Loading...
3425NOTE: With proper validation this form constitutes an encroachment permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) I For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in, connection with MINOR "IMPROVEMENTS and APPROVED SUBDIVISIONS DATE 4-24-01 Subdivision Improvement Permit — Class III Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 78-640 SAGVARO DR. xST DATE PALM DR (Street address or Description of Location) PURPOSE OF CONSTRUCTION ABANDON 2`� WATER SERVICE Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATION OR REMOVAL 5x5 BELL HOLE SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 4-26-01 SEE ATTACHED CONDITIONS APPROXIMATE TIME OF COMPLETION 6-26-01 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) _ In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. ure of'Applicant or Agent C.V.W.D ,. P.O. BOX 1051 COACHELLA CA. 760-398-2651 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. GEN. LIABILITY Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit'- Class I I Public improvements: 3% of estimated construction, costs Private improvements: 3% of estimated construction costs Minor. Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No $0 0 $ to Received by Date 3425 PERMIT VALIDATION PERMIT NO. 3425 DATE APPROVED 4/24/01 EXPIRATION DATE 10/24/01 DATE ISSUED 4/2501 4 //1,a By RAOUL MARTINEZ / Administrative Authority Recorded by 11 Telephone: (760) 777-7075 With proper validation this form, constitutes an encroacrient Permit CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS DATE: y, 2,11-0 Subdivision Improvement Permit — Class III _� 8"lo y 0 s vA2u Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION �r n � (Street address or Oescription of Location) PURPOSE OF CONSTRUCTION 'AiyUow,i 2 " lagT/'.LsL✓t✓a/� etch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATION OR REMOVAL l SIZE OF EXCAVATION. IF NEEDED ������ '° APPROXIMATE TIME WHEN WORK WILL BEGIN `1-2-6 `o / APR 2 4 2001 APPROXIMATE TIME OF COMPLETION � ' 2-6 - o / ESTIMATED CONSTRUCTION COST S WC)R�5 (Including removal of all obstruction, materials, and debts&, backfiltinp, oom• ���� �� Pecuon and placing permanent resurfacing and/or replacing Improvement&) In consideration of the granting of this permit, the applicant herebv agrees to: Indemnify" defend and caw the City. 'IS euthoresam agents. officers. reprasentativee and employees. hannleu from and against any and all penaiti*s. liabilities or IOU resulting from Claims or court action and arlting out of any accident, lose of pea so happening or oOCurring as a Proximal@ '*suit of any work utdenaken u der the ttemll granted pursuant tothis appllCjt on Or prOpaRy Noufy the Admimstrettve Authority at least twantvfour 1241 hour in advance of the Comply wain all apOliybla City Ordinenees, the teems and conditions of the Oertmt and tillla when work &cell IN started. all applecable rules and regulations of the City of La Uuinte and to pay for env additional repfecavtent neceaaery as the mull of this work. A Signe re of ApPlicant Agent Name of Applicant (please punts - 0 63 0 Y /O(' / C n CN/Ll6p t� -Noy,P ZL J^/ _ Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractors Lioanse No. City Business License No. Applicant's Insurance Company GEN. LIA61LITy Policy Number FEES: Subdivision Improvement Permit — Class I II Public improvements: 3%of estimated construction costs Private Improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee s v — Permit Fee Penaltv Cash Oeposit•Surety Bond if required TOTAL. $ Receipt No. Received by PERMIT VALIDATION PERMIT NO. DATE APPROVED Z O EXPIRATION DATE D Z O DATE ISS D 26- A0J 8v /� -nmimsti Au;r.onr; The following General and Special Provisions are attached to and made a part of Permit No. 2. ell / GENERAL PROVISIONS The following shall always apply: ' ENROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints. right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. . TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request that these portions of road be resurfaced over their'entire width. Resurfacing shall consist of one coat of two inches (2) of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC- All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structure& encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quints shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and*compaction. Existing gutter line and drainage ditches ihall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after baekfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it ahall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he'must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS Zowing shall apply when indicated: N07MCAMON: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. iTIELTW CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ITI'II.iT'Y CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. 