CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: 7LDIJ19 q
LOCATION OF CONSTRUCTION L ,-% L ' L , P,— "9LCL
(Street address or Description of Location)
Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
PURPOSE OF CONSTRUCTION 777(31U, 0"' Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION
j1r sSs4..
DIMENSION OF INSTALLATION OR REMOVAL ??s = n
13
SIZE OF EXCAVATION, IF NEEDED 01-LL
APPROXIMATE TIME WHEN WORK WILL BEGIN "L," L)2
APPROXIMATE TIME OF COMPLETIONT��O%�
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
4
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all -applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as,the result of this „work.
Signature of Applicant or Agent'
CA'3, , 'ti 1� uiC , f'�o P J201
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
7V�011) 4
Contractor's License No.
City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class I I I
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
1
Receipt No.
Received by Date
PERMIT VALIDATION
PERMIT NO.
DATE APPROVED 6�15/9q
EXPIRATION DATE
7, We
d ) r,
DATE ISSUED
di
By ,W
Administrative Authority
Recorded by 11 Telephone: (619) 777-7075
(00
Earth Systems Consultants
E�
Southwest 79-81 lB Country Club Drive
Bermuda Dunes. CA 92201
Ss (760)345-158S
(800)924-7015
2 0 FAX (760) 345-7315
December 22, 1999
Centex Homes
2280 Wardlow Circle, Suite 150
Corona, California 91720
,Attention: Mr. John Fong
Subject: Laboratory Test Results .
Crushed Miscellaneous Base
Project: PGA West Weiskopf Course
La Quinta, California
File Number 07000-02
99-12-770
RECEIVE®
FEB 01 2000
PUBLIC WORKS
This report presents the results of laboratory tests performed. on one sample of crushed
miscellaneous base. The sample was obtained by our personnel from the above mention project
on December 20, 1999. Per your request the following tests were performed:
1). -Sieve Analysis, (ASTM C7117/C-136)
2) Maximum.Density/Optimum Moisture (ASTM D1557)
The laboratory test results are attached. We trust this meets your current needs. If you have any
questions or need further assistance please contact us.
Respectfully submitted,
EARTH SYSTEMS CONSULTANTS
Southwest
h-
Mark Houghton' Craig S. Hil
Materials and Testing Supervisor CE 38234
Distribution: 2/Centex Homes ;
1/City:qf La,Quinta .
1/Granite Construction';Company
1/BD
1/V-TA
QPoF ES,s/ON
S. yi��F2
u CE 38234 m
EXP.3/31/01 r"
spy CIVIL �\P
�OF CALI��
I"
..... .....
December 22, 1999
5
A) Sieve Analysis - Fine
2
Summary of Laboratory Test Results
Crushed Miscellaneous Base
Sampled December 20, 1999
i
File No. 07000-02
99-12-770
Sieve
Size
Percent
Passing
SSPWC
Sec 2.00-2.4.2
Specification
Compliance
1 1/2"
100
100
VI
100
3/4"
98
85-100
1/2"
87
1
3/8"
74
5.5-75
#4
48
30-50
#8
44
#16
32
#30
21
12-28
#50
13
#100
6
#200
3.1
2-10
B) Maximum Density/Optimum Moisture
' z
Max Density = 134.0 pcf
Opt Moisture = 6.0 %
. t
EARTH SYSTEMS CONSULTANTS SOUTHWEST
..y
'.Y -
Earth Systems,� Consultants
Southwest
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
l
Client Name
i•_
Client Address
/
I t
Client Phone
DATE
JOB NO.
PROJECT
/Py AS- �'17�
( pil
LOCATION
' //
o fJi e/ I /Z11
CONTRACTOR
OWNER
WEATHER TEMP
oat AM
Oat PM
PRESENT AT SITE
,x
TEST
NUMBER
`
1 .V�. t'
-LOT—
NUMBER
S f`,-e {
Saa l:a� �&
ELEVATION
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
%
DRY
DENSITY
Ibs/cu. ft.
MAXIMUM
DRY
DENSITY
%
MAXIMUM
DRY
DENSITY
Ibs/cu. ft.
OPTIMUM
MOISTURE
CONTENT
%
c
(c �
-2,
ie 35 C�
r
fit„#Ga
3.� c,
/.,ts
�lU
fUZ•�
%/
rt
26
Al Z.
To?
1631
Z
r
REMARKS: Ii °��'? %1 l l/ / �`5�S / ` l� C / C
FI,E'j-'D-REPORT
CLIENT REPRESENTATIVE.SIGNATURE
BD•FS-001 (10/98)
TECHNICIANS SIGNATURE
241.3
I
l
�r Earth Systems C-sultants
Southwest
79-811 B Coun4,.Club Drive
Bermuda Dunes;1CA 92201 • (760) 345-1588
Client Name
Client Address
Client Phone
DATE s
JOB NO.
% Lt,30 z -..
PROJECT
.7-
"
LOCATION
CONTRACTOR
OWNER
WEATHER
TEMP Oat AM
Oat PM
PRESENT AT SITE
FIELD TESTING
REFERENCE CURVE
TEST
�- 9^J� c� rJ
?LOT
ELEVATION
MOISTURE
DRY
MAXIMUM
MAXIMUM
OPTIMUM
NUMBER
t, NUMBER
CONTENT
DENSITY
DRY
DRY
MOISTURE
%
Ibs/cu. ft.
DENSITY
DENSITY
CONTENT
%
Ibs/cu. ft.
%
y.
a
�C)
BIZ.
a
1141-
_��i
ff �,
• 1
r t
�
li
I C A
7 -3. .
l
11-111C t a-j
r
REMARKS: ti .� K( r: /o > r. t-1p�.:.r- w �•, v Pt
�`•J t,- o rt uo
ry ^�
S L.l i C, P' �!2A 4 "+� r, v- "�"" 'S� E•^ �.+..ILi i' ^^•+'�-J iw� r
�'.:•{w.a1..,+=P" .^?. 1 � ^_.lr J� �.Ci.� !" r; r ✓f �f) �ti, .�. r!"�'!"! if r'f S r•C —�1 !i 4'\.. `...r t r' !'� t +" � �..J � a � �.. r.
V ( ^ i 9 �...J •6"' h i 4CJ C-?`"' (� C-4- A r,
Ar"o n as �P-- l� !AA P A s-o f ,. _ � �- c. t �' `i
CLIENT REPRESENTATIVE SIGNATURE.
BD-FS-001 (10/98)
AFIELD REPORT
TECHNICIANS SIGNATURE
Earth Systems Consultants
IMPFSouthwest
79-811B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
Client Address
Client Phone
-- 1, -
4->-A
DATE d s
JOB NO.
