3087NOT
W)1[ii prope•F validation
I'h this form constitutes an
CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)•
t
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DATE: 11./16/99 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION PORTION OF. TR.23773,,GALAVY DR. @ PISCES WAX
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION ROUOR GRADING FOR ROME
DESCRIPTION OF CONSTRUCTION ROUGH GRADING
DIMENSION.OF, INSTALLATION OR REMOVAL
fin+ ArRps. far GRADDING
Sketch (attach construction plans if appropriate)
SEE ATTACHED CONDITIONS
SIZEOF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 11/10/99
APPROXIMATE TIME OF COMPLETION 12/.20199
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify,•defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable ryles and regulations of the City of
La Quinta and to pay for any additional replacement necessary,,as—the^resul.t of —this work'►
Signature, of Applicant
,'Dr, ST. , SAN BERNARDINO,
(909)381-6007
Name of Applicant (please print) Business Address Telephone No.
N1IFVo ENC 79811 COUNTRY CLB. DR, BERM. DU.4ES, CA (760)345-1778
Name of Contractor and Job Foreman Business Address Telephone No.
714188 05641
Contractor's License No. City Business License No.
r.17ARANTY NATL. INS. 1I14C 1004611
Applicant's. Insurance Company Policy Number. '
FEES: Subdivision Improvement Permit —Class III
Public improvements: 3% of'estimated construction costs
Private improvements: 3% of estimated construction.costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $ 2.640
Permit Fee 100
Penalty
Cash Deposit -Surety Bond
if required AS BUILIT
TOTAL:
Receipt No.
Received by
1,000 DEPOSIT
$ 3,740
Date
08
PERMIT VALIDATION
PERMIT NO. IAR7
DATE APPROVED 11/16/99
EXPIRATION DATE
-11/16/00
DATE¢ISSUE`D
By
j v Administrative Authority
Recorded by 11 - Telephone: (619) 777-7075
ks,
SPECIAL CONDITIONS --PERMIT NO. 3087
-=- CENTURY HOMES / NUEVO ENGINEERING ---
In addition to the standard permit conditions, the following shall apply:
1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part)i 1982), all
work shall be performed in accordance with the latest edition. of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Century Homes/Nuevo Engineering, hereinafter referred to as "Permittee", shall be responsible for
providing continuous dust and erosion control. All areas shall be kept watered down daily including
weekends.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day, and
more frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work . site, . the Permittee shall .comply with City regulated work hours. Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during
the following time periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p:m.
Saturday 8:00 a.m. to 5:00 p.m.
May lst to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 P.M.
Work shall be prohibited on legal holidays and Sundays.
5. Work performed within 500 feet of a signalized intersection is, restricted between the hours of 9 a.m.
- 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall
contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal
operation at the intersection is to be altered in any. way..
6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance, 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage.to other City streets or facilities as a result of work performed under this
permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the.City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour and barricade all construction sites.
Special Conditions - Permit No. 3087 Page 1 of 4
'e
SPECIAL" CONDITIONS --PERMIT NO.3087
--- CENTURY HOMES./ NUEVOENGINEERING ---
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A .minimum of one travel. lane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
.be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3.of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in
the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no
water densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing' on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall.
be taken within the lifts to ensure that the full depth of the lift is .compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift
thickness to be compacted for the remainder of the project.
special Conditions - Permit No. 3087
1. Page 2 of 4
SPECIAL CONDITIONS --PERMIT NO.3087
--- CENTURY HOMES / NUEVO ENGINEERING---
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one .per each lift
of backfill, per. 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
G. The depth of the randomly selected compaction tests shall also be randomly selected except .
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other.
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the. public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in.length,.open overnight at a point where construction will begin the next day, provided that this
length -of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete., lighting_ , etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at. all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal'Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the
completion , of, the work. Permanent .pavement replacement shall conform to the following
conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges
shall be straight and clean.
B. Permanent pavement replacement structural section, within all trenches, shall be, 1 " thicker
than existing of asphalt concrete over the same existing thickness of crushed aggregate base
or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of
the.Standard Specifications for Public Works Construction. The .replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify. exact structural replacement section thicknesses with the City
'prior to installation.
Special Conditions - Permit No. 3087
Page 3 of 4
SPECIAL CONDITIONS --PERMIT NO.3087
--- CENTURY HOMES / NUEVO ENGINEERING---
C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium
asphalt concrete as the.base course lift and a City approved'/z" max medium finish course lift
for capping. Asphalt concrete mix design shall be approved by the .City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected'in place during
the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth
of 0.10 feet with butt joint created next to the existing unmilled. pavement. surface. The told -
milled area and base asphalt concrete in the trench area shall be overlaid with a City approved
C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as_ follows:
• For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut
removal lines.
• For longitudinal . trenches located in a traffic lane: two (2). feet outside the sawcut
removal lines, or to the lane line striping, whichever is greater.
• . For transverse trenches across existing street: two (2) feet outside the sawcut removal
lines.
E. If grinding and capping operations- are not performed in the same day as base paving
operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from
saw -cut edge to saw -cut. edge flush with the existing street surface. The base course lift of
paving shall not be left 0.10' low in anticipation of grinding and capping.
F. Any existing lane striping affected by this resurfacing shall be replaced in kind byr the
Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal
loops shall be,removed and replaced in kind. The fmished'pavement surface shall be smooth,
consistent, and shall conform to the surrounding grades.
16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work
performed under this permit with an apg"roved dust control treatment. Soil stabilization shall be done
immediately after completing the operation.
17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically
grantspermission to use the street to deliver.street construction materials and/or equipment.
18. This permit allows. for grading of phases 4-7 of Starlight Dunes Tract 23773 per the approved Rough
Grading plan prepared by V/S Assoc.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3087 Page 4 of 4
ARCHAEO. ADVIS. GRP..' 7603694002 P.,01
• •
Archaeo3q cal Advisory Gro»ia
P.O., Box 491 ;
Pigne. -to n, CA 92268-.0491
Tel: (760) 228-1142 ax: 76A •369-4002 E.Ya l• A,-'OcbRdvgrp@aol,.com
rA. ) �.• �' ¢6advgrp@aol.com
�a��;..Tralnsr�•��s,�•o�a .� r
F Die: November 18,1999 No, of Pa .(including this one): 2 ,
{ To: Ed Knight • . -
{ Company/Agency: Century Homes
FaX No: (909) 381-0041
R From: Jim Brock .
Subjeot: Proposal for Starlight Dunes Mont4oring
l Cgmments,
Hi Ed,
{ .
Here Is the requested proposal. , Ar}y reeor4s show. that there v�ras an archaeological site
previously recorded on the property, QA-RIB/-3W. Do you have aOj of the previous
archaeological studies? Also, a map E.00'"i ng the extent of the prapzeity would be helpful.
Jim
ARCHAEO. ADVIS. GRP
M gmwo LvW.
