Loading...
2915NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class II I DATE: M.-.*ch 15. 1999 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Tract 25953 -- Northeast corner of Milos Ave. and Dune Palms Road (Street address or Description of Location) PURPOSE OF CONSTRUCTION Sire PrA41na Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION CxndA aitr — PhASO, ZZ SEE ATTACHED CONDITIONS. DIMENSION OF INSTALLATION OR REMOVAL AAr. AnDrotrwrt n.xtrz . SEE ATTACHED PRASE MAP. SIZE OF EXCAVATION, IF NEEDEDXRf APPROXIMATE TIME WHEN WORK WILL BEGIN 3%1-5/99 APPROXIMATE TIME OF COMPLETION 6? ^500 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agentr Olij2b�Ant & WilliAmni .+ Rsoc. 77-r900 .eve. of The Stat on Palm Desert. CA 345-2626 Name of Applicant (please print) Business Address Telephone No. Dmfialsand Cnnn truct:inn 50-305 Righwav 111 Coachella. CA 398-5544 Name of Contractor and Job Foreman Business Address Telephone No. 69117 5203 Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number of* ` �o FEES: Subdivision Improvement Permit — Class III MAR ] 5 1999 Public improvements: 3% of estimated construction costs 1�� Private improvements: 3% of estimated constructioncosts or — Minor Improvement Permit — Class IV: See attached schedule 2% Inspection Fee $ 1,875.00 Permit Fee 100.00 Penalty Cash Deposit -Surety Bond if required r TOTAL: $ i .975,.on Receipt No Received by Date PERMIT VALIDATION PERMIT NO. 2915 DATE APPROVED 3/11/99 EXPIRATION DATE 3111/00 DATE ISSUED By — Administrative Authority Recorded by 11 Telephone: (619) 777-7075 The following General and Special Provisions are attached to and made a part of Permit No. S . GENERAL PROVISIONS ` • ~ , The following shall always apply: r t•. �. ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way'ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING, CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall/not be permitted to operate on 1 any paved -,surface unless, fitted with smooth, -faced street' -S. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. Ifahe existing pavement is scarred,'spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quints, shall request that these portio K ns of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C.. , r ' surfacing plus appropriate sea! cost a _ s specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La QuintaCity Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the . + f duration of the project., The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE`OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and y concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event•it.becomes m s necessary to remove or cut existing drainage structures, City of La Quinta:shall be.notified prior to commencement of this work. .• Drainage structures and open drains shall.be kept free of debris at all times for,proper drainage. ' RIGHT OF WAY CLEANUP: IAny surplus material resulting from excavation and backfill operations shall be removed from the right . of.way. 'All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess"material shall be removed prior to paving. Water tanker shall be used, -as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. �. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water; on City of La'Quinta roads, .it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. y .. CLOSING STREETS:' No street shall , closed., A minimum of one lane of traffic shall be maintained atalltimes to provide limited access for ttie adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall. contact this office to obtain the necessary permission.. SPECIAL PROVISIONS t The following shall apply when indicated: NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. UTnXI'Y CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way~ « authorized by permit,•the permittee shall contact all concerned utility companies relative to the location of existing substructures. • Damage to existing substructures resulting from operations conducted under this permit shall be the sole ,t t fi. responsibility of the'permittee.' • , + / R3 UTILITY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the `/ proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area.between the proposed concrete gutter line and the existing road pavement shall be surfaced 1 with inches of A.C. paving placed on inches of class aggregate subbase course having an "R" 'value of not less than ' and in conformance with City of La Quinta Road Improvement Standards and f, Specifications, Ordinance'N461. ^PARKWAY GRADING: Area betweentthe property line and top of the proposed concrete curb shall'be graded to a slope of �. 1/4 inch to one foot (1). „ R6. GRADE<CHECKING: City of La Quints, shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. A R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be t removed.' Curb and/or curb and gutter shall be saw cut, prior to removal. Depressedcurb,+matching concrete gutter and concrete driveway approach shall be constructed in conformance with City, of. La Quinta Standard #207. M DRIVEWAYS: A.C. driveways sball be constructed as not to alter existing drainage pattern.. Surfacing between the property line and the+existing road paving shall be 2 1/2 inches of A.C.'paving placed, on (�� of class aggregate base. It Driveway construct on'shall conform to attached drawing. : a , SIGHT CLEARANCE: Sight clearance of-600 feet in all directions shall be assured and maintained at all times. RIO SOII; STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the i" manufacturer's specifications. CR COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. Rl SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall lye completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. d R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. 