3067NOTE:
With proper validation
this form constitutes an
encroachment permit
CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE: 10/15/99
LOCATION OF CONSTRUCTION TP,. 27519 6 PAM SITE
-'Street address or Description of Location)
PURPOSE OF CONSTRUCTION
GRADIIIG
Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION MDF, xi .27519 6
Cn`"'itlXaT V PARZ 1,TQPTH
SEE &TTAM10 CO"_DIiIa::O
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 10/20/99
APPROXIMATE TIME OF COMPLETION 11/25/99
ESTIMATED CONSTRUCTION COST $ 2114..477
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
1
Signature of Applicant or Agent
c; ~,army CRMTFLL CO1M. (909)301--6007
Name of Applicant (please print) Business Address Telephone No.
nrr%n
Name of Contractor and Job Foreman Business Address Telephone No.
R7141M
Contractor's License No.
02120
City Business License No.
roymm1 rrngu? nis. N.X 544060-00
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee
Permit Fee
$ R.5,314
100
Penalty
Cash Deposit -Surety Bond
b 1,000 DUiLT
if required
PLANCFEEtaK tz, z.7u) t:e*W.L'l
TOTAL: $ 7-1Rg
Receipt No.
Received by Date
PERMIT NO
306
PERMIT VALIDATION
3067
DATE APPROVED 10/15/99
EXPIRATION DATE 10/15/00
DATE ISSUED JJ= 1 0' 7111A 01
By DiA 4A
Admmistrative Authority
Recorded by
Telephone: (619) 777-7075
La Quinta Public Works Department
78-495 Calle Tampico • La. Quinta, CA 92253 •. (760) 777-7075
QUALIFIED STATEMENT OF
SUBSTANTIAL CONFORMANCE AND SUBSTANTIAL COMPLETION
PERMITTEE: Century Crowell Communities
PERMIT NO.
3067
TYPE OF WORK: Rough grading - 18-acre City park land; N/E/C/ Adams & Westward Ho
IMPROVEMENT PLAN TITLE, or IMPROVEMENT PLAN IDENTIFICATION NUMBER.(IPIN):
"City Park Site Mass Grading Plan" (2 Sheets), prepared by Dudek _Associate, approved by
City Engineer 10/5/99'
,This qualified statement is issued as evidence to whom it may concern that the improvement(s) constructed, or installed, pursuant to this
permit substantially conform to the approved improvement plan and are substantially complete. This Statement is issued contingent upon the
.qualifications listed and check -marked below:
❑ The improvement(s) constructed or installed pursuant to this Permit are an improvement requirement for (Tract Map, Parcel Map,,
Site Development Permit) This .statement of substantial conformance and substantial completion is a written
clearance mechanism that advises the Permittee the improvements are sufficiently complete to allow progressive development
activity to occur where subsequent improvements may be dependant on these improvements. This Statement shall not be
construed as evidence the La Quinta City Council has accepted the improvements pursuant to a Subdivision Improvement
Agreement.
Since the improvements constructed or installed pursuant to this Permit are not an improvement requirement pursuant to another
agreement with the City where City Council acceptance action is. required, these improvements are hereby deemed complete
subject to the warranty provisions of the Permit.
ROUGH GRADING
❑ The building pads are suitable for future construction of dwelling.units and structures.
❑ Future construction of dwelling units and structures can occur only if a subsequent Precise Grading Plan providing for a suitable
building pad(s) or storm water management facilities is prepared.
COMMENTS:
The grading work was performed pursuant to an agreement with the City in which Century would grade
the 18-acre park site in exchange for up to 107,000 CY of dirt to export to another site. Century did not
acquire all 107,000 CY,.but did complete the grading in a satisfactory manner. The pad in the S/W/C of
the park site was left high but appropriately leveled. The well casing exposed. by the grading contractor
will bJ abandoned by the City at City expense at a later date.
Loo
AUTHOWED CI, G ATURE
DA E
TAPWDEPT\STAFF\SPEER\Notes & Concepts\Substantial Conformance.wpd
The following General and Special Provisions are attached to and made a part of Permit No. -�S o
GENERAL PROVISIONS ,
The following shall always apply
ENROACEMENI' ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of
way ONLY.. Whenever construction extends within private property, it is the responsibility of the permittee t'or'his contractors to
secure permission from abutting property owners, Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT- Cleated tracklaying construction equipment shall not be permitted to operate on
any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to
protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations. in paved areas., If the existing
pavement is scarred,,spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of.two inches (2') of A.C.
surfacing plus appropriate seal cost as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the
City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the
duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes
necessary to remove or cut existing drainage structures, City of La Quints shall be notified prior to commencement of this work.
Drainage structures and open drains shall be kept free of debris at all times for proper drainage.
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shad' be removed from the right
of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'compaction.
Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed
prior to paving.' Water tanker shall be used, as required, to sprinkle the job site to keep, down dust conditions and shall be used
immediately after backfill.
x '
DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on Cityof La Quinta roads, it shall
be the responsibility of the permittee (contractor) to control thismater and to provide off-street barricades when necessary..,
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles,. In the event it is felt by,th_e permittee that he 'must close a street for
any length of time, permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated. 4
R'1 NOTIFICATION: Parmittee shall notify the City at (619)777-7075 at least 49 hours in advance of starting construction.
ZT ELITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way
authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing'
substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the'sole
responsibility of the permittee. ,
UTILITY CLEARANCE: (Surface Structures) No work sball'be done under this permit until all utilities are clear of the
proposed work site.' The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing toad pavement shall be surfaced
with . inches of A.C. paving placed on inches of class aggregate subbase course having an 'R'
value .of not less than and in conformance with City of Ia.Quinta Road Improvement Standards and
Specifications, Ordinance #461.
R5 PARKWAY GRADING: _Area between the property line and top of the proposed concrete curb shall be graded to a slope of
1/4 inch to one foot (1).
t R6 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter Meet) shall be
removed. Curb and/or curb and gutter shall be saw cut prior to removal.. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standaid #207. ,
RS DRIVEWAYS: A.C. driveways shed be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on ( ) of class aggregate base. .