P. 02
Archaeological Advisory Gromp
Propowl a[lid Contract
999
November 18, 11
To: Century Crowell Communities, Attn: Ed Knigt,.t,A.533 South D Street, San Bigm ..ard; .:n o, CA 92408; Tel: (909) 33 1
6007; Fax (909) 381-0041
Gentlerrien:
We propose to furnish all materials and Perforryk all labor necessary to comoldc-O.c, following scope of work:
Archaeological Monitoring for the StaT.1.0't I*ses Protect (Tra77" 23RemainderRemainder),21 Acres ;It i
.
the INW Corner of Fred Warin9 sad Ad *.rt4:JA Quints,Quints,Rjvenkk-.Cckmty, California. The study
is to include: (1) attendance at the pn�gracle m ci ufr%.vougproperty, grading of the propert, an.d
meeting; (2) oring in iit d* '
(3) a report prepared .for the City of L;%.Quiata on-thc results of the monitoring. :.-he principal hivestigatoJoT the
ill be James Brock. M.r. Orpr4, is an the Rivers . Riverside County, art;b. logical 'referral project wi list and is a
Registered Professional Arctaeologist. Client is to pr6vide at least 49 hoiw s.advance noticeforany me$tji?
attendance or m2nj!qEjns activity.
.. ......... . ..
Fees: Time will be billed on an hourly basis at 555.00 per hour. Therp will 6.e.g.four. . hour minimum fee charged per
c site visit and an eight hour minimum wlicri more than. four but lesi than ighr. hia4rs are worked. Report pre' - n
time will not exceed eighthours if the 6.odings are'negAtive or'minimal. Esfi*Ai� cost is $4840.00 (10 d.ays-. Field, I
day writs -up). Local job: no travel time-i0ileA911 or per them will be cliwed,- Irogrem psymcAts: Semi-rnqnthly
11119 a 20 0 an billing. Terms: 30 days net. Schod Tbis.pro—pos I is valid vMfl.Mak p. 0 d if accepted by time
tim
Nvmk will commeace upon receipt of the contract* and• the report will be comp3.et6d within 30 calendar days of the
compl
etion of monitoring subject to delays causal by. unfonnem: cootin9cup ds. (e.g. uncontrollable labor trouble,
stormy weather, Y2K problems. etc.)- AU-raddaW-0evW0ow: any alter ;iion or.. deviation from the 4
bove
involving M sped Mv a cost of.material of labor will only be execu{ed-upoo.wTitten orders for sa.me.iii1d.will
become an extra cb;&rge over the stun .mentioned in this contract. Ail W.eODents must be made in }v . ri
Indemnification: Archaeological Advisory Group (contractor) agrees to.indPtr).jfy and hold harmless Cgritury
Crowell CoT munities (client), their ; sut�idiafies, Affiliates, officers,' ci401.pyeics, and agents, fi-orn any claims.'
demands, or liability for injury to any persons- or property, indtidin' thctor. its oe . .* . ' q0' Aofficers, ' eTS, CMp1Qy $, or
agents, or other persons arising out- of or restdt.iri8. from contractor!s -P"A461cc under this contract, Wler's Such
inj
ury is caused by the sole negligence orco.ncua�nt active. negtigmce of tle client, its officers, en)p)o
yecy;. or
agents. lfcmtracte5 negligence cmbineswith_ the client's active' begliguna to cause injury, the parties agree tha .1
liability will be apportioned as determipe,4-by a court of rornpactit'ju
risdiction. No party. sbal] request a jury
appointment. Insurance: Contractoiragxees toin# ptain in full fbrce..duzing,ihe term of this contract the folloving
insuran pmsatiov. arid Ef;* Liability
ce sad Umits: (a) Work&.& Coin .oyer's Lia npl.yuigKith statutory rpquirmc , (b)
Commercial General Liability Insurance. with a S-f 000 UOO general a w.egii� [knit and $500.000 property ciwpage
and personal injury Limit each occurrence,, and (c) Comprehensive Auto Liability with $500,000 combined single limit
each occurrence.
Respectfully submitted by: "2
Archaeological Advisory Group
P.O. Box 491 es Broci , m A, ii PA
Pioneertown.iCA 92268-0491 President
(760) 228-1142-1 Fax (760) 369-4002
Acceptance
You are hereby authorized to fum-ish all materials. and labor requited to coraT. We the work mentioned in the: above
proposal for Atcb we agree to pay in.said proposal, And. according to die terms thereof,
have read and agree to the provJisiqps.'of. dais .frq' 0sa.1 and Com-act :' -jta"ettachmentsh hereto.
P and. Y " � eT
Ccattkry Crowell Communities
1535 South D Street
San Bernardino, CA 92408
Accepted by:--...-.__
Title: ......
.Date:
fi------ ------------------------------------------------------- ----
NOTE:
With proper validation gt
this form constitutes an 'CITY OF LA QUINTA
encroachment permit " S
APPLICATION FOR, PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)�4r4
OF TR69
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like publicworksimprovements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit— Class III'
DA I, Minor Improvement Permit Class IV,
LOCATION OF CONSTRUCTION POU-7 r O J OF -T- `L J(n] L-6--Z �►21 V"e:
PI gC44,-- !S WAS
(Street address or Description of Location)
PURPOSE OF CONSTR CT N FL �2e0 I N Sketch (attach construction plans if appropriate.)
DESCRIPTION OF CONSTRUCTION / P
Rote / 'TC�
DIMENSION OF INSTALLATION OR REMOVAL V I
20 -� A ctt.� S
SIZE OF EXCAVATION, IF NEEDED
(
APPROXIMATE TIME WHEN WORK WILL BEGIN D o
APPROXIMATE TIME OF COMPLETION t eG Zo Ig9 1 .,•—���
ESTIMATED CONSTRUCTION COST $ gt8�
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing, permanent resurfacing and/or replacing improvements)
in consideration of the granting of this permit, the applicant hereby agrees to:?
Indemnity, defend and save the City; its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and, arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the AdministreNve Authority at lean twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quints and to pay for any additional replacement necessary as the result of this work.
04.
Name of Con rector and Job Foreman
7/7,F8
Contractor's License No.
s
i
Sianature of Aoolicant or Aaent _
City Business License No.
G. / 00
Applicant's Insurance Company Policy Number .
FEES:
Subdivision Improvement Permit — Class I II
Public improvements: 3% of estimated construction costs '
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
01. f
Inspection Fee, $ `
Permit Fee
Penalty
t Cash Deposit -Surety Bond
if required
TOTAL: $
Receipt No.
Received by Date
Recorded by
2774
PERMIT VALID ION
PERMIT NO. q
DATE APPROVED v
EXPIRATION DATE --
DATE ISSUED
By
Administrative Authority
Telephone: (619) 777-7075
oFo MEMORANDUM
TO: Finance Department
FROM: Raoul Martinez, Assistant Engineer I
DATE: April 11, 2001
RE: Starlight Dunes, Tract 23773, Dust Control Security
The developer of Tract 23773, Century Crowell Communities, LP, has submitted a business check
(check no. - 1000109) in the amount of $22,000.00 to be deposited and held by the City for dust
control security during construction of their project. Please deposit this check into an account which
can be refunded to the contractor upon completion of their project.
cc: Tract 237731file
P.,ermit-3087 file
TAMDEMSTAMMartinehnemo 01 \010411 a.wpd
„.
.
r. _ .:..
.
,.. Y 0600
; .. .
LA QLiINTA; 'CITY ;OF
:'.s:.Check,,No•
= :>:::"10:O,O169 `I.
s' lieck::Da'te, 11` 18> 9:9:::.-:.:.
/ /,
, ... . :.:::.:. ..:...::::.
