Loading...
3192411E NOTE: With proper validation this form constitutes an encroachment permit ! CITY OF LA QUINTA APPLICATION FOR PERMIT 4 'PUBLIC WORKS`'�CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 1. Subdivision Improvement Permit — Class I II DATE: 5/9/00 Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Ave. 52 & Jefferson St. (Street address or Description of Location) PURPOSE OF CONSTRUCTION St. /Waterline/Br3dRr+ Sketch (attach construction plans if appropriate) 1wrovements DESCRIPTION OF CONSTRUCTION Stoakni1e & 9tahA111a-a See, Attached Conditions DIMENSION OF INSTALLATION OR REMOVAL 'Sara n_ l nn nranared by Granite SIZE OF EXCAVATION,. IF NEEDED APPROXIMATE TIME.WHEN WORK WILL BEGIN' -9/In/nn APPROXIMATE TIME OF COMPLETION i9/t /nn ESTIMATED CONSTRUCTION COST.$ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit; the applicant hereby agrees to: Indemnify,.defen&and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in.advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for .any additional replacement necessary as.the result of this work. o Sfgnature'of/Applicant or Agent Granite Construction 38000 Manrne St 775_QAnn Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. 89 Contractor's License No. City Business License No. Certificate'on File Applicant's Insurance Company Policy Number ,.,. FEES: Subdivision Improvement Permit — Class I I I Public improvements: 3% of'estimated construction costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule ^' 3192 Inspection Fee $ PERMIT VALIDATION' t Permit Fee 175 ja PERMIT NO. 3192 4 Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. $ 175 Received by Date DATE APPROVED 5/9/00 EXPIRATION DATE 12/31/00 DATE ISSUED ,/ 519/0V By��N Administrative Authority Recorded by Telephone: (760) 177-7075 SPECIAL CONDITIONS --PERMIT NO.3192 .. --- GRANITE CONSTRUCTION / JAY BADEN --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Granite Construction / Jay Baden, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. Streets shall be kept clean. They,shall be completely cleaned at the end of each working day and more frequently if.required. 4. Pursuant to Section 6.09.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation. and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday . 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Pursuant to Section 14.16'.110 of the La Quinta Municipal Code (Ordinance 10 § .1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public• or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 6. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 §• 1 (part), 1982), advance warning signs and traffic control shall be installed'and maintained in accordance. with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any .construction. It shall be the Permittee's .responsibility to appropriately detour and barricade all construction sites. 7. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. Special Conditions - Permit No. 3192 Pagel of 4 SPECIAL CONDITIONS --PERMIT NO. 3192 --- GRANITE CONSTRUCTION / JAY BADEN --- .8. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities; including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 9. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work ,shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La. Quinta. 10. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. 11. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 12. Access and egress to.all local properties shall be maintained at all times. 13. Permittee shall permanently stabilize any and all soil that was disturbed as . a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 14. Pursuant to Chapter 12.56 of the La Quinta Municipal Code. (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 15. This permit allows for the stockpiling of dirt as shown on the attached sketch. 