Loading...
30704� A ' �• t With proper validation„ this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 10/19/99 LOCATION OF CONSTRUCTION N ST711f? QP Twan'T'GLOB Subdivision Improvement Permit — Class 11'I Minor Improvement Permit Class IV (Street address or Description of Location) PURPOSE OF CONSTRUCTION MODIFY 60" STORM DRAIN Sketch (attach construction plans if appropriate) TO DIVERT NUISANCE WATER DESCRIPTION OF CONSTRUCTION SEE ABOVE SEE ATTACHED CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 10/19/99 APPROXIMATE TIME OF COMPLETION 10/22/99 ESTIMATED CONSTRUCTION COST $ 33.279 (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing: permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, • defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will. be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of tl�jS' work. SignnaatTre'of Applicant or Agent WOPtD DEV. INC. 74333 HWY 111,#103,P .r DESERT,CA. 568-2955 Name of Applicant (please print) B(usiinness Address Telephone No. CASHMAW PIPELINE CORP. P.O. BOX 14327, PA4i�DESBRT, CA. 773-3100 Name of Contractor and Job Foreman Business Address Telephone No. A730834 Contractor's License No. City Business License No. UNITED CAPITOL INS. CO. GLAA 13028-68 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. $ 998.00 100.00 $ 1098.00 ., Received by Date SOTO PERMIT VALIDATION PERMIT NO. t 3070 DATE APPROVED 10/19/99 EXPIRATION DATE 17/111 /99 DATE I'SSUED Al11" b211 By C-k1rl w, 1, Y*,.-1 � Administrative Authority Recorded by II Telephone: (619) 777-7075 r NOTE:, With proper validation, this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the' construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class III DATE: 10/19l99 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION N STDR DF DIRSERT rT.UI3 (Street address or Description of Location) PURPOSE OF CONSTRUCTION MODIFY 60" STORM DRAIN Sketch (attach construction plans if appropriate) TO DIVERT NUZS,ANCE WATER DESCRIPTION OF CONSTRUCTION SEE ABOVE SEE ATTACHED CONDITIONS DIMENSION OF. INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 10/19/99' APPROXIMATE TIME OF COMPLETION 10/22/99 ESTIMATED CONSTRUCTION COST $ 33.279 (Including removal of all obstruction, materials, and debris, backfilling, com- paction -and placing permanent resurfacing and/or replacing improvements In consideration, of the granting of this permit, the applicant hereby agrees to: Indemnify; defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all e penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or, property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply. with all applicable'City Ordinances, the terms and conditions of. the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this► work. r Signat_67of Applicant or CA. /` 568--2955 Name of Applicant (please print) B(usiihefs Address Telephone No. rAgHMAW PIPELINE CORP. P.O. BOX 14327, P11rLM DESERT, CA. 773-3100 Name of Contractor and Job Foreman Business Address Telephone No. A730814 Contractor's License No. City Business License No. IMTTED CAPITOL INS., CO. GLAA 1302$68 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit - Class II I Public improvements: 3% of estimated construction. costs Private improvements: 3% of estimated construction costs I , ( Minor Improvement Permit _ Class IV: See attached. schedule' Rim, Inspection Fee $ 998.00 Permit Fee 100.00 Penalty Cash Deposit -Surety Bond if required TOTAL: $ I nc)s -OO Receipt No. Received by Date Recorded by PERMIT VALIDATION PERMIT NO. 3070' DATE APPROVED 10/19/99 EXPIRATION DATE j� i DATE ISSUED By OA44 I Administrative Authority Telephone: (619) 777-7075. y The following General and Special Provisions are attached to and made a part of Permit No.070 GENERAL PROVISIONS The following shall always apply: ENROACEMUN P ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for -his contractors to • secure permission from abutting property owners. Such authorization must be :secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION, EQUIPME N11. Cleated traeklaying concoction equipment shall not be permitted to operate on any paved surface unless fitted with'smooth-faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations.. Rubber -tired equipment only shall be used in backfill operations in paved areas'. U the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP. Any surplus material resulting from excavation and backfin operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'compaction. Existing gutter line and drainage ditches shall be replaced to'their original standard or better. All excess material shall be.removed prior to paving. Water tanker shall be used, as requited, to sprinkle the job site to keep down dust conditions and shall be used immediately after bsckfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forciag water on City of La Quints roads, it shall be the responsibility of. the permitt" (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING SIRFSIS: No street shall be dosed. A minimum.of one Lum of traffic shell be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permitter that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: R' N07MCA71ON: Permittee shall notify the City at (619)777-7075 at least 48'houre in advance of starting construction. R� LM ITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way authorized by permit, the,parmittes shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the tole' responsibility of the permittee. U1IIdTY CLEARANCE: (Surface Structures) No work ehall be done under this permit until all utilities are clear of the l/ proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVE1v E2ff WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. Paving placed on inches, of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance 0461. R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of i/4 inch to one foot (1). R6 GRADE CEIECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades es established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed., Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. AS DRIVEWAYS:. A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the propam line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (___)-of class aggregate base. Driveway construction shall conform to attached drawing. . SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured. and maintaind at all times. R10 . SOH. STERII.iM : The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with. the manufacturer's specifications. 11 COORDINATE WORK: The proposed worst shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Qointa projects. 12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R 13 PAVENUM' C{T TING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer.. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in sucb.a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. RI-5 BACKFII.L MATERIAL.: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quints deems unsuitable (spongy or saturated materiel) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILI. SAND: Baekfill shall be approved transit -mix sand or equivalent and shall be•pleeed in lifts of not greater than throe feet (31 and vibrated using vibrotamper or equivalent equipment Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be Attained with the structural section of the roadway. R17 BACIGML PLACEMENT. Backfill shall be applied, in layers of cot more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Caro is to be exercised that the backfill materiel is not subjected to extreme swell by flooding operations. Baekfill material shall be placed so that the resulting compaction shall be not lose than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum senlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RIB COMPACTION TESTS: If so required by the inspector, compaction tarts shall be made at intervals of not more than 1000 fact and a minimum of one (1) teat on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R1.9 COMPACTION TESTS: If so required•by the inspector, compaction tests shall be made for each crowing or service line. One (1) copy of each tact shall be forwarded to the.City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 . TEMPORARY PAVFMUM REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC400 shall be placed on a prepared subgrade. The SC-M temporary paving shall be placed after a maximum of 3000 Knear feet of trench has been excavated and backfill operations completed, but in no can shall the placement of the temporary pavement exaeed.a five (5) day limit R21 PERMANENT. PAVEMENT REPAIR After backfill and compaction have been completed, a temporary patch consisting of .two inches (27 of SC400 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL; A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R2 3 STREET RF.STRUM: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of IA Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump bole shall be backfilled and thoroughly compacted as specified in the following pamgrapb. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from an removal shall be backfilled and compacted to trot less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction casts shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO.3070 =- WORLD DEVELOPMENT INC./CASHMAN EXCAVATING --- In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by -'and to the satisfaction of the City Engineer. 2. World Development Inc./Cashman Excavating, hereinafter referred to. as "Permittee", shall be responsible for providing continuous dust and erosion- control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the. work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October lst to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a:m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. 5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. 73 p.m. Traffic control shall be set up after 9 a:m. and.removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee -shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility, to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3010 ' Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO.3070 --- WORLD DEVELOPMENT INC./CASHMAN EXCAVATING --- 8. Pursuant to Section.14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133: It shall be the Permittee's.responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein,,is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting -or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite,,at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector. and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for, compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. ' The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted.- Upon satisfactory completion of this portion 'of trench, the City Inspector .shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3070 Page 2 of 4 V SPECIAL CONDITIONS --PERMIT NO.3070 --- WORLD DEVELOPMENT INC./CASHMAN EXCAVATING--- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench,. the tests shall,be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill .(in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector); shall be tested for compliance with compaction requirements. I. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quints right-of-way shall be backfilled, and temporarily paved if within the existing travel,way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of.open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches; shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively.tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the. City prior to installation. . Special Conditions - Pemit No. 3070 Page 3of4- 91 SPECIAL CONDITIONS --PERMIT NO. 3070 --- WORLD DEVELOPMENT INC./CASHMAN EXCAVATING--- C.. Permanent pavement replacement shall be installed using a City approved 3/a" max medium asphalt concrete as the base course lift and a City approved t/z" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal.lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same' day as base paving operations, the base course lift of 3/a" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. _ Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for completion of the storm drain facilities per the approved storm drain plans prepared for tract 28019. 