117 i J STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January. 1973. SPECIAL CONDITIONS' --PERMIT NO.2915 --- OLIPHANY& WILLIAMS ASSOC.. --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to. Section 14..16.320 of the La Quinta. Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed.by and to the satisfaction of the City Engineer. 2. Oliphant & Williams,. hereinafter referred to „as "Permittee", shall be responsible for providing "continuous dust`and, erosion" control. 3. Streets shall be kept clean. They shall be completely cleaned'at the -end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the, work site, the Permittee shall comply with. City, regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during' the following time periods: October 1 st to April 30: Monday -Friday, 7:00 a.m. to 5:30 p.m. Saturday, 8:00 a.m. to 5:00 p.in May 1st to September 30: Monday -Friday. 6:00.a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 P.m..The.Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is. to be altered in anyway. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code ..(Ordinance. 10,§ 1 (part), 1982), Permittee, shall assume responsibility for repair of any pavement damage to any public or private street and for any "damage to other City streets or facilities as a result .of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La, Quinta Municipal. Code (Ordinance 10 § 1 (part), '1982), advance warning signs and traffic control shall be installed and maintained iri accordance with Cal Trans Standards.or"the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required,. shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. - It' shall be the Permittee's responsibility to appropriately detour and barricade'all construction sites. Special Conditions - Permit No. 2915 SPECIAL CONDITIONS --PERMIT NO.2915 --= OLIPHANT & WILLIAMS ASSOC.. --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A. minimum of one travel lane of paved surface shall be maintained with flagriien.at all times: 9.. - Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to-noiify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety. requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the: City of La Quinta. 1`l. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 .of the latest edition ofthe Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved..Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a'firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to.or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset 'of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at. approximate three-foot vertical intervals as backfill is placed to:ensure the effectiveness of the compaction• methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are,attempted in this trial length of trench; compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion. of this portion of trench, the City Inspector shall. establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 2915 Page 2 of 4 SPECIAL CONDITIONS--PEFMT NO.2915 --- OLIPHANT & WILLIAMS ASSOC.. --- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 3001inear'feet of open trench, at randomly selected locations within the open length of trench: G. The depth of the randomly selected. compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed.backfill.(in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. i 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the, existing travel way, at the end of every. workday as directed by and •to the *satisfaction of the City Engineer for the protection of the public: Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however; Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in, length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition: 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to. Section 14.16.375 of the La Quinta Municipal'Code (Ordinance 10 § 1 (part), 1982), permanent, pavement replacement shall be completed no later, than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one'.(1) foot beyond trench edges. - Edges shall be straight and clean. B. Permanent pavementreplacement structural section, within all trenches, shall be 1" thicker than `existing of asphalt concrete over the same existing thickness of crushed aggregate base or`crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction -and respectively tested, for each 300 linear feet of trench: Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No. 2915 Page 3 of 4 SPECIAL CONDITIONS--PERMIT•NO.'2915 - OLIPHANT & WILLIAMS ASSOC.. --- ' C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved ''/z" max medium finish course lift for capping.. Asphalt concrete mix design shall be approved by the City prior to its placement. D. For transverse trenches across improved streets, the existing pavement surface, three (3) feet on either side of the excavated trench,- shall