.........;,; 1:...... ', ::.
. .:.;.:':;' ,,;.-
;. ......,,. >.
::;
.:`=
INVOICE
-
DATE REMARKS
GROSS
DEDUCTIONS AMOUNT PAID ; '< .�
C �? .............. :: n.::...:::...:...;.::.. . .>;.:.. .. .
:. ...:............. n.......:................:
:..:.......:...:::::::
•:.;'.::.,:.:.}:.})Y':.::}:.>:i.;':.: r: :{.::;.i:.i:.?:.:{.>:.:.>:.::::ii :: <x..}:->}t-:•:{ :.:
:.:::::.,::::::::::.:.:::.:::.,.:::.:r::::::.:.::.;.*.:.
..
.•
:::..:::::::::::::::;...:.,:;:::...,::.;: i.;iiiiiiiiiii:.,:ii:;.ii:;.:;.;i.::i.;:iii:.;;;:;;;:;:.:.:;::::::;;;::.::::;.:::
`. .....:: •. ..:....: n..:::nvnv:
n.
n:::v::: ;t.....,t..... ... .. ..FY
r::}..: <:i::.
:::.:.:::::::.:..::::::::::.:::....:..::....::::..:::.:.:.;:£
V...J nil
...)
; : r
.................................... .. :. ... ...
v::::r............. .....:n:•:::n:vn...........:.....::......................
:•}}>}?}4_?•}}?}:!::::.>':?4:?d}. :::::::: :uv:: )Y:v:n%?: i•i::.v,v.....::.::............::::::::::::..................
.rn ...... ....}?S'.}:•):•):%:-}}:::::
..).:v::::.v::::n:.,-......:...C.:. r.:::::::: n•n..v:::>.?::........:::.:...:v .... n.....,+b,r.....:.........
,.t....... .......4: n::v.v::::,, :: 3:4}:4;.v....:::.v-- n.....x
. :•. lv::::., r.: n•: n•:n: x.::::: ...........:.v-.v.vnv::::.t
v:nv:::: .... :...........
'
................ ..{.}i'::::j;:S:Y-.}':'.i:: i): n>..
...:.:n::v,u:wn::v:::::;::•::.:::::.O:Oi::::?4iy}Y.. :;• .::,
.y....
...:. n.n.. n:w:::::.uv..,v,. ................
,...... .:>: n•: v:.v.v:;
): rv?:->'::::::w::.i• .......t ......::::
.?k ....v O: nv:::
..... . :.. -. ...t,..:vn,.......
.r..v v::::. ..........
n....... n.......: .r.L.........
...................................u.
n.........
...:
... ...... ........ .... ::.:
...
.. n.. rr. r.......v....... n:•: ,•.::::w.v: •-v: n. v.v.v.vn•.v.:»v::: n::w ... �.:::::...: '..........:.. .
s:•: n:v:xv:; .......... n........ ,....t...................:............... .
n. n.........:. :.:::::..u................{.. r.........:.:.::::«::: uv:,....... ...... n...t... r:..... 3..... r::.:?+}}.::::.v>:
....... . .. ............... ..... n........- ....... r.v.. r.......'. .... r.... .......... r.. ..
.......: n-...............:.:..... ......... r...... .
A:.......:............ .......... ...nn ............ r.. .v...... .. J............
. t........*.':.........•Y...... n......... .... r.......:........................ .
...:........ .....v....... n...........
r..........v......{.......
.:; ..
,. ... .-.. ....
u.).: ....... ......v:.v::::::::::;:
.:.:v:...n..+.:, :nv::::n:.........:::::::::n.:::....u.:nv.v:::.A::::::
...... ..:. ... ���
.. y. ,
, , ... w:::::..,.::...............
n.::::):•)iY:::.:•::CC:.)•::::.v:.v..?.uw::::::::
:..<:<. ,:. :: .. ..,
nv::: ••i: •:: �'•??:;:::::::::.v.......
.... .
..\ry ....n : I.........'.
r......n:::44':i+L :C•Y.+•:•
.... ..
....................... .....................
...... ...............................
....... n... ...
::ij::isj:f;:::�j::�:% �:%.rjf:jijjj?�'^':v
jjit?jiy}y;:;:+y;:;:;'ij�:%:%jjj:%v%is%l%:j?ji:%j:Cjjji:!:ii}?�:�:jj: ri::%:jf%%%:
>?%h:::v :vO>i:4i>}:v»}:•):4'4)+•:4}:^i? }}i:4})>)+):?-?i>? }
........................:..v:::.v:::.vvv:-i:J:^>:r: vn•:
:�j':;:;:;:;{:;j:{jji:;iii:ijl:t�%jj:%v;i�;i::jji
... .. ......
w?:::::::: n;.;:: v::.v}:.i:::w:::•.v:::::::.,v:::::..........:..:..::.
ii i:i::::' ji i>:%C'i:%%i i:%is::Jli;::ji::jj::^ij::T_'::::vJ:
.,. i ::.
.....:.:.:-.....:..'.-...
` a
.. ... � �. '
.. ....j:$%�ij::%jjjjjjji:?;:
.,
;.
Fi3jf :;:;i:::iji: ij!':
!..0::: v::
.:..:: ...: :. ::
...............
....................... v: •.4%{C?!{{4)}Y: i:•i}i:•)>:{{n}:::.}}v.v::
........ •r..::::::.:
,. ....
.. , <v::::: v:?4}»;:::: i)):4:•i}}}}:•v::;
n.......::::.. ...
w:; �}?:>ii:•r>}?::::::::4i>::;; . ........ . .:::::::
..< .. v... G:.:
). ;.! u:.t , v.w::::::::::::::::: �::::::::::
....: r.r S .tn.....................-........:.n...vu.r.r..................................
).... ...: :.vv:::::: n.: n............. F..........
, ... >,
...::
•:::v: ...._...:.,..... n...... n.....v...n..........nn
. :. ............... ..................:.v.v.
....... ,. .........
u. r........ .... r...................:....
i:r.,..
,::.v .,.
. . .... .: ....v.:: .,»,.,,, .,v»»:.»»nv„ v»», ui»,,,,,,wvwvv...n,
.......................?... .\.. .
.. r....v .. ... .............
.. ................ ..
..................: ..: ;... .........v.....r ...:..............
....;.
.............t...........................................+......................................
•
}:4i:-:8}>}:4:?ti4:4:.v:::::
.....................
is%:-? i;>:C-}:::v:?{•}?}i>:.})}):.>}?i:::::•>}}:i.?}}>}:•:•jji:%:;:;iii}}}i:?;{{^:??:•.:v.v:.v.
...
.......;....................n.r....u.., :. {n.
.......... :.....:::...:..........::::::::::::::.... .
;
< ............ ..................................... .
.......:, .......... .v..........:.:::::::n..........?:;•:{+.4?:4i:•:L.?y:
...................r:.v:: n:v:.v:::: iw:;.:: •):L:;;
...........................r.?.}}i:•i:•>??: vv: w; ................
C:v::; .,-.................... r::::.:,:{•:\:?:v, ,........:.
.........................................)n+r:.v:::r:.:
;: w: !{4);y:.i;:::
............... .. : r....
v.:v::............ ..
r:::::::::.:v:; .}•,.y..: !:.v.v., ::v:::::::::::::.... :}:
•:.::::_ :•:.v:nw::::
n•:::::.v.vn::vnv.v •:::v: v•: -:,:•.v::::.-..............-......::......,....-................
