Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2902
NOTE: - With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: Fah. 16. 1999 Subdivision Improvement Permit — Class I I I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION PGA West — the "Norman Course" — SP 90--015 North of Airnort Alv, .. OAFIt of ktaAfAOn Rt'.. wegt, of Monrna St. (Street address or Description of Location) PURPOSE OF CONSTRUCTION Basin golf course Sketch (attach construction plans if appropriate) devolopment DESCRIPTION OF CONSTRUCTION Mass grading SEE ATTACHED CONDITIONS. DIMENSION OF INSTALLATION OR REMOVAL See RIM". SEE APPROV110 PLANS. SIZE OF EXCAVATION, IF NEEDED 900,000 t 6- 1- APPROXIMATE TIME WHEN WORK WILL BEGIN 2/18/99 APPROXIMATE TIME OF COMPLETION 5/1199 ESTIMATED CONSTRUCTION COST $ 1.500-Q00- (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers,. representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work . - . . I< Name of Applicant (please print) Signature of Applicant or Agent 44,,w My C`'t Gli.. cr',7,! La Ouinta. CA 564-+1088•�f Business Address Telephone No. Nuevo EnRineerinfz 79-811 Country Club Dr. Bermuda Dunes. CA 345-1778 Name of Contractor and Job Foreman Business Address Telephone No. 438834 Contractor's License No. Zurich -America 157 City Business License No. GLA 6838815-01 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit,— Class 111 FEB 181999 Public improvements: 3% of estimated construction costs Private, improvements: 3% of estimated construction costs V �� LA ��>Rt-� Minor Improvement Permit — Class IV: See attached schedule 0 i 6�i Inspection Fee Permit Fee An-bvilt 1,000.00 ,,,e�nalry Deposit -ash ©ep - si9 Su We iyj=d, :if .4- i'reci Plan Check Credit (7,500.00) $ 40,000.00 100.00 TOTAL: $ 33„600.00 Receipt No. Received by Date PERMIT VALIDATION PERMIT NO': . 2902 DATE APPROVED 2/1.R99, EXPIRATION DATE �� �� ! ci, DATE ISSUED By /I �r� '�C �--►� l Administrative Authority Recorded by n- Telephone: (619) 777-7075 By NOTE: With proper validation this form constitutes an CITY OF LA OUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Jn Subdivision Improvement Permit — Class III DATE: ►� / �i Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION % Q ..W ISO" addms & Description of Location) POSE OF CON UCTION, Sketch (attach cons`t�ructioon plans if appropriate) DESC F ION CONSTRUCTION. �� c� `a DIMENSION OF INSTALLATION OR REMOVAL r ;Ce Xy��6v� f&.4(� SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST S .g • g (Including removal of all obstruction, materials, and debris, backfilling, com- pection and plating permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indarnnity,.defend and am the City, its authorized agents, officers, representatives and emplovees, hornless from and against any and a" penalties, liabilities or on resulting from claims or court action and arising out of any accident. Ion or damege to persons or preputy Ihappaning or occurring a a proximats mutt of any work undertaken under the permit granted pursuant to this spoliation. Notify tM Administnetive Authority at lent twenty-four (44) hours in advance of the time wen work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of V Quinn and to pay. for my sdditionsl replacement necessary as the �result opf this work. Signature of Applicant or Agent - V-6L, P_e5o7-s, I/^C_ - In PGA Blvd Lt o" col,12293 Sro l 10 M Name of Applicant (please print) Business IHL AddressT �antf?o. 7g.Y &rma. bU,J G-3K5 Name of Contractor AnWJob Foremad Business Address Telephone No. 4 2)US4 Contractors License No. City Business License No. Zi.A.rhd"-Ame'lca. ixLO 693S%15-01• Applicant's Insurance Company GEN. LIAQILITy Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule -Inspection Fee $ P it„�ee „ , ' � O Bond / -15� if d n l C� TOTAL: S Receipt No. Received by Date Reenfnlorl by PERMIT VALIDATION PERMIT .NO. 2G1 o Z DATE APPROVED EXPIRATION DATE. DATE ISSUED By Administrative Authority NUEVO ENGINEERING ID:6193456704 FEB 15'99 11:58 No.002 P.02 NUEVO ENGINEERING. INC. Teat,00v++nncu�oa�•,an�,►�s.c�vs� •,r►e•s�x,�a�as+na ae�e+KaaeNrrxlcraA •uacrah.a,eav� PROPOSAL & COPIiEiACT Page No. of Pages TO P"Mr: DAYE KSL Develp2ment Corp - 1 2/15/99- .we Rough Grade The Norman Course La_Quinta CA 92253 _At%n_ Steve Auckland — We hereby submit speffe abns end estimates . •.^ MOBILIZATION. $ 30,000.00 CLEARING $ 90,000.00. PREWATER $ 120,000.00 SITE EXCAVATION 750,000.c.Y. @ .95$/C.Y. $ 712,500.00 OVER EXCAVATION 350,000 C.Y. .954/C.x. $ 332,500.00 GOLF FINISH $ 95,000.00 PAD FINISH $ 120 000.00 $ 1,500,000..00 PROPOSAL NOTES: 1. Bid includes listed items only. 2. Bid excludes: a) Engineering, inspections and permit fees b) Soil testing c) Construction water costs d) Utility removal, relocation and adjustment 3. Bid based`on unapproved plans. Bid may be revised upon receipt of approved plans and/or soils report. 4. Bid based on one move only. Grades to be certified to i. i .5' of planned elevations prior to move out. 5. Owner to provide source for sufficient supply of construction water at construction site boundry. 'b. Nuevo Engineering, Inc. will be responsible for dust control only while working on the Sob site. ale:Vmpoor_ hereby to furnish material and labor —complete in acnordanoe with above specfflcatlons, for the sum of: dollars ($ ). FW"sW to Its made as fcems: All matsdal isto ne epeciWd.Mlworkto be tamp) InevtdAlmanft Authorized messes to standard ARYaharedon ardeuietimiram 00"OS O111. signature . become am Imnr in "Pe apets ail! he esse upon s men orders, and.0 an radxNgp60"1andoUasethe eelimste.A11agreanentscomp+gantuponemcee. Note:ThIspfapo601IttaybowithdraM ers�ms ordelsyshe,dndow tantrolOwtot tDoatry flre.lwredoendolAwriaM ay: 41' It non Bocepted Insurance. Our gorsere ere fu9y mvetsd Dar 1lbrsmen's Carnponeaticn lneuranoo. a6 whhln _ _—_days. ACCp��.. (tCB if iT, D16a1 -- -- +/••.