 'be performed by the Permittee. as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. 'Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. 12: All excavations within City of La Quinta right-of-way shall be backfilled, and. temporarily paved if within the existing travel way, at the end of every.workday as directed by and to the satisfaction of the City Engineer for the.protection of the public.. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where- construction will begin the next day, provided that this length of trench is completely covered by steel plating. All landscaping, irrigation, decorative. rock, decorative, concrete; lighting; etc., -shall be replaced to its original condition. Access and egress to all local properties: shall be maintained at all times. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement, shall be.completed.no later than seven (7) days after the completion of the work. Permanent pavement shall be replaced as required by the Public Works Department. Permittee shall notify the City of -La Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at'(760).777-7075. Permittee 'shall stabilize. any soil :that was disturbed (shoulder areas, etc.) as- a result of work performed under this permit with an approved dust 'control treatment and provide continuous dust control measures as -indicated in,the Fugitive Dust Control Plan, if applicable. Special Conditions - Permit No. 2891 Page 2 of 3 -Medium -Large -Scale Construction/Demolition-Projects. (Greater than 5 acres)l . }. 'Fugitive Dust•(PM]0) Mitigation Plan Date: 1-19-99 � Jurisdiction: La Quinta Project File #:TR, 25389-3 Part l - Project Information ° riocp 99 ss' Y Please provide the infonnation below as completely as possible even if 'it has already been provided on other forms related'to -this project. Failure to provide complete infonnation or provision of -inaccurate inYtI rmation,may delay the processing of'your Fugitive Dust (PMJ0) Mitigation Plan (Plan). is recommended that you submit your Plan' concurrent. with your grading adin or demolition permit application.' Project proponent: RJT Homes LLC Address: P.O. Box 810, •.50842 •,Grand Traverse, • La• Quinta, CA 5'2253 Day phone number: 564-6555 , t Emergency phone number: 564-8421 .Grading contractor (Contact Person): Fred Rainey Address: 50-842 Grand Traverse La •Quinta, CA .Day phone number:. 564=6555 Emergency phone number: 564-8421 Construction Site street address: 'La Quinta: Fairways, Grand Traverse Construction site location: ' (Please include an 8.5x 11 location »iap) La Quinta Fairways Construction site assessor's. parcel number (Tract #): Tract 2.5389-3 Parcel (Tract)'size: 14.55 Acres or Square feet Anticipated date of physical project initiation: 2-1-99 Anticipated date of project completion:-1-31=00 ' Anticipated costs for'dust suppression: $5, 000. 00.. (Attachment B- Must also be.completed and mailed tot e appropnate address when, construction activities have'been completed) i Y , LVE 91999 LAQUINTA DEPARTMENT 1 All projects greater than one half (1/2) acre are'also subject to S.CAQMD,Rules 403 and 403.1. , P. Earthwork Information (Acreage1CubicYards): Project Area: 14 : 55 ,Acres Total Disturbed Surface Area: 14. 55 Acres Cut: 13,000 tY Fill,: ' 13, 000- CY Import: 0 Export: 0 Phasing of Earthwork: NA Date Date Phase I Grading `(Acreage):. From: To: Phase II Grading(Acreage): From: To: Phase III Grading(Acreage): From: To: Phase IV Grading(Acre`age): From: To:' (Attach additional -information if necessary)" -Past 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project.by placing the corresponding letter beneath the following sources. In addition, please indicate at which phase the measure will.be implemented, either at Rough. Grading (RG); Finish Grading (FG); or Final Construction (FC). Demolition projects should only.indtcate measures in the. Rough Grading (RG) column_ After indicating what measures are to be implemented, ".complete _the ':Details" section by describing how.and wlien the measures are to be implemented: Source Details (e a frequency of application number and type of dust"control implements, No. RG FG FC etc. Please be is specific as possible) 1 A _ Prior to grading., the 14.55 acres will" -be pre - watered using movable irrigation pipe. During grading, water trucks.will be used to maintain moisture balance and to abate dust. The area will produce 61 house pads. The 61 house pads will have construction staking within 130 days of grading completion. Street improvements -will be completed within 230 days of .grading completion. r . x .Part.'3 A r ement . d,► _ Y, r '''. I certify that,the.information contained._in this Fugitwe Dust (PNi10)•Mitigation Plan is true and accurate and that all measures;specified'in Part'2 will be .implemerited,during project iconstruction. Fauthorize .the. City of. - � La :FQui nta . to enter the above mentioned property for inspection 'and/or abatement purposes;. and I agree-to°,hold harmless the, City and .its' representatives from liability for any actions related, to this project.