be cold -milled to a depth of 0.10', with a "butt" „ joint. created along each edge of the cold -milled area, and'a new 0.10' lift of max medium asphalt concrete pavement overlay applied throughout the cold -milled area. E. For longitudinal -trenches within improved streets, the existing pavement surface, through the lane width (within lane line striping),'shall be cold -milled to a depth of 0.10', with a "butt" joint created along each edge of the cold -milled area; and a new 0.10' lift of max medium asphalt concrete pavement overlay applied throughout the cold -milled area. F. If grinding .and capping operations are not performed in the same day as base paving - operations, the base course lift of 3/4" max medium asphalt" concrete shall.be installed from " saw -cut edge'to saw -cut edge flushwith the existing street surface. The base course lift of paving shall not be left 0.10',1ow in anticipation of grinding.and. capping. F. Any existing'lane ;striping affected by this resurfacing shall be replaced in kind by the' Permittee, as.directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall`be removed and replaced in kind. The finished pavement. surface shall be smooth, , consistent, and shall conform to the surrounding grades. 16. ' Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior ,to commencement of any construction at (760) 777-7075. ' 17. Permittee shall permanently stabilize any and all soil that was disturbed as a result *ofwork performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 18. Pursuant to Chapter,12.56 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982) the City. has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e.,.streets not part of the Truck Route network) is three (3) tons;. trucks exceeding the weight limit lay use a restricted street if making a delivery or pickup on .the subject street,;or if this permit specifically ' grants permission to use the street to deliver street construction materials. and/or equipment. r' 19. This permit allows grading activities only.per the attached phase'map within Tract,25953. 20. The City of La Quinta reserves the right'.to revoke, suspend or void this permit at any time. V fl Special Conditions - Permit No. 2915 I Page 4 of 4 ------------- ------------------------- NOTE: With proper validation this form constitutes an CITY .OF LA OUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) K, OF For the construction of public` or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like pubfcworks improvements in connectionwith MINOR IMPROVEMENTS arid APPROVED SUBDIVISIONS r` SI Subdivision Improvement Permit — Class III , Minor Improvement Permit Class IV DATE: LOCATION OF CONSTRUCTION A u� e& ,7., ..,� �e I,.r,► c IZDAD (Street addrnss or Deseriptian of LOeatlon) pURP61,E OF rONSTRI ICTtnet A0, Sketch (attach construction plant if appropriate) F DESCRIPTION OF CONSTRUCTION 5 F St DIMEN ION 0p INSTALLATIQN OR REMOVAL £9 LSE AP Ra>1 O 6� A021itJG- L ti � A'�i��NLD''Q`►^'� ''1 SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COSTS (jncluding removal of all obstruction, materials, and debris, backfllling, com- paction and placing permanent resurfacing and/or'replacing improvements) In consideration of the granting,of this permit, the applleent hereby agrees to: Indemnlry,•dafond and save the City, its euthorl:e4 octants, office", reprewntetivM end emploYaes, hannlozs from and Ogeinst any ertd ell pemities, liabilities or loss rewitinct _tram daims.or court action and arising out of any accident, lots or damage p portion.s4lnS or property happening or occurring as a proraimate rerun 01any work undertaken under the permit Granted pursuant to'd+ia application. . Notify the Administrative Authority et least twantr•feur 1241 hours In advance of Ohs time when vverr es De rtGrted. . Compir with all apptiable City Ordlnartnt, the tarma and eondlttont of the.pamth and dl OPP' We ruler Ind reaWstkuts of the CftY of _ LA Quints and td pay for any additional reacement nanecessary as the result "of thw work. pl' Signature of 'Applicant of Agent j y5 �•�4 24 7-14 A✓� ofrH� sT ems' iA. p. y22,� ' Telephone No. Name_ i Applicant (plcau print) Business Address o a NWx ►„ coa4L-erlat'ca 3yg- 55y`t /4t8 et4nlD �oN S tR��t I e n1 3 5 Business Addreas Telephone No Name of Contractor and Job Foreman 5 Zvi . Contractor's License No. City Business License No, I14AjLa Z n�o. Co. S S3 0o Z758 Number Applicant's Insurance Company Policy FEES: Subdivision Improvement Permit— Class III Public improvements: 3% of'estimated construction costs Private improvements: 3% of estimated construction costs 7 / Minor Improvement Permit — Class IV: Sea aged schedule 14 PERMIT VALIDATION Inspection F9e $ Q C Permit Fee. G v s . PERMIT NO.`97 Penalty DATE APPROVED - 3 Cash Deposit•SuretyBond it required: EXPIRATION DATE TOTAL: S DATE ISSUED Receipt No, By Administrative Authority Received by Date -7075 Recorded by .Telephone: (619) T 7 L r EXHIBIT "B",. Page.2 of 2 — _ — — - - MILES AVENUE FROM AFFILIATED CONSTRUCTION CO INC TEL: 760 345 5501 MAR.11r1999 11:06 AM' P 1 S1JR-C"OM'N%I('I08!S'AGREs'L;MENT" -THIS AC;1tr,t"MEN'k', madQ this -is( rd;ty't�F _._ Mcti�h ; I����t� by_tutdl ktuttiveci► c?1 1N11nN'I' AND WIh1,IAMS AS�c.x:tn'rl?S; INC a ,.. ac,rporrttion, hereiii cttllctl "Builder, " tin<I . l)n l_I,'_�,Alyl) („(,rN`' Ij UC { ION ('O.'; IN�r he c;in'called ;'Sitbconvactor." - 6Vf7'N1?S',S'f ?'fC WI•Ir,,Rl;A', the AidIder.iwcunsttuefitig;wul crcctitlj Certain building", mid improvultiu tsecinsistingofa SIN(il,I.? FAMILY SODIVISION• coi siytitljE4 6f niultihle p.tiases totaIingr :l l2 atilt,, hki�:isi�c.l awui tttitil:ruc tied x;r plttrts ariel Stt�e:ilieatit�its as ide�lltifled ill the.' attkhed Exhibit A , (Platt aitd'I'httye I1,t),tiialte<I on imts •••-_ c ;.