• Ii "'n.eabove pfiC9e.6jlfstlllcaildns and owdloonn ate satfslad" and Ore humby adaeated. You are autAatt ed 10 do the work as sDeottled: Payment will be mode as autQned above- si pature Date of AcoWanoe: Signature PRODUCER. - Cert# 9061 DESERT SOUTHWEST INSURANCE BROKERS �73-255 EL PASEO, SUITE 11 PALM DESERT, CA 92260 760-773-5955- ' . 1 FAX 760-776-4205 INSURED NUEVO ENGINEERING, INC. ` K & D EQUIPMENT RENTAL '79-811iCOUNTRY CLUB DRIVE #2 . BERMLIDA DUNES, CA' 92201 , ..ISSUE DATE �.v,,..,re< dx.�•r r .�.., r_.,Rc *,ti..t1�:+'��,`�'.� iJAN 8 99�;_���. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE- . ,• DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.' COMPANIES AFFORDING COVERAGE COMPANY ' A RANGER INSURANCE COMPANY COMPANY B UNICARE INSURANCE COMPANY COMPANY C COMPANY D THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I, LIMITS L CO TYPE OF INSURANCE y • POLICY EFFECTIVE POLICY EXPIRATION TR. POLICY NUMBER ,. � PATE (MM/DD/Y`f) +.• q.4?E (MM/DD1YY).`4sh • Ty�y �T GENERAL LIABILITY GENERAL AGGREGATE $ 2,000,Q00, X COMMERCIAL GENERAL LIABILITY RPO 114760 FEB 9 98 FEB 9 99 PRODUCTS-COMP/OP AGG. $ 1,000,000 LAMS MADE OCCUR. • y - ;.; .; 4 * '4 r' + r ; PERSONAL & ADV INJURY $ 1,000,000 A X OWNER'S & CONTRACTOR'S PROT. EACH OCCURRENCE $ 1,000,000' X $5,000 DED/OCCURRENCE ° - - FIRE DAMAGE(Any One Fire) $ 100,000 • ,♦• ` MED. EXPENSE(Any One Person) $ 5,000. AUTOMOBILE LIABILITY,;,, f,; yr COMBINED SINGLE LIMIT 1,000,0 $ 00 F..•yt 'ANY, AUTO, ,. tir ;.,zr V, tz SBA 353837• FEB 9 98 s i t a e� , FEBV9 99 _ ! 1• Wit' �= = 4. , 13. A BODILY INJURY • "^ 4 X ALL OWNED AUTOS r r. t iiti is F i+x ;u »;O:"SCHEDULED AUTOS +�,t� yit>'fr t a a ,k$ylr(PerPersonjtliti ilSr€ t. J''tiR�+.'fxY..'`sa:':'7r_i.��'tw",.''��«'.�s' �`i�Y)v'iL+.'i.`2�.''.`.3,'S..ai4rA.t:1'At"r�.,.i•f?ri1"`^'4-.e'i`e::i:.. n".r.°.'�i.?i:';.}'ht;^� X HIRED AUTOS' A, BODILY INJURY • $ X NON -OWNED AUTOS + (Per Accident) s s • PROPERTY DAMAGE $ GARAGE,) LIABILITY .• ` _ _ .. AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN AUTO ONLY: I�k1'1L, EACH ACCIDENT $ -- ' AGGREGATE $ EXCESS LIABILITY • ._-_ EACH OCCURRENCE $ 5,000,000 A X UMBRELLA FORM Y - ` CUP 111996 FEB 9 98 FEB 9 99 _' AGGREGATE $ 5,000,000 OTHER THAN UMBRELLA FORM p- + - - WORKER'S COUPENSATION AND STATUTORY LIMITS;,i}, EMPLOYERS' L'IABILITY4- '' SB50-0199-17727 JAN 1 99 JAN 1 00 , , EACH ACCIDENT I.000,000 B THE PROPRIETOR/ �+ INCLDISEASE-POLICY LIMIT $ 1,000,000 PARTNERS/EXECUTIVE, DISEASE -EACH EMPLOYEE OFFICERS ARE: • _ R EXCL . _ $ 1,000,000 A OTHER s • ' RPO 114760 FEB 9 98 FEB 9 99 $2,765,824 - SCHEDULED VALUE _ _ INLAND MARINE - CONTRACTOR'S EQUIPMENT + - DESCRIPTION:OF UPERAI TUNS/LUGAI [UNJ/VtHlL;LtSIJPtWAL I tM5 ;r,t ONGOING GRADING OPERATIONS ) F .'-� ..+T`V'*>-. FCERTIFICATE;HOLDEf2ASi4DDITlOIVALINSUREb,�i�t;r?�4�r#CANCELLATION?i��?'a��«i� . x 1 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE _ ( r (',T �fi•.�Cf)°'Rt F:- ' • i� `EXPIRATION DATE THEREOF THE`ISSUINGCOMPANYWILL MAIU-130 DAYS"--- ;: KSL LANDMARK CORPORATION `" ', u i ' WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. Y rA DELAWARE CORPORATION ; i "''�Vf 'i° Iv - 56-150 PGA BOULEVARD LA QUI NTA, CA 92253 ' ' • 1D-DAY NOTICE OF CANCELLATION APPLIES FOR NON-PAYMENT OF PREMIUM. AUTA&RIZED REPR JS TATIVE DESCRIPTION:OF UPERAI TUNS/LUGAI [UNJ/VtHlL;LtSIJPtWAL I tM5 ;r,t ONGOING GRADING OPERATIONS ) F .'-� ..+T`V'*>-. FCERTIFICATE;HOLDEf2ASi4DDITlOIVALINSUREb,�i�t;r?�4�r#CANCELLATION?i��?'a��«i� . x 1 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE _ ( r (',T �fi•.�Cf)°'Rt F:- ' • i� `EXPIRATION DATE THEREOF THE`ISSUINGCOMPANYWILL MAIU-130 DAYS"--- ;: KSL LANDMARK CORPORATION `" ', u i ' WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. Y rA DELAWARE CORPORATION ; i "''�Vf 'i° Iv - 56-150 PGA BOULEVARD LA QUI NTA, CA 92253 ' ' • 1D-DAY NOTICE OF CANCELLATION APPLIES FOR NON-PAYMENT OF PREMIUM. AUTA&RIZED REPR JS TATIVE r, '..POLICY NUMBER: RPO 114760 COMMERCIAL GENERAL LIABILITY THIS;ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADD-ITIONAL INSURED ----OWNERS, LESSEES or l:: CONTRACTORS (Fo`rm 8)''CG2010 ` h i •+ , This endorsement modifies insurance provided under the following: - ' ' `COMMERCIAL GENERAL LIABILITY COVERAGE PART: "SCHEDULE Name of Person or Organization: ' KSLLANDMARK CORPORATION A`DELAWAF E°Cldi ' ATION 56456 POA BOULEVARD ' LA QUINTA, CA 92253. ; w (If no.entry,appears above„information required to,complete,this endorsement will be shown in the Declarations as applicable to this endorsement:) a l 'WHO IS AN INSURED (Section II) is amended,to'include as an insured the person or organization shown_in,the'$chedule; but•onIy with respecf to liability arising out of."your work" for'that insured by or for you.' Zopyright, Insurance Services Office, Inc. 1984 Registere No. �' t Reg. Fee $ Special $� DeliveryHandling tDatamp oCharge .$ Return $E Receipto tage $Restricted $ n,.0m a ed tly s AI surance S Is L• ited To - " v usto r Must Dec late With Postal 0; International , Insurance Indemnity Is Limited a' Val $ }-r r 'thout Postal (Sea Reverse) ' v nsurance �•� mo to n` Er Y N LU te 1 PS Form 3806, -Receipt for Registered Mail ..