Z
PROJECT
7-%
G �L
LOCATION
I CL
—A
i �,LA
CONTRACTOR
OWNER
WEATHER
TEMP
Oat AM
Oat PM
PRESENT AT/SITE
4.
FIELD TESTING
REFERENCE CURVE
MOISTURE
DRY
MAXIMUM
MAXIMUM
OPTIMUM
TEST
LOT
ELEVATION
NUMBER
NUMBER
CONTENT
DENSITY
DRY,
DRY,
MOISTURE
%
lbs/cu. ft.
DENSITY
DENSITY
CONTENT
%
lbs/cu. ft.
%
rVI A
V
10-3
92-
-2 Z
2-0
MA
Y2
-7
Z-
io�'
94
61 z
2
6)
7
loug,
90
REMARKS:
YA
CLIENT REPRESENTATIVE SIGNATURE
BD-FS-001 (10/98)
FIELD REPORT
TECHNICIANS SIGNATURE
N E 2856
...........
'�`��. r 4'��?� -l; ,,.'�.'�����SxAC�i^"'"'"•o"°v`kxrry�+'y'q,•�`
sultants
Earth Systems Con
IO/ Southwest .
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
Client Address
l
Client Phone
DATE
JOB NO.
I/I3I�
• PR'OJECT
t
LOCATION
i_ da. S..a , r A
CONTRACTOR
OWNER
'
WEATHER TEMP
Oat AM
Oat PM
PRESENT AT SITE
f^• �� r ! � F a'r. c 'fit J. i'•:) � I
TEST
NUMBER
i ••t e� �=Z i r 1
LOT
NUMBER
ELEVATION
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
DRY
DENSITY
Ibs/cu. ft.
MAXIMUM
DRY f
DENSITY
%
MAXIMUM
DRY
` DENSITY
Ibsku: ft.
OPTIMUM
MOsISTURE
CONTENT
%
Z.
`Sc
�G
Z_
%
-)
04
9�
IL
REMARKS:
CLIENT REPRESENTATIVE SIGNATURE
BD-FS-001 (10/98)
FIELD REPORT
TECHNICIANS SIGNATURE_
2900
ultants
Earth Systems Cons
1./ Southwest
1 79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
Client Address
Client Phone
DATE
JOB NO.
117 ' ►
PROJECT
LOCATION
o�,,,.i
L>\ A
CONTRACTOR
OWNER
WEATHER TEMP
Oat AM
Oat - ' PM
PRESENT AT SITE
jli i
FIELD TESTING
REFERENCE CURVE
TEST
LOT
ELEVATION
MOISTURE
DRY
MAXIMUM
MAXIMUM
OPTIMUM
NUMBER
o IJ
NUMBER
CONTENT
DENSITY
DRY
DRY
MOISTURE
�i
%
Ibs/cu. ft.
DENSITY
DENSITY
CONTENT
%
Ibs/cu. ft.
%
7
b
C-j
!
r
10
10
S
v
cl
17
to
C,
1
c,
REMARKS: t ^ ,� , . t:. a Jt 1 n�:>r_ t C :� I �v �:`"f•l(��1 �" �.� IAA, f
C- /- r"'f V `-'Y "T i .'v?.. 1 C Y.:,x , hi D R:l"ii ..�.i k1 ^ {.i '„- jt l.1 C 1 .f. •., !- �.. + r •.j ti.
t
,
1%
Y�' i -� �'• ( ":.) � w �.� � f � -+ �,,��..-c..� v� w � � r.I
,� cl�`.l �., , ..�'� �-� 1 r cEc i� f�'
'r
l
f
CLIENT REPRESENT TIVE SIGNATURE
BD-FS-001 (10/98)
S � v
FIELD REPORT
TECHNICIANS SIGNATURE
2933
wv
Earth Systems Consultants
;R110F Southwest
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1688
Client Name
Client Address
Client Phone
•r -
n
DATE
JOB NO.
PROJECT
LOCATION
t' t% C ,
CONTRACTOR
OWNER
WEATHER TEMP
oat AM
oat PM
PRESENT AT SITE
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
DRY
DENSITY
MAXIMUM
DRY
MAXIMUM
DRY
OPTIMUM
MOISTURE
TEST
NUMBER
t
l ; . - r (� `> `4 `>
LOT .
NUMBER
ELEVATION
%
Ibs/cu. ft.
DENSITY
DENSITY
CONTENT
%
Ibs/cu. ft.
%
{
/7
f l
�-Z�
"ZI
t
5 c
C3
,/
�07
15
Az
REMARKS:
�CIIENT REPRESENTATIVE SIGNATURE
BD•FS-001 (10/98)
z
FIELD REPORT
TECHNICIANS SIGNATURE
-0. 2934
0IK
Earth S stems Con ultants y
Southwest
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
•-v
Client Address
Client Phone
DATE ti "'
JOB NO.
PROJECT
OCATION
L•&
CONTRACTOR
OWNER
WEATHER
TEMP Oat AM
i
oat PM
PRESENT AT SITE
i
TEST
NUMBER
i .ui� G►��+�1
LOT
NUMBER
ELEVATION
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
%
DRY
DENSITY
Ibs/cu. ft.
MAXIMUM
DRY
DENSITY
%
MAXIMUM
DRY
DENSITY
Ibs/cu. ft.
OPTIMUM
MOISTURE
CONTENT
%
w
z
! (_\
�3�
�•
lD��. o
3
V-OCO 04 rS
Z2t 5,10
16-01
107.2
T(
f
1
4
�' b
/Q(".
14
&Z
/01.7
9 S
j ` #
1�-�►a�
C� 3
�r�G.�
s
. '�
REMARKS: DAi-� f ���,. f ✓►AO�e t� `1 Q 1uf? k r�✓ �., G► .0 1 / �.-� fC-1 '�' S R C
tni�nh n 7 li 4e'1
S Vi G sS, r olrI a u
1 LL v J
FIELD REPORT
CLIENT REPRESENTATIVE SIGNATURE
BD-FS-001 (10/98)
TECHNICI� ���GNATURE279O
i�91Y3�+K��i
Earth Systems Consultants
111IM71, Southwest
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
Client Address
Client Phone
DATE
.7 zo `
JOB NO.
r7004-oZ
PROJECT
'.t/1�' •
o y c,
t�vs x t �� '� tr J- - L / t'1 C�
LOCATION
J
, 6L'
CONTRACTOR
OWNER
WEATHER
TEMP oat AM
°at PM
PRESENT AT SITE
TEST
NUMBER
cu-q RU C.� t �lC� L
LOT
NUMBER
ELEVATION
FIELD TESTING
REFERENCE CURVE
'MOISTURE
CONTENT
%
DRY
DENSITY
Ibs/cu. ft.
