this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: mnrah 29. 1999
Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION WAshinoton Streat. from Avenue 50 to Eisenhower Drive '
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION Provide cable T.V. under-
groundinA to Parc LA Quiuta
DESCRIPTION OF CONSTRUCTION RAnlacAmant of cable
T.V. utility.line.
DIMENSION OF INSTALLATION OR REMOVAL a3.000'
SIZE OF EXCAVATION, IF NEEDED WQnt-
APPROXIMATE TIME WHEN WORK WILL BEGIN 4/5/99
Sketch (attach construction plans if appropriate)
APPROXIMATE TIME OF COMPLETION 4/5/00
ESTIMATED CONSTRUCTION COST $ .7 •.ra00-00
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements) _
In consideration of the granting of this permit, the applicant hereby agrees to:
SEE ATTACKED CONDITIONS.
SEE ATTACHED DRAWING.
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
i
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement, necessary as the result of this work.
A..;;1- '0
Signature of Applicant or Agent f%y
Cnehr-Ar Cnmm. Conett,r.36--630 Cathedral Cvn. Dr. Cathedral City, CA 328-6778
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
47AS41
865
Contractor's License No. City Business License No.
EIM Transcontinental Iusurance Co. 10733.59018
Applicant's Insurance Company Policy Number
Lj
bi Y
FEES: Subdivision Improvement Permit — Class 111
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
100.00
$ 100.00
Received by Date
APR U 7 1999
RI _
PERMIT VALIDATION
PERMIT NO. 2933
DATE APPROVED 4/5/99
EXPIRATION DATE 4I5/00
DATE ISSUED - 1 � ! "' � �
Ely
Administrative Authority
Recorded by II Telephone: (619) 777-7075
---------------------------------- _------------ --
-------------- MAR 2 91999 _ - -
NOTE:
With proper validation i s
this form constitutes an itp,q,`
encroachment permit CITY OF LA QUI(ykT1,AL1C WO
APPLICATION. FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) �o
C�y0p 111b��S
For the construction of public o� private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improverent Permi — Class III
DATE: Minor Improve lass IV
LOCATION OF CONSTRUCTI N f' D t 3O SN .(/ %O �A',
p
(Street address orDescriptionof Locatipnb__
PURPOSE F CONSTRUCTION '�11��_� Z Sketch (attach construction plans if appropriate)
t DESCRIPTION OF CONSTRUCTION A gg
DIMENSION OF INSTALLATION OR REMOVAL
,,
a`SIZE OF EXCAVATION IF NEEDED
i
APPROXIMATE TIME WHEN WORK WILL BEGIN — —
APPROXIMATE TIME OF COMPLETION —5—�—
ESTIMATED CONSTRUCTION COST $ 2 `f� eD �' e
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Iridemnify,-defend -and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any'accident, loss or damage to persons or property.
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of,
• La Quints and to pay for eny additional replacement necessary as the result of is work. '
Signature of Applicant QfAent
+ NameofApplicant (please print) Business Address Telephone No. �^
f l � l c Zi�,4l�Ay CG�.yitr. C i� (,ram . .3G 6 , 3 0 �A "T,� E�JI fL If- �i �6L•f 7'
Name of Contractor and Job Foreman Business Address Telephone No.
97�59 3 w�-o� _ _ r _
Contractor's License No. City Business License'No. '
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III -
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor, Improvement Permit — Class IV: See attached schedule 2774.
Inspection Fee $ PERMIT VALIDATION
Permit Fee .
PERMIT NO.
Penalty
Cash Deposit -Surety Bond DATE APPROVED '
if required EXPIRATION DATE `
x, TOTAL: $� DATE ISSUED
Receipt No.
., By
Received by Date Administrative"Authority
Recorded by Telephone: (619) 777 7075
w;
Rancho La Quinta
d
I
2`
3
LI
5.
7.
SPECIAL CONDITIONS --PERMIT NO. 2933
--- Cochran Communications Construction ---
In addition to the standard permitconditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § .1 (part), 1982), all.
work shall be performed in accordance with the latest edition -of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the, satisfaction of the City Engineer.