19. The City of La Quinta reserves the right to revoke, suspend.or void this permit at any time. Special Conditions - Permit No. 3070 Page 4 of 4 ,: ----------------------------------------------------------------------- NOTE: With proper validation this form constitutes an CITY OF LA QUINTA e encroachment permit APPLICATION FOR. PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) i 0F7flb�`vS « For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Subdivision Improvement Permit — Class Ili DATE: -'alai Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION PlOi�'t1'l S �E OF V ES S 2T G L.NI3 (Street address or Description of Location) PURPOSE OF CONSTRUCTION MO�1/ COO S'Tn�ZM Sketch (attach construction plans if appropriate) -MAIM ' b 1DIt/EZT PilltSPr C.I5V (ILIAT"R.. DESCRIPTION OF CONSTRUCTION to,.cIDFLU�-4S DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION in ' 7•7-'gq ESTIMATED CONSTRUCTION COST $!Z=n (including removal of all obstruction, materials, and debris, backfil ng, C-- paction and placing permanent resurfacing and/or replacing improvements) in consideration of the granting of.this permit, the applicant. hereby agrees to: Indemnity, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss_ resulting from claims or court action and, arising out of any accident, loss or damage to persons or property • - happening or occurring as a proximate result of any work undertaken under the permit granted pursuant- to this application. Notify the Administrative Authority at least twenty-four (24) hours in advence.of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of'the City of La Quinta and to pay for any additional replacement necessary as the result of this work. ' Signature of Applicant or Agent 7� Gt)oieLe �EyEGopMFNT /AJG . 7Y333 Hwy 111 �`/03�; 'PA //ESEiZT SRO g23 51� Name of Applicant (please print) Business Address , .Telephone No. A�E�t Q�-7�3C�l,Aki NF , b Name of Contractor and Job Foreman Bus ess Address Telephone No. 7 308 3 /ZC Contractor's License No. City Business License No. 4N iTEo G'*4 01 raj_ /IV Su R-J4^1 GE 4 A -A / 3 v Z 8 62 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ Permit Fee I b Vfj-^— Penalty Cash Deposit -Surety Bond if required �? TOTAL: $ ' I Q q A" Receipt No. Received by Recorded by Date 2774 PERMIT VALIDATION PERMIT NO. ✓ d D DATE APPROVED EXPIRATION -DATE- DATE ISSUED By Administrative Authority Telephone: (619) 777-7075 03/1111999 F!WI4 P{;M NO, Oct. 12 1999 11, 01W pc SUBCONTRACTOR AGREEMENT This agreentent entered into October 12, 1999 betwfacn Cashman Pipeline Corporation, Lievttse No. A730934 hereinafter called "Subeoatra.otor" And R"Irld Deve10pm9R4 lhc., h.ercivaRer called "Contractor" for the Qxplicit purpose of. constructing a pump station (sea attached proposal'yat: THE SEASONS VILL.4,5 on Cloud vices Way, in La Quiate. County of Riverside, C%llfomia, hrreiaaftcr called "project". 1. DESCKIP'I'ION OF WORK Subcontractor zthall furnish all labor and materia ig to complete, per plans: pump Station (,see attached proposal). 2. PAYMEN'T: Comtractor ag:ecs to pay subcontractor for the above work in installments as set out in Schedule "A" attached hereto. 3, PROJECT APPLICABILITY: Subcontracta agrees that any' money paid to persons performing servim,18WX or providing marshals (here-ivafter salted "Work"), shalt be solely for this Project and no other, -and that the releases described in Pamgmph 4 shall state. th<<t such work was solely for the P%jeut described herein. 4. RELEASES: COntraCtor is not requited to snake any payment to Subcontractor unless Subcontractor shall previoaely have provided releases in a form satisfactory to Contractor exetzed by all persons wtto night have a mechanics lien, stop notice or labor and material bond rights against the Project and arlsitlg out of work performed under the Subcontract Agreornent. S. LABOR AND MATERIALS:. Subcontracwr shall promptly pay a).l charges fbr labor and materials, used on Work covered'by this Subcontract Agreement, If Contrattor pays for any labor dr materials ordered by Sui?contraotor on the Project, the amount paid shall be de ducted from any amounts due Sub;.antractor, provided, however that if 96conttaclor has been paid in litll, Subcontractor shall raitnburse Contractor for such labor and nutttrials, All applicable taxes, permits, or fees of any kind whatsoever shall be. included and become. part of this contract. .6. PLANS, SPECIPICATIOI\S AND SUBCONTRACT: The plans, specifications, anal this Subcontract Agreement arc intended to supplement each othor. In the event of conflict between the Plans, specifications and tlte.provisious of the Subconttact Agreement; tlx spc6fieetiors shall control the plans, a..td pro%isions of the Subcontract Agreement shall control. both. Subcontractor acknowledges he has examined all plans and specffications on the date hereof. 