16. " The City of La Quinta reserves the right to revoke, suspend or void this permit at any time Special Conditions - Permit No. 3192 Page 2 of 4 wrCFjVED f APR 17 2000 ,: NOTE: With proper validation �.Bt this form constitutes an CITY OF LA QUINTA U encroachment permit s APPLICATION FOR. PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT). `�_ �`y0F •I'f1b�� � G :N LE I iA Ff For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. -q1-00 Subdivision Improvement Permit — Class III DATE:_ Minor Improvement Permit.Class IV, LOCATION OF CONSTRUCTION (Street address or Description of Location) PURPOSE OF CONSTRUCTION _ OF IMENSION OFl TALLATION OR REMOVAL xtoyaup `�, 6,79.111TIL IZE OF EXCAVATION, IF NEEDED . PPROXIMATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ZE16E Q T ESTIMATED CONSTRUCTION COST $ G (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnity,.deferid and save the City, its authorized agents, officers• representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notlfy the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. ' Comply with all applicable City Ordinances, the. terms and conditions of thr� rmi11 and app blle rules end regulations of Me City of La Quints and to pay for any additional replacement necessary as the rewit f is wo L Q E Sketch (attach construction plans if appropriate)f . 6MV17Z 64573�067-10AJ or Agent Name of Applicant (please print) - Business Address . Telephone No.. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License. No. 21. City Business License No. Old Fi Applicant's Insurance Company Policy Number , FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3%of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule 2774 In Fee $ PERMIT •VALIDATION Permit fee, PERMIT NO. Penalty -00 Cash Deposit -Surety Bond DATE APPROVED if required EXPIRATION -DATE �L 3 L 00 TOTAL: DATE ISSUED —� ""Oo Receipt No. Received by Date By Administrative Authority Recorded by Telephone: (619) 777-7075 a OPR-27-00 THU 09:35 AM GRANITE CONSTRUCTION FAX NO, 7607758229 P. 01 Y GRRnITE connnumall compial sm 1922 Southern California Region FACSIMILE TRANSMISSION COVER SHEET (70:ZWAJ �TO:1 EcrVj( DATE: COMPANY:_ /TY. d�F !� uivT�� _ FAX #: 77V -,715 7 } PHONE #: 7� 7 L' a5 FROM:}cl?k'C" c�CI �- ��r,�ccis NUMBER OF PAGES (INCL. COVER SHEET):_ � COMMENTS: )4 " ? n(. ^ S7Z;;r-4:Pj(, 5 QKI 'IIIC ,SCr wOP E, z Y or ,ve / Jt 2 JFEa7;o�1 . l Nrr C0zP7Trf n[S 'VrSt�J _ f r n/E= 6' 7-A [ Al NCB !W&z'kf . WH rL q n c� From Facsimile Number (760) 775-8229, If you have any problems with this transmission, please contact sonder at (760) 775-7500. 38000 Monroc Street • Indio, California 92203 a (760) 775-7500 1 FAX (760) 775.8229 /O-j�N 22-141 50 SHEETS ;..,:w,o� 22-142 too SHEETS 22-t44 200 5HEETS cn i" z cl c_ . o � z. a � T � z J� r Fri o o � { N O O w (J t. CD n; o m 3 ==> U z X i O ll z0 j rn O +� coN ?J cD t� .. pp l .o Z D _�- O N i; WEI Small Scal Construction/Demolition Projects Plan Acres or Less), Fugitive Dust (PM10) Mitigation Date: ,3 Do Jurisdiction: File #: Part 1 • Pro' t Information Please provide the information below as completely as possible even if it has already been provided on other forms related to this project. Failure to provide complete information or provision of inaccurate information may delay the processing of your Fugitive Dust (PM10) Mitigation Plan (Plan). It is recommended that you submit your Plan concurrent with your grading or demolition permit application. Project proponent: Address: - 660 l �8 1q �z53 - - - - Day phone number: Emergency phone number: Grading contractor (Contact Person): NN/ T r07-2- Addr ess:' 38TO --3T Yeo SW- Day phone number: - Emergency phone number: . Construction site street address:, 5E C,-xNxx- cYG 52 Construction site.location: (Please include an &5 x 11 location map) `•'� �- Construction site assessor's parcel number (Tract #): ��`� L�J✓E�t�7TEu roc Parcel (Tract) size: Acres or Square feet Anticipated date of physical project initiation: Jam• - (Q - Dv Anticipated date of project completion: CO Anticipated costs for dust suppression:' (Attachment B - Must also be completed and mailed to the appropriate address when construction activities have been completed) 1 All projects greater than one half (1/2) acre are also subject to SCAQMD Rules 403 and 403.1. Part 2 - Fugitive Dust Control Actions From the inventory of fugitive dust control measures provided in Attachment A, please indicate which' measures are to be implemented during the project by placing the letter beneath the fugitive dust sources listed below. Please indicate at which phase the measure will be implemented, either at Rough Grading, (RG), Finish. Grading (FG), or Final Construction (FC). Demolition projects should only indicate measures in the Rough Grading (RG) column. After indicating what measures are to be implemented,r