Loading...
2927kr validation constitutes an CITY OF LA QUINTA ment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: march 30, 1999 Subdivision Improvement Permit — Class I I I Minor Improvement Permit Class IV .LOCATION OF CONSTRUCTION 10.12 acres on Miles Ave. APN No. 604-072-005 Tract 25691 - Wil.dflouer (Street address or Description of Location) PURPOSE OF CONSTRUCTION Stockvile dirt Mass Gradins DESCRIPTION OF CONSTRUCTION Stockaile dirt Mass Gradina DIMENSION OF INSTALLATION OR REMOVAL 50,000 cu. wda. SIZE OF EXCAVATION, IF NEEDED 50.000 Cu.yds. APPROXIMATE TIME WHEN WORK WILL BEGIN 3/30/99 APPROXIMATE TIME OF COMPLETION 6/1.5/99 ESTIMATED CONSTRUCTION COST $ 40:000. (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) Sketch (attach construction plans if appropriate) In consideration of the granting of this permit, the applicant hereby agrees to: SEE ATTACHED CONDITIONS. FLANS ATTACHED. Indemnify, • defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result ofAthis work. ►8-120 Calle Estado Name of Applicant (please print) of Applicant or b04 La Quinta; CA ss Address 760) 771--5571 Telephone No. World Develoondat 78-120 Calla Estado, 1104 La Quinta, CA, (760) 771-5571 Name of Contractor and Job Foreman Business Address • Telephone No. 743867 Contractor's License No. 03252 City Business License No. UPW T"aii,-p"eo cor d eep 2340002 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3%of.estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ X=. 2070 Permit Fee 100. Penalty PLamheck Credit (750) Cash Deposit -Surety Bond if required TOTAL Receipt No. Received by _. Recorded by _ $ 192M 1,420 Date 27 PERMIT VALIDATION PERMIT NO. 9977 DATE APPROVED 3/20/94 EXPIRATION DATE 12/30/99 DATE ISSUED By ` Administrative Authority Telephone: (619) 777-7075 SPECIAL CONDITIONS --PERMIT NO.2927 --- WORLD DEVELOPMENT --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quints Municipal Code (Ordinance 10 § l (part), 1982),. all . work shall be performed in accordance with the latest edition bf the Standard Specifications For Public Works Construction (SSPWC) and as directed. by -and to the satisfaction of the City Engineer. 2. World Development, hereinafter referred to as,"Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down.daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and. more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee - shall comply with City regulated work hours:. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: , ' Monday -Friday 7:00 a.m.. -to .5:30 p.m. Saturday 8:00 a.m.' to ,5 :00 p.m. May 1st to September 30: Monday -Friday 6:0.0 a.m to-7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be,prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a signalized intersection is, restricted between the hours of 9 a.m. 3 p.m. Traffic control shall be set up'after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside. Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way: 6. Pursuant to Section 14.16.110 of the La Quints Municipal Code .(Ordinance 10 § 1 -(part), 1982), - Permittee shall assume responsibility for repair of any pavement damage to any publicior private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14:16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance. warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control . plan, if required, shall be prepared in accordance with :the WATCH Manual and submitted .to the City for review and approval one (1) week ' prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 2927 Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO.2927 ---WORLD DEVELOPMENT --- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 §-1° (part),,1982y, Street closures shall not be permitted. A minimum of one -travel lane of paved surface shall be maintained with flagmen• at all times. 9. Prior. to excavating, if required, the Permittee shall, contact Underground Service, Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works -Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation' lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, •signage requirements; or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. .11. Pursuant to Section 14.16.370 of the La Quinta Municipal _Code .(Ordinance 10 § I (part), 1982); backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC); except as otherwise specified herein. Native material -may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by'mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be, the . Permittee's responsibility to provide appropriate geotechnical supervision, testing; and inspection, onsite, at all, times during backfill operations.. , Backfill compaction shall be achieved'by the following conditions: A. When a firm foundation is not encountered due to, soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector, and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture'content range shall, be established at the onset of the - project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be.backfilled in the presence of the City Inspector. Compaction shall be tested at random -depths at approximate three-foot vertical intervals.as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be - compacted.-D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken. within the lifts to ensure that the full depth of the, lift is compacted. Upon satisfactory completion of this portion of, trench, the .City Inspector. shall establish• the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No: 2927 . Page 2 of 4 SPECIAL CONDITIONS --PERMIT N.O.2927 --- WORLD DEVELOPMENT --- F. In subsequent, lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The deptk of the, randomly selected compactiori tests shall also be randomly selected except that where multiple tests are required in a'given length of trench, the tests shall be no closer than three feet (vertically) from each `other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths' of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. . I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the. City Inspector: 12. All excavations within City of La_Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way,,at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths -of open trench shall not greatly exceed that which can not be backfilled in the same ,day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at' a point where construction will begin'the next day, provided that this length of trench is completely covered by steel plating. 