MAXIMUM
DRY
DENSITY
%
MAXIMUM
DRY
DENSITY
Ibs/cu. ft.
OPTIMUM
MOISTURE
CONTENT
%
1
107.to
►
t r �' '�
i
to
lot z
51
2
M A akow o 0 K ��
t � ���s�t� �
Z64 ��
�
�6. Co
i �
REMARKS:
1!
CLIENT REPRESENTATIVE SIGNATURE
BD-FS-001 (10/98)
FIELD REPORT
i
TECHNICIANS SIGNATURE
2791
Earth Systems Consultants
�d Southwest
79-811B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
Client Address
Client Phone
DATE ` .
7
JOB NO.
�
PROJECT
6,17
LOCATION
CONTRACTOR
OWNER
WEATHER
TEMP Oat - AM
oat PM
PRESENT AT SITE
TEST
NUMBER
LOT
NUMBER
ELEVATION
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
%
DRY
DENSITY
Ibs/cu. ft.
.MAXIMUM
DRY
DENSITY
%
MAXIMUM
DRY
DENSITY
Ibs/cu. ft.
• OPTIMUM
MOISTURE
CONTENT
%
3
�N,,A,rfell rod
qF
y7
REMARKS: x?1A), r
FIELD REPORT
CLIENT REPRESENTATIVE SIGNATURE TECHNICIANS SIGNATURE
BD-FS-001 (10/98)
3006
Earth Systems Consultants
Southwest
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345.1588
Client Name
ClIent Address
Cuenl Phone
DATE
-ZZ•
`
JOB NO.
PROJEOT
1 Alf
LOCATION
a
f
U,',4
CONTRAC
R
OWNER
WEATHER
TEMP oat
Oai
ALI
Pm
PRESENT AT SITE
TEST
NUMBER
LOT
NUMBER
ELEVATION
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
DAY
DENSITY
Ostu. !t.
MAXIMUM
DRY
DENSITY
'/
MA)4MUM
DRY
DENSITY
Ibsh. ft.
OPTIMUM
MOISTURE
CONTRiT
o
y�
yG
6-1
�8rt��
��-s
AZ.
9.S
,a
�.
FIEUDREPOR.T
CLIENT REPRESENTATIVE SIGNATURE TECHNICIANS SIGNATURE
BD-FS-001(+We8)
N? 3008
Z'd STCG-SjC 09G sque,4jnsuo0 swa,4srS 44ue3 08S:b0 66 CZ daS
WOW
Earth Systems Consultants• .
Southwest
79-811 B Country Club Drive
Bermuda Dunes, CA 92201 • (760) 345-1588
Client Name
Client Address
Client Phone
DATE
JOB NO.
PROJECT
{
LOCATION
L. A
CONTRACTOR
OWNER '
WEATHER TEMP
Oat AM
Oat PM
PRESENT AT SITE
TEST
NUMBER
�;
LOT
NUMBER
ELEVATION
FIELD TESTING
REFERENCE CURVE
MOISTURE
CONTENT
%
DRY
DENSITY
Ibs/cu. it.
MAXIMUM
DRY
DENSITY
%
MAXIMUM
DRY
DENSITY
Ibs/cu. It.
OPTIMUM
MOISTURE
CONTENT
%
I
a
J
�� J
F'�: t"i� r-�Gsv^.� , - e ✓ tr,J+.v �e �
s% l• t„� u
� C3 (�
/ �� Cr.'� !
�� L�
REMARKS: 0\, r n,la y t. r f �. �... e, i 1.T .^A la = �a r• - "-je
f
t .. � x•.` ^ c ��. i��^ #,vim. rv,!!. s L F-A-)—,j
�'� �' '' ✓ -+'-v J E
�. �.
CLIENT%REPRESENTATIVE SIGNATURE
BD-FS-001 (10/98)
FIELD REPORT
�91 L%.
TECHNICIANS SIGNATURE
} 2952
The followingGeneral and Special Provisions are attached to and made a art.of Permit No.
Pce p �
J GENERAL PROVISIONS
The following shall always apply:
ENROACHffKENP ON PRIVATE PROPERTY- This permit authorizes work to be accomplished within City of La Quints. right of
way ONLY. Whenever construction extends within private property; it is the responsibility of the permittee for his contractors to
secure permission from abutting property owners.. Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING • CONSTRUCTION EQUTPMENf: Cleated tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to
protect the paving during excavations. Rubber4ired equipment only shall be used in backfill operations in paved areas'. If the existing
pavement is scarred, spelled, or broken during the term of this contract, or if•the pavement is marred, City of La Quinta shall request
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2-') of A.C.
surfacing plus appropriate seal cost as,specified above.
PROTECIiON OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the
City Engineer or La Quinta City Public• Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and
coac&te structures encountered during excavation which necessitate removal shall be replaced in land. In the event it.becomes
necessary to remove or cut existing drainage structures;.City of La Quinta shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP-. Any surplus material resulting from excavation and backfill operations shall' be removed from die right
of way. All paved surfaces shalLbe' broomad clean of earth and other objectionable materials immediately after backfill and compaction.
Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed
Prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shallbe'used
immediately after backfill.
DE-WATER'OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints, roads, it shall y _
be the responsibility of.the'permittee (contractor) to control this water and to provide off-street barricades when necessary.,
CLOSING S IMMI•S: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining.property owners and emergency,vehicles. In the event it is felt by the permittee that he -must close a meet•for
any length of time, permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS t
Bowing shall apply when indicated:
R' NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48' hours in advance of starting construction.
R� UTIUM CLEARANCE: (Substructures) Prior to making any excavation within the. City of Is. Quints right of way.
authorized by patmit,.the permittee shall contact all concerned utility companies relative to the location of existing
substructures. Damage to existing substructures resulting from operations conducted underthis permit shall be the sole
responsibility, of the permittee. n
3 LqU ITY. CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities•are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEIIZENTT' WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced.,
with inches of A.C. paving placed on,. . inches of class aggregate subbase course having an 'R'
value of not less than and in conformance with City of LA Quints Road Improvement.Standards and
Specifications, Ordinance #461.
R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb, shallbe graded to a slope of.
1/4 inch to one foot (1).
R6 GRADE CHE(3MG: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be
removed. Curb and/or. curb and gutter shall be saw cut prior to removal.. Depressed curb, matching concrete gutter and
concrete driveway approach shall be, constructed. in conformance with City of La Quints, Standard k207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as:not to alter existing drainage pattern.' Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on f: ) of class aggregate base.
