Loading...
2894NOT£!f; With proper b.livation this form constiti!tes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: February 9, 1999 Subdivision Improvement Permit — Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Rancho La Quinta - Specific Plan 84-004 Jerry Pate Golf Course (Street address or Description of Location) I PURPOSE OF CONSTRUCTION BeRin 7xolf course a Sketch (attach construction plans if appropriate) conntrue-ti:an .. DESCRIPTION OF CONSTRUCTION Mass etsdi.ne DIMENSION OF INSTALLATION OR REMOVAL See ►Maus• SIZE OF EXCAVATION, IF NEEDED 7.200.000 varda APPROXIMATE TIME WHEN WORK WILL BEGIN 2/15/99 SEE ATTACKED CONDITIONS. SEE APPROVED PLANS, TITLED "MASS GRADING PLAN, $P 84-004, JERRY PATE GOLF COURSE," BY WATSON .4 CHRISTIANSEN ENGINEERING. APPROXIMATE TIME OF COMPLETION 8/1/99 ESTIMATED CONSTRUCTION COST $ 1.650.00C• (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. l Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of I La Quinta and to pay for any additional replacement necessary as:the result of -this work. f Signature of Applicant orAgent T.D. Desert Dev+elooment P.O. Box 1716 La Quinta, CA 771-1941 Name of Applicant (please print) Business Address Telephone No. Nuevo Enei-neerine 79-811 Country Club Dr. Bermuda Dunes. CA 345-1778 Name of Contractor and Job Foreman Business Address Telephone No. 488834 Contractor's License No. 157 City Business License No. National Union Fire Ins. Co. OLS440206RA Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class UI Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 43.U00. Permit Fee IOOV08 l en3'I:t"y As -built Deposit 1.000.00 c4• '1+wvH4�' •r�MMe 9esYs Cash�D..eposut-Surety'l:Bond Plan 'check Detmsit (4.500.00) ,6.,4uire'd Credit TOTAL: $ 39.600.00 Receipt No. Received by Date Recorded by 0 F EB 11 P,,ERMhT 51�'DATION PERMIT NO. 2894 DATE APPROVED EXPIRATION DATE DATE ISSUED By Administrative Authority Telephone: (619) 777-7075 Supt. on Job Sheet of� Weather Date Temperature 7-4 OF M.az OF Min Project Work Hours ! to S ! �° Memos Issued Photo: - :. ..: . • .. r" . � 8y' SDI '- Special Conditions, Delays,.Changes " Accidents Damage ` :Sam pling,*Jesting Visitors to- Site ' .• A" 4e4x dzce/ A" Vie'(,' 02. 4Lfa- �: Work Report (Work done, Personnel/Equipment working) i ,z°��'' ' `Daily Inspection Report No. City of La Quin•` • ` J ; + '._..tea i ' r ' u - .. - • . f� . ;_ ` *' Contiactor ' r `. Sheet of Supt. on Job �C%iz�t?Y 'Date - Weather i' i i ` Temperature'F Max 3D °F"Min . Project _—to � WorkHours .7 -- i9— Memos Issued • ' Photos Special Conditions,.Delays, Changes _ Accidents Damage y` , Sampling, Testing « Visitors to Site ° Work Report (Work done, Personnel/Equipment working) i ri ' � ': , ,i, • • ' ` _�• _ , Qom' • t s,. Daily Inspection Report: No. City of La Quin Contractor :_ Sheet of Suet. on Job 7.1/,2zjj Weather = r Date To `7 °F Max `S� `F Min Project Work Hours 7 to � -v Memos Issued Photos Special Conditions, Delays, Changes Accidents Damage Sampling,•Testing Visitors to Site Daily Inspection Report No. City of La Quin 09 Contractor ' + •- ' ` a ,`7 w Sheet of Supt. on Job Date Weather •o • Temperature '7� o F Max F Min Project Work Hours 7 to _ �' Memos Issued Photos , Specia.1tonditions, Delays, Changes ' Accidents Damage . Sampling, Testing Visitors to Site ' Work Report (Work done; Personnel%Equipment working) . - iz �2�� �• �L2�C.L�,�' � �l/LLLG�-dam. , By t NOTE: With proper validation this form constitutes an encroachment permit I CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking' lots, sewers, water mains and other like public,works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS F-,;?b ��1y�q Subdivision Improvement Permit - Class III DATE: Nn p h — orL i nno Minor Improverrient Permit Class IV LOCATION OF CONSTRUCTION Rancho La Quinta,�� ► G Si�crt-i� �GZJ1 -GC J G0. e caolr Lam( (Street address or Description of Location P RPOSE OF C STRUCTION, �` �'t'-� "' ' �t Sketch (attach construction plans if L. p appropriate) (v� Q COULr92 C� DESCRIPTION OF CONSTRUCTION -ftgaL grading SEE ATTACHED CONDITIONS. MASS DIMENS ON0OF INSTALLATION OR REMOVAL M— S SEE APPROVED PLANS, TITLED MR@HI GRADING _e �Nfr- �S-�5',- � m �u BY SIZE OF EXCAVATION, IF NEEDED WATSON CHRISTIANSEN ENGINEERING. Z Coo YoS APPROXIMATE TIME WHEN WORK WILL BEGIN 2 IS 9 1 _c)(Dq APPROXIMATE TIME OF COMPLETION 8 ESTIMATED CONSTRUCTION COST $ -49•h-Ht (Including removal of all obstruction, materials, and debris,'backfilling, com- paction and placing permanent resurfacing, and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby. agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of th2permi n all licable rules an regulations of the City ofLa Quinta and to pay for any additional replacement necessary as the rk. Signature of Applic t or Agent T.D. Desert Development P.o. Box 1716 La Quinta, CA (760) 771-1941 Name of Applicant (please print). Business Address Telephone No. Nuevo Engineering 79-811 Country Club Dr. Bermuda Dunes, CA 345-1778 Name. of Contractor and Job Foreman Business Address • Telephone No. 438834. .157 Contractor's License No ' A• City,Business License No. Natinnal Uninn Fire Tn.atiranco Co- rT 5440206RA Applicant's Insurance,Company Policy Number FEES: %- Subdivision Improvement Permit - Class.,111., ,c,• " ' , Public improvements: 3%of estimated construction costs Private improvements: 3`Yo of estimated construction costs ti Minor. Improvement Permit- Class IV: See attached schedule Ox. M4') i 4a m n Inspection, Fee $ Permit Fee• _ Rom As -built 'Dep. jtUMMM Plan Check_ Dep:' Credit . ,TOTAL: • •100.00 M� ' 1, �f Receipt No. Received by Date Recorded by S. V PERMIT VALIDATION , PERMIT NO. ZT DATE APPROVED EXPIRATION DATE /J DATE ISSUED _12U&(&4 'By Administrative Authority Telephone: (619) 777-7075 The following General and Special Provisions are attached to and made a part of Permit No. GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit iuthorizes work to be accomplished within City of La Quinta right of way ONLY.