13. - All landscaping, irrigation,' decorative rock, decorative concrete, lighting, etc., shall be.replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent, pavement replacement shall_ be completed no later than I.seven (7) days after the completion of the, work. Permanent pavement replacement shall conform, to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges. shall be straight and clean. B. Permanent pavement, replacement structural section, within all trenches, shall be l" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted.to 05% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with,the City prior to installation. a SPECIAL CONDITIONS--PERMIT'NO.2927 --- WORLD DEVELOPMENT --- C.. Permanent pavement replacement shall be installed using, a City approved 3/4" inax medium asphaltconcrete as the base course lift and a City approved''/2" max medium finish course lift for capping: Asphalt concrete mix design/"shall be approved by the City, prior to its placement., t D. For transverse trenches across improved'streets, the existing pavement surface, three (3) feet on either side of the excavated trench, shall be cold -milled to a.depth of 0:10', with a "butt". joint created along each *edge of the cold -milled area, and anew 0.10' lift of/2" max medium asphalt concrete pavement overlay applied throughout the cold -milled area. - E. For longitudinal trenches within improved streets, the existing pavement` surface, through the ,lane width (within lane line striping), shall be cold -milled to a depth of 0.10; with a "butt" joint created along each edge of the cold; -milled area, and'a new 0.10' lift of/2" max mediumfi asphalt concrete pavement overlay applied throughout the cold -milled area.' F. If grinding and capping operations are not performed in the same day as base pavingV operations, the base,course lift of 3/4" max medium asphalt concrete shall be installed from " saw -cut edge to saw -cut edge flush with the existing street surface. Tlie base course lift of paving shall not be left 0.10' low in anticipation,of grinding and capping. F. Any existing lane striping affected by 'this resurfacing, shall be replaced in kind by the, Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall notify the City of La Quinta Public Works Department`a minimum.of 48 hours prior . to commencement of any construction at (760) 777-7075. 17. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 18. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit.for restricted streets (i.e., streets not -part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making -a delivery 'or'pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction -materials and/or equipment. 19. Operation shall be performed per the approved stockpile plan. - 20. Although the permit fee has been paid for the grading operation, only the stockpiling operation shall begin at this time. A permit addendum shall be a issued when the Mass Grading plan is approved to. allow the Mass Grading to take place. , 21. The City of La Quinta'reserves the.right to revoke, suspend or void this permitat any time. Special Conditions - Permit No. 2927 Page 4'of 4 0:3/12/1999 09:49 760-3415999 WARNER ENGINEERING PAGE 03 NMedivan-Lame Scale Construction/Demolition Projects Fugitive DusAt4{PMJO) Mitigation Plan ' Date: jurisdiction: Project File #: 7�2 2SG91 w— fart 1 . ect Ynformatio�l F� 99 - C-7 Please provide t/te information below as completely as possible even if it has already'been provided on other forms related to this project. Failure to provide complete information or pr;ovuion o inaccurate information may delay the progressing of your -Fugitive Dust. (PAID) Mitt'g�tionlan (Plan): !t is recommended that you submit your Plan concurrent with your gra 'drug or demolition permit application Project proponents TIM DAn! D L L C Address: 7 8- l Zo CAU FSTA4v */d'Y' ZA QVywrA Day phone nuntbers.,760 771- 5571 Emergency phone number: Tao 77/ -557 Grading contractor (Contact Person): Jim 3A1GtLEA18E126E R Address: .SAME AS AE3ovE Day phone number:.,7co/77/ -557/ Emergency phone number: 76o/77/-SS7/ Construction site street iddress: M / L ES gv6-. - LA 04 i,v i A Construction site location: �-��- MAP include an 85 x II location map) Construction site assessor's parcel, number (Tract #):ODS- Parcel (Tract) size: - %O. /Z Acres or Square feet Anticipated date orphysicalyroject initiation: 3_. zo -.99 Anticipated date of protect complexion: Anticipated costs for dust suppression: Soo , ov (Attachment B. - Must also bexoinpleted mcai a to the approp�nate address when construction activities have been complet d) j2�Gf i -CD D "' 1 All pro'ects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 4.L .. • 0�/12/1999 09:49' 750-3415993 WARNER ENGINEERING PAGE 04 . •• r K ' , .. _ ' f, � to ' ' - ; r ` �an�ft�uir►�trWgrmistlon, fAc age,16blelardB�: w ; Project Areas Saea-gs "Total Disturbed Surface Area; Cart:' : o FD1D: imports -�Oc t� / -- , Eapostr hwDC�; i Phase I Grading (Acreage): , From:. ®-99' ' 'To: 3 Z Phose,ll Gcading(Acreage): Fronts L. ' To:. Phase III Grading(Acreage): Front:. To:. Phase IV Grading(Acieage)s - ' From: T®: (Attach additional Information if necessary) ' a Part a Fueeteve Dust Centrol�ions ` a� From the inventory of fugitive dust control measures provided in Attachment A; please Indicate which measures are to be implemented during: the .project by placing rise corresponding letter.. beneath the fallowing sources. In addition, please indicate at which phase the measure will be implemented, .eir/ser at liou ould only indicate measures h Gradin; (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects shin the Rough, Grading (1?0) column. After indicating wl at measures are to be., implemented, _complete the . "17etailr" section by _ r describing how and when the measures are to be implemented 'Source .'