Driveway construction shall conform to attached drawing. '
R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times.
RIO SOIL SIERH.IZI : The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with.the
manufacturer's specifications.
1 COORDINATE WORK- The proposed work shall be subordinated to any operation which the State of California or City of
La Quints, may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State of City of La Quints. projects.
SURVEY MONUN92IM: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the des to
these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified
upon completion or replacement of all survey monuments for proper project clearance.
R 13 PAVEMENT' CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method
of pavement cutting shall be approved through the office of the City Engineer.. (Under no circumstances shall excavating
equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best
facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LU Tf OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the
traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. -No
excavation shall remain open for a period exceeding five (5) days. No excavation shell be made unless the construction
material is actually on the work site.
RI 5 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced
by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than
three feet (3) and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any can,
a relative compaction of 95 percent shall be attained with the structural section of the roadway.
R17 BACEY1LL PLACEMENT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (57 lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting
compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction.
Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where
jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous.
RIB COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000
feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
R1.9 COMPACTION TESTS: If so required•by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the•City Engineer for approval and filed prior to making permanent repairs.
Compaction testa shall be made as outlined in Section 6.3.01• of the Standard Specifications, Division of Highways, State of
California, dated January 1973.
g20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC400 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a
maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the
placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT. PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a
inch class base shall be placed no later than days after completion of temporary road repair.
R2-2 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall he applied over all patch areas as
determined by the City Engineer.
R2 3 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be
accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling
public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump
hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to
restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or
barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall
comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
SPECIAL CONDITIONS --PERMIT NO. 3067
--- CENTURY HOMES
In addition to the standard permit. conditions, the following shall apply:
1: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Century Homes, hereinafter referred to as "Permittee", shall be responsible for providing continuous
dust and erosion control. All areas shall be kept watered down daily including weekends.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee shall comply with _City regulated work hours. Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during
the following time periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
5. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10. § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage to other City streets or facilities as a result of work performed under this
permit. .
6. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
7. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not.be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
8. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
Special Conditions - Pernvt`No. 3067 Page I of 3
SPECIAL CONDITIONS --PERMIT NO. 3067
CENTURY HOMES ---
be performed by the Permittee as.directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
9. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982),
backfill compaction -within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Native material may be used as backfill. material provided that minimum compaction, achieved in
the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no
water densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at -all times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the.resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the,materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
D. If lifts greater -than one foot are attempted in this trial length of trench, compaction tests shall
be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift
thickness to be compacted for the remainder of the project.
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of -trench.
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other.
Special Conditions - Permit No. 3067
Page 2 of 3
SPECIAL CONDITIONS --PERMIT NO. 3067
--- CENTURY HOMES ---
H. If any compactiontest fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
10. 'Access and egress to all local properties shall be maintained at all times.
11. Permittee shall notify the City of La Quinta Public Works Department a minimum of 48 hours prior
to commencement of any construction at (760) 777-7075.'
12. Permittee .shall permanently stabilize any and all soil that was disturbed as a result of work
performed under this permit with an approved dust control treatment. Soil stabilization shall be done
immediately, after completing the operation.
13. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets.
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit. specifically
grants permission to use the street to deliver street construction materials and/or equipment.
14. This permit allows for the Grading of the Community Park North and the grading of tract 27519 per
the approved plans for each project.
15. Permittee shall perform all grading operations at its own expense.
16. Permittee shall indemnify and hold harmless the Agency against all liability arising from all activities
conducted by the permittee, pursuant. to this approval.
17. Permittee shall confine grading activities to the area cleared by the Archaeologist.
18. Permittee shall retain the services of a qualified Archaeologist at its own expense to perform
archaeological monitoring during grading operations if it is required by the study/report .
19. Permittee shall apply a long-lasting soil stabilizing agent to all disturbed areas within 2 weeks after
completion of grading activities.
20. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3067 Page 3 of 3
f ' •
---------------
NOTE:
With proper validation
this form constitutes an
encroachment permit
'EIVED
OCT g 1 199a
111111111110
CITY ,OF LA QUINTA
APPLICATION FOR, PERMIT
PUBLIC WORKS. CONSTRUCTION (ENCROACHMENT)
• C`n`y OF ���
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit —Class III
DATE L �`' Minor Improvement ermit Cl as IVY
LOCATION OF CONSTRUCTION
(Street address or Description of Location) I
PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate)
0) t
DESCRIPTION OE CONSTRUCTION Z 51 /�
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
APPROXIk4AjE TIME WHEN' ORK L BEGIN
APPROXIMATE TIME OF COMPLETION �
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, bactfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant, hereby agrees to:
Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and, arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. ,
Notify the Administrative Authority at lean twenty.four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
Lis Quints and to pay for any additional replacement necessary as the result of this work. // }
��Signatu a 7V,rit or Agent
90 � ,a*l-6 7-
Name of Applicant (ease print)B si ness Addres Telephone No.
Name of Contractor and Job Foreman r Business Address Telep one No.
Do2.1o2�
Cesntractor's License No_/, /1 . City Business License No.
Applicant's Insurance
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit Class IV: See attached schedule
Inspection Fee $ v5 3 3
Permit Fee 1 0 d
Penalty 0 01) - F3
Cash Deposit -Surety Bo d ,AZ
if required
TOTAL: $ 11
Receipt No. .
Received by Date
2774.