- Whenever construction extends within private property, it is the responsibility, of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured.by the.permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved -surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during. excavations. Rubber -tired equipment only.shall be used in,backfill operations in paved areas. If the existing pavement is scarred, spalled, or. broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat,of two inches (2") of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. - In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. N .RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior,to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall • be the responsibility of the permittee (contractor) to control this water and to, provide off-street barricades when necessary.. CLOSING STREETS:. No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles, In the event'it is felt by the permittee that:he'must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ,•. ' Rl NOTIFICATION: - Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. UT LrrY CLEARANCE: (Substructures) Prior to making any'excavation within the. City of La Quinta right of way + \� authorized by permit, the permittee shall contact all concerned utility. companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under,this permit shall be the sole responsibility of the permittee. IJTII.ITY CLEARANCE: (Surface Structures) No work shall be done under this.permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: -Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class _ aggregate subbase course having an "R" value of not less than . > and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. RS/ PARKWAY GRADING: • Area between the property line and top of the proposed concrete curb shall be graded to a slope of 1/4 inch to one foot (1'). " r GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile. and/or grades as established by a.licensed engineer. - 4.. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal.. Depressedcurb, matching concrete gutter and .=a concrete driveway approach shall be constructed in conformance with, City of La Quints Standard,N207. •R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on ( ) of class aggregate Vase. Driveway construction shall conform'to attached drawing. SIGHT CLEARANCE: Sight clearance of.600 feet in all directions shall be assured and `maintained at all times. RIO SOIL STERILIZER: • The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the ' manufacturer's .specifications, COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a'licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. X4 LD41T OF EXCAVATIOXbra pns shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shbarricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Pubector shall determine the suitability of excavation barricading in each case. No excavation shall remain odexceeding five (5) days. No excavation shall be made unless the construction material is actually on the BACKFILL MATERIAL: kfi shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately cons aced backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is a ounce d during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gr el. �/` Jr-- SF�2,6a)- BACKFILL SAND: Backfi sh be approved transit -mix sand or equivalent and shall be•placed in lifts of not greater than three feet (3') and vibrated usi vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 ercent all be attained with the structural section of the roadway. ">> k7 BACKFILL PLACE Bac 1 shall be applied in layers of not more than 50 percent of the total depth of the trench / before flooding or a maximum f ve-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less th 9 ercent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding i sed for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets steal a of sufficient length to reach the bottom of each layer and the water supply shall be continuous. /ft3$ COMPACTION If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. Rl COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after s maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of highways, State of California, dated January 1973. . -.SPECIAL CONDITIONS --PERMIT NO.2894 --- T.D: Desert Development --- . In addition to the standard.permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La .Quints Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.. 2. T.D. Desert Development* hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control 3.' Streets shall be, kept clean. They: shall be completely cleaned at the end of each working day and " more frequently if required. 4. Pursuant to, Section 6:08.050'ofthe La Quinta Municipal Code (Ordinance 18 § 1, 19.82), throughout the work ` site, the Permittee shall comply with City regulated work hours. Operation and . maintenance of equipment within one-half mile,of humanoccupancy shall be performed only during the following time periods: October l st to April 30: Monday -Friday '7:00 a.m..to 5:30 p.m. Saturday 8:00: a.m. to 5:00 p.m. May lst to September 30: Monday -Friday 6:00'a:m to'7:00p:m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be -prohibited on legal holidays and Sundays. 5. Work performed within 500 feet. of a•major and/or signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic. control shall beset up after 9 a.m. and removed before.3 p.m. The Permittee. shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275= 6894 if signal operation at the intersection is to be altered in any. way. 6. Pursuant.to Section 14.16.110 of the La Quinta Municipal Code (.Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10'§ 1 (part); 1982), advance warning signs and traffic control shall b'e installed and maintained' in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, 'if required, shall be prepared in accordance with .the, WATCH Manual and submitted to the City for review and approval one -(1) week prior to starting any construction. It shall be the Permittee's responsibility to,apprapriately detour and barricade all construction sites. M Special Conditions - Permit No. 2894 Page I of 3 SPECIAL CONDITIONS --PERMIT NO.2894 --= T.D. Desert Development -- 8. Pursuant to Section 14.16:290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures .shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- . 4133: It shall be,the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain. facilities. 10-. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall '.be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta.,', 11 12. '13 14. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform -with Section. 306-1.3 `of the latest edition of the Standard Specifications For. Public Works Construction (SSPWC),- and as required by the Public Works Department. All excavations within City. of La Quinta right-of-way shall be backfilled, and'temporarily paved if within the existing travel way, at the end of every' workday as directed by and to the satisfaction of the City Engineer for the protection o f the public. Lengths of open trench shall not greatly exceed that which can not>be backfilled in the same day. Excavated trenches shall not be allowed open overnight,, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel- plating. All landscaping, irrigation, decorative rock, decorative concrete; lighting, etc., shall be replaced to its original condition. Access and egress to all local -properties shall be maintained. at all times., 15. - Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be•'completed no later than seven (7) days after the completion of the work. Permanent pavement shall be replaced as required by the Public Works Department. 16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 77777075. 17. Permittee "shall stabilize,any soil that was disturbed (shoulder areas, etc.) 