�+ o e ien rdust 1 J� alit -v � rtw pt�au Fu ae��ji�ih9C) '. _ �.3 .— WA77Ft=ING, .?7euGtc. fWrL� ;Se-ItSED AS+MEGrSS1s2� -rD �r 03/12/1999 09:49 760-3415999 WARNER ENGINEERING PAGE, 06, I cert4 that ,the information contained in this Fu 'tive Dust (PM18) Mitigation Plan is true and accurate and that all measures -specified -in Part 2 will be implemented during project construction. I authorize the City of LO . Qu i nta to enter the above mentioned property for inspection and/orrabatement purposes, annd I agree to hold harmless the City andIts representatives from' liability for any actions related to this project• I also agree to complete the record -keeping, requirements included herein. as Attachment. B;, once the project has been completed. kloRc.A AEv6LoPMENT, tpIc,.� r 6),kA EV, a TIM DAN.'D, LLG ` 3-►5 -99 Signature o er or ut ornze epresentative ; ate Yhave `read the conditions of the FXis ive Dust (PMIO) MMitigation Plan and the owner has authorized the implementation of provisionsahroughout project buildout. ignature a ra mg ontrac or or u onze epresentah e . a e (lf not the same as at ,. 0�/12/1999 09:49. 760-3415999 WARNER ENGINEERING PAGE 07 - • ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES w .• .. 77te left column contains the sources of fugitive dust which areanPeruied lor emission control . under the C' 's dust control ordinance. 77ee two right columns contarn an inventory and • ` description o7-reasonabty available `fugitive dust contra! measures- for each o�� the sorences. Please use this information as a guide when preparing a Fugitive Dust (PM10) Miti9cation'Plan. (Source No) Reasonably Available, , (^_antral pcasaties c2mments , Land (A) Watering o Applicalibn of water by means of truck. hoses and/ Clearina/ . or sprinklers prior to any land elearinj or earth, ` , movement will Increase the moisture contenfthereby FArth- increasing stability of material moving o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin , crust which stabilizes the disturbed surface areas provided that it is not. disturbed • o Security fencing can be used to prevent unwanted future ` F disturbances of sites where a surface crust has been created ' (B) Chemical stabilization ;, o Only effective in -areas which are not subject"to daily disturbances o Vendors can supply information on product' application and requlied concentration's F (C) wind fencing o Three to five foot barriers adjacent to roadways or urban areas w can be effective in reducing the amount of wind blown material leaving, a site L o Should be used in conjunction with other measures (D) Cover haul vehicles o' entire surface area,should be covered once vehicle is hill (E) Wheel washtrs o Should be placed where vehicles exit unpaved areas onto paved agrees o System can be adjusted to spray entire "vehicle; including stored bulk material in haul vehicles° Unpaved (F) Paving o Requires street Sweeping cleaning if subject to material Roads' accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or that;( used for hoavy.equipment " (8) Watering . 4 o in sufficient quantities to keep surface moist o Required application [requency will vary according to soil type, weather conditions, and vehicular use " 03/12/1399 09:49 750-3415999. iWAR ER ENGINEERING PAGE 09 a (Sour+ce Aso) Rnsbeably A•�able Cnritrol Nlam= (Z) Unpaved. t (1) Reduce speed limits J o 15 mile per hour matdmu.R► Roads (J) Reduce vehicle trips,, o,Acceas restriction of redirecting traffic to paved roads in order to .(Coavd) -reduce vehicle trips by a minimum of 60 percent. Storage (1) Wind sheltering o "Choices include silos -or enclosures Enclosure* should consist of three sided barriers equal to lieightRof =Hba o material with no more than 5o"percent "porosity - Q Wet suppression '. o Application, methods include: spray bars, hoses and water trucks . - o Frequency of application *ill vary on site specific conditions Best for use on storage piles subject to infrequent disturbances,. - (M) Chemical suppression , o (1) Altering loadin%loadout - o Confine loadin/loadout procedures to leeward (downwind) aide procedures.' of the material o Most effective when used in conjunction with wind sheltering L (0) Coverings o Tarps, plastic, or other material can be used`as tomporary. " Y coverings o When used, these should be anchored to prevent wind from ' removing coverings Paved (p) Wheel washers_ c Should be placed where vehicles exit unpaved area onto paved Road Thole out areas f o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles ` ,.. h,'• (Q) Sweep/clean ioadways o Either sweepini or ;water flushing may be used ` (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full _ Disturbed (S) Chem_ ical stabilization, . o Vendors can supply information oa methods for application and Areas/ required concentrations' lnaeuve .. CORStMedoA Sites ' (T) Watering o Would require frequent applications unless a crust. • . can be developed overthe site (U) Wind fencing " o Three to'ftve foot barriers adjacent to roadways or urban areas . can be effective'iii reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (Vj Vegetation o Establish as quickly as possible when'active operations have establishment - ceased o Use of drought tolerant, native vegetation is encouraged - . i 03/12/1999 09:49 700-3415999' WARNER ENGINEERING PAGE 09 ATTACHMENT E - COST INFORMAIION Medium -Large Scalia Construction /Demolition Projects r' (Greater than 5 Acres)� Fugitive Dust (PM10) Mitigation Plan Date: 3 - t s -99 - Jurisdictlon: _ _ Project File: Project proponent: -S i M DAn1 ' D LLC, l Address: -7% 1 z•, C4LE Est -A of Oq LAC , N Day phone number-.1 -1' i.