Driveway :construction shall conform to attached drawing.
R SIGHT CLEARANCE: Sight clearance. of 600 feet in all directions shall be assured and maintained at all times.
R10 SOIL STERIIJZE[t: The area to be, surfaced shall be treated with soil sterilizer.' Rate of application shall commply with. the
manufacturer's specifications.' ;.
R 1 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quints forces to preclude delay or interference with State of City of I.A. Quinta projects.
R 1 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the perimi. tee. A complete set of notes showing the des to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
R 13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer.. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
DRI-5
material is actually on the work site.
BACKFTI.L MATERIAL: Backfitl shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quints, deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFE.L SAND- Backfill shall be approved transit -mix sand or equivalent and shall be'piaced in lifts of not greater than
three feet (37 and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACKFTLL PLACEIEP: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5) lifts where trenches are of excessive depths. Caro is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
R18 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Ifiighways, State of California, dated January 1973.
Rl_ COMPACTION TESTS: If so required•by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the.City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01. of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
g2O TEMPORARY PAVEMENT REPAIRS: After compledon of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no.case shall the
placement of the temporary pavement exceed a five (5) day limit. .
R21 pERmANEl r-PAVEME T REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R2'2 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of la Quints road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Tees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of die -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a'maximum of 500 feet at any one time. Adequate signs, flagman and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction testa shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
SPECIAL CONDITIONS --PERMIT NO. 3055
CENTEX HOMES ---
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Centex Homes, hereinafter referred to as "Permittee", shall be responsible for providing continuous
dust and erosion control. All areas shall be kept watered down daily including weekends.
3. Streets shall be kept clean.. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee shall comply with City regulated work hours. Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during
the following time periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m.
- 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall
contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6.894 if signal
operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16J 10 of the La Quinta Municipal Code (Ordinance 10. § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage to other City streets or facilities as a result of work performed under this
permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area.Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Special Conditions - Permit No. 3055 Page 1 of 4
SPECIAL CONDITIONS --PERMIT NO. 3055
--- CENTEX HOMES
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City -facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section. 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in
the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no
water densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing,. and inspection,
onsite, at all times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall
be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift
thickness to be compacted for the remainder of the project.
Special Conditions - Permit No. 3055 Page 2 of 4
SPECIAL CONDITIONS --PERMIT NO. 3055
CENTEX HOMES ---
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a.given length of trench, the tests shall be no closer
than three feet (vertically) from each other.
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the
completion of the work. Permanent pavement replacement shall conform to the following
conditions:
A. Existing asphalt concrete pavement shall be, sawcut one (1) foot beyond trench edges. Edges
shall be straight and clean.
B. Permanent pavement replacement structural section,. within all trenches, shall be 1" thicker
than existing of asphalt concrete over the same existing thickness of crushed aggregate base
or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of
the Standard Specifications for Public Works Construction. The replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify exact structural replacement section thicknesses with the City
prior to installation.
Special Conditions - Permit No. 3055 Page 3 of 4
SPECIAL CONDITIONS --PERMIT NO. 3055
--- CENTEX HOMES ---
C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the base course lift and a City approved'/2" max medium finish course lift
for capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
D. For transverse trenches across improved streets, the existing pavement surface, three (3) feet
on either side of the excavated trench, shall be cold -milled to a depth of 0.10', with a "butt"
joint created along each edge of the cold -milled area, and a new 0.10' lift of t/2" max medium
asphalt concrete pavement overlay applied throughout the cold -milled area.
E. For longitudinal trenches within improved streets, the existing pavement surface, through the
lane width (within lane line' striping), shall be cold -milled to a depth of 0.10'; with a "butt"
joint created along each edge of the cold -milled area, and a new 0.10' lift of t/2" max medium
asphalt concrete pavement overlay applied throughout the cold -milled area.
F. If grinding and capping operations are not performed in the same day as base paving
operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from
saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of
paving shall not be left 0.10' low in anticipation of grinding and capping.
F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the
Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal
loops shall be removed and replaced in kind. The finished pavement surface shall be smooth,
consistent, and shall conform to the surrounding grades.
16. Permittee shall notify the City of La Quints Public Works Department a minimum of 48 hours prior
to commencement of any construction at (760) 777-7075.
17. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work
performed under this permit with an approved dust control treatment. Soil stabilization shall be done
immediately after completing the operation.
18. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically
grants permission to use the street to deliver street construction materials and/or equipment.
19. This permit allows for construction of the subdivision improvements concrete work and storm drain
per the approved plans for tract 28960.
20. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3055 Page 4 of 4
l
NO E: ,
With proper validation '
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DATE:--"' Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION I'GA `4EST YRA.CT 28960
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION 8};C:I1\f SUIDIVI.STO"
OF LEV3,t..OF.'M7,NT
DESCRIPTION OF CONS�� UCTION R�;Tr"r�'C ClC�
�v2 (C_ S.CO it tM i7kf )9-1-j -
DIMENSION OF INSTALLATION OR REMOVAL SE-''1'i:f. N a
SIZE OF EXCAVATION, IF NEEDED SFP PLANS
APPROXIMATE TIME WHEN WORK WILL,3EGIN
1999
Sketch (attach construction plans if appropriate)
APPROXIMATE TIME OF COMPLETION 'V 1999
ESTIMATED CONSTRUCTION COST $ • Z
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
SEE, A'1'lACHM) i3ONDTT.10NI-S
S'RE A1?3. ROVE-) FT.-ANS
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and'all applicable rules and regulations of the City of
La Quinta and to pay for any,additional replacement necessary as the-re.sult-of this %cork.
r \
Signature of,Appl,ica'nt or Agent
CENTEX HOME'S 2 80 ivAPIDL(Yii CIRCLE, STE 150, CO:RONA,_CA 91.720 _
Name of Applicant (please print) Business Address Telephone No.
CEN'�IX ,�.Omms (kuRT GOBF_.1t) 2280 WAIJ3LOW-' CIR�, STE 150, CORONA. (.'A 91.720
--A 1—k C...e.." Rncinacc Ar4racc Telenhnne No.
#7:34094
Contractor's License No.
i &
44, RSH & 11CLFNNNA.N
City Business License No. ��j
G'L• 08322099-0 CO(��.. WC8322096--tPI A —
Applicant's Insurance Company Policy Number MAY 10 NOW
FEES: Subdivision Improvement Permit — Class II I ��•�� OF A :� /' OU��T�y
Public improvements: 3% of estimated construction costs' •✓� g ti.
Private improvements: 3% of estimated construction costs
y Minor Improvement Permit — Class IV: See attached schedule ':
Inspection Fee $
3,40 S1
Permit Fee
] r /UL•OU
TOTAL:
Receipt No.