complete the 'Details" section liy describing how and when the measures are to be implemented. RG. FG LC Details (e.g., frequency of application number and type of dust control implements. etc. Please be as specific as possible) Unpaved Roads { 290 Gy 1=- f Storage PH WILL ttre'-"VtoG— >= 94 PER Paved Road -Track -out. RG FG FC Details fee frequency of application number and tune of dust control implements, etc. g Please be as specific as possible) ' . t Land Clearing or Earth -Moving i ' I } • r • 1 r Disturbed Surface Areas . Part 3 - Agreement I certify that the information contained in this Fugitive,Dust (PM10) Mitigation Plan is true and accurate and that all measures specified in Part 2 will be implemented during project construction. I authorize the City of . La Qu i nta to enter the above mentioned property for inspection and/or abatement purposes, and I agree to hold harmless the City and its representatives from liability for any actions related to this , project.' I also agree to —complete-the-record-kee-ping--requirements included herein as Attachment B once the proje t S been completed: ure o er or Authorized epresentative ate , I h e read the co itions of the Fugitive Dust (PM10) Mitigation Plan -and the owner has aut or'ze t e i ementation of all its provisions throughout project buildout. JIV Sigr%turelof Grading Contractor ate (If not the same as above) For City Use Only Based on all of the provisions contained in this Fugitive Dust (PM10) Mitigation Plan the'Plancis: Approved Conditionally approved '(Conditions specified below) Denied (Explanation :attached) Signature of City Representative (Date)` The following conditions of approval have been added to the Plan by staff, in order to ensure an adequate level of fugitive dust control (Attach additional information necessary 1 nave read the aoove conuipons oL Lne rugitive LlusL kr1viiv) IVllllg'dL1y11 r1411 QilU 1,G pvu to implement all provisions at the concentrations and frequencies identified. Signatureof Owner or Authorized Representative ate ATTACHMENT A - REASONABLY AVAILABLE CONTROL MEASURES The left column contains the sources of fugitive dust which are intended for emission control under the City's dust control ordinance. The two right columns contain an inventory and description of reasonably available fugitive dust control measures for each of the sources. Please use this information as a guide when preparing a Fugitive Dust (PM10) Mitigation Plan. (Source No) Reasonably Available Source Control Measures Comments Land (A) Watering o Application of water by means of truck, hoses and/ Clearing/ or sprinklers prior to any land clearing or earth Earth- movement will increase the moisture content thereby moving increasing stability of material" o Once the initial land clearing/earth movement activities are complete, a second round of watering can generate a thin crust which stabilizes the'&turbed surface areas provided that it is not disturbed o Security fencing can be used to prevent unwanted future disturbances of sites where a surface crust has been created (B) Chemical stabilization o Only effective in areas which are not subject to daily disturbances o Vendors can supply information on product application and required concentrations (C) Wind fencing o .Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures (D) Cover haul vehicles o Entire surface area should be covered once vehicle is full (E) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved areas o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (2) Unpaved (F) Paving Roads o Requires street sweeping/cleaning if subject to material accumulation (G) Chemical Stabilization o Vendors can supply information as to application methods and concentrations o Not recommended for roads with high volumes or those used for heavy equipment (H) Watering o In sufficient quantities to keep surface moist o Required application frequency will vary according to soil type, weather conditions, and vehicular use (Source No) Reasonably Available Source Control Measures Comments (2) Unpaved (I) Reduce speed limits o 15 mile per hour maximum Roads (Cont'd) (J) Reduce vehicle trips o Access restriction or redirecting traffic to'paved roads in order to reduce vehicle trips by a minimum of 60 percent ------------------------------------------------------------------------------------------ M Storage (K) Wind sheltering, o Choices include silos or enclosures Piles o Enclosures sbould.consist of three sided barriers equal to height of material with no more than 50 percent porosity (L) Wet suppression o Application methods include: spray bars, hoses and water trucks o Frequency of application will vary on site specific conditions (M) Chemical suppression o Best for use on storage piles subject to infrequent disturbances (N) Altering loadin/loadout o Confine loadin/loadout procedures to leeward (downwind) side procedures of the material o Most effective when used in conjunction with wind sheltering (0) Coverings o Tarps,.plastic, or other material can be used as temporary coverings o When used, these should be anchored to prevent wind from removing coverings --------------------------------------------------------------- -----.---------------------------------------;- 7 --------------------- (4) Paved (P) Wheel washers o Should be placed where vehicles exit unpaved areas onto paved Road areas Track -out o System can be adjusted to spray entire vehicle, including stored bulk material in haul vehicles (Q) Sweep/clean roadways o Either sweeping or water flushing may be used (R) Cover haul vehicles o Entire surface area should be covered once vehicle is full --------------------- ----------------------------------------------------------------------------------------------------------------------- (5) Di'sffu—rWd—(S)-Ch-emical-stabilization= o Vendors -can -supply information on methods for application. -and Areas/ required concentrations Inactive Construction Sites (T) Watering o Would require frequent applications unless a crust . can be developed over the site (U) Wind fencing o Three to five foot barriers adjacent to roadways or urban areas can be effective in reducing the amount of wind blown material leaving a site o Should be used in conjunction with other measures . (V)" Vegetation o Establish as quickly as possible when.active operations have establishment ceased o Use of drought tolerant, native vegetation is encouraged N ATTACHMENT B - COST INFORMATION Small Scale Construction/Demolition Projects (5 acres or Less). Fugitive Dust (PM10) Mitigation Plan Date:. Jurisdiction: Project File #: Project proponent: Address: Day phone,number: Emergency phone number: �^ In the space provided below please list the costs associated with implementation of all dust # control measures. The information provided below should include all implementation costs (including labor) for dust control throughout the project. Not all measures listed below will apply to all projects. Watering: Chemical stabilization: Wind fencing: Covering haul vehicles: Wheel washers: Street sweeping: Paving: Wind sheltering: Coverings: Vegetation reestablishment: After project completion these records shall be transmitted ' to the Jurisdiction where the grading/demolition permit. was attained and to the Coachella Valley Association of Governments (CVAG) arthe address provided below. PM 10 Cost Monitoring Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 T4ht 4 4a Q" 78A95 CALLE TAMPICO - LA QUINTA, CALIFORNIA 92253 = (619) 777-7000 FAX (619) 777-7101 May 10, 1994 TO: ALL ACTIVE AND PROSPECTIVE DEVELOPERS/BUILDERS IN- THE CITY OF LA QUINTA RE: PM 10 PROGRAM REPORTING REQUIREMENTS FOR FUGITIVE DUST CONTROL PLANS Dear Developer/Builder: The Coachella Valley PM 10 Program has been in its implementation phase since December, 1992. Among the required control measures was the enactment by Valley cities of dust control ordinances which require builders to implement dust control actions during construction, demolition and paving activities. In conjunction with City staff members, we ask your help with the reporting requirements. A significant aspect of the PM 10 Program: is the need to report statistical information to the Federal Environmental Protection Agency via the South Coast AQMD and the State of -California Air Resources. Board. In response to this requirement, a Dust Contro]' Reporting Form has been created, a copy of which is attached. It is requested that if any project developers have amounts to report for any PM 10 mitigation, these forms must be filled out.. This form is -intended to supplement Attachment "B" of the Fugitive -Dust Control Plan by providing specific cost figures related only to dust control measures. The South Coast AQMD has requested that the retroactive operative date be January. 