�tii ii ".1�i _. '-rrtct _._ 2,5953_. ill the Co,iulty of _ ItUl1 81Dk*,j Ctty of ► t�u.iC r `, gtate nt' _ <,AL,if_Ult[ViA; .., .�i-4 per;hio-uI.r ;+ttil .N1.`,�'ti.itt�in ..tad tltc addc�ieta ITervta (ltercitt cnllcd the "prt�lec�'); ;uu� W[fliltCsAS; tht ti:rrtios ftc retci ilcSire,to cuter intat a ytibc6n(ract.williit,,,gi ct it) 1110•worl< ltcrcivartlel de's trbciI ' NC)4V, I'III.I2ks1'Oli1i, In 6hisideratiOtt Or tlke- patties agrCc:ts Ii)lluws: , t. Siihcontractor sliall titink h all labor, materiaL Aill, ci wipna;nt, .w )plies, an�.i ,all oilier things nee csruy ur inciilenGllly nxItlired (herein - ,called thv "work") to pe;rtiirtn attd cornt.tlete iu accurdance,with P�tc pl;u,w;tnif sp4ctltcati�tny,and itddittula thitt porhun at the pC<�Pt;ct reh'erred t� as; FROM : AFFILIATED CONSTRUCTION CO INC TEL: 760 345 5501 • MRR.11.1999 11:07 AM P 2 � i1. olallallrc�acll><f;,1 1r) I:711 ;, '..• juaplsaad oNA X it `jt t 'art A.1 lt= I'1 �l'1 A] �� �I`1 a111 c,ul `�''al'�. salt.. 1!,44 pt� ltnagdllf_) '11?ij1AM IAO tr iA{� a ii atli>luaunl.lirtllt Argi pairlaaxa ptrlu ulajoill aaatll pallcaodau:irtl 01AN ` UauMi►JNV tltJ.lotr�>tl.ltiltu,7-gnsy stgi 3o aplr as.11DA0.111 agi tla 11MOW eV, sl1o111p1uo;•) PlItl M41 plaaa oqu Bull ltl iapjaq ( e"jud aq)IN.l,lr11 N1 i1innl:>J11I Il111rJ111,i1' nt1n1 ur. 1tJ iRn1F of uP of MAHN f 01mulu ny" post 'Pp?iJulPW M M su111 MUM ilprts omw 'il6who II1IM PM LIMO 61111uW'"Imil x6up (�) oAIJ Ur1tIIA+ iptyK .Inlnn.quolgn!; `1n)1u11u11gn.; iqj to Al prill Ip Khlli:gtun Jo auop trJ(lM iq Pall] 0q Ilegs suall Jp ulll AUI! Jl Will e30)1ls JagIJgl All:+I10014119 1, "Jso1 J.Inua Ono ):*qJ Ebtli nli algltuo►ilal of Plppua.Il 1pnls laplp111 vo)11tJ)fu,1gn p.IiKIIrJIU %IIIIJ1UItll Ju Jt)geI Joj llplI AIII: p ollaml i)) unglti Au1'. f1I JI1SI! Inlllap ill ppi!I1111.1. JilPll'IfI Ill Jn Jo11pJDtnaqu5 Ag anp,all ganliq JD Ip»gop Aue,jollnmi It sit JuatulprAl, Fop Ja)fstill Jaj)11o[I All hl[uln.ly s! 0()!lllll u!r JI pa'3ir..g1FlP JO1'1l]K11es an: su1ll plan Jnr.)luprnignti anp splam6v(I Iuulj u1o.q.1p1Jagl amount oil) pllggu,M A1uo .IOlgl(Ill I'll!) ill; Fi1ai1,(nc,1l 'p1Jl(I)1 ,ntn(( 1puls alui111a1m an uu01 pi1.11Urp1 Ault All 11 H, all Auw Fla! 1 1p!i1M IIIIIIIM 111J11 All) 11jull .Its lOu.111100'Igl,Ili OAu1fI l.10JA (I 0111 illJullrluloognl; Ali 111F0 IOylg pull F1111Jp)ilUl I'll 101IIFaJ fit IAA t111I1 0111,I(I OR11111OKrp J0 F1K'I NWI "I K'NRWrir hiplulilt i;ltllil iIrull JpPunpJ1tj slultu4Vd IVtlIj )tint 1julu of imiloboi pg loll Ilrlrs d11?ilot`yl 'Q 'Isllit hill 10 iFlxo must A, -,ill Fil Funr.11lnl0l lilt ill la1(4t18 )1inM 1gt sniiuji�pun Agallll lluo JJ)lpU•quOpgOS 11g1u Ault ill illgngl Aq pasntm Au11P ul uorK>nun Ial. M1ull iol t;Illltungl Jcl.l Jap]I11t1 lsun?Fhrsaltnjl Jill pull ,Bull 1,,1n!XW AglJag dnlrnulunxplg pull 'pU1) pt FJOU Jo Jp1111't1M Itillllllplll •IIIOIvHVIAOr 10 Q.-Ill 's5jpJ9'91n11 Aq P19610 A1411 'A 1iif' F1101 dI111:llllyl0 FAJ1p AIIU 1Q1 0111ISu(OMI Pl1Il pq Vil,l lungs J WINIulp(pI •gNu1 Q nMgU' OHM tMI PU M09 JJIIAn 1111 11a11111101 Ill P1J)IItl1! AUP AI1Ap Alit: II:1P.1 ti)1 ,�ep rill CI'rIN'V1J21J].1,5(1 1r$ lI, tunsatll'Allifund 11 Ku J(111 11111t Kptill;u ip p:.)oPIIlllrl w JappI1J i (11 dull 1111115 ulirnannllagll5 p01111110F 01111) Pill 111t111nt.Monk 11(I 0111dtI101 ill Jilt) Jo1111J01(Imi1q, I)IIIOIIs 1tIC!11JJ11,1, ntloil 11711E A(I 1I'*N11I11 .loplll)[I (1) pAlllUitp)rn1Mr u111 Nil ill 11ualiJIP ApIllay %1 Jo 1ttpljoludill! Oft j)I(H)M 11 liflil illtl Jo11011 KIl01jU111I1!i Hill) Illi,'A 110III)AIn111 Ill Aljdl11fn11 >(d1.M 1gl p111d111tt1 Ol ir1ltQ U,.If.).+Nl luOatlnl Jill KAUIII) Al{I All );dIo1FL'01i> L)p11 n)1 n1,iIILLIIIDIn l :)W%111 J(ll 11g1(!I 1q IIIRF 1)1 htgl 61a1111) J0111111U0pfj11� '11-0g1Ji1 110 1p}ttJ 11t1Ji11t;; 11:11injo 11o1111.11doon p1tHI!)I1000ill ulitltl splindip 11/(oJd 1tp Je sFOXIIA j111I,111uuUD1 alp, )fill) POnlsmp(nl $11 '11i0m /ill ajaldn,lo 1j g^)I(n1 III FA1rP IOAt II Ji1V��l1., I N ut)yr -.140W 1IAW1111 O( ]IV 11tJ111i,11I11$ lap, Jlln+ p11M,011 III J1AOMoll 1111RIMl, iIIM )0110J11641 JO slrnlllhunO alp se AI J In su punt uoltlKllJ 111JA1Illl a U! 11JtiMj)iUF,,121 U16111111R P(IU 0P Vt ot; ilpllup (nil Aq I�dpIJM u! paIlljun ynlaq Ja11r. FAu1i JI:pulpn ; iX I,I {6) I1llpthl l0'SIJnA1 H1116 JqJ A111fO.1 RI loit(t)d oy Ell lr(lus Ku NioM Itll IJUlturu)l llpgF 101�p.qut}Dgn� pU.r. FI 10111:1)1101 tl,' ?1 II AI,11) 'J1 ollO.111 oll) K11111s if) (n1111JOaf 11,' 11 1 •(11(1 (, 1j;lllll trip , Ill �, 'IDUJIlIP1 Mh dIP11i1 IIIII?Jbp 1h Ii+11 4 S I I I I I I i 1 J • I 1 11 J1r Juana mil ul J1pIPIj1 lsuplill sit sn'lala u1�1 E.N11uglmU 11111J )11:,e11aoJgnS,Jil iyHIJ Qt11)u 11AIUM U KU PpI1I1SI1o11(l I(III 1lInIF uulK1A(ln gI111. •1111mill IIM0118 filllnKJu Jdta:cu rtn`rif r)1Au1u 19u 19A01 Ulf tlpl'Is g11!1 All p1u lfi Og Jpl s pull saaAol httl K.ICgtilJlunayn}; Jn 11-sel Jill sn)fllunl Iltil: CpolJpd OtI'l l AIJ 1pF IUIIN iIWAU({ p1't1u1111 Ilful� '1111p u) 11t1,1A1•(I pp7r1u11r lu11J00 s,lntlUaurtllgnS