Loading...
3146NOTt: t-- With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT); For the construction of . public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: 2/29/00 LOCATION OF CONSTRUCTION CITRUS: TR.28447 Subdivision Improvement Permit — Class.11l Minor Improvement Permit Class IV (Street address or Description of Location) PURPOSE OF CONSTRUCTION MASS GRADING Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION PRE —WATER, CLEARTNG, GRADING SEE ATTACHED CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL 12..5 AC SIZE OF EXCAVATION, IF NEEDED 7.000 Yn.S APPROXIMATE TIME WHEN WORK WILL BEGIN 311 inn APPROXIMATE TIME OF COMPLETION 411100 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend, and -save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative .Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of —A, pocant or Agent RJT HOMES. LLC P_6_,Rnx fttn, T.A AT7TI A C� ��ccc Name of Applicant (please print) Business Address Telephone No.' Sams Name of Contractor and Job Foreman Business Address Telephone No. 690645 Contractor's License No. moan City Business License No. ICW GROUP 7RAf:5S7 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs s;") 4 C FT , Minor. Improvement Permit — Class IV: See attached schedule �' $ 1, 00 3146 � Inspection Fee $ PERMIT VALIDATION. Permit Fee. 100 3I46 PERMIT NO. Penalty Cash Deposit -Surety Bond if required TOTAL: $ .1,900 Receipt No. Received by Date Recorded by DATE APPROVED 2/29/00 EXPIRATION DATE 2/28/01 DATE (ISSUED ! �� 2/2-9/00 By i � t� �d I AJI v 0 Administrative -Authority Telephone: (760) 777-7075 NOTE' - With proper validation this form constitutes an CITY OF LA OUINTA e encroachment permit APPLICATION FOR, PERMIT !$ PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) 0 For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS Z, 0 0 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV ; LOCATION OF CONSTRUCTION Citrus Tract 28447 (Street address or Description of Location) Mass Grading PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION, PrP—suss tar .r /: ;yam?�A ��pl�t./vJ 1 Pari nc' C`rar] DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION; IF NEEDED r ycl. s APPROXIMATE TIME WHEN WORK WILL BEGIN 0 O APPROXIMATE TIME OF COMPLETION — ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing- permanent resurfacing andlor replacing improvements) in consideration of the granting of this permit, the applicant hereby agrees to: Indemnity, -defend and save the City, its authorised agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or noun action and arising out 'of any accident, loss or damage to persons or property - happening or occurring as a proximate result -of any work undertaken under the permit granted pursuant to this application. Notify the Admintstrative Authority st.leass twantyfour,124) hours In advance of the time when work will be started. Comply with all appikabla City Ordinances, the terms and conditloits of the permit and all applicable rule and regulations of the City of V Quints and to pay for any additional replacement necessary as the mult.of this work. . Signature-of Applicant or Agent RJT Homes, LLC . P O Box.810 La Oninf-a' Ca 60-564-65 5 Name of Applicant (please print) Business Address Telephone No. SAME Name of Contractor and Job Foreman Business Address Telephone No. 690645 naaan Contractor's License No. City Business License No. ICW Group FPA('.5�7 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class Ill Public improvements: 3% of,estimated construction costs Private improvements: 3% of estimated construction coin Minor Improvement Permit -- Class. IV: See attached schedule 2774 Inspection Fee $ PERMIT VALIDATION Permit Fee 0� PERMIT NO. I � Penalty Cash Deposit -Surety Bond if required TOTAL: $ Receipt No. Received by Date Recorded by DATE APPROVED EXPIRATION DATE - DATE ISSUED By Administrative Authority Telephone: (619) 777-7075' Nov-24-99 12:49 J. Rue v.1 Jaffee 0. Itue Conatrucdan Co., Inc, PO Box 1;,810, Palm Desert, CA. 92256 (70) 568-WO Fax: (700)'M.3342 . SICS95 License To: RJT Norms I.-L.C. . 56 842 Grand Terraveme PO Box 810 Ls Quints. Ce, 92253 Alin, Grad Moycr Enginew: MDS Consuilin8 Description 1 MOONLi tion, Cfewing & Pre-wa iering 2 On• Sile Excavation Cut of 11.171 3 Finisn Grade 52 Lots +l- .1', R¢ugh Grade Streets +1- .3' 111241" Oty. Unit Amount l:5 fb17,S00.00 $1�,.5170.00 1 LS $16,500:00 118.500.00 .I LS S 4.000.00 324,000.00 Total $60,000.00 Construction Notes Eutudes testlng, plvw ts. Yupectlon teed. vskinp i,nd vrow d v, btrtd, ow or wMer 'Rutty irl" ion wxl ►sio;*W tuQ6tmwl t yr si tntior*. cle8n•up of dtw i1166t.,M� 4Te 1WdiV. of rlWrdoiii rr&erttie. 2 us is mlonl e, m IntW or wq*r, Inclu ka 1 A9 PW wf.a' reporl 3 of ntolsium pono iste.. Is hItudW. � No cw �t t< Rntl �Ded S OW COMM 0 INU4W In our Pero of IOMIav 'o+►tl' dunry oar q*ro , a ro wO v=(h ffi)Cn Is reudW. 6 r!+e grnpao:el Mdu6oa tvw matxtt�tfOne tt mesa ere rugulrmd edt;Ifbnld oAlrga►wll �e made. .1 I It • ' The following. General and Special Provisions are attached to and made a part of Permit No. GENERAL' PROVISIONS The following shall always apply: ' ENROACHM Nr ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY.' Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be ,secured' by the permittee prior to starting work. i TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. Ail mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipmentonly shall be used in backfill operations in paved areas: If the existing pavement is scarred, spalled,.or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2) of A.C. —facing, plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC- All excavations and work areas #hall be properly lighted and barricaded as deemed necessary by the City Engineer or La`Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTVRES: Any drainage structure rincluding corrugated- metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shell be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be. notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right r of way. All paved surfaces shall be broomed clean of eartE and other objectionable materials immediately after backfill and'compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after baekfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shell be the responsibility of. the peimittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining .property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: R' NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance. of starting construction. R2 TTmm CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3. i MXXY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road'pavement shall be surfaced' with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than ' and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall -be graded to a slope of 1/4 inch to one foot (1J. R6 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS:. A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter- and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard I207. R8 DRIVEWAYS: A.C. driveways shell be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on ( ) of elm aggregate base. Driveway construction shall conform to attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL SIERIIIZE U The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with. the manufacturer's specifications. r i 13 COORDINATE WORK: The proposed work shall he subordinated to any operation which the State of California or City of La Quints may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State of City of La Quinta projects. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property fines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. PAVEMENTCVJIING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edkes shall be corrected. R14 LDN1T OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unleea the construction material is actually on the work site. R1• BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved mad or gravel. R16 BACKFILL SAND- Backfill shall be approved transit -mix sand or equivalent and shall be'plaeed in lifts of not greater than three feet (31 and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction .of 95 percent shall be attained with the structural section of the roadway. R17 BACKFII L PLACFdNEUVT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (51 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. RIB COMPACTION TESTS: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of highways, State of California, dated January 1973. R1.9 COMPACTION TESTS: If so required -by the inspecm'i, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to tbe.City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared gubgmde. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT -PA .V EMEW REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2") of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than • days after completion of temporary road repair. 11 R22 FOG SEAL: A fog.seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. STRM RFSTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee'to maintain the tree in a vigorous growing condition at its new location. Trove to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 3146 --- RJT HOMES --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. RJT Homes, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required.. 4. Pursuant to Section 6:08.050 of the La Quints Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3146 Page I of 4 SPECIAL CONDITIONS --PERMIT NO. 3146 --- RJT HOMES--- 8. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § l (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained .with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La.Quinta. 11. Pursuant to Section 14.16.370 of the La' Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or'other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture. content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of -trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3146 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3146 --- RJT HOMES--- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No. 3146 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3146 --- RJT HOMES--- C. Permanent pavement replacement shall be installed using a City approved'/4" max medium asphalt concrete as the base course lift and a City approved''/z" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic ' lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 1/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and. replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the rough grading of tract 28447 per the approved grading plan. 19. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 3146 Page 4 of 4 Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres)' Fugitive Dust (PM10) Mitigation Plan ......Date: > b�� Jurisdiction: �u��fi . Project. File #: Part 1 - Project Information Trz 2 3Yy �- Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PMIO) Mitigation Plan (Plan). it is recommended that you submit your Plan . concurrent with. your grading or demolition permit application. Project proponent: pj T f pM F wL Address: 5o — gq-2 67R_O�-Nr,) T(4UgV_SJ2_ L-A OU III ek e_IZ2S,3 Day phone number:-(766)C�4--6t55'Emergency phone number. Grading contractor (Contact Person): Address: Day phone number. Emergency phone number: Construction site street address: Construction site location: (Please include an & 5 x 11 location map) Construction site assessor's parcel number (Tract Parcel (Tract) size: ) Z , 5 p Acres or Square feet Anticipated date of physical project initiation: M ��2G{-j 0 0 Anticipated date of project completion: Anticipated costs for dust suppression: $ (Attachment B - Must also be completed and marled to the a�riate address when construction activities have been completed) ECC EVE CITY -OF LAOUINTA ... ..iunn nCDAQTKAFNT 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. Earthwork IntornLation (Acreage/Cubic Yards) ' Project Area: I2, So Total Disturbed Surface Area: Cut: 3 Fill: Import: Export: 2-0S Phasing or Earthwork: DateDat 'Phase I Grading (Acreage): From: MpRZ 7 To: J0 Phase II Grading(Acreage): From: To: Phase III Grading(Acreage): From: To: Phase IV Grading(Acreage):. From: To: (Attach additional information if necessary) Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which measures are to be implemented during the project by placing the corresponding letter beneath the following sources. In addition, please indicate at which phase the.measure will be implemented, either at Rough Grading (RG), Finish Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating what measures are to be implemented, complete the 'Details" section by describing how and when the measures are. to be implemented Source, Details (e.grreauencv or application number and tune or dust control implements. No. N 4 9 FC etc. Please be as specific as possible) i✓ if �H'�� 1 �i�L `. LL12W'i��1J Up 6lJ GvMI�+—+rv7�1�a'►J (alqlssod se 3!j!30s sivaq 3SB21d WN u w l wl JUJIU03 Isap J paid w u Tolle3liade jo Mu3nDUJ--'w3)Ili aunos (papaau si.aaeds leuoil!ppe J! abed stgi jo saldoa asn) PaPa=A r m n J certify that the information contained in this Fugitive Dust (PM 10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of la Quinta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this project. I also agree to complete the record -keeping requirements included herein as Attachment B. once the project has been completed. I have read the conditions of the Fugitive Dust (PM10) Mitigation Plan and the owner has authorized the implementation of all its provisions throughout project buildout. ignature o ra ing Contractor -or Authorized Representative (Date) (If not the same as above) ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description of reasonably 'available fugitive dust control measures for each of the sources Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available ,Source . Control Measures - Land (A) Watering Clearing/ Earth. moving (B) Chemical stabilization (C) Wind fencing (D) Cover haul vehicles Comments o Application of water by means of truck, hoses and/ or sprinklers prior to any land clearing or earth movement will increase the moisture content thereby increasing stability of material o' Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the disturbed surface areas provided that it is not disturbed o Security.fencing can be used to prevent unwanted future disturbances of sites where.a surface crust has been created o Only effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles e)dt unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving o Requires street sweeping/cleaning if subject to material Roads accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, weather conditions, and vehicular use - f (Source No) Reasonably Available Soucontrol Measures Unpaved (I) Reduce speed'limits Roads Comm n o 15 mile per hour maximum (Cont'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to paved roads in order to reduce vehicle trips by a minimum of 60 percent .............................. •.................... -............ --...................................... (3)... Storage (K) Wind sheltering o Choices include silos or enclosures Piles o Enclosures should consist of three sided barriers equal to height of material with no'more than 50 percent porosity (L) Wet suppression o Application methods in spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression o Best for use on storage'piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps, plastic, or other 'material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings (4) Paved • (P) Wheel washers o Should be placed where vehicles exit unpaved area's onto paved Road areas Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full _....... -.............................. ___...