3131NOTE:
With proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHM,ENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit— Class III
DATE: 2Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION ROYAL ST GEORGE, THE NORMAN COURSE, TR. 29348-1
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION PRECISE GRADING
DESCRIPTION OF CONSTRUCTION PRECISE GRADING] OF
19 LOTS FOR SINGLE FAMILY DEV.
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED
500 YAS
APPROXIMATE TIME WHEN WORK WILL BEGIN
Sketch (attach construction plans if appropriate)
APPROXIMATE TIME OF COMPLETION Z/1b/uu
ESTIMATED CONSTRUCTION COST $ 19.000
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
SEE ATTACHED CONDITIONS
Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the ermit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the resultHof this wore.
Signature of Applicant or Agent
r
TTAURON T,'FV- LLC 78080 CALLS ESTADO #201. LO
Name of Applicant (please print) Business Address Telephone No.
MARVTN HOMES/ RRTAN MONROE 771-2567
Name of Contractor and Job Foreman Business Address Telephone No.
771RR3 5960
Contractor's License No. City Business License No
ORVAT A-M—FRTCAN TNS- CO. CR.1645
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class 111 A/D
Public improvements: 3% of estimated construction costs Fce
Private improvements: 3% of estimated construction costs
Minor. Improvement Permit — Class IV: See attached schedule
Inspection Fee x 570.00
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required PA !;r
TOTAL:
;! Receipt No.
Received by
100.00
Co&rrrw
$ 8670.00
Date
.'JT }' U8.2000
S
PERMIT VALIDATION , •Y /.
PERMIT NO. 3131
DATE APPROVED )/iInn
EXPIRATION DATE 3/31/00
DATE ISSU D y 2/1/00
gy
a Administrative Authority
ti Recorded by
Telephone: (760) 777-7075
SPECIAL CONDITIONS --PERMIT NO. 3131
--- MARVIN HOMES/TIBURON DEV. ---
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For
Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Marvin Homes/Tiburon Dev., hereinafter referred to as "Permittee", shall be responsible for
providing continuous dust and erosion control. All areas shall be kept watered down daily including
weekends.
3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and
more frequently if required.
4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout
the work site, the Permittee shall comply. with City regulated work hours. Operation and
maintenance of equipment within one-half mile of human occupancy shall be performed only during
the following time periods:
October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m.
- 3 p.m. Traffic control shall be set up after. 9 a.m. and removed before 3 p.m. The Permittee shall
contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal
operation at the intersection is to be altered in any way.
6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private
street and for any damage to other City streets or facilities as a result of work performed under this
permit.
7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with Cal
Trans Standards or the Work Area,Traffic Control Handbook (WATCH Manual). A traffic control
plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City
for review and approval one (1) week prior to starting any construction. It shall be the Permittee's
responsibility to appropriately detour,and barricade all'construction sites.
Special Conditions - Permit No. 3131 Page 1 of 4
SPECIAL CONDITIONS --PERMIT NO. 3131
--- MARVIN HOMES/TIBURON DEV. ---
8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of one travel lane of paved surface shall be
maintained with flagmen at all times.
9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
10. Should additional work, materials, or modifications of the work be. required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost
to the City of La Quinta.
11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), .1982),
backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in
the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no
water densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations.
Backfill compaction shall be achieved by the following conditions:
A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material,
such material shall be removed to the limits directed by the Geotechnical Inspector and/or the
City Inspector and the resulting excavation backfilled with pipe bedding material.
B. Backfill materials shall be brought to or maintained at an appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the
depth of lift that can be compacted.
.D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall
be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift
thickness to,be compacted for the remainder.of the project.
Special Conditions - Permit No. 3131 Page 2 of 4
SPECIAL CONDITIONS --PERMIT NO. 3131
--- MARVIN HOMES/TIBURON DEV. ---
F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift
of backfill, per 300 linear feet of open trench, at randomly selected locations within the open
length of trench.
G. The depth of the randomly selected compaction tests shall also be randomly selected except
that where multiple tests are required in a given length of trench, the tests shall be no closer
than three feet (vertically) from each other.