Cochran Communications Construction, hereinafter referred to as "Permittee", shall .be responsible
for providing continuous dust and erosion control.
Streets shall be kept clean. They shall be completely cleaned at -the end of each working day and
more frequently if required.
Pursuant to Section 6.08.050 ofthe La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee, shall comply with City regulated work hours Operation and
maintenance of equipment within one-half mile of human -occupancy shall be performed only during
the following time periods:
October 1 st to April 30: Monday -Friday :00 a.m. to 5:30 p.m.
1.
Saturday 8:00 a.m. to 5:00 p.m.
May 1 st to September 30: .Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday .8:00 a.m. to 5:00 P.m.
Work shall be prohibited on legal holidays and Sundays.
Work performed. within 500 feet of a major and/or signalized intersection is restricted between the
hours of 9 a.m. = 3 p.m. Traffic control, shall be set up after 9 a.m. and removed before 3 p.m." The
Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-
6894 if signal operation at the intersection is to be altered in anyway.
Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 §;1 (part), 1982),
Permittee shall assume responsibility for repair. of any pavement damage to any public or private
street and for. any damage to other City streets or facilities as a result of work performed under this
permit.
Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part),1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the. WATCH Manual and_submitted to the
City for review and approval .one (1) week' prior to starting any construction: Jt shall be the
Permittee's responsibility to appropriately detour and barricade all constructionsites.
Special Conditions Permit No. 2933 Page 1 of 3
SPECIAL CONDITIONS --PERMIT NO. 2933,
--- Cochran Communications Construction ---
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of. one travel lane of paved surface shall be
maintained with flagmen at all' times.
9 � Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated.
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3. of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), and as required by
the Public Works Department.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if .
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly'exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight; however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced"to
its original condition. o
14. Access and egress to all local- properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),'
permanent pavement replacement shall be completed no later than seven (7) days after 'the
completion of the work. Permanent pavement shall be replaced as follows:
a) Sawcut and remove existing a.c. surfaces a distance of one foot (F) beyond all trenchwalls,
including any sloughing or cave in of adjacent soils. Undermined a.c. surfaces shall be.
removed. All a.c. edges shall be straight, clean and vertical.
b) Provide an existing section (four -and -one-half inches [4'/Z"] minimum) of crushed aggregate
or miscellaneous base material, compacted to 95% minimum relative compaction.
c) Provide an existing section plus one inch (I") [four inches (4") minimum] of asphalt concrete
in two (2) or more lifts; the first lift(s) comprised of a base course a.c. material, of a City
Special Conditions - Permit No. 2933 Page 2 of 3
SPECIAL CONDITIONS --PERMIT NO: 2933
--- Cochran Communications. Construction ---
approved mix design, meeting the requirements of Greenbook class-B-AR-4000; the final 0.10'
lift comprised of a wearing course a.c: material, of. a City approved mix design, meeting the
requirements of Greenbook class' C2-AR-4000. Ali pavement edges shall" be flush with
adjacent a.c. surfaces. Each lift of a.c. material shall. be compacted to 95% minimum relative
compaction. .
d) For. trenches greater than two feet'(2') in width,.the Permittee shall perform a grind and a.c. '
overlay, of 0.10' depth for three Tfeet (3') in addition to.the pavement replacement specified
above. "
e MultiPle' trench cuts, depending upon location and quantity, will require complete grinding -and
0.10' depth asphalt concrete removal and repaving, at•the direction of and to the satisfaction.
of the City Engineer.. Other alternative surfacing, such as slurry sealing, may be approved at,
the'direction of the appropriate Homeowner's Association and the'City Engineer.
16. Permittee shall notify the City of La Quinta Public. Works Department a minimum of 48' hours prior
to commencement of any construction at (760) 777-7075.