(Customer Copy) , February 1995 r (Seeinlormation on Reverse) r - t Attachment 2 N ncz ar mmarr (NOI) To CMR.LT M9 WE T=ff OZ ffi �L PAS To DLSC8d1GE STD iiAZa ASSOCIA2 D HM ifs ALTivni CE►L ZeraDCrim Qbo !last Submit Discharges of storm water associated with construction activity (storm water discharges) that results in the disturbance of five acres or more of total land area or which is part of a larger common area of development or sale must be permitted. Construction activity includes clearing, grading, excavation, and reconstruction of existing facilities involving'removal and replacement. Construction activity does not include routine.' maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. The owner of the land where the construction activity is occurring is responsible for obtaining a permit. Owners may obtain coverage under the General Storm Water Permit to Discharge Storm Water Associated with Construction Activity'(General Permit) by filing a N0I is accordance with the following instructions. Coverage for construction activity conducted aw easements (a.S.,.pipeline construction) or on nearby properties by agreement or permission, shall be obtained by the entity responsible for the construction activity. Caascructim Activities Not Coeeavd by 7b3 Cemaeal Prrvit Storm water discharges in the Lake Tahoe Hydrologic Unit will be regulated by A separate permit(s) adopted by the California Regional Water.Quality Control Board, Lahonton Region, and.may not seek coverage under the State Water Board's general permit. Storm. water discharges on Indian lands "ll'be regulated by the U.S. Environmental Protaction Agency. The NOI should -be sailed to the State Water Rosa Control Board at`ths.following addresst State Water Resources Control Board ~`\, 0 IA7,/ Division of Water'Quality Attnt Storm, Water Permit Unit P.O. Box 1977 Sacramento, CA 95812-1977 Owners of ongoing construction must file a NOI, along with the appropriate aaaual fee, .by September 30. 1992. Owners of new construction (those beginning construction after September 30, 1992) vast file a NOI prior to the Icosmtencement of construction. For ongoing construction activity involving a change of ownership, the new owner . must submit a new NOI within 30 days of the date of change of ownership. Preferably, the NOI should be, sent with the revocation prepared by the previous owner. Iry The current annual fee is $250.00 for sash construction site which discharges into a municipal separate storm sewer system regulated by an areawide urban storm water'permit-and $500.00 for all other construction sites. The following General and Special Provisions are attached to and made a part of Permit No. GENERAL PROVISIONS +: The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permitauthorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners: Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on. any paved surface unless fitted with, smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill.operations in paved areas. If the existing , pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist, of one coat of two inches (2")'of A.C. 1 surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City. Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project: The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. ' Drainage structures and open drains shall be kept free of debris at all times -for proper drainage. RIGHT OF WAY•CLEANUP Any surplus material resulting from excavation•and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other`objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better: All excess material shall be removed prior, to paving. Water tanker shall be used, as required, to sprinkle.the job site to keep down dust conditions, and shall be used I immediately after backfill: DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor)' to control this water and to provide off-street barricades -when, necessary.. CLOSING STREETS: No street shall be closed. A.minimum of one.lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the•permittee that he must close a street for any length of time, permittee shall contact this office to,obtain.the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ' Rl NOTIFICATION:.. Permittee, shall notify the City at (619)777-7075 at least 48 hours in advance, of starting construction. �. UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized by permit, the permittee shall .contact all concerned utility: companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ('CR)3 UTILITY CLEARANCE: (Surface Structures) No work shall be done under this.permit until all utilities are clear -of the proposed work site. The permittee shall notify all concerned. utility companies,of the proposed work. R4 PAVEMENT WIDENING:. Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an "R" value; of not.less than and in conformance with. City of La Quinta. Road Improvement Standards and Specifications, Ordinance /1461. PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of 1/4, inch to one foot (1'). 6 GRADE -CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer.,* R7 CURB.REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter L_feet) shall be removed. _Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and , concrete driveway approach shall,be constructed in conformance with City of La Quinta Standard #207. . R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be, 2 1/2 inches of A.C. paving, Olaced,on of class aggregate base. Driveway construction shall conform to attached drawing. RSIGHT CLEARANCE:. Sight clearance of,600 feet in all directions shall be assured and maintained at all times,. �10 SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with.the ' manufacturer's specifications. 