Received by
Date
PERMIT VALIDATION
PERMIT NO.
DATE APPROVED
EXPIRATION DATE 5"' `- . 164 OU
DATE ISSUED
Administrative Authority
Recorded by
Telephone: (619) 777-7075
CENTEX BIOMES R E Lj I V E D CONTRACT
2280 WARDLOW CIRCLE #150 Phone: 909)279-4000 SEP 1 0 1999 No. PGA-1004
CORONA, CA 91720
TO: LARRY JACINTO CONSTRUCTION
P.O. BOX 615
MENTONE, CA 92359
ATTN: LARRY JACINTO
DATE: 8/27/99
PROJECT: PGA WEST
JOB: PGALD2-ACCTG
Master Contract #101-1
r"" 4; }`
n .. .. w..tL a.....0 3.:a. .+.e{ �,.+.�.w.+�el,rw�..:- !%'aiZ�.+.i•�3..t.�s.t,..1�w....4A:vx,x.wi�.lY�.w...3' -i �.....iF.ti. "A..i:r�.@raw-1-..-e.w.w....+i rt'�.:fi a�tl- .a. ".hea:'�j.`i'..�-.n 1_.. f.
CENTEX HOMES CENTEX HOMES
Tract 28960 2280 WARDLOW CIRCLE #150
La Quinta, CA 91720 CORONA, CA 91720
For the satisfactory completion of the items of work included in this agreement, the Builder agrees to pay the Contractor
according to the following price schedule: 90% payable upon completion and Acceptance of Installation. A 10% Retention
shall be withheld from each invoice, and shall be payable approximately thirty five (35) days after Completion and Acceptance.
Invoices may be submitted progressively as work is completed.
Iie' myY„-^0�Unttsy^T t0moun`.;at';" ea
01 8,295.00 LF Construct 6" Wedge Curb per Detail on $8.50 $70,507.50
Sht. 2 of the plans
02 10,729.00 SF Construct 8' Wide x 4" Thick Concrete $1.88
Golf Cart Path
03 1,505.00 SF Construct 14' Wide x 4" Thick Concrete $1.88
Golf Cart Path
$20,170.52
$2,829.40
Unit Cost: $93,507.42
Total: $93,507.42
***JOB AGREEMENT / CONSTRUCTION AGREEMENT***
The Construction Agreement is hereby modified and amended by the following deviations from.plans, specifications, project description,
and/or unit prices. All provisions of the Original Agreement shall remain in full force and effect without change because of these deviations.
Description: Master Contract #101-1 is amended to include the project known as PGA WEST
Schedule C, C-I (if applicable), B and B-1 are attached hereto and made part of this Job Agreement
At such time(s) that a price adjustment becomes necessary, to be determined by builder, in it's sole and absolute discretion, a change order
will be issued by Builder. The above prices include all freight, fees, permits, taxes or applicable costs required to provide for the work and/
or materials indicated.
When invoicing, Contractor shall submit a copy of the Standard Invoice or Requisition Form. Quantities are approximate and final payment
will be made on actual quantities installed and field verified. Quantities exceeding those listed above shall be covered by a Contract
Change Order.
Contracted By: .
LARRY ACINT CO STRUCTI
Signed:
By: LARRY JACINTO
Date:
Contracted By:
CENTE.
Signed:
By:
Signed:
® Date:
Expedition
4
t ,
C N <EX HOMES CONTRACT
NO. PGA-1003
2280 WARDLOW CIRCLE #150 Phone: 909)2794000 -
.CORONA, CA 91720 '
TO: Jones Bros. Construction Co. DATE: 7/22/99
r ' 85-989 Avenue 52 PROJECT': PGA WEST
P.O. Box 905 JOB: I PGALD2-ACCTG
r Coachella, CA .92236
ATTN: Mike Jones Master Contract No. 102-3
• I
Tract 28960 CENTEX HOMES
PGA West 2280 WARDLOW CIRCLE #150
La Quinta CORONA, CA 91720
I
For the satisfactory completion of the items of work included in this agreement, the Builder agrees to pay the Contractor
according to the following price schedule: 90% payable upon completion and Acceptance of Installation. A 10% Retention
shall be withheld from each, invoice, and shall be payable approximately thirty;five (35) days after Id ce.
Invoices may be submitted progressively as work is completed. ,Pr Q�ress f-rtr seyviGe,' icy
Item,�,^�.Quantity;Un�ts
�:,°, Desc"ription iUnit Price;;��
tNetAmount
01 319.00 LF
Construct 24" RCP Storm Drain i $47.00
$14,993.00
02 367.00 LF
Construct 30" RCP Storm Drain i $63.00
$23,121.00
03 4.00 EA
Construct MH No. I per RCFWCD Std. $4,860.00
$19,440.00
251
'04 7.00 EA
Construct Mod. Catch Basin per $5,172.00
$36,204.00
RCFWCD Std. 302 with Std. 305, Double
Type 24-18 Grates including Local
Depression
05 3.00 EA
Construct Bubbler per Detail on Sht. 2 of $1,477.00
$4,431.00
the plans
06 154.00 LF
Construct 8" ADS SDR-35 Drain Pipe i $36.00
$5,544.00
07 626.00 LF
Construct 30" ADS SDR-35 Storm Drain i • $61.00
$38,186.00
Pipe
t
c �
,
i
' Unit Cost:
$177,964.00
'
- I
Total:
$177,964.00
***JOB AGREEMENT / CONSTRUCTION AGREEMENT***
The Construction Agreement is hereby modified and amended by the following deviations from plans, specifications; project description,
and/or unit prices. All provisions of the Original Agreement shall remain in full force and effect without change because of these deviations.
Description: Master Contract No. 102-3 1 is amended to inI clude the project known as PGA WEST
Schedule C, C-1 (if applicable), B and B-1 are attached hereto and made part of this Job Agreement
At such time(s) that a price adjustment becomes necessary, to be determined by builder, in it's sole and absolute discretion, a change order
will be issued by Builder. The above prices include all freight, fees, permits, taxes or applicable costs required to provide for the work and/
or materials indicated.
When invoicing, Contractor shall submit a copy of the Standard Invoice or Requisition Form. Quantities are approximate and final payment
will be'made on actual quantities installed and field verified. Quantities exceeding those listed above shall be covered by a Contract
Change Order.
Contracted By: '
Jones Bros. Construe ' n Co.
Signed:
-By: JerY 6111IN
' Dater
- Expedition
Contracted By:
CENTEX HO ES
Signed:
By: Bob ming
Signed:
Michael ghlin
Date:
.i
Medium -Large Scale Construction/Demolition Projects
(Greater "than 5 acres)l y.