17. Permittee shall stabilize any soil that was disturbed (shoulder areas, :etc.) as a- result of work
performed under this permit with an approved dust control treatment and'provide•continuous dust
control measures as indicated in the:Fugitive Dust Control Plan', if applicable:
18. Pursuant to Chapter 12.56,of the La Quinta Municipal Code (Ordinance -10 § 1 (part), 1982) the City
has designated certain city streets. as Truck Routes. The'weight,limit for restricted streets (i.e., "streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making 'a delivery or pickup on the subject street, or if this permit. specifically
grants permission to use Ahe street to deliver street construction materials and/or equipment.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
20. This permit authorizes undergrounding of overhead cable television utilities within Avenue 50 and
Washington Street right of way.
Page 3 of 3
The following General and Special Provisions are. attached to and .mad e a part of Permit No: Z%
GENERAL, PROVISIONS
The following shall always apply: ,
ENROACHMENT ON PRIVATE PROPERTY: This:permit authorizes work to be, accomplished within City of La Quinta right of
way ONLY. 'Whenever construction extends within private property, it is the responsibility of the permittee for his. contractors to
secure permission from abutting property owners. Such authorization must be :secured by the permittee prior to starting, work.
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on.
any paved surface unless fitted with smooth -faced street pads., All mechanical outriggers shall be fitted with rubber"street shoes to
protect the paving during excavations. Rubber -tired equipment only shall,be used in backfill operations in paved areas.:If, the -existing
pavement' is scarred, spalled,,or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches .(2") of A.C.
surfacing plus appropriate seal cost as specified above:
PROTECTION OF TRAFFIC: All excavations and work areas shall be.properly lighted and barricaded as deemed necessary by the
City Engineer or: La Quinta City Public Works inspectors. Suitable :detours and detour signs shall be placed and maintained fo; the
duration of the project. The City shall be notified.24 hours in advance of any traffic -detours or delineations..
CARE OF DRAINAGE STRUCTURES:. Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and
concrete structures encountered- during excavation which necessitate removal shall,be replaced in kind. In the event, it becomes
necessary to remove or, cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this. work..
Drainage structures and open drains shall be kept free of debris.at all times for proper drainage.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right,
of way.. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill'•and compaction.
Existing gutter line and drainage ditches,shallbe replaced to their. original standard or better." All excess material shall'be'removed
prior to paving. Water tanker shall be used, as required, to sprinkle the job site to_keep down•dust conditions and shall'be•used
immediately after backfill:
DE -WATER OPERATIONS: If de -watering operations are required and -pumps are forcing water on City of La`Quinta roads; it shall
be the responsibility of the permittee (contractor) to, control this water and to provide off-street barricades when necessary.:
CLOSING :STREETS: No street shall be closed., A minimum of one lane of traffic shall be maintained at all times to provide limited
access for,the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close 'a street for
any length of time, permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
RI NOTIFICATION: Permittee shall notify, the City at (619)777-7075 at, least 48 hours in advance of starting construction.
UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way
authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing
substructures. Damage to existing substructures_ resulting from operations conducted under this permit shall be the sole
responsibility of the permittee.
�R4'
UTII,ITY CLEARANCE: (Surface Structures) No work shallbe done under:this.permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
PAVEMENT WIDENING: • Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with - inches of A.C. paving placed on inches of class " aggregate subbase course having an "R"•
value of not less than and in conformance with City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
R5 PARKWAY GRADING:. Area.between the property line and top.of the proposed concrete curb shall begraded to a slope -of
1/4 inch to one foot (P).
R6 GRADE -CHECKING: City of La-Quinta shall -check grades upon receipt of plan and profile and/or .grades as established by
a licensed engineer.
R7 CURB -REMOVAL FOR DRIVEWAYS: A portion.of the existing: concrete curb and/or curb and gutter (feet)' shall be
removed. Curb and/or curb and gutter, shall be saw cut prior to removal.. Depressed curb, matching.. concrete gutter and
concrete driveway, approachshall be constructed in. conformance with, City of La Quinta Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of;A.C. paving placed on'( ) of class aggregate base.
Driveway construction shall conform to attached drawing.
VR9) SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times:
69 SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer.' Rate of application shall commply with the
manufacturer's specifications.
11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quinta projects.
Rl SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LUffr OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. -No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quints deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied, in layers of not more than50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed,. bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.