..........n..... r .t....................
.. .. n•.v:::::nv:::: v::::: ....?.....
n'%-:?-}%-I............... -. ♦::•::.:....*, .,.:„:, ..t........................,
ry ,v::::.:............ ..v:v.v:1:•:: v.
?:4;::::: n.....%:.v::w::;;.v::::::.:v......... •i: y'n>i>i:4}}::•:h
- .... .. .'. ... : '...
9 ................ ..... ,. .
r.....,...+v ;...:.. v ..
r::::: r:::::::0:>i:: r: n•?4i:v'
''
•... {.;;•; )?};:::nv.v::v:
:: Y.:?z..
i;i
.............. ....... .....r ,.
..........:....... .yt-:::..... n:t}-:::::.v:::::::.v::
.,n•.,, .t...................nv:::. n,::.:::v:
v.v.v.. .........:.............i .,:..
........ ..... n•j.
..-... ..... t...........v. .......:
............t..:.............
:' :"
... I., :
:v.v.v:::::::.v.vn:..................... ......: �.........:.�
............... w:::....
............. ...........:.... �: ........... :::::
v:: w,v........ ..::::::::::::..
. .....::::::... ..t. r....:: ”- .....n??4i>:....:::::::::
r...........::::3>3:•:•>:f:
.. ...nw:::::.v.........
nv.}v::::::: nu 'ij:%:j Jjijj: ................
.:4:4i3>:•J:•Y:
...:v:::::.:n ::.Jl4' s2 :::;{:; i:'ji ::::%%%?:::jjj:..
.........:::.:::
................
.. ...::: ::w:::::
j... ij:i.... -::! jj....j;ijj;:;S� :ti; ;:^;;:;: ;: ;i:;i :{:; ;Y':
r}:j?;;??;vi»>?i?i}? i:•:v 4:?•:Jii>i}};•}}}:•)}>}):•}»?ir.,jn?;;%%%: :ii�j ^jn::
w. ............. . .
CITY OF LA UINTA ..
Q :'
..., . ,:. :
•`. ::'.. , ..
;::;
'
01-A0:0:-1 I
P. O. BOX 1504
,. . .. ...... ... ;. . .:<.,:,
LA QUINTA;CA 92253...,::
:; '
..: ....' ... .
,
l.
,. <., .. .:...>..... :
..,. .. ,..:..,.:
. - .
, ... ...
..
. . ......::.::..::. :>;y
:... ..... .
:,
<..., .....:. .....
....:.. , ,..
.:
. - .:,.
1.
..
, .:. I .::, ., .
f -,
:..
.. ,.. .. . >.. ...:.
-.
: Ce nttiiy`Ciowell Corrimunities':6.
'.,
Y 100600:,;.LA QU'INTA,..:.CITY OF
.:.
:,
; ' `:;,::".:Check::ATo.,;:;`,,
"..';1':000:10.9'
:.: , -
.... -'
...,
.;..
• .:I.;.
.... ..
...:. ..
. ..
INVOICE. ..
......,.::
,:...
DATE.. REMARKS
........
.. ,. ,....
...
GROSS
, DEDUCTIONS - AMOUNT PAID
...:........:::.:..::...:..
•i}:•iri:=: f::.:{r: {::.}': v:.} !r{::::.Lii?'•i>ii:•}:!{{•}i :*:::{•>>?>}>:h}}}?i:4)'{:
-v:::::: v .
...::.::.-:. :.. i .:l'�:. ./.�........ ..................
...:.. r•:+.. `.tF- xi. v.v::: �.:: ..v: .::).:: ..v:::
..:..r:C.. n........... r.. •}.:v.v: nv: nG:::; •::::{..::::W:�
............ ............,.:,..:......,...: ........... r..:...
in• ::::•:::::::: n•:::::::::::::::.v:::::.a': i:: v:::.-.....................:...... .........:
..::::.0...........:::y..............:.:....... . : ... r.:: :v::::::::: v::v::::::::Y)::::::::::vn....:...........
:: ?): .} ' ..:::. .•. ... ..: �.,:y.. .: •:::.`}�( .:. :)j:. .'.. ' '.:}:i4}j:::%:j:%:ji:::::?:..:...i}}:
{��] ��'�y7'q{'��. fi�r,{'':[�: .y.-.��``f�JJ.��'�{. .]]'' :.v . :•: .: �,�t,-.v.. : • ::: :::::
•:: iji'!sy,>J.,{,..4. 14Y:-lY.,4::.?�i{ .(;}'[-�'vn '�Q``�'��'
-%: Y!h4 ...
... . .:
:'.:... ........... .. .... -,. .
n:w.:: ::•:::.v:.w:::::::: vnw:nw- ::v,;v.................--v: ;•. ;... ..
n r::�.:C;:;):j;:;:;� :;>'f.;::-, ::ji::jj j:
".: ".:".}}}:4...•4:•i??>:`.i.:}:4?:4:CiY.4?Ti'L::::S%{:iijii ::iv;i:.j:j:
.. :.::: .: ...:::. v::}.�. .. :::.. ..::::::.v::::.:w::::::: nC.::::.v:.v.v:::::: �..:::. '.: ........ n...:::::. -
... } v: • . • : -, ..:v::: v::: • • :v.v:::::::::.v::: r:::...........
i4:??i .v..n...' ryry++ee••�� yyyy n KKph
`i}J :;<y; ::i:;:.
...
. ..
...................
...........:.t: :::Yn:....:....a .i!.................
-.
.J�!fi•:•i>i:`v:%4:+}::
::::::
..,
.....
u : ...
/; l." .�....4.V.:..::.,..
— — —
..
:::{..:::::n:.:.,•.,••::::::::-}::.i:-:-is:::fA:Ii!:: i:;
"a
-- -- -- — --—
ii:{?;•>:?..;: is i:•i:-:-:i:i:.}:;•?.!>:;{>::
.................
.....''
.......:: ::....
.........................................k•::::.,...............::.....................,......................:...................:...
.....n.................1.....v.•: v...........
:... <
.......w:::::: ?: >.:+.u:v:::::::
...........................................
:........ .. ..........-... ...................
.. .:.............:.........:.: ...:
............
v: n:w: v:v:•i� : (h.�
2: %iij:;::;:j'v%i%;:%}:j:;:;::?%
... .....
-
n. :.t. ... ......
.......... ................ .. . ....
iiiiiii:.....j}:;j:'. i;... �•( /�
...................
..� ,
.........t.......... ......................,,v::;
...............
- .. ... .. ,..
r n:v::..: ti.::::::::....... n..v:::::::::::::::v:...
:::.n..»v::::::nwnvn:v:::::::::::::::::::::. v.:
..... n• :...:
.. ..:...
J:4:t.v.: r......::::::::::::::................... ....
...... ...................
........... jii4�:lryv.:+.'jj?�j:%%::ii:tl:tii:4jjj:%:y.
- :-.....
... ..
t.....::::.........::: n:,v:::: i:: iinv:...::.::.....
n..................., .:::::..:.:.:: ....:::::::..:::...
..................x::::::::::::::::::: nvv:::::::•i3:{Cv:•?}Y}>:::::
r ..::.:::::::::x.v::nv:::::::::::n:•:::::::.v:4}:{•}%.;:::::::{-n.nv:::::::
{.... .............::::: n.:....
