Loading...
3416NOTE:. ' With proper validation' this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) r 0— For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 4/4/0101 Subdivision Improvement Permit— Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION WASHINGTON S WY 111 POINT HAPPY PARCEL MAP 29736 (Street address or Description of Location) PURPOSE OF CONSTRUCTION UTILITY & SIGNAL INSTALLATION Sketch (attach construction plans if appropriate) DESCR.I.PTIO OF CQNST UCTION BlREET C9 $SING & SxGty Mt�bi lCCA LON SEE ATTACHED SPECIAL CONDITIONS DIMENSION OF INSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED APPRW)C,1VN f TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION 4 13/01 ESTIMATED CONSTRUCTION COST $ 26,000 (Including removal of all obstruction, materials, and debr s, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising o'ut of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms aid conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary a t o. this work. Signature of Applicant or Agent MADISON DEVELOPMENT 78-446 HIGHWAY 111 861-9541 Name of Applicant (please print) Business Address Telephone No. CALIF INFO STRUCTURES Name of Contractor and Job Foreman 765648 Contractor's License No. ROYAL INSURANCE COMPANY Applicant's Insurance Company Business Address FEES: Subdivision Improvement Permit — Class III Public improvements:1,3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attzched schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: $ 780.00 100.00 $ 880.00 Receipt No. Received by Date Recorded by 4 Telephone No. 06290 City Business License No. K2B516242 3 1 2001 CITY OF IA OUINTA 41 FINANCEPERMIT VALID TION 3416 PERMIT NO. .. DATE APPROVED 4/6/01 Al� EXPIRATION DATE 10/06/0 DATE ISSUED A 4/A,J01 By Administrative Authority • Telephone: (760) 777-7075 J� The following General and Special provisions are attached to and made a part of Permit No. 102 GENERAL PROVISIONS The following shall always apply: ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: AD excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP- Any surplus material resulting from excavation and backfill operations shall be removed form the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water flanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints, roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING SI'REE'I'S: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: 6RZ NOTIFICATION: Permittee shall notify the City at (619)777-7075 at least 49 hours in advance of starting construction. iYMXI'Y CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole _ responsibility of the permittee. R3 LTI LJTY CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. \ x,l PARKWAYGRADING: Area between the property fine and top of the proposed concrete curb shall be graded to a slope of �f 1/4 inch to one foot (1'). R6 GRADE CHECMG: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. R8 DRIVEWAYS: A.C. driveways shall tie constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on (_) of class aggregate base. Driveway construction shall conform to attacbed drawing. 9 SIGHT CLEARANCE Sight clearance of 600 feet in all directions shall be assured and maintained at all times. R10 SOIL S"MUUZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with the manufacturer's specifications. � 1 COORDINATE WORK: The proposed wont shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this ares during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with Stare of City of La Quint. project,. 1 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R 13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LD HT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. 1 S BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or saturated material) which isencountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND- Backfill shall be approved transit -mix sand or equivalent and shall be•placed in lifts of not greater than three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFiLL PLACEMENT: Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not lose than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction testa shall be made -at intervals of not more than 1000 feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs: Compaction testa shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. 