Loading...
2925rll�_ NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class I II DATE: March 25, 1999 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Parcel Map 28935 The Estaucias (Street address or Description of Location) PURPOSE OF CONSTRUCTION Re —grade lots DESCRIPTION OF CONSTRUCTION Rouuh stradinit DIMENSION OF INSTALLATION OR REMOVAL See plans. SIZE OF EXCAVATION, IF NEEDED Import avprox. 15,000 C.V. APPROXIMATE TIME WHEN WORK WILL BEGIN April 1, 1999 APPROXIMATE TIME OF COMPLETION Mav 1. 1999 ESTIMATED CONSTRUCTION COST $ 93.380.00 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) Sketch (attach construction plans if appropriate) In consideration of the granting of this permit, the applicant hereby agrees to: SEE ATTACHED CONDITIONS. SEE APPROVED PLANS. NOTE: LOTS 3 AND 4 ARE NOT APPROVED FOR GRADING AND WILL BE BY SEPARATE PERMIT. Indemnify, Aefend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of, -this work. r Name of Applicant (please print) re of Applicant or Agent La Quinta, Business Address CA Telephone No. Nino Inaineerino 79-811 Country Club Dr." Bermuda Dunes, CA Name of Contractor and Job Foreman Business Address Telephone No. 438834 Contractor's License No. 157 City Business License No. American State Insurance 01—CE-•400185-1 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 2,801.40 Permit Fee 100.00 e�rral_ty As --built Deuosit 1.000.00 �Cas51IDepps'ii SaTret�,8oiS'd; )�r_eq_5ir E4 Plan Check Credit (750.00) TOTAL: $ 3,151.40 Receipt No Received by Date PERMIT VALIDATION ' PERMIT NO. 2925 DATE APPROVED 1/25/99 3/25/00 EXPIRATION DATE x DATE ISSUED ?�� B .. Administrative Authority Recorded by Telephone: (619) 777-7075 NOTE: With proper validation this form constitutes an ,CITY OF LA QUINTA. encroachment permit. APPLICATION FOR PERMIT � PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of .public or private curbs, driveways. pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements -in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS `0(G Subdivision Improvement Permit — Class. 1l l DATE: J ff L Inor Improvement Perm' Class IV' LOCATION.OF CONSTRUCTION v "� V\ Qr [Aa 3� (Street address or.Dewription of LomtiorlbL PURPOSE OF C RUCTION;. Sketch (attach construction plans if appropriate) ' b DESCRIP N OF CO IbCTI N v DIMENSION OF -INSTALLATION OR REMOVAL /� n IT S E OF EXCAVATION, IF NEEDED s cr APPROXIMATE IME WHEN'WORK WILL BEGIN r i r "'"' ", l- 3 a� arm APPROXIMATE.TIME OF COMPLETION ESTIMATEDCONSTRUCT.IONCOST$ �� (Including removal of all, obstruction, materials, and debris, backfilling,.com- aT�-- paction and placing permanent'resurfacing and/or replacing improvements) 4, In consideration of the granting of .this permit,.the applicant .hereby agrees to: Indemnify..detend-and save the..City, its authorized agents, officers, representatives and employees, harmless from, and against any and all penalties, liabilities or loss: resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or. oceurring.as.a proximateresultof any work undertaken under<the permit granted pursuant to this application. - .Notify the Administrative Authority„at least twenty-four (24) hours In advance of the -time when work will be started. Comply with all applicable -City Ordinances, the terms and conditions. of the permit and all applicable rules and regulations of'the -City of . 1 la .Quints and to pay for any.additional replacement necessary as the It of this work. Si at a offtplicant or Agent , scw ?"/o .- 1160 w Name of Applicant (p)ease print)Bu mess Address Tgleottrn I&l \I C_V Li- h-�i4C-:t�\Y (.V\"� 1 'yi1 l o. ,VA l �,�v� A�C'� yTt-!(ylJ C.� �tiJl ��7 1bil Name of Contractor —and -Job Forerrifin Business Address _ Telephone No. 4 tit _'4 \� Contractor's License No. r� City Business License No. r�lhn, 5 .ly��i'tYi aht V I_ L _" Applicant's Insurance Company St.,LV� �i v ��� �t�ns rc r`e� Policy. Number FEES: Subdivision Improvement Permit --Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs . Minor Improvement Permit — Class IV: See attached schedule 2774 Inspection F $ (J 1::' v PERMIT VALIDATION ' Permit.Fee { PERMIT NO. ft-ky- As ([+ 1. QQ0 J Cash.De d DATE.APPROVED if reenirtrf— I :'1 EXPIRATION DATELk TOTAL: $ DATE ISSUED - Receipt No. By Received by Date Administrative Authority Rernrdpd by __ T t ...t,......• rc+ot m_�mS r ' NVEV6 ENGINEE➢ ING ,1NC. 7"1 t COUNTRYCLUB DRM . BERMunn DUNES, cae2so+ - 61V348`+178 • fAK s,9laaFre7oa GENERAL ENGO&EMG CONTRACTOR. UCEN9E:84388'.!4 - PROPOSAL � CONTRACT f Page No-1 of 1. Ptiges .... _- .: .._.. ... .. :._-'ONE TO ...............