glint i;lflallH$ loll 'p1l)IIUInap,ll,.lnaiaill 11pg,1G F1FUa11) g)lnuagjA0I'MT Pia 01 MCA )1:)ilaJ+l atll utulli pas 11 a(j o).tnol l-'11s;Itnit lu,+luIli 1116.10 Klulial+ou iIII iQI Kap!nnlll pun sung paUlI11.31 gjrM `JalI`nnlalayd6-41ljklvgli` (top solos Afro jn )uautArd 1yj nJ Jolii! .u11'IPIf.I gti111J41 iI1%qF pal; ;1u111Jpy{ lu0 MU nil MM s;,nlr,l111u1 puo sullu 01 pt mall JIPIIIIII Olt) Illn: 'oWltualU 1111 lallwil 11ogK par. 1u1l Iulppoq uillaJllp srupgp All Flpq Fr..J0 upgM JlJ0M Oql IIpM uo!111nna):1 al Jo uo J,;) n >1n!li))1n)ulnJlslg Jill 3ualiu�lntI-joilUl 'FIuiI.11lpto Ill! JIlJ Alld Ilu1s Jo11ol)nottyuq ;t;til:1SF:1 f1t 1 O SI 111111 Sur Il)a1 1 1 I i 1' )111.1 I SI .i 11 )al. oK alt.11) Sll a s :•lull Fjll:1 )11�jllla�(IrfiR I t I t l I1 t joaf(l.rd '1111 111!M ,11(17; 1wp.I11: 111 1o1fo.1( ,1t11 :,t�ldlwat 101 +tt oS moplal "i pM ;lw,l;ld(,(m mks ';u,lpualulaac]n� taafilac �y1 (fq 1�jac1al}1 hn strnaalul at;tn as 1t1 ac)s t;atll[t (lr►s: I;it11 All ails tail' ulo.11 1)t3ncn.U0,1 cull 11rlt.ls: l.lhr'j1'.1.1(111 SIl1J uj(iat gII11t11f;1f1 l;pgo}J pal, lj:suM JI, •saajln)1 pup (lals 1)ttr. 4ui1!s dua� `�a11t1:>!a:111(� a1t1:'1trl;►.r's}lt;'cl d(,1�n1y `s�l•'.M `ilttltllY.}pa 111i�1�[?C1 `f;:.1p1I.lA II11M islaaats lna'ulstlq uor'111alo.1,(ae.10dilu1) `.1,1q) l:c11x;11i1tNow (gnjRal'al,):nl i)attt.11�tltt!tlts�aaou you 1ric.�'sua�11}1►,llaacts par. l:ulltc:l I);al.li,iluattr.;an(,({tl at{1 `tucxll I)a11dlIIl �IgLlroslla,lao Iru)1)aattarptli SR ops my apt l.t9 01 1»a.111 »a `I3rnitajaodSut;.q `tuallal lnl')a `:r(,i11j1 `tclaalultl 1111 oplll^,a! Ilrtis ala()M a(ta,lu o[i()crc; all] fl •1,110M a111 aanc,) 1I0jjolps1al)r,9IJinl:1; AUP pun aanniq tvgswivul III it'ant W1Ic ; tu;.) 'W11SC) {tl;) `�alelloall S6,1. 111Silil XW) kgpIllolli) Bl'tlln(')1 1 11i ti1t1;?lCJ:1at111)03 zipjoaltl 111�i1s suo!j �tllljsrll ptlrt slr..la;1'1r111111V 'V m morjb) we *HIM op w "Aim'S IlUllud"t q H. oil) .Iql saoJ�,1OJottanu)agnc; oq,I, :WOM JO AMS 't' I OZ:V luaunl7aq VIV .iod stl sluat11411i1 laaa`dc►a(1 Itroat pjovjq)!l N aq 111M 11011ua1")a )uaa.lacl ual V '(I popuMupladns laalb.ld ` s.vapllnq Xq pam-odds: lit: Mad to12.11110o ltljol oip c,1 rlo qd u )l.r(mAn o l'I;jll,1:1J,1d nql i1tgXjdc1v AqI)3llltlr.l:)17}}) aq I}ily, S1unottlll Fuli1lq sso•I` o,l, ) aal�iliins altl pul" a01,wj)1101411, o1((ptl, t api,lu nq llllll~ S.lallanon Ss:1.191 03d 11.11 'JIgodwl iuo.lt 55fi,' N nX,.j s:?A11,71,331 .10p11n . 11taAa altj ui 11 W111M0C1()) Ill'ItI10411 041.10 AVP QOZ ?qj 3](111lA11110 04 llrltll: `IL'nC,Ado fit opli:11111. "xills, j:►�4'oail sa;lFlinq pull s1sl;:at;t,1 t17t1�,ulgrl olgt' rlidcl»'1u:)u.lajl:jti S1u�111({ a dq�ralullcluu»al; `1111101ti tlat''a:jo �llp lIllS , alv Aq r;a lltln!oa:Ja alc,nlit 9u1111t1;10 a1Flp atlj c)1.t(,1ac11)aj:llcitlula �}a(rM :rc3:I t;It�llq t1111ii,11J 1; la0 pajctaaal� oq 11!M Sia1111q hs,.)Aol,:r -V- ;6mctll�j >;u nigll,fw(I (001/UO1uu111aapuul l onl;I 1)111301(t11,1, 0M,i,•Ax1S)' r10'0os` 0j -R) Wn (illllll iejo.l mil 1wal, mil mg xwpiLijuo-)gilS of Alod 11j1th 1'I)Illill oll.t. -j; isimitpt? MM plat saw Itial; act Mad lun1gq) lltogimwill paaalll: K :,y rttlnl >LuIM nql leljj 7tuyxOttt.ia'llJl'1 alll llllhl ill! a I:I;) i�tllllllt li)(. uln.rl ltpllaj')1)Il pull su(lrjeoglao(is pcn: sere11cf a11j )a 11l' pailruwyo sr.(I Pu l 3l`yl nI I•)tle )imm tuli;lo llOIjnl(I unn (ant oaueul,ll),I.lnd s1Jnu:t n, Jq aP1Au.lcI Ul sl JOoummillu sltp.Jo:)tlAW nth iil p so$ polMou11au1ojallmuoagns oiU, 00'OOM S ON1nWID WWII] SONlt•ISA, 't'ItAt;'l' �tla: t'.1.r�Cl SQIILNll 72 �(:,..�( t c 363NtIcvul)t/ !s. 7:1 AA l.." 79 320Cnlle Viva V;;l'dt7•-* TI .113'iG 3 79 .164 (;rllk Vf sta Vcr(le ' 7.5 31(C 1 79-.378 C ille Vistn Vcr(!c 76 2[t(; i '19.392 t:;alle �Vistit Vei•de r"r . 413 r? i�{06 tape ViStn VcrJu 7 I 2 S 7y•:120 (,sillu Vista Verde 9 AR 1 . %'%-1i14i (',:111C VlYt:1'•�/ifrJC :IA 2 r!r:,hls'( 77uc Vistrt vc:r(io '. 81 dA • 1 ' P .449 Calle Viva 9 .1 Vc't'cli;' 82 ARC Vet<Ia9 83 :cEl :i /9 425, Cnlia W—da W At" . 84 l.kl . 6 .79-413.0dlo Vista Verde 83 3itA I ` 79-40LCalle Vist:t Vu'du 86 IIZA ' 79.3a9 (;11110 Vista Verd7 87 alic 1 . Vislu'Verde. 88 1ltG' E :. 19-:ltS5 Ultle _Vista Verde H9 4(. ? !9•.15J C.'flllc' Vista V�;i'u(: a 6 I�l :341`C'illle.Vista Verde 9l 3IZA 1 ;?� 7. ..nllc Vista vrtlr. 9?. 3(;: • )': !4-:I l'1 C_alli; Vista VrI'd C, ?. 1 '19-3fl Nticvo.l;)rivc _ , 3n' 4 19-:322 Nuevo Drive = 93 It j 7.)_1g2 Nei vo 1.)rivr,. l',.LAt1Ui.tiL:t.\K12S1-Vsi. P1.,71N d ti . PLAN) 1 It) F113MI �. 5 ..I•I1::MF:.1. ` • : IiuurF:' ,'IJlll..p c.;fllitist•nln Lllcrul JJ87.0 (,-;;II1Putslia ['ilca�.l ' Stucco 1PX-!f I:Vtt:yhcll' !P.`(28.Cvllral;�; , I18WJI69 .usmbrern rPtiW2U5pL)c?unel Illnwn' (: arage F)ooryll.emycrs lIS1h;119;?'lulyt.lotYai IJ51V). Il l Nii►ibus 1N11iic 5C;1If;MiS 3 5C:HFMI"1 Bast'• IJ$2ij t',tliti?rnia 1117 od. 1i826 (;alifuruin Mciul Sulccu: !IX- to tvlcadowlirixsk - It (-11 On!rnc;(11 l ssuin/131trgc/`Prim: 1PSW2191 t..ilhsu'tl;r #SW*)1 6 Oak (,' i;o!: - Clitrtll;u I3uur;7/E:unvec�7: ' !1S W :>,�t�lti >iurut7scr' Wisitc;- ..IIStiV7.17J`Pucl,E�) ' 8C':f I L.:> �iGE{1NIFs G Rod; 489.0 Cafifim-iia 131cild, . JPB'20 CnliQ11,11 1 Illr.uil. Stucco:- 11sC::?J Ast;e;n /P:`C.Si.) C;rystol White fncl:Jicarge/l'ritsi:.. lfsWlmn. I)s'y Loc,k: IPSW2.183 Yearling' (lunge 1)oorsrL,g711very: #SW2024 (JobiBeig(: • MSW'2,JT.; fiallict Fluige Stucco 1iy: La Habra Stucco; Roo l"I'ile by: L• Ache; P;iint by: Sherwill-Williarns b d Wd' 60 : T L 666T ' i Z 'TOSS -SUZ '092 : 791 Oki 100 NO La91dd -1 i a_d WO83 Medium=Large Scale Construction/Demolition'Projects (Greater than 5 acres)1 Fugitive Dust(PM10) Mitigation Plan. bate: •3181 y5 Jurisdiction: L.A Q v t -f\J T-,& Project File #: Tw 2 Part I - Project Info_r_m_atio AooP 99 " s 9 Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may .delay.the processing of your Fugitive Dust (PMIO) Mitigation Plan (Plan). ,It is,recommended that you submit .your. Plan concurrent with, your grading..,or demolition permit application. Project proponent: 'oipLwNE- AAiD As foe. :ZAe. a Address: '%%'yd0 .i4diz eF TH¢ STATES .