9 COMPACTION TESTS: If so required -by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01. of the Standard Specifications, Division of Highways, State of California, dated January 1973. RZ 0 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared gubgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. nr 2 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two incbts (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R2 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 fat at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large boles resulting from tree removal shall be backfilled and compacted -to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction testa shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. J ir SPECIAL CONDITIONS --PERMIT NO. 3416 ---MADISON DEVELOPMENT --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. Madison Development, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. By special permission of the City Manager, work under this permit has been granted to be performed during the weekend, beginning Friday, June 1, 2001 and continue through Sunday, June 3, 2001. Work hours will be restricted as follow: Friday 9: 00 a m. to 3: 00 p. m., including traffic control set up & take down. Saturday 9: 00 am. to 3: 00 p. m., including traffic control set up & take down. Sunday 6: 00 a m. to 6: 00 p. m., including traffic control set up & take down. 5. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Special Conditions - Permit No.3416 Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO. 3416 ---MADISON DEVELOPMENT --- plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. No modifications to the approved traffic control plan will be allowed, without the approval of the City Inspector on site. 8. Pursuant to Section 14.16.290 of the La. Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards; safety requirements, signage requirements; or to fit actual field conditions, the work shall be performed by the Permittee. as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at'an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as Special Conditions - Permit No.3416 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3416 ---MADISON DEVELOPMENT --- backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14-16.375 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. Special Conditions - Pernut No.3416 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3416 MADISON DEVELOPMENT --- B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The' existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and`base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a Special Conditions - Permit No.3416 Page 4 of 4 SPECIAL CONDITIONS --PERMIT NO. 3416 ---MADISON DEVELOPMENT --- restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. Stock pile shall not exceed 3' in total height from the existing surrounding area. 19. This permit allows for the placement of dry utilities across Washington Street, approximately 150' south of Channel Drive and modification of the traffic signal at Channel Drive. 20. The City'of La Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Pemrit No.34I Page 5 of 4 NOTE: With proper validation may, v„�m:30AS this form constitutes an CITY OF LA OUINTA encroachment permitAPPLICATION FOR. PERMfTPUBLIC WORKS CONSTRUCTION IENCROACHMENT) For the construction of publicor private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains qand other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 01-0 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV TION Of CONSTRUCTION\S�CN CVA I 151reet address or Description oslohAioo. _ t \ ' t1 P E ON RUCTION t VA Sketch (attach construction plansifappropriate) DESCRIPTION CON TR ON. ve 1J ��� en G c/1/L I'��.�ttyy^,! 1 ,141 DIMENSION OF INST ATION O REMO L IZE OF EXCAVAT40N, I Ar kEDED APPRO MATE TIME WHEN WORK WILL BEGIN APPROXIMATE TIME OF COMPLETION ZA /3/0 ESTIMATED CONSTRUCTION COSTS DaD Iincluding removal of all obstruction, materials, and debris, badcfilling, com• paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnity,•detew and save the City, its authorized agents, oflieen, representatives and employees, harmless from and against any and all penalties, liabilities or lox+ resulting from claim or court action sand arising out of any accident, loss or dwriaes to persons • or property happening or occurring a a proximate result of any work undenaken under the permit granted pursuant to this application. ' • ' Nottty the Adminfrtrative Authority in Nan twenty-four (it) hours In ad- 08 of the time when wtrrir will be trtrtad. . Comply with NI applicable City Ordinanws, the tames and conditions of the permit and all applicable ruin and regulnione of the City of U Quin and to pay for any additional n pi ce rami naonw, this coo ^ . Signature of App 'cant or Agent `i o hvsUW Name of Applicant (please print) Business Addrgfs Telephone o. Name of ntra or and Job Foreman Business Address Telephone No. tractor's 'tense No. Ci Busina Lieense No. = Applicant's surance Company Polity Number FEES: Subdivision Improvement Permit — Class III Public improvements: 3% of estimated construction costs Private improvements: 3%of estimated construction costs Minor Improvement Permit —Class IV: See attached schedule "$ O f Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: $ Receipt No. Received by Date ' 2774 PERMIT VALIDATION