-SS-1 t Emergency phone numbee: In the space provided below please list else costs associated with implementation of all dust control measures. Tire lnjormation provided below should include all 'implenientation costs (including labor) for dust control throughout the project, Mt all measures slated -below will appty to all projects. Wateringi WAT>-Z 77euck 450n . o0 Chemical stabilization: Goo• o� Wind reacting: ' Covering haul vehicles: a, Wheel washers: Street sweepings,a Paving ' s Wind sheltering: t rings:tation reestablishment: ' After project completion t iese records 'shall be ' transmuted to t :e uy w re thegrading/demolition ermit was attained and to the Coachella Valley Association of Governments (CVAG) at the address provided below. PM10 Cost Monitoring Coachella Valley Association of Governments r 73-710 Fred Waring -Drive, Suite 200 Palm Desert, CA 92260 1 All pro'ects greater than one half (1/2) acre are also subject to SCAQMD Mules 403 and 3.1. • CONDITIONS FOR FDCP APPLICATION 99-63: JIM DAN D, L.L.C./WORLD DEVELOPMENT) TT 25691; ± 5 ACRES (PHASE 1 ONLY) GENERAL: - 1. Applicant shall comply with all control measures -as set forth in the approved application•for FDCP 99-63, and the following conditional measures. This dust, control plan approval shall also ,apply to any encroachment or haul. permits) issued by Public Works. ' 2. The full amount of security for,FDCP 99-63 la's determined. by Public Works) shall be available for any measure(s), deemed 'necessary by'the City to achieve adequate dust control, whether'or not such additional measures. are proposed with this application: Any requests for bond amount revisions/reductions must be made in .writing to the Public Works Director. The applicant shall implement all methods set forth herein for the duration of the project. construction. . 3. Applicant shall submit copies of all records related to cost accounting.for the dust control measures assumed during all, pre -grade activity 'and grading construction upon any request for release/reduction in posted security. Said records shall be submitted within 30 days after completion of all dust control measures as outlined in and conditioned upon the plan.,. All such records shall accompany the completed PM 10 Program Report Form; which can be obtained from the Public Works or Community Development Completion. ompletion. of all dust control measures shall be verified by.the assigned field inspector. 4: Adequacyof all proposed and conditional stabilization measures shall be determined by the assigned .grading inspector. The City .may require remedial measures beyond those identified or conditioned upon the project, which the City deems necessary in the event such approved measures are :not effective. Enforcement of these 'conditions shall be at the discretion of the assigned grading inspector, who shall monitor and field verify that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application, frequencies, quantities and other aspects of this FDCP may be made by the inspector, at his/her discretion, in order to. assure compliance.. 5. The contractor/vendor responsible for provision/application• of all soil stabilizing agents used to implement this ' plan and it's conditions shall submit. the appropriate Material Safety Data Sheet(s),^along with approval from the Water - Quality Control .Board, to the Public Works Department prior to any site application. Application of stabilizing agents must be in compliance with NPDES and the State Water Quality Control Board requirements. r. 6. The .conditions of ,this dust control plan approval are applicable to ,the full range of construction operations associated with the ±'5 acres within TR 25691, and shall remain in effect fo'r the duration of all construction undertaken as part of development approval for the subject property. This approval is applicable for Phase 1 area grading only; subsequent FDCP approvals will be required: Transfer.of real property or other interests regarding this project shall *not affect the validity of this- :plan approval. Implementation of all, proposed and conditional measures shall be carried out for, the duration of 'all construction activity, as applicable. However, nothing herein shall preclude any future party of interest from filing a revised -FDCP with the City for. any portion of the site. 7. Ap-proval of this dust control plan -does 'not in and of itself constitute or otherwise authorize any site disturbance, preparation or construction. The developer is required to obtain any and. all necessary permits and clearances as set forth in any development approvals issued and currently in effect - pertaining to this site. This includes any type of testing, monitoring or sampling required as' a condition ,of development approval, such as that conducted for archaeologic, hydrologic and geologic reporting purposes. SITE DEVELOPMENT: _ 8. Any pre -watering. of areas proposed for grading shall be in accordance with recommendations of the grading contractor, based on'the area soil conditions as described in the associated soils report(s). At a minimum, pre -watering time shall be for three days prior to any earth disturbance(s): rg. FDCP 99-63 indicates 50K CY of fill will be imported. to the site. All transported, s soils and stationary storage piles on -site shall be sufficiently stabilized, watered down_ and/or covered as appropriate. 