11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. Rl SURVEY MOB: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. LIMIT OF EXCAVA NS: Excavaf . ns shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations sh a prop y barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public o Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain ope r ape ' exceeding five (5) days. No excavation shall be made unless the construction material is actually on work site. R BACKFILL MATERIALXconso' be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequatelackfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which uring exSee cavation shall not be used for baackfill,,bbutshall be supplemented or replaced by an approved sand or gr-an 6 BACKFILL SAND: Backfil all b approved transit-mixquivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using ' rotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 pe ent 1 be attained with the structural section of the roadway. BACKFILL PLACEME Backfill all be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum f five oot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected time swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than ercent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is ed for maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets sh a of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal .coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed,. bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire. width of the -tree stump shall be removed and disposed of.so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 2902 --- KSL Desert Resorts Inc. --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section-14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. .2. KSL Desert Resorts. Inc, hereinafter-) eferredto as "Permittee", shall be responsible for providing continuous dust and erosion control. ' 3. Streets shallwbe kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. ' Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982); throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m.A65:00 p.m. May 1st to September 30: ,Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m: to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays: 5. Work.perforined within 500 feet of a major and/or signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275- 6894 if signal operation at the intersection is to be altered in anyway. 6'. Pursuant to Section 14.16.110 of the La.Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan; if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one .(1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade "all construction sites. Special. Conditions - Permit No. 2902 , Page I of 3 SPECIAL CONDITIONS --PERMIT NO. 2902 --- KSL Desert Resorts Inc.: - 8. Pursuant to. Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982), street closures shall not. be permitted..' ermitted. 'A minimum .of one travel lane of paved surface shall be .maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall%be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, ' irrigation lines, electrical conduits, and storm drain facilities., •' 10. Should additional work, materials, or modifications of the+work.be required in order to meet City standards;- safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. ` ~ 1-1. - Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), - 'backfill compaction within street -rights=of way shall conform with -Section 306-1.3 of the latest ;.edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works, Department. 12. - 'All- excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if t within the existing travel way, at the end of every workday as directed by and to the satisfaction of • the City Engirieer'for�the protection of the public. Lengths of open trench shall not greatly exceed that which can not, be backfilled .in the same day. Excavated trenches shall not be allowed open . overnight, however, Permitiee may leave a length of excavated trench, not to exceed twenty (20) feet ' in length, open overnight at a point -where. construction will begin the next day, provided that this length of trench•s completely covered by steel plating. �• A 13. ,.All landscaping, irrigation, decorative rock, decorative• concrete, lighting, etc., shall be replaced to+ ` its original condition. 14. -Access and egress to all local properties shall be.maintained at all times. ' 15. ,-Pursuant�to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be'completed no later than, seven (7) days after the • completion of:the work. Permanent pavement shall be replaced as required by the Public Works Department. 16. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 777-7075-. 