�i4�i►7' QIS� Gf¢ yL Z l� .. . Day phone number.(7Gr.) 3YS-z� z4 Emergency phone number, c��a) y i3 - 7oi y Grading contractor (Contact Person): DrIrELAY%)b Cd J-57't2(ACr•ta,-) C 11»1 Address: 5o .3oS N&dJy///� CoA-�yr-a-A., e,,a Day phone number�(16a) 3 yy_ SS rq Emergency phone number: Construction site street address: /JoRrNF 'STcaenxrz M,wFS �aE e OK�Ia Pf-�r,s-Rd. Construction site location: (-A CA (Please include an &5 x 11 location map) Construction site assessor's; parcel number (Tract #): 259 517 Parcel (Tract) size: ;qp ,/.� , Acres or Square feet Anticipated date of physical project initiation: zt 15718 Anticipated date of project completion: 9/1.Ofg, Anticipated costs for dust suppression: (Attachment B - Must also be completed and mailed tot the appropriate address when construction activities have been completed) 1 All pro ects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 4�3.1. Earthwork Information (Acreage/CubirYards): Project Area: 1 ,Y z Total Disturbed. Surface Area: 1 Z Cut: Fill: Import: i Export: Phasing of Earthwork: Date Date Phase I Grading (Acreage): 7.30 1From: 4/13/98 .To: 5./13/98' Phase II Grading(Acreage):. I (v • Z From: Z 1 1 S 1 `d To; 4 l! y Y Phas-e IIL-Grading(Acreage)i From: To: Phase IV` Grading(Acreage): :From:: To: (Attach additional. information if necessary) Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in,Attachment A, please indicate which measures are', to be,_implemented during the project by placing the corresponding letter beneath the following sources.` In addition, please indicate at which phase the measure will be implemented, either at Rough. Grading (RG), Finish Grading .(FG), or Final Construction (FC).- Demolition projects should only indicate measures in, the Rough. Grading (RG) column. After indicating what measures are to be implemented, complete .the "Details" section by describing how and when the measures are to be implemented. Details e:. fre uenc of a lication number and t e of dust control implements Source � L' Q Y DD VD D No., RG FG FC etc Please be as specific as possible) 1 A A A One 2,OOo gallon water"truck will be _working daily as needed. 2 H H „H One•2,.000'gallon water truck will be working daily -as needed. r (Use copies of this_ page if additional space is needed) Part 3'- A:greement I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the.City of La Quinta to enter the aboye'mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives:from liability -for any actions related to this project. I also agree to complete the record -keeping requirements included herein as Attachment B; once the projec has been completed. ignatu e o wrier or ut orized Representative t I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the. owner has authorized the implementation of all its provisions throughout project buildout. ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description p f reasonably available fugitive dust control measures for each of the sources. Please use this'information as a'guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Sorg Control Measures Comments Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land.clearing Or,earth Fad. movement will increase the moisture content thereby moving increasing stability of material o Once the initial land clearing/earth movement activities are : complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security fencing "can be used to prevent unwanted future disturbances of sites where,a surface crust has been created (B) Chemical stabilization o Only effective in areas which arc not subject. to dailydisturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o. Three to five foot barriers adjacent -to roadways or urban areas can be effective in reducing the amount of wind blown material�leaving a site' o Should be used in conjunction with other measures (D) Cover haul vehicles' o Entire surface area should be covered once vehicle is full (E); Wheel washers" o• Should be placed where vehicles exit unpaved areas onto paved areas ` o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads ' "° accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o. Not recommended for roads with high volumes or those used for' heavy equipment, (H) Watering , o' In sufficient quantities to keep surface moist o .'Required application frequency will vary according to soil type, weather conditions, and vehicular use. (Source No)' Reasonably Available, Sou Control Measures Commend . Unpaved (I) Reduce speed limits' o 15 mile per.hour majdmum Roads (Cont'd) , (J) Reduce,vchicle=trips o Access restriction or redirecting traff'c to paved roads in order to reduce vehicle lrips•by a minimum' of 