Fugitive Dust (PM10) Mitigation Plan '.
Date: g/s'I99 Jurisdiction: &_C� Project File i/� Z89�o
Part 1 - Project Information
r Please provide the information below as completely az possible even if it has already been
provided on other forms related to this project. • Failure to provide'complete information or
provision of inaccurate information may delay the processing of your Fugitive Dust (PM10)
Mitigation Plan (Plan). It is recommended 'that you submit your Plan concurrent with your
grading or demolition permit application. c
Project proponent:. CENTEX HOMES
Address: 2280 WARDLOW CIR., SUITE 150, CORONA, CA' 91720
Day phone number: 909/279-4000 Emergency phone number: 909/279-4000 .
Grading contractor (Contact Person): GREG METTLER TITAN ' ENGINEERING, IN
Address: - 41689 ENTERPRISE CIRCLE NORTH, SUITE 218, TE ECULA,. CA 92590'
Day phone number: 909/676-6202 Emergency phorie'numbem 909/676-6202
Construction site street address: 80-652'COLUNBINE
Construction site location: t
SOUTHEAST OF PGA BLVD.
(Please include an &5 z 11. location map)
,
Construction. site assessor's parcel number (Tract #):� TRACT 28960
Parcel (Tract) size: ` 24.3 Acres or Square feet
Anticipated date of physical project initiation: MAY 1999
Anticipated date of,project.completion:
Anticipated costs for dust suppression: $ 24,-000.00,
(Attachment B - Must also be completed and mailed tot a appropriate address when "
construction activities have been completed)
Er V E
RY M' 51999
CITY OF LAOUINTA'`
PLANNING DEPARTMENT
1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and
403.1. .
Earthwork Information (Acreage/Cubic Yards):
Project Area: TRACT 28960 Total Disturbed Surface Area: 24 ACRES
Cut: 26,800 Fill: 26,800
Import: —0— Export: —0—
Phasing of Earthwork:
Date Date
Phase I Grading (Acreage):24 ACRES From: 5/17/99 To: 6/7/99
Phase II Grading(Acreage): From: To:
Phase III Grading(Acreage): From: To:
Phase IV Grading(Acreage): From: To:
(Attach additional information if necessary)
Part 2 - Fugitive Dust Control Actions
From ,the inventory of fugitive dust control measures provided in Attachment A, please indicate
which measures are to be implemented during the project by placing the corresponding letter
beneath the following sources. In addition, please indicate at which phase the measure will be
implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction
(FC). Demolition projects should only indicate measures in the Rough Grading (RG) column.
After indicating what measures are to be implemented,' complete the 'Details" section by
describing how and when the measures are to be implemented.
Source Details (e.g.. freauencv of application number and type of dust control implements.
No. RG FG FC etc. Please be as specific as possible)
1• A A B' 10,000 GALLON STAND TANK:• USE OF 4;000 GALLON WATER TRUCKS
DIIRING SITE GRADING. SITE WILL BE PRE —WATERED PRIOR TO
COMMENCEMENT OF.GRADING.
2 H/I H/I H11; USE OF WATER TRUCKS DURING WET AND DRY UTILITYCCONSTRUCTION AND
STREET IMPROVEMENT IN CONJUNCTION WITH RESTRICTED SPEED LIMIT.
WATER TRUCKS WILL BE CONSTANTLY IN,USE DURING CONSTRUCTION
HOURS.
(Use copies of this page if additional space is needed)
Source Details (e.e frequency or application number and type or dust control implements.
No. RG FG FC etc. Please be as specific as possible)
3 _ _ _ DOES NOT APPLY
4 Q Q Q TRANSITION AREAS FROM UNPAVED TO PAVED ROADS WILL HAVE
COMPACTED .BASE MATERIAL PLACED IN A4,24:':%30' ' AREA.
PAVED ROADS WILL BE ROUTINELY SWEPT.
S T/U S S UPON COMPLETION OF GRADING,.UTILITY AND STREET CONSTRUCTION,
ALL INACTIVE PADS WILL BE SPRAYED WITH A POLYMER (EVIROTAC II),
AND A SECURITY FENCE INSTALLED TO PREVENT ACCESS THEREBY
CAUSING DISTURBANCE. ANY SURFACE DISTURBANCE WILL BE
RE —TREATED AS REQUIRED.
Part 3 - Agreement
I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true
and accurate and that all measures specified in Part 2 will be implemented during project
construction. I authorize the City of La Quinta to enter the above mentioned property
for inspection and/or abatement purposes, and'I agree to hold harmless the City and its
reptesentatives from liability for any actions related to this project. I also agree to
complete the record -keeping requirements included herein as Attachment B; once the
project has been completed.
lgnature O wne . OI t onzed epresentative -JOHN FONG to
PROJECT MANAGER
I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has
authorized the implementation, of. all its provisions throughout project buildout.
s � 9
(Ion(Date)
iature o mg tractor not the same as above) TITAN ENGINEERING, INC.-
GREG METTLER., PRES.
y ,
r
JA
i /• ~yam:/ •• ��•r '1.. �^� j41
I
i �.
Npor,ti.l EVE
CIey� �IUI,IA - I aan��3
ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES
The left column contains the sources of fugitive dust which are intended for emission control
under the City's dust control ordinance. The, two right columns contain an inventory and
description of reasonably available fugitive dust control measures for each of the. sources.
Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan.
(Source No) Reasonably Available
Source Control Measures Comments
(1)
Land (A) Watering
o Application of water by means of truck, hoses and/
Clearing/
or sprinklers prior to any land clearing or earth
Earth-
movement will increase the moisture content thereby
moving
increasing stability of material
o Once the initial land clearing/earth movement activities are
complete, a second round of watering can generate a thin
crust which stabilizes the disturbed surface areas provided
that it is not disturbed
o Security fencing can be used to prevent unwanted future
disturbances of sites where a surface crust has been created
(B) Chemical stabilization
o Only effective in areas which are not subject to daily disturbances
o Vendors can supply information on product application and
required concentrations
(C) Wind fencing
o Three to five foot barriers adjacent to roadways or urban arcas
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(D) Cover haul vehicles o Entire surface area should be covered once vehicle is full
(E) Wheel washers o Should be placed where vehicles e)at unpaved areas onto paved
areas
o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(2)
Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material
Roads accumulation
(G) Chemical Stabilization o Vendors can supply information as to application methods and
concentrations
o Not recommended for roads with high volumes or those used for
heavy equipment
(H) Watering o In sufficient quantities to keep surface moist
o Required application frequency will vary according to soil type,
weather conditions, and vehicular use
(Source No) Reasonably Available
Source control Measures
(2)
Unpaved (I) Reduce speed limits
Roads
ommen
o 15 mile per hour maximum
(Cdnt'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to
reduce vehicle trips by a minimum of 60 percent
----------------------------------------------------------------------------------------------------------------------------- -- ------
(3)
Storage (K) Wind sheltering o Choices include silos or enclosures
Piles o Enclosures should consist .of three sided barriers equal to height of
material with no more than 50 percent porosity
(L) Wet suppression o Application methods include: spray bars, hoses and water trucks
o Frequency of application will vary on site specific conditions
(M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances
(N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side
procedures of the material
o Most effective when used in conjunction with wind sheltering
(0) Coverings o Tarps, plastic, or other material can be used as temporary
coverings
o When used, these should be anchored to prevent wind from
removing coverings
-------------------------------------------------------------------------------------------------------------------------------------------
(4)
Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved
Road areas
Track -out o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(Q) Sweep/clean roadways o Either sweeping or water flushing may be used
(R) Cover haul vehicles
-------------------------------------------------
(5)
Disturbed (S) Chemical stabilization
Areas/
Inactive
Construction .