-' I' also agree to 0 R . complete the record=keeping requirements included. herein as„'Attachment•B; once the -project has been completed.,w wrier or ut on epresentattve N /ate / �gnature o ' ' I "have read 'the conditions of thetFugitive Du the Mitigation Plan and the owner has Y.- w authorized the implements.lion of all.iis'provisions throughout project buildout. Igg ture-o Grading, ontractor r _. ut onze epresentative )ate) r (If'not the -same as above; - . - " ` ,w-e - .• ;1. yr; - - f ,~ .a .. - ; , - rat. - .• - �j! _ r, y 7ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES ' The left column contains the sources of fugitive dust which are intended for emission' control under the City dust control ordinance.. The two right columns contain an inventory and description 'of reasonably available fugitive dust control measures for each of the sources:.. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (S'ource No) Reasonably'Available Source Control Measures Comments Land (A) Watering o Application of water by means of truck, hoses and/" Clearing/ or sprinklers prior to any land clearing or -earth Earth- movement will increase the moisture content thereby moving . increasing stability of material o Once the:initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used,to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective..in areas which are not subject to daily disturbances o Vendors can supply information on product application and, required concentrations (C) Wind fencing -o Three to five foot barriers adjacent to roadways or urban arcas can be effective in reducing the amount of wind blown material leaving a site o Should be used -in conjunction with other measures (D) Cover haul vehicles o .Entire surface area should be covered once,vehicle is full . (E) Wheel washers o Should',be placed where vehicles e)dt unpaved areas onto paved 'areas ° o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation is (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according'to soil,type, weather conditions, and vehicular use. (Source, No) Reasonably Available. � J. . - Source Control Measures Comments. (2) Unpaved•. (1) Reduce speed limits o 15 mile per hour maximum Roads - (Cont'd) (J) Reduce vehicle trips o' Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent ----------------------------------------------------- Storage (K) Wind sheltering ` . o : Choices include silos or enclosures Piles o Enclosures should consist of three sided barriers equal to height of material with no more than 50 percent porosity (L) Wet suppression o Application methods include; spray bars, hoses and water trucks o Pr.'equency oCapplica6on willvary on site specific conditions (M) Chemical suppression o Rest for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic-, or other material can be used as temporary coverings o .When used, these should be anchored to prevent wind from removing coverings ---------------------------------------------------------------------- Paved- (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved Road Track -out areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full --------------------------------------- ------------------- (5) Disturbed ---------- -- ----- (S) Chemical stabilization -.; o Vendors can supply information on methods for application and Areas/ -: required concentrations inactive Construction Sites (T) Watering .4 o Would require frequent applications unless a crust , can be developed over the site (U)"Wind fencing o Three to five foot'barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material -leaving a site a o Should be used in conjunction with other. measures ' " . (V) vegetation o .Establish as quickly.as possible when active operations have establishment ceased '. o Use of drought tolerant; native vegetation is encouraged ATTACHMENT B - COST INFORMATION y Medium -Large Scale:Construction/Demolition Projects , (Greater than 5 acres)' , Fugitive Dust (PM10) Mitigation Plan Date: 1-19-99 .Jurisdiction: La- Quinta ~ y Project File #:TR 25389-3 Project proponent: RJT •Homes, LLC Ipay phone number: 564-6555-. Emergency phonernuinber: 56.4-8421 I- In the space provided below please "list the costs associated with implementation of all dust . control measures. The information,provided below should include all.implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply,to all projects. _ Watering: o Chemical stabilization: ' Wind fencing: r . Covering haul vehicles: r Wheel washers: ,,Street sweeping: Paving: , r Wind sheltering: Coverings: Vegetation reestablishment: k , t After• project ,completion these records shall be 'transmitted to ,t1ie Ciry where the , grading/demolition permit was attained. arid' to 'the Coachella Valley Association of ' Governments (CVAG) at:the address 'Provided below. PM10.Cost Monitoring - Coachella -Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 y. ' 1 All projects greater. than -one half�(1/2) acre are also subject -to SCAQMD Rules 403 and 403.1. t �OOC=., I . ddW' XIGNI 00I JWVl 3-1-lV0 4 L M M .zi 99 1fg rg 2g i9 `" _ a 3 dim e o� 49 t9 Q9 � 09 l9 66! ' �� c� _ i£ 3AI2I; S»: 1 1NI0d. m `£ o, Nrsvo 12 z o � M z *:57 ..My 02 £ N p ' , U3 N 91 9 y ry 9£ Z l 1' { 91 -< £l. 01 21 It , Ou I lv1 va I N3Av � . isdno:) 100 O S3NI d 3�1Sd0 . -O J (1-13 74 • 0� 1 � �V�O-1 ds e �, dNY21,9 Ot .��.V: NYn, rrf.i� R.fF'�f..l(l'U • 3nN3AV H105 For City Use Only Based on all of the provisions contained-lin•this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved 1 Conditionally approved. (Conditions specified below) Denied. (Explanation attached)' . z%9 9 Signature of City Representative (Date) The following conditions of approval have been added to the Plan by staff in order to ensure aIn.adequate level of fugitive dust contr'ol.. ' Gv� '77 ' t • J 4 . l (Attach additional information if necessary) 1 have rea[i the above conditions of the Fugitive Dust (PM1.0) Mitigation Plan and I agree to -implement of all provisions at the concentrations and trequencies iaentitiea. c tgnatu e o wrier r ut orize e resentative ate � i • k CONDITIONS FOR FDCP APPLICATION 99=55: RJT HOMES/LA QUINTA FAIRWAYS VTR 25389-3; ± 14.6 ACRES GENERAL: 1.. Applicant shall comply with all control measures as set forth in'the approved application for FDCP 99-55, and .the following conditional measures. 2. The full amount of security supplied for FDCP 99-55 (as determined by Public Works) shall be available to the City for any measure(s) deemed necessary by the City to achieve adequate dust control, whether or not such additional measures are. included by the applicant for this application. The applicant shall implement all methods set: forth herein for the duration of the project construction. Any requestsfor.bond amount revisions/reductions must be•made in writing to the Public`.Works Director. Security shall be in the form of a non - expiring Certificate of Depositor a renewable Letter of Credit. 3. Applicant shall submit copies of all records, related to cost accounting for the dust control measures assumed during all pre -grade activity and grading construction upon any request for release/reduction in posted security, but no later than 30 days after completion of all dust control measures as. outlined 'in and conditioned upon -the -plan. All such records shall accompany a completed PM10 Program Report Form, available through the Public Works�or Community Development Departments. Completion of all dust control measures shall be verified, by the assigned .field inspector. 4. Adequacy of all proposed and conditional. stabilization. measures shall be determined by the assigned grading inspector. The,City may require remedial measures beyond. those identified or'conditioned upon the project, which the City deems necessary in the event such approved measures are not effective. ' The City may release a portion of the bonded amount to the applicant for such work. Enforcement of these conditions shall be'' at the discretion of the assigned grading inspector, who shall monitor and field verify that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to" application,frequencies, quantities and other aspects of this FDCP may be made by the inspector, at his/her discretion, -in order 'to assure compliance. 