-......... _._-......... .............................. ---................................. . (S) .. Disturbed (S) Chemical stabilization ,r o Vendors can supply information on methods for application and Aces/ required concentrations Inactive Construction Sites M Watering o Would require frequent applications unless a crust can be developed over the site -(U) Wind fencing o Three to five foot barriers adjacent, to roadways or urban areas can be effective in reducing the amount of wind blown material leavinga' site o Should be used in conjunction with other measures (V) Vegetation o Establish as quickly as possible when active operations have establishment ceased o Use of drought tolerant, native vegetation is encouraged ATTACHMENT B - COST INFORMATION ` Medium -Large Scale Construction/Demolition Projects (Greater than 5 acres)l Fugitive Dust (PM10) Mitigation Plan Date: Lelelj jurisdiction: t A try U Project File #: �8 IZZ Project proponent: (Z- J 7 H 0is L"- . Address: 50 — 94-2_ OIU iN7-pt l'jk �22 Day phone number. ti6a �q,,6S55Emergency phone number: In the space provided below please list the costs associated with implementation of all dust control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: % 0cq Chemical stabilization: O00 Wind fencing: Covering -haul vehicles: Wheel washers: Street sweeping: Paving. Wind sheltering: Coverings: Vegetation reestablishment: Auer project comptenon these recarus Jrscui uG uu.unsuww .v .y •-•-_•_ grading demolition permit was attained and to the Coachella Valley Association of .Governments (CVAG) at the address provided below. PM10.Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive; Suite 200 Palm Desert, CA 92260 - 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 4�3.1. For City Use Only Based on all of the provisions* contained in this Fugitive Dust (PM10) Mitigation Plan the Plan is: Approved `)C x Conditionally approved (Conditionns specified below) Denied (Explanation attached) Signature of City Representative (Date) The following conditions of approval have been added to the Plan by staff in order to ensure an adequate level of fugitive dust control (Attach additional information if necessary) I have read the above conditions of the Fugitive Dust (PM10) Mitigation Plan and I agree to implement of all provisions at the concentrations and frequencies wentitiea. CONDITIONS FOR FDCP APPLICATION 2000-78: RJT HOMES/THE RANCH 49 LOTS TR 28447; ± 12.5 ACRES GENERAL: 1. Applicant shall comply with all control measures as set forth in the approved application for FDCP 2000-78, and the following conditional measures. 2. The full amount of security supplied for FDCP 2000-78 (as determined by Public Works) shall be available. to the City for any measure(s) deemed necessary by the City to achieve adequate dust control, whether or not such additional measures are included by the applicant for this application. The applicant shall implement .all methods set forth herein for the duration of the project construction. Any requests for bond amount revisions/reductions must be made in writing to -the Public Works Director. Security shall be in the form of a non -expiring Certificate of Deposit or a renewable Letter of Credit. 3. Applicant shall submit copies of all records related to cost accounting for the dust control measures assumed during all pre -grade activity and grading construction upon any request for. release/reduction in posted security, or no later than 30 days after completion of all dust control measures as outlined in and conditioned upon the plan. All such records shall accompany a completed PM10 Program Report Form, available through the Public Works or Community .Development Departments. Completion of all dust control measures shall be verified by the assigned field inspector. 4. Adequacy of all proposed and conditional stabilization measures shall be determined by the assigned grading inspector. The City may require remedial measures beyond those identified or conditioned upon the project, which the City deems necessary in the event such approved measures are not effective. The City may release a portion of the bonded amount to the applicant for such work. Enforcement of these conditions shall be at the 'discretion of the assigned grading inspector, who shall monitor and field verify that the spirit and intent of the FDCP and its attached conditions are being complied with. Adjustments to application frequencies, quantities and other aspects of this FDCP may be made by the inspector, in his/her discretion, in order to assure .compliance. 5. The contractor/vendor responsible for provision of all soil stabilizing agents shall submit the appropriate Material Safety Data' Sheet(s), along with approval from the Water Quality Control Board, to the Public Works Department prior to any site application. Application of stabilizing agents must be in compliance with NPDES and the State Water Quality Control Board requirements. 6. The conditions of this dust control plan approval are applicable to the full range of construction operations associated with the:entire ' ± 12.5 acres within TR 28447, and shall remain in effect for the duration of all construction undertaken as part of development approval for the subject property.. Transfer of real property or other interests regarding this project shall not affect the , validity of this plan approval. Implementation of all proposed and conditional measures shall be carried out for the duration of all construction .activity, as applicable. However, nothing herein,shall preclude any future party of interest from filing a revised FDCP with the City for any portion of the site. 7. Approval of this dust control plan does not constitute an authorization for any site :disturbance, preparation or construction. The developer 'is required to obtain any and all necessary permits and clearances as set forth in any development approvals issued and currently in effect pertaining to this site. This includes. any type of testing, monitoring or sampling required as a condition of development approval, such as that conducted for archaeologic, hydrologic and geologic reporting purposes. SITE DEVELOPMENT: 8. Any pre -watering of areas proposed for grading shall, be in accordance with recommendations of the grading contractor, based on the area soil conditions as described in the associated soils report(s). At a minimum, pre -watering time shall be for three days prior to any -earth disturbance(s). 