PERMIT VALIDATION
PERMIT NO. 3��7
DATE APPROVED
EXPIRATION DATE 10'15
DATE ISSUED
By
Administrative Authority
Recorded by
Telephone: (619) 777-7075
COOLEY CONST. INDIO Fax:760-775-4254 Apr 8 '99 1:59 F.02
OO ]p�� LICENSED CONTRACTORS 4M12 N. Jackson Street
Cooley
r Suite 4
CONSTRUCTION, INC. Asphalt Paving, Grading, Underground Indio, CA 92201
CA Lit. 0 348038 AZ Lie. # 108371 Telephone (760) 775-5344
NV Lic. 0 0038743 and 0038744 Fax (750) 775-4254
To: CENTURY HOMES Attention: GARY/ED KNIGHT
1535 SOUTH D ST. SUITE 200 Date. 3/11/99
SAN BERNARDINO, CA 92408
We propose to furnish you labor. equipment and material only as noted below at the unit prices shown for the construction.
of your project: CENTURYIALISO DEL RAY TR-27519
located at:
Item No. Description Quantity UIM UnitPrice Total Price
1 1 ON SITE GRADING 1.0 LS 0.000 0.00
1 1A PRE -WATER TRACT 18.0 AC 636.000 11,448.00
1 1 B PRE -WATER PARK SITE 18.0 AC 700,000 12,600.00
1 1C CLEAR TRACT REM.TREES @ RETN. 1.0 LS 25,752.000 25,752.00
1 ID CLEAR PARK SITE (TRIM TREES) 18.0 AC 410.000 7,380.00
1 1E TRACT CUT/FILL 38,677.0 CY 1.000 38,677.00
1 1F PARK SITE CUTIFILL 21,000,0 CY 0.980 20,580.00
1 1G IMPORT FROM PARK SITE 138,500.0 CY 0.960, ' ,132,960.00
1 1 H ROUGH GRADE PADS/RET.POND/ST. 790,297.0 SF 0.037 29,240.99
1 11 ROUGH GRADE PARK SITE 806,667.0 SF 0.024 19,360.01
1 1J MOBILIZATION-TRACT/PARKSITE 1.0 LS 12,181.000 12,181.00
310,179.00
Total Proposal Price: $310,179.00
Special Conditions: - ols- 7 CiD
1. No permits, testing, bonds, survey
2. No dust control/ soil stabilization upon completion of our work
3. No landscapetfinal grading
4. No adjusting/relocating/removing any utilities/manholes/vaults
5. No backfill of walls/footings
6. Not responsible for unknown underground utilities encountered in grading operations
7. No cost of construction water or meter.
Quotation Note:
SITE TO BALANCE, IMPORT FROM PARK SITE TO BE ADJUSTED TO BALANCE TRACT. CLEARING ON
TRACT SITE., REMOVAL OF EUCALYPTUS TREES AT RETENTION BASIN ONLY, REMOVE TAMARISK
TREES AT SOUTH WEST CORNER OF TRACT, HAUL OFF PILES OF TRASH. CLEARING PARK
SITE,TRIM TAMARISK TREES ALONG EAST EDGE,REMOVE LIGHT BRUSH, WE WILL NEED 2 WATER
LOCATIONS 1 AT DUNE PALMS AND 1 ON WESTWARD HO FOR PRE -WATERING.
N
TO:
THRU:
FROM:
DATE:
RE:
MEMORANDUM
Tom Genovese, City Manager
Chris Vogt, Public Works Direct r/City Engineer
Steve Speer, Senior Engine
October 5, 1999
Community Park North Mass Grading Agreement - Century Homes
The attached agreement has been reviewed by Dawn Honeywell and found to be sufficient
to suit our needs, if:
'I) the work is performed under a grading/encroachment permit that has ail the
typical insurance and indemnification requirements we require when anyone
works in city right of way or'performs grading in the City's jurisdiction, and
2) the permit is not issued until the archeological survey is completed, and
3) the permit is issued with the soil stabilization requirement.
It should be noted, all three items are standard requirements whenever a grading permit
is issued in the City and will of course be made a part of the permit issued to Century
Homes.
Please sign the attached agreement at your earliest convenience.
T:IPW DEPTISTAFF�SPEER%M EMOSISTD.wpd
e
FUGJTI1VE D-UST (PM• 10
M I T I G A T I .O N. P L A. N
For Construction Pro j ect
r
ALISO DEL, REY `
TRACT NO. 27519
LOTS 1 - 70 APPROVED BY COMMUNITY DEVELOPMENT DEPT
.E .
DATE s k 9
I GiJGP 99 •�2
� 1 EXHIBIT
Prepared for CASE NO. - ��2•
p
Century Crowell Communities
Prepared by
Dudek and Associates, Inc.
,+Ff.:ffffffff�f/f/f,f.+f:fi'•'•}:i::j^'^.':; ;:;YJ.!:,+/fFFFffff.^, ' ,
. - vlix.}f:. �i� • 4'% Jam{ �i fi}. {�' � � � V � � V � � f &. ASSOCi�•MS, INC. - D � �
f4 1a+v(rsailMal'�iRinuf(�"Iixiuy'RPY6jrciS R -
August 1999 CITY OF LAG UINTA
PLANNING DEPARTMENT .
{
r
t
WE VIT
a �4-ia�dil
zUA - — VViE
GI LHAED BA MAMMA DEAEIDi;MVIi DELL
Z
D
r
�
N
0 M
c)
0
F--.1 0
=
Z
m
Boy�
o
y
Z
CD
CD
r*m
o
WASHINGTON
ST.
F
rn
m
0
ADAMS
L
ST.
=
N
Z
.,
z
DUNE
PALMS
ROAD
rm
�~
Z>
Z
m o
0
v
'
O
JEFFERSON
AVE
o
Medium -Large Scale Construction/Demolition Projects
(Greater than 5 acres)'
Fugitive Dust (PM 10) Mitigation Plan
Date: August 18. 1999 Jurisdiction: City ofLa Quinta Project File #: 1902
Part 1-Project Information
Please provide the information below as completely as possible even if it has already been provided
on other forms related to this project. Failure to provide complete information or provision of
inaccurate information may delay the processing of your Fugitive Dust (PM 10) Mitigation Plan
(Plan). It is recommended that you submit your Plan concurrent with your grading or demolition
permit application.