'as a result of work. performed'.under this permit -with an approved dust control treatment and provide continuous dust control measures as indicated in the Fugitive Dust Control Plan, if applicable. Special Conditions Permit No. 2894 Page 2 of 3 State Water- Resources Control Board v.. John P. Caffrey, Chairman Peter M• Rooney • ,- Division of Water Quality, Storm Water Unit Pete W�On Secrermy for ' 901 P. Street • Sacramento, California 95814 • (916) 657-0919 FAX (916) 657-1011 GON�O1 Fxrvlromaervcl s, ,. Mailing Address: P.O. Box 1977'• Sacramento, California • 95812-1977 Protection • Internet Address: httpJ/www.swmb.ca.Qov r January 08, 1999 GRANDY SPARKS ITD DESERT DEVELOPMENT ,79-295 RANCHO LA QUINTA'.t ,. LA QUINTA, CA 92253 .RECEIPT OF YOUR NOTICE OF INTENT The State Water Resources Control Board (State Water Boardj has received and processed your NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THEGENERALPERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY. Accordingly, you are required to comply with ,the permit requirements.. r. Your WDID identification number is: 7 33S310342. Please'use this number in any future communications regarding this permit: SITE DESCRIPTION f •When construction is complete or ownership has been• transferred,: dischargers are required to notify the ' „ Regional Water Board by submitting a Notice of Termination (NOT}: ;All: State and local requirements must be met in accordance with Special Provision No. 7 of the General Permit. I have. enclosed a NOT for your future use. If you'do' not notify the State WatefBoard that construction_ activity has been completed you will continue to` be invoiced for the annual fee each January. , If youhaveany questions regarding permit requirements, please contact your Regional Water Board at (760) 346-7491. Sincerely, Audrey Shimizu Storm Water Unit Division of Water Quality , Enclosure ..df�iF, -nvironmenal Pi►nt�c� encv r Qd Recvcled Paver State Wateis esources ,Control Board ,. John,P. Caffrey;,C6airman J Peter X Rooney `` 4' `Division of Water Quality t. Pete Wilson Secretaryfor 901 P Street •Sacramento; California 95814:• (916) 657-0156 FAX (916) 657-23U Co►�rnor E viromnental Mailing Address: P.O. Box 944213 • Swnunerito, California - 94244-2130 Protection ; .16temet Addmss:. 6tt :#www swrcb.cagov, . r F To: Storm Water Permit Holder RE: •K �; NOTICE,OF TERMINATION OF COVERAGE UNDER THE GENERAL CONSTRUCTION STORM WATER PERMIT: GENERAL PERNII In order for us to terminate your coverage under the General Permit, please complete and submit the`enclosed Notice of Termination (NOT) to the.Regional Boaid'which has+the jurisdiction over your site: Refer to the Iasi. -page of an NOT packet for Regional Board locations. Please note that you are subject to the annual' fee until you filea NOT with the Regional Board :"'And the Regional Board approves your NOT: Should y'ou have any questions regarding this matter; feel free t_o contact either the Regional r Water` Board at the number listed on the back page of.the NOT.package; or the Storm Water Unit at (916) 657-0757. ., + . Sincerely Audrey Shimizu + r. Storm Water Unit " A Division of Water Quality Y ' Enclosure I r t . o , ..Cdlifornia Environmental Protection Agency - r �d Recycled Paper �• a State of California State Water Resources Control BoardCa --' NOTIOE.OF TERMINATION OF COVERAGE UNDER THE NPDES GENERAL PERMIT NO. CAS000002 -.. FOR DISCHARGES OF STORM WATER..:r-�_,.;r;.:; ASSOCIATED WITH CONSTRUCTION ACTIVITY, Submission of this Notice of Termination constitutes notice that the owner.(and his/her agent) of the site identified on this fort is no longer'authorized to discharge storm water associated with construction activity by NPDES General Permit No. CAS000002. ..:_ I. WDID NO, II. OWNER COMPANY NAME COUTACT PERSON STREET ADDRESS_ TITLE CITY STATE 71P PHONE III. CONSTRUCTION SITE INFORMATION ' Y A. DEVELOPER NAME CONTACT PEpsON STREET ADDRESS MILE CITY A ZIP PHONE, IV. BASIS OF TERMINATION 1. The construction 'project is'complete and the following conditions have been met. -All elements of .the ,Storm Water..Pollution Prevention Plan .have been_completed. - Construction materials and waste have been disposed of property... P� P perty... ..The, site is in compliance with all local storm water management requirements. - A post -construction storm water operation and management plan. is in place. Date of project completion 2. Construction activities have been suspended, either temporarily or indefinitely and the following conditions. have been met. - All elements of the Storm Water Pollution Prevention Plan have been�completed.:.: -"Construction materials and waste have been disposed of properly. - All denuded areas and other areas of potential erosion are stabilized. - An operation and maintenance plan for erosion and sediment control 'is in place. - The site is in compliance with all local storm water management requirements. Date of suspension �_� Expected start up date 10-mr--1 N State of California State' Water Resources Control Board INSTRUCTIONS FOR COMPLETING NOTICE .OF TERMINATION - FOR CONSTRUCTION,ACTIVITY Who May File Dischargers who are presently covered under NPDES General Permit No. CAS000002 for discharge of storm -water associated with construction activity may submit a Notice ,of Termination when they meet one of the following criteria. 1. The construction project has been completed and the following conditions have been met: all elements of the Stormwater Pollution Prevention Plan have been completed; construction materials and equipment maintenance waste 'have been disposed of properly; the site is in compliance'with . all local storm water management requirements including erosion/sediment control requirements and the appropriate use permits have been obtained and a post -construction storm water operation and management plan is in place. 2. Construction, activities have been suspended, either temporarily or indefinitely and the following conditions have been: all elements of the Stormwater Pollution Prevention, Plan have been completed; construction materials and equipment maintenance waste have been disposed of properly; all denuded areas and other.areas of potential erosion are stabilized; an operation and maintenance plan -for erosion and sediment control *is in place; and the site is in compliance with all local storm water"management requirementsincluding erosion/sediment control requirements. The date construction activities were suspended, and the expected date construction activities will start up again should be provided. 3. Construction site can not discharge storm water to waters of the United States. Please indicate if all storm water.is retained on site; or if storm water.is collected 'offsite. . 4. Discharge of construction storm water from, the site is.now subject to another NPDES general permit or an ,individual NPDES permit.". The.geheral permit or individual permit NPDES number and date coverage began should be provided. 