17. - Permittee shall stabilize any soil that was,disturbed (shoulder areas, etc.) as a result .of work' performed under. this permit with' an approved dust control treatment and provide continuous dust control measures as indicated in the Fugitive Dust Control Plan, if applicable. Special Conditions - Permit No. 2902 Page 2 of 3 Medium -Large Scale Construction/Demolition Projects ` (Greater than 5.acres)' Fugitive Dust (PM10) Mitigation Plan ......Date:. i Z z 9q Jurisdiction: Project File #: SP 9,d Part 1 - Project Information 99 'Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information. may delay the .processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: KS L' Deser f ResoY� S iN, Address: 56-14o P(,,A UP . lQ %A%tiie, 92153 Day phone number: �� q= Job& Emergency phone number: 2J9-iob:6 Grading contractor (Contact Person): NueVO ;�e�r��ug UJayNe UJa#ers. Address: -79 -q81 Cm,;,� ak� Dr Day phone number:."7(o - 34 5- 0 9 Emergency phone number: 160-345-I'71 �. Construction site street address: '/�, ' Construction .site location: (Please include an 8:5x 11 location map) Construction site assessor's parcel number ('Fact-#): Parcel (Tract) size: ' ' a 8 5 Acres or Square feet Anticipated date of physical project initiation: Tx N,-4,.y Anticipated date of project completion: 0 1191 Anticipated costs for dust suppression: $ ���►a�„w (Attachment B - Must also be completed andmailed tot the appropRate'address when construction activities have been completed) . Earthwork Information (Acreage jCubic Yards): ; .Project Area: Total Disturbed Surface, Area: Cut: Fill: , Import: Export: Phasing of Earthwork: Date Date Phase I Grading (Acreage): From: sow: %0hC, To: PhaseII Grading(Acreage): From: To: Phase III Grading(Acreage): From: To: Phase IV Grading(Acreage): From: To:. (Attach additional information if necessary) Part 2 Fugitive Dust Control Actions . From the inventory of fugitive dust control measures provided in Attachment A, please in which measures are to be implemented during the project by placing the corresponding letter beneath the following sources. In addition, please indicate at which phase the measure will be implemented, either at Rough Grading (RG), Finish .Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough. Grading (RG) column. - After indicating what measures are to be implemented," complete the ,'Details" section by describing how and when the measures are. to be implemented Source Details (ex frequencv of application. number and type or dust control implements: No. RG FG Letc. Please be as specific as possible) ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fuggive,dust which are intended for emission control under the . City's dust control ordinance. The two right columns: contain an inventory, and. description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing,a Fugitive Dust (PM10) Mitigation Plana (Source No) Reasonably Available Source Control Measures. Comments Land (A) Watering o "Application of water by means of truck, hoses and/ Clearing/ - or sprinklers prior to any land'clearing or earth Earth. movement will increase the moisture content thereby moving increasing stability of material o'. Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future 'disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject'to daily.disturbances 'o Vendors can supply information on product application and required concentrations . (C) Wind fencing o 7hree to five foot barriers adjacent to. roadways.or urban areas can be effective in reducing the amount of wind blown material leaving a site o, Should be used -in conjunction with other measures (D) Cover haulvehicles , o. Entire surface: area, should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including,stored bulk material in haul vehicles Unpaved (F) Paving' . o Requires street sweeping/cleaning if subject to material Roads accumulation (G)=Chemical Stabilization o Vendors'can supply information as to application methods and concentrations o Not recommended for roads with high volumes. or those used for heavy -equipment (H)-Watering. o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, ' weather conditions, and vehicular use (Source No) Reasonably Available ou Control Measur'e� mm n (2) Unpaved ' (1) Reduce speedlimits o 15 mile per hour max;mum Roads . (Cont'd) , . (J) Reduce.vehicle trips o. Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent Storage .. (K) Wind sheltering o Choices include silos or enclosures Piles' o Enclosures should consist of three sided barriers equal to height of material with no`more than 50 percent porosity (L) Wet suppression o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression, o Best for use on storage,piles•subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side ,procedures of the material . ;.. o Most effective when used in conjunction with wind sheltering (0).Coverings o Tarps, plastic, or other material can be used as temporary . coverings o When used, these should be -anchored to prevent wind front . removing coverings Paved. (P) Wheel washers - o Should be placed'where vehicles exit unpaved areas onto paved . Road - areas . Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean .roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o .Entire surface area should be covered once vehicle is full Disturbed ($) Chemical stabilization o Vendors can supply information on"methods. for application and ..Areas/ required concentrations Inactive Construction...: Sites, (T) Watering .. o.,Would require frequent applications unless a crust can be developed over the site (U) Wind fencing o Three'to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (V) Vegetation o Establish as"quickly as possible when active operations have establishment ceased o Use of drought tolerant, --native vegetation is encouraged s r,.�, �®1 _ � •, ®� f,}�� ®1'L1111111111� �- � I 1 ' � ® w !�� ���(/'• .��!.!