9. FDCP 2000-78 indicates. that 2,087 CY of export material will be generated.. All transported soils shall be sufficiently stabilized (watered down and/or . covered) so as not 'to create dust during loading, transport and spreading. Minimum freeboard shall be established by the Public Works Department. Any on/off-site storage piles shall be covered, and/or'suitably stabilized at all times. 10. Track-ou.t and other accumulation of soil material(s) onto any paved streets outside of areas proposed for grading (i.e. Park Avenue, Calle Tampico, affected internal paved roadways) shall be minimized. Any construction access to the site from existing pavement shall be improved with a.c. pavement, aggregate base material or similar, for a distance of 120' from the pavement, edge_ into the site to minimize track -out, until such time. as the roadway is permanently paved, or access is abandoned. Wet sweeping/flushing of soil accumulations from all paved areas shall be conducted daily, and kept damp during construction hours until so removed at the end of .the work day. 1 1. All unpaved travel ways serving the. site shall be' prepared *for traffic and kept watered down and compacted to retain moisture content during all construction traffic/activity, including building construction. Road lengths shall be watered each day as necessary, commencing- prior to any traffic activity and terminating at the end of the work day after all activity has ceased. All track - out to paved surfaces shall be. removed per Condition #10. 12.. All construction traffic and parking shall be limited to existing paved areas. No vehicle parking or traffic of any kind is permitted on or over any previously stabilized or otherwise inactive unpaved areas or building pads. Any temporary office facilities (sales, construction, etc.) shall be provided with paved, compacted or otherwise stabilized parking and access during their operation, to be constructed as required by Public Works Department standards.. 13. Disturbed but inactive development areas subject to additional grading or building construction within 30. days of completion of the initial disturbance, shall be watered daily in conjunction with watering of access roads and other grading activity, and to the full extent possible once construction commences. All previously disturbed areas where further grading, construction or other land disturbance will not occur within 30 days of initial grading completion shall be stabilized with an appropriate chemical binder, as approved by the California Water Quality. Control Board, Region 7, no later than four days after completion of the disturbance, in accordance with the provisions and conditions for this dust control plan approval., Such property shall be staked, posted or otherwise restricted* in order to prevent any vehicular access onto .or over those areas. 14. Construction activity associated with this project will occur during high wind activity (February through June) in the Coachella Valley. All active graded areas shall be watered daily at appropriate intervals..A minimum of 1 water truck shall be stationed on -site at all times. All security and project personnel shall be alerted to the need for dust control and instructed to monitor graded areas for wind -generated dust as part_ of their routine duties. 15. On Sundays, holidays and other non -construction days, personnel shall be on - call for emergency watering in the event of high winds. Additionally, during all grading operations, an appropriate individual shall be assigned to monitor wind conditions. This shall be done by utilizing wind forecasts available from the South Coast Air Quality Management District (SCAQMD).. Wind forecasts can be obtained by dialing 1-800-CUT-SMOG and following menu options for Air Quality and High Wind and Dust. The individual shall access this information prior to daily activities. In the event that winds are predicted to exceed 25 MPH (403.1 High Wind Day), all construction activities and on -site traffic shall be closely monitored to insure compliance with the.FDCP. The individual shall coordinate with the assigned inspector on adequacy of current dust control measures and any additional measures potentially necessary. r 9 PM 10 Program Report Form I. GEIISRAL n0"o 2M=ON Project Developer Name: Address: Phone: Project Site Project Title Address: Traci No.: Acreages Grading Subcontractor (if dif!e_rent ) Name: Address: Phone: P@,SES? 'ZS_ NO If so how many? Type of Development/Project: C--mmercial Single Family Multi Pamilp Demolition Other Date of Project/Phase Start -Co: Date of Project/Phase Completion: II. COST IIPPomexxon If actual. costs are not available, please estimate to the best of your ability. 1. RA=: Amount: Total Cost: 2. COSTS: A. Water Trask: Number on Site: Total Cast: Hourly. Rate: Hours: B: Street Sweeper: Number on Site: Total Cost: Hourly Rate: Hours: C. TtvWrary Irrigation: Total Cost: D. Wind Fencing: Linear Ft.: Total Cast: Goat/Ft. S. Chemical Material Stabilisation: Total Cast: Sq. Ft. Cost per Sq. Ft.: . F. Vegetation Cost: Material: Total Cost: Maintenance: G. other: Type: Total Cost: Hourly Rate: Hours: 3. LABOR COST: Hourly Rate: Total Coat: Hours: 4..ADIQ1I37RATICN COSTS: Total Cast: III. TOTAL Cons: Add items 1 - 4 for total. cost. TOTAL COST: ?LEASE RETURN FORM AT COtPLZTION OP PROJECT OR ?EASE OR ANNUALLY rROM THE DA'"p OF ?RO.iTCT/PEASE START UP. =1194