5., There is a new. owner of. the identified site:' If ownership or, operation, of -the facility has been transferred then the previous owner must submit a Notice of Termination and the new owner must submit a Notice of Intent for coverage under the general permit.. The date of transfer and information on the new owner should be provided. Note that the previous owner may be..liable for discharge from the'site until the new owner files a Notice of Intent for.cove'rage' under the general permit. Where to File The Notice of. Termination should be submitted to the Executive Officer of the Regional Water Board. responsible for the area. in which the facility is located. 'See attached. If the Executive Officer, or his designated staff, agrees with the basis of termination; the Notice of Termination will be.transmitted..to the State Water Board for processing. If the 'Executive, Officer; or. his designated staff, does not agree with the basis of termination, the Notice of Termination will be returned. The Regional Water.Board- may also inspect your site prior to accepting..the basis of termination. 1 C-If1 Storm Water Contacts tp : for the4tate S ..anal, /w � � Region al Boards; STATE WATER RESOURCES CONTROL BOARD 2) SAN FRANCISCO BAY REGION SF) CENTRAL VALLEY REGION Division of Water Ouardy. Ms. Loretta Kahn Bansamian, Executive Officer Fresno Branch Office Attention:.Storm Water Pennft Unit ' 1515 Clay Street. Suite 1400 Mr. Loren J. Harlow, Assistarrt.ExeMive Officer P.O. Box 1977 ' Oaldand, CA 94612 3614 EastAshlan Avenue Sacramento, CA 95812/1977 (510) 622-2300 FAX: (510) 622.2460 Fresno, CA 93726 (916) 657-0919 FAX: (916) 657-1011 } Caitaat Tom Mumky (209) 445 5455 FAX (209) 4455910 Contact Brune Fujunoto Contact Lonnie Wass ' • 3) CENTRAL COAST REGION 1) NORTH COAST REGION Mr. Roger W. Briggs, Executive Officer 6SLT) LAHONTAN REGION Mr. Lee A: MichBn, Executive Officer ' 81 Higuera Street, Suite 200 South Lake Tahoe Office SS50 Skylane Boulevard, Suite A San Luis Obispo, CA 93401.54V Mr. Harold J. S-riger, Emaift Officer Santa Rosa, CA 95403 (805) 5493147 FAX: (805) 543.0397 2501 Lake Tahoe l3oidevard (707).576 2220 FAX: (707) 5230135 Cotact Off Fabry South Lake Tahoe. CA 96150 Contact Nathan Quarks (530) 542-5433 FAX: (530) 544-Ml 4) LOS ANGELES REGION Contact Chris Adair Mr. Dennis Dickerson, Executive Officer .,�,,;�,•� __ 101 Centre Plaza Drive 6V) LAHONTAN REGION t� ,g Monterey Park, CA 91754-2156 V•wtorvi le Office mom (323) 266.7592 FAX: (323) 266.7600 Mr. Hisam Be* Supervisirg Engineer sanrou ( Contact: Xavier Sxamikannu `. 15428 Civic Drive, Suite 100 Icooe V'idarviile, CA 92392 .5S) CENTRAL VALLEY REGION', -4760) 241-7377 FAX: (760) 241-7308 Sacramento Office Contact Anthony IOecha slwa ; • u 1 rnoW1r Mr. Gary M: Carton, Executive Officer 3443 Rautier Road, Suite A 7) COLORADO RIBASIN REGION VER 5R ` ''� I Sacramento, CA 958U-3098 ' Mr. Philip Gruenberg, Executive Officer ►�+ (916) 255 3072 FAX: (916) 2553015 73.720 Fred Waring Drive, Suite 100 ,. Contact Kathryn Gaffney. Palm Desert CA 92260 (760) 776.8935 FAX: (760) 341.6820 roles., Contact Ed Kashak °uma � 5R) CENTRAL VALLEY REGION ,N,lo cw, Redding Branch Office ' 8) SANTA ANA REGION GLENN sum�EnA. Mr. James C. Pedri, Super*bi Engineer Mr. Gerard J. Thnbeautt, Executive Officer. 415 Knollaest Drive, Redding, CA 96002 3737 Main Street, Suite 500 ,F ,m•0' , CO1"' f (530) 224-4849 FAX: (530) 2244857 Riverside, CA 925013339 L"I 2 PLACER Contact Carole Crowe (909) 782.4906 FAX: (909) 781.6288 Contact Laurie Taul 1010 �OOI'•O° • "4? 70UDYA NA. � .•�, SAN DIEGO REGION ' Mr. John H. Robertus, Executive Officer . ' :• 5 9771 Clairemont Mesa Boulevard, Suite A San Diego, CA 92124 „�,;.. .� (619) 467-2952' FAX: (619) 571.M Contact Gloria Fulton (Industrial Pemrit) 4 FRANCODD w Greg Gearheart (Constructlon Permit) 2. s aNu a ""°°'" •� • ' 6r FRESt10 ••` • "� .1 ono ` 3 6167 5F ..5 ObfliO lam . r r •` 6Y16611w161w0 •� _ - '•` • SYfO BM/MY , J •i i �.. `+6Ff YJ VBfIVN 4 . .. - - ws •� ' > 6w1 OIEW . Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres)' Fugitive Dust (PM10) Mitigation Plan Date: I - 4 - 9q Jurisdiction: L,� (�u��r�c Project File Part 1 - Project Information -, f:i9C,P 99 - 5-2 Please provide the information below as...completely as, possible even if it has. already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information. may delay the. processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit, application. Project proponent: T D DESERT . DEV • C RANCHO LA, QUINTA, CC. Address:79 — ZBS RANCHO L& QUINTA M , LAQutNTA ICA19Z153 Day phone number: 0fo0)7777747 Emergency phone number: (&0).7-lcJ.(0gJ8 Grading contractor (Contact Person): PETE PETERS . NUM MG. Address: 79.811 'COVN'TtZY CLUS UR BERMVDA. 1DUNE5,CA; Day phone number: (?(op) 345.I 7? a Emergency phone number: (760) 34 S 1118 Construction site street address: EAST %Z OF SEC, I?- TS 5 R-I C SB Wl Construction -site location: (Please include an &5 x 11 location map) 0,07.1 Construction site assessor's parcel number (Tract #): ' 100- 0 00 ,02 Zlo - 006 rKRV 01(o Parcel (Tract) size: �32, Acres or Square feet Anticipated date of physical'project initiation: FES I4t9q ' Anticipated date of project completion: a,-f '(9 9 9 Anticipated costs for dust suppression: $ ZG ODo . o 0 (Attachment B - Must also be completed and mazIM tot the appropriate address when construction activities have been.completed) 1 All projects greater than one half (1/2) acre are.also subject to SCAQMD Rules 403 and 403.1. 110 S* Irio - -,Pie n oj fa Earthwork Information (Acreage/Cubic Yards): Project Area: 13Z, PLC—* Total Disturbed Surface Area: 1322 AL Cut: 00,000 Fill: 2, Z00 , 000 Import: 1(2� 'Export: Phasing of Earthwork: Date Date . Phase I Grading (Acreage): From: FM MOO To: 0C T t°l 9 Phase II Grading(Acreage): ' From: To:. Phase III Grading(Acreage): From: To: Phase IV Grading(Acreage): From: To: .(Attach additional information if necessary) Part l - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please -indicate which measures are'to be implemented during the project'by placing the corresponding letter, beneath the following sources. In addition, please indicate at which phase the measure will be implemented, either at. Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating. what measures are to be implemented, complete the 'Details section by describing how and when the measures are to be implemented. Source Details (e.g., frequency of ariplication "number and type of dust control implements. No. RG FG LC etc. Please be as specific as possible) A Sire -1'0 6e Pre-L.)m}-er&4 %y spr►n%lerS Or 2 fo 3 we .prior+o cdrgA '`� . W-,4ei -f-roa6, w�l� 0e✓s64- a!« .7 olvr8�r 17 /4 rn n I. c {� u r wa l-er- �'rvn ks will b c v{-r l r area S W r I b e.- cII ke►K i c.o•l l- s-z.b t 1 r� ag ro J c�r-0.o�I -ro Co n�to k i ova J Per ► v+1 e i-e r sT►ie e s will %� s w ep v s re ✓ i v-eoC . /Oct.s 15 . f( CCU s s, uvi-5+ oc-+r ain STo•S � � a.Vie-c, I ��'. reroi�cedQ sPe�Q. CtS rMPH) Cp n a "Fi" v c-'� �1 s� � a. r•es�. �'o � l o c.a � n e:w� c,�, po<� er� r� w�-y `}10 .