Sites
(T) Watering
o Entire surface area should be covered once vehicle is full
o Vendors can supply information on methods for application and
required concentrations
o Would require frequent applications unless a crust
can be developed over the site
(U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(V) Vegetation. o Establish as quickly as possible when active operations have
establishment ceased
o Use of drought tolerant, native vegetation is encouraged
ATTACHMENT B - COST INFORMATION
Medium -Large Scale Construction/Demolition Projects
(Greater than 5 acres)?
Fugitive Dust (PM10) Mitigation Plan
Date: s 9 9 Jurisdiction: L, Q r Project File #: loc.P 99- 6 9
Project proponent: CENTS% HOMES
Address: 2286 WARDLOW CIRCLE, SUITE 150, CORONA, CA 91720
Day phone number: 909/279,414000 Emergency phone number: 909/279-4000
In the space provided below please list the costs associated with implementation of all dust
control measures. The information provided below should include all implementation costs
(including labor) for dust control throughout the project. Not all measures listed below will
apply to all projects.
Watering:
$40; 0000 .
Chemical stabilization:
$10,000.
Wind fencing:
$ 7,000.
Covering haul vehicles:
-0-
Wheel washers:
-0-
Street sweeping:
$5,000.
Paving:
-0-
Wind sheltering:
-0-
Coverings:
-0-
Vegetation reestablishment:
-0-
After project completion these recoras snatt oe rrurw»««CU IV !f« %-!!y rv, r- t!«
grading/demolition permit was attained and to the Coachella Valley Association of
Governments (CVAG) at the address provided below.
PM10.Cost Monitoring
Coachella Valley Association of Governments
73-710 Fred Waring Drive, Suite 200
Palm Desert, CA 92260
1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and
403.1.
For City Use Only
Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan.
the Plan is:
Approved ..
XX Conditionally approved (Conditions specified below)
Denied (Explanation attached)
Signature of City Representative (Date)
The following conditions of approval have been added to the Plan by staff in.order to ensure
an.adequate level of fugitive dust control
(Attach additional information if necessary) .
I have read the above conditions of the Fugitive -Dust (PM10) Mitigation Plan and I agree
to implement of all provisions at the concentrations ano frequencies identified.
th o zedRepresentative to
JOHN FONG - PROJECT MANAGER
CONDITIONS FOR FDCP APPLICATION 99-69:
CENTEX HOMES/TITAN ENGINEERING
TR 28960; ± 24.3 ACRES
GENERAL:
1 . Applicant shall comply with all control measures as set forth in the approved
application for FDCP 99-69, and the following conditional measures. This dust
control plan approval shall, also apply to any haul/encroachment permit(s)
issued by Public Works. Where any conflicts arise, the Public Works Director
shall determine the appropriate controlling provision(s).
2. The full amount of security furnished for the approved FDCP (as determined by
Public Works) shall be available to the City for any measure(s) deemed
necessary by the City to achieve adequate dust control, whether or not such
additional measures are included in this application. Form of security shall be
determined by Public Works. Any requests for bond amount revisions must be
made in writing to the Public Works Director.
3. Applicant shall submit documentation for all costs incurred for dust control
measures assumed during all pre -grade activity and grading construction. Said
records shall be submitted within 30 days after completion of all dust control
measures as outlined in and conditioned upon the plan, or upon any request for
release/reduction in posted security. Documentation shall include a completed
PM 10 Program Report Form. Security may be withheld pending submittal of
this information. Applicant shall have completed all dust control measures, as
verified by the assigned field inspector, prior to release of any posted security.
4. The contractor/vendor responsible for provision of Envirotac-II and any other
soil stabilizing agents shall submit the appropriate Material Safety Data
Sheet(s), along with approval from the Water Quality Control Board, to the
Public Works Department prior to any site application. Application of stabilizing
agents must be incompliance with NPDES and the state Water Quality Control
Board requirements.
5. Adequacy of all proposed and conditional stabilization measures shall be
determined by the assigned grading inspector. The City may release a portion
of the bonded amount to the applicant for any remedial measures beyond those
identified or conditioned upon the project, which the City deems necessary in
the event such approved measures are not effective.
Enforcement of these conditions shall be at the discretion of the assigned
grading inspector, who shall monitor and field verify that the spirit and intent
of the FDCP and its attached conditions are being complied with. Adjustments
C:\Wrkgrp\FDCP\fdcp99-69.wpd
to application frequencies, quantities and other aspects of this FDCP may be
made by the inspector, at his/her discretion, in order to assure compliance.
6. The conditions applied to this dust control plan are anticipated to cover the full
range of construction operations associated with development of the 75
residential lots and associated. common lots within the limits of TR 28960, as
shown on the application's tract exhibit. Theapproval provisions and
conditions for this dust control plan shall remain in effect for the duration of all
construction activities for this area of the tract, including building construction.
Transfer .of any real property or other interests with respect to this project will
have no effect on the validity of this` plan approval or conditions.
Implementation of all measures as proposed and conditioned shall be carried
out for the duration. of all construction activities, to the extent they are
applicable. However, nothing herein shall preclude any future interest from
filing a revised FDCP with the City for any portion of the site.
7. Approval of this dust control plan does not in and of itself constitute or
otherwise authorize any site disturbance, preparation or construction. The
developer is required to obtain all necessary permits and clearances as set forth
in any development approvals issued and currently in effect pertaining to this
site. This includes any type of testing, monitoring or sampling required as a
condition of development approval, such as that conducted for archaeologic,
hydrologic and geologic reporting purposes.