__.�,__ .. ... , PHONE . BATE La 62uInta Orchard Partners 771-1941 5/6/98 'JOB F.0. Box.1716 Parcel -,Map #26525 La Quinta, CA 9225 --_-•_..._.. Attn: .Blake _ a hereby Wbnw oWMeatlons and 030Mtes tor: 4 r MOBILIZATION 3,540.•00 .CLEARING $ 7,300.00 ON -SITE EXCAVATION $ Ts500.00 IMPORT ..15,000 c..Y: @ $4.50/c.Y. $ 67,500.00, FINISH $ 7,540.00• i $ 93,380.00 PROPOSAL. NOTES.: 1. Bid'includes listed items only. I?.. Bid excludes: a) Engineering,. inspect4ons and .permit fees b) Soil 'testing C') Construction water costs d) Over excavation e) Structural excavation and backfill 3. Bidbased-on 'unapproved plans.:Bid.may be:revised upon receipt of approved plans and/or soils report. 4.'Bid based on one move only. Grades to be certified to one tenth of a..foot. 5. 0 ner.to, provide source, for sufficient supply of construction crater at construction site boundary. 6. On=site excavation includes benches and keys for.fill placement, but does not include any overexcavati.on.. ' e'.,paid by load count, 15 c,uble •yards per truck load. 7. 'import to.b 8. Clearing.inc'ludes removal of existing'retaining.wall on Parcel #2 and between Parcel,#2 and`#3 (approximately 400 L.F.) all others to remain in place.. r We fropnott hereby to furnish: matorist and labor-complsts in-aceordanee with above specifications, toy the sum of r dollars' ($ 1 i ' AO amledal Is gw�a e0d t0 Be 0s 8ppcdled. AO trorlt to De eamploled in a 1V**Manfdte Authorized - .. ..menu@+at:oord+tu�tontela^derdc�i�o. Arryr eaeraUo^adsvledm�trrnn atmva 7liectnee yj�atura _.._... ..__ _. r.•- - .irons Involvin® e,Va tOSt6 nitl be executed oNyy upon wriltemwders; and w.11 becane • an enar�e over and strove tiro eatemato: Ao agreomente eoNir,gent upon strikes. Moto: 7tits proposai may be wwWrawn - ikcWantsor Botays Beyond our conba. OHner to crsrty rve, tanoCo arro aBu nacess�uY p us if not accepted within Jaya. irisurence, Our vrorkere are tutly caveredpy Nforkmon a Compensation Insurance.,, � Y _ .�i64IRCt. � �g6f�i�lBEI�-'The abave•pricea, apeciiicetione snit - - �` ����. 't , <endtliena are 8at18/nttory and-are'naratsy aCCAptad: you are a2dd to S fur •�n�' . do dre vrotH aB spoclltod^t?ayment.xritl De ma as outllrted above. 141 . Signature ---»» t r The following General and Special Provisions are attached to and made a part of Permit No. 2cg2 GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit,authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting propery owners. Such authorization must tie secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal cost,as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City 'shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES:. Any drainage structure including, corrugated metal pipe,, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage_ structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainageditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be •used immediately after backfill: DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads,,it shall be. the responsibility of the permittee (contractor) to control thisi matey and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed.- A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event iris felt by the permittee that he 'must close a street for any length of time, permittee shall contact this office'to obtain the necessary permission. SPECIAL PROVISIONS . Thee following shall apply when indicated: NOTIFICATION: 'Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. _.UTILITY CLEARANCE: ' (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. UTILITY CLEARANCE: (Surface Struciures)-No work shall be done under this permit until all utilities are clear of the . proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C: paving placed on inches of class _ aggregate subbase course having an "R" value of not less than: and in conformance With City of La Quinta Road Improvement Standards and Specifications, Ordinance #461: ' /R5 PARKWAY GRADING: Area between the property line and top of the proposed, concrete curb shall be graded to a slope of (,(,// 1/4 inch to one foot (11). GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter feet) shall be removed. Curb and/or curb and gutter shall be. saw ctitprior to removal. Depressed curb, matching concrete gutter'and concrete driveway approach shall beconstructedin conformance with City of La Quinta Standard.