7. EXTRA WORK: The Subcontract price set forth in Schedule ,1 attached herelo ib deemed to bs full oompensation rot a)I work -and materials furnished by Subwatractor whether specifically ,called for, or not, in the contract, plans or specifications, a;td no additional compensation shall be paid to Subcontractor unless a written extra work .order is signed by Contractor in advance. or this ®arts work. stating that the work is: extra and designating the amount to be paid f Ini;tuls: �_ :s�1t1�u� •yt 114PAM0 w1$04 popin�tA ao tw�taeil I+OOF pule spay ;nnWr+u N aAgtad 'y 'f I gdeJBP.Ja,I ut pap!tiold a OOMiIi dutoa S IMAQ!JVnt p> d eriai�lsn{ 11Mb^pr �!^dtd.<1Cnonupaw a oJMM1v9 'A •ot op oI nym t)Alr- US44 (it) JAVAltaa+l mnofutumil"; unnlE sau Jantnut._) MAN dtuuwtu 611juett: -mm poo'b 41 JAPON 9t( p3 wu4•+J M ge(oga'w,JlnpaJ, (itnantgWttb'Iytsm Uk4QIJA •jIMMI of iJnUoil 1 •gxtx 7s:anu0?*w tuJgliad w rlalJVJrw Jadoid-m wtfWQtA pnpgf 1,.1�!aljtn dtddnt cis 0mi�d "o 91 4unnirJa,l tg l*HI111� m aturJ9GJt1 n cpu,y JUwaq aoAvP' w,w eni►sIu(ad Jo tuopaQy4lloo ve 1wt^txn!ap 8atwveoy 'D twatuuo� of a(q-Adatan iou oMold4o Awn aow►t of Word 'o > oy3 o13tg1r1sJ sonvilijo Jn wai 4w supdowsia 'q pa(ad O i1."7J p►ys!u:nJ gma�►*w JqW a+WUJI,A Jaqul wi uewle!a»w Je ,u!tgaAt (ed (pptGaad as "gig i 'o 'Jsrgonlswgng J:1yltsta to yuf a41 atglralaJ'vl ilil!+41 Iou MR tnlpnlavl 1w!lx+dxa wide fiiw Iolallnuu 1 pusps++,ar+ltign (q ,None ►yI a1!(tllloa pm y>fa qo( 3qI JN (r 1=1 aJY tI-MiM •t prod umq Wy mmumns q$U+n 1oJ smatisdo pal tgw4 Islopipul lie io ..sU1 poly ogMU d vP ay1 Jo uo(stinssod p:lUi '101o111vorgnS It s.olnmt tqt *Mt.iwitq Astir 10 :lolarpuoNtN :a onp tutvAq N In anP.Aouow Aug 11104 .IOalstp lsop oto wr"P PUV %itOJt y43 awidwoo tq d:a mt o aq ,Caw av I-JeFalta, pun JD((% 4=1 np,eu,u uoledo i4 W Am JelaanuCO 'IQWPAAV. trJluwgm6 ol41J0 AWM.Funn pax m aW Jo Aut tuJ'tJJad Jo *%JW40 nt (!ty us tax 8u!m!,y da41 JO Am ultlwaa Joa ARUPPgoS Prowls 1'tllY 1'1� sir 52t0i�Y1>aiJ:OJ8113'6i 'aona!dwoa lien :ylaa8t(!p anugtmo Wi pms Jolw ilmaj 4 lo!ma .4o f Japtalva 121 oMt twdT, 71.MM puaww,)-..:r. oath ,mwI x.agtls'Ivau aaasr atAoo+gp5 tng) Jo oouetdeeeo Nor) :x110,!� dU 5S�TIflO>�d 'Yi wlseauxgns tipr+la►a+wtJo1JA uto411+ plofWre�e 1p0+p,1»gat to listosa'ot low a µ,saq lieup itaoeJaJoa 'wlaenuo•� Ja ronomds tnp(r,.aoiw oyl uxp11M JopvnOJotp tlwws(ad of �glty ?tP Jp Ewtueytt+ t'1�laoegng tPn ,dptse at 6auIW0 J!►Jo4 7J0"� •411e .cue IetN,OpgtY 1aa uiM "C I*q+a••� wtasJrn»R^S 1;0,1.)v%L 4(y.*. C ,iQ D�Dl�vuj►waenc 'c t . a00-�nnuo7 a atta.al! ple+.to Ad- 1!u,gne 1p,r pao a wov N W 11,11 ,(uo lean, wigm u Pio4 oslr Ila4t fJolrenuuoMis +1% puv Jnnanaoegnb -mmlmi lluvo of rsao:tll planav AJoo v 1pagm pus pmoK ain.apt't vtu18 a,oltWntlo� Y31,Cq plutail flop aq lla;la wefoOJluuain+ +lq P Jo}�tWuoogng :faSNM 1 -91 .4dgjAkvun Slip apan wnlefl;,gc ,(tn Jo Jol;,VjjU Jgns p",;.4 Wv Ilrys jgvnsw4 aAaywx JOAS" ap Pcom of mo"unJ Jo anllvd ' 4rm Aue jo lumuaou.wwtr. +4I 01 JaJJd OSX,15N1 ''lYNO 1,023V'. fo JnlonntJ,1;) p„1wilu 'eenrl> It0!lr40% .Cap (41) Vol a goJm =11101 J4 a>eag!uaa g9i6mY 11s4t Je3 Jpu�gns �+oantaoo Jed ll0'000'OdG`lS Uew +fill too ivlWM w U. 4011e4 sommoul +l!llgv!'! oAltcagatduxt,-) Duo allod ammil o! 1 opmadWo b mt:nlroM r latl(ja Dao 9010J UN ul ulrwtaw 07 oant9v Jolao4uoayn6 V1,vHlRSlrl 'C1 op1a,3 ptWuw ••1{ ,x lunuved iIA3,04 3s4g1►g wmt%ulpP 3m 94K Cstolosma.plit alit ae j,*4- &jwr 1nt; ,pvtt valm,e0t4tt Allr!5tmut,; p4itwid t uay ZAMLI ,(rtu QqV. vewd :tire 3typl+l.W) arNuan avio� Jo +oll►p�sm atueu au duago ACM ,apun °NmM 311JUJA41x 91061LA uoagnt liq i3 ioloouwouns 01 A!dCe 11kigR gdrJmamd slia.to tuolt!noJd ov gv INN Yns plot Jola UOD 91J L441J p4l; JopoiluOogtu pun NIV 4'+n1t gl 4*91001114 rolevai'oop t[o!gN gloom Ave dxd (tw OmiluOg ' IZ pw 41 w 41:t11 m s11(!!1 mo 4SI242xa drtu ,oalrhroo j ivana MP w 1-moil's r141 pig atgltuoy A4 