60 percent (3) Storage (K) Wind sheltering o, Choices!iuclude silos or enclosures o Enclosures should consist. of three sided barriers equal to height of Piles material with, no more than 50 percent porosity . (L) Wet suppresston o'Application,mcthods include. spray bars, hoses and.watt r trucks o Erequenry of application will vary on site specific conditions (M) Chemical•suppression o, Best for use,on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side Procedures' of the material o Most effecth when used in conjunction with wind sheltering t(O} Coverings o, Tarps, plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent }wind from removing coverings Paved (P) Wheel washers o Should bc,plaeed_whe'rc vehicles'c*it unpaved areas onto paved Road Track -out areas o System can'be, adjusted to spray entire vehicle, including stored - • bulk material in haul vehicles (Q) Sweep/clean roadways : o Either sweeping or water flushing, may be used "• (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full Disturbed (S) Chemical stabilization -o Vendors can supply information on methods for application and Areas/ ` required concentrations Inactive .-Construction Sites:.,. (I�:Watering . ` ; o'Would require frequent applicauotu•unlcss a Crust can be developed over the site (U) Wind fencing. o Three to five foot barriers adjacent.to roadways,or urban areas ..Pan be effcctive,in. reducing the amount of wind blown' , material leaving.a site - o Should be used in conjunction with other,.,measures M VegetaEon o Establish as quickly as possible when acave'operaiions have establishment c6ascd o Use of drought;toletant, native vegetation is encouraged. 3nN3Atl S3lIW --3.r.,s.sen �I _ J - - .N. 10-1 •g .r. to _ NOUNaUrd .I[I LL u n _ _ :••: 1 ['°° JJ 6'W - d! s•c5 - L [•cs rll-1�•/ 1 u "J z nv7d tt wra I L rrry 1 IDS LS 95 +`'S r tt cs I 1 ZS LS OS ME 113M ml 4 1 ,cn 1 1 •m' 1 09 Z0 8 ce B H "g S9 8 69 B LB . 6 W i 12 MYL r j. I 5i•: rlv - I • W ,nl I� ♦ I [ 18 18 _ __� 1 _ ul ' ,'''b 1� i 20 • I y d - 3083A tl151A 311tl0 ♦ i 09 OLL--__ J.Oi I w 4 y .ill - -^ -- ---• -- -- y -- -• -� ; - - i I ;i5. .all � /� •'1, I i .. - y1 •m' m yZ9 5 = ,:11 09 i I t •:, I J D I .rt •� .sv j I•m - y R'. .ml W y 0L I I I @ I'•I.. I y sr mro y sl d�' wcO` CL I k Z6 - ------ ri _ !L .aa I? I I�Zq I e '^ +i c•m • --j IE2 �" I ILC I •� I 69 ' ,u ml I y _ .0 ,K._ - 3AIV OA3f1N. A y a 0La ce h'/ ml I H. 101 Noutal3d/xtl'Od u .a ° e irti :.y. I K. r oc $� 1 'm•L s,, Il ulll I .�. ' c Z0 LOl' I L8 1 C y L - - - - J .•t I 'w Ilt 60l BOl I ..:9IX .ml 1 , ^I L4 -¢ - IXl I y � wYU B 9 - I ZIX 4 9. �\ 4C _ r ' � s.ml - •B - - yy•. yl r 083dSONd all 7 . r. I 68 I 9 OI CC y ml - - - - - rl 9 eU B L0. _ Bll C . 91 S OZl I I y oIX y I cc I k .0 .0 .0 . I X .ri I yl I I I A 1 1C cl I IIX I '; .0 •[ a 1 ea C 9$ $ ra s 9A - 5a B On 2 czl - ZA I m � .I i Cotg Za . I ca l 1 a .[t .0 .0 .re .0 .0 .0 .rr.0 t � cc B) As ' - - 013Y11tld 311V0 .0 • .0 .0 .0 v.lr .[c Z �o Z a�sa �fl� .LISIHXa (Attach additional information if necessary) . I have read the above conditions of the Fugitive Dust (PM10) Mitigation Plan and I agree to implement of all provisions at the concentrations anu irCt4UUII r b 1U;,71,L111V,-U. . CONDITIONS FOR- FDCP APPLICATION 99-59:- ' OLIPHANT/WIL' LIAMS ASSOCIATES TR 25953;,16.2 ACRES (PHASE'2 ONLY) r GENERAL: 1. Applicant shall comply with all -control measures as set forth in the approved application for FDCP-99-59, and'the following conditional measures. This dust control plan approval shall also apply to any encroachment or haul permit(s) issued by Public Works. ' The full amount of security for FDCP 99=59 (as determined by Public Works) shall,be available for any measures) deemed necessary by the CityFto achieve ' adequate dust control; whether or not such additional measures are proposed with this application. Any requests -'for bond amount'revisions/reductions must be made in writing to the Public Works Director. The applicant shall implement all methods set forth herein -for the duration of the project construction. -' 3. Applicant'shall submit copies -of all records related to cost accounting for the dust control measures assumed during all pre -grade activity and grading construction upon any request for release/reduction, in.posted security: Said records shall be submitted within 30 days after completion of all dust control r measures,as•outlined in and conditioned upon the plan. All such. records -shall accompany the completed PM10 Program'Report Form, .which can be obtained _.from the Public Works or"Cornmunity Development Departments. Completion of all dust control measures shall be verified by.,the assigned field inspector. 4. Adequacy of'`all proposed and conditional stabilization measures shall be determined by the assigned. -,grading inspector. The .City may require remedial measures beyond those identified' or conditioned upon the'project, which the City deems necessary in the event such approved measures are n-ot effective. 'Enforcement of" these conditions shall be at the discretion. of ..the assigned grading inspector, who shall monitor and field verifY ' th'at the spirit and intent ' of the FDCP and its attached conditions 'are being complied with. Adjustments to application frequencies,_ quantities and other aspects of this -FDCP may be made by -the inspector,.at his/her discretion, in order to•,assure compliance. 