Project proponent: Century -Crowell Communities
Address: 1535 South "D" Street, Suite 200, San Bernardino, Ca. 92408
Day phone number: 909-381-6007 Emergency phone number: 909-514-8003
Grading contractor (Contact Person): To be determined
Address: To be determined
Day phone number: Emergency phone number:
Construction site street address: Dune Palms Road north of Westward Ho Road
Construction site location: (See attached 8%2 x 11 " Location Map)
Construction site assessor's parcel number (Tract #): Tract No.: 27519
Parcel (Tract) size: 17.6 Acres or Square feet
Anticipated date of physical project initiation: September 1999.
Anticipated date of project completion:. January 2000
Anticipated costs for dust suppression 20 000.-00 r�
(Attachment B-must also be completed and mailed to he appropriate address when construction
activities have been completed.)
1 All projects greater than one half C/Z) acre are also subject to SCAQMD Rules 403 and 403.1.
Page 1
Earthwork Information (Acreage/Cubic Yards
Project Area: 17.6Acres
Cut: 42.345 c.v.
Import: 128, 679 c. v.
Part 2 - Fugitive Dust Control Actions
Fugitive Dust (PM]0) Mitigation Plan
Total Distributed Surface Area: 17.6 Acres
Fill: 136.819 -c. v.
Export: 0 c.y.
From the inventory of fugitive dust control measures in attachment A, please indicate which measures
are to be implemented during the project by placing the corresponding letter beneath the following
sources. In addition, please indicate at which phase the measure will be implemented, either Rough
Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only
indicate measures in Rough Grading (RG) column. After indicating what measures are to be
implemented, complete the "Details" section by describing how and when the measures are to be
implemented.
Page 2
! • '
Fugitive Dust (PMIO)'Mitigation Plan,,*
-Source
_Detail e.frequency of application, number, and'ty-pe,of ausi control
'
implements etc. '
` r No. RG
FG -, ,FC
. 1 A
Pre =grading site watering. by agri-type water system to be
}
t. done in the 'mass grading. stage. Required depth of water
penetration to be determined by grading contractor's field
t
superintendent and Soils Engineer.
A
'Site watering to be done by water trucks until completion of
massgrading.,* Water shall be.ih the form•of multiple daily
applications in such amounts and such frequency so as to
prevent fugitive dust from iigrating across property lines.,'
This shall include ;watering before and afterconstructionr,
hours and on holi s}and weekends. '
-
j . 1 ; A
Site watering by water trucks shall be' utilized on building
_
' . pads,'streets and landscaped areas after massgrading is
.'completed. Watering shall be 'in the form of multiple daily,
`
applicationns in such amounts and of frequency so as to, ` '
prevent fugitive dust from migrating across property lines.
` This shall include watering before and after, construction and
'
on holidays and weekends: '
2 H •
Site watering'to be done by trucks on,roadways used by_ `
construction traffic. Watering shall be done:in the form of ;
multiple'daily, application in such amounts and of such
.,
frequency so as to prevent fugitive dust from migrating
;
across property lines.,•This shall include watering before and
after construction and on holidays and weekends. ,
' 2 ' I
I' I .. A speed limit'of 1 S miles per hour will be enforced on all dirty
y'
.� • roads ford all construction veli cles�
rf
a
.�
_ s , '� •
Page 3 ,
w ..
Fugitive Dust (PMIO) Mitigation Plan
Source Detail (e.g. frequencof application, number, and type of dust control
implements etc.
No. RG FG FC
3 L L Soil storage areas and soils stockpiles shall be kept
continuously wet by use of a temporary sprinkler system. As
an alternate, soil stockpiles may be stabilized by the use of an
EPA approved chemical dust suppressant.
In any event, soils stockpile, storage, and other areas
distributed by the grading operation shall be stabilized by the
use of an EPA approved dust suppressant whenever
operations on these specific areas are discontinued for a
period in excess of 30 days.
4 P P P Stabilized construction entrance (aggregate road base) to be
installed (See SWPPPIPMIO Plans for location, size, and
details) at unpaved roads adjacent to paved public roads.
These will be kept in place and maintained until project
streets are paved.
ALL
4 Q Q Q Pavedf. streets shall be cleaned on a daily basis to remove
soil originating from the site to the satisfaction of the City
inspection staff.
4 R R R Loads of soil transported to or from the site on public streets
shall be. wet down and covered. Additional measures maybe
specified by the City inspection staff.
5 S S Soils stabilizers (Aqueous Acrylic Vinyl Acetate Polymer
Emulsion Dust Retardant) to be used (See SWPPPIPMIO
Plans) in the rough and finish grading stage until completion
of the improvements (includes buildings and roadways).
Page 4
Fugitive Dust (PM10) Mitigation Plan
Source Detail (e.g. frequency of application, number, and tXpe of dust control
implements etc.
No. RG FG FC
5 T T. Site watering to be done in the fine grading stage until
completion of the improvements (includes buildings and
roadways). Watering shall be in the form of multiple daily
applications in such amounts and of such frequency so as to
prevent fugitive dust from migrating acrossproperty lines.
This shall include watering before and after construction
hours and on holidays and weekends.
5 V Vegetation (hydroseed, stolons, sod, trees and plantings) to
be installed on building pads and perimeter areas. (See
Landscape Plans for type, size and loc'ation.)
In addition to the above listed dust control measures, the following controls are to be implemented:
To minimize track -out of soil, the wheels and tires of all vehicles shall be inspected and
washed prior exiting to the paved streets.
2. Applicant shall apply sufficient fugitive dust control measures to minimize dust visible from
off -site.
3. An approved NPDES permit shall be secured and submitted prior to the issuance of the
grading permit.
4. Applicant agrees to abide by all measures specified in the project environmental. impact report
relating to grading and dust control activities.
5. Applicant agrees to abide by and implement all measures relating to fugitive dust control
specified in the site grading plan.
6. Applicant agrees to abide by the provisions of the South Coast Quality Air Management
District Rule 403 and City Ordinance No. 6.16 relating to fugitive dust and erosion control.