:: r: ..................................................................:
if}i:L:: is is ...................
.. }:tij{: :..................:.:::::::::::::::::.:::�::::
........,....:....... iiii:.:::::::::::::::::::::::::::::.:v.
:.:,.. ..y
::::
::nw::::v::v:4}::..
n•:::r:::::::::i
.�::::::.:4>?>v: nv.:::
„ ..
4:C:nv.v:::nw:.v;: n•r.v.v::: ��:?3i'•3:J?:4i:•ii:•t:;?;+'
n•.{?•?::::r...r..-}:':+i-?.
,::.:: ii:v:?'; ,'i'3j:%::i::}:.}:•:vii.
......... ..........................,............:,.
.........:...............:::.:::::nv:::.:::::::.:v::.v.
�::: :•. �:::.v.
Nom
.. r...... �.,i.-.%,% .. ::�>3:! . .............:::•::...
}:.}i}%:v::: i:i)i:{C �j%$j:i jji is%C:{i:; jj}}}jiY.L•))i}±!?:
-
.f. .........,. ♦ ;
:::):):n•i+;4}•:::::::::: ......................::.::::. v,
.............:::::.......r...:..r.:.:..,v.::::....:::)}i»i};.i:•j;%:ti;.;
.... ....
w.}:;... u..: ;....:.....;•:.v:,...........................:..;...........F...?:i....:..r::.{.:..:....:.....:....:...:..f.-.
ti•>:}.:;::v:i???4:•i:{?v:•?:•}}>}»}»:??.::•iri:•>ii:•i:::
......
... ... .. ... C.;: n?':::.•:i
}}: {:?Li:?•?}3»::i:•;}:•i%is4:o'4:4}?}>>iii%Y}i:•)):{•:?•>:?
.:,
.v
.r:.v: n:.v.v::::::: w.v:v:::::'.+>iv::::::::::::::.::w.uv::.-nv
r.:...:..1v....... t. t..l:.......t?
iiG: i:4u;{•}:4:vri :{•: %%:v}:•i i»>:;
.
:?-\..?ii%%>:•t.4j:u'v:ii::iiJi::i>�%:.?tjj::i'' 'jiYJ:�jrijj'Rij:'j iji :::}Fjiii:.r;:?j
xv::: n.:::.w::.v�i,:::::::: n:..: v:. w:::::::.v%:: ..v: nv::.'
:::....... ...........:::::...... ............... .............. ..........:v.;:::::.v.v: n.............,
. .. . . :.
::::v:•'a':
....:4•: .. :4:4•jj}i:%;;%;j::{.}':}:;%:;i::}.'.r?t>%CL??:'??}?i:4iji'•j:•i:•::}:L%4j:•jf%j?iiii:•:ti':%G)j;'!:;F`
n .<n...v.:. f.::•n :v w::.M; v
::::::..::::.v:::::::::.v: >:::::::.:>::::::::::::!.y:::;4}:!!:•%r?•A?.}vY.:!%-)??:•?:{•}}:....
........... ......
?:4'->'4
...
`::':+:•:^:%?{::.
.
?\
?*:;?}.�:).n.,ri-jj:%:jvi:^:j"vjjjjj;.;%>Y::}j?i{?::»3y;{+{l,•;:
:C:j:%%n;%:;:ti%%v;'F.j;}:isti{%:}•:}j;:ii}j}jii;;iij)j}}:{:;:::;:<;;:
:.v::.v: •::::;
'C:Lv!':!{:•,`:}%% %jj:Jj;i:i'?::%i%ij i::j:%%•j;%:;%%:;v..r
............:.................... %..4::: nu•::::..• .O:.:Y{?C'}}T ..:
.
!:Ji?i: :ri j: :j:: :::':::i:}:?;%>:ii:%i •):,-.., +i;i:;:':;:v (;:;}}j-^YW);?4):�4iv.,v,.v.iviiY.:-%?v'i??.:•-J.•?ivi:
:?;:jv ti:•?}}}}}}:::j:};'::. :nw:;: r.::.: n•:�•?:•)i}.::;u., .... .. ......... .
.. n..... n..-v;.v: •: r:: n:•:.........: n:v:..
.::::.v.,•::;:?:}%r:
.. .. ... .................:::n...,....r.....n.................fw::::::::.v:::::::.v:::.v::::
:•.:,-:::::: .;....-....v....nnv:.w:nv:•......n...,.......
w: n:•::.w.v:.v:.v::
............
): A'r;:::::::4'•:>?}•%?%)•{:::
n•. •:.-', .t..,.:4.!:4i?}):!i}ii{'{'vjvii.F V';}: j::,., '
........... ....."........,.
......:............:.:. :::::n•.n•:.v:::..•; .....:,.::.v:.n :::r..........:::::::.t:v:::.v.v:.v::.:.v ..... :.::?!?-}.!i:::{%;;
:: ...............:::...... .,-:..::::::-K....:::nv.v: v::::..._...
,,.. ,.: .. .: .....
:.r
•: :•:::.•::::::::::::::nv :•: r:::.v, •r......
.........v:........:.....:......
.......::::::::: n•:.v:::: nvn::•Y...................:::::::::::::>>:•):^}:{•::•}:4:-i:
... ... ...
r <.
......r.... ......
.. ..
.:.. ......n
.:.,. ..
�®9W�'0i'�PYFV94'.RFS�W�AIRi6'—•wv _ '.
'•'� q.
anv�naav■
.n . - n, r •o
,,_ .I-,.......>....
o �o.e.
� ,. - -
£:'
. . :...... . .<. .., , V :.
CE NTURY CROWELL :COMMUNITIES
Community;Barik `
16-347/1222' : ' :
:: a - .: .. ,... .;..:.: ,.:..
;... :.:..
e 1535';South. D Street Surte::200'-
.:'.'
1.175 East Hi hland Avenue >":>:;:'
San.Berriard�no CA 92404
: `
.-: , . ,, ,
. . ,,:..
San Bernardino, CA`92408
.
.
Na.'
909 .381-'6007:.FAX 909 381-0041::,....
. ) ......
:.
..
.
:. : v':
..:.:..: ..::. ":.... ..:.. .. ,
.......
..
,.. .
,:. :.
. ,.. ,
. . , : ...:............:. x
22""°000:00
..:..::. .....:.:...
.,,.:, , ..:::
;;: ::
.y .
...... :....: `:. .....
. ,....
TWENTY TWO TH(�JSAND AND 00/100 , ..
:., ....:::.: �...... ., ::
:. ....:::: :.:.::' ..�:. :...:::..... ;'.: .:....:..:..:...... : , .....:...:..
.
:.. ........:
.':...-: .. :..........,r.:,
PAY TO.THE ORDER OF.... .., ---. ..,:. >
:..: . ..
'.::::,'. :.;• .:: ,
C
, ....,E-RUWEI:L'.CO .�UNITIES;.IsP::
,:.', CITY;OF'
LA QUINTA :<...,.,
.
:.. .- B.OX.1504 n.:... .:
P..O
. :.
, ...._:. ..... , .:.:
:: ; ;
:..
:. .. „
:.. .. LA U
Q 225. :;'
:.,:.... :. ,;: ,.