5. The contractor/vendor responsible for provision/application of all soil stabilizing agents.,;used to implement this plan and • it's conditions shall submit the appropriate Material -Safety Data Sheet(s), along with approval from the Water Quality .Control Board, to- the Public Works Department -prior) to any site application. Application of stabilizing agents must be in, compliance with NPDES' . and the State Water Quality Control Board requirements. f 6. The conditions of this dust control plan approval are applicable to the full range. of construction operations -associated with,the 16.2 acres within TR 25953-2, . and shall remain in,effect forthe duration of all construction; undertaken as part. of development approval,for the subject property. This approval. is applicable for Phase 2 area grading only; subsequent FDCP approvals will be required. ,Transfer of -real property or other interests regarding this project shall not affect the validity of . this' plan approvayl: Implementation 'of all proposed and conditional measures shall be carried out for the- duration of all construction activity, as applicable. However, nothing herein shall preclude any future party' of interest.from filing a revised FDCP with the,City-for any .portion of -the site. 7. _• Approval of this, dust control plan does not in and of itself constitute or ;otherwise authorize any site disturbance, :preparation. or construction. The ' deve.loper is required to obtain any and all. necessary -permits and clearances as set forth in any development approvals issued and currently in effect 'pertaining to this site. This includes any "type. of testing, monitoring or sampling , required as�a condition of development approval, such'as that conducted for archaeologic, ,hydrologic and geologic reporting purposes.. ' SITE DEVELOPMENT: a 8. Any pi'e-watering of areas proposed for grading shall be in accordance with recommendations of the grading contractor, based on the area soil conditions' as.described in the associated soils report(s). At a minimum, pre -watering time shall be for three days prior to any earth disturbance(s). • 9. FDCP 99 r59 indicates no excavation or fill over the site.. Any transported soils and stationary storage piles.on-site shall be -sufficiently stabilized, watered down and/or -,covered' as appropriate. -Minimum freeboard shall be as established by the Public Works Department. Any on -site borrow areas shall be routinely watered and chemically stabilized .after borrow activities to mitigate airborne dust, as appropriate pending final grade'completion. 10. Track -out and other accumulation of soil materials) onto any paved areas outside the limits of all work shall be minimized. ,Any unpaved construction exit/entry points along existing paved roads/areas shall be improved with gravel, aggregate base or similar material, for a distance of 12.0' from the pavement edge into the site to minimize track -out... Wet sweeping/flushing of, soil accumulations from all paved areas (i.e., Dune Palms Road, Miles Avenue and any paved,interrial project areas) shall be conducted daily, and kept damp during construction' hours until. so removed: Frequency of, cleaning shall be determined by theassigned field inspector as per Condition #4. 1 1 . Any unpaved construction access and travel ways to be used within the site shall be prepared for traffic prior:to commencing grading .activities and kept, watered down an.d compacted to retain moisture content during all, construction traffic/activity, including ,building construction. Track -out, shall be removed per- Condition, #10. -12. Any on -site temporary facilities (sales, construction, model complex, etc.) shall be provided, with paved, compacted or otherwise stabilized parking and access during their operation, with those improvements to be 'constructed to the applicable Public Works Department standards. 13. If approved on -site roadways are 'constructed to ultimate design prior to completionof construction activities_; then traffic and .parking shall be limited to those paved areas as feasible. No .vehicular parking or traffic of any kind is. permitted on or over any previously stabilized or other inactive soil areas., 14. All. previously disturbed areas where no further grading, trenching, construction or other land disturbance will occur for at least 30 days, shall be stabilized with an . appropriate. dust suppressant, as' defined in LQMC Chapter 6.16 and approved, by the California Water Quality 'Control Board, Region 7 and the City 'of La Quinta. The suppressant shall be 'applied no later. than four days after completion of the initial grading, and staked;' posted or otherwise restricted in order to prevent any access on or across those areas. 15. Construction activity associated with this project 'will occur during seasonal high wind activity (February through June) in the Coachella Valley. All active graded areas shall be watered daily -at appropriate intervals. A minimum of one water truck shall be stationed on-siite on weekends, and holidays. All security personnel.shall be alerted to the need for dust control and instructed to monitor disturbed areas for wind -generated dust as part of their routine duties. On -Sundays, holidays and other non -construction days, personnel shall be on -call for emergency watering in the event, of high winds_ .'"