'Ile permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not lass than and in conformance with City of La Quints Road Improvement Standards and Specifications, Ordinance 0461. PARKWAY GRADING: . Area between the property line and top of the proposed concrete curb shall -be graded to a slope of 1/4 inch to one foot (1). R6 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan'and profile and/or grades as estabUshed by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior io removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with' City of La Quints. Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on of class aggregate base. Driveway construction shall conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained ai all times. RIO SOH. STERMIZER: The area to be surfaced shall be treated with soil sterilizer. Rau of application shall commply with.the manufacturer's specifications. 11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quints, forces to preclude delay or interference with State of City of La Quinta projects. r-12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer of surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. �13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer.. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. 1�'1... BACIFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any materiel which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFU-L SAND: Backfill shall be approved transit -mix sand or equivalent and shall be'placed in lifts of not greater than three feet (3) and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFILL PLACEMENT- Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (51 lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TEST'S: If so required by the inspector, compaction tests shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction teats shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. COMPACTION TESTS: If so required•by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the. City Engineer for approval and filed prior to making permanent repairs. Compaction testa shall be made as outlined in Section 6.3.01• of the Standard Specifications, Division of Highways, State of California, dated January 1973. 2� TEMPORARY PAVEMENT REPAIRS: After completion of .backfill and compaction operations, a temporary patch consisting of 2 inches of SC-800 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R2 I PERMANENr•PAVEMENI' REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. .R23 STREET REST'RIPTNG: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured "a service, and bandied safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be. restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.1.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. CVWD, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation ' and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October lst to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3425 Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- 8. Pursuant to. Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1=800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City,facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (S SPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's 'responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content. range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3425 Page 2 of 4 SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the* tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent' pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No. 3425 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly *protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt. concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shallbe removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. a 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the abandonment of a 2" water service at 78-640 Saguaro Drive and Date Palm Drive. 19. The City of La.Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 3 42 5 Page 4 of 4 r NOTE:, With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connectioi with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 4-24-01 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 70-640 SC_±;VAI'10 Doi. :.ST ))nir rm.": nu (Street address or Description of Location) PURPOSE OF CONSTRUCTION A1110. i0.i `'" "'Aiun SL11VICB DESCRIPTION OF CONSTRUCTION DIMENSION OF INSTALLATION OR REMOVAL :)!:5 r,-LL LOLL SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL: BEGIN 4_Z6_01 Sketch (attach construction plans if appropriate) G'—'C AZ iACULD COBS i IO::.5r APPROXIMATE TIME OF COMPLETION 6-76-01 ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend• and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any worc undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. "(Signature of Applicant or Agent C.V.11.D P.O. D0 1051 COACH%iLLA CA. 760-998-2651 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Contractor's License No. GL«. LYABIL177 Business Address Telephone No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 0 II Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by J Date t PERMIT VALIDATION PERMIT NO. 3425 DATE APPROVED 't/"q01 EXPIRATION DATE 10/24/01 DATE ISSUED 4/25/01 By 1ADUL Administrative Authority Recorded by 11Telephone:-(760) 777-7075 The following General and Special Provisions are attached to and made a part of Permit No. -; G GENERAL PROVISIONS The following shall always apply:: ENROACEMJ[ENP ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quint& shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (27 of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shallbe properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of 1A Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shallbe removed from the -right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'oompaction. Existing gutter line and drainage ditches 'shall be replaced to their original standard or better. All excess material shall be -removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he 'must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS Zowing shall apply when indicated: NOTMCA71ON: Permittee shall notify the City at (619)777-7075 at least 48 hours in advance of starting construction. UI'H.1TY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quint& right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. MUM CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. 'The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEN 04T WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with yinches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not less than and in conformance with City of La Quints Road Improvement Standards and �5\Specifications, Ordinance N461. 5 PARKWAY GRADING: . Area between the property line and top of the proposed concrete curb shall'be graded to a elope of 1/4 inch to one foot (11. R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( _feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with, City of La Quinta Standard N267. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on of class aggregate base. Driveway construction shall conform to attached drawing. R9 SIGHT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. R10 SOIL S1ERI IZEIR: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with.the manufacturer's specifications. EL6i dienagf pMVp'elwo;gJO OlInS'sdgmt(811f3o aotatmtQ'suoue*yloadS PisPsslS eql;0 l0'E'9 ¢ogoss glum dldmoo Ilegg gim aogosdmo0 •poglam play to indmt atp dq paa!twalap se uoq*edmw ialea8 sip s! I*Aago!gm'punw8 Batpanomns sip of lusjvA!nbs to luaaad 06 aegl seal Ion of poloedmoo pug polly:ioeq aq l fags Iemoma oan moy Baginsai soloq a2ml somq lie is oygnd 8011SAgq SIP loa)oid oI pap!Awd aq llegs eapeaweq to pag aem8gy 's¢8!e algnbapy amp Sao Am is laa; 00S;o mnmlxem a o) paiotnsa aq llegs :uom sip 'oy;en I*Wsa of tiessawa gamooaq st aagM •gda8ttied Bmmollo; aqi m Payloads se paioedmoo dlg8noiogl pue pally:peq aq l(egs aloq dmnis sqy *X—ql!q Sq);o Mo!A m gatema sugap on imp os;o pwodsip pug PaAomai aq Ilego dmtgg aan oq)10 gipim aqua eq.L 'oy;gn (vmgl!q of pjmq to eoaaeja)at inogl!m Xla;es paipueq aq aeo go!gm soopoas m ag hags ponomu aq of eowZ ¢otie*oi moo gi! is aoq!paoo 8mmoi8 snoiolm g m owl otp umumm of aau!miad gqi;o f4!1!q!s¢odsai oql aq hags 11 gml*Aen aql of psezeq io oomVela! inogl!m Ale;es palpaeq ptm'ao!Aias eSA painsa! pue papuoq'pasaao!l a Xq pags!ldmoaoe eq lls4s Alan )o ig8u pew mulno rl do'(i!0 sip at9ilm aopewlai aa{y VIVAOIAM NO NOLLVJWM 331LL Kv •aleda iuoaemied;o uonstdmoo aodn paoelda eq hags 8mdttlg q*nD 'polBAeoxa eq OI sieans DO aIQIg1A Il!Is gt 8¢tdtils Icons aagM :�MdllLL I r2 &U £ Z� •iSau!8ag d)!J aql dq Pon. glop n seas golad lie iSAo pogdda aq 1piyg aolslnmo aglegdse;o ¢oge*!ldde ae;o Balistsoo* Ieoa piss 80; y :��$ OOd •iteda pew diaodmal;o aopaldmoo ialle sXep ¢etp ianel on paould aq hags aseq seal* goat a no paoeid Baimpng •yy ngoat ;o qoied luaaemiad V -Alopgpamm! pmld aq !legs OOg-JS In (.Z) sggo¢t omI ;o 8ugetguoo tried diaodmel a 'paloldmoo aaaq ameq aogaedmo* Pas Ilgilnq JSVV-MVd3ii ,IXHMVd'.LN3NVWH3d T Z� •i!ani (ep (S) oAy s paa*xo luom*Aed diaodmal aql;o laameosid atp hags om on of inq'pmaldmoe saonwado py: ouq pug PaleAa*xo uoaq nq gouan;o iaa; ieaug OOOE;o mnm!xgm e aSyg paoeld aq tiegs 8atmed (iaodwo3 OOg-:)S eqL •opa8gns paiedatd a no pooeld aq llegg Oog-:)S;o sogom z;o 8ups!9u03 q*Iad diwodmal a 'guoWedo aogoedmoo poe Ily:peq;o aopaldmoo jolly :S1IIVd3H •LPf3 MVd ANVNOdPm QA 'CL61 dienaef PaieP 'e!ui01!le'J ;o SIaJS 1edemg8!1{;o aotstm.