#207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on of class - 'aggregate base. Driveway construction shall conform to attached drawing. 'R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. , 10' SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the manufacturer's specifications. COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of " `v La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quints projects. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be. replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. /14� L OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. I xcavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling blic. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavati shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction C / materi is ally on the work site. 5 RAC MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes ` \ of produ • g an adequately consolidated backfill. Any material which the City of La Quints deems unsuitable (spongy or saturate aterial) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an pro d sand or gravel. BAC L SAND: Backfill shall be approved tra sit -mix sand or equivalent and shall be'placed in lifts of not greater than 461 three fe 3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relat a compaction of 95 percent shall be attained with the structural section of the roadway. 7eppionding LACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench bg or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the bial is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting call be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Wor flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. 1S COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. Rl COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the. City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new lolation. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. Tb stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessa y to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. . � ^ " • SPECIAL CONDITIONS= -PERMIT NO. 2925 -A --- JPW Construction --- - - ` In :addition to the standard permit conditions, the following .shall` apply: " 1. : Pursuant to Section .14.16.320 of the La Quints Municipal- Code (Ordinance 10 § • 1 (part), 1982), all work shall be performed in accordance with the latest, edition of the Standard Specifications For • Public- Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. K 2. JPW Construction, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and'erosion contr a 3. Streets shall be kept clean' They shall be,completely clean_ ed'at the end of eacliworking'day and r more frequently if required: • 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 §.1,• 1982); throughout the work site, the Permitted shall comply with City regulated work hours. Operation and - , maintenance of equipment w_ ithin one_ -half mile_ of human occupancy shall be performed only during - the following time periods: .. October 1 st to April 30: Monday -Friday • 7:00 a.m. to 5:30 p.m. Saturday 8'00 a.m. to'5:00 p.m. s May 1st to September.30: ; 'Monday -Friday 6:00 a.m,to 7:00 p:m. • Saturday $:00 a.m. to 5.00T.M. i a,. r Work shall be prohibited on gal holidays and Sundays.. - r �r 5. ' . Work performed within 500 feet of a major and/or signalized intersection is restricted between the ' hours of 9 a.m. - 3 p.m. Traffic control. shall be setup after 9 a.m. and removed before 3 p.m. The „ Permitted shall contact the Riverside Country Traffic Signal Maintenanceat (909) 275- _Department 6894 if signal operation at the intersection is to be altered in any way. ' 6. , Pursuant to Section 14.16.110 of the.La Quinta-Municipal Code (Ordinance 10 § •1 (part), 1982), Permittee, shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. v. 7. 47 Pursuant to Secti6n-14`16.250 of the La Quinta,Municipal- Code, (Ordinance 10 §:1 (part), 1982), ' advance warning signs and traffic control shall be installed and maintained.in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH,Man ual). -A traffic control :plan, if required,, shall be prepared in accordance with the. WATCH Manual and submitted to the „ - City for review and approval one (1) week prior to starting any,construction..It shall -.be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No: 2925~ • f , . Page 1 of 3 SPECIAL CONDITIONS --PERMIT NO., 2925 --- JPW Construction --- 8. Pursuant to Section 14.16.290 of the La.Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall'be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical, conduits, and storm drain, facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by;the Permittee as directed by and to the satisfaction of the City Engineer.at no cost to the City of La Quinta. 1,1. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction. within street rights -of -way shall conform with Section 306-1.3. of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by the Public Works Department. 12. All excavations within City of La Quiiita right -of. --way shall be. backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by.and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open. overnight, however, Permittee may leave a length.of excavated trench, not to exceed twenty (20) feet in length, open overnight'at a point where construction will. begin .the next day, provided that this length of trench is completely covered by steel; plating. 13'. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement shall be replaced as required by the Public Works Department. a 16. Permittee shall notify the City of La.Quinta Public Works Department a minimum of 48 hours prior to commencement of any construction at (760) 777-7075. 17. Permittee shall :stabilize any soil that .was , disturbed (shoulder areas, etc.) as a result of work performed under this permit with an approved dust control treatment and provide continuous dust, control measures as indicated in the Fugitive Dust Control Plan, if applicable. Special Conditions- Permit No. 2925 Page 2 of 3 lo lo ,° *, ►.= . AMENDMENT #1. *ENCROACHMENT PERMIT #2925 This permit amendment removes the"grading restriction imposed by the original, permit . : • regarding lots 3 .and 4 due to design revisions that were'not yet complete�at the time of permit •issuance:. The revisions are -now complete and approved, for construction: -The original,fee'ca(culated�for this permit* as based on,performing all of. e work ` shown''on'the grading plan; therefore; rio;additional fee amount -is. needed for the work authorized' -by thisamendment' rg + ' ,,.n - +•�. ram, +' � re .. .. T:\PWDEPT11)evdiv\PermitAmendments\2925-1.wpd Small.Scale Construction/Demolition Projects Acres or Less), Fugitive Dust (PM10) Mitigation�Ian . , Date: '.'Jurisdiction: �� w�,i� File #: 7 t 2 S 955 v �,oc P 99 - � 0 Part 1 - Project Information Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or 'provision of inaccurate information may delay the processing of your Fugitive Dust '(PM10) Mitigation Plan - (Plan).. It is recommended that you submit your Plan concurrent with your grading or"demolition permit.application. Project proponent: Co Yl%�cv\ t�,�.�, Address: .­1 0) ` 3� ��,.� i O Day phone number: ,..- )GO _ $�i _ 3ttkEmergency phone number: -U _ 564 _ Yo( 3 Grading contractor' (Contact Person): - " Address: C'fu .r Ov�j D, v.c C of d .Day phone number: �0_34 „�`�-lc� Emergency phone number: 76o _34, _ n-)s .Construction site street address: Construction site location: (Please include an &5 x 11 location map) Construction site assessor's parcel number (Tract Parcel',(Tract). size: 4Acres or Square feet ' oa5 Anticipated date of physical project'initiation: Anticipated date of project completion: Anticipated costs for dust suppression: i ,SOC7" (Attachment B - Must also be completed and mailed to the appropriate address when construction activities have been completed) �/0 Z/.9 q 1 All projects greater than one half (1/2) acre are also subject to*SCAQMD Rules 403 and 4011. _ -RG. FG- FC Details (e a frequency of aRRlication number and bW of dust control imalementsc etc: z Please be as specific is possible) s , <Land Clearing or Earth -Moving , ---� YsJ. + a` Disturbed Surrace Aieas. - Part 3 Agreement`, }, 3. .�7..` t - I'certify that'the information, contained in this Fugitive Dust (PM10) Mitigation Plan is true , t 2 will be im lemented durin ro•ect and accurate and. that all measures specified:in Par .p during.project J v" ' ntionedproperty • construction. I authorize�theCity of . La. Quinta to'enter the abo e:me ! . ` for inspection'and/or abatement purposes, and I agree to hold .harmless the City and its representatives :from liability, for any actions . related to. this project. J also. agree -to ' ---complete the:-r-eeor-d-keeping-requirements included . herein as Attachment} Bonce the oject h been completed. i.. ` f ` igna re of.Owner or Auttiorizea , e entative.. a e I aye read`the conditions of the Fugitive Dust-(PM10)' Mitigation' Plan