'Minimum freeboard shall be as. established by the Public Works Department. Any borrow areas shall be . routinely watered and chemically stabilized after borrow activities to mitigate airborne dust; as appropriate pending final -grade completion. This shall apply to any off, site borrow areas used within the City; any off -site areas outside City, limits must be authorized by the appropriate agency. 10.., Track -out and -,other, accumulation of, soil material(s). onto any paved areas outside the limits of all work shall be minimized. Any unpaved construction exit/entry points along existing paved roads/areas shall be improved with gravel, aggregate base• or similar material, for a distance -of 120' from the pavement edge into the site to minimize track -out. Wet sweeping/flushing of soil accumulations from all paved areas (i.e. Miles Avenue), shall• be conducted daily, and kept damp during construction hours -until so removed. Cleaning 'frequency shall be determined by the assigned field inspector per Condition #4. x. -1 1 . Any unpaved construction access and travel ways to be used -within the, site „ shall 'be prepared for traffic prior to commencing grading activities, and• kept watered down and - compacted to retain moisture content- during ` alk construction traffic/activity, including building construction. Track -out shall be,, removed per Condition #10. 12 Any on -site temporary facilities (sales, construction, model complex; etc.) shall be provided with paved, compacted or otherwise_ stabilized parking and access ' during their operation, with those improvements '.to be' -constructed to the applicable Public Works Department standards.. , 1.3. If approved on -site ,roadways are' constructed to 'ultimate design, prior to. ' completion of. construction activities, then traffic and parking shall be limited - to those paved areas. as feasible. No vehicular parking or traffic of. any kind is ' permitted on or over any previously stabilized or. other inactive soil areas. 14. - All previously disturbed areas where no. further grading, trenching, construction r or other .land disturbance will occur for at least 30 days, shall^be stabilized with an -appropriate dust 'suppressant, as defined ' in LQMC Chapter 6.16 and = approved by the California Water Quality' Control Board, Region 7 and the City of La Quinta. The suppressant shall be applied no later than four days after completion of the initial grading, and staked, posted or. otherwise `restricted in order. to prevent any access on or across those' areas:' 15. Construction activity associated with. this project will occur during seasonal- . high wind activity (February, through June) in the Coachella. VaIley. All active graded areas shall. be.watered�daily ,at appropriate intervals. -A minimum ofone water truck shall be stationed on -site on weekends'and holidays.,Any�security personnel shall .be alerted to the need for dust`control-and instructed to monitor, disturbed areas for wind, generated 'dust as part of, .their routine duties.. On Sundays, holidays and other non -construction days' personnel shall be on -call for emergency watering in the event of high winds. 0 NOTE: With proper validation dt this form constitutes an. CITY OF LA QUINTA encroachment permit " S APPLICATION FOR ,PERMIT ' PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the .construction` of public or private curbs,' driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works, improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit -Class I II DATE: '3 - - 99 / Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION /o. /Z Acre r onr /NrL 6S AvE /a. La 44i./T,4. . APA/: 6o y - o7Z (Street address or Description of Location) PURPQSE &ONSTRUIS 10 �'�� Sketch (attach construction plans if appropriate) �� + + DESC�IPTION OF CONSTRUCTION 572GK ?/G E / 5 R- , A-rm, Hi -n lott DIMENSION OF INSTALLATION OR REMOVAL _. tr�� Lu VdS SIZE OF EXCAVATION, IF NEEDED -!%ChDQ. Ctt ttal-S ; APPROXIMATE TIME WHEN WORK WILL BEGIN - - APPROXIMATE TIME OF COMPLETION -� _ ESTIMATED CONSTRUCTION COST $� oct­> • 0cp (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration.of.the granting of this permit, the applicant hereby agrees to lddemnify,.defend-and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring asa proximate result of any work undertaken under'the permit granted pursuant to this application. ' .Notify the Administrative Authority at least twenty-four.(24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of ' La Quinti and to pay for any additional replacement necessary as the result of this work. ' LOCALL,D A1/ELoftM EWT I Itx .l. PIPE ft mm- Signature of A li `ant or Agent SINt D4ta l-L C_ " '79 IZo CALLS' ESTitDo t`lo� - LA C?.IkLj:A "16e1'1-il.-rail Name of Applicant (please print) Business Address Telephone No. Wot`L-Lb 1> Vn4PMtNTFIN(r'781Z,o C41LILE C �tDo"Ifaq-CA QLAINM' "lbof-1-1.1-SS�I " Name of Contractor and Job Foreman Business Address Telephone No. 03zSv Contractor's License No. City Business License No. 111 S14MA;QCF SE-A.V/e_ S 2 3L+ 000Z Applicant's Insurance Company - Policy Number FEES: Subdivision Improvement Permit - Class 1I I Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit - Class IV: See attached schedule 2774 Inspection Fee (Z 0, PERMIT VALIDATION Permit Fee too PERMIT NO, 6707 J� Penalty �Cash Deposit -Surety Bond �,( 4% � , DATE APPROVED r7 9 if required ea EXPIRATION DATE `­ r TOTAL: $ DATE ISSUED Receipt No. By Received by Date Administrative ,Authority Recorded by Telephone: (619) 777-7075 I SUBCONTRACTOR AGREEMENT 1 I999 between Cooley 'Cons ruction, Inc., License .This agreement entered into. April , Y No.348038, hereinafter. called "Subcontractor" and World Development, Inc., hereinafter called "Contractor" for the explicit purpose of the development of thirty-eight (38) single family homes located at: 10 Acres at Miles Avenue/Verbenia in La Quinta (Wildflower), in La Quinta, Comity of Riverside,, California, hereinafter called "Project",. 