,.......- :
... , .. ,..:.:, . ;. .. .
. ..:...
. . ,.. -. �...... .
,
. .,. :::.:... ..
-
STARLIGHT DUNES
TRACT NO. 23773 '
(REMAINING PHASES)
.fiPre ared for
s Century Crowell. Communities
Prepared by
Dudek and Associates, Inc.
...... ........
.. •fi3,.
• . - ' .y: ' 'll r1. K:i 'Sit•
• , ; 31313•lJ3ry�'h'J� ice'+Iryy%J )r'+'J+Y+i»iiiJ J f+++i+. J•
& ASSOCIKUS,1NC.. '
' IleafcWonal Terms fm Toky's Projects
NOVEMBER 1999 i
Medium -Large Scale Construction/Demolition Projeets
Greater than 5 acres)'
Fugitive Dust (PM 10) Mitigation Plan
Date: November 2. 1999t , �- 4 Jurisdiction: City of La QuintaProject File #: 1961 •
m .-Part 1-Pr`oject Information i
• Please provide the information below as completely as possible even if it has already been provided
on other forms related to this project. Failure to provide complete information or provision of.
inaccurate information. may delay the processing of your Fugitive Dust (PM 10) Mitigation Plan
(Plan). It is recommended that you submit your Plan concurrent with your grading or demolition
Permit application.
Project proponent: Century -Crowell Communities`
Address: 1535 South "D" Street, 'Suite 200, San Bernardino, Ca. 92408
Day phone number: 909-381-6007 Emergency phone number: 909-423-4757
Grading contractor (Contact Person): To be determined
Address: To be determined
Day phone number: Emergency phone number:
Construction site street address: Northwest corner of Adams Street and Fred Waring Drive '
Construction —site location: (See, attached 8%a x 11"Location Map)
Construction site assessor's parcel number (Tract ft Tract'No. 23773
Parcel (Tract) size: 22.1 Acres 'or Square feet
'Anticili tedrdate of physical project initiation: December 1999
y,- Anticipated date of project completion: March 2000 '
Anticipated costs for dust suppression: S 22.000.00 t r
• (Attachment B-must also be completed and mailed to the appropriate address when construction
activities have been completed.) '
' All projects greater than one half (!12) acre are also subject to SCAQMD Rules 403 and 403.1. ;
Page 1 '
Fugitive Dust (PMI0) Mitigation Plan
Earthwork Information (Acreage/Cubic Yards):
Project Area: 22.1 Acres Total Distributed Surface Area: 22.1 Acres
Cut: 71, 966 c. M. Fill: 38, 319 c. v.
Import: 00 c.v. Export: 26,885 c.vc.v.
Part 2 - Fugitive Dust Control Actions
From the inventory of fugitive dust control measures in attachment A, please indicate which measures
are to be implemented during the project by placing the corresponding letter beneath the following
sources. In addition, please indicate at which phase the measure will be implemented, either Rough
Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only
indicate measures in Rough Grading (RG) column. After indicating what measures are to be
implemented, complete.the "Details" section by describing how and when the measures are to be
implemented.
Page 2
Fugitive Dust (PMIO) Mitigation Plan
Source
Detail (e frequency of application number and type of dust control
'
implements etc. ;
'.No.' . RG
FG FC }
1 A
Pre grading site watering by agri-type water system to be
done in the mass grading stage. Required depth of water
penetration to be determined by grading contractor's field ,
•
superintendent and Soils Engineer.
• 1 .. A
Site watering to be done by water trucks until completion of
mass grading. Water shall be in the form of multiple daily
'
applications in such amounts and such frequency so as to
prevent fugitive dust from migrating across property lines.
' This shall include watering before and after construction
'
hours and on holidays and weekends.
1 A
Site watering by water trucks shall be utilized on building
pads, streets and landscaped areas after mass grading is
completed. Watering shall be in the form of multiple daily
applications in such amounts and of frequency so as to
prevent fugitive dust from migrating across property lines.
This shall include watering before and after construction and
on holidays and weekends. ,
2 H
Site watering to be done by •trucks on roadways used by
construction traffic. Watering shall be done in the form of
multiple daily application in such amounts and of such
frequency so as to prevent fugitive dust from migrating
across property -lines. This shall include watering before and
after construction and on holidays and weekends.
2 I
I I A speed limit of 15 miles per hour will be enforced on all dirt
' roads for all construction vehicles.
Page 3
n
I A.
Fugitive Dust (PMIO) Mitigation Plan
Source Detail e.gf frequency
of application, number, and type of dust control
implements etc.
No. RG FG• FC
3 L L
Soil storage areas and soils stockpiles shall be kept
f
continuously wet by use of a temporary sprinkler system.. As
an alternate, soil stockpiles may be stabilized by the use of an
EPA approved chemical dust suppressant.
�. In'any event, soils stockpile, storage, and other areas
distributed by the grading operation shall be stabilized by the
use of an EPA approved dust suppressant whenever
operations on these specific areas are discontinued for a
period in excess of 30 days.
4 P P -P
Stabilized construction entrance (aggregate road base) to be
installed (See SWPPPIPM10 Plans for location, size, and
details) at unpaved roads adjacent to paved public roads.
These will be kept in place and maintained until project
streets are paved.
- 4 Q Q Q
Paved city streets shall be cleaned on'a daily basis. to remove
=
soil originating from the site to the satisfaction of the City
'
inspection staff.
4 R.- R R
Loads of soil transported to or from the site on public streets
shall be wet down and covered. Additional measures may be.
specified by the City inspection staff.
5 Sr S
Soils stabilizers (Aqueous Acrylic Vinyl Acetate. Polymer
Y ;
Emulsion Dust Retardant) to be used (See SWPPPIPM10
i
Plans) in the rough and finish grading stage until completion
`
of the improvements (includes buildings and roadways).
i
I
i
Page 4
_
r
Fugitive Dust (PMIO) Mitigation Plan
j Source r Detail (e.g!frequency of application, number, and type of dust control
implements etc.
No. f RG " FG FC
5 T T Site watering to be done in the fine grading stage until
completion of the improvements (includes buildings and
roadways). Watering shall be in the form of multiple daily
applications in such amounts and of such frequency so as to
' • prevent fugitive dust from migrating across property lines.
This shall include watering before and after construction
r
hours and on holidays and weekends.
5 V Vegetation (hydroseed, stolons, sod, trees and plantings) to
be installed on building pads and perimeter areas. (See
Landscape Plans for type, size and location.)
In addition to the above listed dust control measures, the following controls are to be implemented:
1. To minimize track -out of soil, the wheels and tires of all vehicles shall be inspected and
washed prior exiting to the paved streets. }
2. . •, Applicant shall apply sufficient fugitive dust control measures to minimize dust visible from
off -site.
3. , An approved NPDES permit shall be secured and submitted prior to the issuance of the
grading permit." • R
-4. Applicant agrees to`ahide'b' all measures specified in the project environmental impact report
• , . relating to grading and dust control activities. -
r:; f
• S.. Applicant agrees to abide by and implement all measures relating to fugitive dust control
specified in the site grading plan.
6. `Applicant agrees to abide. by the provisions of the South Coast Quality Air Management .
District Rule 403 and City Ordinance No. 6.16 relating to fugitive dust and erosion control.