✓y i n r M V� k r t l e 4r-lpS ors u v% Pk eat ro s . Part 3 - Agreement I certify that the: information contained.in this Fugitive Dust (PM10) Mitigation Plan.is true . and accuratee and that all, measures specified in Part 2 will be implemented during project construction. I authorize the City "of - La, Quinta to enter the above mentioned property . for inspection and/or abatement purposes, and.1 agree to hold harmless the City and its representatives from liability for any actions related to.. this project. I also agree to complete the record -keeping requirements included herein as Attachment & once the -project has been completed. ignature o weer or ut orize epresentative ate I have read the conditions of the Fugitive Dust:(PM 10) Mitigation Plan and the owner has authorized the implementation of all, its provisions throughout project buildout. _ 2 _g ig ature of CirAding on ctor or ut orized Representative ate (If not the same as above) . d ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission. control under the. City's dust control ordinance. The two right columns contain an inventory and description of reasonably available fugitive dust control measures' for each ,of the sources. Please use this information as a guide when preparing a Fugitive Dust.(PM10) Mitigation Plan. (Source No) Reasonably Available' Source. Control Measures Comments Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement will increase the moisture content thereby moving increasing stability of material o Once the initial land clearing/earth movement activities are complete, a second .round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used'to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances . e o Vendors can supply information on product application and required concentrations (C) Wind fencing o Three to, five foot barriers adjacent to roadways or urban. areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (2j Unpaved (F) Paving' o Requires street sweeping/cleaning if subject to. material Roads accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads.with high volumes or those used for heavy equipment ' (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available Source Control Measures Comments (2) Unpaved (I) Reduce speed limits o 15 mile per hour maximum Roads (Cont'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to_ ------- --- reduce vehicle trips by a.minimum of 60 percent --- --------- ---------------------------------------------- ------------------------- ------------------------------------------------------- . (3) Storage (K) Wind sheltering o Choices include silos or enclosures _ Piles o Enclosures should consist of three sided barriers equal to height of material,'with no more than 50 percent. porosity .(L) Wet.suppression o Application methods,include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions. (M) Chemical suppression o Best for use on storage piles subject to ,infrequent disturbances' (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of,the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings -------------------- -.------------------------------------------------------------------------------------------------------- Paved (P) Wheel washers . o. Should be placed where vehicles exit unpaved areas onto paved Road Track -out areas o System can be adjusted'to spray entire vehicle, including stored bulk material in.haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may, be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full ,Disturbed (S) Chemical stabilization o Vendors can supply information on methods, for application and Areas/ required concentrations Inactive Construction . Sites (T) Watering ..o Would require. frequent applications unless a crust can be_developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunctionwith other.measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant,native vegetation is encouraged ■! D RESIDENTIAL I m —ola z • • • .ems. r c m • • O •• • O j a • • • GOLF COURSE STOq • WELL SITE RESIDENTIAL er v \ O�tiTi GOL OURSE CONSTRUCTION YARD a q� PROPOSED MAINTENANCE FACILITY CONSTRUCTION ACCESS ` WELL SITE ;G ING EQUIPMENT STAGING AREA, / I I• u I C4 RESIDENTIAL• I = z y • �=Q m K • GOLF OURSE �/ Q� WELL SITE _ • • • / IID SUBSTATION TEMPORARY CONSRUCTION WAT LO ION --ac WELL SITE E •®- y C JEFFERSON STREET S I T E- P -^ N zz SCALE: 1• =. 500•. - - - EXHIBIT fr'� . i Ln D RESIDENTIAL I ' • • v.„ GOLF COURSERoom .,Y STOgM •� • • _ _v;: qT WELL SITE RESIDENTIAL • s • S/0, ' \ K,�71 GOL CURSE CONSTRUCTION YARD y • • 9� PROPOSED MAINTENANCE FACILITY '^ 9 CONSTRUCTION ACCESS WELL SITE ? tt 3 aG ING EQUIPMENT STAGING AREA co RESIDENTIAL < A z + 46 r GOLF CURSE • e� WELL'SITE • `' �_ • / IID SUBSTATION TEMPORARY CONSRUCTION WAT L ION -- WELL SITE o - E, ®®A• JEFFERSON STREET S i T E- P LA N z / SCALE: 1• 500' • - - - EXHIBIT 2 r : { Gradina Schedule The projected date to begin grading the project site is January1999. The project will be graded .as one phase and it is .estimated that rough 'grading' of the site will be completed within ninety days. As rough grading,of golf holes are completed, fine grading or shaping of the • golf. holes will begin resulting in a total grading operation time of approximately'six months.. -it is anticipated 'that the golf,course will -be completed by ;. • November or December, 1999. Separate precise grading plans will be submitted for the maintenance facility and the residential areas after mass grading has been completed and r the design of these areas finalized by the developer. r Fugitive PMIO Dust Generation Calculations The following formula provides an estimate of the potential to generate fugitive dust from the_development of'this site. This provides a basis for measuring the effectiveness of the employed control measures. The generation factor is 110 pounds per acre per day , of disturbed area. The. amount of disturbed area will increase daily until the total construction area has been disturbed which results in the maximum generation of fugitive PM,o Dust., Total potential.dust emissions from this site are: Facility Sites:- 314 acres. x 110 Ibs/acre/working "day Total Potential Dust Emissions:. 