7. Applicant understands that failure to abide by any of the fugitive dust control mitigation
measures listed in this plan may constitute a cause for.abatement by the Building Division and
possible work stoppage.
Page 5
Part 3 - Agreement
I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true
and accurate and that all measures specified in Part 2 will be implemented during project
construction. I authorize the City of La Quinta to enter the above mentioned property
for inspection and/or abatement purposes, and I agree to hold harmless the City and its
representatives from liability for any actions related to this project. I also agree to
complete the record -keeping requirements included herein as Attachment B; once the
project has been completed.
ienature o wner or Authorized Representative ate
I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has
authorized the implementation of all its provisions throughout project buildout.
To V '
ignature o Grading Contractor or Authorized Representative (lute)
(If not the same as above)
ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES
The left column contains the sources of fugitive dust which are intended for emission control
under the City's .dust control ordinance. The two right columns contain an inventory and
description of reasonably available fugitive dust control measures for each of the sources.
Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan.
(Source No) Reasonably Available
Source Control Measures Comments
Land (A) Watering o Application of water by means of truck, hoses and/
Clearing/ or sprinklers prior to any land clearing or earth
Earth- movement will increase the moisture content thereby
moving increasing stability of material
o Once the initial land clearing/earth movement activities are
complete, a second round of watering can generate a thin
crust which stabilizes the disturbed surface areas provided
that it is not disturbed
o Security fencing can be used to prevent unwanted future
disturbances of sites..where a surface crust has been created
(B) Chemical stabilization o Only effective in areas which are not 'subject to daily disturbances
o Vendors can supply information on product application and
required concentrations
(C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas
can be'effective in reducing the amount of wind blown r^
material leaving a site
o Should be used in conjunction with other measures
(D) Cover haul vehicles o. Entire surface area should be covered once vehicle is full
(E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved
areas
o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(2)
Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material
Roads i accumulation
(G) Chemical Stabilization o Vendors can supply information as to application methods and
concentrations
o Not recommended for roads with high volumes or those used for
heavy equipment
(H) Watering o In sufficient quantities to keep surface moist
9. Required application frequency will vary according to soil type,
weatherndi cotions, and vehicular use
(Source No) Reasonably Available
Source Control Measures
(2)
Unpaved (I) Reduce speed. limits
Roads
(Cont'd) W Reduce vehicle trips
(3)
Storage (K) Wind sheltering
Piles
(L) Wet suppression
Comments
o 15 mile per hour maximum
o Access restriction or redirecting traffic to paved roads in order to
reduce vehicle trips by a minimum. of 60 percent
o Choices include silos or enclosures
o Enclosures should consist of three sided barriers equal to height of
material with no more than 50 percent porosity
o Application methods include: spray bars, hoses and water trucks
o Frequency of application will vary on site specific conditions
(M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances
(N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side
procedures of the material
o Most effective when used in conjunction with wind sheltering
(0) Coverings o Tarps, plastic, or other material can be used as temporary
coverings
o When used, these should be anchored to prevent wind from
removing coverings
(4)
Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved
Road areas
Track -out o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(Q) Sweep/clean roadways o Either sweeping or water flushing may be used
(R) Cover haul vehicles o Entire surface area should be covered once vehicle is full
(5)
Disturbed (S) Chemical stabilization o Vendors can supply information on methods for application and
Areas/ required concentrations
Inactive
Construction
Sites
(T) Watering o Would require frequent applications unless a crust
can be developed over the site
(U) Wind fencing o Three to five foot barriers adjacent to roadways or. urban areas
can be effective in reducing the amount of wind blown
material leaving a.site
o Should be used' in conjunction with other measures
(V) Vegetation o Establish as quickly as possible when active operations have
establishment ceased
o Use of drought tolerant, native vegetation is encouraged
For City Use Only
.Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan
the Plan is:
Approved .
Conditionally approved (Conditions specified below)
Denied (Explanation attached)
signature of City Representative (Date)
(Attach additional information if necessary)
have read the above conditions of the Fugitive Dust (PM10) Mitigation ..- ,and I agree
to implement of all provisions at the concentrations anti trequencies iueiiui,cu.
9
CONDITIONS ' FOR FDCP APPLICATION 99-72:
CENTURY CROWELL HOMES/ALISO DEL REY
TR 27519, 17.6 ACRES; RESIDENTIAL LOTS 1 - 70
GENERAL:.
1 . Applicant shall comply with all control measures as set forth in the approved
application for FDCP 99-72, and the following conditional measures. This dust
control plan approval shall also apply to any haul/encroachment permit(s)
issued by Public Works. Where conflicts arise, the Public Works Director shall
determine the appropriate controlling provision.
2. The SWPPP, as referred to in the FDCP application, is not a part of this FDCP
approval. The Public Works Department is responsible for approving the
SWPPP, and any requirements placed on said approval shall supersede any
conflicting condition or provision of this FDCP.
3. The grading contractor shall be responsible to show that any off -site borrow
or dump sites have appropriate approvals from the property owners and
respective permitting agencies, and shall present said authorizations) prior to
receiving any grading permit, or commencement of any site work.
3. The full amount of security furnished (to be determined by Public Works) for
the approved FDCP shall be available to the City for any measure(s) deemed
necessary by the City to achieve adequate dust control, whether or not such
additional measures are included in this application. Form of security shall be
determined by Public Works. Any requests for bond amount revisions must be
made in writing to the Public. Works Director.
4. Applicant shall submit documentation for all costs incurred for -dust control
measures assumed during all pre -grade and grading construction activity. Said
records shall be submitted within 30 days after completion of all dust control
measures as outlined in and conditioned upon the plan, or upon any request for
release/reduction in posted security. Documentation shall include a completed
PM 10 Program Report Form. Security may be withheld pending submittal of
this information. Applicant shall have completed all dust control measures, as
verified by the assigned field inspector, prior to any release of posted security.