(I 'guogeogpedS PiePaMS aqi;o f0'E'9 aogoaS u! Paa!gno se apem aq llggg sisal aogoedmo0 sleds IaSaemiad 8anIem of loud poly pas Iemoidde io; iaeut8ug dltj'ag) of papnmio; aq pegs leaf goes;o ddoo (1) aaO -oral aotmtes to 8atesw* goea io; opsm aq Iletpi sisal aogoedmoo'ioloodsat sip dq•pa!nba 0911 :RLSX . NOL13viN100 U61 dign¢ef PaleP'e!ao;!M;o 0191S'9demg8!H;o aotetAtQ'soopeoylaadS pnpue)s etp;o 10•E 9 aon"S a! paatgno ge opsm aq !legs glaal oopoedmoJ •situda Iuaaeauad Burpta of loud pall; pas IaAoidde to; ioom9ag dI!J sip of pep—ol aq hags mi q*ea;o Cdoo (1) Sap -peal goes no im (1) auo;o mnm!a!m a pas. iea; 0001 uggi aom iou;o sleAiaim IS apem aq Ilegs gmi uopoedmo*'imadmi otp dq pai!nba os;I :&LS&L NOLLOVdwoz) gill enonugao* aq Hags dlddng tam* eg) pan iadel goeo;o monoq sip gosa of q)8aal Iaatot};ns;o aq llegs siof 2tp 'Pagn g! 80naf aogM iSpim oql atgla of poi*nnsao* oq 1[!A+ ea:11P alenbspe 'Iusmatun mnmlxem a io; pagn g! BatpooU io 8alpaod aagM aopoedmoo talea8 sip to ioAogo!gm'punoi8 8uipanoLns SIP oa IaaleA!nba to laoaod 06 aeq) seal Ioa aq Ilgge aopoedmo* Batilnsa aqI isgi og pa*eid aq IIBga leuaiam lRPloe(l suo!Iaado 8a!P00y d4 IIa^^g amoilxa of pai*afgns too et pivalem 1I9>tos4 SIP I89i Pae!*taxa eq of 91 a93 •sgidop aA!sgaoxa;o ale sogaaan aagm gil!l (.S) ioo;-any;o mnm!xem a in 8mpooll aio;aq gouan agl;o gidap pnol ogl;o I000ied OS aegl atom ion;o siadel al'pelldde 24 Ilsgs I[yiloeH :JAMP 3JVIIJ TnL MVH LIN 'dempew ogi;o uoq*w leitaonm atp tp!m poupuf aq Ilegg luawad 56;o noq*admoo amgelai e 'age* Ave a! inq 'palmgsgns Sq dam gpogiam eiewagV •laomdmba IualaA!nba io iadumoiq!A 8msn pa)eiq!A pug (.E) Ica) saga uegl ial9a8 lot;o sytl ul pa*eld.aq liege Pas laol-!nba io pass x!w-i!gaen pamwdde aq hags Il93loell 4INVS TUMIOVH 911 •19Aa8 io paeg poAoidde ue dq peosidei io polaemalddng aq pegs Itiq'IMnq io; paun aq Ion Ilegg aogeAsoxe 8uunp paialano*aa g! gotgm (jugolgm pummus io Mods) olgellnsun smaop aialno wljo dill atp go!gm Ieualetu duV •IpjAoeq polepgoguoo dla)enbaps ue Batonpoid;o sasodind to; osn qt of lelaaminap eaag)sgns *!ae8io iaglo io slow 'gswq;o aay aq Ilsgg 11yX088 :gNrd3.LVNI TIIAMVH j •oi!g :atom axp no dlpmon a! Ietialem aogonamoo sip ssmlan apem aq huge uogemeoxa oN •sdep (S) any 8mpaa*xo pouad a io; oado mama !legs agpeme*xa oN. ass* goBe m 8mpe*uieq ¢ogeAe*xo;o d)y!gm!ns aql aa!mjm9p hags iolaadsm s:lioM oggnd aq•l• •*tlgnd 8a!lanen eql;o aopmaid atp io; o.(ePf1oq pan spum:iaam no 1ig8!waAo sig8g tp!m papeouieq duadwd oq !lays guogemeaxa. l(V •a!8aq Isnm gaogaadg Ily)(*eq ao;oq q*can aado;g Iaoj —Uq 0001 01 Pa)!m!l ag hags ga0gemeoxg :SNOLLVAVOX3 30 LB4[I'I till pai*ato* oq pegs ga8po Ig8lals IaamaAed of o8etuep Am limopaado 8u1Aed pug oI loud •*y;el) moll Ieiaaa8 aqi a)eigt*e; Iraq of n aoglood a Bons at pa*eld aq ilegg leuamm nopemeoxg (•IaamaAed;o 8arnno o) loud algme*xa 0I pas n aq Iuamdmba BageAe*xa legs eo*amomn*n* on t9paf1 ''taau!fug 4!O atp;o aoglo sip Onomp paAoidde aq Ilegg 8uilino laamamgd;o pogloyy aouaseigeoomg8les g of Ina mes dlptotasyoam aq pun IaamaAed :`JNLLL[1J .•LN3TN3AVd £ T: •oonaeap loofoid iedoid iol iquemnuotadamns Iis;o wamsoelda io aopaldmoo aodn paygou eq I(egg a*ylo s!q.L •eiaamnnom due;o Ptmoma atp of ioud'isaut8ag d)tJ sip oI pags!wty aq 11eg9 givamnaom angt m sop Sip 8atmogs salon )o lw alaldmoo V •aanimied oql;o asaadxa SIP )e iodamins io iaaatgue I!A!o Pas¢aog s dq paoelda aq dp*Suoo pas dl!peat dam dagl os Imo pan dlalaldmoo aq !lags PoAioma[ aagm gaud dliadwd io giaane Ire Jo amlialaao sip no is!xo go!gm giaomnnom doAino lie 'uogonnsaoo;o 8umu!8eq to uogemeoxa M loud :S•LAt35V[1N01q AAAHM Z T-� q=f-d sienna e<13o 4t3;o eieiS q)!m eoaaayela! in delop spnlosid of ge*ig; mu!nb -13o Al!:) io alias otp tp!m palea!ptoo* aq Hags :lioM Ipped stq);o pouad acp 8aunp ease g!qi at lonpuoo dem elu!na n ;o da!J to smio31n jo amS atp q*!qm nogaado doe oa Paismpiogns aq !legs :uom pasodwd oqy MOM 3I VHIQli000 T T i� SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. CVWD, hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. All areas shall be kept watered down daily including weekends. 3. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently if required. 4. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work -shall be prohibited on legal holidays and Sundays. Work performed within 500 feet of a signalized intersection is restricted between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the Riverside Country Traffic Signal Maintenance Department at (909) 275-6894 if signal operation at the intersection is to be altered in any way. 6. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 7. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with Cal Trans Standards or the Work Area Traffic Control Handbook (WATCH Manual). A traffic control plan, if required, shall be prepared in accordance with the WATCH Manual and submitted to the City for review and approval one (1) week prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Special Conditions - Permit No. 3425 Page 1 of 4 SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- 8. Pursuant to. Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum,of one travel lane of paved surface shall be maintained with flagmen at all times. 9. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City,facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 10. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requiremerits, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 11. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights -of -way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at an appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establisli the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. Special Conditions - Permit No. 3425 Page 2 of 4 4 SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- F. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected locations within the open length of trench. G. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given length of trench, the'tests shall be no closer than three feet (vertically) from each other. H. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. 12. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 13. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 14. Access and egress to all local properties shall be maintained at all times. 15. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. Special Conditions - Permit No. 3425 Page 3 of 4 SPECIAL CONDITIONS --PERMIT NO. 3425 --- COACHELLA VALLEY WATER DISTRICT --- C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved t/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench sawcut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold - milled area and base asphalt. concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: two (2) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: two (2) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 16. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 17. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 18. This permit allows for the abandonment of a 2" water service at 78-640 Saguaro Drive and Date Palm Drive. 19. The City of La. Quinta reserves the right to revoke, suspend or void this permit at any time. Special Conditions - Permit No. 3425 Page 4 of 4 f NOTE: With proper validation this form constitutes an encroachment permit + ' • CITY OF LA QUINTA • APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS _ Subdivision Improvement Permit — Class I I I DATE: / :;l j, r<<I Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION -' 'r J L (Street address or Description of Location) PURPOSE OF CONSTRUCTION 0 r ` ' s Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION r" DIMENSION OF.INSTALLATION OR REMOVAL . , ... ?1.1. . -3.0- SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN ,I•'"� r APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials, and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: 0 Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four :24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. ti Signature of Applicant or Agent Name of Applicant (please print) z Business Address, ,7 - �.,� Telephone No. Col.. L i,., ii J.;.,yJ C'i -", � C,'.' .. 0. L,',a - J ...... 1 .: _ t.; 1 Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number I I UJ �-- - FEES: Subdivision Improvement Permit — Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No Received by ', .;,i J Date APR 2 0 2001 CITY OF LA QUINTA FINANCE DEPT PERMIT VALIDATION PERMIT NO. DATE APPROVED EXPIRATION DATE DATE ISSUED By Administrative Authority Recorded by 11 Telephone: (760) 777-7075 ice; I • • R 11 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of IA Quints forces to preclude delay or interference with State of City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when involved shall be completely tied out so they may readily and correctly be replaced by a licensed civil engineer or surveyor at the expense of the pertain". A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper project clearance. R j_ 3 PAVEMENTCUTTING: Pavement will be mechanically saw cut to a straight to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer.. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1000 linear feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. -No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. (RD115AC7aILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes f producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or . saturated materiel) which ie encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFTLL SAND- Backfill shall be approved transit -mix and or equivalent and shall be'placed in lifts of not greater than three feet (3) and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of 95 percent shall be attained with the structural section of the roadway. R17 BACKFiLL PLACEMENT- Backfill shall be applied. in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5) lifts where trenches are of excessive depths. Care is to be exercised that'the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R18 COMPACTION TESTS: If so required by the inspector, compaction testa shall be made at intervals of not more than 1000 feet and a minimum of one (1) test on each road: One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R1.9 COMPACTION TESTS: If so required -by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the. City Engineer for approval and filed prior to making permanent repairs. E Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. t2Q TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2.incbes of SC400 shall be placed on a prepared subgrade. The SC-800 temporary paving shall be placed after a maximum of 3000 linear feet of trench has. been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 pERMANEN'T-PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2') of SC-800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a / Z inch class Z base shall be placed no later than days after completion of temporary road repair. R2 2 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 . STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quints road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the -tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where is becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. G0,,J7'I►c7' PJB�+t Wait:.%,S frLa2 To PilTchfwozlc fF$ � n/ TE/GS�GTio•✓ t 5 SCJ/EatJ To 8E p,4.�eo S Y. T The following General and Special Provisions are attached to and made a part of Permit No. GENERAL PROVISIONS The following shall always apply: ENROACEMEENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2') of A.C. surfacing plus appropriate seal cost as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or La Quinta City Public Works inspectors. Suitable detours and detour signs shall be placed and maintained for the . duration of the project. The City shall be notified.24 hours in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of Ls Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shallbe removed from the -right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and'compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be.removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he 'must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: fZ- 075 at least 49 hours in advance of starting construction. iTTIIdT Y CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. RP U MXI7Y CLEARANCE: (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. ' The permittee sball notify all concerned utility companies of the proposed work. R4 PAVEhIENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with . inches of A.C. paving placed on inches of class aggregate subbase course having an 'R' value of not leas than and in conformance with City of Is Quints Road Improvement Standards and Specifications, Ordinance 0461. R5 PARKWAY GRADING: Area between the property Line and top of the proposed concrete curb shall -be graded to a slope of 1/4 inch to one foot (1). R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (_feet) shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of Is Quinta Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the properly line and the existing road paving shall be 2 1/2 inches of A.C. paving placed on () of class aggregate base. Driveway construction shall conform to attached drawing. R9 GBiT CLEARANCE: Sight clearance of 600 feet in all directions shall be assured and maintained at all times. RIO SOIL STERILUMU The area to be surfaced shall be treated with soil sterilizer. Rate of application shall commply with.the manufacturer's specifications. COCHRAN COMMUNICATIONS CONSTRUCTION 36-630 Cathedral Canyon Drive Cathedral City, CA 92234 for TIME WARNER CABLE IID Vault - ------------� Cable Pedestal Wall I — CO Z O W LL W n TRENCH N (not to scale) Thomas Guide 5470 A 4 Cable Pedestal 0 ------------ l C o Ca P o o ra en 0 0 to m b� -------------- ------ -,- - - - - - � o iA .�► t ^� r1"7�V I S�'l SSQJ1 k 8�1 0 0 r O n' o to ------------------------------------ T T N C-v vasirdt-to i ---------------------------- F ILe Y f