and the owner has i a rized t e imple entatio of all its provisions throughout project buildout. ,, t ) �9 rn ature o ram ntractor a eot thee same`as'above) ,. s t In the space provided below please list., the costs associated with implementation of all dust control,•measures. The information provided below should. include, all ,implementation costs; x (includingaabor) for dust control throughout the project. -Not all measures listed below will " applyto all projects: F a, t. ~ After project completion these records shall be transmitted to the Jurisdiction where the grading/demolition r permit : was attained' and to the 'Coachella Valley , Association of Governments, (CVAG) at: the. address provided below'..'', r . PM 10 Cost . Monitoring , ` Coachella Valley Association of Governments 73-710 Fred Waring> Drive; Suite 200 Palm Desert, CA 92260 '' CONDITIONS FOR FDCP APPLICATION 99-60: JPW CONSTRUCTION, L.L.C. PM 28935; 4.25 ACRES - ORCHARD LANE (ESTANCIAS) GENERAL: 1 . Applicant shall comply with all control measures as set forth in the approved • application for FDCP 99-60, and the following conditional measures. This dust r control plan approval shall also apply to any encroachment or haul permit(s) issued by Public Works. 2. The full amount of security for FDCP 99-60 (as determined by Public Works) shall be available for any measure(s) deemed necessary by the City to achieve adequate -dust control, whether or not such additional measures are proposed with this application. Any requests for bond amount revisions/reductions must be made in writing to the Public Works Director. The applicant shall implement all methods set forth herein for the duration of the project construction. 3. Applicant.shall_submit copies of all records related to cost accounting for the dust control measures assumed during all pre -grade activity and grading . construction upon any request for release/reduction in posted security. Said records shall be submitted within 30 days after completion of all dust control measures as outlined in and conditioned upon the plan. All such records shall accompany the completed PM10 Program Report Form, which can be obtained from :the Public Works or; Community Development Departments. Completion of all dust control measures shall be verified by the assigned field inspector. 4: Adequacy of all proposed and conditional stabilization measures shall be determined by the assigned grading inspector. The City may require remedial measures beyond those identified or conditioned upon the project, which the City deems necessary in the event such approved measures are not effective. Enforcement 'of these conditions shall be at the discretion of the assigned grading inspector, who shall monitor and field -verify that the spirit and intent of the. FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities and other aspects of this FDCP may be made by the inspector, at his/her discretion, in order to assure compliance. 5. The ; contractor/vendor responsible for provision/application of any soil stabilizing agents used to implement this plan, including -conditions, shall submit the appropriate Material Safety Data Sheet(s), along with approval from thel Water Quality Control Board, to the Public- Works Department prior to any site application. Application of stabilizing agents must be in compliance with NPDES and the State Water Quality Control Board requirements. 6. The conditions of this dust,.control plan approval are applicable to *the full range ' of construction operations associated with, the 4.25 acres within PM 28935; and shall remain, in effect for the duration of all construction undertaken as part of development approval for the subject property, and until the entire site . development has` been completed. ,Transfer. of real property or other interests. regarding this project shall not affect the validity of this plan approval. Implementation of all proposed and conditional' measures shall be carried out for'the duration of all construction + activity, as applicable: 'However,'nothing herein shall preclude any future party of interest from filing a revised FDCP with the City for any portion of the site. 7. Approval' of this dust control plan does not in 'and of itself constitute or .,Otherwise authorize any site disturbance, preparation or construction. The developer is required to obtain any and all necessary permits and clearances as set forth inany development approvals issued and currently in effect - pertaining