1. DESCRIPTION OF WORK:. Subcontractor shall furnish all labor and materials: to complete: Import and Grading of Dirt. (See:Attached Proposal) 2 PAYMENT:,. Contractor agrees to pay subcontractor for the above -work in installments as set out in Schedule "A" attached hereto. 3. PROJECT APPLICABILITY:Subcontractor agrees that any money paid to persons performing services, labor or providing materials (hereinafter called "Work"),shall be. solely for this Project and no other, and that the releases described -in Paragraph 4 shall state-that;such work was solely for the Project described herein. 4. RELEASES: Contractor is not required to make any payment to Subcontractor unless . Subcontractor shall previously have provided releases in : a form satisfactory to Contractor executed by all persons who might have a mechanics lien, stop notice orlabor and material: bond rights against the Project and arising out of work performed under the Subcontract Agreement. 5. LABOR AND MATERIALS: Subcontractor shall promptly pay ,all charges for labor and materials used on Work,covered by this Subcontract Agreement. If Contractor pays for any labor or materials ordered by Subcontractor on the Project, the amount paid shall be deducted from any amounts due Subcontractor, • provided, however that if Subcontractor has been ,paid in full, Subcontractor shall reimburse Contractor for such labor and materials. All applicable, taxes, permits, or fees of any kind whatsoever shall be included and become part of this contract. 6. PLANS, SPECIFICATIONS AND, SUBCONTRACT: The plans, specifications, and this Subcontract Agreement are intended to supplement each other, In the event of conflict betwecu . the plans, specifications and the. provisions of the Subcontract. Agreement; the specifications shall control the plans, and provisions of the Subcontract Agreement shall control both. Subcontractor. ' acknowledges he has examined all plans and,specifications on the date hereof 7. EXTRA WORK: The Subcontract price set forth in Schedule A attached hereto is deemed to be full compensation for all work and materials furnished by Subcontractor whether specifically called for, or not, in the contract, plans or specifications, and no additional compensation shall be, paid to Subcontractor unless a written extra work order is signed by. Contractor in advance, stating that the work is extra and designating the amount to be paid -for this extra work. - f Initals: t < i 8. ALTERNATIVES: Subcontractor shall not deviate from ti►e requirements of the plans and specifications as to materials and equipment to be furnished or the method of performing the work unless prior written approval has been obtained from Contractor. Subcontractor warrants that any alternate equipment, material, or method proposed by Subcontractor will achieve all performance standards established by the contract documents. 9. DL'S'1'ItUC'1'ION OP 1'ItEMISES: If die project is destroyed by fire or other catastrophe, Subcontractor will be paid for all work performed up to that time, and both parties will be relieved of any further obligation under this Subcontract. In the event of partial destruction, Contractor may elect to continue this agreement and pay for restoration as "extra work" as defined under Paragraph 7. 10. Subcontractor agrees to indemnify and hold Contractor hannhess from any damages or loss caused by any delay by Subcontractor in the prosecution of his work. Subcontractor will prosecute the work diligently to completion pursuant to the progress schedule for work in the Project, receipt is hereby acknowledged. Subcontractor will be excused for any delay only as provided for in the General Conditions for the specifications. 11. WORKMANSHIP: All work shall be done in good, workmanlike and substantial manner. Subcontractor hereby warrants that all workmanship shall affect or exceed the standard practice of the trade. A one year warranty, on faulty workmm►ship, is included from tlncidate of filial building inspection on said structure. Manufacturers' warranty on components automatically transfer to Contractor. 12.; If subcontractor should become bankrupt, make an assignment for.the benefit of creditors, or if receiver is appointed, lire obligations of all parties under the Subcontract shall thereupon terminate. Contractor shall then be entitled to replace subcontractor and shall then have a claim against the bankrupt estate to lire extent of losses suffered by this occurrence. There shall be no further payments to Subcontractor for work performed up to that time or yet to be performed until Contractor's losses (if any) have been established. 13. NOTICES: Any notices required or permitted under this subcontract shall be served by telegram or certified or registered mail at the addresses contained in this subcontract Agreement, but addresses may be changed by written notice by either party as needed. 14. UNION BENEFITS: Subcontractor will hold Contractor harmless from claims, demands and liability for union welfare, pensions; vacations, apprenticeships, owner -operator health and welfare, and related payment obligations connected with the Project, whether or not well founded, when such claims arise from employment by Subcontractor or his Subcontractors. If Sub contractor or his subcontractors are listed by the administrative office of the appropriate health and welfare, pension, vacation or apprenticeship fund as being delinquent in payment, Contractor is entitled to assume that the listing is' correct and that Subcontractor has therefore breached this Subcontract. In that event, Contractor may exercise the rights set forth in Paragraphs 19 and 21. Contractor may pay any announts•which contractor believes due to such fund and subcontractor shall reimburse Contractor said such funds. All tine provisions of this Paragraph shall apply to subcontractor or his subcontractors performing work under any change of name, association or joint venture (including" any person who may have been a principal financially associated with Subcontractor or his subcontractors) who are delinquent in fringe benefit payment to the named funds. 