PERMIT NO. DATE APPROVED / yf ` /y EXPIRATION DATE '�5 Z6 DATE ISSUED y/G l By AdmiindUrative Authority Recorded by Telephone: (619) 777-7075 Tar 4 4 Quwcu MEMORANDUM TO: Tom Genovese, City Manager FROM: Chris Vogt, Public Works. Director/City Engineer DATE: May 29, 2001 RE: Point Happy - Parcel Map 29736, Washington Street Utility Crossing Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), you are requested to authorize extended construction work hours on Sunday, June 3, 2001 from 6 a.m. to 6 p.m. Madison Development has requested permission to trench across Washington Street, south of Channel Drive, for multiple utility installations. Madison Development has proposed to perform this work during the weekend beginning Friday, June 1, 2001 and continuing through Sunday, June 3, 2001. Engineering staff recommends authorization as requested in our earlier memorandum dated May 16, 2001, for tli6 following reasons: 1) Subject location on Washington. Street is very congested during regular work hours and will result in significant delays to commuters if extended hours are not authorized, and 2) Extended construction hours will have no impact on residents because subject location is adjacent to commercial uses. If you have any additional questions, please call me. b cc: Parcel Map 29736, file IV Permit 3416 file TAPWDEPnSTAFF\Martinez\memo 01\010525a.wpd (WAA,0 TD (-'I- ), M-CJ DEVELOPMENT May 9,.2001 City Of La Quinta 78-495 Calle Tampico La Quinta, California 92253-1504 Re: Traffic Control at utility crossings Washington Street Encroachment Permit Attn: Steve Speer Senior Engineer City Of La Quinta Dear Steve: Pursuant to your recent meeting with Rick Wilkerson and Michael Shovlin and, our follow up meeting of May 3, I have outlined a revised schedule for the work on Washington St. and respectfully submit same for your review and approval. The work outlined below consists of an RD crossing, CVWD water, Verizon Telephone and So. California Gas Company, with some extra sleeves for Time Warner should they require future access. Our contractor will coordinate all these utility crossings so they can occur at one time. The Tops and Barricades/Cal Trans traffic control plan that was originally submitted will be revised to reflect the following. We understand the work will start on June 1 and proceed as follows. Prior to the work commencement Notify local TV stations for the "cone alert" programs Post warning of delay signs 48 hours in advance Friday June 1, 2001/ 9:00 AM to 3:00 PM Set up traffic control and saw cut Friday AM one lane only at East side of Washington. We would allow a right turn into the AM/PM adjacent to the bank. This allows for 2 lanes to be left open. Sleeve for the gas main. The main to be connected to by the Gas Co at a later point in time. Provide sleeve for TV and Verizon through these lanes. Install phone and III) parallel to curb and turn sweep into this lane: Backfill and temp patch Saturday June 2, 2001 / 9:00 AM to 3:OOPM Set up traffic control to capture the 2 passing lanes on the Eastside and Westside of Washington. Saw cut and dig. Extend subject utilities across 4 lanes as well as the center divider area. Provides for a through lane on either side of the street. Back fill and temp patch 938 North Mountain Avenue . Ontario, California 91762 . 909.933.9118 . Fax 909.933.0066 71361 San Gorgonio Road . Rancho Mirage, California 92270 . 760.776.1728 . Fax 760.773.0738 Sunday June 3, 2001 5:30 AM to 5:OOPM Set up traffic control and capture the Westerly lane of the South bound and complete the crossings. Backfill and temp patch Also, we intend to contact the Riverside County Sheriffs office to apprise them of the traffic situation and inquire about hiring off duty officers to help, if needed, with traffic control. By utilizing this schedule we can cross Washington in three days as opposed to the 5 days you discussed with Rick Wilkerson and Michael Shovlin. We stand ready to discuss the work and schedule at your earliest convenience. Respectfully resubmitted for your review and approval and encroachment permit issuance. Please call should you have any questions or comments. Sincerely, Ed Alderson Construction Manager Madison / PTM La Quinta LLC CC: Rick Wilkerson Michael Shovlin Mike Allan Install phone and III) parallel to curb and turn sweep into the first through lane Backfill and temp patch Saturday June 2, 2001 / 9:00 AM to 3:OOPM Set up traffic control to capture the passing lanes on the East and West of Washington Saw cut and dig Extend subject utilities into the next lane while reopening lanes previously closed. Back fill and temp patch Sunday June 3, 2001 5:30 AM to 5:OOPM Set up traffic control and capture the Westerly lane of the South bound and right turn lane of Washington Street Complete crossing of all utilities Backfill and temp patch Also, we intend to contact the Riverside County Sheriffs