5. The contractor/vendor responsible for provision of all soil stabilizing agents shall submit the appropriate Material Safety Data Sheet(s), along.with approval from -the Water Quality Control Board, to the Public Works Department prior to any site application. Application of stabilizing agents must be in compliance with"NPDES and the State Water Quality Control Board requirements. y 6. -The conditions of this dust control plan approval are applicable to the full range - of construction operations associated with the entire t 14.6 acres within TR ' 25389-3; and shall remain' in effect for- the duration of all construction ' undertaken as part of developmentapproval for the subject property. Transfer of real property or other interests regarding this project 'shall not affect the - validity of this plan `approval. Implementation of all- proposed and .-conditional measures shall, be carried out for the duration of all construction x activity, as applicable.', However, nothing herein shall preclude any future party of interest from'filin'g a -revised: FDCP with the City for any portion of the site. 7. Approval of this dust control .plan does not constitute an authorization for any site disturbance, preparation ,or 'construction. The. developer is required- to obtain any and .all necessary . permits- and clearances as set forth in. any development- approvals issued and currently ,in effect pertaining to this site. This includes any type, of testing, monitoring or sampling required as a condition of development approval, such as that conducted for archaeologic, .. hydrologic and geologic reporting purposes._ SITE DEVELOPMENT': 8. Any pre -watering of areas proposed, for grading -shall, be in accordance' with recommendations of the grading contractor,, based on the area soil conditions . ` as described in the associated soils report(s). At a .minimum, pre -watering time shall be fo'r three days prior to any earth disturbance(s). 9. FDCP 99-55 indicates that.tract grading will 'be balanced.' Any transported soil , '. on -site shall be sufficiently stabilized -(watered down and/or covered) so as not to create dust during loading,. transport and spreading. Minimum freeboard shall be established by the Public Works Department. Any on/off-site storage piles shall be covered, or suitably stabilized at. all times. 10. Track-_out.and other accumulation of soil material(s) onto any paved streets outside of areas proposed for grading (i.e. ,Park Avenue, Calle Tampico, affected internal paved roadways) shall.be minimized: Any construction, access w Ito the, site • from existing' pavement shall'be improved -with. a.c: ' paverent, ' 4' aggregate base material or similar, for a distance of 120' from the pavement. , edge into the site to minimize track -out; until such time as the roadway is ' -permanently paved, or access is abandoned. Wet sweeping/flushing of soil accumulations.from•all paved areas shall be conducted daily, and, kept damp . during` construction hours until so removed at .the "end of the work day. 11. All. unpaved- construction access'and travel ways,,,serving the site shall be prepared for traffic and kept watered down -and compacted to retain moisture content during all,construction traffic activity, including building construction. Road Aengths shall be watered each day as necessary, commencing prior to any traffic activity and terminating at the endof the work day after all activity has ceased.All track-put� to,pave.d surfaces shall be removed per Condition '#1,0. 12: All construction traffic, and parking shall` be limited to. existing paved areas. No.' vehicle parking,or traffic ,of any `kind . is permitted on. or over any previously, stabilized or otherwise inactive unpaved areas or building pads. Any temporary office facilities (sales' construction, etc.) shall' be provided with paved, compacted or otherwise,stabilized parking and.access: during their operation, - to be constructed as required;by'Public Works Department standards:, 13. 'Disturbed. but- inactive development areas subject to ' additional grading or . building. construction within 30 days of ,completion of the initial disturbance, shall be watered dailyJn conjunction with watering of,access roads and other grading activity, and to:the full extent possible once construction commences. All previously disturbed: areas where further grading,'construction or other land ' disturbance Will not occur, within.30 days*of initial grading completion shall,be stabilized With an appropriate':chemical binder, as approved by the California Water Quality -Control: Board, Region 3, no later than''four days after completion of the disturbance, in accordance with the .provisions and, conditions for this dust control plan approval. Such property shall be staked, posted or otherwise restricted in `order