15. INSURANCE: Subcontractor agrees to maintain in full force and effect' a Workman Compensation insurance policy and Comprehensive Liability insurance policy in an amount not less than $1,000,000.00 per occurrence. Subcontractor shall furnish certificate of insurance with a ten (10) day cancellation clause, naming Contractor as ADDITIONAL INSURED prior to the commencement of any work. Failure of Contractor to demand delivery of certificate hereunder shall not relieve Subcontractor,of any obligation under this paragraph. 16. LICENSES: Subcontractor and his subcontractors shall be duly license by the Contractor's State License Board and subunit a copy of said license to Contractor. Subcontractor and his subcontractors shall also bold a current local city business license and shall submit a copy of said license to Contractor. 17. SUBCONTRACTING BY SUBCONTRACTOR: Subcontractor agrees that he will not subcontract any of the work herein defiined or assign this Subcontract'Agreement or lire rights to payments thereunder wiU►out the prior written approval of Contractor. Contractor shall have the right to assign this subcontract agreement without prior consent of the Subcontractor. 18. PROGRESS OF WORK: Upon acceptance of this Subcontract Agreement, Subcontractor agrees to comnnence work upon two (2) calendar days notice by Contractor and to continue diligently until completion. 19. SUBCONTRACTORS DEFAULT: Should Subcontractor commit any of the following acts or fail to observe or perform any of tine terms•and conditions of this Subcontract Agreement, Contractor may at its option provide such labor mid materials as may be lern►inate necessary to complete the work and deduct the cost thereof from any money due or to become due to Subcontractor, or may the services of Subcontractor, take possession of the work premise mid any or all'• materials, tools and appliances for which Subcontractor has been paid or which are located at the job site, and complete tine work by whatever method Contractor may deem expedient, including but not limited to, relating the job to another Subcontractor. a. Failure to promptly pay worknnen or materialmen for labor performed and/or materials furnished for the project. b. Disregarding any law or ordinance relating to the work c. Failure to remove any employee not acceptable to Contractor. d. Uecumliig dellutpteut un cuull ibutiuua ut payoleutn ol'mltltl0yco 6161i1 (Iultlp tin 1wootllliN an uullhied In Pnt al;lolih 14. c. failure to supply suflicicut skilled worknnen or proper materials to perfomt subcontract work. C Failure to timely perform work, continuously remain on the job as required hereunder in good workmanlike manner alter Contract .n' Initals. has given Subcontractor twenty-four (24) hours written notice to do so. g. Failure to continuously provide adequate insurance and workman's compensation as provided in Paragraph 15. . h. Failure to maintain State and local licenses_as provided for in Paragraph 16. h► the event Contractor exercises its rights as described above, Contractor shall be,liabhe for all losses and damages sustained by Contractor as a result of Subcontractor's default 20. TERMINATION: Termination of the services of Subcontractor and any rights herein shall be effective on lho date of the written notice of ternunation as mailed to address of Subcontractor. 21. PAYMENTS WITHHELD: Contractor may withhold any payment due Subcontractor, without'paying interest thereon until the following events of default are corrected: a. Defective work and/or materials b. Lien claims or stop notice claims that are file) or presented to Contractor. c. Failure of Subcontractor to properly pay persons supplying labor, materials or equipment. d. Subcontractor causes damage to other work on the Project. e. Failure of Subcontractor to pay any taxes, insurance premiums, bonds or employee union benefits (if applicable). 22. If either party hereto becomes involved in arbitrntion or litigation arising out of this contract or the performance of it,.lhe court or tribunal in such arbitration of litigation may award reasonable costs and expenses of such arbitration and litigation, including expert witness fees and attorney's fees, to tine successful party. 23. INDEMNITY: Subcontractor hereby agrees to indemnify mid hold Contractor and the property of tine Project free and hannless from any and all claims, losses,' damages, injuries of any person or persons, or from the damage or destruction or defective construction of any property or properties caused by or connected with the performance of the work by Subcontractor, his agents, employees and subcontracts. 24. RELIANCE OF PROPOSAL: Until a copy of this Subcontract Agreement, signed by Contractor, is delivered to Subcontractor, it only constitutes a proposal'by Subcontractor to perform the work. Tile proposal; shall be irrevocable until ten (10) business days after ti►e date of said proposal; thereafter, the proposal may be withdrawn by written notice to the Contractor. 25. GENERAL CONDITIONS: The General Conditions referred to in the attached Exhibit are incorporated herein by reference as if set forth in full and Subcontractor has received a copy thereof. In lie event of any conflict or inconsistency between the General Conditions and the terms herein, Ole latter shall control. 26.' ESSENCE OF TIME: The parties agree that time is of the essence of this agreement. 27. CLEANUP: Subcontractor is iesponsible for his own clean up, to include but not limited to,floors scraped and cleaned where applicable, all excess materials and debris picked up and all material containers are to be removed fron jobsite. 28. PENALTY: Subcontractor may be penalized $100 per day for each Jay he and/or his crews delay progress of the Project. 