Jo:osstuoogrts 1r41 Pun Iattun0 it thllml s-a} Iw.p twnlSsa W 9a11,10 $l loloe.JlucJ Tofu►{fC' ul lwq 0nbullap Aappun) d!ysap3aattfih Jo uoltaaan 'oo,sutw b,oJIM puv 41Mq apudoadda OW.Jv 29W'> +•tl:N309PURI,m a4w 44 ,PMI41 ON W01014nOgns '114 Jv 9494•au00 40S JI 'W6VV.4MVAPS Igll 10 JOAr+It."".. dy Waae(oltitia u,OJJ ;i,"A twlal• qms uogw ean,a,tp 1(>h wu Jo Moo Ze3pr a :41 6147I DaAEouOp fvolpJO!lio ttlattt<at t+ovrlu Pao' 'ervil- P- Lo" 10TW k>_Jawau adigaa!lauCdt .ta lteos,t 'via+:At6M '*MlaM UWIaa 1PJ •�f 1'gK!! p'tu �Nt"'#tango wurl v.atutmy :oleoJtar) pinq.ltlx ina.a+v,w4nC C:Ild2N6a NO M� bt papaau sa 61:au JQyt!0 6q yJllou rfqum 4q pa4Uaga Jq Am trat►o m 1114 yaawme,v us"naoagnr 114a W Pa rPlatto iaaoJppr VW IV HOW paiattlU to oaU!Y*O JO I04$apl tiq pxvFS 04 trio xroAaodgllt 4111 Mull palpwma Jo poJp" I .100 4UN" ;5amaOPt 'CI pags!lgalt3 t .rq aAf y (.(ca ll: a+srot s a»tJlaoO p1mil ptatuJQuad oq o7124,o mm isnll of do pauuouw !wort JarraJtw,ngng of swwlicd +a41a}J qa 3t! pays oryl, amasJtt�ao siyl,1q paAWo fa of Jo lv lM ON of rin+* tdns;mq oyt isulyda W!e:^ f, a:wq Uayt t!a11+ pelt Jot'J►na^tt4^r *.*t dal of pa(nlm aq uwn 1!p4s 1010Muo� aroIIIIJI 1 vodvlmd* 11, * "W100gnS 01P 3►putt 8a!Yati lin;n stw!IaAu40 Mo 'pwMeln to Jaeltsal's; Jo'U0110:4 Jo 7ti•0�! mn iry wouivelwo aW b4aut 'lonquvq w+60.4 PI^01► xitarfltt0ogn+ If 'Li •JylarJpto� of J,N,S0rJ1 �Illytiru:Atn* +luavWdwuc uo n,uauw. ,rw+opaojntmyr e:ra.n.0r• pn:t uottuprsadoul aamnllq PnW ,p olfp otp atoll pop^tau! y'dlyfueta;Jam ti11nW u, ',tivouu+ Jttod wo y •opan a,/ ,lo a!IlWd pf»(.ta+lf wail paoow w 3� Ila4a di4nvat>lJom. pa XUI IIUVI Rv, ,(QkVq Jo7enx—qn$ •Jauaaw NA'JtaeaOl put O'X!i'mwV- " ` ws ul euOP N !Iwit iJIIM lld i(lNbl yvq)t-do 11 -11 >a.ollae!1!eeds alit mJ ssre!uDIwJ P�"Q1:7 up u1 .K4 paPlnold a Alao dalop .(tn wa JV p3snoxa rq litm Jomo q^S 'pnSpalMoa>rar (R++Ip1 w, ►4!roa+ 77J(oJd r4► u! )ix1M AD) 0IMPa40+ stwoid VIP 01 pareJnd uollaldua» u1 tapir►glll9 IVO+t will altgotvJd Ill.m Jotowtaoe9nS gJoni e!yJo wgta+te t1 7w at .rni"Mi,"gnS 94 4*1*P .tau Aq ;»tots ffol Jo,"Illlaap ,tux wog U31W uq oo pwluoa Pm otm /Al%1wopol H $GOA% SOlwwtvoegn9 'ot •(, tpylJpWa,l JalaJtt patlpap ad ,,:1JOM n.1+,a, N uni;eJwwJ wy ,SV4 puU luawiilBa s!yC aaupuva of tw�r . Aviv Joloviluo y •,Wxtn -1sw (tlued JO Ition m ui 'ImuttteNnp rltp n'PNM av(d AL rt ptm 'aHL%3 p N on poauQ JUI ltilm fln JC; pP,d a4 Illm Jolmu aq^$ 'aydum-ma Jatpu u a, J,Cq patotiCop C! iao(tud asp JI :t gsCPgFilid d0 NOC1J!)ril C3G '6 . 'tntmua�P pt;Iuop in!) �4 paye„gt:lte tp,apurls JsxalwJOjlOd it ?na!tf m ulna ,tmauu.»gng ,tQ ptndwd ptatpaw ut `lsualrui yn>vudmbr ftuutolpi SW pltff gwear4i Josoruuoogtks •Jo004Ut+J ux>JJ povtfftp ufeq Wq IreO.tddr t t,06 Mid VMWn Iptaa atll f e.-OJJad Jo pogl►w alp Jn p++M!WJ^J aQ 01 limudirbo pall vpgapw ty at Ea,oiJ►otJp*dr pw sodle Mo Jta slummi"Wi vei uwij 01VIAsp .ov Mega IV '9 ad WIdITO:11 EE61 0 piste `xa�7ra uxc� L98f�4# Z'suao11 *b-at ssvt owaa. woo uoprawdao, aultadld' ��4� { 9oallp pao wup uu ♦u;m taaumia &,MUQ34,,6 6!y1 in. quo) lab timain tau furltsluaw�l�t m �aollultn9bu 'MrAMtd 4,jttbwx989 •0:jd JaV .oipn byt M 'p►b to 1a0plflpgn ptfi WS ,Spoawa pug 1fibid PM e0 �}1O^" pns oy1 w 9,y�bj , vy�ay 9341 d a41 JO 10 004iEY 4PA I'M 1101 NO U141ruM luaw a t v+ar MOS;14LLL :.LN'AMJSV0V INW413 •et ^BI'P'41 lanba tunuw>t to papttaw aq M aWI11ro1otAueaqus'1alaY�Ct lv,vwA;uao4 so • ryppo'!at"a4uoo bap d4 paq=m 1Aelap ukum AoloanuobgOaJt 'tm�intd agt,la 4saAnu:,crtap ►Mato 11'r ,u!pu1 W •SbP >to� b+�t �cYy gad 00fS pcsgYuxl oq,ctw +oqunroa4gS �hS,T+N9d '8t '5us411fllID4 paeM IN 04 01 On u191M*2 1ptublew 410 (ult'4n pbtlmd "Aft? ptn bpxtaltw "%& I a •algvollie" an4* patsew pub pNR121 awtyj of panut!l wu unt 2j"4w, 0'41, Loot$ uM0 s!y At7 6l4uwrma+ u tntn>•+tt»bgn8 :dnmmll 'GL Itrauubdt■ riot ;1u oximp otp J0 01 Own srY) I -wit liNuad BU ;ay!UJ• do 1:1"(2231 pL µnaxn Ipyv +YRI apl+'WaOW MAI bill puY bu0111Pltop Impo Fill U;bwpq (Atal.uuart} 10 lalgucro Xus Ju lubna Ma al 'IMA4l S6ro g paNtoal OR A0121111Yg2f(os on ON .t 4u4t 131it 616 aouaralot 44 Y1aa4 Nm"Uoaul w rq'4pa P24MIP g11 ttl 01 FUQJW nluglvuu') Into") am •6NOWCH:O] lVrll3N90'6C "Mix+Iuoo aW 01 ba!pu Um! ► 4q uate~ 24 Rout psl &A Hp 'tby(vNM 1."Odud pn>: i° �tp silt r.