H. If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the.Permittee. Copies of all
test results shall be furnished to the City Inspector.
12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of
the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed
that which can not be backfilled in the same day. Excavated trenches shall not.be allowed open
overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet
in length, open overnight at a point where construction will begin the next day, provided that this
length of trench is completely covered by steel plating.
13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to
its original condition.
14. Access and egress to all local properties shall be maintained at all times.
15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 1,0 § 1. (part), 1982),
permanent pavement replacement ' shall be completed no later than seven (7) days after the
completion of the work. Permanent pavement replacement shall conform to the following
conditions:
A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges
shall be straight and clean.
B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker
than existing of asphalt concrete over the same existing thickness of crushed aggregate base
or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of
the Standard Specifications for Public Works Construction. The replaced pavement and base
material shall be compacted to 95% relative compaction and respectively tested, for each 300
linear feet of trench. Verify exact structural replacement section thicknesses with the City
prior to installation.
Special Conditions - Permit No. 3131 Page 3 of 4
SPECIAL CONDITIONS --PERMIT NO. 3131
--- MARVIN HOMES/TIBURON DEV. ---
C. Permanent pavement replacement shall be installed using a City approved 1/4" max medium
asphalt concrete as the base course lift and a City approved'/2" max medium finish course lift
for capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during
the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth
of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -
milled area and base asphalt concrete in the trench area shall be overlaid with a City approved
C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows:
• For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut
removal lines.
• - For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut
removal lines, or to the lane line striping, whichever is greater.
• For transverse trenches across existing street: two (2) feet outside the sawcut removal
lines.
E. If grinding and capping operations are not performed in the same day as base paving
operations, the base course lift of max medium asphalt concrete shall be installed from
saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of
paving shall not be left 0.10' low in anticipation of grinding and capping.
F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the
Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal
loops shall be removed and replaced in kind. The finished pavement surface shall be smooth,
consistent, and shall conform to the surrounding grades.
16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work
performed under this permit with an approved dust control treatment. Soil stabilization shall be done
immediately after completing the operation.
17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically
grants permission to use the street to deliver street construction materials and/or equipment.
18. This permit allows for grading of lots 1-19 of Tract 29348-1 per the approved plans.
19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
Special Conditions - Permit No. 3131 Page 4 of 4
4 ,
NOTE:
With proper validation c
this form constitutes an CITY OF. LA OUINTA
encroachment permit
APPLICATION FOR. PERMIT.
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
M0F TI��
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement.Permit —Class I I I
DATE: 3�6 Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION u S Gear 7ti c G�� No•f eo C
rlLtA•G� �13 y � ` .
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION P�CG�S G r4 s�iA4 Sketch (attach construction plans if appropriate)
DESCp^LION OF C<ON STRUCTIOo f ./rtc- �A<� ` ` G&JOCO'A
S/rs s Ic wJ i'
DIMENSION OF STALLATION OR REMOVAL
IL +
SIZE OF EXQ` Vt AATION, I NEEDED
1
APPROXIMATE TIME WHEN WORK WILL BEGIN
7-2-an i '719is9
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)'
in consideration of the granting of this permit, the applicant hereby agrees to:
indemnity, • defend and save the City, its authorised agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or. court action and arising out of any accident, loss. or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. .
Notify the Administrative Authority at least twenty-four 124) hours in advance of the, time when work will be started.
Comply,with all applicable City Ordinances, the terms and conditions of the P.rmit and all applicable rules and regulations of the City of.
La Quints and to pay for any additional replacement necessary es the row) s wo
Signature of Appli t or Agent
T dv/o m 4e 0-/, .Orrl�'�� GGG ��% o yo Co �/c �"6
Name of Applicant (please print) Business Address Telephone No.
11,11,04-,vlr7 A?"eJ Ai4A A fwG
Name of Contractor and Job F reman Business Address Telephone No.
77/.9k7
S 9(oo
Contractor's LicenslNo.
City Business License No.