� �::; �� •ate `' rr ����� "® . INA ME III ill —A WE pal � � - � (y � � is ••"• � _ ���*��%� r(' �'� fly ® • PIPoo �® OWNS •1 1 1 / 1 '1' 1 1 1• 1 1 1 1 11'. • 1 1 • a : • • • For City Use Only Based.on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved Conditionally approved (Conditions specified below),. Denied (Explanation attached) Signature'of City Representative (Date) The following conditions -of approval have been added to'the Plan by staff in order to ensure an adequate level of fugitive dust control '(Attach additional information if necessary) , I have read the above conditions of the Fugitive Dust (PM10) Mitigation Plan and I agree to implement of all provisions at the concentrations and trequencies iaentinea. Part 3 - Agreement I certify that -the information contained in this Fugitive Dust (PM10). Mitigation Plan is.true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of La Quinta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless -the City and its representatives from liability for any actions related to this Project. I also agree to complete the record -keeping requirements included herein as Attachment B. once the project has been completed. Sign ure o wner-or Authorized Representative ate I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorized the -implementation of all its provisions throughout project buildout. ►� A C1 ignature o ra ing Contractor or Authorized Representative'ate (If not the same as above) 9. . CONDITIONS FOR FDCP APPLICATION 99-56: ` KSL DESERT RESORTS/NORMAN COURSE' SP 90-015. AMENDED #1; GOLF COURSE/RESIDENTIAL PAD SITES GENERAL: -1. Applicant shall' comply with all control measures as set forth in the approved application for FDCP 99-56, and -the following conditional measures. This dust control plan approval shall also apply to any haul/encroachment permit(s). issued by Public Works..Where conflicts arise, the Public Works Director shall determine the appropriate controlling' provision. 2. The grading contractorshall be responsible to show that any off -site borrow or dump sites have appropriate approvals from the property owners and respective permitting agencies, and shall present said authorization(s) prior to receiving.any grading ,permit. 3.' _ The full amount of security furnished (to be determined by Public Works) for the approved FDCP'shall,be available to the City for any measures) deemed necessary by the'City to achieve adequate dust control, whether or not such additional measures are included in this application., Form of security'shall be. determined by Public' Works. Any requests for bond amount revisions must be made in writing to'the Public -Works Director. ' 4. Applicant shall submit documentation for all costs incurred for dust control measures assumed during .all pre -grade and grading construction activity. Said . . records shall'be submitted within 30 days after,completion of all dust.control measures as outlined in,and conditioned upon the plan,. or upon any request for release/reduction in posted security. Documentation shall include a completed PM10 Program Report Form. Security may be withheld pending submittal of this information. -Applicant shall have completed all dust control measures, as verified by the assigned field inspector.; prior to any release of posted security. 5. The contractor/vendor responsible for provision of all soil stabilizing agents shall submit all appropriate Material Safety Data Sheet(s), along with approval from'.the Water Quality Control Board, to the Public Works. Department prior to any site application. Application' of stabilizing agents must be in compliance. with NPDES and the state Water Quality' Control Board requirements: 6. Adequacy of all proposedand conditional -stabilization measures shall be -determined by the assigned grading inspector. The City may release ,a portion of the bonded amount to the. applicant for any remedial measures beyond those identified or conditioned upon: the project, which the City deems necessary in the•event such•approved measures are not effective. of Enforcement these conditions;shall be at the discretion of the assigned grading inspector, who shall monitor and field verify that the spirit and intent . ' of'the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities and other aspects of this FDCP may be made by the inspector,' at his/her. discretion, in `order to'assure compliance. 7. • The conditions applied to this dust control plan are anticipated to cover the full range: of construction operations as presented in FDCP 99-56 for the Norman ' Course. The, approval- provisions and conditions for FDCP 99-56 shall remain in � effect for, the duration of all grading construction undertaken within the subject 285-acre area. `. Transfer of any real property.or other interests with respect to this project will have .no- effect' :on the validity. of this . plan approval or conditions. Implementation of, all measures as proposed and conditioned shall be carried out for the duration -of all construction activities, to the extent they are applicable: However,. nothing herein shall preclude any future: interest, from filing a revised FDCP with. the• City for' any portion of the site. 8. Approval' of this ,FDCP does not in a,nd of itself constitute or otherwise authorize any site disturbance,. preparation or construction: The developer is required to. obtain all'necessary permits and clearances as set -forth in any development` approvals issued and currently, in effect pertaining to this site-.,.' This includes any type .of testing, monitoring.