>,ftt trigp 1sbW1IW (f)11 lrA 19� al'I�onp:+! w IIRic �prsadvd a4 J• •,Iron aid vuajifli of AOtaCJlYOagbt$ Sq lolodad p ttbattcioaoo AjYo 1! 'aa+o':tlu034119 4'1 oOrnlwA q 'aolslwWO.> iil pytt G 'I"M*A t' 111441i""S +tut Jo Wbb 0 Iltu;1 VIVSOdOW do 90NVi18i1 -Pt '.atiwtu03gm put mAoldwa'urvpe Ny'x+lat+twaony dq q,oe► agtyo boww)q ad ty1411M papa nm so 4q pkM* 1011Wurd JD Altadoitl Run Jo uopnwA" ne1I06j1,p A ucylontlStp to 6ftuep bill " p'nbob,ad w Yuuad Am )O OMA(YI.1 WAMP '10901 *4ep 1P pud 4uY uwi) ttbpw44 pup -9 —ra,d oto p &Advul xp pub MINI tuoy P104 Pun A;jluuigttr! to >Cnd!Y Agwtw 193.NAt MOC !AJJNKWtQ 'CC .ivnl 14i►1.7'ana a,p �'�J b�SwruYb pun 'I n MOM y*dpe lotpolotn •uatlp9p11 PS uo!mtl!4x Mm JY 1p►040 Put OtDa algttaosM Ng,1r..tebu o0!te8N Ja pfW-Ql4a qm ul IQunQtl, u ts"c, btp'y J aoun.uuaa xp,n tnbquaa bill J0 lfl0 �d{)Ilt3 uap¢lpll !o trouaat4lt YI DaroOnvi spwgoa9 Otuiy tyasd,Ay►lY K 'tt •(a14eo11dd0p) q+Jaua4 uaun-AgIAYQ P Fpuat'lwnim'A *100 w 'i}1191 Stw An4 41 dQ~-4nSfo antiPd 'Y 'tao(bkt 41 u? llaoe apa of btllaltp ma eo 'q" 6 v iltflYt� llila Q OlrntyY W 'AM 0*'C4ddfW VM6vrd A%J .,4jMc rd c4 rolmooegng Jc albpgd ':p J�1aY)ttlo� of pplYbsaid m poll a s m, eupp oap i doll io imp or. ,% . •L1W1'lltliY AOJpItC 7(WM?�111?1(lOQ a ;pitaar� Gm 11�i0pJ° �gwas 7ulMOI1G ?41 t!140 uoar,y► t+ta+aiw Ilu!�u 1ttYytl b 'r1ltevAuoxv;ng altp lYaau(YA dtty Ma441.r► tttul latallNv� :CI'IlHWJ,IM lLLW' p XVd ' It • 'lataYltllabQtt$10 tW1p9g pl Pg11aW 54 MpR�!u++p1 Jo ax;;vu aallum mis io altp a4l go "1►7 wq. bq Itty% ,ra,ay 11%ift cab Pu* 1,4oa4dL**g JO OMA405 Dill AO 90111tRUE01 -14011,V N WM- 1 V 11�Jap ► wibaq�wagnti W 40- 4 a,rl�riluo;1 44 as imas saAaalpp p►a wisol IIa :a1 M01 aq 1114/ iol''YaluoJ a►+p9t F>q!ratat+0 610!A L11 a:pra,ro+uto,uf(K) mn+o by; 01 F vd 11" : I T 666T 3T •100 S0 3-1d CS 3NI13dId NVVIHStn : *ON 9N0Hd LLZL-989-6T9 . :ow, VO"8T 666T/it/60 lEaluT 409S 7 v/F L98£tN:4► astu�r� i/- Ql :aiNa 000,16 ' :) up"Cl Wlsd " •ortI yaawdgoAs oM �Cg Nup11>ef.lad.>ro� sullodtd usmq,c»e, cot# IT I 1 ,(8A►45'H Eti`bL a�►'.l.N sva�Zan9a os�+ •O.L VaDIOANt 11W9nS 2OV314 'd3L11>♦Iamid mmom MLL 321Ni U X1'1nd QNY 218HAIIIN ,LO'I 3KL 3Q(MIN1 lii1W S1310.t.'a 'l1V 73.10ANt'i'ly AgW WOMV .Lsaw 53sV313a 1V1t131vlq QNY 11Q8Y'1 ammkAvd MOd MMMO 03L gV,t.Llmans 311006 llXojaynN00 aI}11 A8 (13<tog4jaV 138 ,LSAW ISTMANI 11Y 'NILLILS VZ OL1QA SELL AS 'HINOW 3H,L do,.vl 3HL 419 alVJ in ii1M M NOW BH130 �Ot $H.L As'41SA1I•-711 SSMAM �!{1NQ11' TH-L d0 m451 3H1 GlYd 32 TOM RIWOK VNI JO.191 3HI tH Q MIMIN "3110A)a 1J1l1J SIt7 a�,LdM A3ZiMA d113HOVOO 3Hl CINV V.LNlf10' V, 10 A.L10 3Kl tie S1N3W3AOWl Nl A0 30Nb'IMOV ONH N01131diNOO NOcin %001 :RIA0 10A Sd 3- CVW 39 01 SX •i.!` MglVd (L 3�!aYQiin3�`✓ It(3aTd!ljVJI1NvW GKV Q O9dS Sy 3l9t 0 01 a3$,6Ar1I"O 'lVI*d 1bK iiV •666t'iZ aoK'»O Aq opit (I tals,h jQUsA esagoeO-) 3U Pus 440.(00 e'110 +1lJ ayy'aoputaoa 4q paAoldde pus Malda103 it 1110MA (00'O" Umpod PO4Pnn'n amA jo cnuoy • a,.taaal trygt �e�as�lnongwg !00'6Li'Ct'$) S1AY'1'IOQ RlulN'A I:N3A35 a3adSNnH OM.1 cemmON13$i1N.I-at> alu s9O121d ' jIOi0dOAd PagVgta . aa:) uolMS d,and sueld rid 'alndwo w ylala+IM P*R aogvl III? VW4"J Ilat{c U011 Qio, ouilsld seuWa3 0 sd wldco:TI 666T. 2T "00 'ON �NOHd G0 QS -qNT-13dId NVVJHStf) • . wca�' L/TL-999-6T9 b0:6T 66FT/TT/60 �J9%ilii95J 18:619-586-i'2r'i' UASHAAN P 1 -iNL 5U r iliL ter • FROM PHONE NO. = Oc 12 1999 11:&-0419 P6 • CA, uC. �rarwa�a K.J. CASHWN, PI9S�D C PIPELINE CORPORATION po. e0X 14027 - PALM DESERT, CA SUG1 (760) 77$4100 • FAXt (is" 777ba" Vw hwwwooaa* fx bah w rreaaoiy • a�rva+.K. aaa mama. w p.nam m. �v...q ••� water 9ystern Line 0 Desription Ouan __ Unit 1. I $ x 18 Low Fidw Catch ®"in w/ Cane eie Apron 817' H,U-FE. AM a Tie In to IV' R.C.P, V=2.0V 1 EA • 2. Modified Manhole #2 wi36 x 36 Crated Drop inlet In Flow Lirw of Existing 66" R: C. P. Marftle V=I&CXY L=6.OV Inlet V=4.00' 1 EA 6,750.00 6,150.00 26,620.00 26,529 00 Total - water System297 9 00 supw and .air RPM to a* go tofu W" •nd ow%.M s en Ma•+www aba ha�ef ara part o1 #ft WMrfWA and an ltaauyhq untls�aed _ ACCI�riL'R/ OR ti 1G� - -- k47wE; AOCRIOFIAL ITRW AND CONDRI" A0 APP Y. PLEASE R6J10 86sosE SIGNING. BtONA'rURE CpNgTITUTFe canv�n CAi M PIPNLIHM