11' subcontractor suffers delays created by the Contractor, Owner , Or Governmental agencies, subcontractors time shall be extended an amount equal to the delay. 29. ENTIRE AGREEMENT: Tlnis Subcontract Agreement constitutes the sole and only agreement of tine parties hereto relating to the said work on said Project and correctly sets forth the rights, duties and obligations of each to the other. Any prior agreements, promises, negotiations, or representations not expressly set forth in this Subcontract Agreement are of no force and effect: ACCEPTED: Cooley Construction, Inc. License # 3.48038 l Date! By World Development, Inc. By:_ Jim S License #743867 G Date: Initals: I. SCHEDULE "At' Cooley Construction, Inc. will funush all labor, materials, and equipment necessary for the Import and Grading,of Dirt: (See Attached Proposal) Traffic Control and Temp Asphalt 10 acres $4,650.00 Clear Site & Pre -Water 10 acres $2,200.00 Site Cut/Fill 2,613.0 cu. yds $7,900.00 hnport from Borrow Area 50,000 cu yds $45,000.00. Rough Grade Site +/-15' 410,500 sf $9.250.00 Total Proposed Price $69,000.00 If more than 50,000 cu yds of dirt is imported, the price shall be increased by $0.90 per cu yd. If less than 50,000 cu yds of dirt is imported, the price shall be decreased by $0.90 per cu yd. ALL MATERIAL IS GUARANTEED TO BE .AS "SPECIFIED AND MANUFACTURED IN ACCORDANCE TO . GOVERNMENT REGULATION, ALL WORK PERFORMED WITH CITY . APPROVED PLANS AND LOCAL CODES. PAYMENT IS TO BE MADE AS FOLLOWS: 90% UPON COMPLETION 10%RETENTION AFTER 30 DAYS OF COMPLETION INVOICES RECEIVED BY THE 1ST OF'EACH MONTH WILL BE PAID BY THE 15TIL INVOICES RECEIVED BY THK 15TH OF EACH MONTH WILL BE PAID BY THE 1ST- ALL INVOICES MUST BE APPROVED BY THE CONTRACTOR BEFORE SUBMITTAL TO OWNER TOR PAYMENT. LABOR AND MATERIAL RELEASES MUST ACCOMPANY ALL INVOICES. ALL INVOICES MUST INCLUDE THE LOT/BLOCK NUMBER. PLEASE SUBMIT INVOICES TO: WORLD DEVELOPMENT, INC. 78120 CALLE ESTADO' STE: 104 LA QUINTA, CA. 92253 ACCEPTED: Cooley Con -uction, Inc. y By: zu Z. IWorld Development, Lic. License #348038 Date: ?� License #143867 Date: Initals: / .: i - 1eckaon Street 43-a2 N. J" rte 4 I LICENSED CONTRACTORS Indio, CA 92201 COOK Grading, Underground one 7t30) 776-5344 CON>s1>RUCi10N, W Aepbalt Paving, Teleph GA t,le.. 0 $490311 A: Llo. 0 90ath1 Fax (760) 776-4254 MV Lie. 00301r43 and 0038744 Ta: p$VELOPM1rNT Attention: JIM SNELLENBeRGER WORLD Datst 3/29/99 i 78•120 CALLS ESTADO, TE- LA omWA. CA 92253 , 'W pwo to fltrnleh you IaUor. equlpmont slid mrttoriil only not, below al tile unit Prlccr snawn for the condtructiaa or! our proJectt WORLD DEV-411ILES �4 yr"'61VA rice Total PriCc 0"ted &I: Quantity U/M , UnitP am No. Descrlptlon 1.o LS 1 -r 12 aF<;� LoN�QOL' TE,�.P' 10.0 -AC a��O 1 CLEAR SITE . d PRE- Wa-reK sires ;2,613.0 CY 7 1 ' SITE CUT/FILL ` 1 IMPORT FROM BORROW AREA 410,600.0 OF 9aS° t ROU(jH GRADE SITE +/-.15' Total Pro oral Price: De ri.No permits, testing, bonds, survey, englneeringNo duet oonUollmoil stabilization upon completion of our work radl No landscape/iinal`fl ng .I 4: No a4usting/reloceting/rernoving any utlllties/manholesNAvlts . 8. No baokfill of walin/f xAngs - ' rations 0. Not responsible for unknown underground Wlltles encountered In grading oPe 7. No demolltlon of concrete or asphelt 8. All oleer and grub Items to be Stockpiled onsite - 8. No cost of oonstruction water or meter: --- Quotation Note: 'r CUT/FILL, FROM OLIPHANT TRACT RICE INCLUDES CLEARING/PRE-WATERING SITE,$ITS CU, OTHER SIDE OF DUNE PALMS. INSTALL AC PAVING; ON �CIMPORT PRICE BASED ON g0000 Cy' PROTECT , I EDGE OF PAVEMENT,TRAFFIC CONTROL, 1 MOSILIzATION. NYTHINO OVER WILL tat: BILLED AT .90,CENTS CUBIC YARD. QUOTE 13ASED OFF OF PLANS DATED j /08 FROM WARNER ENGINEERING., 3-31-'. 999 3 : 51 PM FROM ARCHA.EO. ASSuG: 9bl- 244 Gt�3a' x 14 - ARCHAEOLOGICAL ASSOCIATES' March 31, 1999 Mr. Jim Snellenberger World Development, Inc. 78.120 Calle Estado, Suite 104 La. Quinta, CA. 92253' RE: Archaeological Monitoring of TT 25691, La Quinta, Riverside County. , Dear Mr. Snellenbcrger. Archaeological Associates would be happy to provide grading monitoring services for your above -referenced project. Our staff is comprised of experienced professionals who specialize in handling all aspects of archaeological. issues. , Furthermore, all of our field monitors have extensive experience working around heavy equipment on both small and large scale grading projects. The primary purpose of archaeological monitoring,is to ensure that if•such resources are encountered during earthmoving Ioperations that a .qualified archaeologist has the opportuinity to recover and determine the importance of the` find(s). Presently, we are proposing to field a single monitor. The monitoring program would be supervised by Ms. Laurie• Whitc, a SOPA certified archaeologist. If archaeological resources are encountered during the course of the grading program, the monitor should have the authority to temporarily halt or divert earthmoving activities until the importance of the find(s) can be ascertained. However, if the cultural material encountered cannot be adequately evaluated in the field or if due to the'nature of ' the finds) further. study (e,g.' excavation, site recordation) is needed, an additional scope of work and budget will be submitted under a separate agreement. . Our rate "for,archaeological monitoring is $350,Jday per monitor (8-hour work day).,: Overtime is billed at the rate of time and one-half and starts only after 40 standard hours in a week have been exceeded. If no archaeological finds are made during the project, the only additional cost that you would incur is that of a' short letter report describing the monitoring program and its results: The fee for such a report would be $ 150• P_O. Bbx 180 Sun City, CA 92586 (909) 244;1783 FAX (909) 244.0084 ..