34,540 Ibs/day, ' This total represents unmitigated, emissions potential. The emission of fugitive dust is . Prohibited such that no dust which remains visible in the'atmosphere'shall cross beyond. - the property lines of the emission source. Fugitive PM,,, Dust -Control Measures Prior to clearing and„grading; the areas to be disturbed will be re -watered for eriod p p of two to three weeks This:will be accomplishedby installing movable sprinkling. systems, the source of water being irrigation water provided by the Coachella Valley Water District or other on .site sources. Portable water, tanks wily',be located on site to supply water trucks for continuous site watering during rough grading and fine grading (shaping) :of the golf course. This will be a continual process. until .grow -in of the. golf ,cob rse.has.'been completed. It is anticipated that planting of the course will occur in. May and June of 1999. ' Soil stabilizers will be.applied to the residential areas -after rough grading has, been completed. Fine grading of , -these sites for,, construction of these. respective uses is expected to occur continually from the completion', of rough grading to buildout of the property. Continuous site watering, by- water trucks will be utilized during construction of these sites to mitigate dust generation. As the golf course. irrigation system is installed and as portions,are activated, continuous watering,of the site will'be accomplished using the permanent imgation system. Re -vegetation or chemical.treatment of the disturbed areas will occur as they are completed. During grading, the access. roads will, be watered by water trucks to: control dust generation. In conjunction with construction -of the. 'residential areas, the future roads -will'be graded, and paved for permanent usage: The developer or developers representative shall keep records of all activities, contracts and materials, purchased associated with the blows and/fugitive dust program: Weekly reports should be maintained and available for, review;by the City of La Quinta. Fugitive .PM,o Dust Control'Program 5) . Wheel Washing Provisions a The grading equipment will be trailered to and from the project site. There is no .import or export of dirt to or from the site. Any tracking of material onto public roads will be washed daily by water trucks. " Rough Grading: Mass Grading Operation Following are the rough,grading and mass grading operation general requirements for mitigation of PM,o Dust. , 1) Hauling Procedures: a. All vehicles going from dirt areas ,onto paved streets shall have tires and Y wheels inspected and washed if necessary'to avoid "tracking -out" dirt. N b. Trucks hauling dirt on paved streets shall maintain at least a half foot "freeboard" from rim to dirt, and cover all dirt or dusty debris loads with an . appropriate tarp. .. - c.� The haul route should be shown hereon or on an attached sheet, and shall be cleared with the'City of'La}Quinta or other jurisdictions for any applicable transportation permits prior to its use. All hauling. trucks. shall have a copy of these, provisions with them at all times. a d. The import or export site must have a valid grading permit and should comply with all appropriate dust mitigation measures also. ` 1 e. When practical, trucks and equipment, should shut off engines rather than idling for extended periods, to minimize exhaust emissions.and noise. This, becomes more critical as the size and numbers of vehicles increases: 2) Vehicles traveling :on dirt and/or on'unpaved roads should restrict their, speed to 15 m.p.h. maximum. Signs to that effect should be placed`at the project entrance or other, appropriate locations to improve compliance: 3) ` All stripped, graded or -otherwise disturbed -areas shall be stabilized by some appropriate means... Areas- actively being graded.�can usually be stabilized by applying adequate amounts of water., Disturbed areas not actively being worked _ may., be effectively treated with some more durable soil stabilizer, such as ` hydromulch or chemical treatment., to avoid. ,constant watering.. The preferred - method of site watering is by sprinklers, if they do not interfere with the grading vehicles. Following are project specific details forlhe mass grading operation. .1) Hauling, Procedures a: It is,anticipated that hauling to and from the site wil`b�e limited to grading equipment; trash removal, and delivery of construction materials: All vehicles . _ traveling from dirt'areas onto `paved streets shall have tires. and wheels inspected and washed if necessary to avoid "tacking ouf dirt. All debris . hauled from the site shall be transported -in trucks equipped with tarps that completely cover the truck bed. -2) Speed. Restriction Sign: Location . a. The access road shall have signs posted at.the entrance from 48' Avenue. Finish Grading: Buildings, Utilities and Landscaping Following. are the finish grading general requirements for mitigation of PM,o dust. ,. : 1) All inactive areas should have been stabilized by this stage. If previously covered,, the actual building pads may now.need to be stripped, scarified, and recompacted for building pad compaction and elevation certifications. Dust would be kept down by watering, usually by temporary sprinklers or water trucks. - 2) Trenching,for..building utilities, dryweil construction,, pools, etc., form the bulk of, earthwork after the pads have been.certified. Water trucks willbe used to water the building sites for dust control prior to the beginning of framing. . 3) Establishing the landscape. and sprinkler system around the perimeter of large projects should be done at.this stage. Plantings around the perimeter serve as a Y Wind buffer and collection system for dust and sand. If is good to have dust and sand Well under control prior to the building phase for the sake of certain gluing and painting processes that can be ruined by blowsand or`dust. t. -Site Specific Details; " Following are project specific details for finish' grading, buildings, utilities and landscaping. 1) Building Pad Natering .,a. The building pads for the ,residential areas shall be watered daily during fine grading of the sites and also during building -construction once the integrity of the soil stabilizer applied after rough grading has been disturbed. 2) Formwork and Trench Watering a. Daily watering of the site using..water trucks is required, City shall be named,as an authorized agent for`purposed. of ordering or- calling -out a water truck or, causing *an irrigation system,to be made operational. Should the general. contractor not have such a contractor have failed to designate the City as an agent or not informed the City of the contractor's :name; address, -and, telephone number, or the City is unable to contact the: contractor aft r.a reasonable effort is made to do so,,the City may. authorize any other -vendor as its' agent;for purposes of entry, upon the site to attempt to mitigate any potential dust control .problems. c. In the event anon-sitei irrigation system is installed, the City will cause the irrigation system to operate. The general contractor shall take all necessary.steps to ensure that the City has the means to access the site and the valves of the irrigation system;,that is, the keys to any and all locks shall, be provided to the City (Engineering Department) by the end of the nektwork day following -the installation of any'such lock. Each key shall be plainly. and 'clearly marked with the project name and corresponding lock (main gate, south irrigation system, etc.) If, in the opinion of the City of La Quint&*Official; the intensity, frequency or duration of fugitive _dust emissions from„the site constitutes'a hazard to .the safety of the public, by intrusion beyond.the project boundary, the official or his designee or agent may immediately enter upon the site or immediately. take other'such action. as may be -necessary to remedy the hazard, such as, but'not limited to commencing watering on the,site or ordering the cessation Ik ` 'Licenses! Contractor's Declaration I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section. 