7. Applicant understands that failure'to abide by any of the fugitive dust control mitigation
rmeasures listed in this plan may constitute a cause for abatement by the Building Division and
possible work stoppage. '
Page 5
Part 3 - Aereement
I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true
and accurate and that all measures specified in Part 2 will be implemented during project
construction. I authorize the City of La Qu i nta to enter the above mentioned property
for inspection and/or abatement purposes, and I agree to hold harmless the City and its
representatives from liability for any actions related to this project. I also agree to
complete the record -keeping requirements included herein as Attachment B; once the
Droiect has been completed.
I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has
authorized the implementation of all its provisions throughout project buildout.
ature o , ra ing ctr Authorized Representative ate
(I not the same as ab v
ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES
The left column contains the sources of fugitive dust which are intended for emission control
under the City's dust control ordinance. Die two right columns contain an inventory and
description of reasonably available fugitive dust control measures for each of the sources.
Please use this 4nformation as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan
(Source No) Reasonably Available
Source Control Measures Comments
Land (A) Watering o Application of water by means of truck, hoses and/
Clearing/ or sprinklers prior to any land ciearing,or earth
Eat_ movement will increase the moisture content thereby
moving increasing stability of material
o Once the initial land clearing/earth movement activities are
complete, a second round of watering can generate a thin
crust which stabilizes the disturbed surface areas provided
that it is not disturbed
o Security fencing can be used to prevent unwanted future
disturbances of sites where a surface crust has been created
(B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances
o Vendors can supply information on product application and
required concentrations
(C) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas .
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(D) Cover haul vehicles o Entire surface area should be covered once vehicle is full
(E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved
areas
o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(2)
Unpaved (F) Paving. o Requires street sweeping/cleaning if subject to material
Roads accumulation
(G) Chemical Stabilization o Vendors can supply information as to application methods and
concentrations
o Not recommended for roads with high volumes or those used for
heavy equipment
(H) Watering o In sufficient quantities to keep surface moist
o Required application frequen-cy will vary according to soil type,
weather conditions, and vehicular use
(Source No) Reasonably Available
Source Control Measure
(2)
Unpaved (I) Reduce speed limits
Roads
Comments
o 15 mile per hour maximum
(Cont'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to
reduce vehicle trips by a minimum of 60 percent
(3)
Storage (I) Wind sheltering o Choices include silos or enclosures
Piles o Enclosures should consist of three sided barriers equal to height of
material with no more than 50 percent porosity
(L) Wet suppression o Application methods include: spray bars, hoses and water trucks
o Frequency of application will vary on site specific conditions
(M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances
(N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side
procedures of the material
o Most effective when used in conjunction with wind sheltering
(0) Coverings o Tarps, plastic, or other material can be used as temporary
coverings
o When used, these should be anchored to prevent wind from
removing coverings
(4)
Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved
Road areas
Tract: -out o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(Q) Sweep/dean roadways o Either sweeping or water flushing may be used
(R) Cover haul vehicles o Entire surface area should. be covered once vehicle is full
(5)
Disturbed (S) Chemical stabilization
Areas/
Inactive
Construction
Sites
(T) Watering
o Vendors can supply information on methods for application and
required concentrations
o Would require frequent applications unless a crust
can be developed over the site
(U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas
can be effective in reducing the amount of wind blown
material leaving a. site
o Should be used in conjunction with other measures
(V) Vegetation o Establish as quickly as possible when active operations have
establishment ceased
o Use of drought tolerant, native vegetation is encouraged
ATTACHMENT B -COST INFORMATION
Medium -Large Scale Construction/Demolition Projects
(Greater than 5 acres)?
Fugitive Dust (PM10) Mitigation Plan
Date:
Project proponent:
Address:
Day phone number.
Jurisdiction:
Project File #:
Emergency phone number.
In the space provided below please list the costs associated with implementation of all dust
control measures. The information provided below should include all implementation costs
(including labor) for dust control throughout the project. Not all measures listed below will
apply to all projects.
Watering:
Chemical stabilization:
Wind fencing:
Covering haul vehicles:
Wheel washers:
Street sweeping:
Paving:
Wind sheltering:
Coverings:
Vegetation .reestablishment:
After project completion these records shall be transmitted to me
grading demolition permit was attained and to .the Coachella Valley
Governments (CVAG) at the address provided below.
PM10 .Cost Monitoring
Coachella Valley Association of Governments
73-710 Fred Waring Drive,.Suite 200
Palm Desert, CA, 92260
here tie
.ation of
1.All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and
. 403.1.
:For City Use Only
Based on all of the provisions contained in this Fugitive Dust (PM10): Mitigation Plan
the Plan is:
Approved
X X Conditionally approved (Conditions specified below)
Denied (Explanation attached)
to implement of all provisions at the concentrations and frequencies 19entinea.
ture of Owner or ut o
esentative
to
CONDITIONS FOR FDCP APPLICATION 99-75:
CENTURY CROWELL HOMES/STARLIGHT DUNES
TR 23773(R); 22.1 ACRES
GENERAL:
Applicant shall comply with all control measures as set forth in the approved
application for FDCP 99-75, and the following conditional measures. This dust
control plan approval shall also apply to any haul/encroachment permit(s)
issued by Public Works. Where conflicts arise, the Public Works Director shall
determine the appropriate controlling provision.
2. The SWPPP, as referred to in the FDCP application, is not a part of this FDCP
approval. The Public Works Department is responsible for approving the
SWPPP, and any requirements placed on said .approval shall supersede any
conflicting condition or provision of this FDCP.
3. The grading contractor shall be responsible to show that any off -site dump
sites for export material have appropriate approvals from the property owners
and respective permitting agencies, and shall present said authorization(s) prior
to receiving any grading permit, or commencement of any site work.
4. The full amount of'security furnished (as determined by Public Works) for this
FDCP shall be available for any measure(s) deemed necessary by the City to
achieve adequate dust control, whether or not such measures are part of this
approval. Form of security shall be determined by Public Works. Requests for
bond amount revisions must be made in writing to the Public Works Director.
5. Applicant shall submit documentation for all costs incurred for dust control
measures assumed during all pre -grade and grading construction activity. Said
records shall be submitted within 30 days after completion of all dust control
measures as outlined in and conditioned upon the plan, or upon any request for
release/reduction in posted security. Documentation shall include a completed
PM 10 Program Report Form. Security may be withheld pending submittal of
this information. Applicant shall have completed all dust control measures, as
verified by the assigned field inspector, prior to any release of posted security.
6. The contractor/vendor responsible for provision of the approved soil stabilizing
agent shall submit a Material Safety Data Sheet, along with approval from the
Water Quality Control Board, to the Public Works Department prior to any site
application(s). Application of stabilizing agents must be in compliance with
NPDES,.the SWPPP and state Water Quality Control Board requirements.
7. Adequacy of all proposed and conditional stabilization measures shall be
determined by the assigned grading inspector. The City may release a portion
of the bonded amount to the applicant for any remedial measures beyond those
identified or conditioned upon the project, which the City deems necessary in
the event such approved measures are not effective (see Condition 4).
Enforcement of these conditions shall be at the discretion of the assigned
grading inspector, who shall monitor and field verify that -the spirit and intent
of the FDCP, the SWPPP and all attached conditions are being complied with.
Adjustments to application frequencies, quantities and other aspects of this
FDCP may be made by the inspector, at his/her discretion, in order to assure
compliance.