to this site. This includes any type of testing,, monitoring or sampling required as a condition- of development approval; such as that conducted for' ' archaeologic, -hydrologic and geologic reporting purposes. SITE DEVELOPMENT: ' 8. Any pre -watering of areas proposed for- grading shall, be in accordance with recommendations of the grading contractor,_ based on the area soil conditions as described in.the associated soils report(s). At a minimum, pre -watering time " shall berfor three days prior to any earth disturbance(s). ' 9.' FDCP 99-60 .indicates no import/export • quantities. over the site. ,Any. transported soils and` stationary storage piles on -site shall be sufficiently stabilized, watered down..and/or covered as appropriate. Minimum freeboard ' shall be as established by the Public.Works 'Department., Any on -site borrow areas shall be routinely watered and chemically stabilized after, borrow activities ' to mitigate airborne,dust, as appropriate pending final grade completion. This shall apply ,to any 'off -site, borrow/spreading', areas used within the City. Any off -site areas•that are used outside City limits ;must be shown as permitted by " the appropriate agency. 10. Track -out and other "accumulation'of soil materia.l(s) onto any paved areas shall be minimized. Any unpaved construction exit/entry points along -existing paved roads/areas shall", be improved with gravel, aggregate base or similar material, for a distance of, 120' from the pavement edge into the site to minimize track - out.. Wet° sweeping/flushing of soil accumulations from all paved areas (i.e. "'internal project areas) shall be conducted daily, and kept damp during' construction hours.until so, removed. Frequency of cleaning.shall be determined by the assigned field inspector`as.per Condition #4. F ' 1 1 . Any unpaved construction access and travel ways'to be.used within the site ' shall be prepared for traffic prior. to, commencing grading activities and kept Watered 'down and - compacted • to retain. moisture content' during all ' construction -traffic/activity, including building construction. Track -out shall be removed per Condition#10. - • 1.2. Any on -site temporary facilities (sales,•construction, model complex, etc.) shall ; be -provided with paved, compacted or otherwise stabilized'parking,and access • during their, operation,-with"those improvements, to `be constructed to the- . applicable Public Works- Department standards. 13.` :Traffic and parking shall be limited to approved on -site roadways. No vehicular parking or traffic of any, kind is permitted on or over any'•previousl,y stabilized or other inactive soil areas. 14. '' All previously •disturbed areas where no further. grading, trenching, construction or other land disturbance will occur for at least 30 days, shall be stabilized with r an appropriate., dust suppressant, as defined in LQMC Chapter 6.16 and approved by the.California Water Quality Control Board, Region 7. and the City �., of La Quinta (compliance with Condition 5 shall be verified by Public Works if stabilization is,necessary): The suppressant shall be applied -no later'than four days after, completion of the,initial grading, and staked, posted or otherwise , restricted in order to prevent any access on or across those areas. All other , areas shall be watered daily as set forth in FDCP 99-60.. 15. ''Construction activity associated with this project will occur during seasonal, high° wind activity (February, through June) in the Coachella Valley. All active • - graded areas shall be watered daily at appropriate intervals. A minimum of one water ,truck shall be 'stationed` on -site on weekends and holidays. All security personnel shall be alerted to the need for dust control and .instructed to monitor disturbed areas for wind -generated dust as part, of their routine duties. On ' Sundays, holidays'and other non -construction days, personnel shall be on -call for emergency watering in the event of high winds. is • .. - 1052 CONSTRUCTION, • - 76365 HWY. 111, NO: 309, -LA QUINTA„CA .92253 _ ,, -` M= 91 U2119 • . 3 1221(t) .DATE - r 'PAY -TO THE ORDER OF-�— `O DOLLARS • .: . _'WELLS RGrO BANK _ � FARGO ... - - _ . - :.. :,,• . '�. __ NP F_OR w_ .i. u'00 L05 2 10L LLI0.9044 II - • - J �1 , RECEIPT. City of La Quinta, 78-495 Calle Tampico, P. O. Box 1504, La Quinta CA 92253 DA 34438 RECEIVED FROM—) ADDRESS _ • / DO RS $ � ��•y CJ� FOR ACCOUNT HOW PAID. AMT.OF CASH ACCOUNT AMT. PAID ICHECK BALANCEMONEY BY DUE ORDER 13 a f ..