+ )in
Applicant's Insurance Company
Policy Number
FEES: Subdivision Improvement Permit — Class III
Public improvements: 3%'of estimated construction costs
Private improvements: 3%of estimated construction costs
Minor Improvement Permit — Class' IV: See attached schedule
2774
Inspection Fee $ S I O
PERMIT VALIDATION
Permit Fee 1
PERMIT NO.
Penalty
DATE APPROVED - 0d
Cash Deposit -Surety Bond
if required
EXPIRATION DATE -
TOTAL: L d ..
DATE ISSUED 2 1
Receipt No.
By
Received by Date
Administrative Authority
Recorded by
Telephone: (619) 777-7075
TIBURON DEVELOPMENT, LLC VALLEY INDEPENDENT. BANK
2052
78080 CALLE'ESTADO LA QUINTA, CX-92253 "
STE 201. 90-384211222
LA QUINTA, CA 92253
(760) 771-2567 02/02/2000
PAY TO THE City of La Quinta **
ORDER OF 8,630.00
Eight Thousand Six Hundred Thirty and 00/100************************************************************ss*:****** DOLLARS
Security features
City of La Quinta I' I oelmisooback.
MEMO
11000 20 5 211' 1: 12 2 2 3131, 201: 008sef 50 7 7 4011'
TIBURON DEVELOPMENT, LLC
City of La Quinta
Valley Indepe
02/02/2000
Grading permit.
Refundable bond.
� P s
e�s oli s'v�eia .F LLIS' FAR O'BANK'. 4 3 9 ,3{a
PAY TO THE ORDER
7.
ti..
PETER •L. 'JACOBS
(760) 413=6668.. "
P. 0. BOX- 692 r -
LA QUINTA; CA 92253
.MEMO
1 2'2`101 1.9'11i:.11 39.3`:''0'60=2: 3 L
wST GO��IRvi. S�`�c17 g�
pb
'#8670
2052
630.00
8,000.00
8,630.00
Medium -Large Scale Construction/Demolition Projects
(Greater than 5 acres)'
Fugitive Dust (PM10) Mitigation Plan
Date: l`1;7
.7-��av Jurisdiction: ( G ��N, Project File #:
Part 1 - Project Information
Please.provide the information below as completely as possible even if it has already been
provided on other forms related to this project. Failure to provide complete information or
provision of inaccurate information may delay the processing of your Fugitive just (PM10)
Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your
grading or demolition permit application.
Project proponent: T �4r G/
GGc.
AX-f/- /i // e:
Address: 2V- a o
20
Day phone number: 74o, 71-
Emergency phone number: 740-yvo
Grading contractor (Contact Person):k
Address: 25? -/ Zp �4 //t �.tf4tl 9 /d 3 L
'
Day phone number: 760 - 3Gd=�2rs--Emergency
phone number:
.7GU - 25-0 kYG
Construction site street address: 1?a
4/ X e
Z 9 4 I' •-
Construction site location:
(Please include an &5 x 11 location map)
Ttie X,,rf 41
Construction site assessor's ,parcel number
(Tract. #): 76
yv - a yS
Parcel (Tract) size: V.12 Acres
or
Square feet
Anticipated date of physical project initiation:
Z _ Z_ 2O00
Anticipated date of project completion:.
Anticipated costs for dust suppression:
(Attachment .B - Must also be completed
construction activities have been completed)
$ s? DUu
and mart the appropriate
address when
QMD Rules 403 and
Earthwork Information (Acreage/ Cubic Yards);
Project Area: 747-1 Qc/irl Total Disturbed Surface Area:
Cut: S"vu yes. Fill:
Import: D Export: 0
V,I,zl 4«r1I
Phasing of Earthwork:
Date Date
Phase I Grading (Acreage): From: 2 - Z- o, To: 2 -/t,-oo
Phase II Grading(Acreage): From: To:
Phase III, Grading(Acreage)c From: To:
Phase IV Grading(Acreage): From:. To: .
(Attach additional information if necessary)
Part 2 - Fugitive Dust Control Actions
From the inventory of fugitive dust control measures provided in Attachment A, please indicate
which measures are to be implemented during.the project by placing the corresponding letter,
beneath the following sources. In addition, please indicate at which phase the measure will be
implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction
(FC), Demolition projects should only indicate measures in the Rough Grading (RG) column.