1, 1993, for reporting purposes. This means that each jurisdiction is requested to review projects since that date where PM 10 control measure expenses have been incurred by developers, whether or not they have been incorporated as part of a Dust Control Plan, and forward this data to CVAG as soon as practical. Your-cooperation-in-completi-ng-these-forms-as-part- of-the-gr-ading-permi-t-procedure-wil-l-help . assure that the Coachella Valley and the development community as a whole receive deserved credit for the" effort to attain Clean Air Act standards for PM 10. Very truly yours, RRY HERMAN Planning & Development Director JH:WHN:bjs Attachment MAILING ADDRESS - P.O. BOX 1504 - LA OUINTA, CALIFORNIA 92253 � • 1 t PM 10 Program Report Form I. GZNXRAL INFORL1TION Project Developer Name: Address: Phone: Project Site Project Title, Address: Tract No.: Acreage: Grading Subcont-ractor (if different) Name: Address: Phone. - PHASES? YES_ NO If so how many? Type of Development/Project: C_-mxDerci.al_ Single Family Multi Family_ Demolition Other Date of Project/Phase Star`-uD: Date of Project/Phase Completion: Il. COST INFOR2&TION If actual costs are not available, please estimate to the best of your . ability. 1. WATSR: Amount:. Total Cost: 2. BQQIPHSI4T COSTS: A. Water -Truck: Number on Site: Total Cost: Hourly Rate: Hours: B. Street Sweeper: Number on Site:. Total Cost: Hourly Rate: Hours: C. Temporary Irrigation: Total Cost: D. Wind Fencing: Linear Ft.: Total Cost: Cost/Ft. B. Chemical/Material Stabilisation: Total Cast: Cost per Sq. Ft.: F. Vegetation Cost: Material: Total. Cost: Maintenance: G. Other: Type: Total Cost: Hourly -Rate: Hours: 3_ LABOR COST: Hourly Rate: Total Cost: Hours: 4. ADH=SMRAT?ON COSTS: Total Cost: - III. TOTAL COSTS: Add items 1 - 4 for total cost. TOTAL COST: PLEASE RETURN FORM AT CJMP_L2TION -'OF PROJECT OR ?EASE OR ANNUALLY FROM T�.E DATE OF ?RO.re,CT/?HASE START QP • 0 3/31 /94 i , GRRnITE consrRunon comma 51922E March 20, 2000 City of,La Quinta PO Box 1505 78 495 Calle Tampico La Quinta, CA 92253-1504 Attention: James Lindsey Re: Jefferson St. Improvements Project; No 99-05 Subject: Stockpile Permits Dear Sir: Enclosed,. please find the requested calculations for the dimensions as well as the locations for the proposed stockpiles on the property on the southeast corner of 52"d and Jefferson as well as the KSL properties on the West side of Jefferson from 52"d to 54`h. Also enclosed are the corresponding.parcel maps showing the' parcel numbers of the said properties per the Riverside County Tax Assessor's Office. Granite Construction Company -will implement dust mitigation ineasuresto the proposed stockpiles in accordance with the Plan for Water Pollution Control submitted for the Jefferson Si Improvements Project, No. 99=05. Upon completion of the project, dust mitigation will be the sole responsibility of the owners of the aforementioned ,properties. Letters of authorization from the owners of the above properties to Granite Construction Company are soon to follow and will promptly be made available upon receipt. The individual owners of the properties will be responsible for the implementation of long-term dust control measures. Please prepare and issue stockpile permits for the proposed stockpile amounts and locations as described in'the enclosures. If further information is required., please contact meat (760) 775-7300.. Sincerely GPANI CON C ION COMPANY George P. Moschopoulos, Project Engineer Enclosures: Calculations of Stockpile Amounts and Stockpile Locations (3 Pg.) Parcel Maps of Relevant Properties Cc Art Kotz, Senior Project Manager Job File Southern California Region .38000 Monroe St. Indio,.CA.92203 Phone 760/775-7500 FAX 760/775-8227' 22-141 50 SHEETS PAD (4� 22-142 100 SHEETS 22-144 200 SHEETS 22-141 50 SHEETS } a�nvao 22-142 100 SHEETS 22-144 200 SHEETS Ilk - r f a f y 1 , t i r ' O V Art .. .. .. 9 ` • V o f q lb bi • L. w v ' t Y 9 �tt n. i _ a � N avao ays _ -- - - — '--JEFFERSaV-- — 1 _ _ ST �L • . COICM£LLA our "' ff; s;; a ro O � Pit 33h i . !.apt A14DISON - --�� sr b� • ` � � b W I i f CO �SG,G6 „�� e _ *•tea '��. � 41 rwn t t r. •!c �* ' 1 ,� 1 is eR •9 7��. Pctls o y 3!� rI•E b • n� 0 1 our ' ✓EFFERSON ".... •S . - T, ADACNfLLA our O _ b j.