CORPORATION La Quinta Public Works Department 78-495 Calle Tampico • La Quinta, CA 92253 • (760) 777-7075 QUALIFIED STATEMENT OF SUBSTANTIAL CONFORMANCE AND SUBSTANTIAL COMPLETION PERMITTEE: . PERMIT NO. CONTRACTOR: Cashman Pipeline Corporation 3070 TYPE OF WORK: Modify 60" storm drain to divert nuisance water and install nuisance water connection in retention basin. IMPROVEMENT PLAN TITLE, or IMPROVEMENT PLAN IDENTIFICATION NUMBER (IPIN►: Desert Club Drive Pump Station, Tract 28019 This qualified statement is issued as evidence to whom it may concern that the improvement(s) constructed, or installed, pursuant to this permit substantially conform to the approved improvement plan and are substantially complete. This Statement is issued contingent upon the qualifications listed and check -marked below: The improvement(s) installed constructed or pursuant to this Permit are an improvement requirement for (Tract Map,iweel Map, $ 0 19 . ,This statement of substantial conformance and substantial completion is a written clearance mechanism that advises the Permittee the improvements are sufficiently complete to allow progressive development activity to occur where subsequent improvements may be dependant on these improvements. This Statement shall not be construed as evidence the La Quinta City Council hasaccepted the improvements pursuant to a Subdivision Improvement Agreement. ❑ Since the improvements constructed or installed pursuant to this Permit are not an improvement requirement pursuant to another agreement with the City where City Council acceptance action is required, these improvements are hereby deemed complete subject to the warranty provisions of the Permit. ROUGH GRADING ❑ The building pads are suitable for future construction of dwelling units and structures. ❑ Future construction of dwelling units and structures can occur only if a subsequent Precise Grading Plan providing for a suitable building pad(s) or storm water management facilities is prepared. COMMENTS: AUTHORIZED CITY SI NATURE DAT F091 1 1 /99 rim.. t ;- _ ; x'�c",✓ "f ._,` '` v i� Z_� r s..-.r..�" ..:3...:....5':+v _...y. _-. f.�z ".. '``' 's ..:c.. _ _..±'�.. " t t r 1. _y � v ��� . P S- � � .•� i,. .z°, a ;fi 4 �. A � �� �� M c T W TH U S. off �I t'1 l DAY WFedITHER BTite OVCfCBS[ Rant SDOw r Project Job No TEMPERATURE To 32 32 30. 50 70 2 3 85 up t Chent t fContrac[or t WIND Snll High Report No K Pre5— 9,r t.Humid s Y HUMIDITY �i': ' - AVERAGE FIELD FORCE. Name of Contractor w.Non-Manual Manual Remarks C asy771a7� /'fie%" VISITORS .. . Time, Representing Representing `Remarks ' a 717 EQUIPMENT AT THE &TIE CONSTRUCTION ACTIVITIES ` 1 :Distribution: I. Project Manager r I. Field Office Page I of Pages 3. File • Title ��% 4: Client gy /)la"Pr;fr( "' tf . Project 711/aO 16r7r-7 dYC7ir� Job No. `�Q %C� Client Contractor Projeci Mgr DAILY CONSTRUCTION REPORT DATE 11� 2/- 9 9 DAY WEATHER TEMPERATURE WIND HUMIDITY Brite 115et" Overcast Rain Snow To 32. 32-50 150-70 70-85 86X Still 7 High Report No. Dry fr Humid 0 AVERAGE FIELD FORCE Name of Contractor �peItne Non -Manual Manual Remarks . VISITORS Time Representing Representing Remarks Distribution: I. Project Manager 2. Field Office Page l of Pages ' 3. File 4 4. Client By: Title top- 6 ly,,1�112 Project St-0 711 c�>'� t 7? Job No. - So 70 Client Contractor Project Mgr DAILY CONSTRUCTION REPORT DATE S M DAY 'K �T/ W TH F S WEATHER TEMPERATURE WIND HUMIDITY Brite Overcast Rain Snow To 32 32--5500` 50-70 70-85 8 u Still r High Repoit No. . Dry I 1Vr Humid AVERAGE FIELD FORCE Name of Contractor )�eSfey�? Struck•. Non -Manual Manual Remarks VISITORS Time Representing Representing Remarks Distribution: I. Project Manager 2. Field Office 3. File 4. Client Page I of Pages By:/ Title D'(�Qi G ,,"4 st Project c%a, 77 Job No. Client. Contractor Project Mgr DAILY CONSTRUCTION REPORT DATE S 1X1 T I W TH -F [S] DAY WEATHER TEMPERATURE WIND HUMIDITY Brite G Overcast Rain Snow To 32 32-50 50.70 70-85 8 u Still or High Report No. I Humid Dry 110o r AVERAGE FIELD FORCE Name of Contractor /"XI If Non -Manual Manual' Remarks VISITORS Time Representing Representing Remarks Distribution: I. Project Manager 2. Field Office Page I of Pages 3. File 4. Client gY !1-ir� ( �7L16N Title