After indicating what measures are.. to be implemented, complete the 'Details". section by
describing how and when the measures are to be implemented.
Source Details (e.g., frequency of application number and type of dust control implements,
No. RG FG FC etc. Please be as specific as possible)
g — — 7iJc./0/b�OoSl� /✓o<./c. i� 7L .��� /i/ ffl a fiilii.!►i,/ �o�
0/ 1So� !hc J/fc �.� // Ift l✓a ��i►t� 4 // <l,, ��+y s�vii✓ .
A"!/ /O/i16_T/ai► A �1 f7� �40/i'i4i j4t �O/ fIOA s T �gG
S / �� � �i � �T!/'>j �✓i /T 4 � :v I �r ��/C ��I'p //q /�� �4T l A/ 76 /'.
46J f" '/0(4l/o /:
(Use copies of this page if additional space is needed)
Source Details (e.E frequency or application number and bw or dust control implements
No. RG FG EC etc. Please be as specific as possible)
�1.Ffc,, laM�l /t 1�w� . f.+hc gr�1,N , w w, �c . wl� It
Part 3 - Agreement
I certify that the information contained in this Fugitive Dust (PM10) Mitigation Plan is true
and accurate. and that all measures specified in Part 2 will be implemented during project
construction. I authorize the City of La. Quinta to enter the above mentioned property
for inspection and/or. abatement purposes, and I agree to hold harmless the City And its
representatives from liability for any actions related to this project.. I ,also agree to
complete the record -keeping requirements included herein as Attachment B; once the
project has been completed....
ignature o wne r Authorized Representative. ate
I have read the conditio of the F itive Dust (PM10) Mitigation Plan and the owner has
authorized the ' m tation 11 i rovisions throughout project buildout.
-- c0
SignagiFe of Grading Contractor or Authorized Representative ate
(If not the same as above)
Conte i,-��,�5 nr�crr4r� 3 ws�
ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES
The. left column contains the sources of fugitive dust which are intended for emission control
under the City's dust control ordinance. The two right columns contain an inventory and
description of reasonably available fugitive dust control measures for each of the sources.
Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan.
(Source No) Reasonably Available
Source Control Measures
Comments
Land (A) Watering
o Application of water by means of truck, hoses and/
Clearing/
or sprinklers prior to any land clearing or earth
Earth-
movement will increase the moisture content thereby
moving
increasing stability of material
o. Once the initial land clearing/earth movement activities are
complete, a second round of watering can generate a thin
crust which stabilizes the disturbed surface areas provided .
that it is not disturbed
o Security fencing can be used to prevent unwanted future
disturbances of sites where a surface crust has been created
(B) Chemical stabilization
o' Only effective in areas which are not subject to daily disturbances
o Vendors can supply information on product application and
required concentrations
(C) Wind fencing
o Three to five foot barriers adjacent to roadways or urban areas
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(D) Cover haul vehicles
o Entire surface area should be covered once vehicle is full
(E) Wheel washers
o Should be placed where vehicles exit unpaved areas onto paved:
areas
o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles .
(2)
Unpaved (F) Paving.
o Requires street sweeping/cleaning if subject. to material
Roads
accumulation
(G) Chemical Stabilization o Vendors can supply information as to application methods and
concentrations
o Not recommended for roads with high volumes or those used for
heavy equipment
(H) Watering o In sufficient quantities to keep surface moist
o .Required application frequency will vary according to soil.type,
weather conditions, and vehicular use
s ,
(Source No) Reasonably Available
Sou Control Measures
(2)
Unpaved (I) Reduce speed limits
Roads
(Cont'd) (J) Reduce vehicle trips
ommen
o 15 mile per hour maximum
o Access restriction or redirecting traffic to paved roads in order to
reduce vehicle trips by a minimum of 60 percent
-----------------------------------------------------------------------------
------------------------------
(3)
Storage (K) Wind sheltering o Choices include silos or enclosures
Piles o Enclosures should consist of three sided barriers equal to height of
material with no more than 50 percent porosity
(L) Wet suppression o Application methods include: spray bars, hoses and water trucks
o Frequency of application will vary on site specific conditions
(M) Chemical suppression, o Best for use on storage piles subject to infrequent disturbances.