8. The conditions applied to this dust control plan are anticipated to cover the full
range of construction operations as presented in FDCP 99-75 for TR 23773(R).
The approval provisions and conditions for FDCP 99-75 shall remain in effect
for the duration of all grading construction undertaken within the subject 22.1
acre area.
Transfer of any real property or other interests with respect to this project will
have no effect on the validity of this plan approval or conditions.
Implementation of all measures as proposed and conditioned shall be carried
out for the duration of all construction activities, to the extent they are
applicable. However, nothing herein shall preclude any future interest from
filing a revised FDCP with the City for any portion of the site.
9. Approval of this FDCP does not in and of itself constitute or otherwise
authorize any site disturbance, preparation -or construction. The developer is
required to obtain all necessary permits and clearances as set forth in any
development approvals issued and currently in effect pertaining to this site.
This includes any. type of testing, monitoring or sampling required as a
condition of development approval, such as that conducted for archaeologic,
hydrologic and geologic reporting purposes.
SITE DEVELOPMENT:
10. Pre -.watering of all areas proposed for grading shall be in accordance with
.requirements of the Public Works Department, based on the area soil
conditions as described. in the associated soils report(s).
11. Track -out and other accumulation of soil material onto any paved areas outside
the limits of grading shall be minimized as stipulated in the FDCP. Any unpaved
construction exit/entry point along existing paved roads/areas shall be
improved as.set forth in the FDCP. Wet sweeping/flushing. (dry -sweep not
permitted) of soil accumulations from all paved areas shall be conducted daily,
and kept damp during construction hours until so removed.
12. All on -site traffic on unpaved roads shall be limited to 15 MPH as stated in the
FDCP application. Signs shall be posted at all entries and along all unpaved
access and travel ways at minimum 300-foot intervals. Size and height of the
signs shall be appropriate for their respective locations, and shall not be posted
on any adjacent private properties. Project site superintendent(s) and any
security personnel shall be responsible for enforcing this requirement-.
13. All unpaved construction access and travel ways within the site shall be
prepared for traffic prior to commencing grading activities and kept watered
down and compacted to retain moisture content during all construction
traffic/activity, including building construction. At a minimum, temporary
construction travel ways shall be improved to a 20 foot width. All unpaved
road lengths shall be watered each day, prior to and at intervals during any
traffic activity, and at the end of the day after all activity has ceased. All track -
out shall be removed as per Condition #10.
14. FDCP 99-75, indicates 26,885 CY of export material. All on and off -site soil
transport and.stationary storage piles shall be sufficiently stabilized, watered
down and/or covered as required. Minimum freeboard shall be as established
by the Public Works Department. Any storage areas shall be. routinely watered
and chemically stabilized after borrow activities to mitigate airborne dust. Off
site spreading areas shall be subject to requirements of this FDCP, and any
such areas outside the City limits shall have the appropriate agency and
property owner authorizations (see Cond. 3).
15. All on -site temporary employee facilities (sales, construction, equipment
storage/staging, etc.) shall be provided with paved, compacted or otherwise
stabilized parking and access during their operation, with those improvements
to be constructed/installed to the applicable Public Works Department
standards. This requirement shall apply to any approval for such facilities under
a minor use or other permit process.
16. If approved on -site roadways/parking areas are constructed to ultimate design
prior to completion of construction activities, then: traffic and parking shall be
limited to those paved areas as feasible. No vehicular parking or traffic of any
kind is permitted on or over any previously stabilized or undisturbed soil -areas.
17. Disturbed but inactive development areas subject to additional grading or
building construction within 30 days of completion of the initial disturbance,
shall be watered daily in conjunction with watering of access roads and
developing areas, unless an appropriate dust suppressant defined in Chapter
6.16 of the LQMC and approved by the California Water Quality Control Board,
Region 7, or as specified in the FDCP, has been applied in lieu.
All disturbed areas where no further grading, construction or other land
disturbance will occur for at least 30 days, shall be stabilized with dust
suppressant specified in the FDCP, or by establishment of vegetation, no later
than four days after completion of the initial grading. These areas shall be
staked, posted or otherwise restricted in order to prevent any access on or
across them.
18. Construction activity associated with this project will occur during potential
seasonal high wind activity in the Coachella Valley, and is located within an
identified blowsand hazard zone. All active graded areas shall be watered daily
at appropriate intervals. At least one water truck shall be stationed on -site on
weekends and holidays. All security personnel shall be alerted to the need for
dust control and instructed to monitor graded areas for wind -generated dust
as part of their routine duties.
19. On Sundays, holidays and other non -construction days, personnel shall be on -
call for emergency watering in the event of high winds. Additionally, during all
grading operations, an appropriate individual shall be assigned to monitor wind
conditions. This shall be done by utilizing wind forecasts available from the
South Coast Air Quality Management District (SCAQMD). Wind forecasts can
be obtained by dialing 1-800-CUT-SMOG and following menu options for Air
Quality and High Wind and Dust. The individual shall access this information
daily, prior to commencing construction activities. In the event.that winds are
forecast to exceed 25 MPH (403.1 High Wind Day), all construction activities
and .on -site traffic shall be closely monitored to insure compliance with the
FDCP. Said individual shall coordinate with the assigned inspector on adequacy
of current dust control measures and any additional measures potentially
necessary. If such measures are ineffective in minimizing airborne dust, then
grading activity shall cease until high wind conditions subside or other effective
dust control measures are employed to allow grading to continue.
�vv
78-495 CALLS TAMPICO — LA QUINTA, CALIFORNIA 92253 - (619) 777-7000
FAX (619) 777-7101
May 10, 1994
TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS
IN THE CITY OF LA QUINTA
RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL
PLANS
Dear Developer/Builder:
The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992.
Among the required control measures was the enactment by Valley cities of dust control ordinances
which require builders to implement dust control actions during construction, demolition and paving
activities. In conjunction with City staff members, we ask your help with the reporting requirements.
A significant aspect of the PM 10 Program is the need to report statistical information to the Federal
Environmental Protection Agency via the South Coast AQMD and the State of California Air Resources
Board. In response to this requirement, a Dust Control Reporting Form has been created, a copy of
which is attached. It is requested that if any project developers have amounts to report for any PM 10
mitigation, these forms must be filled out. This form is intended to supplement Attachment "B" of the
Fugitive Dust Control Plan by providing specific cost figures related only to dust control measures.
The South Coast AQMD has requested that the retroactive operative date be January 1, 1993, for
reporting purposes. This means that each jurisdiction is requested to review projects since that date
where PM 10: control measure expenses have been incurred by developers, whether or not they have
been incorporated as. part of a Dust Control Plan, and forward this data to CVAG as soon as practical.
Your cooperation in completing these forms as pan of the grading permit procedure will help assure
that the Coachella Valley and the development community as a whole receive deserved credit for the
effort to attain Clean Air Act standards for PM 10.
Very truly yours,
RRY HERMAN
Planning & Development Director
JH:WHN:bjs
Attachment
MAILING ADDRESS - P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253
APPROVED BY: CITY OF LA QUINTA
CHRIS A. VOGT, P.E. DATE
PUBLIC WORKS DIRECTOR/CITY ENGINEER .
R.C.E. NO. 44250 EXP DATE 6-30-01