SITE DEVELOPMENT:
8. Pre -watering of all areas proposed for grading shall be in accordance with
recommendations of the grading contractor, based on the area soil conditions
as described .in the associated soils report(s). At a minimum, pre -watering time
shall be for three consecutive days prior to any earth disturbance(s).
9. Track -out and other accumulation of soil material(s) onto any paved areas shall
be minimized. Any unpaved construction exit/entry point along existing paved
roads/areas shall be improved with pavement, aggregate base or similar
material; for a distance of 120' from the pavement edge into the site to
minimize track -out. Wet sweeping/flushing of soil accumulations from all paved
areas shall be conducted daily, and kept damp during construction hours until
-so removed.
10. All unpaved construction access and travel ways within the site shall be
prepared. for traffic prior to commencing grading activities and kept watered
down and compacted to retain moisture content, during all construction
traffic/activity, including building construction. At a minimum, all construction
travel ways shall be improved to a '20-foot width. Road lengths shall be
C:\Wrkgrp\FDCP\fdcp99-69. wpd
I
watered each day; prior to, during, and after all land disturbance activities.
Track -out shall be removed per Condition #9.
All on -site traffic shall be limited to 15 MPH. Signs shall be posted at all entries
and along all unpaved access and travel ways at minimum 300-foot intervals.
Size .and height of the signs shall be as appropriate for their respective
locations, and shall not be posted on any adjacent private properties. Site
superintendent and security personnel shall be responsible for enforcing this
requirement.
11 . FDCP 99-69 indicates balanced cut/fill for TR 28960. Any transported soils
and/or stationary storage piles shall be sufficiently stabilized, watered down
and/or covered as appropriate. Minimum freeboard shall be as established by
the Public Works Department as necessary. Any on and off -site borrow and
spreading areas shall be routinely watered and chemically stabilized after
disturbance to mitigate airborne dust. Off site areas shall secure necessary
approvals, or show they exist, prior to use.
12. Any on -site temporary 'employee facilities (sales/construction trailers;
equipment storage, etc.) shall be provided with paved, compacted or otherwise
stabilized parking and access during their operation, with those improvements
to be constructed to the applicable Public Works Department standards. This
requirement shall apply to any approval for such facilities under a minor use or
other permit process, and parking . lot/trailer locations as shown in the
application.
13. If approved on -site roadways or parking areas are constructed to ultimate.
design prior to completion of construction- activities,. then traffic and parking
shall be limited to those paved areas as feasible, unless alternate paved parking
is available. No vehicular parking or traffic of any kind is permitted on or over
any previously stabilized or other inactive soil areas.
14. Disturbed . but inactive development areas subject to additional grading or
building construction within 30 days of completion of the initial disturbance,
shall be watered daily in conjunction with watering of access roads and .
developing areas. In lieu of daily watering of such areas, an appropriate soil
binder may be applied.
All disturbed areas where no further' grading, construction or other land
disturbance will occur for at least 30 days, shall be stabilized with an
appropriate dust suppressant, as defined in Chapter 6.16 of the LQMC and
approved by the California Water Quality Control Board, Region 7, no later than
four days after completion of the initial grading. These areas shall be staked,
posted or otherwise restricted in order to.prevent access on or across them.
Any fencing used to restrict such access shall not exceed 4 feet in height and
C:\Wrkgrp\FDCP\fdcp99-69.wpd
be equivalent to snow fencing,. to further mitigate potential for blowing dust.
Chain link/cyclone-type fericing is not permitted without wind slats, and must
be approved by the Community Development Director if proposed. Any fence
permitting requirements of Building and Safety shall be met.
15. Construction activity associated with this project will occur during high wind
activity (February through June) in the Coachella Valley. All active graded
areas shall be watered daily at appropriate intervals. A minimum of 1 water
truck shall be stationed on -site on weekends and holidays. All project personnel
shall be alerted to the need for dust control and instructed to monitor disturbed
areas for wind -generated dust as part of their routine duties. On Sundays,
holidays and other non -construction days, appropriate personnel shall be on -
call for emergency watering in the event of high winds.
C:\Wrkgrp\FDCP\fdcp99-69.wpd
78-495 CALLE TAMPICO — LA QUINTA, CALIFORNIA 92253 - (619) 777-7000
FAX (619) 777-7101
May 10, 1994
TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS .
IN THE CITY OF LA QUINTA
RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL
PLANS
Dear Developer/Builder:
The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992.
Among the required control measures was the enactment by Valley cities of dust control ordinances .
which .require builders to implement dust control actions during construction, demolition and paving
activities. In conjunction with City staff members, we ask your help with the reporting requirements.
A significant aspect of the PM 10 Program is. the need to report. statistical information to the Federal
Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources
Board. In response to this requirement, a Dust Control Reporting Form has been created, a copy of
which is attached. It is requested that if any project developers have amounts to report for any PM 10
mitigation, these forms must be filled out. This form is intended to supplement Attachment "B" of the
Fugitive Dust Control Plan by providing specific cost figures related only to dust. control measures.
The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for
reporting. purposes.. This means that each jurisdiction is requested to review projects since that date
where PM 10 control measure expenses have been incurred by ,developers, whether or not they have
been incorporated as part of a Dust Control Plan, and forward this data to CVAG as soon as practical.
Your cooperation in completing these forms as part of the.grading permit procedure will help assure
that the Coachella Valley and the development community as a whole receive deserved credit for the
effort to attain Clean Air Act standards for PM .10.
Very truly yours,
RRY HERMAN
Planning & Development Director
�M WHN:bjs
Attachment
3�
MAILING ADDRESS - P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253
1 TR\vN n1
f
PM 10 Program Report Form
I. GMNX Ar_ DMRbM=ON
P=jec'-- DevelOper Name; CENTS% ROMES
Address: W CIR. STE 150-CORONAC one:
909 279-4000
24.3
Z02
in:
Our
T�
`4 -
SENDER .complete items 1' and #2;.wheri. addmoaaF;services "d
-%t,?our;,a respj
66it--rotrm, to -v6u-',iThe.�ietLifn'*.;ewill 'Provide yod the*�6eiDt The ame c
A eal,e, e v li 6 I— Fdr.-add—ltionq te s t ei o owing ,rseryices 'are ':avails ble
s
g',6ddre
0addresseess
t
icl
CENTEX HOMES T e of Sec
22-80 WARDLOW CIRCLE SUITE 150 vP
%E-J"Rei g stere
;,;xE�i CORONA. CA 91270 -riif ied
0-
Always
o6taii
_Sign re =Addressee i 8.'iA d riss
requ
ested
Wit. ivy1117- �Ili