office to apprise them of the traffic situation and inquire about hiring off duty officers to help, if needed, with traffic control. By utilizing this schedule we can cross Washington in three days as opposed to the 5 days you discussed with Rick Vilkerson and Michael Shovlin. We stand ready to discuss the work and schedule at your earliest convenience. Respectfully submitted for your review and approval and encroachment permit issuance. Please call should you have any questions or comments. Sincerely, Ed Alderson Construction Manager Madison / PTM La Quinta LLC CC: Rick Wilkerson Michael Shovlin DEVELOPMENT May 2, 2001 City Of La Quinta 78-495 Calle Tampico La Quinta, California 92253-1504 Re: Traffic Control at utility crossings Washington Street Encroachment permit Attn: Steve Speer , Senior Engineer City Of La Quinta Dear Steve: Pursuant to your recent meeting with Rick Wilkerson and Michael Shovlin, I have outlined a schedule for the work on Washington St. and respectfully submit same for your review and approval. The work outlined below consists of an IID crossing, CVWD water, Verizon Telephone and So. California Gas Company, with some extra sleeves for Time Warner should they require future access. Our contractor will coordinate all these utility crossings so they can occur at one time. The Tops and Barricades/Cal Trans traffic control plan that was originally submit can be used in this case with the start date being the exception. We understand the work will start on June 1 and proceed as follows. Prior to work commencement Notify local TV stations for the "cone alert" programs Post warning of delay signs 48 hours in advance Friday June 1, 2001 9:00 AM to 3:00 PM Set saw cut Friday AM one through lane only. We would like to utilize the right turn lane in front of the Food Mart as a work lane also. This would allow a right turn into the AM/PM adjacent to the bank Sleeve for the gas main. Main to be connected by the Gas Co. �� Provide sleeve for TV and Verizon through these lanes. MAY 0 2 2001 PUBLIC 1fl1®RKB 938 North Mountain Avenue . Ontario, California 91762 . 909.933.9118 . Fax 909.933.0066 71361 San Gorgonio Road . Rancho Mirage, California 92270 . 760.776.1728 . Fax 760.773.0738 �... ,�-o -�� �' .. � t� � . � ,� / 1 i i � :�' ,� ' ` �• - � i ,� � - �� � � /� 4 6.08.050 May 1st through September 30th Monday —Friday: Saturday: Sunday: Government Code holidays: six a.m. to seven p.m. eight a.m. to five p.m. none none B. No person doing or causing work prohibited by subsection A of this section, after being informed orally or in writing that the work has caused noise or sounds which disturb any other person's peace and quiet, shall fail, refuse or neglect to take whatever steps or use whatever means are necessary to assure that the work does not again disturb the other person's peace and quiet. Exceptions: 1. Emergency repair of existing installations or equipment or appliances; lti � 1, lyu) 6.08.060 Animals near buildings. It is a nuisance and it is unlawful for any person to keep any animal, fowl, or bird, wild or domestic, except customary domestic pets, within twenty feet of any building, school, church, hospital, or any residence or dwelling house or other buildings used for the habitation of human beings. (Ord. 10 § 1 (part), 1982) 6.08.080 Animals on unsanitary premises.. It is a nuisance, and it is unlawful, for any person to keep or permit to be kept on any premises any wild or domestic animal, fowl, or bird, when the premises or the animal, fowl or bird is offensive, obnoxious, filthy or in any unsanitary condition. (Ord. 10 § 1 (part), 1982) 6.08.090 Disposal of carcasses. It is a nuisance, and it is unlawful, for the owner, possessor, or the person responsible for the death thereof, on whatever premises it may be, to fail to cause any dead animal or part thereof, within six hours after the death of the animal, to be buried so that there is at least three feet of soil above the carcass, or to be disposed of in some other sanitary manner; provided, however, that this section shall not apply to animals slaughtered for and fit for human food. (Ord. 10 § 1 (part), 1982) 6.08.106 Discharge of sewage upon ground. It is a nuisance, and it is unlawful, for any person to permit any part of the contents of any private vault; cesspool, septic tank, water closet, urinal, pipe, sewer line, or any sewage, effluent, night soil, slop water, or any other filthy water, matter, or substance, to flow or discharge upon the ground or upon the surface of any lot or premises or in any public street or other public place. (Ord. 10 § 1 (part), 1982) 6.08105 . Animal manure prohibited unless odorless. It is a nuisance, and it is unlawful, for any person to use, stockpile, have in possession, deliver or convey any form of animal manure at or to a point within the city unless the manure has been processed or treated so as to render it substantially free of unpleasant odor. This section shall not apply to domesticated pets' excrement nor to equestrian facilities regulated under the equestrian overlay district except where manure is spread over any area within such a facility. (Ord. 284 § 1 (Exh. B) (part), 1996: Ord. 10 § 1 (part), 1982) 0.a Quinta 9-96) 158 � �' - � �• � / i' �� 1 i / ,%' ► ,..o � .