5. The contractor/vendor responsible for provision of the approved soil stabilizing
agent shall submit a Material Safety Data Sheet, along with approval from the
Water Quality Control Board, to the Public Works Department prior to any site
application(s). Application of stabilizing agents must be in compliance with
NPDES, the SWPPP and state Water Quality Control Board requirements.
6. "Adequacy of all proposed and conditional stabilization measures shall be
determined by the assigned grading inspector. The City may release a portion
of the bonded amount to the applicant for any remedial measures beyond those
identified or conditioned upon the project, which the City deems necessary in
the event such approved measures are not effective.
Enforcement of these conditions shall be at the, discretion of the assigned
grading inspector,.who shall monitor and field verify that the spirit and intent
of the FDCP, the SWPPP and all attached conditions are being complied with.
Adjustments to application frequencies, quantities and other aspects of this
FDCP may be made by the inspector, at his/her discretion, in order to assure
compliance.
7. The conditions applied to'this dust control plan are anticipated to cover the full
range of construction operations as presented in FDCP 99-72 for TR 27519.
The approval provisions and conditions for FDCP 99-72 shall remain in effect
for the duration of all grading construction undertaken within the subject 17.6
acre area.
Transfer of any real property or other interests with respect to this project will
have no effect on the validity of this plan approval or conditions.,
Implementation of all measures as proposed and conditioned shall be carried
out for the duration of all construction activities, to the extent they are
applicable. However, nothing herein shall preclude any future interest from
filing a revised FDCP with the City for any portion of the site.
8. Approval of this FDCP does not in and of itself constitute or otherwise
authorize any site disturbance, preparation or construction. The developer is
required to obtain all necessary permits and clearances as set forth in any
development approvals issued and currently in effect pertaining to this site.
This includes any, type of testing, monitoring or sampling required as a
condition of development approval, such as that conducted for archaeologic,
hydrologic and geologic reporting purposes. .
SITE DEVELOPMENT:
9. Pre -watering of all areas proposed for grading, shall be in accordance with
requirements of the .Public Works Department, based on the area soil
conditions as described in the associated soils report(s).
10. Track -out and other accumulation of soil material(s) onto any paved areas
outside the limits of grading shall be minimized in accordance with the
measures stipulated in the FDCP. Any unpaved construction exit/entry point
along existing paved roads/areas shall be improved as set forth in the FDCP
Wet sweeping/flushing -(dry-sweep not permitted) of soil accumulations from
all paved areas shall be conducted daily, and kept damp during construction
hours until so removed. Applicant shall provide details on wheel washing
method for acceptance prior to issuance of a grading permit.
11. All on -site traffic on unpaved roads shall be limited to 15 MPH as stated in the
FDCP application. Signs shall be posted at all entries and along all unpaved
access and travel ways at minimum 300-foot intervals. Size and height of the
signs shall be appropriate for their respective locations, and shall not be posted
on any adjacent private properties. Project site superintendent(s) and any
security personnel shall be responsible for enforcing this requirement.
12. All unpaved construction access and travel ways within the site shall be
prepared for traffic prior to commencing grading activities and kept watered
down and compacted to retain moisture content during all construction
traffic/activity, including building construction. At a minimum, temporary
construction travel ways shall be improved to a 20 foot width. All unpaved
road lengths shall be watered each day, prior to and at -intervals during any
traffic activity, and at the end of the day after all activity has ceased. All track -
out shall be removed as per Condition #10.
13. FDCP 99-72 indicates 128,678 CY of import material'. All on and off -site soil
transport and stationary storage piles shall be sufficiently stabilized, watered
down and/or covered as required. Minimum freeboard shall be as established
by the Public Works Department. Any borrow areas shall be routinely watered
and chemically stabilized after borrow activities to mitigate airborne dust. Off
site borrow and spreading areas shall be subject to requirements of this FDCP,
and any such areas outside the City limits shall have the appropriate agency
and property owner authorizations (see Cond. 3).
14. All on -site temporary employee facilities (sales, construction, equipment
storage/staging, etc.) shall be provided with paved, compacted or otherwise
stabilized parking and access during their operation, with those improvements
to be constructed/installed to the applicable Public Works Department
standards. This requirement shall apply to any approval for such facilities under
a minor use or other permit process.
15. If approved on -site roadways/parking areas are constructed to ultimate design
prior to completion of construction activities, then traffic and parking shall be
limited to those paved areas as feasible. No .vehicular parking or traffic of any
kind is permitted on or over any previously stabilized or undisturbed soil areas.
16. Disturbed but inactive development areas subject to additional grading or
building construction within 30 days. of completion of the initial disturbance,
shall be watered daily in conjunction with watering of access roads and
developing areas, unless an appropriate dust suppressant defined in Chapter
6.16 of the LQMC and approved by the California Water Quality Control Board,
Region 7, or as specified in the FDCP, has been applied in lieu of daily
watering.
All disturbed areas where no further grading, construction or other land
disturbance will occur for at least 30 days, shall be stabilized with dust
suppressant specified in the FDCP, or by establishment of vegetation, no later
than four days after completion of the initial grading. These areas shall be
staked, posted or otherwise restricted in order to prevent any access on or
across them.
17. -Construction activity associated with this.project will occur during potential
seasonal high wind activity in the Coachella Valley, and is located within an
identified blowsand hazard zone. All active graded areas shall be watered daily
at appropriate intervals. At least one water truck shall be stationed on -site on
weekends and holidays. All security personnel shall be alerted to the need for
dust control and instructed to monitor graded areas for wind -generated dust
as part of their routine duties.
18.1 On. Sundays, holidays and other non -construction days, personnel shall be on -
call for emergency watering in the event of high winds. Additionally, during all
grading operations, an appropriate individual shall be assigned to monitor wind
conditions. This shall be done by utilizing wind forecasts available from the
South Coast Air Quality Management District (SCAQMD). Wind forecasts can
be obtained by dialing 1-800-CUT-SMOG and following menu options for Air
Quality and High Wind and Dust. The individual shall access this information
daily, prior to commencing construction activities. In the event that winds are
forecast to exceed 25 MPH (403.1 High Wind Day), all construction activities
and on -site traffic shall be closely monitored to insure compliance with the
FDCP. Said individual shall coordinate with the assigned inspector on adequacy
of current dust control measures and any additional measures potentially
necessary. If such measures are ineffective in minimizing airborne dust, then
grading activity shall cease until high wind conditions subside or other effective
dust control measures are employed to allow grading to continue.