7000 of Division. 3 of the Business and Professions Code), and that my license is in full force and effect. ` License Class: Number: 8 3 S 3 Contractor's Name: V" �,,,-W ftg4AIv Company Name: Company Address: _�%.9// �47e,4,r ' 4 �-�� a Contact Ph'one'Numbers: Day: 3�5-1 ?� Night: 3�S -/77S Contractor's Signature: �� - Date:, d fi ^ T Owner's Certification I certify that I have read this application and that the information contained herein is true and correct. I agree to comply with City ordinances and; all laws relating to" -grading operations. I authorize representatives of the City`of La Quinta to enter upon the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this permit. Owners Name(s): 45fz &4.co% Owner's Address: z 2 s Contact Phone Numbers: Day: - 7 71 Night: 7 7g 7, Owner's Signature(s): Date: a- I, f i (Attach additional. information if necessary) . i have read the above conditions of the Fugitive Dust (PM10) Mitigation Plan and I agree to implement of all provisions at the concentrations. ano frequencies iaenuneu. i • t A n } " ` CONDITIONS FOR FDCP APPLICATION 99-52: .RANCHO LA QUINTA EAST;. ± 314 ACRES SP 84-004 AMENDED #2; EAST GOLF COURSE AND RESIDENTIAL':SITES GENERAL: .1. Applicant shall comply with all'control measures as set forth in the approved application for FDCP 99-52; the Local Air Quality Management Plan (LAQMP) and the following conditional measures. This dust control plan approval shall ,also apply to any haul/encroachment ,permit(s) issued by Public Works. Where conflicts arise, the Public Works Director shall, determine.'the appropriate controlling provision. 2. The full amount of security furnished (to be determined by Public ,Works) for the approved FDCP shall be avail able to the City for any measure(s) deemed necessary by the City to achieve adequate dust control, whether or not such additional measures are included in this.'application. Form of security shall be determined by Public Works. Any requests for bond amount "revisions must be made in writing to the Public Works Director. 3. Applicant shall submit documentation for all costs :incurred for dust control =grade grid grading construction activity. Said measures assume� during all pre records shall, be submitted within 30 days after completion of all dust control T measures as outlined in and conditioned upon the plan,a or upon any request for release/reduction in posted security. Documentation shall include a completed PM 10. Program Report Form. Security may' be withheld pending submittal of this information. Applicant shall have completed all dust control measures, as . verified by the assigned field inspector, prior to any release of posted'security'. 4. ,The contractor./vendor responsible for provision 'of :all soil stabilizing agents shall submit all appropriate Material Safety Data Sheet(s), along with approval from..the Water Quality Control Board; to the Public Works Department -prior to any site application. Application of. stabilizing agents must be in compliance with NPDES.and the state Water Quality Control Board requirements. 5.. Adequacy of. all proposed and conditional stabilization measures 'shall be determined by the assigned grading inspector. The City may release a portion of the bonded amount to the.applicant for any remedial measures beyond those identified or conditioned upon the project, ,which the City deems necessary in the event such approved measures are not effective. Enforcement of these' conditions shall be"at the' discretion of the assigned grading inspector,' who shall monitor and field verify -that the spirit and intent ' of the FDCP.and its attached conditions are being complied with. Adjustments to application frequencies, quantities, and other aspects of this FDCP may be made by the inspector, at his/her discretion, in.order.to assure compliance. a+ 6. The conditions applied to this dust control plan are anticipated. to cover the full range of construction operations as presented in the Local Air Quality Management Plan (LAQMP) for Rancho La Quinta. The approval provisions and conditions for this FDCP shall. remain in effect for the .duration of all construction undertaken within ,the subject 314-acre area, and the LAQMP is hereby incorporated as part of -FDCP 99-52. Transfer of any real property or other interests with respect to this project will have no effect on the validity . of this plan approval or conditions. Implementation of all measures -as proposed and conditioned shall be carried out for the duration.. of all construction activities,. to the extent they are applicable. However, not herein ,shall preclude any future interest from filing a revised FDCP with the .City for any portion of the site. 7. Approval of this FDCP/LAQMP does not in and of"itself constitute or otherwise authorize any site disturbance, preparation or construction. The developer is required to obtain all necessary permits.and clearances as set forth in any development approvals issued and currently in. effect pertaining to .this site. This includes any type of testing, monitoring or. sampling required as a condition of development approval, such as that conducted .for archaeologic, hydrologic and geologic reporting purposes. SITE DEVELOPMENT: 8. Pre -watering of all areas proposed.for grading shall be in accordance with recommendations of the grading contractor, based on the area soil conditions as described in the associated soils report(s). At a minimum, pre -watering time 'shall be as prescribed in the LAQMP document. 9. Track -out and other accumulation of soil materials) onto any paved `areas, outside the limits of -grading shall be minimized. Any unpaved construction exit/entry point along existing paved roads/areas shall be improved with pavement, aggregate base or similar material, for a, distance of 120' from the pavement edge into the site to minimize track -out. Wet sweeping/flushing (dry - sweep not permitted) of soil accumulations from all paved -areas shall be conducted daily, and kept damp- during construction hours until so removed. 10.. All on -site. traffic shall be limited to 1'5 MPH. Signs shall be posted at all entries F and along all unpaved access and travel. ways at minimum. 