- -� i r i r . 6.08.010 Chapter 6.08 . NUISANCES Sections: 6.68.010 Vacant premises —Maintenance. 6.08.020 Air pollution. 6.08.030 Mosquito breeding places. 6.08.040 Noises. 6.08.050 Disturbances by construction noises. 6.08.060 Animals near buildings. 6.08.080 Animals on unsanitary premises. 6.08.090 Disposal of carcasses. 6.08.100 Discharge of sewage upon ground. 6.08.105 Animal manure prohibited unless odorless. 6.08.110 Depositing or leaving of refuse. 6.08.120 Parldng of vehicles containing offensive substances. 6.08.130 Hauling of offensive substance in defective vehicle. 6.08.010 Vacant premises —Maintenance. It is a nuisance, and it is unlawful, for any person or agent to allow any vacant or unoccupied building to remain open and of easy access to trespassers or to allow the same to become infested with vermin or rodents, or to become a menace to health. (Ord. 10 § 1 (part), 1982) 6.08.020 Air pollution. It is a nuisance, and it is. unlawful, for any person to establish, conduct, maintain or operate. or cause or permit to be established, conducted or operated any business, factory, yard, establishment or other place which will generate into or pollute the atmosphere with any unwholesome, offensive, or deleterious gas, fumes, dust; smoke, or odors, or to allow offensive odors to be emitted from offal, garbage or any animal or vegetable matter. (Ord. 10 §. 1 (part), 1982) 6.08.030 Mosquito breeding places. It is a nuisance, and it is unlawful, for any person to maintain any premises upon which there is stagnant or still water or a marshy condition which harbors and breeds mosquitos or other poisonous or objectionable insects. (Ord. 10 § 1 (part), 1982) 6.08.040 Noises. It is a nuisance, and it is unlawful for any person to make, cause or suffer, or permit to be made or caused upon any premises any unnecessary noises or sounds which are physically annoying to persons of ordinary sensitiveness or which are so harsh or so prolonged or unnatural or unusual in their use, time, or place as to occasion physical discomfort. (Ord. 10 § 1 (part), 1982) 6.08.050 Disturbances by construction noises. A. It is a nuisance and it is unlawful, for any person to be engaged or employed, or for any person to cause any other person to be engaged or employed, in any work of construction, erection, alteration, repair, addition to, or improvement to realty, except between the hours set forth as follows, if the noise or other sound produced by the work is of such intensity or quality that it disturbs the peace and quiet of any other person of normal sensitivity. The permitted hours for such work are as follows: October 1st through April 30th Monday —Friday: Saturday: Sunday: Government Code holidays: seven a.m. to five -thirty p.m. eight a.m. to five p.m. none none 157 (La Quinta 9-96) NO M 1 t Spµ. „y � � � � .''�.r%% • — CHART A — r` MINIMUM RECOMMENDED DELINEATOR AND SIGN PLACEMENT SIGN SPACING TRAFFIC SPEED TAPER LENGTH DELINEATOR SPACING (Advance of Taper (Each lone) (Town (Tangent) 6 Between Signs) 25 MPH (40 Km/h) 150 Ft. (50m) 25 Ft. (8m) 50 Ft. (15m) 150 Ft. (50m) 30 MPH (45 Km/h) 200 Ft. (60m) . 30 Ft. (9m) 60 F1. (18m) 200 Ft. (60m) 35 MPH (50 Km1h) 250 Ft. (75m) 35 Ft. (t tm) 70 Ft. (21m) 250 Ft. (75m) 40 MPH (60 Km/h) 350 FL 010m) 40 Ft. (12m) 80 Ft. (24m) 350 Ft. (110m) '45 MPH (70 Km/h) 550 FL 070m) 45 Ft. (14m) 90 Ft. (27m) 550 Ft. (170m) 'S0 MPH (80 "Kmm) 600 Ft. (180m) 50 Ft. (15m) 100 Ft. ;(30m) 600 FL (180m) 'SS+MPH (85 Km/hj 1000 FL (300m) 50 Ft. (15m) 100 Ft. (30m) "1000 Ft. (300m) •Notes, -See Section 8 for high speed situations: -0mances drown in parentheses are approximate. i � � � r' �" .. "` W s : a f -, �!� � � �, � � I _ �.,i+ r r`- - - _--. ? �� y � .! -�, r . � i i •� �• , f, �'! � v �� . � . } � _ 1 � I I ' � �' f� (. ' h, ' ,, ,., . _. - , 74 r f 4 t I _y Yy U 1 'ry ij s, 1 r AMENDMENT #1 ENCROACHMENT PERMIT #3416-1 This permit amendment revises the scope of the work originally approved under this permit. The additional work day (Thursday, May 31, 2001) is permitted to perform sawcutting only in the northbound- right turn only lane of Washington Street south of Channel Drive. This work shall be completed with all traffic control taken down no later than 3:00 p.m. This approval is only for work within the City of La Quinta Right -of -Way. It is the permittee's responsibility to. obtain approval for work in any other agency's Right -of -Way Amendment Authorized By: S�T/ D City of La duinta Date TAMDEPTOevdivTermit Amendments\3416-1.wpd