• or sampling required as a 'condition of development approval,.such as that conducted for archaeologic, hydrologic and`geologic.reporting purposes. _ SITE DEVELOPMENT: 9. Pre -watering of all areas .proposed for grading shall}be in accordance with recommendations of the grading contractor or Public. Works Department, ..based on,the area soil conditions as described in the associated soils report(s). 10. .,Track out and'. other - accumulation of soil material(s) onto any paved areas outside the limits of grading shall be minimized. Any unpaved construction exit/entry point along existing paved roads/areas'. shall be improved with pavemert, aggregate base or_similar material, fora distance `of 120' from the pavement edge into the site to minimize track -out. Wet sweeping/flushing (dry-. - . sweep not permitted) of soil accumulations from all paved areas shall be _ conducted daily, and kept,,damp during construction hours until so removed. " + 1 1., All on, -site traffic on. unpaved roads shall be limited to 15 MPH. Signs shall be —posted -at all entries and along all unpaved access and.travel ways at minimum, 300-foot intervals. Size and height of .the signs shall be appropriate for their respective'-, locations, and shall not be', posted on any adjacent private T . properties. Project site superintendent and security personnel shall be responsible for enforcing this requirement. 12. All unpaved construction access and travel ways within the site shall be prepared for traffic prior to commencing grading activities and kept watered down and compacted to. retain moisture content during all construction ,traffic/activity, including building construction. At a minimum, temporary, construction travel ways shall be improved to a 20 foot width. All unpaved road lengths'shall be,watered each day, prior to and at intervals during any .traffic activity, and at the end of the day after all activity has.c_eased. All track - out shall be removed as per Condition #10. 13. FDCP 99-56 does not indicate any import/export quantities. Any on and off -site transported soils.and stationary storage piles shall be sufficiently.stabilized, . watered down and/or covered as,appropriate. Minimum freeboard shall be as established by the Public Works Department.. Any borrow areas shall be routinely watered and chemically stabilized after borrow activities,to mitigate airborne dust. All haul vehicles accessing any paved area from active grading areas shall. have wheels cleaned of excessive soil accumulations. 14. All on -site temporary employee facilities`' (sales, construction, equipment storage/staging, etc.) shall be provided with paved, compacted or otherwise stabilized parking'.and access during their !operation, with those improvements to be constructed/installed to the applicable Public Works Department standards.. This requirement shall apply to any approval for such facilities under a minor use or other permit process. 15. `If approved on -site roadways nor parking areas are constructed to ultimate design prior, to completion of construction activities, then traffic and parking shall be limited to those paved areas as feasible: No vehicular parking ortraffic• of any kind' is permitted on or over any previously stabilized or other inactive soil areas. 16. Disturbed but inactive development areas subject to additional grading or" building construction within 30 days of completion of the initial disturbance, •' shall Tbe -watered daily in conjunction with watering of•,:access roads and developing areas, unless an appropriate dust suppressant as defined in. Chapter , 6.16 of the. LQMC and approved by the California .Water Quality Control Board, Region 7, has been. applied in lieu of daily watering. All disturbed areas where no further grading, construction or other land . disturbance will occur for at least 30 days, shall be stabilized with an appropriate dust suppressant no, later than four days after completion of the ` initial grading. These areas shall be staked, .posted or otherwise restricted in order to prevent any access,on or across them. a y 17 .:Construction activity associated, -with this project will occur during seasonal, -high wind.activity (February,througk4tiune) .in the„Coachella Valley. All active - graded areas shall be watered daily at,appropriate intervals. A minimum of two .'water,trucks syhall •bestationed on-site•on weekends and holidays: All security ' personnel shall be alerted.to the•need;for dust control and instructed to'monitor { ,graded -areas for'wind-ge.ne.rated dust as part of their -routine `duties. a On' Sundays;, holidays and other non -construction days personnel shall be on call for emergency watering in the event of, high winds. Additionally, -during all ;grading operations,' an appropriate individual shall be assigned- to monitor wind' conditions. This shall bey done by utilizing wind'forecasts available from the South. Coast Air Quality Management•District (SCAQMD). Wind forecastsrcan ' 'be obtained by dialing 1--800-CUT-SMOG and following menu options for. Air Quality and High Wind and Dust. The'individual-shall access this information each day;, prior to commencing daily constr.uction-activities. In the event that �winds are forecast to.exceed 25 MPH,,(403:1 High Wind, Day), 'all:construction' activities and on -site traffic "sh'all*be closely monitored to. insure, compliance '¢ with,the FDCP. The individual shall coordinate with the'assigned inspector on r adequacy of current dust control "measures .and any additional measures + potentially necessary. - r r r January 12, 1999 Mr.' Steve Auckland K.S. L. Recreation Corporation P.G.A. West Gregg Norman Course 56-140 P.G.A. Boulevard La Quinta; CA 92253 Yt i. `--60 2`i 9= r 6ti- FX: 760/771-0546 Dear Mr. Auckland: Midwest Industrial Supply, Inc. is pleased to submit the following cost information to K.S.L Recreation Corporation for a dust and erosion control program on golf course residential lot pads and other designated disturbed areas at their P.G.A. West Gregg Norman Course construction project in La Quinta, California. I. OBJECTIVE "_Toprovide P.G-.A: West _Gregg Norman Course with cost=effective dust'and erosion -control on areas treated with'Soil=Sement® Dust and Erosion Control Agent. II. AREAS TO BE TREATED A.. Approximately 285 acres of building ,pad areas with no vehicular traffic III. COST Soil-Sement® Delivered and Applied....... . ....