4
78-495 CALLE TAMPICO - "LA QUINTA, CALIFORNIA 92253 (619) 777-7000
FAX (619) 777-7101
May 1.0, 1994
TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS
IN THE CITY OF LA QUINTA
RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL
PLANS
Dear Developer/Builder:
The Coachella Valley PM 10 Program has been in its implementation .phase since December, 1992.
Among the required control measures was the enactment by Valley cities of dust control ordinances
which require builders to implement dust control actions during construction, demolition and paving
activities. In conjunction with City staff members, we ask your help with the reporting requirements.
A significant aspect of the PM 10 Program is the need to report statistical information to the Federal
Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources
Board. In response to this requirement, a Dust Control Reporting Form has been created, a copy of
which is attached. It is requested that if any project developers have amounts to report for any PM 10
mitigation, these forms must be filled out. This form is intended to supplement Attachment "B" of the
Fugitive Dust Control. Plan by providing specific cost figures related only to dust control measures.
The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for
reporting purposes. This means that each jurisdiction is requested to review projects since that date
where PM 10 control measure expenses have been incurred by developers, whether or not they have
been incorporated as, part of a Dust Control Plan, and forward this data to CVAG as soon as practical.
Your cooperation in completing these forms as part of the grading permit procedure will help assure
that the Coachella Valley and the development community as a whole receive deserved credit for the
effort to attain Clean Air Act standards for PM 10.
Very truly yours,
ZRRY HERMAN
Planning & Development Director
JH:WHN:bis
Attachment
r :1
MAILING ADDRESS - P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253`
1
r . ,
PM 10 Program Report Form
I. ` GENERAL I1gP0MaL=0N
Project Developer Name:
Address:
Phone:
Project Site Project Title
Address: Tract No.:
Acreage:
Grading Subcont-ractnr (if different)
Name:
Address:
Phone:
PEASES? YSS NO
If so bow many?
Type of Development/Project: C-=Dercial_
Single. Family
Multi Family_
Demolition
Other
Date of Project/Phase Star` -On: Date of Project/Phase
Crmnletion:
IZ . COST I11FORMAT103
If actual costs are not available, please
estimate to the
best of your
ability.
1. WA=: Amount:
Total
Cost:
2. RQII-xPH= COSTS:
A. Rater =rack: Number on Site:
Total
Cost:
Hourly Rate:
Hours:
B. Street Sweeper: Number on Site:
Total
Cost:
Hourly Rate:
Hours:
C. Temporary Irrigation:
Total
Cost:
D. Wind Fencing: Linear Ft.:
Total
Cost:
Cast/Ft.
B. Cdemical/w-aterial Stabilisation:
Total -Cost"
Sq. Ft.
Cost per Sq. Ft.:
F..Vegetatina Cost: Material:
Total
Cost:
Maintenance:
G. Other: Type •
Total
Cost:
sourly Rate:
Hours:
3. LABOR COST: Hourly Rate:
Total
Cost:
Hours:
4. ADM=sTR&=-oN COSTS:
Total
Cost:
III. TOTAL COSTS:
Add items 1 - 4 for total cost.
TOTAL COST:
?LEASE RETURN FORM AT CO14-DLZ7ION OF PROJECT
OR ?EASZ OR ANNUALLY rROM d
DATE OF ?ROJLCT/PEASE STARTUP.
1
i
1
1
CENTURY
VINTAGE•. July 13,2001 '
H0MEs
By Century Crowell
-James. D. Lindsey, Assistant Engineer
CITY OF LA QUINTTA
P.O. BOX 1504 ,
78-495 Calle Tampico' � "
La Quinta, CA 92253
Ref: Release of Liability — Certificate of D r7�685 �1IdTract 27519 — Dust Contiol Security of P
City of,La Quinta, California
Dear Mt. Lindsey: t !
Century Crowell Communities has completed all the irimprovements associated with the above referenced
Project.' '
We. hereby request that the City "of La Quinta release and return the above referenced Certificate of Deposit.
Please inform this office in writing, if any other requirements are needed prior to the Districts acceptance of
this improvement.
a
I look forward, to a favorable and speedy response.
Sincerely, +
By: CENTURY "CROWELL COMMUNITIES, LP. a California limited partnership
Its: Managing Member"
BY: CENTURY HOMES COMMUNITIES, a California Corporation "
Its: General Partner
By:
Doris A. Benoit
Secretary of Operation
db
1 ,
1535 South "U Street, Suite 200, San Bernardino, California, 92408, (909) 381-6007, Fax (909) 381-0041
1-800-BUY-CENTURY!, http://www.centuryvintage.com
r
}
PSCRIVS D
.Cj.z 3 1
• I OK HIAN K NUN-NttiV I IHIiLt • NV I I HHIVJrtHttHt7L. c
OF CALIFORNIA MEMBER FDIC CERTIFICATE OF DEPOSIT
MULTIPLE SINGLE MATURITY O MATURITY n toher 1_ �nc0_ �95 -0 6 6 5
MATURIT DATE Branch
Inland Fmni re BRANCH 'Ontari n CALIFORNIA OCtOber 191, 1999
THIS CERTIFIES THAT%— h::;- .' :: :::::: .' .'
'-'—'—'-C'.Pntilry E'rnw 1 1 CnrrTtluni ti es HAS/HAVE DEPOSITED
Av OCR
IN TOKAI BANK OF CALIFORNIA �NLy CTSCTS DOLLARS $2 000 00-�%�%�^�—'�—
PAYABLE TOz\ Cher of TA Dii1t�3__ c::.—...............a..,.....��............,,\.\...\.,
UPON SURRENDER OF THIS CERTIFICATE, PROPERLY ENDORSED, AT THE. ISSUING BRANCH..