(N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side
procedures of the material
. o .Most effective when used in conjunction with wind sheltering
(0) Coverings o Tarps, plastic, or other material can be used as temporary
coverings
o When used, these should be anchored to prevent wind from
removing coverings
(4)
Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved
Road areas
Track -out o System can be adjusted to spray entire vehicle, including stored
bulk material in haul vehicles
(Q) Sweep/clean roadways o Either sweeping or water flushing may be'used
(R) Cover haul vehicles o Entire surface area should be covered once vehicle is full
--------------------I------------------------------------------------------------------------------------
----------------------
--------
(5)
Disturbed (S) Chemical stabilization
Areas/
Inactive
Construction .
Sites
(T) Watering
o Vendors can supply information on methods for application and
required concentrations
o Would require frequent applications unless a crust
can be developed over the site
(U.) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas
can be effective in reducing the amount of wind blown
material leaving a site
o Should be used in conjunction with other measures
(V) Vegetation o Establish as quickly as possible when active operations have
establishment ceased
. o Use of drought tolerant, native vegetation is encouraged
CONDITIONS FOR FDCP APPLICATION 2000-79:
TIBURON DEV'T, L.L.C./DBA MARVIN HOMES 19 LOTS @ NORMAN COURSE
TR 29348-1; ± 8.13 ACRES
GENERAL:
1. Applicant shall comply with all control measures as set forth in the approved
application for FDCP 2000-79, and the following conditional measures.
2. The full amount of security supplied for FDCP 2000-79 (as determined by
Public Works) shall be available to the City for any measure(s) deemed
necessary by the City to achieve adequate dust control, whether or not such
additional measures" are included by the applicant for this application. The
applicant shall implement all methods set forth herein for the duration of the
project construction. Any requests for bond amount revisions/reductions must
be made in writing to the Public Works Director. Security shall be in the form
of a non -expiring Certificate of Deposit or a renewable Letter of Credit.
3. Applicant shall submit copies of all records related to cost accounting for the
dust control measures assumed during all pre -grade. activity and grading
construction upon any request for release/reduction in posted security, or no
later than 30 days after completion of all dust control measures as outlined in
and conditioned upon the plan. All such records shall accompany a completed
PM10 Program Report Form, available through the Public Works or Community
Development Departments. Completion of all dust control measures shall be .
verified by the assigned field inspector.
4. Adequacy of all proposed and conditional stabilization measures shall be
determined by the assigned grading inspector. The City may require remedial
measures beyond those identified or conditioned upon the project, which the
City deems necessary in the event such approved measures are not effective.
The City may release a portion of the bonded amount to the applicant for such
work.
Enforcement of these conditions shall be at the discretion of' the assigned
grading inspector, who. shall monitor and field verify that the spirit and intent
of the FDCP and its attached conditions are being complied with. Adjustments
to application frequencies, quantities and other aspects of this FDCP may be
made by the inspector, in his/her discretion, in order to assure compliance.
5. The contractor/vendor responsible for provision of all soil stabilizing agents
shall submit the appropriate Material'Safety Data Sheet(s), along with approval
from the Water Quality Control Board, to the Public Works Department prior to
any site application. Application of stabilizing agents must be in compliance
with N.PDES and the State Water Quality Control Board requirements.
6. The conditions of this dust control plan approval are. applicable to the full range
of construction operations associated with the entire ± 8.13 acres within TR
29348-1, and shall remain in effect for. the duration of all construction
undertaken as part of development approval for the subject property.
Transfer of real property or other interests, regarding this project shall not affect
the validity of this plan approval. Implementation of all proposed and
conditional measures shall be -carried out for the duration of all construction
activity, as applicable. However, nothing herein shall preclude any future party
of interest from filing a revised FDCP with the City for any portion of the site.