300-foot intervals. Size and height. of the signs shall be appropriate for their respective locations, and shall not be posted on any adjacent private properties. Rancho La Quinta site superintendent. and security personnel shall be responsible for enforcing this requirement. s y - 11 . All unpaved. construction access and travel- ways within the. site shall be prepared for traffic prior, to commencing grading activities and kept watered down and compacted to retain moisture content during all construction " traffic/activity,, including. building construction.}' At. aminimum, temporary construction. travel ways shall be improved to a 20 foot width. All unpaved road'Iengths shall be.watered each day, prior to and at intervals during any traffic activity, and at the end of the day after all activity has ceased. All track - out shal�l• be removed as per ;Condition #9. . • w 12. The .FDCP application and LAQMP indicate'that no import/export will be necessary. Any on -site transported. soiIs and stationary storage piles shall be sufficiently stabilized, watered down and/or covered as appropriate. Minimum freeboard shall be as established by the Public Works Department. Any borrow ' areas shall be'rbutinely watered and chemically -stabilized after borrow activities to mitigate airborne dust.,.All haul vehicles accessing any paved area from active grading areas shall have wheels cleaned of excessive soil accumulations. 13. All on -site temporary employee facilities (sales, construction, equipment storage/staging, etc..) shall. -be provided with paved, compacted or otherwise stabilized parking and access during their operation, with those improvements to be constructed/installed to the applicable Public Works Department standards. This requirement shall apply to any approval for such facilities under a minor use or other permit process. 14. If approved on -site roadways or parking areas are constructed to° ultimate design -prior to completion of construction activities,, then traffic Wand parking shall be limited to -those paved areas as feasible. -No vehicular parking or traffic of any kind is permitted on or over any previously stabilized or other inactive soil areas. 1.5. Disturbed .but -.inactive development areas subject to additional. grading or - building construction within 30 days of completion of the initial disturbance, shall be watered daily in conjunction with watering of access roads and developing areas, unless *an. appropriate dust. suppressant as defined in Chapter 6.16 of the LQMC and approved by the California Water Quality Control Board, Region 7, has been applied in_lieu of daily watering. 'All -disturbed areas' where no further grading, 'construction or' -other land disturbance will -occur for at least 30 days, shall". be stabilized with an appropriate dust suppressant no later than four days after completion of the initial gr_ading..These areas shall be staked,' posted.or'otherwise restricted in order.to prevent any access on or across'them. i 16. Construction activity associated with this project will occur during .high wind. activity (Febr.uary through June). in 'the Coachella. Valley. All -active graded . areas shall be watered daily at appropriate intervals. A minimum of two water OF'L UpN �� 0 _ - .^ , - , - - 4, BAN rq� ERT BANK 2 6 ppUv1 DES NATIONALBER ��� January 22,1999 pie. %9 IRREVOCABLE, STANDBY LETTER OF CREDIT NO. 1268..ks 9 Beneficiary:. _ Amount: $314,000.00 City.of La Quinta 78-495 •Calls Tampico ; La Quinta, CA -92253 ' To Beneficiary: _ .We hereby establish.our irrevocable Standby Letter of Credit in your favor, by order of T. D: 'Desert Development Limited Partnership, 530 Beacon Parkway W. #800,. Birmingham, Alabama, 35209. r The amount" set forth above will be available to you by submission of your Sight Draft(s), through proper clearing channels'(consult your bank)., accompanied by this original Letter of. Credit and Beneficiary's officially -signed statement certifying that: T.D. Desert Development Limited Partnership (TDDDLP), a Delaware "Limited Partnership, has failed to perform dust abatement -for development of eastern % of Rancho La Quinta -(golf course and residential area)• adjacent property known as Rancho La. Quinta and 'that TDDDLP has been 'notified in writing of the. failure ,to •" perform at least -ten (10)'days prior to drawing(s). •' 3, ' Each draft, must state on its face,. "Drawn under Palm Desert National Bank Letter t of Credit No. 1268 dated January 22,1999" . This Letter of Credit will be automatically renewed until such time that the City' .. authorizes its'ezpiration or until sixty (60),days after the City receives notice from the financial institution of intent to allow the expiration of the Letter of Credit. This • ' Letter of Credit is transferable, only upon our prior approval and payment of an - appropriate t transfer'fe.e. - • We,hereby agree'to duly honor drafts 'properly drawn on, and in strict compliance _ :with the terms of,•this Letter of Credit, on:presentation during -normal banking hours_ • to"this bank at 73-745 El Paseo, ;Palm Desert, 'CA 92260, ATTN: Note Dept. This Letter of Credit ts.subject to law of the State of Cafifornia, including the Uniform Commercial Code—. hd lnteinational Chamber of Commerce rules pertaining to Uniform Customs and. Practice foi Documentary Credits.(l'CC Publication #500, , 1993 re vision). TO'BE VALID, THIS LETTER OF CREDIT MUST. BE- SIGNED'BY TWO OF THIS' ' BANK'S CORPORATE OFFICERS. : PALM DESERT -NATIONAL BANK. �-!ip By. r �� Ju y Lozan St hen Christian Senior' Vice President _ Vice President . 73-745 El Paseo, Palm Desert, California 92260•(619) 340-1145 78-495 CALLS TAMPICO - LA OUINTA, CALIFORNIA 92253 (760) 777-.7000 TOD 17601 77.7-1227 . February 24, 1999 Mr. Grady Sparks Via Facsimile:,(160) 771-1841 Post Office Box 1716 La Quinta, CA 92253. RE: Construction Access to Rancho La Quinta Dear Mr. Sparks: The intention of this letter is to follow up on our discussion of Tuesday, February 16, 1.999, regarding construction access to Rancho La 'Quinta on Avenue 48. As you recall, it was determined that full access onto Avenue. 48 at Dune Palms Road is not possible until the necessary equipment is added to the existing traffic signal to. facilitate the traffic`,movement out of Rancho La Quint' and across Avenue 48. Sparks Construction will be required to install ,this equipment at its expense, subject to a 50% credit against future payments to the City for Avenue 48 street improvements. In the interim, all construction access should*'prohibited from Ave nue.48 at Dune Palms Road. Full construction access is available into Rancho La •Quinta at Avenue 49 and Jefferson Street. as well as.at Orchard Lane on Avenue 50:. Please be*advised that access taken from Avenue 48 at Dune Palms Road is unsafe and illegal until.the traffic signal is fully operational. "If you have questions please call me at (760) 777-7089. Sincerely, INA Marcus L. Fuller, P.E. Assistant -Engineer Enc. cc: ' Chris Vogt, City Engineer/Public Works Director . Steve. Speer, Senior Engineer SDP 84-004, Project File Permit 2894 filer K:\P W DEPT\STAFF\FULLER\LETTERSU 999\99022 4&wpd J MAILING, ADDRESS P.O. BOX 1504 - LA OUINTA, CALIFORNIA 92253 \