This certificate is issued for a period of 1 Year If multiple maturity it will automatically renew for a similar
period of time at the then current interest rates, unless presented for redemption within 10 days after the maturity date. If single maturity, no
interest will be paid after the maturity date.. The Bank reserves the right to redeem this certificate during any renewal period upon 14 days prior
written notice. The interest. rate on this certificate is 2 - 00 % per annum, based on a 365 day year.
`,INTEREST IS:
SIMPLE
I COMPOUNDED DAILY
COMPOUNDED QUARTERLY
1
❑ HOLD AS COLLATERAL
❑ HOLD IN SAFEKEEPING
PAY INTEREST: BY: '
❑ EVERY DAYS ❑ REINVEST (CAPITALIZE) AT MATURITY
❑ EVERY MONTHS ❑ CHECK TO DEPOSITOR(S)
AT MATURITY ® CREDIT CHECKING ACCOUNT 001 —513923
❑ CREDIT -SAVINGS ACCOUNT .
❑ ADDITIONAL INSTRUCTIONS
SIGNATURE OF PURCHASER
SIGNATURE OF PURCHASER
I/WE UNDERSTAND. THERE -MAY BE A SUBSTANTIAL PENALTY FOR EARLY WITHDRAWAL.
PLEASE READ AND UNDERSTAND THE FOLLOWING RULES ON TIME CERTIFICATES OF DEPOSIT
1. AS A TIME.CERTIF.ICATE DEPOSITOR; YOU HAVE AGREED TO KEEP YOUR FUNDS ON DEPOSIT FOR AT LEAST THE PERIOD OF TIME STATED
ON THE TIME CERTIFICATE OF DEPOSIT.
2. IN THE iEVENT A CERTIFICATE IS REDEEMED PRIOR TO ITS MATURITY DATE (i.e., BEFORE THE PERIOD OF TIME STATED ON THE
CERTIFICATE AS THE TERM OF DEPOSIT HAS ELAPSED) AN EARLY WITHDRAWAL PENALTY SHALL BE ASSESSED AT THE NOMINAL (SIMPLE
/INTEREST) RATE. THESE PENALTIES DO NOT APPLY ,FOR WITHDRAWALS FOLLOWING. THE DEATH OF ANY DEPOSITOR OR THE
DECLARATION OF INCOMPETENCY OF ANY DEPOSITOR BY A COURT.
3. IF THE CERTIFICATE HAS AWORIGINAL MATURITY OF UP TO ONE YEAR, THE EARLY WITHDRAWAL PENALTY WILL BE THE LOSS OF THE .
EQUIVALENT OF 31 DAYS INTEREST, WHETHER OR NOT THE INTEREST IS EARNED ON THE AMOUNT WITHDRAWN.
4. IF THE..ICERTIFICATE HAS AN ORIGINAL MATURITY OF OVER ONE YEAR, THE EARLY WITHDRAWAL PENALTY WILL BE THE LOSS OF THE
EQUIVALENT OF THREE MONTHS INTEREST, WHETHER OR NOT THE INTEREST IS EARNED, ON THE AMOUNT WITHDRAWN.
5. FOR 7=31'DAY CERTIFICATES, THE EARLY WITHDRAWAL PENALTY WILL BE THE LOSS OF AN AMOUNT EQUAL TO THE GREATER OF (A) ALL
INTEREST EARNE UNT WITHDRAWN FROM THE MOST RECENT DATE O I DATE OF RENEWAL OR (B).SEVEN (7)
DAYS•INTER
NATURE OF RCHASE DATE SIGNA .PURCHASER DATE.
1Wi.r
!/ o r �.y$ a .v=•-s��tE. tr t x �' F`� yI Y 3 F i I�DA t1-
off DAY
5
y
WE A- THE
R
D�w,IG oVM.aa� R81A Jaow yA`
Frolect
y' ltib No To 32
TEMPERATURE 32 56. 50.70 , 7 5 85 up
t f
Contractor s WIND LDq.
High ori RepNo
Project Mgr Humid
HiJMIDITY . . M,
Distribution: I. Project Manager
_ 2. Field Office
3. File .
4. Client'
l ;
Distribution: 1. project manager
2. Field Office
3. File
4. Client
pip I of pegs
BY: bAro -Title I
� a s-+. .-,.- fry ._. $. �' 3'TS"'�._„"?$k �+ aS ^•., :� ep, . ..y., �,,,�_ ,.p.
DAILY-CON3TRUC.TION, DO-
Y
REPORT Y
i t S r F F r DATE
. c
of f z ; _ ,DAY
F
AVERAGE FIELD FORCE `
Name of Contractor Non -Manual Manual' Remarks
�(/es�err� S�yucf:
VISITORS
Time °
Representing
Representing
Remarks
AT
STRUCTION ACTIVITIES
Distribution: I. Project Manager
2. Field Office
3. File
4. Client
Page 1 of Pages
� .<t yt � ���v`.^r '�. '�+- - s%i 1-,�.c �� r' C ..q;,4„ 3 �•;: t � m, - 4 - .. .�
-DAILY'CQNST'RU TION
,ems
t}�. iF
REPORT _ ,� • ,y,:
Y y :f
DATE �� i.j9 9 J,�
3 v. e r 4 �!
ofv _ DA171
-77
„f
rIVERAGEFffiMFOR4Name of Contractor
seer?� Si'y�c f,
Non -Manual
Manual
Remarks
VISITORS
Time
Representing
Representing
Remarks
EQUIPMENT AT THE SITE
Q �e
CONSTRUCTION ACTIVITIES
71
?ar7 ole (,o i si e 7 v / e re LI r d
Distribution: I. Project manage
2. Field Office Page 1 of Pages
QQ .
3. File B �O aJ �06V2 Title �(�zo h P.C7FD'(
4. Client Y