7. Approval of this dust control plan does not constitute an authorization for any
site disturbance, preparation or construction. The developer is required to
obtain any and all necessary permits and clearances as set forth in any
development approvals issued and currently in effect pertaining to this site.
This includes any type of testing, monitoring or sampling required as a
condition of development approval, such as that conducted for archaeologic,
hydrologic and geologic reporting purposes.
SITE DEVELOPMENT:
8. Any pre -watering of areas proposed for grading shall be in accordance with
recommendations of the grading contractor, based on the area soil conditions
as described in the associated soils report(s). At a minimum, pre -watering time
shall be for three days prior to any earth disturbance(s).
9: FDCP 2000-79 indicates that ± 500 CY of fill material will be needed. All
transported soils shall be sufficiently stabilized_ (watered down and/or covered)
so as not to create dust during loading, transport and spreading: Minimum
freeboard shall be established by the Public Works Department. Any on/off-site
storage piles shall be covered, and/or suitably stabilized at all times.
10. Track -out and other accumulation of soil material(s) onto any paved streets
outside of areas proposed for grading (i.e. Airport Blvd., Jefferson Street, any
internal .paved roadways) shall be minimized. Any construction access to the
site from existing pavement shall be improved with a.c'. pavement, aggregate
base material or similar, for a distance of 120' from the pavement edge into the
site to minimize track -out, until such time as the roadway is permanently
paved, or access is abandoned. Wet sweeping/flushing of soil accumulations
from all paved areas shall be conducted daily, and kept damp during
construction hours until so removed at the end of the work day.
11. All unpaved travel ways serving the site shall be prepared for traffic and kept
watered down and compacted to retain moisture content during all
construction traffic/activity, including building construction. Road lengths shall
be watered each day as necessary, commencing prior to any traffic activity and
terminating at the end of the work day after all activity has ceased. All track -
out to paved surfaces shall be removed per Condition #10.
12. All construction traffic and parking shall be limited to existing paved areas'. No
vehicle parking or traffic of any kind is permitted on or over any previously
stabilized or otherwise inactive unpaved areas or building pads. Any temporary
office facilities (sales, construction, etc.) shall be provided with paved,
compacted or otherwise stabilized parking and access during their operation,
to be constructed as required by Public Works Department standards.
13. Disturbed but inactive development areas subjectto additional grading or
building construction within 30 days of completion of the initial disturbance,
shall be watered daily in conjunction with watering of access roads and other
grading activity, and to the full extent possible once construction commences.
All previously disturbed areas where further grading, construction or other land
disturbance will not occur within'30 days of initial grading completion shall be
stabilized with an appropriate chemical binder, as approved by the California
Water Quality Control Board, Region 7, no later than -four days after completion
of the disturbance, in accordance with the provisions and conditions for this
dust control plan approval. Such property shall be staked, posted or otherwise
restricted in order to prevent any vehicular access onto or over those areas.
Use of wind fencing is not appropriate, as it only is effective in reducing
blowsand, .not finer soils
14. Construction activity associated with this project will occur during high wind
activity (February' through June) in the Coachella Valley. All active graded
areas shall be watered daily at appropriate intervals. A minimum of 1 water
truck shall be stationed on -site at all times. All security and project personnel
shall be alerted to the need for dust control and instructed to monitor graded
areas for wind=generated dust as part of their routine duties.
15. On Sundays, holidays and other non -construction days, personnel shall be on -
call for emergency watering in the event of high winds. Additionally, during all
grading operations, an appropriate individual shall be assigned to monitor wind
conditions. This shall be done by utilizing wind forecasts available from the
South Coast Air Quality Management District (SCAQMD). Wind forecasts can
be obtained by dialing 1-800-CUT-SMOG and following menu options for Air
Quality and High Wind .and Dust. The individual shall access this information
prior to daily activities. In the event that winds are predicted to exceed 25 MPH
(403.1 High Wind Day), all construction activities and on -site traffic shall be
closely monitored to insure compliance with the FDCP. The individual shall
coordinate with the assigned inspector on adequacy of current dust control
measures and any additional measures potentially necessary.