to prevent any vehicular access onto or over, those areas. May d, 1994 78-495 CAL'LE TAMPICO — LA OUINTA, CALIFORNIA 92253 - (619) 777-7000 FAX (619) 777-7101 TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS IN THE CITY OF LA .QUINTA RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL --PLANS Dear Developer/Builder: The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992. Among the `required control measures was the, enactment by Valley cities of dust control ordinances which require builders to implement dust control actions during construction, demolition and paving activities. In conjunction with City staff members, we ask -your help with the reporting requirements. A significant aspect of the PM 10 Program is the need to report statistical information to the Federal Environmental Protection Agency via the South he A.QMD and the State of California Air Resources Board. In response to, this requirement, a Dust Control Reporting Form has been created, a copy of ,which is attached. It is requested that if any project developers have amounts to report for any PM 10 mitigation, these forms must be filled out. This form is intended to supplement Attachment "B" of the Fugitive Dust Control Plan`by providing specific cost figures related only to dust control measures. .The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for reporting purposes. This means that each jurisdiction is requested to review projects since that date where. PM 10 control measure expenses have been incurred by developers, whether. or not they have been, incorporated as part of a Dust Control Plan, and forward this data to CVAG as. soon as practical. Your cooperation- in `completing these forms as part of the.grading permit procedure will help assure that the'Coachella Valley and the development comm Iunity as a whole receive deserved credit for the effort to attain Clean Air Act standards for PM 10.: Very truly yours, RRY HERMAN. Planning & Development Director . JH:WHN:bjs Attachment' ^ MAILING .ADDRESS P.O. BOX 1504 - LA OUINTA, CALIFORNIA 92253 I. GENZRAL DIFORMATIOH Piroject,.Developer Name: " RJ.T Homes: , LLC - - • Address: 50842 Grand Traverse.'' '..Phone: ".-564-6555. Project .Site,. La.'Quinta Fairways Project Title, La. Quinta' Fairways Address: Tract Noi •• 25389-3 Acreage: 14. 55 -Grading Subcout<-actar.. (if different )'_ Name: Address; F. , s i�• Phone: , PEA_SES? YBS NO' I_' sobow many? a •. Type of-Develcs�ent%Project: Conercial Single Family x Multi Family_ Demolition Other. Date of Project/Phase Star;-Qo: ,2/9.9 Dabi of -;Project/Phase C--mipletion: l /00 II. -COST IiYFOR2 =C!N *` h 'If actual costs are not available, please'estimate to�the best of your ability. 1. WATXt: Amount: Total 'Cost: '.'. 2:,BQUIPMENT CASTS: a i A. WatEr Truck: - Number on Site.: Total C -st: ' Hourly Rate: Hours: ` B. Street'Sweeper: Number on Site: :� Total• Crst:, `'Hcurly, Rate: Hours' ' C. TQ-mporary Ir_ igation. ; Total.- Cost: . _D. Wind -Fencing:,, linear Ft. Total cost: , - Cost/Ft. • • _ -B:. Cbemical/Yateri,al Stabili7ta on: Total Cost: . 'Ft. } Cost 'per Sq. F. Vegetation Coati.; Material: Total Cost: - • Maintenance: G. Other: -Tyne: _ Total Cost: Hourly 'Rate: .. Hours: 3.' LABOR CAST: Hourly Rate: Total -Cast: 4., ADMZ ISTRATZON "COSTS: Total Cost: III. T(= COSTS: • , , . '.' tl `t, i - r Add items - .4 for 'total 'cost.' llp ' COST: ?LEASE RETURN . ?CRM AT; COIQL2 'ZON OF PROJECT OR PEASE -OR ANNUALLY FROM. THE.. DATE OF ?RO,c.CT/?RASE START XP . - 3131 /94 ,. , a. •f `. ',+ .Y .t w, . \.•l •} I,. ,t .. �a • " 'r ' .' 1 ` � � �" - .1 i �«� � !J-. _ s •• ' ,.�' • ..31 � �. ,� `• x� �.. !. fir: \"�' �i ,�� '.� •S r ,,. _ ��, ii :1y `!t i'C _ »✓�" . • _ t. f :. r r ,tI• '� 'y .4 _ .. _ ''tw3y' .+, { t - t7 '• { ,b rhy .'Y•t •1 .. � a� tt y � � }� � i ,, y t . . y .f .. , . � _ ire ..\ � _ •- ` t,. �.. yeti • f - 4 • {t' _+a • �' •'-, r... II81P�....,.,oa:a'afn �� �� acau _ • . Q.IIt �.�9 /1Q�Sv'Sitt �- f .. flld:.*.itCitll IIG.JC.1'ID __ F. ' �aG.`}. .. �� � .jry - fr - � - . ........... ' .RJT HOMES, LLC ,r . P::O BOX 810 -. _ Y 3• ^ LA QUINTA, CA.'92253 - C ^j' Y r r r • ^ = , ) fi' 90-3842/ 1222 �. - « " ", " `� �, •'t , Qp•,, •., ^; ' PAY `� .. } DATEw `�/'/ fU / r .w TO THE •' ORDER OF �. .. y� i /�/� t` f �4OLL`ARS fl ' j B VALLEY INDEPENDENLBANK. ' ` t�17 ( .. - - r • " . �. •'. .. 51-290 Avenida Bermudas, La QuiMa, Celifomie 92253' �( �I 1-800-942-6222 . , . • -p .. - ? �' y •- A- ; ' FOR CJi s / c _ _ +' 1110.006'2 2116 11: i..2 2 2 384.204, 008!,150.6`1 2411' nm -- - '