$470.00 per acre 285 acres at $470.00 per acre.. ..... ................$133,950.00 total Soil-Sement® will not leach:away.or dry. up and crack with age: Combined with our experienced application service, Soil:Sement® will, provide.. the most durable; long lasting, and cost-effective dust control measure available. SERVING AMERICA'S COAL MINING -INDUSTRY AND ITS CUSTOMERS P.O., BOX 8431, CANTON, OHIO 44711 216-456-3121 • FAX 216-456-3247 I MEMORANDUM CAM OF. PA 1 TO: Finance Department FEB 1 `' 19g9 FROM: Marcus Fuller, Assistant Engineer I .VA a'dTY; LAQUNT" DATE:., February 16; 1999 RE: The '.'Norman Course" =- PGA- West Specific Plan 90-0.15 Dust Control Security The developer of Specific Plan 90-015, the "Norman Course", KSL'De`sert Resorts Inc., has ;submitted a check (check no: 0065903) in the amount of $133;950 to be deposited and held by the City for dust control security:during construction of their project. Please. -deposit :this check into an ., account which can be refunded, to the,contractor upon completion of their project. cc:. SP 90-015 Project Hfile Permit 2902 file _ to .RECEIPT City of La Quinta,'78=496 Cal Tampico, .b. Boz 1.504,,La Quinta CA 92253 2 TE % 19 RECEIVED FROM [� S{� v� - S 3 �� 4 ADDRESS DOLLARS C, ---j FOR- ACCOUNT HOW PAID T.OF CASH AMv ACCOUNT AMT. PAID" I- CHEC y BALANCE BY DUE ORDER K:\PWDEPTNSTAFF\FULLER\MEMOS\1999\990216b.wpd • KSL DESERT RESORTS;:INC. 0065903; C4825 CITY OF LA QUINTA FINANCE 00000000000000008870 1/21/99 f k�;trw, —;,a.a '.a r} .'.X - :;°i5:+wc >. r....ii `:; Nx,•v.•'�i'z,y AID ,I.•:a . ,•'�R'i•: ��i: '' �kd•�9i`sc'6•� 't' �" b it�;i,��s :i,•>+¢j� .y�r+i References ;; ,t ,,,, Your Iny,olce s N lnvolce y, nVO Ce i� y; ? .: Amount Pald; ;�� � "+�aDlscount „ ;CIN Net Amount ; 3481 :` 999. ' 1/20/99 $133,950 QO $133 950.00 .- $0 00 $133950 00 $133'950 00`> `$133 95.0:00 $0.00 $1,33"950:.00 ;. DESERT RESORTS, INC. BANK OF AM �Y DISBURSEMENT ACCOUNT '•P O Box 659 Drawn onFirst Union National Bank x rt` Q Ga Quanta CA 922�3 . } R Chapel Hilt'NC 27514 66-156 P.ESO0.T 6,G I:UB t - t '�, a � 531 1• ` tt �. gaDATEz, L iCK# ;t�AM OUNT f' ` PGA WEST 1/21%9 006 x u. „ 950 OOs > One Hundred Thlrty Three Thousand Nlne Hundred Flfty Dollars And 00 Centss SPAY OROER CITYA Q OF L'UINTA (FINANCE) OFa, PO BOX 1504:' � s LA QUINTA CA 92253 r a: •:z:, = es' Checks over $ 0 regw signatur - II50065903110 1:053 10 1 S G W:20799 2005751361I■ 44 WA ElVI'AN=D%YEES` of — Return check to requestor Mail check Name J Title of person requesting check r Department individual is associated with:. Check payable to: , a SL' f1�p2�S C Amount:'$ ( : (Ven or, o.) (A ress Account Number: 1 0 1 000 . 7 � U0o � • QK J SIT CA -�I ZZS3. • Y ' ZC� I `0 Project Number: o S ` '- j Check description and invoice number: ;? r Signature: s (Department Head) JAN705-2000 WED `07:33 ,PM. KSL DEVELOPMENT• CORP FAX NO..7605647,1131, P. ' 03 I; GENERAL. INFORMATION e Project Developer `Name: KSL Land Corporation: r Address: 55920 PGA Boulevard; La Qulnta, 922531 Project Site Norman Course (Tract,291.36):° ,Address: Northeast Corner of Madison Street and Airport Boulevard ' Grading Subcontractor (if different) + - Name: Nuevo Engineering ' Address:, " 79811�County.CIub Drive •�. . PHASES? YES X ,NO ' It so�how many? - 2: 1-Golf Course (completed) (228.236 acres] and 1-Reside Type of Development/Project: - . Golf Course and Residential' 4 Date of Project/Phase Start=Up: Construction start up: February, 1999;. Finished Course: D II. COST INFORMATION, If actual costs are not available, please estimate to the best of your ability. 1. WATER: (See Equipment CostsMater.Truck) Amount:. ' 2: EQUIPMENT COSTS: = ,, A. Water Truck' a = - Number on Site: r Hourly Rate: Hours: B.. Street Sweeper + Number onSite:,. i Hourly Rate: Hours: C. Temporary Irrigation:- Water Tank Rental � ti 'Cost/Month: $ 750.00 ' .. A, ' :# of Towers' 5 • D. Wind Fencing Linear Ft.: ' • CosVFt.: ` ` i + E. ChemicaVMaterlal Stabiiization'(for Golf Course and Residential): ° Sq-14. Acre: 285.00 ~ Cost per Sq-R Acre.: $ 111.68 «. F: Vegptation Cost: Material: , ' Maintenance: w G. Other: Re-stabiBtationfor disturbed Resident Type: Chemical/Material Stabj ki 300.00 • _ ' * MearaAGit3;8J: 12 ., .3. 'LABOR COST: Hourly Rate: Hours:' e +4. ADMINISTRATION COSTS: •", III. TOTAL COSTS: •Add items 1 - 4 for total cost. 7 ,TOT PLEASE RETURN FORM .AT COMPLETION OF PROJECT OR PHASE OR ANNUALLY F'RU DATE OF PROJECT/PHASE START UP.... " F Is (52.08 acres] !r, 1999 Total Cost: Total Cost: $ 293,600.00 e r TotaLCBst: Y r , • Total Cost, S • 37,500.06 Total Cost: $ • 38,775.00 `y TotalCost $ 31,830.00 + Total Cost Total Cost $ S 3,600.00' Total Cost: r Total Cost: $ ` 40,530.50 T: �' $ 445,835.50 IL